21
Scaling up the coordination and resources for implementation of the SNA Building a Strategic Plan for Uruguay Lourdes Erro [email protected] Meeting on Scaling up the coordination and resources for the implementation of the SNA. Luxemburg 28-29 May 2013

Use pilot countries to expand the experience to other countries in a second stage

  • Upload
    hedva

  • View
    15

  • Download
    0

Embed Size (px)

DESCRIPTION

Scaling up the coordination and resources for implementation of the SNA Building a Strategic Plan for Uruguay Lourdes Erro [email protected]. Meeting on Scaling up the coordination and resources for the implementation of the SNA. Luxemburg 28-29 May 2013. - PowerPoint PPT Presentation

Citation preview

Page 1: Use  pilot countries  to expand the experience to other countries in a second stage

Scaling up the coordination and resources for implementation of the SNA

Building a Strategic Plan for Uruguay

Lourdes [email protected]

Meeting on Scaling up the coordination and resources for the implementation of the SNA.

Luxemburg 28-29 May 2013

Page 2: Use  pilot countries  to expand the experience to other countries in a second stage

Building a Strategic Plan for Uruguay

1. A strategic plan in the framework of the Regional Plan

2. Strategic Plan for Uruguay

3. What support is required?

Page 3: Use  pilot countries  to expand the experience to other countries in a second stage

• The Strategic Plan for LAC countries was approved in 2009-2010, but it has been facing many difficulties

• Situation in LAC countries:

– is very unequal

– has special institutional challenges (in 16 countries NA compilers are Central Banks)

• The Plan is now emphasizing a different strategy:

incremental work

Building a Strategic Plan for Uruguay

1 A Strategic Plan in the framework of the Regional Plan

2 Strategic Plan for Uruguay

3. What support is required?

Use pilot countries to expand the experience to other countries in a second stage

Page 4: Use  pilot countries  to expand the experience to other countries in a second stage

Work in the pilot countries: design and implement a National Action Plan with the support of ECLAC:

• establish objectives and resources

• determine inter-institutional agreements, responsibilities and deadlines

• work hand in hand by ECLAC staff and national staff to monitor the Plan

Spread the experience to others: adapt and learn from the pilot countries experience (with horizontal cooperation and technical assistance)

Building a Strategic Plan for Uruguay

1 A Strategic Plan in the framework of the Regional Plan

2 Strategic Plan for Uruguay

3. What support is required?

Page 5: Use  pilot countries  to expand the experience to other countries in a second stage

• Implementation of 1993 SNA released in March 2009:

• 2005 base year

• current and constant annual SUT (intermediate consumption matrix, national and foreign origin detailed)

• without Institutional Sectors Accounts

• Lack of resources (recent years):

• in supporting economic statistics, mostly supplied by NSI

• In NA team: by adding the responsibility of compiling BOP with no additional resources

2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Page 6: Use  pilot countries  to expand the experience to other countries in a second stage

• An opportunity (2012):

– Strategic Plan for the Central Bank: a strategic initiative: to improve the scope of NA and to adopt international recommendations

– Strategic Regional Plan: apply to become a pilot country

• Ask for the ROSC (IMF) and for ECLAC support

2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Page 7: Use  pilot countries  to expand the experience to other countries in a second stage

Diagnostic (2012) based on recommended tools (ECLAC mission and ROSC (IMF):

1. Statistical Requisites auto diagnostic

2. Milestones for the implementation

3. Minimum Requirement Data Set (MRDS) (Minimum, Recommended, Desirable)

4. Conceptual Compliance Questionnaire

5. Data Quality Assessment Framework (DQAF-IMF)

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 8: Use  pilot countries  to expand the experience to other countries in a second stage

Conclusions of the Diagnostic:

• limited SNA scope (Uruguayan NA don’t fulfil Minimum Required Data)

• accuracy and reliability problems (mostly due to lack of statistical sources)

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 9: Use  pilot countries  to expand the experience to other countries in a second stage

What are the main national policy challenges?

• quick knowledge about the impact of the international situation, deal with inflation, exchange rate policy, fiscal policy

• retain foreign capital when the situation in developed countries improves

• open new foreign markets for goods and services

• achieve improvements in infrastructure investment (increase productivity and competitiveness)

• improve investment without neglecting the environment

• achieve improvements in human capital; continue to reduce poverty and to improve distribution of income

• public sector reform and sustainability of social security system

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 10: Use  pilot countries  to expand the experience to other countries in a second stage

What are the implications for the scope and detail of the accounts and supporting statistics?

