r ~~~~ (~~om~~) National Highways Authority of India (Ministry of Road Transport & Highways) ~ CflF4iw", 31l"mrr /Regional Office, Odisha 301-"q", ~~, 11I(if~, ~-;f~/7, ~ ~ 'l"'~~(:H - 751013, ~TT ~ BHARATMAlA 30 I-A, 3rd Floor, Pal Heights, Plot No : JI7, Jayadev Vihar ~."''llama .O'DTO"OSP£ANHA'1~ffm'Ltr~Oiab~Oq~3di~0 - ~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 t.=Jror le-mail: [email protected] [email protected] ~/Website : http://www.nhai.org 12.05.2020 To ", The Sr. Technical Director, NIC Centre at MoRTH, Transport Bhawan, New Delhi 110001 Sub: Rehabilitation and up-gradation to 4-laning of Teleibani- Sambalpur section of NH-6 (Km.493.300 to Km.521.300 and Km.545.176 to Km.566.000) in the State of Odisha under EPC mode- Permission to lay waste water pipelines across NH-53 (Old NH·06) crossing at Km.565/145, 565/146.5 and 565/616 - Reg Sir, Please find enclosed herewith a proposal of Project Engineer, (EE, PH), Orissa Water Supply & Sewerage Board (OWSSB), Sambalpur for: RoW permission for lay Waste Water Supply pipeline across NH- 53 crossing 565+145, 565+146.5 Km at Near Sarla Chowk and Km. 565+616 near St. John's School Chowk. The details are as under: ,/ Diameter Diameter Remark of MS SI. No Stretch Description Chainage of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur Microtunneling 1 565+146.5 200 300 Chowk NH-06 Jacking St. John's Methodology 565+616 350 NA , School Chowk 2. Accordingly, as per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R) dt. 22.11.2016, the application along with the recommendations of. concerned PO/Consultants are enclosed herewith with request to hoist the same in the Ministry's Website for public comments within 30 days of uploading on the website. This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha, Bhubaneswa. Yours faithfully, (I~~ Manager (Tech) Corporate Office: G-5 & 6, Sector-Ill, Dwarka, New Delhi-110 075, Phone: 011-25074100/200 Website : http://www.nhai.org

-~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

r~~~~(~~om~~)

National Highways Authority of India(Ministry of Road Transport & Highways)

~ CflF4iw", 31l"mrr /Regional Office, Odisha

• •

301-"q", ~~, 11I(if~, ~-;f~/7, ~ ~'l"'~~(:H- 751013, ~TT

~ BHARATMAlA 30 I-A, 3rd Floor, Pal Heights, Plot No : JI7, Jayadev Vihar~."''llama .O'DTO"OSP£ANHA'1~ffm'Ltr~Oiab~Oq~3di~0

- ~/Tel. : +91-674-2361570/670m/Fax: +91-674-2361770t.=Jror le-mail: [email protected]

[email protected]~/Website : http://www.nhai.org

12.05.2020

To ",

The Sr. Technical Director,NIC Centre at MoRTH,Transport Bhawan,New Delhi 110001

Sub: Rehabilitation and up-gradation to 4-laning of Teleibani- Sambalpur section of NH-6 (Km.493.300 toKm.521.300 and Km.545.176 to Km.566.000) in the State of Odisha under EPC mode- Permissionto lay waste water pipelines across NH-53 (Old NH·06) crossing at Km.565/145, 565/146.5 and565/616 - Reg

Sir,

Please find enclosed herewith a proposal of Project Engineer, (EE, PH), Orissa Water Supply &Sewerage Board (OWSSB), Sambalpur for: RoW permission for lay Waste Water Supply pipeline across NH-53 crossing 565+145, 565+146.5 Km at Near Sarla Chowk and Km. 565+616 near St. John's SchoolChowk. The details are as under: ,/

Diameter Diameter Remarkof MS

SI. No Stretch Description Chainage of DI K7/K9 CasingPipeline Pipeline(mm) (mm)

Crossing 565+145 450 NA Near SarlaChowkTeleibani- through

Near Sarla1. Sambalpur Microtunneling 1 565+146.5 200 300 ChowkNH-06 Jacking St. John'sMethodology 565+616 350 NA, School Chowk

2. Accordingly, as per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R) dt.22.11.2016, the application along with the recommendations of. concerned PO/Consultants are enclosedherewith with request to hoist the same in the Ministry's Website for public comments within 30 days ofuploading on the website.

