Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
@ SIME DARBY BUSINESS PARKISKANDAR MALAYSIA
FREEHOLD MANAGED PARK
No Foreigner Restriction
TANJUNG PUTERIGOLF RESORT
TO SENAI-DESARUHIGHWAY /
TANJUNG LANGSATPORT
JOHOR PORTPASIR GUDANG
INDUSTRIAL ZONEMATURED
NEIGHBOURHOODS
@ SIME DARBY BUSINESS PARK@ SIME DARBY BUSINESS PARK
TAMANPASIR PUTIH
TAMANPASIR PUTIH
A RARE OPPORTUNITYTO OWN A PREMIUM
FREEHOLD INDUSTRIAL DEVELOPMENTIN ISKANDAR MALAYSIA
(FLAGSHIP D)
PROUDLY PRESENTS
TM
DEVELOPTO DELIVER
Harvest Green is an innovative industrialaddress located at Sime Darby Business Park.Built upon 23.6 acres of freehold land,this prime industrial park comprises detached,semi-detached and cluster factoriesset within a secure gated and guarded environment.Strategically located within Iskandar Malaysia'sFlagship D - Eastern Gate Development,
Harvest Green is positioned betweenTanjung Langsat and Johor Port,as well as many of Flagship D's key amenities.
@ SIME DARBY BUSINESS PARK
PengerangPetroleum Terminal
Tanjung LangsatPetroleum Terminal
Tanjung BinPetroleum Terminal
Pengerang IntegratedPetroleum Complex
Tanjung Langsat PetroleumSupport Service Hub
RM 19.5 BILLIONWITHIN ISKANDAR
& PENGERANG
TOTAL INVESTMENT OF
Changi Airport
Senai Airport
CausewayWoodlandsCheckpoint
- 4 Resorts- 2 International Golf Courses
Desaru Coast
SINGAPORE Rapid PengerangOil & Gas Hub Project
Independent DeepwaterPetroleum Terminal
FLAGSHIP DEastern Gate Development
TanjungLangsat
Port
Cahaya Baru Exit
Tanjung LangsatIndustrialComplex
Pasir GudangIndustrial Area
Tanjung PuteriGolf Resort
JOHOR BAHRUCITY CENTRE
CIQ
CIQ
EDL
Johor Port
Port OfTanjung Pelepas
Jurong Port
SENAI-DESARU HIGHWAY
SENAI-DESARU HIGHWAY
ASIA PACIFICTRADE
& EXPO CITY
PASIR GUDANG HIGHWAY
COASTAL HIGHWAY
JB PARKWAY
SKUDAI HIGHWAY
NUSA IDAMANHORIZON
HILLS
EDUCITY
TO KOTA TINGGI
Exit toPermas Jaya
(1403B)
KOTAISKANDAR
PUTERIHARBOUR
MEDINI
TUAS
SECOND LINKBRIDGE
EASTLEDANG
EAST COAST PARKWAY
Port OfSingapore Authority
PAN ISLAND EXPRESSWAY (PTE)
JALAN SKUDAI
STRAITS OF JOHOR
GPS Coordinates : N1 27’52.0” E103 56’32.2”
CE
NTRAL EXP
RESS
WAY
(CTE
)
HARVEST GREEN’S INDUSTRIAL
SERVED
Harvest Green is fully equipped with Ready Built Facilities (RBF)that ensure the immediate availability of facilities to propel your business forwards.Natural gas supply is available within the vicinity by Gas Malaysia.
Be assured of plentiful and most importantly, dependable electricity supply that mitigate the business risk. The power supply is e�ciently sourced from 2 separate power plants - Sultan Iskandar Power Station & YTL Pasir Gudang Power Station.
Harvest Green o�ers business owners a highly safe and secure environment that is gated and guarded with 24-hour CCTV monitoring. HOUR
SECURITY
ABUNDANTELECTRICAL
POWERSUPPLY
READY BUILTFACILITIES
COST-EFFECTIVE SOLUTIONSFOR LONG-TERM SUSTAINABILITY
Coastal HighwayPasir Gudang HighwaySenai-Desaru Highway Johor Port
Tanjung Langsat PortPort of Tanjung Pelepas
Tanjung PuteriGolf Resort
Senai Airport
Regency Specialist HospitalPenawar Hospital
Pasir Gudang Hospital
THE NEXT THRIVING INDUSTRIAL OVER 12,600 JOBSwill be created in
FLAGSHIPE Dwill be created in
FLAGSHIP D
1. The only gated and guarded freehold industrial park in Pasir Gudang.
2. Within Sime Darby Business Park, we o�er world-class infrastructure with accessibility to utilities
(electrical, water and gas supply) and international sewerage systems standard.
