生产件批准程序 Production Part Approval Process (PPAP). PPAP is to demonstrate supplier’s understanding of: PPAP 是为表明供应商怎样理解以下内容的一个过程:. 零件的功能 Part’s functionality. 零件的特性 Part’s Characteristics. 特性的关键性 Criticality of features. 怎样测量零件 How to gauge the part. 生产要求 Production requirements. - PowerPoint PPT Presentation
Citation preview
生产件批准程序 Production Part Approval Process
(PPAP)
PPAP is to demonstrate supplier’s understanding of:PPAP 是为表明供应商怎样理解以下内容的一个过程:
- - 零件的用法零件的用法 Part’s UsagePart’s Usage
- - 相关的项目相关的项目 Associated Associated
pprogramsrograms
- - 车辆车辆VehicleVehicle
- - 型号年份型号年份Model Year (MY)Model Year (MY)
零件的功能Part’s functionality
零件的特性Part’s
Characteristics
特性的关键性Criticality of features
怎样测量零件How to
gauge the part
生产要求Production
requirements
工程图纸要求工程图纸要求Engineering Engineering
drawing drawing requirementsrequirements
工程规范 工程规范 (ES)(ES)材料特性材料特性
Material Material CharacteristicsCharacteristics
材料处理材料处理 (( 热热处理处理 , , 外观外观 ))Material Material
Treatment (Heat Treatment (Heat Treat, Treat, Appearance)Appearance)
安全特性安全特性Operator Safety Operator Safety
features, if anyfeatures, if any
关键特性关键特性Critical Critical
Characteristics Characteristics
重要特性重要特性Significant Significant
CharacteristicsCharacteristics
高影响的特性高影响的特性High Impact High Impact
CharacteristicsCharacteristics
传递特性传递特性Pass Through Pass Through
CharacteristicsCharacteristics
使用哪些最为使用哪些最为合适的量具合适的量具What most suitable What most suitable
gauges to use?gauges to use?- - 计量型量具计量型量具 Variable gaugesVariable gauges- - 计数型量具计数型量具 Attribute gaugesAttribute gauges
基准基准DatumDatum
测量方法和装测量方法和装配工厂存在配工厂存在相关性相关性Measurement Measurement
Correlation with Correlation with using plantsusing plants
何时需要?何时需要?When needed?When needed?
哪里需要哪里需要 ??Where needed?Where needed?
多少数量多少数量 ??How much?How much? -- 按节拍生产按节拍生产 Run at RateRun at Rate -- 生产能力确生产能力确认认 Capacity Capacity
VerificationVerification
Application什么时候用到 PPAP?• PPAP is required for, but not limited to: • PPAP 对以下情况适用(但不局限于):
All new tooled parts (使用新模具生产零件) All new vehicle programs and "running changes" for vehicles c
urrently in production ( 新车型,或者是对现有车型的变更 ) Any change in supplier operating pattern (i.e. new shift)
( 生产模式的变更 ) Any additional, modified or reconfigured production tooling, eq
uipment or work streams (模具,设备或生产线的增加,改造或重新装配) Revised customer DPV (Daily Production Volume) exceeding v
erified supplier capacity level (客户需求量的增加)
Content内容• Phased PPAP introduction• 阶段性生产件批准程序的介绍• Ford special requirements to PPAP 18 elements.• 福特汽车对于生产件批准 18 个项目的要求。• VPP usage• VPP 的使用方法
阶段性生产件批准程序PHASED PPAP PROCESS
What is the Phased PPAP?什么是 Phased PPAP ?• Phased PPAP is Ford’s approach to PPAP process management Phased PPAP 是福特特有的生产件批准管理程序。• Introduced to improve upon launch performance
用来提高项目开发和实施的表现。• Requires a supplier site to demonstrate
• Manufacturing capability (制造能力)• Product quality (产品质量)• And production capacity (产能)
• …prior to job #1 (在 J#1 之前)
Phased PPAP vs the old PPAPPhased PPAP 与 PPAP 的比较
• Phased PPAP organizes the process into four phases• Phase 0: Run-at-Rate• Phase 1: Quality Verification• Phase 2: Production Verification• Phase 3: Capacity Verification
PPAP
X 1 PP FEU Job 1
Phased PPAP Phase 0 Phase 1 Phase 2 Phase 3
Supplier Phased PPAP Process Map阶段性生产件批准程序示意图STATUS:Phase 2
Completed
Phase 2 Warrant
[#18]
Yes
Status Tracking Database
2 3
4
Proc
eed
to n
ext p
age
Submit to Customer
Important note:Phase 2 and Phase 3 can happen concurrently if all Inputs and Outputs are satisfied
No
INPUTSReleased design
[#1,2,3 & 4]
Trained supplier
production operators
Sub-supplier(s) material status
from Tier-x R@R
Job 1 Location (final site &
line)
Quantity of parts required as defined by
customer (default 300 consecutive
parts)
Production process
including control plan, flow diagram
instructions & Process
parameters [#5,6 & 7]
Production Tools, Facilities
& Gauging[#8,16 & 17]
EVENT:Conduct Run at
Rate
Planned production
cycle times required to
support Daily Production
Volume
Outputs from the event STATUS:
Phase 0 Completed
Implement Corrective
Action on Input
Was the Pre-Launch Control Plan
followed?