This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha,Bhubaneswa.

Yours faithfully,

(I~~Manager (Tech)

Corporate Office: G-5 & 6, Sector-Ill, Dwarka, New Delhi-110 075, Phone: 011-25074100/200Website : http://www.nhai.org

Page 2: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

~.m~ ••~~National Highways Authority of India(Ministry of Road Transport & Highways)

~ CbI4f(i'j4,~TT jRegional Office, Odisha301 -It, ~ ~, "tffiif ~, ~;:j" ~/7, ~ ffmr'~~~~(-751013,~rr

B3h01b-A,3rd Floor, Pal Heights, Plot No: J/7, Jayadev Viharu aneswar- 751013, Odisha

NHAI/13011/5411ROIODI qO~ 12020

- ~/Tel. : +91-674-2361570/670~lFax: +91-674-2361770t~ le-mail: [email protected]

[email protected]~/Website : http://www.nhai.org

••~ BHARATMALA'VITfit.tM q'{ amn ROAD TO PROSPUJTY

12.05.2020

", INVITATION OF PUBLIC COMMENTS

Sub: Rehabilitation and up-gradation to 4- laning of Teleibani- Sambalpur section of NH-6 (Km.493.300 toKm.521.300 and Km.545.176 to Km.566.000) in the State of Odisha under EPC mode- Permissionto lay waste water pipelines across NH-53 (Old NH·06) crossing at Km.565/145, 565/146.5 and565/616 - Reg

Project Engineer, (EE, PH), Orissa Water Supply & Sewerage Board (OWSSB), Sambalpur hassubmitted a proposal for RoW permission to lay Waste Water Supply pipeline across NH-53 crossing thechainage 565+145, 565+146.5 Km at Near Sarla Chowk and Km. 565+616 near St. John's School Chowk.The details areas under:

Diameter Diameter Remark-

of 01 K7/K9 of MSSI. No Stretch Description. Chainage Pipeline Casing

Pipeline//

(mm) (mm)

Crossing 565+145 450 NA Near SarlaChowk

Teleibani- through Near Sarla1. Sambalpur Microtunneling 1 565+146.5 200 300 ChowkNH-06 Jacking St. John'sMethodology 565+616 350 NA School Chowk

2. As per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R) dated 22.11.2016, theHighway Administration will put out the application in the public domain for 30 days for seeking claims andobjections (on grounds of public inconvenience, safety and general public interest).

3. In view of the above, the comments of public, if any, an the above mentioned proposal is invited onbelow mentioned address:

The Regional Officer,National Highways Authority of India,

Regional Office, Od ish a301·A, 3rd Floor, Pal Heights,

J/7, Jayadev Vihar, Bhubaneswar 751013, Odishae-rnail : [email protected]

This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha, Bhubaneswar".

Man~~National Highways Autho~~t;/India,

Regional Office, Odisha301·A, 3rd Floor, Pal Heights,

J/7, Jayadev Vihar, Bhubaneswar 751013

Corporate Office: G-5 & 6, Sector-l0, pwarka, New Delhi-110 075, Phone: 011-25074100/200Webslte : http://www.nhaLorg

Page 3: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

512

Checklist for getting approval for laying of waste water supply pipe line on NH land.

SI. Item Information/Status RemarksNo.