3. Strategically located within Flagship D with key economic activities focused on heavy industries and logistics,
including electrical and electronic (E&E), chemical, oleochemical, food and engineering-based industries.
4. Accessibility to world-class facilities within 10 minutes such as Johor Port and Tanjung Langsat Port.
5. Direct access to four major highways.
6. Nearby recreational spots such as Tanjung Puteri Golf Resort, Daiman 18 Golf Club and healthcare facilities.
7. Well-connected to all commercial amenities and facilities.
8. The proposed 3rd Malaysia-Singapore bridge link, to Changi is expected to be sited at Pasir Gudang.
(Source from New Straits Times 10/9/2013)
9. Surrounded by matured neighbourhoods with ready pool of skilled workforce.
10. A rare FREEHOLD industrial development in Pasir Gudang, which increases asset appreciation and re-sale value.*
Major Key Factors To Unlock The Potential
*Remarks : Most landbanks in Flagship D are 30 + 30 and 60 years leasehold land, under Johor Corporation (JCorp)
Land Area :7251.88 sq.ft - 16934.403 sq.ft
Built-up Area :From 5328.61 sq.ft - 10494.17 sq.ft
WITH TWO STOREY OFFICE
CLUSTERFACTORY
SINGLE STOREY
SIDE ELEVATION
4000
4000
5200
12235 3310010000
45335
7700 7700 7700
GROUND FLOOR
1st FLOOR
2nd FLOOR
CLUSTER FACTORY
PE
PE
PE
PE
PE PE
PE
PE
GV
66001'
N
GROUND FLOOR PLAN
FIRST FLOOR PLAN SECOND FLOOR PLAN
3310
010
000
7700
7700
7700
14000
DN
GENERALOFFICE
TOILE
T
3310
010
000
7700
7700
7700
14000
VOID ABOVEFACTORY AREA
UPDN
GENERALOFFICE
TOILE
T
1223
533
100
1000
0
4533
5 7700
7700
7700
140006096
20096
TOILE
T
FACTORY AREA
LAND
SCAP
EBIN
CENT
ER
LANDSCAPE
UP
UTILI
TY
1 NO
LORR
Y PA
RKTU
RFIN
G
PRAYER ROOM
2 NO
S CAR
PARK
10 N
OS M
/B PA
RK
3 NO
S CAR
PARK
Land Area :9806.472 sq.ft - 17600.53 sq.ft
Built-up Area :From 6695.15 sq.ft - 11073.92 sq.ft
WITH TWO STOREY OFFICE
SEMI DETACHEDFACTORY
SINGLE STOREY
GROUND FLOOR PLAN
FIRST FLOOR PLAN SECOND FLOOR PLAN
GROUND FLOOR
1st FLOOR
2nd FLOOR
4000
4000
5200
270008100 18900
4533512192 6143
9000
SIDE ELEVATION
14000
UPDN
VOID ABOVE FACTORY AREA
GENERAL OFFICE
TOILET
2700
081
0018
900
6300
6300
6300
14000
DNGENERALOFFICE
TOILET
2700
081
0018
900
6300
6300
6300
2700
081
0018
900
4533
512
192
20096140006096
6143
UP
FACTORY AREA
LAND
SCAP
EBIN
CENT
ER
TOILETLOBBY
1 NO
C
AR P
ARK
1 NO
LORR
Y PA
RKLA
NDSC
APE
TURFING
3 NO
S C
AR P
ARK
10 N
OS
M/B
PAR
K
PRAYERROOM
SEMI-DETACHED FACTORY
PE
PE
PE
PE
PE PE
PE
PE
GV
66001'
N
All plans, information and specifications contained herein are subject to change and / or amendments as directed by the relevant authorities / architects and cannot from any part of an offer and contract. All measurements are approximate and the illustrations are artist’s impressions only. While every reasonable care has been taken in preparing this brochure,the developer cannot be held responsible for any inaccuracies.
SINGLE STOREY SEMI-DETACHED FACTORY WITH TWO STOREY OFFICE
TOTAL BUILT-UP (PER UNIT)LAND AREAPLOT NO.
9806.472 sq.ft - 11192.530 sq.ft 6695.148 sq.ftPLOT 1 - PLOT 5
PLOT 6 13206.627 sq.ft 8625.121 sq.ft
16516.473 sq.ft 10450.787 sq.ftPLOT 7
11660.800 sq.ft 8462.586 sq.ftPLOT 8 & PLOT 9
15060.960 sq.ft 10393.630 sq.ftPLOT 10
13924.130 sq.ft - 17295.122 sq.ft 10759.282 sq.ftPLOT 84 - PLOT 85
13924.130 sq.ft 9773.629 sq.ftPLOT 86
17600.530 sq.ft 11073.920 sq.ftPLOT 87
TOTAL BUILT-UP (PER UNIT)LAND AREAPLOT NO.