Were the prescribed number of acceptable parts
produced?
Were the parts produced in the defined
period?
Did all operations
meet their planned cycle time
?
Yes
Yes
Yes
Yes
No
No
No
No
Are the Run@Rate input
requirements in place for the production
stream?
Yes
START
No
Capacity Analysis
Worksheet
Status Tracking Database
1
4
Proc
eed
to n
ext p
ageRe
quire
d In
puts
Submit to Customer
Note: [#x] refers to the Element Number in PPAP 4th Edition that will assist in confirming requirements
STATUS: Phase 1
Completed
Continue Production Part Approval Process (PPAP) using parts from Phase 0
- Dimensional measurements [#9]- Material Tests [#10]- Statistical process package [#11]- Performance Tests [#12]- Appearance criteria [#13]- Sample parts [#14]- Master samples [#15]- Customer Specific Requirements[#17]- as defined by PPAP
Have the PPAP elements been
satisfied?
Yes
Status Tracking Database
1
4
2
4
Important note: For suppliers with only one production stream completion of Phase 1 & 2 occur at the same time
Proc
eed
to n
ext p
age
Return to Phase 0 for corrective
action
No
Submit to Customer
Phase 1 Warrant
[#18]
Phase 2 Warrant
Scheduled down time
defined (TPM, change over, Breaks etc.)
Sub supplier material status
from Tier-x Phase 3
EVENT: Conduct Capacity
Verification Run STATUS:Phase 3
Completed
Quantity required is
customer DPV for one full day
All personnel for all shifts,
trained
Are the CVR input
requirements in place for all production
streams?
Yes
END
Status Tracking Database
Return to affected phase
and start corrective action
Phase 3 Warrant
[#18]& Capacity Analysis
Report
Determine Root Cause &
Plan Corrective Action
Was the control plan followed& acceptable parts
produced?
Did the volume of acceptable
parts produced meet or exceed the required
DPV?
No
Yes
No
3
Requ
ired
Inpu
ts
Phase 0 Phase 1 Phase 2
Phase 0Run-at-Rate
Phase 1Quality Verification Phase 2
Production VerificationPhase 3Capacity Verification
1 - Design Records2 - Engineering Change Documents3 – Customer Engineering Approval 4 - Design FMEA5 - Process Flow Diagrams6 - Process FMEA7 - Control Plans8 - Measurement System Analysis Studies16 - Checking Aids17 - Customer-Specific Requirements
9 - Dimensional Results10 - Records of Material / Performance Test Results11 - Initial Process Studies12 - Qualified Laboratory Documentation13 - Appearance Approval Report14 - Sample Production Parts15 - Master Sample18 - PPAP Warrant
PPAP Warrant (element 18)
Run-at-Rate for all production streams (element 1 – 8, 16, 17)
Quality Verification for all production streams (element 9 – 15)
Capacity Analysis Report
Capacity Analysis Report PPAP Warrant (element 18)
Have Run-at-Rates (Phase 0) been
conducted and Quality Verifications (Phase 1) been satisfied for ALL production streams?