1 General Information Construction of Sewerage s

System of Sambalpur Town1.1 Name and address of the Er. BiranchiNarayan Das

applicant/agency (ProjectEngineer)Project Management Unit- I,

OWSSB,CollectorateCampus.Dist- Sambalpur,Odisha-768001

1.2 National Highway Number NH-53 (Old NH-6)1.3 State Odisha1.4 Location Sambalpur1.5 ( Chainage in Km.) Crossing at Km-5651l45, Details attached in

Km-5651l46.5 and Km- Drawing no:565/616) OWSSB/SBP/C5/NH-

53(OLD-6)1.6 Length in Meters. Crossing length 140m1.7 Width of available RoW /'

(a) Left side from centre line Varies from 38 m to 9.144 mtowards increasing (RoW list enclosed)chainage/km. direction

(b) Right side from centre line Varies from 38 m to 14.52 mtowards . . (RoW list enclosed)mcreasmgchainage/km. direction

1.8 Proposal to lay underground wastewater pipeline

(a) Left side from center line A) 36 m to 7.144 m.towards increasingchainage/krn direction. B) 36 m to 12.52 m.

(b) Right side from center -linetowards increasingchainage/km direction. ,

1.9 Proposal to acquire land(a) Left side from centre line. NA(b) Right side from centre line. . NA

1.10 Whether proposal is in the same side NAwhere 'land is not to be acquiredIf not then where to lay the waste NA

.water pipe line.

1.11 Details of already laid services, if any, Nilalong the proposed route

1.12 Number of lanes (2/4/6/8 2lanes)existing

1.13 Proposed number of lanes(2 lane with 4paved shoulders/4/6/8 lanes)

- ----)

.~ f.ii'lCfl/project Director~ ~- ~ mr-.fCh"""{1JT fcl'l.TP1

National Highlivays Authority of India"11.Cfii.t \-ji:~~Z, mm/PIU, Samb~dptlf. Odisha,.

Page 4: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

5111.14 Service road existing or not Not exist

If yes then which side(a) Left side from center line Nil(b) Right side from center line Nil

1.15 Proposed service road Yes

(a) Left side from centerline Yes(b) Right side from center line Yes

1.16 Whether proposal to lay waste Water After service Road at thepipe line is after the service road or edge of RoWbetween the service road and maincarriageway

1.17 The permission for laying of waste Agreedwater pipe line shall be considered forapproval/rejection based on theMinistry Circulars mentioned as above·

(a) Carrying of sewage/gas pipelines on Agreedhighway bridges shall not be permittedas fumes /gases pipes can acceleratethe process of corrosion or may causeexplosions, thus, being much moreinjurious than leakage of watei./

(b) Carrying of waste water pipe lines on Agreedbridges shall also be discouraged.However if the waste water supplyauthorities seem to have no otherviable alternative and approach theHighway Authority well in time beforethe design of the bridge is finalized.They may be permitted to carry thepipe line on independentsuperstructure, supported on extendedportions of piers and abutments III ,such a manner that III the finalarrangement enough free space aroundthe superstructure of the bridgeremains available for inspection andrepairs etc.

Cc) Cost of required extension of the Agreedsubstructure as well as that of thesupporting superstructure shall beborne by the agency- in- charge of theutilities.

ij'~~D' tq 111\'J'HT 1'1'1~' Project irec or'\ffi('\M ~{f?,l1r1 mr~T fq~1'l

National Highways Authority of IndiaQ.Cf1f.tlf«f01jT. 3fu~'TipiU, Sambc.\pt.'f, Odisha

Page 5: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

(d)

1.18

Services are not being allowedindiscriminately on the parapet/anypart of the bridges, Safety of thebridges has to be kept in view whilepermitting various services alongbridge. Approvals are to be accordedin this regard with the concurrence ofthe Ministry's project Chief Engineersonly.

If crossing of the road involved. Ifyes, it shall be either encased in pipesor through structure of conduitsspecially built for that purpose at theexpenses of the agency owning theline.

(a) Existing drainage structures shall notbe allowed to carry the lines.

(b) Is it on a line normal to NH

(c) Crossing shall not be too near theexisting structures on the NationalHighway, the minimum distance being15 meter. What is the distance fromthe existing structures?