• Better short-term statistics (mostly on the expenditure side)

• Financial accounts statistics by sectors

• Government accounts

• Distribution of income accounts

• External sector statistics (FDI, Exports of Services, etc)

• Capital formation, Employment, Productivity

• Environmental statistics

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 11: Use  pilot countries  to expand the experience to other countries in a second stage

In summary, high priority to:

Institutional Sector Accounts

(N/A since 1990)

some improvement on short term statistics

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 12: Use  pilot countries  to expand the experience to other countries in a second stage

Plan based on 4 pillars:

1. Strengthen the institutional framework for basic statistics (dimension worst evaluated by ROSC)

2. Compile a new benchmark base year (jointly for NA and BOP) using SUT

3. Expand the present NA scope (including Institutional Sector Accounts, and at least to satisfy all Minimun Required and most of Recommended Data)

4. Adopt new recommendations in a priority framework

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 13: Use  pilot countries  to expand the experience to other countries in a second stage

Stages of the Plan

Stages Activities Span/Deadline Description

Stage 0Statistics Sources and Training

2013-2014 29 statistical or software projects

Stage 1Reference year compilation (SUT, IEA)

2015-2016

Data consistency and arbitrage process. SUT and IEA for the reference year. Harmonization BOP-NA

Stage 2

Annual and quarterly NA series (2012-2018) compilation

2017-2018SUT and IEA for 2012-2018. Chained volume measures

Stage 3 Release 2019 New web platform for users

2 Strategic Plan for Uruguay

2.1 Background

2.2 Diagnostic

2.3 Implementation Plan

Page 14: Use  pilot countries  to expand the experience to other countries in a second stage

There are first order problems and secondary problems

3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

First order problems (Fundamental

problems; long term resolution)

Advocacy

Institutional agreements

Supporting statistics

Commitment of users

Secondary problems (Tools to support the

implementation)

Training

Horizontal Cooperation

Technical assistance

Manuals and Handbooks in the appropriate language

Page 15: Use  pilot countries  to expand the experience to other countries in a second stage

It is necessary:

Memorandum of Understanding (MOU): ECLAC-CBU-NSI

Targets: Cooperation agreement; Support for NSI

Agreed:• Inter-institutional Working Groups to improve basic statistics

(Classifications, Business Register, Economic Survey and Construction Statistics, already working)

• Following Commission

• Twice a year report to authorities with the support of ECLAC

3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

• to raise political support to the project

• to establish institutional commitments beyond individual responsibilities

Page 16: Use  pilot countries  to expand the experience to other countries in a second stage

• MOU provides political support:

– raises awareness among the authorities

– assists on the accountability by monitoring the National Plan

• MOU expedites and supports institutional agreements:

• Facilitates: diagnostic and establishment of priorities in a cooperatively way

• Promotes joint work: Inter-institutional Working Groups

• Provides tools for monitoring

3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Page 17: Use  pilot countries  to expand the experience to other countries in a second stage

In Uruguay it is not possible to improve the scope of SNA (let alone the implementation of 2008 SNA):

without looking for new basic statistics

without involving National Statistical Institute (NSI)

3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

International support is necessary to better involve the National Statistical System in an integrated statistical approach

Page 18: Use  pilot countries  to expand the experience to other countries in a second stage

On the supply side:

• Enterprises register

• Economic Activity Structural Surveys

• Agricultural costs

• Construction activity

• Informal sector

Cross elements:

• Trade margins are outdated (most from 1997)

On the expenditure side:

• Household Expenditure Survey is outdated (2006)

• Gross Capital Formation

• Exports and Imports of Services

Institutional Sectors:

• Companies accounting data from Tax Declaration Registry are not available

• It doesn’t exist a Central Balance Sheet Data Office

Major gaps in information:

3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Page 19: Use  pilot countries  to expand the experience to other countries in a second stage

Users often don’t ask for NA, as they are not aware of its usefulness

• In medium term something can be done to encourage this:

• Examples:

• Organize Seminars: to explain NA uses, to allow discussions between researchers on suggested subjects

• Organize Users Surveys and feedback

3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Although results only will be visible in the long run, it is very important to involve users along this process

Page 20: Use  pilot countries  to expand the experience to other countries in a second stage

• Training:

• introductory courses for the new team

• advanced courses and international workshops to discuss specific topics

• Horizontal Cooperation: to learn about procedures and practical issues, mainly to compile Institutional Sector Accounts

• Technical Assistance: mainly for basic statistics

• Manuals and compilation guides in appropriate language

3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Page 21: Use  pilot countries  to expand the experience to other countries in a second stage

Scaling up the coordination and resources for implementation of the SNA

Building a Strategic Plan for Uruguay

Lourdes [email protected]

Meeting on Scaling up the coordination and resources for the implementation of the SNA.

Luxemburg 28-29 May 2013