© Turner & Townsend plc 18 Apr 2023 making the difference
HEFMA Conference 2010
Should Higher Education Institutions Outsource their Facilities Management Function?
John Samuel
Turner & Townsend
© Turner & Townsend plc Apr 18, 2023 making the difference
The path to be travelled
2
Context
Contract and Management
Outsource Review
Risk & cost
Pros and Cons
© Turner & Townsend plc Apr 18, 2023 making the difference
Statement and an Easy Question
Statement Facilities are key to the delivery of HE Institutions core mandate –
higher education and research Management of the development and operations of facilities requires
managerial skill
Question? Should Higher Education Institutions Outsource their Facilities
Management Function?
Answer - It all depends !!!!!! Corporate culture Assets are significant to the Balance Sheet but is FM a core business? Managerial and technical skills Asset development and operational management structures
3
© Turner & Townsend plc Apr 18, 2023 making the difference
Terminology
In sourcing Services are provided by institutional employees. External advisors
might be used to improve processes
Out-tasking Contracting of a Service Provider for the delivery of specific functional
services (eg cleaning, security)
Out-sourcing Full transfer of the Facilities Management Function to an outside firm –
an Integrated FM Service Provider (IFMSP)
PPP Fund, design construct, operate, maintain, transfer (full turnkey
solution)
4
© Turner & Townsend plc Apr 18, 2023 making the difference
Saudi Women’s University _ Riyadh
"Princess Nora Bint Abdulrahman Women's University“ Area 800 ha square metres Built area 300ha. Administration buildings, 13 faculties, 700-bed student hospital,
laboratories, research centres, residential area for students and staff.
University capacity approx 26,000 students. Cost $12bn (USD) Construction 2 years
The campus will be so large that they are building the campus' very own mechanically operated (as in no conductors) sky railway system that will take students from door to door of each building!
5
© Turner & Townsend plc Apr 18, 2023 making the difference
Capital vs Operational Costs
6
80%
20%
model
DESIGN BUILD DISPOSE TOTALOPERATE
1 YEAR 2 YEARS 1 YEAR TOTAL25 - 50 YEARS or longer
R
3%
R
17%
OPERATION = 40 %
MAINTENANCE = 30 %
ASSET REPLACEMENT= 40%
LIFE CYCLE COST (LCC)
R
?
100%
Total
Cost of
Ownership
© Turner & Townsend plc Apr 18, 2023 making the difference
Facilities Management Trends
2000’s2000’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds• Mail/CourierMail/Courier• TelecomsTelecoms• ITIT• PrintPrint• FMFM• AdminAdmin• TrainingTraining• Real EstateReal Estate• MarketingMarketing• ManufactureManufacture
2000’s2000’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds• Mail/CourierMail/Courier• TelecomsTelecoms• ITIT• PrintPrint• FMFM• AdminAdmin• TrainingTraining• Real EstateReal Estate• MarketingMarketing• ManufactureManufacture
OutsourcingOutsourcing
1990’s1990’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds• MailMail• TelecomsTelecoms• ITIT• PrintPrint• FMFM•AdminAdmin
1990’s1990’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds• MailMail• TelecomsTelecoms• ITIT• PrintPrint• FMFM•AdminAdmin
Out taskingOut tasking
1970’s1970’s
• CleaningCleaning
1970’s1970’s
• CleaningCleaning
In- HouseIn- House
1980’s1980’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds
1980’s1980’s
• CleaningCleaning• SecuritySecurity• CateringCatering• MaintenanceMaintenance• GroundsGrounds
Contracted ServicesContracted Services
Efficiency and CompetitionEfficiency and Competition
2010’s2010’s
• FundingFunding• ConstructionConstruction• FurnitureFurniture• FittingsFittings• EquipmentEquipment• Soft FMSoft FM• Hard FMHard FM• ReplacementReplacement• RefurbishmentRefurbishment• Risk TransferRisk Transfer• AvailabilityAvailability
• PerformancePerformance
• Pay for Pay for AvailabilityAvailability
2010’s2010’s
• FundingFunding• ConstructionConstruction• FurnitureFurniture• FittingsFittings• EquipmentEquipment• Soft FMSoft FM• Hard FMHard FM• ReplacementReplacement• RefurbishmentRefurbishment• Risk TransferRisk Transfer• AvailabilityAvailability
• PerformancePerformance
• Pay for Pay for AvailabilityAvailability
Workplace Workplace EnvironmentEnvironment
© Turner & Townsend plc Apr 18, 2023 making the difference
Different views
Facilities Management Development of Facilities
Design & construction - Outsourced
Management – In-source or outsourced Operations Management
From nearly all in-sourced to outsourced
All HE Institutions outsource some “FM” activities
Design + Project Management
Construction + Project Management
Full Integrated FM Service Provider - Outsourcing
Functional Services – Out Tasking
Specialist Services – Hard FM requirements
8
© Turner & Townsend plc Apr 18, 2023 making the difference
Management and Risk
Management Structure Scale Skill Depth
