COUNTY AGENCY PIN PROJECT DESCRIPTION FUND SOURCES FFY TOTAL 4-YEAR PROGRAM in millions of dollars PHASE AQ CODE FFY 2022 FFY 2023 FFY 2021 FFY 2020 4-YEAR PROGRAM (FFY) Starting October 01, 2019 Tuesday, November 3, 2020 Page 1 of 74 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST 0.108 NHPP 0.108 DETLDES 2020 DETLDES 0.027 0.027 2020 NFA 0.173 NHPP 0.173 PRELDES 2020 PRELDES 0.043 0.043 2020 NFA 0.189 0.189 CONINSP NHPP 2021 CONINSP 0.047 0.047 2021 NFA 1.828 1.828 CONST NHPP 2021 CONST 0.456 0.456 2021 NFA NYSDOT 100132 NY 2 BRIDGE OVER NY 22, BRIDGE REPLACEMENT TOWN OF PETERSBURG, RENSSELEAR COUNTY, BIN 1000250. R313 2.871 0.351 2.520 0.000 0.000 AQC:A19P TOTAL 4YR COST : RENSSELAER TPC : $2-$4 M 0.266 NHPP 0.266 CONINSP 2020 CONINSP 0.067 0.067 2020 NFA 2.660 NHPP 2.660 CONST 2020 CONST 0.665 0.665 2020 NFA 0.160 NHPP 0.160 DETLDES 2020 DETLDES 0.040 0.040 2020 NFA 0.031 NHPP 0.031 ROWACQU 2020 ROWACQU 0.007 0.007 2020 NFA 0.001 NHPP 0.001 ROWINCD 2020 ROWINCD 0.001 0.001 2020 NFA NYSDOT 100136 NY RT. 2 BRIDGE OVER THE POESTENKILL, BRIDGE REPLACEMENT TOWN OF BRUNSWICK, RENSSELAER COUNTY, BIN 1000190. R316 3.898 3.898 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST : RENSSELAER TPC : $3.3-$5.6 M 0.004 NHPP 0.004 ROWINCD 2020 ROWINCD 0.001 0.001 2020 NFA 0.224 0.224 CONINSP NHPP 2021 CONINSP 0.056 0.056 2021 NFA 2.255 2.255 CONST NHPP 2021 CONST 0.564 0.564 2021 NFA 0.125 0.125 DETLDES NHPP 2021 DETLDES 0.031 0.031 2021 NFA 0.056 0.056 ROWACQU NHPP 2021 ROWACQU 0.014 0.014 2021 NFA NYSDOT 100716 NY RT. 144 BRIDGE OVER HANNACROIS CREEK, BRIDGE REPLACEMENT TOWN OF COEYMANS, ALBANY COUNTY, BIN 1038070. A576 3.330 0.005 3.325 0.000 0.000 AQC:A19P TOTAL 4YR COST : ALBANY TPC : $3.3-$5.6 M

** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 1 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.108 NHPP 0.108 DETLDES2020DETLDES 0.027 0.027 2020NFA

0.173 NHPP 0.173 PRELDES2020PRELDES 0.043 0.043 2020NFA

0.189 0.189 CONINSPNHPP 2021CONINSP 0.047 0.047 2021NFA

1.828 1.828 CONSTNHPP 2021CONST 0.456 0.456 2021NFA

NYSDOT

100132

NY 2 BRIDGE OVER NY 22, BRIDGE REPLACEMENT

TOWN OF PETERSBURG, RENSSELEAR COUNTY, BIN 1000250. R313

2.871 0.351 2.520 0.000 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $2-$4 M

0.266 NHPP 0.266 CONINSP2020CONINSP 0.067 0.067 2020NFA

2.660 NHPP 2.660 CONST2020CONST 0.665 0.665 2020NFA

0.160 NHPP 0.160 DETLDES2020DETLDES 0.040 0.040 2020NFA

0.031 NHPP 0.031 ROWACQU2020ROWACQU 0.007 0.007 2020NFA

0.001 NHPP 0.001 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

NYSDOT

100136

NY RT. 2 BRIDGE OVER THE POESTENKILL, BRIDGE REPLACEMENT

TOWN OF BRUNSWICK, RENSSELAER COUNTY, BIN 1000190. R316

3.898 3.898 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M

0.004 NHPP 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.224 0.224 CONINSPNHPP 2021CONINSP 0.056 0.056 2021NFA

2.255 2.255 CONSTNHPP 2021CONST 0.564 0.564 2021NFA

0.125 0.125 DETLDESNHPP 2021DETLDES 0.031 0.031 2021NFA

0.056 0.056 ROWACQUNHPP 2021ROWACQU 0.014 0.014 2021NFA

NYSDOT

100716

NY RT. 144 BRIDGE OVER HANNACROIS CREEK, BRIDGE REPLACEMENT

TOWN OF COEYMANS, ALBANY COUNTY, BIN 1038070. A576

3.330 0.005 3.325 0.000 0.000 AQC:A19P TOTAL 4YR COST :ALBANY TPC : $3.3-$5.6 M

Page 2: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 2 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.140 NHPP 0.140 CONINSP2020CONINSP 0.035 0.035 2020NFA

1.650 NHPP 1.650 CONST2020CONST 0.412 0.412 2020NFA

0.050 NHPP 0.050 DETLDES2020DETLDES 0.012 0.012 2020NFA

0.050 NHPP 0.050 PRELDES2020PRELDES 0.012 0.012 2020NFA

NYSDOT

102409

ROUTE 196 OVER DIKE ROAD (CANAL), BRIDGE REPAIR, TOWN OF KINGSBURY, WASHINGTON COUNTY, BIN 4039820

2.361 2.361 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M

0.800 0.800 PRELDESSTBG FLEX 2022PRELDES 0.200 0.200 2022NFA

0.738 0.738 CONINSPSTBG FLEX 2023CONINSP 0.184 0.184 2023NFA

7.380 7.380 CONSTSTBG FLEX 2023CONST 1.845 1.845 2023NFA

0.800 0.800 DETLDESSTBG FLEX 2023DETLDES 0.200 0.200 2023NFA

NYSDOT

103955

US ROUTE 9W OVER CSX/CP RAIL, BRIDGE REPLACEMENT

TOWN OF BETHLEHEM, ALBANY COUNTY, BIN 1007570. A598

12.147 0.000 0.000 1.000 11.147 AQC:A19Z TOTAL 4YR COST :ALBANY TPC : $9.5-15.5 M

0.160 NHPP 0.160 PRELDES2020PRELDES 0.040 0.040 2020NFA

1.120 1.120 DETLDESNHPP 2021DETLDES 0.280 0.280 2021NFA

1.600 1.600 CONINSPNHPP 2022CONINSP 0.200 0.200 2022NFA

11.200 11.200 CONSTNHPP 2022CONST 2.800 2.800 2022NFA

NYSDOT

104342

RT. 9 OVER I-87 AT EXIT 17 BIN 1005679, BRIDGE REPLACEMENT AND INTERCHANGE REALIGNMENT ; TOWN OF MOREAU , SARATOGA COUNTY SAR115

17.400 0.200 1.400 15.800 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $15-$25 M

0.400 NHPP 0.400 DETLDES2020DETLDES 0.100 0.100 2020NFA

0.400 NHPP 0.400 PRELDES2020PRELDES 0.100 0.100 2020NFA

0.748 0.748 CONINSPNHPP 2021CONINSP 0.187 0.187 2021NFA

7.185 7.185 CONSTNHPP 2021CONST 1.797 1.797 2021NFA

NYSDOT

104357

US ROUTE 9 BRIDGE OVER I-90 (EXIT 11), BRIDGE REPLACEMENT

TOWN OF SCHODACK, RENSSELAER COUNTY, BIN 1092730. R315

10.917 1.000 9.917 0.000 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $9.5-15.5 M

Page 3: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 3 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.015 STBG LG URB 0.015 ROWACQU2020ROWACQU 0.004 0.004 2020NFA

0.052 0.052 CONINSPSTBG LG URB 2021CONINSP 0.013 0.013 2021NFA

0.434 0.434 CONSTSTBG LG URB 2021CONST 0.108 0.108 2021NFA

TN OF EAST GREENBUSH

104358

US RT. 9 AND 20 SIDEWALK CONSTRUCTION FROM BRUEN COURT TO THE RENSSELAER CITY LINE.

TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R309

0.626 0.019 0.607 0.000 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : $0.6-$1.5 M

0.110 0.110 DETLDESNHPP 2021DETLDES 0.027 0.027 2021NFA

0.110 0.110 PRELDESNHPP 2021PRELDES 0.027 0.027 2021NFA

0.154 0.154 CONINSPNHPP 2022CONINSP 0.038 0.038 2022NFA

1.182 1.182 CONSTNHPP 2022CONST 0.295 0.295 2022NFA

NYSDOT

104360

ROUTE 9 OVER ROGERS BROOK, BIN 1005790, BRIDGE REPAIR OR REPLACEMENT. TOWN OF SCHROON, ESSEX COUNTY. E

1.943 0.000 0.274 1.669 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

0.204 0.204 PRELDESSTBG LG URB 2021PRELDES 0.051 0.051 2021NFA

0.240 0.240 DETLDESSTBG LG URB 2022DETLDES 0.060 0.060 2022NFA

0.456 0.456 CONINSPSTBG LG URB 2023CONINSP 0.114 0.114 2023NFA

4.582 4.582 CONSTSTBG LG URB 2023CONST 1.146 1.146 2023NFA

NYSDOT

104517

NY RT 378 OVER HUDSON, BRIDGE PAINTING

VILLAGE OF MENANDS AND CITY OF TROY, ALBANY COUNTY AND RENSSELAER COUNTY, BIN 1062850. A600

6.853 0.000 0.255 0.300 6.298 AQC:A19Z TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

0.693 NHPP 0.693 PRELDES2020PRELDES 0.173 0.173 2020NFA

NYSDOT

104518

NY 378 TROY MENANDS BRIDGE STUDY

BRIDGE REPLACEMENT STUDY: EVALUATE OPTIONS TO RELOCATE THE BRIDGE TO A LOCATION TBD. BIKE/PED ACCOMMODATIONS WILL BE EVALUATED.

VILLAGE OF MENANDS AND CITY OF TROY, ALBANY & RENSSELAER COUNTY, A605 & R344

0.866 0.866 0.000 0.000 0.000 AQC:C3Z TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 4: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 4 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.900 NHPP 0.900 CONINSP2020CONINSP 0.100 0.100 2020NFA

8.675 NHPP 8.675 CONST2020CONST 0.964 0.964 2020NFA

NYSDOT

105177

I-787 NB RAMP TO SOUTH MALL EXPRESSWAY WESTBOUND, ELEMENT SPECIFIC BRIDGE REPAIR TO ADDRESS CONDITION RATING

CITY OF ALBANY, ALBANY COUNTY, BIN 109299A. A572

10.639 10.639 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :ALBANY TPC : $9.5-15.5 M

1.920 HPP 1.920 CONST2020CONST 0.480 0.480 2020NFACONST 2.800 2.800 2020NFA

0.572 NHPP 0.572 CONST2020CONST 0.143 0.143 2020NFA

0.640 TAP FLEX 0.640 CONINSP2020CONINSP 0.160 0.160 2020NFA

4.360 TAP FLEX 4.360 CONST2020CONST 1.090 1.090 2020NFA

0.240 0.240 CONINSPSTBG LG URB 2021CONINSP 0.060 0.060 2021NFA

1.108 1.108 CONSTSTBG LG URB 2021CONST 0.277 0.277 2021NFA

NYSDOT

105182

ALBANY SKYWAY (ALBANY CORNING PRESERVE BICYCLE & PEDESTRIAN CONNECTOR RAMP).