(d) The casing pipe( or conduit pipe in thecase of waste water supply pipe line)carrying the utility line shall be ofsteel, cast iron, or reinforced cementconcrete and have adequate strengthand be large enough to permit readywithdrawal of the carrier pipe/cable.

(e) Ends of the casing/conduit pipe shallbe sealed from the outside, so that itdoes not act as a drainage path.

(f) The casing/conduit pipe should, asminimum extend from drain to drain incuts and toe of slope in the fills.

Agreed

Yes, at Crossing Km-5651145, Km-565/146.5 andKm-565/616) LatestTrenchless Technology ofMicrotunnelinglPi pe JackingMethod shall be adopted forlaying across the NationalHighway, wherein aminimum depth of 1.2 fromthe road level shall bemaintained.

. Agreed

Yes

Agreed

Agreed

Agreed

Agreed

51 0

Page 6: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

509

(g) The top of the casing/conduit pipe Agreedshould be at least 1.2 meter below thesurface of the road subject to being atleast 0.3 mtr below the drain inverts.

(h) Crossing shall be by boring method Agreed(HDD) specially where the existing -road pavement is of cement concreteor dense bituminous concrete type.

(i) The casing/conduit pIpe shall be Agreedinstalled with an even bearingthroughout its length and in such amanner as to prevent the formation ofa waterway along it.

2 Document / Drawings enclosed with Enclosedproposal

2.1 Cross section showing the size of Yestrench for open trenching method. (Isit normal size of 1.2m deep XO.3mwide).

(i) Should not be greater than 60cm. YesWider than the outer diameter of thepipe.

./

(ii) Located as close to the extreme edge Yes'of the right-of-way as possible but notless than 15 meter from the centre-lines of the nearest carriageway.

(iii) Shall not be permitted to run along the YesNational Highways when the roadformation is situated in double cutting.Nor shall these be laid over theexisting culverts and bridges.

(iv) These should be so laid that their top is Yesat least 0.6 meter below the groundlevel so as not to obstruct drainage of

,

the road land.2.2 Cross section showing the size of the Incorporated in the drawing

pit and location of waste water supplypipeline for HDD method

;.'

2.3 Strip plan / Route plan showing waste Enclosedwater pipe line, chainage, width ofRoW, distance of proposed pipe lineform the edge of RoW, important milestone, intersections, cross drainageworks etc.

qi1"'cl~R~tor~ ~ D01frrT ~nfi-~ ~'>iJll

Nstional HigllwiJys Auth.ority of IndiaQ:cfil.{, ~:'F<!l\~rg~,3f(s~nlplU,Sarnbalpur, Odisha

Page 7: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

"

5082.4 Methodology for laying of proposed Microtunneling /Pipe

waste water pipe line. Jacking Methodologyattached

2.4.1 Open trenching method (May be Agreedallowed in utility corridor only wherepavement is neither cement concrete r

nor dense bituminous concrete type).If yes, Methodology of refilling oftrench.

(a) The trench width should be at least 30 Agreedcm, but not more that 60 cm widerthan the outer diameter ofthe pipe.

(b) For filling of the trench, bedding shall be Agreedto a depth of not less than 30cm. It shallconsist of granular material, free of lumps,clods and cobbles and graded to yield afirm surface without sudden change in thebearing valve. Unsuitable soil and rockedged should be excavated and replacedby selected material.

(c) The backfill shall be completed in two Agreedstages (i) side-fill to the level of thetop of the pipe and (ii) overfill to-thebottom ofthe road crust. -

(d) The side fill shall consist of granular Agreedmaterial laid in 15cm .layers eachconsolidated by mechanical tamperingand controlled addition of moisture to95% of the Proctor's Density. Overfillshall be compacted to the same densityas the material that had been removed.Consolidation by saturation or pondingwill not be permitted.

(e) The road crust shall be built to the Agreedsame strength as the existing crust oneither side of the trench. Care shall betaken to avoid the formation of a dip at

,

the trench.(t) The excavation shall be protected by Agreed

flagman; signs and barricades and redlights during night hours.

