The wind potential in Romania

A wrong solar map of Roamania

The solar potential in Romania . An improve one.

A more exact map of solar irradiation

Investment efficciency balance between wind and photovoltaic.

Romanian case.

Study case:3 milion euro investment fund

A private look and a state look.

3 mil euro with Vestas V100 an 3 different wind location

3 mil euro with Vestas V100 on other 3 different wind location

Locatia (sursa)FC [%]

Energy [Gwh/yr]

T.recuperareactualizat [yr] Observatii

Tetchea (3tier) 21,87 3,44 13,63

Calarasi (3tier) 24,52 3,86 11,51

Arsuri (3tier) 32,51 5,12 8,07

Fantanele (3tier) 32,81 5,17 8,01

BERLIN (dwia) 36,66 5,78 6,77

Dealu (3tier) 37,59 5,92 6,72

ALBACETA (dwia) 38,57 6,07 6,36

Istria larg (3tier) 38,59 6,08 6,35

Tarnita (3tier) 43,08 6,79 5,71

Cheatra (3tier) 44,81 7,06 5,33

Simulare L220 mod (50€/Mwh CV=45€)fara indexare cu inflatia

cu turbina VESTAS V100 Hturb=100m

@ 1,3euro/wat

investitie 3mil eurodin care 33% CM

Wind location comparison. References: Fantanele, Berlin, Albaceta

3 milion fotovoltaic farm on the best Romanian solar site

3 milion fotovoltaic farm on the worst Romanian solar site

Locatia(sursa NASA)

Radiatia H

[Kwh/mp/day]

Energy

[Gwh/yr]

T.recupactualiz

[yr] Observatii

Sahara 5,26 2,19 5,11

Craiova 3,71 1,55 7,75

Mangalia 3,69 1,52 7,81

Cluj Napoca 3,31 1,37 9,01

Cottbus 2,78 1,16 11,33

Simulare cf L220 modif (50€/Mwh CV=45€)

cu panouri cu ef14,5% la 2,5€/W

investitie 3mil eurodin care 5% CM

Comparison between different solar sites. Refferences Sahara and Cottbus(Ge)

3 mil euro investment balance: photovoltaic vs wind

Locatia(sursa)

FC [%]

Radiatiape oriz.

[kwh/mp/an]

Energy [Gwh/yr]

T.Recupactualiz

[yr]

Simulare cf legii 220/2008

modificata L139/2010

Tetchea 21,87 3,44 13,63

Arsuri 32,51 5,12 7,87

Fantanele 32,81 5,17 8,01

Dealu 37,59 5,92 6,72

Istria larg 38,59 6,08 6,35

Tarnita 43,08 6,79 5,71

Cheatra 44,81 7,06 5,33

Craiova 3,71 1,55 7,75

Mangalia 3,69 1,54 7,81

Cluj 3,31 1,38 8,96

Brasov 3,30 1,37 9,01

cu panourifotovoltaice cu ef. 14,5% @ 2,5euro/w investitie 3 mil euro

50euro/Mwh 45euro/Mwh

cu turbinaVESTAS V100 Hturb=100m @ 1,3 euro/w investitie: 3 mil euro

Cu corectie de inflatie medie pe 15 ani de 4% (37,8 - 77euro/CV)

Tetchea 21,87 3,44 9,73

Fantanele 32,81 5,17 5,82

Dealu 37,59 5,92 4,95

Istria larg 38,59 6,08 4,82

Tarnita 43,08 6,79 4,23

Cheatra 44,81 7,06 4,05

Craiova 3,71 1,55 5,36

Mangalia 3,69 1,54 5,39Cluj 3,31 1,38 6,13Brasov 3,30 1,37 6,15

cu panourifotovoltaice cu ef. 14,5% @ 2,5euro/w

investitie 3 mil euro

57euro/Mwh CV compensat cu infl. 63euro/CVcu turbina VESTAS V100 Hturb=100m @ 1,3 euro/w investitie: 3 mil euro

INVESTITOR PRIVAT-AUTORITATI PUBLICEalte constrangeri

VOLUMUL de investitii versus aria “imobilizata”Mic in zona montana, mare in zona de campie

Eolian (1,8Mw) Fotovoltaic(1Mw)Proiect si date Minim 1 an Minim 1 lunaCertificate autorizari Greu de precizat datorita politiculuiRealizare ~ 1 an ~ 2 luni

TIMPUL INVESTIRII (cazul eolian)

7,196,936,456,06T.R. actualizat2016201520132011Fantanele

DURATA PROIECTULUI

Cazul parcului Fotovoltaic (200ha)de la Cluj Napoca

Photovoltaic world - senior PV market analyst Sam Wilkinson:

After two years of solid growth, demand has softened and PV modules are

being priced highly competitively as a result,he writes in a report: "We've seen modules

from recognized brands being offered for less than $1.45/W (~€1.02).“

30th June 2011

P.Solar Cluj Napoca (200ha) with brand solar equipment

P.Solar Cluj Napoca (200ha) with cheap solar equipments

P.Solar Cluj Napoca (200ha) with cheap equipment and inflation correction

Cluj Napoca photovoltaic parc (200ha)

Only a very good incentives?Or a “political” affair?

DANEMARCAUniv. Aalborg planifica energetic Danemarcaanului 2050 – care va fi 100% pe regenerabile

ROMANIAPoliticieni iau decizia “lautareste” – ca sa-l citezpe C.Noica, nu sunt interesati profesionisti

DIFFERENT RENEWABLE ABORDATIONS

EFFICIENCY is the key of energy

THANKS

Octavian Capatina

RoEnergy,

7-9 July 2011, Bucharest