CONVERTS NB I-787 RAMP FROM QUAY STREET TO CLINTON AVENUE TO A LINEAR PARK, CONNECTING BROADWAY TO THE CORNING PRESERVE

CITY OF ALBANY, ALBANY COUNTY. A588

REPURPOSED DEMO ID NY060 PROGRAM CODE RPS0

13.850 12.165 1.685 0.000 0.000 AQC:K1P TOTAL 4YR COST :ALBANY TPC : $12.5-$19 M

0.383 NHPP 0.383 CONINSP2020CONINSP 0.043 0.043 2020NFA

3.825 NHPP 3.825 CONST2020CONST 0.425 0.425 2020NFA

NYSDOT

105183

I-787 PAVEMENT CORRECTIVE MAINTENANCE, FROM EXIT 3B TO EXIT 7

CITY OF ALBANY AND VILLAGE OF MENANDS, ALBANY COUNTY. A597

4.676 4.676 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M

0.640 NHPP 0.640 PRELDES2020PRELDES 0.160 0.160 2020NFA

0.640 0.640 DETLDESNHPP 2021DETLDES 0.160 0.160 2021NFA

1.806 1.806 CONINSPNHPP 2022CONINSP 0.451 0.451 2022NFA

18.055 18.055 CONSTNHPP 2022CONST 4.514 4.514 2022NFA

NYSDOT

105185

DUNN BRIDGE WB TO I-787 SB: ELEMENT SPECIFIC REPAIRS

THE REDUCTION IN NHPP REFLECTS CDTC TRADING $4.65M OF NHPP FOR HSIP

CITY OF ALBANY, ALBANY COUNTY, BIN 109294A. A595

26.426 0.800 0.800 24.826 0.000 AQC:A19Z TOTAL 4YR COST :ALBANY TPC : $21-$31 M

Page 5: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 5 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.297 HSIP 0.297 PRELDES2020PRELDES 0.033 0.033 2020NFA

0.051 HSIP 0.051 ROWINCD2020ROWINCD 0.005 0.005 2020NFA

0.675 0.675 CONINSPHSIP 2021CONINSP 0.075 0.075 2021NFA

4.500 4.500 CONSTHSIP 2021CONST 0.500 0.500 2021NFA

0.225 0.225 DETLDESHSIP 2021DETLDES 0.025 0.025 2021NFA

0.562 0.562 ROWACQUHSIP 2021ROWACQU 0.062 0.062 2021NFA

NYSDOT

108540

CARMAN ROAD SAFETY ENHANCEMENTS

TWO ROUNDABOUTS (ONE AT CARMAN ROAD AND LYDIUS STREET AND ONE AT CARMAN ROAD AND THE RAMP TO I-890/I-90)

TOWNS OF GUILDERLAND & ROTTERDAM, ALBANY & SCHENECTADY COUNTY, A583 & S272

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

ALL BUT $4.650M OF THESE FUNDS ARE FROM A STATEWIDE SOLICITATION AND DO NOT COUNT AGAINST CDTC - ' CORE' FUNDING. THE $4.65M HSIP REFLECTS CDTC TRADING $4.65M OF NHPP FOR HSIP.

7.010 0.386 6.624 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

0.450 HSIP 0.450 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.315 0.315 DETLDESHSIP 2021DETLDES 0.035 0.035 2021NFA

0.327 0.327 CONINSPHSIP 2022CONINSP 0.036 0.036 2022NFA

3.272 3.272 CONSTHSIP 2022CONST 0.364 0.364 2022NFA

NYSDOT

108544

NY RT.146 AND CLIFTON COUNTRY ROAD INTERSECTION: SAFETY PROJECT (RM 146 1504 1063-1068), HIGH ACCIDENT LOCATION

INCLUDES RECONSTRUCTING THE INTERSECTION AND REBUILDING THE SIGNAL, IMPROVED PEDESTRIAN ACCOMMODATIONS, AND RESURFACING AND RESTRIPING FROM TALLOW WOOD TO PLANK ROAD.

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA319

4.849 0.500 0.350 3.999 0.000 AQC:A6Z TOTAL 4YR COST :SARATOGA TPC : $4.6-$7.5 M

Page 6: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 6 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.073 0.073 DETLDESSTBG FLEX 2022DETLDES 0.018 0.018 2022NFA

0.073 0.073 PRELDESSTBG FLEX 2022PRELDES 0.018 0.018 2022NFA

TN OF CLIFTON PARK108548

NY 146 AND NY 146A BICYCLE AND PEDESTRIAN ACCESS IMPROVEMENTS, INTERSECTION OF NY 146 AND NY 146A (VISCHER FERRY RD).

1) NEW CURBING AND SIDEWALK & 10-FOOT WIDE MULTI-USE PATH ON NY 146 NORTH SIDE 2) 10-FOOT WIDE MULTI-USE PATH ON EAST SIDE OF VISCHER FERRY RD (CR 90) 3) ADD RECTANGULAR RAPID FLASHING BEACONS AT TWO INTERSECTIONS 4) PEDESTRIAN COUNTDOWN TIMERS WITH PUSH BUTTONS AT NY 146 AND SCHOOL DRIVE 5) BICYCLE SYMBOLS ON NY 146 SHOULDERS.

TOWN OF CLIFTON PARK, SARATOGA COUNTY, SA323

0.182 0.000 0.000 0.182 0.000 AQC:C2Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

0.035 0.035 DETLDESSTBG LG URB 2022DETLDES 0.009 0.009 2022NFA

0.035 0.035 PRELDESSTBG LG URB 2022PRELDES 0.009 0.009 2022NFA

0.046 0.046 CONINSPSTBG LG URB 2023CONINSP 0.012 0.012 2023NFA

0.385 0.385 CONSTSTBG LG URB 2023CONST 0.097 0.097 2023NFA

TN OF GUILDERLAND

108549

CARMAN ROAD SIDEWALKS, OKARA DRIVE TO JUST SOUTH OF EAST OLD STATE ROAD.

CONSTRUCT A 5-FOOT CONCRETE SIDEWALK ON THE EAST SIDE OF CARMAN ROAD.

TOWN OF GUILDERLAND, ALBANY COUNTY. A604

0.628 0.000 0.000 0.088 0.540 AQC:C2Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

0.080 STBG FLEX 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.080 0.080 CONINSPSTBG FLEX 2021CONINSP 0.020 0.020 2021NFA

0.904 0.904 CONSTSTBG FLEX 2021CONST 0.226 0.226 2021NFA

NYSDOT

108977

ROUTE 4 CULVERT C180001, ROUTE 4 OVER SLOCUM CREEK. LARGE CULVERT REPLACEMENT PROJECT - CURRENTLY CIN C180001, FUTURE STRUCTURE WILL EXCEED 20’ CLEAR SPAN AND BE CLASSIFIED AS A BRIDGE. LOCATED AT RM ROUTE 4 1803-1018, TOWN OF GREENWICH, WASHINGTON COUNTY.

1.330 0.100 1.230 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $1.2-$2.5 M

0.263 HSIP 0.263 PRELDES2020PRELDES 0.029 0.029 2020NFA

0.263 0.263 DETLDESHSIP 2022DETLDES 0.029 0.029 2022NFA

0.315 0.315 CONINSPHSIP 2023CONINSP 0.035 0.035 2023NFA

3.150 3.150 CONSTHSIP 2023CONST 0.350 0.350 2023NFA

NYSDOT

108979

US ROUTE 4/I-90 INTERSECTION SAFETY ENHANCEMENTS

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R340

4.434 0.292 0.000 0.292 3.850 AQC:D1Z TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M

Page 7: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 7 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.350 HSIP 0.350 CONINSP2020 2.200 HSIP 2.200 CONST2020

NYSDOT

10PS02

PHASE TWO OF NEW YORK'S FIRST EVER COMPREHENSIVE PEDESTRIAN SAFETY ACTION PLAN. THIS FIVE-YEAR, MULTI-AGENCY INITIATIVE PROVIDES NEW YORK STATE DEPARTMENT OF TRANSPORTATIONS' REGION ONE (ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, AND WASHINGTON COUNTIES) WITH $3.2 MILLION TO IMPROVE SAFETY FOR PEDESTRIANS THROUGH INFRASTRUCTURE IMPROVEMENTS, PUBLIC EDUCATION EFFORTS, AND INCREASED LAW ENFORCEMENT EFFORTS, AND INSTALL SYSTEMIC PEDESTRIAN SAFETY FEATURES AT LOCATIONS IDENTIFIED IN THE PEDESTRIAN SAFETY ACTION PLAN (PSAP). THE NEW YORK STATE DEPARTMENT OF HEALTH AND THE GOVERNOR'S TRAFFIC SAFETY COMMITTEE ARE PARTNERS WITH NYSDOT IN THIS INITIATIVE.

2.550 2.550 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.280 STBG FLEX 0.280 PRELDES2020PRELDES 0.070 0.070 2020NFA

0.224 0.224 CONINSPSTBG FLEX 2021CONINSP 0.056 0.056 2021NFA

1.600 1.600 CONSTSTBG FLEX 2021CONST 0.400 0.400 2021NFA

0.160 0.160 DETLDESSTBG FLEX 2021DETLDES 0.040 0.040 2021NFA

NYSDOT

111002

CULVERT REPLACEMENT (BRIDGE PROJECT): ROUTE 74 CULVERT C120086, ROUTE 74 OVER EAGLE LAKE CHANNEL. THIS IS LOCATED AT RM ROUTE 74 1201-1113, TOWN OF CROWN POINT, ESSEX COUNTY.THIS LARGE CULVERT IS GOING TO BE REPLACED WITH A BRIDGE (THE NEW CLEAR SPAN IS (Formerly PIN: 104359)

2.830 0.350 2.480 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $2-$4 M

0.215 NHPP 0.215 PRELDES2020PRELDES 0.054 0.054 2020NFA

0.164 0.164 CONINSPNHPP 2021CONINSP 0.041 0.041 2021NFA

1.636 1.636 CONSTNHPP 2021CONST 0.409 0.409 2021NFA

0.215 0.215 DETLDESNHPP 2021DETLDES 0.054 0.054 2021NFA

NYSDOT

111141

US ROUTE 20 OVER SCHOHARIE CREEK, ELEMENT SPECIFIC REPAIRS

INCLUDES ADA UPGRADES TO CURBS AND SIDEWALKS.

TOWN OF DUANESBURG, SCHENECTADY COUNTY, BIN 1054370. S260

2.788 0.269 2.519 0.000 0.000 AQC:A19Z TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M

0.091 0.091 PRELDESNHPP 2022PRELDES 0.023 0.023 2022NFA

0.091 0.091 DETLDESNHPP 2023DETLDES 0.023 0.023 2023NFA

NYSDOT

111659

ROUTE 9N OVER STYLES BROOK, BIN 1007000. TOWN OF KEENE, ESSEX COUNTY. BRIDGE REPLACEMENT PROJECT.

0.228 0.000 0.000 0.114 0.114 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

Page 8: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 8 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.480 NHPP 0.480 PRELDES2020PRELDES 0.120 0.120 2020NFA

0.210 0.210 DETLDESNHPP 2022DETLDES 0.052 0.052 2022NFA

0.294 0.294 CONINSPNHPP 2023CONINSP 0.073 0.073 2023NFA

2.098 2.098 CONSTNHPP 2023CONST 0.524 0.524 2023NFA

NYSDOT

112442

ROUTE 23A OVER KAATERSKILL CREEK, BIN 1018020. TOWN OF CATSKILL, GREENE COUNTY. BRIDGE REPLACEMENT PROJECT.

3.851 0.600 0.000 0.262 2.989 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $3.3-$5.6 M

PRELDES 0.200 0.200 2020NFA 0.140 0.140 DETLDESNHPP 2022

DETLDES 0.035 0.035 2022NFA 0.423 0.423 CONINSPNHPP 2023

CONINSP 0.106 0.106 2023NFA 2.800 2.800 CONSTNHPP 2023

CONST 0.700 0.700 2023NFA

NYSDOT

113074

BIN 1017210, RT. 22 OVER BOQUET RIVER, WHALLONSBURG BRIDGE, TOWN OF ESSEX, ESSEX COUNTY. BRIDGE REPAIR PROJECT.

4.404 0.200 0.000 0.175 4.029 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

0.184 0.184 DETLDESSTBG LG URB 2022DETLDES 0.046 0.046 2022NFA

0.184 0.184 PRELDESSTBG LG URB 2022PRELDES 0.046 0.046 2022NFA

0.368 0.368 CONINSPSTBG LG URB 2023CONINSP 0.092 0.092 2023NFA

3.681 3.681 CONSTSTBG LG URB 2023CONST 0.920 0.920 2023NFA

ALBANY CO

113216

NY 155/CR 157 NEW KARNER ROAD CORRIDOR REHABILITATION, FROM US 20 TO WATERVLIET SHAKER ROAD.

INCLUDES SAFETY AND COMPLETE STREETS IMPROVEMENTS.

TOWNS OF GUILDERLAND AND COLONIE, CITY OF ALBANY AND VILLAGE OF COLONIE, ALBANY COUNTY. A295

5.521 0.000 0.000 0.460 5.061 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M

0.360 0.360 PRELDESNHPP 2022PRELDES 0.090 0.090 2022NFA

0.040 0.040 ROWINCDNHPP 2022ROWINCD 0.010 0.010 2022NFA

0.360 0.360 DETLDESNHPP 2023DETLDES 0.090 0.090 2023NFA

0.160 0.160 ROWACQUNHPP 2023ROWACQU 0.040 0.040 2023NFA

NYSDOT

118839

ROUTE 67 OVER B&M RR BRIDGE REPLACEMENT.

TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. BIN 1303390. R330

1.150 0.000 0.000 0.500 0.650 AQC:A19Z TOTAL 4YR COST :RENSSELAER TPC : $6-$9.4 M

Page 9: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 9 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.120 HPP 0.120 CONINSP2020CONINSP 0.030 0.030 2020NFA

0.880 HPP 0.880 CONST2020CONST 0.220 0.220 2020NFA

0.032 STBG FLEX 0.032 CONINSP2020CONINSP 0.008 0.008 2020NFA

0.320 STBG FLEX 0.320 CONST2020CONST 0.080 0.080 2020NFA

NYSDOT

121807

RT. 9L PAVING FROM THE CITY LINE TO QUAKER RD. AND FROM SUNNYSIDE RD. TO CLEMENTS RD. TOWN OF QUEENSBURY, WARREN COUNTY. REPURPOSE EARMARK DEMO ID NY060, FUND RPS0

1.690 1.690 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

0.155 0.155 DETLDESHSIP 2021DETLDES 0.019 0.019 2021NFA

0.155 0.155 PRELDESHSIP 2021PRELDES 0.019 0.019 2021NFA

0.159 0.159 CONINSPHSIP 2022CONINSP 0.018 0.018 2022NFA

1.326 1.326 CONSTHSIP 2022CONST 0.147 0.147 2022NFA

NYSDOT

130682

I-87 EXIT 6 INTERCHANGE SAFETY IMPROVEMENTS

STATE ROUTE 7 INTERCHANGE WITH INTERSTATE-87. ADD MERGE LANE ON BOTH ON-RAMPS TO I-87.