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Phase 0: Run-At-Rate (按节拍生产)Start
Released Design[#1, 2, 3, 4]
Trained supplier production operators
Sub-supplier(s) material status
from Tier-X Run-at-Rate
Quantity of parts required as defined
by customer (default 300
consecutive parts)
Job 1 location (final site and line)
Production process including control
plan, flow diagram instructions, and
Process Parameters
[#5, 6, 7]
Production tools, facilities, and
gauging[#8, 16, 17]
Planned production cycle times required to
support daily production volume
Are the Run-at-Rate input requirements in place for
the production stream?
Was the pre-launch
Control Plan
followed?
Were the prescribed number of acceptable
parts produced?
Were the parts
produced in the defined
period?
Did all operations meet their planned
cycle time?Implement corrective action on
input
EVENT: Conduct Run-
at-Rate
STATUS: Phase 0
Complete
Capacity AnalysisReport
Status Tracking Database
4
1
YES
NONO
NO
NO
NO
YES
YES
YES
Submitto customer
Outputs from the event
YES
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Phase 1 Prerequisites (Phase 1 的先决条件) In order to begin Phase 1, the following are required:
要进入 Phase 1 ,必须达到以下条件:– Successful completion of Run-at-Rate (Phase 0) for at least one work strea
m
– 对至少一条生产线成功完成节拍生产
– Capacity Analysis Report completed for at least one Job1-intended producti
on work stream
– 对至少一条生产线成功完成产能分析
– Tier “X” successful completion of Phase 1
– 分供方完成了 Phase 1 PPAP.
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Phase 1: Quality Verification ( 质量验证)
1
Continue Production Part Approval Process (PPAP) using parts from Phase 0
• Dimensional measurements [#9]• Material tests [#10]• Statistical process package [#11]• Performance tests [#12]• Appearance criteria [#13]• Sample parts [#14]• Master samples [#15]• Customer-specific requirements [#17]• As defined by PPAP
Return toPhase 0 for
corrective action
STATUS: Phase 1
Complete
Phase 1 Warrant
[#18]
Status Tracking Database
4
2
NO
Submitto customer
YES
Have the
PPAP elements been satisfie
d?
Important note: for suppliers with only one production stream, completion of Phase 1 & 2 occur at the same time.
4
What is required to get Phase 1 PSW approval?获得 Phase1 PSW 的条件
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Input Requirements ( Phase 2 的先决条件)
Phase 2 requires the following ( Phase2 需要以下条件) :
– All Job 1 intended production work streams have successfully compl
eted Run-at-Rate (所有生产线都成功完成了节拍生产)– Capacity Analysis Reports completed for all Job 1 intended producti
on work streams (所有生产线都成功完成了产能验证)– Tier ‘X’ successful completion of Phase 2 ( 分供方完成 Phase 2
PPAP).
Page 51 – Define Tier X and include note requesting add’l info for script due to sound
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Phase 2: Production Verification (生产验证)
2STATUS: Phase 2
Complete
Phase 2 Warrant
[#18]
Status Tracking Database
3
NO
Submitto customer
YES
Have Run-at-Rates (Phase 0_ been conducted and
Quality Verifications (Phase 1) been satisfied for ALL
streams?
Important note: Phase 2 and Phase 3 can happen concurrently if all inputs
and outputs are satisfied.
4
Copyright © 2000-2004 Ford Motor Company. All rights reserved.
Phase 3: Capacity Verification
3
Are all personnel for all shifts
trained?
Quantity required is customer DPV for one full day
Phase 2 Warrant
Scheduled down-time defined (TPM,
change-over, breaks, etc.)
Sub-supplier material status
from Tier ‘X’ Phase 3
Are the CVR input
requirements in
place for all
production
streams?
Was the production
control plan
followed and
acceptable parts
produced?
Did the volume of acceptable parts meet or exceed
the required DPV?