(g) If required, a diversion shall be Agreedconstructed at the expenses of agencyowning the utility line.

2.4.2 Horizontal Directional Drilling(HDD) NAMethod

2.4,3 Laying of water supply pIpe line Enclosedthrough CD works and method oflaying ~,

~~~~/t> t! '- ~"I<1I'T1'il 1 ~. rojec Ire~ or,~ ~..f ~R \fJfliPl mfi-1~ \cl'I.J1l1

National HighwaysA.tlthority of Indiaq 3';1'; ~TIl'{ '3f.s:m!PIU Sarnba\pul',Odisha.' I.~,"~'tJ r e

Page 8: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

507

(a) On approaches, the waste water Agreedmainsl cab les shall be carried along aline as close to the edge of the right-of-way as possible up to a distance of30 m from the bridge and subject to allother stipulations contained 111 thisMinistry's guidelines issued with letterNo. NH-HIIP/66/76 dated 19.11.1976.

3 Draft License Agreement signed by Enclosedtwo witness

4 Performance Bank Guarantee 111 To be submitted as and whenfavour of NHAI has to be obtained @ intimated by NHAIRs.50/- per running meter (parallel toNH) and Rs. 1,00,0001- per crossing ofNH, for a period of one year initially(extendable if required till satisfactorycompletion of work) as a security for'ensuring / making good the excavatedtrench for laying the cables/ducts byproper filling and compaction,cleaning debris / loose earth produceddue, to execution of trenching at least

-:50m away from the edge of the nghtof way. No payment shall be payableby the NHAI to the licensee forclearing debris /loose earth.

4.1 Performance BG as per above is to be To be submitted as and whenobtained. intimated by NHAI

4.2 Confirmation of BG has been obtained Yesas per NHAI guidelines

5 AffidavitlUndertaking from the Yesapplicant for

5.1 Not to damage to other utility, if Encloseddamaged then to pay the losses either .'to NHAI or to the concerned agency.

5.2 Renewal of Bank Guarantee. Enclosed5.3 Confirming all standard condition of Enclosed

NHAI's guidelines.5.4 Shifting of waste Water pipe line as Enclosed

and when required by NHAI at theirown cost.

5.5 Shifting due to 6 laning/widening of Enclosed .NH.

5.6 Indemnity against all damages and Enclosedclaims clause (24).

5.7 Traffic movement during laying of Enclosedwaste water pipeline to be managed bythe applicant.

;m-~~:ctor~ ~ Wfl=fTlT [email protected]\Df fc1'lW1

National Highways Authority of Indiat[cE1.t 'W6j~, T!.g:m!PiU. Sambalpor.Odish3

Page 9: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

r

506

5.8 If any claim 1S raised by theConcessionaire then the same has to bepaid by the applicant.

Enclosed

5.9 Prior approval of the NHAI shall beobtained before undertaking any workof installation, shifting or repairs, oralterations to the showing watersupply pipe line located m theNational Highway right of ways.

Enclosed

5.10 Expenditure, if any incurred by NHAIfor repairing any damage caused to theNational Highway by the laying,maintenance or shifting of the wastewater pipe line will be borne by theagency owning the line.

Enclosed

5.11 If the NHAI considers it necessary infuture to move the utility line for anywork of improvement or repairs to theroad, it shall be carried out as desiredby the NHAI at the cost of the. agencyowning the utility line' within areasonable time (not exceeding60days) of the intimation given. .~

Enclosed

5.12 Certificate from the applicant jn thefollowing format

(i) Laying of waste water pipe linewill not have anydeleterious effects on anyof the bridge componentsand roadway safety fortraffic.

(iijFor 6-laning" We do undertakethat we will relocateservice roads/app~oachroad/utilities at our owncost notwithstanding thepermission granted withinsuch time as will bestipulated by NHAI forfuture six-laning or anyother development".