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

TOWN OF COLONIE, ALBANY COUNTY. A602

1.998 0.000 0.348 1.650 0.000 AQC:A19Z TOTAL 4YR COST :ALBANY TPC : $1.2-$2.5 M

0.080 STBG FLEX 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.200 STBG FLEX 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.240 0.240 CONINSPSTBG FLEX 2021CONINSP 0.060 0.060 2021NFA

1.200 1.200 CONSTSTBG FLEX 2021CONST 0.300 0.300 2021NFA

NYSDOT

135013

REPLACE THE BRIDGE CARRYING ROUTE 81 OVER TEN MILE CREEK, TOWN OF DURHAM, GREENE COUNTY. BIN 1031010

2.150 0.350 1.800 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $2-$4 M

Page 10: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 10 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

2.400 2.400 CONINSPSTBG FLEX 2021CONINSP 0.600 0.600 2021NFA

12.000 12.000 CONSTSTBG FLEX 2021CONST 3.000 3.000 2021NFA

0.800 0.800 DETLDESSTBG FLEX 2021DETLDES 0.200 0.200 2021NFA

0.004 0.004 ROWINCDSTBG FLEX 2021ROWINCD 0.001 0.001 2021NFA

0.160 0.160 ROWACQUSTBG FLEX 2022ROWACQU 0.040 0.040 2022NFA

NYSDOT

138320

IMPROVE THE RESILIENCY AND SAFETY OF THE STATE ROUTE 73 CORRIDOR IN THE VICINITY OF THE CASCADE LAKES, STABILIZATION OF ROADSIDE SLOPES, INSTALLATION OF PERMANENT RAIL WITH APPROPRIATE DEFLECTION DISTANCE BASED ON THE LOCATION, AND REHABILITATION OF THE PAVEMENT. REHABILITATION OF DETERIORATED RETAINING WALLS, SLOPES, AND SECTIONS OF ROUTE 73 PRONE TO EROSION AND POTENTIAL WASHOUT IN HEAVY PRECIPITATION. OTHER ISOLATED LOCATIONS TO BE INCLUDED BETWEEN ROUTE 9 AND THE CASCADE LAKES TO REPAIR SIMILAR DETERIORATED BARRIER. TOWNS OF KEENE AND NORTH ELBA, ESSEX COUNTY.

19.205 0.000 19.005 0.200 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $15-$25 M

0.450 NHPP 0.450 PRELDES2020PRELDES 0.050 0.050 2020NFA

1.006 1.006 CONINSPNHPP 2021CONINSP 0.111 0.111 2021NFA

10.080 10.080 CONSTNHPP 2021CONST 1.120 1.120 2021NFA

0.450 0.450 DETLDESNHPP 2021DETLDES 0.050 0.050 2021NFA

NYSDOT

152539

I-890 BRIDGES OVER ERIE BLVD AND BROADWAY, ELEMENT SPECIFIC REPAIRS.

CITY OF SCHENECTADY, SCHENECTADY COUNTY BINS 1049921 AND 1049922. S264

13.317 0.500 12.817 0.000 0.000 AQC:A19Z TOTAL 4YR COST :SCHENECTADY TPC : $12.5-$19 M

0.400 0.400 PRELDESNHPP 2021PRELDES 0.100 0.100 2021NFA

0.400 0.400 DETLDESNHPP 2023DETLDES 0.100 0.100 2023NFA

NYSDOT

152883

EVERETT ROAD OVER I-90, ELEMENT SPECIFIC BRIDGE REPAIRS

INCLUDES WIDENEING SHOULDERS AND ADDING SIDEWALKS

CITY OF ALBANY, ALBANY COUNTY, BIN 1034529. A596

1.000 0.000 0.500 0.000 0.500 AQC:A19Z TOTAL 4YR COST :ALBANY TPC : $9.5-15.5 M

0.270 NHPP 0.270 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.270 NHPP 0.270 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.595 0.595 CONINSPNHPP 2022CONINSP 0.066 0.066 2022NFA

5.946 5.946 CONSTNHPP 2022CONST 0.661 0.661 2022NFA

NYSDOT

152887

I-90 PAVEMENT CORRECTIVE MAINTENANCE

HUDSON RIVER TO EXIT 10.5 (AT KRAFT ROAD)

TOWN OF EAST GREENBUSH, TOWN OF NORTH GREENBUSH, TOWN OF RENSSELAER, TOWN OF SCHODAK, RENSSELAER COUNTY. R342

7.868 0.600 0.000 7.268 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : $7.5-$12 M

Page 11: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 11 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.270 NHPP 0.270 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.270 NHPP 0.270 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.576 0.576 CONINSPNHPP 2021CONINSP 0.064 0.064 2021NFA

5.760 5.760 CONSTNHPP 2021CONST 0.640 0.640 2021NFA

NYSDOT

152888

I-90 PAVEMENT CORRECTIVE MAINTENANCE

EXIT 10.5 (KRAFT ROAD) TO NYS THRUWAY

TOWN OF SCHODACK, RENSSELAER COUNTY. R341

7.640 0.600 7.040 0.000 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : $6-$9.4 M

0.300 NHPP 0.300 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.600 0.600 CONINSPNHPP 2023CONINSP 0.075 0.075 2023NFA

7.000 7.000 CONSTNHPP 2023CONST 0.700 0.700 2023NFA

NYSDOT

172246

I-87 OVER ROUTE 9, BINS 1005741 AND 1005742, BRIDGE REPAIR, TOWN OF LAKE GEORGE, WARREN COUNTY WAR177

8.705 0.330 0.000 0.000 8.375 AQC:N/A TOTAL 4YR COST :WARREN TPC : $7.5-$12 M

0.135 NHPP 0.135 DETLDES2020DETLDES 0.015 0.015 2020NFA

0.189 0.189 CONINSPNHPP 2021CONINSP 0.021 0.021 2021NFA

1.350 1.350 CONSTNHPP 2021CONST 0.150 0.150 2021NFA

NYSDOT

172255

THIS PROJECT WILL EITHER REHABILITATE THE EXISTING BRIDGE DECK FOR THE I-87 EXIT 32 NB OFF RAMP OR RECONFIGURE THE RAMP AND REMOVE THE EXISTING BRIDGE BASED ON RECOMMENDATIONS. TOWN OF LEWIS, ESSEX COUNTY. ESSEX

1.860 0.150 1.710 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

0.358 NHPP 0.358 CONINSP2020CONINSP 0.040 0.040 2020NFA

3.778 NHPP 3.778 CONST2020CONST 0.419 0.419 2020NFA

NYSDOT

172257

I-87 RESURFACING EXIT 11 TO SARATOGA SPRINGS CITY LINE (SOUTH)

TOWN OF MALTA, TOWN OF ROUND LAKE, SARATOGA COUNTY. SA321

4.595 4.595 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :SARATOGA TPC : $4.6-$7.5 M

0.135 NHPP 0.135 DETLDES2020DETLDES 0.015 0.015 2020NFA

0.333 0.333 CONINSPNHPP 2021CONINSP 0.037 0.037 2021NFA

3.465 3.465 CONSTNHPP 2021CONST 0.385 0.385 2021NFA

NYSDOT

172258

I-87 RESURFACING SARATOGA SPRINGS CITY LINE (SOUTH) TO EXIT 15

TOWN OF MALTA, CITY OF SARTOGA SPRINGS, TOWN OF WILTON, SARATOGA COUNTY. SA315

4.370 0.150 4.220 0.000 0.000 AQC:A10Z TOTAL 4YR COST :SARATOGA TPC : $3.3-$5.6 M

Page 12: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 12 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.135 0.135 DETLDESNHPP 2022DETLDES 0.015 0.015 2022NFA

0.135 0.135 PRELDESNHPP 2022PRELDES 0.015 0.015 2022NFA

0.333 0.333 CONINSPNHPP 2023CONINSP 0.037 0.037 2023NFA

3.330 3.330 CONSTNHPP 2023CONST 0.370 0.370 2023NFA

NYSDOT

172259

I-87 RESURFACING EXIT 15-16

TOWN OF WILTON, SARATOGA COUNTY. SA316

4.370 0.000 0.000 0.300 4.070 AQC:A10Z TOTAL 4YR COST :SARATOGA TPC : $3.3-$5.6 M

0.135 0.135 DETLDESNHPP 2023DETLDES 0.015 0.015 2023NFA

0.135 0.135 PRELDESNHPP 2023PRELDES 0.015 0.015 2023NFA

NYSDOT

172260

I-87 EXIT 16 TO CDTC PLANNING AREA BOUNDARY: RESURFACING

TOWN OF WILTON, SARATOGA COUNTY. SA320

0.300 0.000 0.000 0.000 0.300 AQC:A10Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

0.045 NHPP 0.045 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.315 0.315 CONINSPNHPP 2021CONINSP 0.035 0.035 2021NFA

3.150 3.150 CONSTNHPP 2021CONST 0.350 0.350 2021NFA

0.045 0.045 DETLDESNHPP 2021DETLDES 0.005 0.005 2021NFA

NYSDOT

172261

RESURFACING OF I-87 FROM EXIT 26 (POTTERSVILLE) TO EXIT 28 (SCHROON LAKE). TOWN OF SCHROON LAKE, ESSEX COUNTY

3.950 0.050 3.900 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

0.045 0.045 PRELDESNHPP 2021PRELDES 0.005 0.005 2021NFA

0.315 0.315 CONINSPNHPP 2022CONINSP 0.035 0.035 2022NFA

3.150 3.150 CONSTNHPP 2022CONST 0.350 0.350 2022NFA

0.045 0.045 DETLDESNHPP 2022DETLDES 0.005 0.005 2022NFA

NYSDOT

172262

I-87 RESURFACING FROM EXIT 29 (NORTH HUDSON) TO EXIT 31 (ELIZABETHTOWN), ESSEX COUNTY, IN THE TOWNS OF ELIZABETHTOWN, MORIAH, NORTH HUDSON, WESTPORT.

3.950 0.000 0.050 3.900 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

Page 13: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 13 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.045 0.045 PRELDESNHPP 2022PRELDES 0.005 0.005 2022NFA

0.284 0.284 CONINSPNHPP 2023CONINSP 0.032 0.032 2023NFA

2.835 2.835 CONSTNHPP 2023CONST 0.315 0.315 2023NFA

0.045 0.045 DETLDESNHPP 2023DETLDES 0.005 0.005 2023NFA

NYSDOT

172263

I-87 RESURFACING EXIT 31 (ELIZABETHTOWN) TO CLINTON COUNTY LINE, ESSEX COUNTY, IN THE TOWNS OF CHESTERFIELD, LEWIS, WESTPORT.

3.566 0.000 0.000 0.050 3.516 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

0.090 0.090 DETLDESNHPP 2022DETLDES 0.010 0.010 2022NFA

0.090 0.090 PRELDESNHPP 2022PRELDES 0.010 0.010 2022NFA

0.330 0.330 CONINSPNHPP 2023CONINSP 0.033 0.033 2023NFA

3.330 3.330 CONSTNHPP 2023CONST 0.315 0.315 2023NFA

NYSDOT

172270

I87 RESURFACING, EXIT 24-26, TOWN OF BOLTON, WARREN COUNTY

4.208 0.000 0.000 0.200 4.008 AQC:N/A TOTAL 4YR COST :WARREN TPC : $3.3-$5.6 M

0.160 0.160 PRELDESNHPP 2022PRELDES 0.016 0.016 2022NFA

0.160 0.160 DETLDESNHPP 2023DETLDES 0.016 0.016 2023NFA

NYSDOT

172271

INTERSTATE 87 RESURFACING, EXIT 16 TO HUDSON RIVER, TOWN OF MOREAU, SARATOGA COUNTY

0.352 0.000 0.000 0.176 0.176 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $4.6-$7.5 M

CONST 1.200 1.200 2020NFA 0.240 STBG FLEX 0.240 CONINSP2020

CONINSP 0.060 0.060 2020NFA 2.031 STBG FLEX 2.031 CONST2020

CONST 0.508 0.508 2020NFA

CITY OF TROY

175459

SOUTH TROY INDUSTRIAL PARK ROAD PHASE I (SOUTHERN END)

IMPROVE EXISTING EAST INDUSTRIAL PARKWAY FROM MAIN STREET/ BURDEN AVENUE (US 4) TO NORTHERN TERMINUS AND CONSTRUCT A NEW TWO-LANE ROAD FROM THERE TO MONROE STREET, INCLUDING SIDEWALKS AND BIKE LANES.