40574.463 sq.ft 19760.08 sq.ftPLOT 43
SINGLE STOREY DETACHED FACTORY WITH TWO STOREY OFFICE
SINGLE STOREY CLUSTER FACTORY WITH TWO STOREY OFFICE
TOTAL BUILT-UP (PER UNIT)LAND AREAPLOT NO.
13206.627 sq.ft 10494.167 sq.ftPLOT 11 & PLOT 13
PLOT 12, PLOT 14 - PLOT 26 9806.472 sq.ft - 11192.530 sq.ft 7980.785 sq.ft
7251.880 sq.ft - 8395.960 sq.ft 5328.605 sq.ftPLOT 27 - PLOT 42
16840.930 sq.ft - 16934.403 sq.ft 9085.386 sq.ftPLOT 44 - PLOT 46
8065.745 sq.ft - 9358.447 sq.ft 6141.780 sq.ftPLOT 45, PLOT 47 - PLOT 63
9169.121 sq.ft - 14843.763 sq.ftPLOT 64 - PLOT 83 7441.315 sq.ft
SEMI-DETACHED FACTORY
DETACHED FACTORY
CLUSTER FACTORY
N
PRIMARY SCHOOL
RESIDENTIAL
MEDIUM COST SHOP
PERIMETERFENCING
TURFTURF
PROPOSED COMMERCIAL
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
PE(DC)
GV
JALAN SENANGIN 5
JALA
N S
ENA
NG
IN 5
JALAN SENANGIN 5
JALAN SENANGIN 5
JALA
N SEN
AN
GIN
6
JALA
N SE
NA
NG
IN 6
JALAN SENANGIN 6
JALA
N SEN
AN
GIN
7
PLOT 11
PLOT 13
PLOT 12
PLOT 14
PLOT 15
PLOT 17
PLOT 16
PLOT 18
PLOT 19
PLOT 21
PLOT 20
PLOT 22
PLOT 23
PLOT 25
PLOT 24
PLOT 26
PLOT 28
PLOT 27
PLOT 30
PLOT 29
PLOT 32
PLOT 31
PLOT 34
PLOT 33
PLOT 36
PLOT 35
PLOT 38
PLOT 37
PLOT 40
PLOT 39
PLOT 42
PLOT 41
PLOT 43
PLOT 46
PLOT 47
PLOT 50
PLOT 51
PLOT 54
PLOT 55
PLOT 58
PLOT 59
PLOT 62
PLOT 63
PLOT 67
PLOT 66
PLOT 71
PLOT 70
PLOT 75
PLOT 74
PLOT 79
PLOT 78
PLOT 83
PLOT 82
PLOT 84
PLOT 85
PLOT 86
PLOT 87
PLOT 44
PLOT 45
PLOT 48
PLOT 49
PLOT 52
PLOT 53
PLOT 56
PLOT 57
PLOT 60
PLOT 61
PLOT 64
PLOT 65
PLOT 68
PLOT 69
PLOT 72
PLOT 73
PLOT 76
PLOT 77
PLOT 80
PLOT 81
PLOT 1
PLOT 2
PLOT 3
PLOT 4
PLOT 5
PLOT 6
PLOT 7
PLOT 8
PLOT 9
PLOT 10
66001'
SEMI-D FACTORY-TYPE A
SEMI-D FACTORY-TYPE B
CLUSTER FACTORY-TYPE A
CLUSTER FACTORY-TYPE BDETACHED FACTORY
CLUSTER FACTORY-TYPE C
CLUSTER FACTORY-TYPE D
SEMI-D FACTORY-TYPE CSEMI-D FACTORY-TYPE D
ToKota
Masai
GUARDHOUSE
JALA
N SEN
AN
GIN
6
JALA
N PA
SIR PU
TIHJALAN SENANGIN 6
JALA
N SA
GA
I 1 66'JALAN SELAYANG UTAMA 66'
INNOVATIVE & FUNCTIONAL SPACESIDEAL FOR A VARIETY OF MANUFACTURING INDUSTRIES
GENERAL OFFICE
DIRECTOR ROOM/ MEETING ROOM
RECEPTION AREA
PRODUCTION AREA9m CEILING HEIGHT
UP TO 3-TONSTRUCTURE PROVISION
FOR OVERHEAD CRANE
SALES OFFICE :0304 Level 3, Indah Walk 3, Jalan Indah 15,
Taman Bukit Indah, 79100, Bandar Nusajaya, Johor, Malaysia.Tel: +607 230 5252
Fax : +607 239 5252Website : www.harvestlandholdings.com
Harvest Land Development Sdn Bhd(1089981-A)
TM