In-house vs Out Tasking vs Outsource Risk Transfer vs Direct cost Direct Cost vs Indirect cost
9
© Turner & Townsend plc Apr 18, 2023 making the difference
The Balance
Service Delivery measured by outcomes User not interested in HOW Service Level = User Cost = Finance Staff Issues = Operations and Executive
It’s a balancing act Service Level Cost Management involvement Flexibility Risk Transfer
10
© Turner & Townsend plc Apr 18, 2023 making the difference
Contract vs Risk
11
Contractors
Risk
0%
100% 0%
100%
H E
Institution
Risk
Construction ContractsFixed Price Cost Plus
CertaintyHigh Low
Operations
PPP In-house
Management structureSmall Large
Outsourcing Out Tasking
Risk Pro
file
Contracts
Institutional Management
© Turner & Townsend plc Apr 18, 2023 making the difference
Risk vs Expectations and Cost
Cost 1
Cost 2
Risk Transfer
UserExpectations
Low
Low High
High
© Turner & Townsend plc Apr 18, 2023 making the difference
Function or Form?
13
Is it the Buildings or the Teaching?
© Turner & Townsend plc Apr 18, 2023 making the difference
Where it matters
Contracts SMART (Specific, Measurable, Attainable, Realistic and Timely) Robust Meaningful
Procurement Input vs Output Specification Service Level Agreement
Management Latin – to lead by the hand French – the art of conducting, directing Leading and directing …… through the deployment and manipulation
of resources
14
© Turner & Townsend plc Apr 18, 2023 making the difference
Management - Where the rubber hits the road
15
© Turner & Townsend plc Apr 18, 2023 making the difference
Management
In-source - Management competency Technical competency – Soft and Hard FM Services Human Resources Financial Significant management organisation - broad based Management depth and back up High level of flexibility – multiple point accountability
Out Source – Integrated FM Service Provider Contract Management – small number of staff with high level of skill Performance monitoring Contract administration Limited flexibility – single point accountability
16
© Turner & Townsend plc Apr 18, 2023 making the difference
Management
Out task Contracts for limited duration per service function Contract Management – multiple contracts, with high level of skill Performance monitoring - multiple contracts Contract administration – multiple contracts Limited flexibility – accountability per functional service
PPP – Finance, design, build and operate Best on a new facility Capital cost > R500m Asset risk transfer Contract Management – Complex contract Performance monitoring Contract administration More limited flexibility – single point accountability
17
© Turner & Townsend plc Apr 18, 2023 making the difference
In Sourced FM Service Provision
Direct control of operations Direct control of service
level; adjusted quickly to meet different needs
Flexibility in delivery Budgets can be adjusted
against service level = adjust number of people
Good cultural fit in provision of services; institution's staff
Perceived as cheap; hidden costs not measured
Control of consumable costs outsourced
Skills shortages problem outsourced
Budgets first used for salaries Budgets not secure; can be cut Staff are non core to the institution - not in the
mainstream for development Low level staff in a highly “knowledge” based
organisation Executive Management not geared for managing
low level staff Management required for large non core staff
numbers All service delivery risks held by the Institution Staff relatively expensive with respect to the
market Staff cannot be changed easily Control of consumable costs not well established –
not core Skills shortages for management and hard FM
services
18
Benefits Disadvantages
© Turner & Townsend plc Apr 18, 2023 making the difference
Out Tasked FM Service Provision
Low level Staff is not on the Institutions payroll Direct management of the individual Service
Providers through their contracts Short term contracts (1-3 years) Can change Service Providers at contract expiry
(1-3 years) Dispute in one service does not impact other
services Direct costs only are measured - hidden
management costs not measured Functional staff have a career path in a Core
business Staff can be changed easily Budgets secure; difficult to cut Functional service delivery risks transferred Cost Savings for same level of service Control of consumable costs outsourced Skills shortages problem outsourced
Multiple Service Providers = multiple contracts to be managed
Budgets used for delivery Budgets difficult to cut Flexibility in the delivery
of services reduced Changes in service level
cost money Management skills in the
management and administration of operational contracts required
No asset risk transfer
19
Benefits Disadvantages
© Turner & Townsend plc Apr 18, 2023 making the difference
Outsourced FM Service Provision
Single contract for the provision of services and asset maintenance –
Single point contact Reduced Institutional management Clear lines of communication Help Desk?