CITY OF TROY, RENSSELAER COUNTY. FINAL TREATMENTS WILL BE IDENTIFIED IN THE DESIGN PROCESS. R195

4.039 4.039 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :RENSSELAER TPC : $9.5-15.5 M

Page 14: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 14 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.098 0.098 ROWACQUSTBG-OFF 2021ROWACQU 0.028 0.028 2021NFA

0.232 0.232 CONINSPSTBG FLEX 2023CONINSP 0.059 0.059 2023NFA

2.720 2.720 CONSTSTBG FLEX 2023CONST 0.680 0.680 2023NFA

LOCAL

175527

BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING, CR10 (MIDDLETON BRIDGE) OVER SCHROON RIVER, BIN 3305150, TOWN OF BOLTON AND TOWN OF WARRENSBURG, WARREN COUNTY WAR100

3.817 0.000 0.126 0.000 3.691 AQC:N/A TOTAL 4YR COST :WARREN TPC : $3.3-$5.6 M

0.048 STBG-OFF 0.048 ROWACQU2020ROWACQU 0.012 0.012 2020NFA

0.016 STBG-OFF 0.016 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.164 0.164 CONINSPSTBG-OFF 2022CONINSP 0.041 0.041 2022NFA

1.639 1.639 CONSTSTBG-OFF 2022CONST 0.410 0.410 2022NFA

LOCAL

175528

BRIDGE SUPERSTRUCTURE REPLACEMENT TO ADDRESS CONDITION RATING, CR61, SHUSHAN OVER BATTENKILL, BIN 3306450, WASHINGTON COUNTY WAS103

2.334 0.080 0.000 2.254 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M

0.054 NHPP 0.054 PRELDES2020PRELDES 0.013 0.013 2020NFA

0.054 NHPP 0.054 SCOPING2020SCOPING 0.013 0.013 2020NFA

0.054 STBG FLEX 0.054 PRELDES2020PRELDES 0.014 0.014 2020NFA

0.054 STBG FLEX 0.054 SCOPING2020SCOPING 0.014 0.014 2020NFA

0.054 0.054 SCOPINGNHPP 2022SCOPING 0.013 0.013 2022NFA

0.054 0.054 SCOPINGSTBG FLEX 2022SCOPING 0.014 0.014 2022NFA

0.054 0.054 SCOPINGNHPP 2023SCOPING 0.013 0.013 2023NFA

0.054 0.054 SCOPINGSTBG FLEX 2023SCOPING 0.014 0.014 2023NFA

CDTC

175563

CDTC PROJECT DEVELOPMENT SUPPORT

THIS IS FOR PROJECT DEVELOPMENT OF SPECIFIC PROJECTS (UPWP TASK 5.61).

IT INCLUDES TRAFFIC FORECASTS, ALTERNATIVE TESTING AND REGIONAL AIR QUALITY EVALUATION.

PROJECTS LOCATED IN ALL FOUR COUNTIES. RG29

0.540 0.270 0.000 0.135 0.135 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 15: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 15 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.003 STBG-OFF 0.003 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.005 STBG-OFF 0.005 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.120 0.120 CONINSPSTBG-OFF 2021CONINSP 0.030 0.030 2021NFA

1.226 1.226 CONSTSTBG-OFF 2021CONST 0.307 0.307 2021NFA

LOCAL

175727

CULVERT REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING: C.R.57 SOUTH JOHNSBURG RD OVER MILL CREEK, BIN:3305370, TOWN OF JOHNSBURG, WARREN CO. WAR176

1.694 0.011 1.683 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

0.028 STBG LG URB 0.028 ROWACQU2020ROWACQU 0.006 0.006 2020NFA

0.080 0.080 CONINSPSTBG LG URB 2022CONINSP 0.020 0.020 2022NFA

1.129 1.129 CONSTSTBG LG URB 2022CONST 0.282 0.282 2022NFA

RENSSELAER CO

175815

CR 68 OVER WYNANTSKILL CREEK

BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING

BIN 3303610, RENSSELAER COUNTY R287

TOWN OF POESTENKILL

COMBINED WITH 1760.48 (R312).

1.545 0.034 0.000 1.511 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $1.2-$2.5 M

0.023 0.023 ROWACQUSTBG LG URB 2021ROWACQU 0.005 0.005 2021NFA

0.400 0.400 CONINSPSTBG LG URB 2022CONINSP 0.100 0.100 2022NFA

3.856 3.856 CONSTSTBG LG URB 2022CONST 0.964 0.964 2022NFA

CITY OF SCHENECTADY

175895

KINGS ROAD (CR 65) OVER CSX, BRIDGE REPLACEMENTCITY OF SCHENECTADY, SCHENECTADY COUNTY, BIN 2203130. S204

INCLUDES 5 FOOT SHOULDERS FOR BIKES

5.348 0.000 0.028 5.320 0.000 AQC:A19P TOTAL 4YR COST :SCHENECTADY TPC : $4.6-$7.5 M

CONINSP 0.061 0.061 2020NFACONST 0.170 0.170 2020NFA

0.134 STBG FLEX 0.134 CONINSP2020CONINSP 0.034 0.034 2020NFA

1.225 STBG FLEX 1.225 CONST2020CONST 0.306 0.306 2020NFA

tn of halfmoon

175984

PROJECT WILL REPLACE EXISTING TRAFFIC SIGNALS WITH UPDATED INTERCONNECTED SIGNALS AT SITTERLY RDS INTERSECTIONS WITH WOODIN RD AND CROSSINGS BLVD. IT WILL ALSO CONSTRUCT A NEW LEFT HAND TURNING LANE ON THE WOODIN RD APPROACH TO SITTERLY. CLIFTON PARK SA281

RESULT OF MOU, ALL LOCAL MATCH IS PIT BOND PER REGION ONE

1.930 1.930 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $2-$4 M

Page 16: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 16 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.192 0.192 CONINSPSTBG-OFF 2021CONINSP 0.048 0.048 2021NFA

1.469 1.469 CONSTSTBG-OFF 2021CONST 0.367 0.367 2021NFA

LOCAL

176021

BIN 3302960 CR6 (SPRUCETON RD) OVER THE WEST KILL BRIDGE REPLACEMENT. TOWN OF LEXINGTON, GREENE COUNTY

2.076 0.000 2.076 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $2-$4 M

0.250 STBG FLEX 0.250 CONINSP2020CONINSP 0.063 0.063 2020NFA

1.562 STBG FLEX 1.562 CONST2020CONST 0.390 0.390 2020NFA

0.098 STBG FLEX 0.098 ROWACQU2020ROWACQU 0.024 0.024 2020NFA

LOCAL

176022

NEW BIKE LANES ALONG CR12 (SOUTH ST.) FROM STATE RT. 296 TO WINDHAM MOUNTAIN SKI RESORT. TOWN OF WINDHAM, GREENE COUNTY. GREENE

2.387 2.387 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $2-$4 M

0.024 STBG FLEX 0.024 ROWACQU2020ROWACQU 0.006 0.006 2020NFA

0.120 0.120 CONINSPSTBG FLEX 2021CONINSP 0.030 0.030 2021NFA

0.600 0.600 CONSTSTBG FLEX 2021CONST 0.150 0.150 2021NFA

LOCAL

176023

CR83 (SKI BOWL RD) CULVERT REPLACEMENT AS WELL AS A POSSIBLE NEW PEDESTRIAN BRIDGE. TOWN OF HUNTER, GREENE COUNTY. GREENE

0.930 0.030 0.900 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M

0.068 NHPP 0.068 CONINSP2020CONINSP 0.017 0.017 2020NFA

0.544 NHPP 0.544 CONST2020CONST 0.136 0.136 2020NFA

0.010 NHPP 0.010 PRELDES2020PRELDES 0.002 0.002 2020NFA

LOCAL

176024

BIN 3303280 CR23B (MAIN ST) OVER THE SHINGLEKILL BRIDGE PRESERVATION PROJECT. TOWN OF CAIRO, GREENE COUNTY. GREENE

0.777 0.777 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M

0.068 STBG LG URB 0.068 CONINSP2020CONINSP 0.017 0.017 2020NFA

0.616 STBG LG URB 0.616 CONST2020CONST 0.154 0.154 2020NFA

vil of Green Island

176029

HUDSON AVENUE MILL & FILL FROM THE INTERSECTION WITH TIBBITS AVE TO THE WATERVLIET CITY LINE. INCLUDES IMPROVEMENT TO ADA COMPLIANT CROSSWALKS, INSTALLATION OF HIGH VISIBILITY CROSSWALKS, AND IMPROVEMENTS FOR CYCLIST SAFETY. VILLAGE OF GREEN ISLAND, ALBANY COUNTY. A568

0.855 0.855 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

Page 17: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 17 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.051 0.051 CONINSPSTBG LG URB 2022CONINSP 0.013 0.013 2022NFA

0.468 0.468 CONSTSTBG LG URB 2022CONST 0.117 0.117 2022NFA

TN OF SAND LAKE

176034

SAND LAKE HAMLETS SIDEWALK ENHANCEMENTS

REHABILITATE 2200 FEET OF SIDEWALK & REPLACE 43 PIECES OF SIDEWALK

TOWN OF SAND LAKE, RENSSELAER COUNTY. R310

SHARED JURISDICTION: SAND LAKE & RENSSELAER COUNTY

0.649 0.000 0.000 0.649 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : $0.6-$1.5 M

0.027 0.027 CONINSPSTBG FLEX 2021CONINSP 0.007 0.007 2021NFA

0.238 0.238 CONSTSTBG FLEX 2021CONST 0.060 0.060 2021NFA

TOWN OF GLENVILLE

176040

SUNNYSIDE RD COLD RECYCLING PAVING FROM FREEMANS BRIDGE RD (NY 911F) TO THE VILLAGE OF SCOTIA LINE. TOWN OF GLENVILLE, SCHENECTADY COUNTY. S240

0.332 0.000 0.332 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SCHENECTADY TPC : < $0.75 M

0.087 0.087 CONINSPSTBG LG URB 2021CONINSP 0.022 0.022 2021NFA

0.784 0.784 CONSTSTBG LG URB 2021CONST 0.196 0.196 2021NFA

CITY OF SCHENECTADY

176042

BROADWAY MILL & FILL FROM 0.12 MILES SOUTH OF WEAVER STREET TO FOURTH STREET

INCLUDES UPGRADING 8 CROSSINGS TO ADA GUIDELINES

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S242

1.089 0.000 1.089 0.000 0.000 AQC:A10P TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M

0.016 0.016 CONINSPSTBG LG URB 2021CONINSP 0.004 0.004 2021NFA

0.141 0.141 CONSTSTBG LG URB 2021CONST 0.035 0.035 2021NFA

SCHENECTADY CO

176043

MOHAWK-HUDSON BIKE-HIKE TRAIL REHABILITATION

TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S243

SHARED JURISDICTION BETWEEN SCHENECTADY COUNTY, TOWN OF ROTTERDAM, AND NYSOGS.

0.196 0.000 0.196 0.000 0.000 AQC:C2P TOTAL 4YR COST :SCHENECTADY TPC : < $0.75 M

Page 18: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 18 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.106 STBG LG URB 0.106 CONINSP2020CONINSP 0.025 0.025 2020NFA

0.876 STBG LG URB 0.876 CONST2020CONST 0.219 0.219 2020NFA

SCHENECTADY CO

176044

HIGHBRIDGE ROAD & EAST CAMPBELL ROAD: HOT IN-PLACE RECYCLING & SIDEWALK RECONSTRUCTION/EXTENSION

HIGHBRIDGE ROAD (CR 48) AND EAST CAMPBELL ROAD (CR 67) FROM KINGS ROAD TO HAMBURG STREET

INCLUDES FORMER S246. TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S244

PROGRESSED AS ONE PROJECT WITH 176061 (S246)

1.226 1.226 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M

0.020 0.020 CONINSPSTBG LG URB 2021CONINSP 0.005 0.005 2021NFA

0.162 0.162 CONSTSTBG LG URB 2021CONST 0.040 0.040 2021NFA

0.024 0.024 ROWACQUSTBG LG URB 2021ROWACQU 0.006 0.006 2021NFA

0.019 0.019 ROWINCDSTBG LG URB 2021ROWINCD 0.004 0.004 2021NFA

TN OF GUILDERLAND

176045

WEST OLD STATE ROAD NEW SIDEWALKS

SOUTH SIDE OF THE ROAD FROM GARDEN VIEW TERRACE TO REGINA DRIVE, AND FROM AN EXISTING WALKWAY ON VICTORIA DRIVE TO LYNWOOD ELEMENTARY SCHOOL

TOWN OF GUILDERLAND, ALBANY COUNTY. A581

0.280 0.000 0.280 0.000 0.000 AQC:C2P TOTAL 4YR COST :ALBANY TPC : < $0.75 M

0.152 0.152 CONINSPSTBG FLEX 2021CONINSP 0.038 0.038 2021NFA

1.592 1.592 CONSTSTBG FLEX 2021CONST 0.398 0.398 2021NFA

SARATOGA CO

176046

ASHDOWN ROAD BRIDGE OVER THE DHRR, BRIDGE REPLACEMENT

TOWN OF CLIFTON PARK, SARATOGA COUNTY, BIN 2202570. SA297

2.180 0.000 2.180 0.000 0.000 AQC:A19P TOTAL 4YR COST :SARATOGA TPC : $2-$4 M

0.041 0.041 CONINSPSTBG FLEX 2022CONINSP 0.010 0.010 2022NFA

0.370 0.370 CONSTSTBG FLEX 2022CONST 0.092 0.092 2022NFA

RENSSELAER CO

176049

TAMARAC ROAD (CR 129) LARGE CULVERT REPLACEMENT

REPLACE WITH AN ALUMINUM BOX CULVERT. LOCATION IS BETWEEN STATE ROUTE 7 AND STORM HILL ROAD.