Determine root cause and plan corrective action
EVENT: Conduct Capacity
Verification Run
STATUS: Phase 3
Complete
Phase 3 Warrant [#18]
& Capacity AnalysisReport
Status Tracking Database
YES
Submitto customer
Outputs from the event
NO
End
Return to affected phase and start corrective action
Complete Capacity Analysis
Worksheet
Phase 0 Phase 1 Phase 2 Phase 3
NO
NO
YES
YES
Ford Special Requirements to PPAP 18 Elements
福特对生产件批准 18 个要素的要求
1. Design Record 设计记录• The design must be released and authorized by Ford D&R.• 总成图必须获得福特设计工程师的批准,并在福特系统中 (WERS) 发布。• Where the design record is in electronic format, the organization shall produc
e a hard copy (e.g., GD&T drawing) to identify measurements taken.• 当设计记录 ( 如 CAD/CAM 数模、零件图纸、技术规范 ) 是以电子格式(如数模)存在时,供应商必须复制一份硬拷贝(如示意图、几何尺寸和公差表、图纸)以标识测量的内容。 • Engineering change level properly indicates the latest design change.• 工程变更等级必须符合最新的设计变更状态• For FSS, if the parts are identified as black box, the design record should at le
ast specifies the interface and performance requirements. (e.g. Vehicle Assembly Position).
• 对全服务供应商,对于定义为黑盒子的零件,设计记录要规定和其他件配合的关系和性能要求。
2. Engineering Change Documents 工程变更文件• SREA signed by CFT. 《供应商工程变更申请》
• WERS Concern. - 如果有权限进入 WERS ,供应商可以通过 WERS Concern 来提交设计变更 - 福特提出的设计变更通过 WERS Concern 来通知供应商和内部相关人员
WERS = World Engineering Release System
3. Customer Engineering Approval 客户工程批准• The organization shall obtain documented Ford Product Development
engineering approval of DV (Design Verification) and PV (Production Validation) tests of the initial sample parts.
供应商必须获得福特 PD 部门对 D/PVP&R 的书面批准。• The organization shall conduct the PV testing on parts/products which were
produced at “run at rate”. (使用节拍生产出来的零件进行 PV 试验)• Where appropriate, Ford Engineering records initial sample part approval on
the ESER/ESO. 工程批准的方式可能有很多: ESER, ESO, DVP&R…
• WERS Alert for Interim-Approval. 临时批准需要有 WERS Alert 支持。
4. DFMEA 设计不良模式效应分析• When developing FMEA, the requirements of Ford FMEA handbook (special
characteristic definition) shall be met. 有产品设计职责的组织,必须按照福特的 FMEA 手册开发设计 FMEA 。• For parts with YC/CC, DFMEAs must be approved in writting by Ford D&R
engineer. 如果零件有关键特性( YC/CC, 车辆安全规范或政府法规控制), DFMEA 要获得福特设计工程师的书面确认。• Ford reserves the right to review and approve all organization-developed
DFMEAs. 福特保留审核和批准供应商开发的 DFMEA 的权利。• Over patent concerns, sometimes, supplier does not wanna share DFMEA,
we could review it at the supplier site or have the supplier bring them to our office. (现场审核 DFMEA 硬拷贝)
5. Process Flow Diagram 过程流程图制造过程绘制 Mapping the Manufacturing Process.• 组队• Organize the team
• 制作过程流程图• Develop A Process Flow Diagram
• 确定每一过程的偏差来源• Identify sources of variation in each process
• 结合经验教训• Incorporate lessons learned
• 记述各个步骤的目的• Describe purpose of each step
5. Process Flow Diagram 过程流程图Op 编号Op No.
偏差来源Sources of Variation
操作描述Operation
Description (Purpose of Op.)
Op. 标记Op. Symbol
产品特性Part Characteristic
过程特性Process Characteris
tics
6. PFMEA 过程 FMEA
General Procedure to develop PFMEA: 编制过程 FMEA 的一般流程• Ask the questions:
• 哪些方面可能会出现错误?• What can go wrong?
• 如果发生了会怎样!产生什么影响?• So what !!! Effect ? 不产生功能
No function产生部分功能Partial出现不需要的功能Unintended function
• 原因?• Cause (s)?
6. PFMEA 过程 FMEA
General Procedure to develop PFMEA: 编制过程 FMEA 的一般流程( 续 )
– 当此情况发生需要采取何种措施?当此情况发生需要采取何种措施?– What do we do when this happens?What do we do when this happens?