Enclosed

6 Who will sign the agreement on behalfof waste water pipe line agency

Er. Biranchi Narayan DasProject,Engineer, PMU-

I,OWSSB,Sambalpur7 Certificate from the Project Director Shall be enclosed

L-,~?~/proiect Director~m-cn~ut?r.l \0i-qrT ~)~ I~~

National H;ghways Authority of Indiaq.c\'.:.t i;i~~i]t.0fu'ffT/PIU, SarnbaltJti'I'· Odisha

Page 10: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

505

7.1 Certificate for confirming of allstandard condition issued videMinistry Circular No.

1. Ministry Circular No. NH-41(58)/68 dated 31.1.1969

2. Ministry Circular No. NH-IIIIP/66176 dated18/19.11.1976

3. Ministry Circular No. RWINH-IIIIP/66176 dated 11.05.1982

4. Ministry Circular No. RWINH-11037/1/86-DOI(ii) dated28.07.1993

5. Ministry Circular No. RWINH-11037/1/86-DOldated19.01.1995

6. Ministry Circular No. RWINH-34066/2/95/S&R dated25.10.1999

7. Ministry Circular No. RWINH- .3406617/2003 S&R(B) dated17.09.2003

Yes

7.2 Certificate from PD in the followingformat

(i) "It is certified that any '/otherlocation of the waste Water Pipeline would be extremely difficultand unreasonable costly and theinstallation of Water Supplypipe line within RoW will notadversely affect the design,stability and traffic safety of thehighway nor the likely futureimprovement such as wideningof the carriageway, easing ofcurve etc."

(ii) For 6- laning(a) Where feasible is available" I

do certify that there will beno hindrance to proposed six-laning based on the feasibilityreport considering proposedstructures at the saidlocation."

(b) In case feasibility report is notavailable, "I do certify that·sufficient RoW is available atsite . for accommodatingproposed six-laning."

Yes

~ N ---1~,.~ ~~:rrcF./projc:ct Director

'li,1{(jl~~<:! ~~ mf>.-fCfi1'JT fq~J11Natlona! Highways Authority of India

q:ch:.t ~~:F.~JPIU. SambalpUf,Odisha

Page 11: -~/Tel. : +91-674-2361570/670 m/Fax: +91-674-2361770 ...of DI K7/K9 Casing Pipeline Pipeline (mm) (mm) Crossing 565+145 450 NA Near Sarla Chowk Teleibani- through Near Sarla 1. Sambalpur

504

8 If NH section proposed to be taken upby NHAI on BOT basis -a clause is tobe inserted In the agreement. "thepermitted Highway on which Licenseehas been granted the right to laycable/duct has also been granted as aright of way to the concessionaireunder the concession .agreement forup-gradation of [----------------sectionfrom Km ---------- to Km -----------of NH NO.----------on Build,Operate and Transfer Basis] andtherefore, the licensee shall honourthe same."

Yes, inserted in theagreement

,

9 Who will supervise the work of layingof waste water pipe line

OWSSB/NHAI

10 Who will ensure that the defects inroad portion after laying of wastewater pipe line are corrected and if notcorrected then what action will betaken.

OWSSBI NHAI, as percondition in the agreement

11 Who will pay the claims for damagesdone/disruption In working' ofconcessionatre if asked by/ theconcessionaire.

OWSSB

12 A certificate from Project Director thathe will enter the proposed permissionIn the register of records of theperrnissions in thy prescribedproforma (copy enclosed).

Shall be enclosed

13 If any previous approval is accordedfor laying of underground waste watersupply pipe line that photocopy ofregister of records of permissionsaccorded as maintained by PD thencopy be enclosed

Shall be enclosed

b~~QU?-V'i1,1 ~/Project Director

~p-r ~'t,:!J ·,~;:r,::ri·\:nt~.lCfl{lJT fu'l.1Tll

Nationall-HgY1:rJ6'i' ;r;ority of Indiaq.Chl.~,~l:. 01':5~n/Piu,Sambalpof, Odisha