TOWN OF PITTSTOWN, RENSSELAER COUNTY. R314

0.513 0.000 0.000 0.513 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $0.6-$1.5 M

Page 19: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 19 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.014 STBG-OFF 0.014 ROWACQU2020ROWACQU 0.004 0.004 2020NFA

0.220 0.220 CONINSPSTBG-OFF 2022CONINSP 0.055 0.055 2022NFA

1.440 1.440 CONSTSTBG-OFF 2022CONST 0.360 0.360 2022NFA

LOCAL

176051

WATER ST. OVER THE BRANCH, BIN 3301700, ELIZABETHTOWN, ESSEX COUNTY. BRIDGE REPAIR PROJECT.

2.093 0.018 0.000 2.075 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

0.140 STBG-OFF 0.140 DETLDES2020DETLDES 0.035 0.035 2020NFA

0.140 STBG-OFF 0.140 PRELDES2020PRELDES 0.035 0.035 2020NFA

0.020 STBG-OFF 0.020 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.008 STBG-OFF 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.200 0.200 CONINSPSTBG-OFF 2023CONINSP 0.050 0.050 2023NFA

1.984 1.984 CONSTSTBG-OFF 2023CONST 0.496 0.496 2023NFA

LOCAL

176052

ALEXANDRIA AVE OVER LAKE GEORGE OUTLET, BIN 3301870, TOWN OF TICONDERGOA, ESSEX COUNTY. BRIDGE REPAIR PROJECT.

3.115 0.385 0.000 0.000 2.730 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $2-$4 M

0.023 NHPP 0.023 ROWACQU2020ROWACQU 0.006 0.006 2020NFA

0.016 NHPP 0.016 ROWINCD2020ROWINCD 0.005 0.005 2020NFA

0.332 0.332 CONINSPNHPP 2022CONINSP 0.083 0.083 2022NFA

3.458 3.458 CONSTNHPP 2022CONST 0.864 0.864 2022NFA

WASHINGTON COUNTY

176055

REPLACEMENT OF CHURCH STREET BRIDGE OVER THE METTAWEE RIVER, VILLAGE OF GRANVILLE, WASHINGTON COUNTY. BIN #3-20366-0. SPAN CONSTRUCTED IN 1920. SUPPLEMENTAL PROJECT THROUGH STATE MOU.

4.787 0.050 0.000 4.737 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $4.6-$7.5 M

0.144 STBG-OFF 0.144 CONINSP2020CONINSP 0.036 0.036 2020NFA

0.720 STBG-OFF 0.720 CONST2020CONST 0.180 0.180 2020NFA

SARATOGA CO

176056

CR 13 (BARKERSVILLE FAYVILLE ROAD) OVER CADMAN CREEK, BRIDGE REPLACEMENT

TOWN OF PROVIDENCE, SARATOGA COUNTY, BIN 3304740. SA302

1.080 1.080 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

Page 20: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 20 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.102 0.102 CONINSPHSIP 2021CONINSP 0.011 0.011 2021NFA

0.919 0.919 CONSTHSIP 2021CONST 0.102 0.102 2021NFA

CITY OF SCHENECTADY

176057

BRANDYWINE AVENUE, I-890 TO STATE STREET: SAFETY ENHANCEMENTS, CITY OF SCHENECTADY

SIGNAL UPGRADES, PEDESTRIAN IMPROVEMENTS, CORRIDOR LIGHTING (CITY SHARE) & LANE RECONFIGURATION (MODIFICATION TO STRIPING)

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

1.134 0.000 1.134 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M

0.200 NHPP 0.200 CONST2020CONST 0.050 0.050 2020NFA

0.200 STBG FLEX 0.200 CONST2020CONST 0.050 0.050 2020NFA

CDTA

176059

WASHINGTON/WESTERN BRT PHASE 1, 2017, CITY OF ALBANY

BUS STOP WORK, ENHANCED LIGHTING, RAISED MEDIANS, TURN LANES, ON-STREET PARKING, SIGNALIZED MID-BLOCK PEDESTRIAN CROSSINGS, CURB EXTENSIONS AND BUMP OUTS. THE DESIGN WORK WAS COMPLETED UNDER PROJECT T90 . (FORMERLY PIN: 1760.59)

SOME HSIP, NHPP & STP-FLEX FUNDS IN 2016-17 ARE DUPLICATED AS FTA MISC IN ORDER TO ALLOW CDTA TO OBLIGATE THE FUNDS IN 17-18, BUT DON’T REPRESENT ADDITIONAL FUNDS.

0.500 0.500 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $50-$85 M

0.093 0.093 CONINSPHSIP 2022CONINSP 0.010 0.010 2022NFA

0.900 0.900 CONSTHSIP 2022CONST 0.100 0.100 2022NFACONST 0.250 0.250 2022NFA

SCHENECTADY CO

176060

NOTT STREET/BALLTOWN ROAD INTERSECTION: SAFETY ENHANCEMENTS

REDESIGN INTERSECTION WITH NEW TURN LANE. INCLUDES MILL AND FILL OF NOTT STREET FROM BALLTOWN ROAD TO CLIFTON PARK ROAD.

TOWN OF NISKAYUNA, SCHENECTADY COUNTY. S249

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

1.353 0.000 0.000 1.353 0.000 AQC:D1P TOTAL 4YR COST :SCHENECTADY TPC : $1.2-$2.5 M

Page 21: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 21 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONST 0.160 0.160 2021NFA 0.040 0.040 CONINSPSTBG LG URB 2021

CONINSP 0.010 0.010 2021NFA 0.350 0.350 CONSTSTBG LG URB 2021

CONST 0.087 0.087 2021NFA

CITY OF SCHENECTADY

176062

ROSA RD, WENDELL AVE AND NOTT ST INTERS. IMPROVEMENTS5-LEG SIGNAL, PED ACCOMMODATIONS, REFUGE ISLANDS, HIGH VISIBILITY CROSSWALKS, IMPROVED STRIPING. S245

CITY OF SCHENECTADY, SCHENECTADY COUNTY

0.647 0.000 0.647 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M

0.078 0.078 CONINSPCMAQ 2021CONINSP 0.019 0.019 2021NFA

0.482 0.482 CONSTCMAQ 2021CONST 0.120 0.120 2021NFA

0.025 0.025 ROWACQUCMAQ 2021ROWACQU 0.006 0.006 2021NFA

TN OF GUILDERLAND

176079

THIS PROJECT WILL CONSTRUCT APPROXIMATELY 2,250 FEET OF ADA COMPLIANT SIDEWALK ON THE SOUTHERN SIDE OF STATE ROUTE 20 (WESTERN AVENUE) FROM DEVONSHIRE DRIVE TO MERCY CARE LANE. TOWN OF GUILDERLAND, ALBANY COUNTY.

THIS INCLUDES CURBS AND INTERSCTIONRAMPS.

A586

0.730 0.000 0.730 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

0.263 CMAQ 0.263 ROWACQU2020ROWACQU 0.066 0.066 2020NFA

0.320 0.320 CONINSPCMAQ 2021CONINSP 0.080 0.080 2021NFA

2.755 2.755 CONSTCMAQ 2021CONST 0.689 0.689 2021NFA

TN OF BETHLEHEM

176080

US NY 9W / FEURA BUSH ROAD / GLENMONT ROAD (NY 910A): ROUNDABOUT

INCLUDES SIDEWALK EXTENSION ON GLENMONT ROAD TO GLENMONT ELEMENTARY SCHOOL.

TOWN OF BETHLEHEM, ALBANY COUNTY. A587

THESE FUNDS ARE CAPPED

4.173 0.329 3.844 0.000 0.000 AQC:D1P TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M

0.076 0.076 CONINSPCMAQ 2022CONINSP 0.019 0.019 2022NFA

0.631 0.631 CONSTCMAQ 2022CONST 0.158 0.158 2022NFA

TN OF CLIFTON PARK176082

MOE ROAD MULTI-USE PATH

THIS PROJECT WILL CLOSE AN EXISTING GAP ON THE MOE ROAD MULTI-USE PATH BY CONSTRUCTING AN EXTENSION THAT WILL CONNECT OKTE ELEMENTARY SCHOOL TO HOUSING DEVELOPMENTS LOCATED OFF OF MOE ROAD AND TERMINATE AT THE INTERSECTION WITH SUGARBUSH ROAD.

TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA306

THESE FUNDS ARE CAPPED

0.884 0.000 0.000 0.884 0.000 AQC:C2P TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M

Page 22: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 22 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.018 TAP LG URBAN 0.018 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.160 0.160 CONINSPTAP LG URBAN 2021CONINSP 0.040 0.040 2021NFA

0.960 0.960 CONSTTAP LG URBAN 2021CONST 0.240 0.240 2021NFA

CITY OF RENSSELAER

176084

RENSSELAER RIVERFRONT MULTI-USE TRAIL

THIS PROJECT CONSTRUCTS 3750 FEET OF MULTI-USE TRAIL AND 100 FEET OF BIKE/PED ACCOMODATIONS BETWEEN DELAETS LANDING AND RIVERFRONT PARK.

CITY OF RENSSELAER, RENSSELAER COUNTY, R323

THESE FUNDS ARE CAPPED

1.423 0.023 1.400 0.000 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : $1.2-$2.5 M

0.118 TAP LG URBAN 0.118 ROWACQU2020ROWACQU 0.029 0.029 2020NFACONST 0.421 0.421 2021NFA

0.195 0.195 CONINSPTAP LG URBAN 2021CONINSP 0.049 0.049 2021NFA

1.073 1.073 CONSTTAP LG URBAN 2021CONST 0.269 0.269 2021NFA

CITY of SARATOGA SPR

176086

SARATOGA GREENBELT DOWNTOWN CONNECTOR, SARATOGA SPRINGS, SARATOGA COUNTY

THE PROJECT BEGINS AT LAKE AVENUE,EXTENDS ALONG HIGH ROCK AND EXCELSIORAVENUES AND CONNECTS TO THE BICYCLE-PEDESTRIAN BRIDGE I-87 EXIT 15.

NEW SIDEWALKS, MULTI-USE TRAILS, BIKELANES, BE (FORMERLY PIN: 176084)

2.154 0.147 2.007 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $2-$4 M

0.012 REC TRAILS 0.012 DETLDES2020DETLDES 0.003 0.003 2020NFA

0.008 0.008 CONINSPREC TRAILS 2022CONINSP 0.002 0.002 2022NFA

0.076 0.076 CONSTREC TRAILS 2022CONST 0.019 0.019 2022NFA

NYSOPRHP

176087

HOOSIC RIVER GREENWAY TRAIL ENHANCEMENT

FIRST PHASE OF A PROPOSED 2.2-MILE TRAIL INCLUDES A 700-FOOT TRAIL EXTENSION FROM THE CURRENT TERMINUS TO SEWER PLANT ROAD, INSTALLATION OF A 5-CAR TRAILHEAD PARKING LOT, AND TRAILHEAD AMENITIES

RENSSELAER CO, TN OF HOOSICK FALLS, S236

0.120 0.015 0.000 0.105 0.000 AQC:EXEMPT TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

Page 23: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 23 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.041 STBG-OFF 0.041 DETLDES2020DETLDES 0.011 0.011 2020NFA

0.087 STBG-OFF 0.087 PRELDES2020PRELDES 0.021 0.021 2020NFA

0.004 STBG-OFF 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.007 STBG-OFF 0.007 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.100 0.100 CONINSPSTBG-OFF 2022CONINSP 0.025 0.025 2022NFA

0.776 0.776 CONSTSTBG-OFF 2022CONST 0.195 0.195 2022NFA

LOCAL

176089

BRIDGE REPAIR OR REPLACE, CR 22 OVER THE CATSKILL CREEK, BIN 3303120, TOWN OF DURHAM, GREENE COUNTY

1.269 0.173 0.000 1.096 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $1.2-$2.5 M

0.240 0.240 DETLDESSTBG FLEX 2021DETLDES 0.060 0.060 2021NFA

0.240 0.240 PRELDESSTBG FLEX 2021PRELDES 0.060 0.060 2021NFA

0.032 0.032 ROWACQUSTBG FLEX 2022ROWACQU 0.008 0.008 2022NFA

0.008 0.008 ROWINCDSTBG FLEX 2022ROWINCD 0.002 0.002 2022NFA

0.264 0.264 CONINSPSTBG FLEX 2023CONINSP 0.066 0.066 2023NFA

2.359 2.359 CONSTSTBG FLEX 2023CONST 0.590 0.590 2023NFA

NYSDOT

176090

TAHAWUS ROAD BRIDGE REPLACEMENT OVER SANFORD LAKE (BIN 3302690), TOWN OF NEWCOMB, ESSEX COUNTY

3.929 0.000 0.600 0.050 3.279 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

Page 24: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 24 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.025 0.025 CONINSPREC TRAILS 2021CONINSP 0.025 0.025 2021NFA

0.137 0.137 CONSTREC TRAILS 2021CONST 0.138 0.138 2021NFA

CITY OF ALBANY

176091

CITY OF ALBANY SOUTH END CONNECTOR LOWLINE

THIS IS A 1.5 MILE SHARED USE PATH THAT WILL CONNECT THE EXISTING ALBANY COUNTY HUDSON-HELDERBERG RAIL TRAIL AT ITS TRAIL HEAD IN THE CITY OF ALBANY’S SOUTH END, APPROXIMATELY A QUARTER MILE FROM THE INTERSECTION OF SOUTH PEARL STREET AND MOUNT HOPE DRIVE AND THE MOHAWK HUDSON BIKE HIKE TRAIL AT ITS TRAIL HEAD IN ALBANY AT THE INTERSECTION OF BROADWAY AND QUAY STREET

CITY OF ALBANY, ALBANY COUNTY, A589

OPRHP PROJECT NUMBER “175160”

LOCAL MATCH IS 50%

0.325 0.000 0.325 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : < $0.75 M

0.149 HSIP 0.149 DETLDES2020 0.104 HSIP 0.104 PRELDES2020 0.222 0.222 CONINSPHSIP 2022 1.011 1.011 CONSTHSIP 2022

CITY OF ALBANY

176092

CITY OF ALBANY PSAP

PEDESTRIAN SAFETY ENHANCEMENTS AT: 20 UNCONTROLLED CROSSWALKS & 12 SIGNALIZED INTERSECTIONS.

