24
... ااان ا ت ي ت ي ف ت ن م سلا ا ة ي حكا... ااان ا ت ي ت ي ف ت ن م سلا ا ة ي حكاPrepared by Prepared by Belal ali Belal ali Ibrahim Ibrahim ahmed ahmed

حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Embed Size (px)

Citation preview

Page 1: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

حكاية االسمنت في حكاية االسمنت في تيتاااان...تيتاااان...

Prepared byPrepared by

►Belal aliBelal ali►Ibrahim Ibrahim

ahmedahmed

Page 2: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Simply the components of Simply the components of cementcement

►Limestone cacoLimestone caco33

►Clay Clay ►SandSand► Iron oxides or slag (iron ore)Iron oxides or slag (iron ore)

NoteNote : :Vary the ratio of the component to Vary the ratio of the component to another another

Page 3: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

..

►First:First: Removing over burden layer Removing over burden layer ►SecondSecondType of methodType of method : :o Digging in soft material Digging in soft material Ex :sand Ex :sand

quarryquarry..o Ripping in medium to hard material)Ripping in medium to hard material)Ex: Clay and may be limestone Ex: Clay and may be limestone o Drilling and blasting Drilling and blasting (in hard material )(in hard material )

Page 4: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Method of quarrying in L.S Quarry

► 1)Ripping.1)Ripping. ► 2) Drilling and blasting.2) Drilling and blasting.

The two methods depending on theThe two methods depending on theenvironment .environment .

But, But, Ripping: Ripping: need long time and giveneed long time and givesmall amount of rock.small amount of rock.Drilling and blasting:Drilling and blasting: need short time need short time

andand give large amount of rock.give large amount of rock.

Page 5: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Methods of Quarry Methods of Quarry depending ondepending on

►Capacity. Hardness. Cost .Capacity. Hardness. Cost .►Environment .Environment .►Quarry land natureQuarry land nature►Environment .Environment .►Quarry land nature.Quarry land nature.

Page 6: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

DrillingDrilling

► After removing the After removing the over burden layer over burden layer from the quarry from the quarry land we used land we used drilling machine.drilling machine.

Page 7: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

In case of drilling and In case of drilling and blastingblasting

►VerticalVertical► InclinedInclined

Each method had to be special ButThe second method used because

it is more safely

Page 8: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

BlastingBlasting

► After drilling process we usedAfter drilling process we used► Blasting Blasting We useWe use

dynamite + ANFO + Gelatenedynamite + ANFO + Gelatene

• Anfo : moderate effectAnfo : moderate effect• Gelatene : High effectGelatene : High effect

► Note We used both of them during blasting but Note We used both of them during blasting but we used Anfo with high amount than Gelatene.we used Anfo with high amount than Gelatene.

Page 9: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

TransportingTransporting

••AfterAfter using blasting process the using blasting process the

machine transported the blastedmachine transported the blasted

L.s to crusher machine.L.s to crusher machine.

••It isIt is very important to be quarry near very important to be quarry near crusher machine to reduce the cost of crusher machine to reduce the cost of transporting.transporting.

NoteNote : we need to reach to : we need to reach to

HomogeneityHomogeneity

Page 10: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed
Page 11: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Cement production stages

► Quarry ► Raw mix bending ► Row mils ►Preheating (Q) في الحرارة علي بنحصل منين

دي المرحلة► Kiln

►Cooler ► Cement mils ► Packing

Page 12: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Stages of cement productionStages of cement production

►Quarry.Quarry.►Crushing.Crushing.►Raw Mill.Raw Mill.►Kiln.Kiln.►Cement Mill.Cement Mill.

Note : we have get the material from Note : we have get the material from the quarry so we are going throw the the quarry so we are going throw the process of manufacture process of manufacture

Page 13: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

••Before the rock enter Before the rock enter to crusher .theto crusher .the

rock must be in size rock must be in size (65x65) Cm.  (65x65) Cm.  

••If the blasted L.s rock If the blasted L.s rock is large we usedis large we used

(hydrollic hammer ) for (hydrollic hammer ) for reducing itsreducing its

size     size     

••The crusher capacity The crusher capacity is (1500 Ton/H ).is (1500 Ton/H ).

L .S L .S HammerHammercrushercrusher

Page 14: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Control of hammer crusher

Page 15: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

BeltsBelts

Safety of belts:Safety of belts:►1)Drift switch1)Drift switch

Prevent the belt from Prevent the belt from displacement .displacement .

►2)Rope switch2)Rope switch

Prevent persons and belts.Prevent persons and belts.►3)Speed switch3)Speed switch

To watch the dorphel movement.To watch the dorphel movement.

Page 16: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Belts

Page 17: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed
Page 18: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Magnet

Page 19: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Clay quarry

Clay is Hydrous Al Silicate.► •We have two quarries of clay► Clay 1 (rich with Alumina –dark in color )► Clay2 (rich with Silica –lighter in color )► Clay is the source of (Al-oxides & Si-oxides

inlarge amount and Fe-oxides in small amount )

Stages of clay quarry► 1) Removing the over burden layer► 2) Ripping (because it is softer than L.s).► 3) Transporting .

Page 20: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

The clay crusher machine (roller machine)

►The clay crusher give 500 Ton/H

Page 21: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

The clay crusher control system

Page 22: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Reclemer

Page 23: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Stacker

Page 24: حكاية الاسمنت في تيتاااان... Prepared by ► Belal ali ► Ibrahim ahmed

Buffer soil (storage)

►In normal case it stored 3000 ton