Asset survey and maintenance budget provided
Services budgets secured All service and integration risks
transferred Cost Savings for same level of service FM staff and low level staff not on
Institutions books Skills provided by the IFMSP Career development for IFMSP staff Consumable and operating risks
transferred
Operating Budgets committed -limited flexibility
Asset maintenance and refurbishment budget not fixed; can lead to cuts and backlog maintenance
Management skill required for procuring and managing the contract
No asset risk transfer
20
Benefits Disadvantages
© Turner & Townsend plc Apr 18, 2023 making the difference
PPP - Workplace Environment
Single contract for the funding and provision of assets and services
Robust feasibility – clear understanding of the requirements
No Capital Monthly payment for availability of
serviced workspace Lender construction and services
supervision Turnkey solution - fixed price Single point contact – construction and
services Reduced Institutional management Clear lines of communication Help Desk
Asset and services budgets secured
All funding, design, construction, operating, equipment and consumable risks transferred
Long term contract Operating and refurbishment
Budgets committed Management skill required for
procuring and managing a complex contract
Institution needs Well developed concept Robust feasibility Sound procurement process Competent contract management Needs (project) of sufficient size to
cover feasibility and procurement costs
Up front feasibility and procurement costs usually hidden
Procurement costs Time in doing it right
21
Benefits Disadvantages
© Turner & Townsend plc Apr 18, 2023 making the difference
Risks Funding Design Construction Completion Commissioning Utilities Operational Services Asset Maintenance and
integrity Budget secured and fixed Refurbishment Asset Handover
22
PPP Risk vs Cost
Costs Single monthly fee
Interest and Redemption Services Replacement Refurbishment Management Costs Risk Premium Asset Integrity on
handover Contract Management
© Turner & Townsend plc Apr 18, 2023 making the difference
Value for Money
23
Level ofService
Service Delivery
Public Sector Private Sector
Existing
Aspired
CurrentSituation
Outsourced DeliveredServices
UnacceptableSituation for
Service Provider
Unlikely to Be Achieved
X
In-h
ou
se C
ost
In-h
ou
se C
ost
Ou
tsou
rced
Cost
Ou
tsou
rced
Cost
Retained Risk
Value for Money
At the same level of service
Institutional Risk
Institutional Risk
© Turner & Townsend plc Apr 18, 2023 making the difference
Why Contract Out Facilities Management
FM is a Non-Core Business
Management Focus on Core Business = Higher Education and
Research
Better Service for the Same Cost = lower cost same service
Transfer Risk - Has Risk Allocated to the Party Best able to Manage
that Risk
Assets maintained – Reduced back log maintenance
Workplace experience enhanced
Access to Industry Best Practice and Experience
Specialist Service Providers
Career path for staff
© Turner & Townsend plc 18 Apr 2023 making the difference
HEFMA Conference 2010
Thank You
John Samuel
Turner & Townsend