CITY OF ALBANY, ALBANY COUNTY. A590

THIS PROJECT IS CAPPED.

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.

1.486 0.253 0.000 1.233 0.000 AQC:C2P TOTAL 4YR COST :ALBANY TPC : $1.2-$2.5 M

Page 25: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 25 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.053 0.053 CONINSPHSIP 2021 0.285 0.285 CONSTHSIP 2021

CONST 0.067 0.067 2021NFA

TN OF CLIFTON PARK176093

CLIFTON PARK PSAP

PEDESTRIAN SAFETY ENHANCEMENTS AT: 3 UNCONTROLLED CROSSWALKS & 5 SIGNALIZED INTERSECTIONS ON CLIFTON PARK CENTER ROAD AND CLIFTON COUNTY ROAD

TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA312

THIS PROJECT IS CAPPED

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.

0.405 0.000 0.405 0.000 0.000 AQC:C2P TOTAL 4YR COST :SARATOGA TPC : < $0.75 M

0.048 0.048 CONINSPHSIP 2021 0.402 0.402 CONSTHSIP 2021

CITY OF RENSSELAER

176094

CITY OF RENSSELAER PSAP

PEDESTRIAN SAFETY ENHANCEMENTS AT 6 SIGNALIZED INTERSECTIONS.

CITY OF RENSSELAER, RENSSELAER COUNTY. R327

THIS PROJECT IS CAPPED

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.

0.450 0.000 0.450 0.000 0.000 AQC:C2P TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

Page 26: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 26 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.095 0.095 CONINSPHSIP 2021 0.780 0.780 CONSTHSIP 2021

CITY OF SCHENECTADY

176095

CITY OF SCHENECTADY PSAP

PEDESTRIAN SAFETY ENHANCEMENTS AT: 10 SIGNALIZED INTERSECTIONS

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S257

THIS PROJECT IS CAPPED

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.

0.875 0.000 0.875 0.000 0.000 AQC:C2P TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M

CONINSP 0.114 0.114 2020NFACONST 1.111 1.111 2020NFA

0.109 STBG FLEX 0.109 CONINSP2020CONINSP 0.027 0.027 2020NFA

0.859 STBG FLEX 0.859 CONST2020CONST 0.215 0.215 2020NFA

CITY OF GLENS FALLS176096

PAVEMENT PRESERVATION, SPOT REPAIRS, SIDEWALK REPLACEMENT AND 21 ADA RAMPS ALONG 0.64 MILES OF DIX AVENUE FROM RIDGE STREET TO PLATT STREET, CITY OF GLENS FALLS, WARREN COUNTY.PROJECT AWARDED FROM A/GFTC LOCAL HIGHWAY PAVEMENT PRESERVATION PROGRAM SETASIDE.

2.435 2.435 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $2-$4 M

0.040 STBG FLEX 0.040 CONINSP2020CONINSP 0.010 0.010 2020NFA

0.450 STBG FLEX 0.450 CONST2020CONST 0.112 0.112 2020NFA

NYSDOT

176097

CR 46 PAVEMENT CORRECTIVE MAINTENANCE FROM US 4 TO PLUM ROAD. 1.77 MILES. TOWN OF FORT EDWARD, WASHINGTON COUNTY

0.612 0.612 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $0.6-$1.5 M

0.094 STBG FLEX 0.094 CONINSP2020CONINSP 0.023 0.023 2020NFA

0.670 STBG FLEX 0.670 CONST2020CONST 0.167 0.167 2020NFA

0.016 STBG FLEX 0.016 DETLDES2020DETLDES 0.004 0.004 2020NFA

LOCAL

176098

CR 28 PAVEMENT CORRECTIVE MAINTENANCE, PART 1, CR27 TO RESERVOIR RD (1.6 MILES) AND PART 2, RESERVOIR ROAD TO NYS ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN NOW INCLUDES PIN 176139.

0.974 0.974 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M

Page 27: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 27 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.103 STBG FLEX 0.103 CONINSP2020CONINSP 0.026 0.026 2020NFA

1.278 STBG FLEX 1.278 CONST2020CONST 0.319 0.319 2020NFA

WARREN COUNTY

176099

PAVEMENT REHABILITATION PROJECT TO RESTORE CONDITION FOR 1.05 MILES OF CR 39 (SUNNYSIDE EAST) FROM NYS 9L (RIDGE ROAD) TO WASHINGTON COUNTY LINE, AND 0.96 MILES OF CR 54 (SUNNYSIDE ROAD) FROM NYS 9L (RIDGE ROAD) TO CR 7 (BAY ROAD), TOWN OF QUEENSBURY, WARREN COUNTY. PROJECT AWARDED FROM A/GFTC LOCAL PAVEMENT PRESERVATION PROGRAM SETASIDE (1TO427). THIS PIN NOW INCLUDES 176100.

1.726 1.726 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

0.032 STBG-OFF 0.032 CONINSP2020CONINSP 0.008 0.008 2020NFA

0.176 STBG-OFF 0.176 CONST2020CONST 0.044 0.044 2020NFA

LOCAL

176102

SARATOGA COUNTY BRIDGE PRESERVATION: CLARK ROAD OVER SNOOK KILL (BIN 3304130) AND CR 29 (RIVER RD) OVER SNOOK KILL (BIN 3304140), TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN NOW INCLUDES PIN 176104.

0.260 0.260 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :SARATOGA TPC : < $0.75 M

0.044 STBG-OFF 0.044 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.297 STBG-OFF 0.297 CONST2020CONST 0.074 0.074 2020NFA

WASHINGTON COUNTY

176103

WASHINGTON COUNTY BRIDGE PRESERVATION: DR. JOHNSON RD OVER BATTEN KILL (BIN 3306080) AND CEMETERY RD OVER BLACK CREEK (BIN 3203730). TOWNS OF JACKSON AND SALEM, WASHINGTON COUNTY. WAS 164

0.426 0.426 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : < $0.75 M

0.209 NHPP 0.209 DETLDES2020DETLDES 0.011 0.011 2020NFA

0.171 NHPP 0.171 PRELDES2020PRELDES 0.009 0.009 2020NFA

0.285 0.285 CONINSPNHPP 2021CONINSP 0.015 0.015 2021NFA

2.501 2.501 CONSTNHPP 2021CONST 0.132 0.132 2021NFA

CITY OF SCHENECTADY

176118

FRANCIS AVE OVER I-890, BRIDGE REHAB OR REPLACEMENT

CITY OF SCHENECTADY, SCHENECTADY COUNTY, BIN 2203080. S258

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY

3.333 0.400 2.933 0.000 0.000 AQC:A19P TOTAL 4YR COST :SCHENECTADY TPC : $3.3-$5.6 M

Page 28: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 28 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.309 NHPP 0.309 DETLDES2020DETLDES 0.016 0.016 2020NFA

0.309 NHPP 0.309 PRELDES2020PRELDES 0.016 0.016 2020NFA

0.285 0.285 CONINSPNHPP 2021CONINSP 0.015 0.015 2021NFA

2.686 2.686 CONSTNHPP 2021CONST 0.141 0.141 2021NFA

CITY OF TROY

176119

CAMPBELL AVE OVER WYNANTSKILL BRIDGE REHAB

CITY OF TROY, RENSSELAER COUNTY, BIN 2202290. R328

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY

3.777 0.650 3.127 0.000 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M

0.057 0.057 CONINSPSTBG-OFF 2021CONINSP 0.003 0.003 2021NFA

0.522 0.522 CONSTSTBG-OFF 2021CONST 0.028 0.028 2021NFA

0.060 0.060 DETLDESSTBG-OFF 2021DETLDES 0.003 0.003 2021NFA

0.060 0.060 PRELDESSTBG-OFF 2021PRELDES 0.003 0.003 2021NFA

SARATOGA CO

176120

HANS CREEK RD OVER HANS CREEK, REHAB OR REPLACE

TOWN OF PROVIDENCE ,SARATOGA COUNTY, BIN 2202820. SA313

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY

0.736 0.000 0.736 0.000 0.000 AQC:A19P TOTAL 4YR COST :SARATOGA TPC : $3.3-$5.6 M

0.112 STBG-OFF 0.112 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.120 STBG-OFF 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.018 STBG-OFF 0.018 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.152 0.152 CONINSPSTBG-OFF 2022CONINSP 0.008 0.008 2022NFA

1.395 1.395 CONSTSTBG-OFF 2022CONST 0.073 0.073 2022NFA

LOCAL

176121

BRIDGE NY TIMBER LAKE RD OVER BROAD ST., GREENE COUNTY, BIN 3201240. 95% FEDERAL (USING 15% TOLL CREDITS), 5% LOCAL. BRIDGE REPLACEMENT PROJECT.

1.915 0.287 0.000 1.628 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $1.2-$2.5 M

Page 29: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 29 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.057 0.057 CONINSPSTBG-OFF 2021CONINSP 0.003 0.003 2021NFA

0.537 0.537 CONSTSTBG-OFF 2021CONST 0.028 0.028 2021NFA

0.060 0.060 DETLDESSTBG-OFF 2021DETLDES 0.003 0.003 2021NFA

0.060 0.060 PRELDESSTBG-OFF 2021PRELDES 0.003 0.003 2021NFA

TN OF EDINBURG

176122

FOX HILL RD OVER LITTLE HANS CREEK, BRIDGE REHAB OR REPLACE

TOWN OF EDINBURG, SARATOGA COUNTY, BIN 2202670. SA314

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY

0.751 0.000 0.751 0.000 0.000 AQC:A19P TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M

0.257 0.257 CONINSPNHPP 2021CONINSP 0.014 0.014 2021NFA

2.144 2.144 CONSTNHPP 2021CONST 0.113 0.113 2021NFA

0.019 0.019 ROWACQUNHPP 2021ROWACQU 0.001 0.001 2021NFA

WARREN COUNTY

176123

REPLACEMENT OF BRIDGE (BIN 3360320) CARRYING WARREN COUNTY ROUTE 7 (BAY ROAD) OVER HALFWAY CREEK (BROOK), TOWN OF QUEENSBURY, WARREN COUNTY. PROJECT IS A BRIDGE NY PROGRAM AWARD. TOLL CREDITS TO PROVIDE 15% SHARE.

2.548 0.000 2.548 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $2-$4 M

0.037 STBG-OFF 0.037 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.095 0.095 CONINSPSTBG-OFF 2021CONINSP 0.005 0.005 2021NFA

0.843 0.843 CONSTSTBG-OFF 2021CONST 0.044 0.044 2021NFA

TN OF SAND LAKE

176124

STOP 13 RD OVER WYNANTSKILL, BRIDGE REPAIR OR REPLACE

TOWN OF SAND LAKE, RENSSELAER COUNTY, BIN 2201960. R329

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY

1.026 0.039 0.987 0.000 0.000 AQC:A19P TOTAL 4YR COST :RENSSELAER TPC : $1.2-$2.5 M

0.143 NHPP 0.143 DETLDES2020DETLDES 0.007 0.007 2020NFA

0.143 NHPP 0.143 PRELDES2020PRELDES 0.007 0.007 2020NFA

0.019 NHPP 0.019 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.143 0.143 CONINSPNHPP 2022CONINSP 0.007 0.007 2022NFA

1.243 1.243 CONSTNHPP 2022CONST 0.065 0.065 2022NFA

LOCAL

176125

BRIDGE NY BLOOMER RD OVER GOOSEBERRY CREEK, GREENE COUNTY, BIN 3200960 . 95% FEDERAL (USING 15% TOLL CREDITS), 5% LOCAL. BRIDGE REPLACEMENT PROJECT.