• 来预防故障来预防故障• To prevent the failureTo prevent the failure
• 来发现故障来发现故障• To detect the failureTo detect the failure
– 假如还不够, 那么:假如还不够, 那么:– If that is not enough, then:If that is not enough, then:
• 还需要做什么?还需要做什么?• What else need to be done?What else need to be done?
6. PFMEA 过程 FMEA
Process FEMA Output 过程 FEMA 输出: • 哪些需要被控制• What needs to be controlled
• 对于产品和过程来说哪些是关键的? • What is critical in the product & the process
• 怎样来控制这些• How to control these things
6. PFMEA 过程 FMEA
• If DFMEA does not exist, the team must have a meeting with the Design Engineer - using the CRT approach.
如果没有 DFMEA ,供应商需要和福特设计工程师确定关键特性和显著特性的清单。• For parts with CC, PFMEAs need to get Ford Engineering & STA Approval. 对有关键特性的零件, PFMEA 要获得福特 PD 和 STA 的批准。• Characteristic traceability is required from the DFMEA through the PFMEA to the
Control Plan (Supp.K). 要保证特殊特性在各个文件中的一致性。• Error Proving list is one output of PFMEA. 防错清单是 PFMEA 的一个重要输出。• PFMEA is living document. (8D, SREA…) PFMEA 要不断更新。
7. Control Plan 控制计划• 对过程按从开始到结束的逻辑顺序• Documenting the logical order of processes, start to finish
• 说明产品特性及过程参数• Specify product characteristics and process parameters
• 对什么进行控制及怎样控制• What to control & how
• 何时进行控制及控制程度• When to control & how much
• 如遇故障,下步需做什么• What to do, if all failed
7. Control Plan 控制计划• CC/SC list is properly cascaded in to CP. 控制计划要体现对特殊特性的有效控制。• Incoming Inspection is the 1st part of CP. 来料检验是控制计划的第一部分。• The Reaction Plan should be evaluated for effectiveness and use. 评估应变计划以验证其有效性• Lists all process parameters and part characteristics that require specific quality
planning actions. 对产品特性和过程特性都要规定有效的控制措施• STA approval. STA 批准(对 CC 件,要获得福特 PD 和 STA 批准)• Living documentation. (根据变更和 8D 更新控制计划)
7. Control Plan 控制计划
Potential Critical Characteristics andSignificant Characteristics Identified
DFMEA
DVP & R
PFMEA
DVP&R
Pre- Launch Control Plan
Production Control Plan
Prototype Control Plan
Modification of PFMEA (as required)
Standard Work Instructions/Visual Aids
Process Flow Diagram
• Employee & Customer Safety• Government Regulations • Design• Field Actions • Warranty• Customer Concerns
Actual Critical Characteristics andSignificant Characteristics Identified
8. Measurement System Analysis 测量系统分析研究• All gauges (both general or dedicated) in Control Plan. 无论测量系统的类型是什么,用于检查福特产品的所有量具 , 都需进行量具再
生 /再现性分析。 • MSA 3.0 based. 基于 MSA3.0版本• Associated % tolerance and % study variation. 在总偏差中的量具误差占公差的比例和过程变差的比例。• To variable gages, the parts used for the Gauge R&R study must be within
Design Record specifications. 对计数型量具,用于 MSA 的零件必须符合设计规范。• The acceptance criteria for Gauge R&R as a percent of TOLERANCE is less
than 10%. If %tolerance is over 10% customer approval is needed. The Gauge is unacceptable if % tolerance is over 30%. NDC more than 5.
• ANOVA Method preferred with Minitab. (优先使用方差方法)
9. Dimensional Results9. Dimensional Results 全尺寸报告全尺寸报告• Dimensional Measurements to compare the actual part with the drawing
(bubble prints). Default are 3 parts measured (5 pcs preferred). 比较实际零件是否符合设计记录的要求,默认三件。• If production parts will be produced from more than one cavity, mold, tool,
die, pattern or production process, a dimensional evaluation on one part from each should be completed.