1.778 0.320 0.000 1.458 0.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $1.2-$2.5 M

Page 30: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 30 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.240 STBG LG URB 0.240 DETLDES2020DETLDES 0.060 0.060 2020NFA

0.960 STBG LG URB 0.960 ROWACQU2020ROWACQU 0.240 0.240 2020NFA

0.056 STBG LG URB 0.056 ROWINCD2020ROWINCD 0.014 0.014 2020NFA

0.320 0.320 CONINSPSTBG LG URB 2022CONINSP 0.080 0.080 2022NFA

3.558 3.558 CONSTSTBG LG URB 2022CONST 0.889 0.889 2022NFA

CITY OF TROY

176130

SOUTH TROY INDUSTRIAL PARK ROAD PHASE II (NORTHERN END)

CONSTRUCT A NEW TWO-LANE ROAD FROM MONROE STREET TO ADAMS STREET, INCLUDING SIDEWALKS, BIKE LANES A NEW BRIDGE OVER THE POESTENKILL.

CITY OF TROY, RENSSELAER COUNTY. R195A

THIS PIN INCLUDES A PORTION OF PIN 175459 THAT WAS SPLIT

6.417 1.570 0.000 4.847 0.000 AQC:K1P TOTAL 4YR COST :RENSSELAER TPC : $9.5-15.5 M

0.022 STBG FLEX 0.022 PRELDES2020PRELDES 0.005 0.005 2020NFA

LOCAL

176139

CR 28 PAVEMENT PRESERVATION PROJECT - PART 2, RESERVOIR ROAD TO NYS ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN WAS MERGED INTO PIN 176098

0.027 0.027 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : < $0.75 M

0.030 STBG FLEX 0.030 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.070 STBG FLEX 0.070 PRELDES2020PRELDES 0.018 0.018 2020NFA

0.010 STBG FLEX 0.010 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.014 STBG FLEX 0.014 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.120 0.120 CONINSPSTBG FLEX 2022CONINSP 0.030 0.030 2022NFA

0.760 0.760 CONSTSTBG FLEX 2022CONST 0.190 0.190 2022NFA

LOCAL

176140

CR 31 (FORTSVILLE RD) OVER NORTH BRANCH CREEK (LIN# 250), REPLACE CULVERT WITH BRIDGE, TOWN OF MOREAU, SARATOGA COUNTY

1.256 0.156 0.000 1.100 0.000 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

Page 31: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 31 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.008 STBG FLEX 0.008 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.034 0.034 DETLDESSTBG FLEX 2023DETLDES 0.008 0.008 2023NFA

0.076 0.076 PRELDESSTBG FLEX 2023PRELDES 0.019 0.019 2023NFA

0.008 0.008 ROWINCDSTBG FLEX 2023ROWINCD 0.002 0.002 2023NFA

LOCAL

176141

CR 24 (SPIER FALLS ROAD) OVER HUDSON RIVER TRIBUTARY (LIN# 251), REPLACE CULVERT, TOWN OF CORINTH, SARATOGA COUNTY

0.157 0.010 0.000 0.000 0.147 AQC:EXEMPT TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M

0.158 STBG FLEX 0.158 DETLDES2020DETLDES 0.040 0.040 2020NFA

0.158 STBG FLEX 0.158 PRELDES2020PRELDES 0.040 0.040 2020NFA

0.014 STBG FLEX 0.014 ROWINCD2020ROWINCD 0.003 0.003 2020NFA

0.222 0.222 CONINSPSTBG FLEX 2022CONINSP 0.055 0.055 2022NFA

1.583 1.583 CONSTSTBG FLEX 2022CONST 0.396 0.396 2022NFA

0.047 0.047 ROWACQUSTBG FLEX 2022ROWACQU 0.013 0.013 2022NFA

LOCAL

176143

Johnsburg Bridges over Glen Creek, Bridge Replacements, Dippikill Road (3305490) and Glen Creek Road (3305500). Town of Johnsburg, Warren County WAR187

2.729 0.413 0.000 2.316 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $2-$4 M

0.075 STBG FLEX 0.075 DETLDES2020DETLDES 0.019 0.019 2020NFA

0.190 STBG FLEX 0.190 PRELDES2020PRELDES 0.047 0.047 2020NFA

0.008 STBG FLEX 0.008 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.022 STBG FLEX 0.022 ROWINCD2020ROWINCD 0.005 0.005 2020NFA

0.173 0.173 CONINSPSTBG FLEX 2022CONINSP 0.043 0.043 2022NFA

1.920 1.920 CONSTSTBG FLEX 2022CONST 0.480 0.480 2022NFA

LOCAL

176144

County Route 19 (Olmstedville Road) Reconstruction, Hidden Lake Road to County Line (2.7 miles) 2.588Town of Chester WAR188

2.984 0.368 0.000 2.616 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $2-$4 M

Page 32: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 32 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.078 STBG FLEX 0.078 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.038 0.038 DETLDESSTBG FLEX 2021DETLDES 0.010 0.010 2021NFA

0.050 0.050 CONINSPSTBG FLEX 2022CONINSP 0.012 0.012 2022NFA

0.544 0.544 CONSTSTBG FLEX 2022CONST 0.136 0.136 2022NFA

LOCAL

176145

County Route 63 Oxbow / Moon Hill Road Reconstruction, NYS 149 to CR 7 (Bay Road) (1.17 miles) 0.742Town of Queensbury, Warren County WAR189

0.888 0.098 0.048 0.742 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M

0.034 STBG FLEX 0.034 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.086 STBG FLEX 0.086 PRELDES2020PRELDES 0.022 0.022 2020NFA

0.080 0.080 CONINSPSTBG FLEX 2022CONINSP 0.020 0.020 2022NFA

0.912 0.912 CONSTSTBG FLEX 2022CONST 0.228 0.228 2022NFA

LOCAL

176146

CR 16 (East River Drive) and CR 32 (Call Street) Rehabilitation, Warren County Line to Hawk Road (3.7 miles),Town of Lake Luzerne, Warren County WAR190

1.390 0.150 0.000 1.240 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

0.216 0.216 DETLDESNHPP 2021DETLDES 0.054 0.054 2021NFA

0.216 0.216 PRELDESNHPP 2021PRELDES 0.054 0.054 2021NFA

0.277 0.277 CONINSPNHPP 2022CONINSP 0.069 0.069 2022NFA

2.465 2.465 CONSTNHPP 2022CONST 0.616 0.616 2022NFA

LOCAL

176147

CR 47 & CR 70 (QUAKER ROAD) PAVEMENT PRESERVATION, US 9 TO LOWER WARREN STREET (3.96 MILES) TOWN OF QUEENSBURY, WARREN COUNTY WAR191

3.967 0.000 0.540 3.427 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $3.3-$5.6 M

0.064 0.064 DETLDESSTBG FLEX 2023DETLDES 0.016 0.016 2023NFA

0.064 0.064 PRELDESSTBG FLEX 2023PRELDES 0.016 0.016 2023NFA

0.011 0.011 ROWACQUSTBG FLEX 2023ROWACQU 0.003 0.003 2023NFA

0.005 0.005 ROWINCDSTBG FLEX 2023ROWINCD 0.001 0.001 2023NFA

LOCAL

176148

HUDSON STREET OVER MILL CREEK, BRIDGE REPLACEMENT (3305340) 0.809TOWN OF JOHNSBURG, WARREN COUNTY

0.180 0.000 0.000 0.000 0.180 AQC:N/A TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M

Page 33: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 33 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.086 0.086 DETLDESSTBG FLEX 2022DETLDES 0.021 0.021 2022NFA

0.086 0.086 PRELDESSTBG FLEX 2022PRELDES 0.021 0.021 2022NFA

0.026 0.026 ROWINCDSTBG FLEX 2022ROWINCD 0.007 0.007 2022NFA

LOCAL

176149

COUNTY ROUTE 15 (ADIRONDACK ROAD) OVER MILL BROOK, BRIDGE REPLACEMENT (3305280), TOWN OF HORICON, WARREN COUNTY

0.247 0.000 0.000 0.247 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

0.065 0.065 PRELDESSTBG FLEX 2022PRELDES 0.016 0.016 2022NFA

0.014 0.014 ROWINCDSTBG FLEX 2022ROWINCD 0.003 0.003 2022NFA

0.065 0.065 DETLDESSTBG FLEX 2023DETLDES 0.016 0.016 2023NFA

LOCAL

176150

STATES ROAD EAST OVER STONY CREEK, BRIDGE REPLACEMENT (BIN 3305610), TOWN OF STONY CREEK, WARREN COUNTY

0.179 0.000 0.000 0.098 0.081 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M

0.026 STBG FLEX 0.026 DETLDES2020DETLDES 0.007 0.007 2020NFA

0.027 STBG FLEX 0.027 PRELDES2020PRELDES 0.007 0.007 2020NFA

0.058 0.058 CONINSPSTBG FLEX 2022CONINSP 0.015 0.015 2022NFA

0.522 0.522 CONSTSTBG FLEX 2022CONST 0.131 0.131 2022NFA

LOCAL

176152

CR 35 and CR 36 Pavement Preservation, US 4 to Warren County line, Town of Kingsbury, Washington County WAS167

0.793 0.067 0.000 0.726 0.000 AQC:EXEMPT TOTAL 4YR COST :WASHINGTON TPC : $0.6-$1.5 M

0.018 STBG-OFF 0.018 DETLDES2020DETLDES 0.004 0.004 2020NFA

0.022 STBG-OFF 0.022 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.018 0.018 CONINSPSTBG-OFF 2021CONINSP 0.004 0.004 2021NFA

0.160 0.160 CONSTSTBG-OFF 2021CONST 0.040 0.040 2021NFA

LOCAL

176153

CR 61 OVER BATTEN KILL (BATTEN-DUGAN) BRIDGE REPLACEMENT, BIN 3306370, TOWNS OF GREENWICH AND JACKSON, WASHINGTON COUNTY. CONSTRUCTION ANTICIPATED FOR FFY 2023-2024.

0.271 0.049 0.222 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $4.6-$7.5 M

Page 34: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 34 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.128 0.128 DETLDESSTBG-OFF 2022DETLDES 0.032 0.032 2022NFA

0.116 0.116 PRELDESSTBG-OFF 2022PRELDES 0.030 0.030 2022NFA

0.008 0.008 ROWINCDSTBG-OFF 2022ROWINCD 0.002 0.002 2022NFA

0.141 0.141 CONINSPSTBG-OFF 2023CONINSP 0.035 0.035 2023NFA

1.064 1.064 CONSTSTBG-OFF 2023CONST 0.266 0.266 2023NFA

0.026 0.026 ROWACQUSTBG-OFF 2023ROWACQU 0.006 0.006 2023NFA

LOCAL

176155

COUNTY ROUTE 74 OVER FLY CREEK, BRIDGE REPLACEMENT (BIN 3306170), TOWN OF EASTON, WASHINGTON COUNTY AND HICKORY HILL ROAD OVER CAMDEN VALLEY CREEK, BRIDGE REPLACEMENT (BIN 3306600), TOWN OF SALEM, WASHINGTON COUNTY . THIS PIN NOW INCLUDES 176156. WAS170

1.854 0.000 0.000 0.316 1.538 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $1.2-$2.5 M

0.087 STBG LG URB 0.087 DETLDES2020DETLDES 0.023 0.023 2020NFA

0.087 STBG LG URB 0.087 PRELDES2020PRELDES 0.023 0.023 2020NFA

0.144 0.144 CONINSPSTBG LG URB 2022CONINSP 0.036 0.036 2022NFA

1.200 1.200 CONSTSTBG LG URB 2022CONST 0.300 0.300 2022NFA

CITY OF SARATOGA SPR

176158

MISSING LINKS PROGRAM: CITY OF SARATOGA SPRINGS

ADD CONCRETE SIDEWALK, ADA CROSSWALKS, AMENITIES AND SOME CURBING AND DRAINAGE IN SEVERAL LOCATIONS.

CITY OF SARATOGA SPRINGS, SARATOGA COUNTY. SA322

1.900 0.220 0.000 1.680 0.000 AQC:C2Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

0.094 0.094 DETLDESSTBG LG URB 2021DETLDES 0.023 0.023 2021NFA

0.094 0.094 PRELDESSTBG LG URB 2021PRELDES 0.023 0.023 2021NFA

0.194 0.194 ROWACQUSTBG LG URB 2021ROWACQU 0.048 0.048 2021NFA

0.016 0.016 ROWINCDSTBG LG URB 2021ROWINCD 0.004 0.004 2021NFA

0.112 0.112 CONINSPSTBG LG URB 2022CONINSP 0.028 0.028 2022NFA

0.934 0.934 CONSTSTBG LG URB 2022CONST 0.233 0.233 2022NFA

TN OF GLENVILLE

176159

FREEMANS BRIDGE ROAD MULTI-USE PATH

FROM THE SCOTIA-GLENVILLE LOOP SEGMENT OF THE MOHAWK-HUDSON TRAIL TO DUTCH MEADOWS LANE

CONSTRUCT A 4,800 FOOT LONG AND 10 FOOT WIDE PROTECTED MULTI-USE PATH WITH 3 NEW CROSSWALKS.