对于每个独立加工的过程,如:生产单元或生产线,和所有的多模腔、成型模、模型或冲模,都必须有全尺寸测量结果。• Make one of the parts measured as "Master Sample“. 将其中一个零件作为标准样品
10. Material/Performance Test Results 材料 / 性能试验结果的记录• Where Ford specifies that materials are to be purchased from an approved supplier, th
e organization should contact the buyer to determine appropriate materials suppliers. 对特殊材料必须选择福特指定的供应商。• Ford PD is supposed to approve the PV test plan, and to sign the PVP&R. PV 试验计划要获得福特 PD 的确认。 PV 试验成功完成后, PD 要在 PVP&P上签字。• All PV test requirements are clearly identified in the DVP&R. (PVP&R) D/PVP&R 中必须规定试验设备。• PV testing is supposed to use run at rate parts. PV 试验的零件来自节拍生产• All test equipment used for PV Testing is available and in the appropriate location (full
y calibrated and certified). 试验设备要经过校准和确认。
11. Initial Process Study 初始过程研究• MSA should be conducted before Ppk study. 在进行初始过程研究之前,必须确保量具已经做过 MSA 。• Ppk is required for Initial Process Study, SCs and CCs must meet at minimu
m 1,67 Ppk. 特殊特性要满足 Ppk>=1.67 的要求。• Focus on variables data. 针对计数性数据• If Ppk < 1.67, Error Proofing or 100% Inspection is required. 如果不能满足 Ppk>=1.67 的条件,必须采用防错或者 100%检测来控制该特性。
Cpk or Ppk?
- Cpk is to determine if the process is capable to meet specifications, and is a prediction of what your process can do.
- The process has to be in statistical control.
- At leat 100 individual samples available.
when you can't determine statistical control or if you are looking at a very short production run, Ppk should be used.
12. Qualified Lab Documentation 合格的实验室文件• The qualified laboratory (internal or external) shall have a laboratory scope
and documentation to show it is qualified to conducted the inspection and testing for PPAP.
组织必须有一份实验室范围和说明所使用的实验室遵循的证明文件。• The external laboratory shall be in compliance with the latest ISO/IEC 17025
(or national equivalent). 外部实验室要符合最新 ISO/IEC 17025 的要求 (或所在国等同要求)
13. Appearance Approval Report 外观批准报告• All parts/products having appearance criteria shall be reviewed and
approved by the appropriate Ford activity (Design Quality).• 当产品和零件在设计记录上有外观要求且要求提交时,则每一个零件或零件系列都必须填写一份单独的外观批准报告( AAR )。• Appearance approval includes, but is not limited to: overall appearance,
surface quality, color, texture, and gloss.• 外观批准包括整体外观,表面质量,颜色,皮纹和光泽度等等。• Visual "match-to-master" is the specified requirement for AAR sign-off.
Numeric evaluations should only be used for on-going quality control after visually acceptable parts/products are attained.
• AAR 是福特精致工艺部门参照外观标准对零件的视觉比较(主观的)。计量型评价方法只可以作为生产过程控制的方法来使用,但必须在获得 AAR 之后。• AAR plan and Pre-AAR.
14. Sample Production parts 生产件样品• Customer defines the quantity. • 客户规定生产件样品的数量。• Sample Parts are needed for the parts functioning in the Vehicle or Powertra
in Assembly 。• 生产件样品用来在整车厂或发动机厂作功能性装车试验。• Photos as evidence is acceptable.• 可以使用照片作为证据。
15. Master Sample 标准样件• Master sample which is retained in the supplier’s site for reference. Master
sample has the same life as PPAP package.• 标准样件由供应商负责保管,保存期与生产零件批准文件的保存期相同 。• Supplier shall retain a master sample from each position of a multiple cavity die,
mold, tool or partern, or production process unless otherwise sepcified by the customer.
• 组织必须保存一份由多腔模具、铸模、工装、仿形模或生产过程的每一腔模具生产的样件。• Customer (STA&PD) signature with approval date.• 标样必须标识顾客批准标样的日期。 • Dimensional Result is required form Master Sample • 标准样件要有全尺寸报告
16. Checking Aids 检查辅具• Gauge strategy and drawing approved by customer.• 专用检具和特殊工装的图纸。检验辅具可以是零件专用检具,包括卡具、量规、模形、模版及聚酯薄膜。• The gauges are to the latest design level.• 检具必须符合零件的最新设计状态。• MSA study to checking fixtures is required.• 对专用检具要做MSA 分析。
17. Customer Specific Requirements 客户特殊要求 -Packaging Approval 包装批准• Expendable Package VS. Returnable Dunnage.• 一次性包装 VS. 可回收包装• Forms: 表格 - FoE&FAP: FORM 1121 (via FSBC) 福特欧洲和亚太: 1121 表 (福特澳洲通过 FSBC 提交) - NA: FORM 150E 福特北美: 150E 表• Trial shipment that simulates the production logistics process. (Water
Shipment Trial for exporting suppliers)• 如果使用福特指定的物流商,供应商需要完成海运试验来支持包装批准。
17. Customer Specific Requirements- Capacity Verification (产能验证)
• Measure the ability of a supplier to meet Ford Motor Company’s Capacity Planning Volume (CPV) with quality parts, on time.
• 目的是验证供应商能否满足福特产能的要求。• Capacity verification to each work station to identify the bottleneck process• 产能验证要细化到每个工位来识别瓶颈工序。• CPV information should be provided by buyer.• 福特采购部门提供计划产能信息。
17. Customer Specific Requirements - Supplement-K & IMDS - K 表和国际材料数据系统• Supp.K is used to demonstrate the linkage between the Drawing - FMEAs -
Control Plans - Operator Instruction Sheets.• K 表用来验证不同文件(图纸, DFMEA , PFMEA ,控制计划和操作指导书)之间的联接性• All material need to comply to requirement of WSS-M99P9999-A1.• 通过国际材料数据系统报告零件材料成分。
VPP UsageVPP 的使用
What is VPP?什么是 VPP?
• VPP = Vehicle Parts Progress (整车零部件进展)• Online data management & tracking system for Phased PPAP.• 对阶段性生产件批准的在线数据管理和追踪系统。• Allows STA and Program team to track part Phased PPAP status.• STA 和项目组可以及时的跟踪阶段性生产件批准的状态。• Reports Approval or Rejection of PPAP Submission warrants.• 在线批准或拒绝 PSW.
• Generate reports by part, supplier, program.• 可以根据零件,供应商和项目生成相应的报告
How supplier to load Phased PPAP Promised Dates into VPP? 供应商如何提交信息?
STA Approval thru VPP在线批准CMMSFOGA VPP PART DETAILS 07/26/04 07:31:45 ==> _________ __________________________________________________ PART/Descr: 3F23- 2B195-AG__________ CC: 34 SUPPLIER CODE/Name: S43XC ABC PLASTIC COMONENTS Challenge/By: -- Verification Promises -- -Quality Approval- -Slip Codes/Remarks-
Run-at-Rate: Y 05/03/04 EF247EU 050204 A PG00156 050404 _________________ Quality: Y 05/21/04 EF247EU 052004 A PG00156 0523/04 __________________ Production: P 06/25/04 EF247EU 060704 __________________ Capacity: P 09/14/04 EF247EU 072304 __________________ Demo Wkly Cap: 3250 OTG Exclude: _ ____ Purchse: __ _____________________________ NMP: __ _____________________________
Mfg Locations: 1) S43XC 3 L 2) _ Tool Src: _____ Tool IPD: N ________ Promise Reqd Dt: 02/11/18 Program: 401 Plant: AP20A V/L: TA4 Part Class: NTJ MY: 2004.00 CPSC: Body/Trim: B Auth: P DDL: PPAP Level: 3 Func Appr: Sourced: 02/10/29 Desourced: Ntc/Release Dt: NC00E11425114000 02/10/24 Buyer: GC41 Name: C MULDER CDS: Phone: A PROGRM PLANT B-P IPD Over-ride Part SUP S Alert GYR Rej C ------ ----- ----- -------- -------------------------- --- - --------- - - F1=Help F2=AE0A/User Lookup F4=Prev Supplier F5=Next Supplier F6=FPGA/Supp Plan F9=FQGA/Challenge F10=Prev Part F11=Next Part F13=FRGA/Mfg F14=FNGA/Functioning NO MORE RECORDS AVAILABLE PG00156
SupplierSupplierPromisePromiseDatesDates
SupplierSupplierReady-for-Ready-for-InspectionInspectionDatesDates
PPAPPPAPLevelLevel
STASTAApprovalsApprovals
Thank you!谢谢您!