TOWN OF GLENVILLE, SCHENECTADY COUNTY. S265

1.803 0.000 0.496 1.307 0.000 AQC:C2Z TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M

Page 35: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 35 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.030 0.030 DETLDESSTBG LG URB 2022DETLDES 0.007 0.007 2022NFA

0.030 0.030 PRELDESSTBG LG URB 2022PRELDES 0.007 0.007 2022NFA

0.038 0.038 CONINSPSTBG LG URB 2023CONINSP 0.009 0.009 2023NFA

0.319 0.319 CONSTSTBG LG URB 2023CONST 0.080 0.080 2023NFA

CITY OF SCHENECTADY

176160

FRANKLIN STREET CYCLE TRACK, CITY OF SCHENECTADY

INSTALL A PROTECTED TWO-WAY CYCLE TRACK ON FRANKLIN STREET FROM NOTT TERRACE TO JAY STREET.

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S266

0.520 0.000 0.000 0.074 0.446 AQC:C2Z TOTAL 4YR COST :SCHENECTADY TPC : < $0.75 M

0.227 0.227 DETLDESSTBG LG URB 2022DETLDES 0.057 0.057 2022NFA

0.227 0.227 PRELDESSTBG LG URB 2022PRELDES 0.057 0.057 2022NFA

CITY OF TROY

176161

NY 2 CORRIDOR PROJECT, NY 2 (CONGRESS AND FERRY STREETS) FROM 11TH STREET WEST TO THE CONGRESS STREET BRIDGE RAMPS

CORRIDOR IMPROVEMENTS, INCLUDES: MILL & FILL, RESTRIPING TO ONE DRIVING LANE EACH, REPAIR 50% OF SIDEWALKS, ADD CURB EXTENSIONS AND BIKE LANES

CITY OF TROY, RENSSELAER COUNTY. R339

0.568 0.000 0.000 0.568 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : $3.3-$5.6 M

0.276 0.276 DETLDESSTBG LG URB 2021DETLDES 0.069 0.069 2021NFA

0.276 0.276 PRELDESSTBG LG URB 2021PRELDES 0.069 0.069 2021NFA

0.292 0.292 CONINSPSTBG LG URB 2022CONINSP 0.073 0.073 2022NFA

2.994 2.994 CONSTSTBG LG URB 2022CONST 0.748 0.748 2022NFA

VIL OF SCOTIA

176162

SUNNYSIDE ROAD OVER AMTRAK, BRIDGE REHABILITATION

REPAIR CONCRETE PIERS, CAP BEAMS, AND STEEL STRUCTURAL MEMBERS, REPLACE STEEL BEARINGS AND DECK INCLUDING RAILINGS, BIKE LANES, AND SIDEWALK ON SOUTH SIDE.

VILLAGE OF SCOTIA, SCHENECTADY COUNTY, BIN 2257170. S263

4.797 0.000 0.690 4.107 0.000 AQC:A19Z TOTAL 4YR COST :SCHENECTADY TPC : $7.5-$12 M

0.054 0.054 DETLDESSTBG LG URB 2021DETLDES 0.014 0.014 2021NFA

0.054 0.054 PRELDESSTBG LG URB 2021PRELDES 0.014 0.014 2021NFA

0.071 0.071 CONINSPSTBG LG URB 2022CONINSP 0.018 0.018 2022NFA

0.592 0.592 CONSTSTBG LG URB 2022CONST 0.148 0.148 2022NFA

CITY OF ALBANY

176163

HENRY JOHNSON BOULEVARD MILL & FILL, FROM SHERIDAN AVENUE TO LIVINGSTON AVENUE

CITY OF ALBANY, ALBANY COUNTY. A593

0.965 0.000 0.136 0.829 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

Page 36: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 36 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.042 0.042 DETLDESSTBG LG URB 2021DETLDES 0.010 0.010 2021NFA

0.042 0.042 PRELDESSTBG LG URB 2021PRELDES 0.010 0.010 2021NFA

0.055 0.055 CONINSPSTBG LG URB 2022CONINSP 0.014 0.014 2022NFA

0.456 0.456 CONSTSTBG LG URB 2022CONST 0.115 0.115 2022NFA

CITY OF ALBANY

176164

LARK STREET MILL & FILL, FROM MADISON AVENUE TO WASHINGTON AVENUE

ADA-COMPLIANT PEDESTRIAN AMENITIES FOR ALL SIDEWALKS AND CROSSWALKS. REPLACE 1,200 SQUARE FEET OF SIDEWALK.

CITY OF ALBANY, ALBANY COUNTY. A594

0.744 0.000 0.104 0.640 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

0.032 STBG LG URB 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.032 STBG LG URB 0.032 PRELDES2020PRELDES 0.008 0.008 2020NFA

0.043 0.043 CONINSPSTBG LG URB 2021CONINSP 0.011 0.011 2021NFA

0.354 0.354 CONSTSTBG LG URB 2021CONST 0.088 0.088 2021NFA

CITY OF RENSSELAER

176165

CITY OF RENSSELAER THIRD AVENUE PAVEMENT REHABILITATION & BIKE/PED IMPROVEMENTS, FROM THE BRIDGE TO CITY/TOWN LINE

CITY OF RENSSELAER, RENSSEALER COUNTY. R338

0.576 0.080 0.496 0.000 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.040 0.040 DETLDESSTBG LG URB 2021DETLDES 0.010 0.010 2021NFA

0.045 0.045 PRELDESSTBG LG URB 2021PRELDES 0.011 0.011 2021NFA

0.080 0.080 CONINSPSTBG LG URB 2022CONINSP 0.020 0.020 2022NFA

0.721 0.721 CONSTSTBG LG URB 2022CONST 0.180 0.180 2022NFA

SCHENECTADY CO

176166

GUILDERLAND AVENUE MILL & FILL FROM CURRY ROAD (NY 7) TO THE SCHENECTADY CITY LINE

ADD 8 CURB RAMP NODES AT ALL THE TOWN INTERSECTIONS WITHIN THE PROJECT LIMITS, ADD APPROXIMATELY 100 FEET OF SIDEWALK AND CONCRETE CURBING IN FRONT OF THE BELLEVUE GOSPEL CHAPEL, IMPROVE THE TWO EXISTING CURB RAMPS AT THE CURRY ROAD/GUILDERLAND AVENUE INTERSECTION.

ANDHELDERBERG AVENUE MILL & FILL, FROM CURRY ROAD (STATE ROUTE 7) TO CITY OF SCHENECTADY MUNICIPAL LINE (NEAR AMELIA STREET)

SIDEWALK: REPLACE OR REPAIR 750 LINEAR FEET, ADD 200 FEET NEW, INSTALL 28 ADA CURB RAMPS, IMPROVE PAVEMENT MARKINGS & SIGNAGE WHERE NEEDED.

TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S261THIS PIN NOW INCLUDES PIN 176167 (S262)

1.107 0.000 0.106 1.001 0.000 AQC:A10Z TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M

Page 37: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 37 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.128 0.128 DETLDESTAP FLEX 2021DETLDES 0.032 0.032 2021NFA

0.256 0.256 PRELDESTAP FLEX 2021PRELDES 0.064 0.064 2021NFA

0.004 0.004 ROWINCDTAP FLEX 2021ROWINCD 0.001 0.001 2021NFA

0.036 0.036 ROWACQUTAP FLEX 2022ROWACQU 0.009 0.009 2022NFA

0.576 0.576 CONINSPTAP FLEX 2023CONINSP 0.144 0.144 2023NFA

1.912 1.912 CONSTTAP FLEX 2023CONST 0.478 0.478 2023NFA

TN OF BETHLEHEM

176168

DELAWARE AVENUE COMPLETE STREETS

MILL & FILL FROM ELSMERE AVENUE TO NORMANS KILL BRIDGE, COMPLETE STREETS & ROAD DIET PROJECT

TOWN OF BETHLEHEM, ALBANY COUNTY. A601

FUNDING FOR PAVEMENT PRESERVATION IS NOT INCLUDED HERE AND WILL BE PAID FOR BY THE NYSDOT PAVEMENT PRESERVATION SET-ASIDE

3.640 0.000 0.485 0.045 3.110 AQC:A2Z,A10Z TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M

0.025 0.025 DETLDESSTBG LG URB 2022DETLDES 0.006 0.006 2022NFA

0.025 0.025 PRELDESSTBG LG URB 2022PRELDES 0.006 0.006 2022NFA

0.062 0.062 CONINSPSTBG LG URB 2023CONINSP 0.015 0.015 2023NFA

0.516 0.516 CONSTSTBG LG URB 2023CONST 0.129 0.129 2023NFA

CITY OF SCHENECTADY

176169

CRAIG STREET PAVEMENT REHABILITATION, FROM ALBANY STREET TO WYLLIE STREET

INCLUDES SELECT FULL DEPTH REPAIRS, ADA NON-COMPLIANT INTERSECTIONS WILL BE MADE COMPLIANT. HIGH VISIBILITY, LADDER BAR STYLE, CROSSWALKS WILL BE INSTALLED AT EVERY CROSSING.

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S259

0.784 0.000 0.000 0.062 0.722 AQC:A10Z TOTAL 4YR COST :SCHENECTADY TPC : $0.6-$1.5 M

0.002 0.002 DETLDESSTBG FLEX 2021 0.002 0.002 PRELDESSTBG FLEX 2021 0.018 0.018 CONINSPSTBG FLEX 2022

CONINSP 0.004 0.004 2022NFA 0.149 0.149 CONSTSTBG FLEX 2022

CONST 0.037 0.037 2022NFA

RENSSELAER CO

176170

EASTERN UNION TURNPIKE (CR 49) OVERLAY, GLASS LAKE ROAD TO NY 43

TOWN OF SAND LAKE, RENSSELAER COUNTY. R333

0.212 0.000 0.004 0.208 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.002 STBG LG URB 0.002 DETLDES2020 0.002 STBG LG URB 0.002 PRELDES2020 0.020 0.020 CONINSPSTBG LG URB 2022

CONINSP 0.005 0.005 2022NFA 0.167 0.167 CONSTSTBG LG URB 2022

CONST 0.043 0.043 2022NFA

RENSSELAER CO

176171

PERSHING AVENUE (CR 68) OVERLAY, FROM TROY AVENUE TO PECK ROAD

TOWN OF NORTH GREENBUSH, RENSSELAER COUNTY. R335

0.239 0.004 0.000 0.235 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

Page 38: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 38 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.002 STBG FLEX 0.002 DETLDES2020 0.002 STBG FLEX 0.002 PRELDES2020 0.013 0.013 CONINSPSTBG FLEX 2022

CONINSP 0.003 0.003 2022NFA 0.106 0.106 CONSTSTBG FLEX 2022

CONST 0.027 0.027 2022NFA

RENSSELAER CO

176172

FOGARTY ROAD (CR 126) OVERLAY, FROM WETSEL ROAD TO PITTSTOWN TOWN LINE

TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. R334

0.153 0.004 0.000 0.149 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.013 0.013 CONINSPSTBG FLEX 2022CONINSP 0.003 0.003 2022NFA

0.103 0.103 CONSTSTBG FLEX 2022CONST 0.027 0.027 2022NFA

0.002 0.002 DETLDESSTBG FLEX 2022 0.002 0.002 PRELDESSTBG FLEX 2022

RENSSELAER CO

176173

RIVER ROAD (CR 120) OVERLAY, FROM CR 125 TO WASHINGTON COUNTY LINE

TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. R336

0.150 0.000 0.000 0.150 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.075 0.075 DETLDESSTBG LG URB 2021DETLDES 0.019 0.019 2021NFA

0.075 0.075 PRELDESSTBG LG URB 2021PRELDES 0.019 0.019 2021NFA

0.074 0.074 CONINSPSTBG LG URB 2022CONINSP 0.018 0.018 2022NFA

0.615 0.615 CONSTSTBG LG URB 2022CONST 0.155 0.155 2022NFA

VIL OF GREEN ISLAND

176174

COHOES AVENUE, ARCH STREET TO THE COHOES CITY LINE: MILL & FILL

INSTALL CONCRETE SIDEWALKS FROM ARCH STREET TO TIBBITS AVENUE AND REPAIR ALL SIDEWALK RAMPS TO MEET ADA STANDARDS.

VILLAGE OF GREEN ISLAND, ALBANY COUNTY. A599

1.050 0.000 0.188 0.862 0.000 AQC:A10Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

0.120 STBG LG URB 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.018 STBG LG URB 0.018 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.120 0.120 DETLDESSTBG LG URB 2021DETLDES 0.030 0.030 2021NFA

0.022 0.022 ROWACQUSTBG LG URB 2021ROWACQU 0.006 0.006 2021NFA

0.175 0.175 CONINSPSTBG LG URB 2022CONINSP 0.044 0.044 2022NFA

1.300 1.300 CONSTSTBG LG URB 2022CONST 0.326 0.326 2022NFA

CITY OF RENSSELAER

176175

SOUTH STREET BRIDGE REPLACEMENT & PEDESTRIAN IMPROVEMENTS, SOUTH STREET BETWEEN 2ND AVENUE AND AIKEN AVE

CITY OF RENSSELAER, RENSSELAER COUNTY, BIN 2202200. R331

2.195 0.172 0.178 1.845 0.000 AQC:A19Z TOTAL 4YR COST :RENSSELAER TPC : $2-$4 M

Page 39: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 39 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.002 STBG LG URB 0.002 DETLDES2020 0.002 STBG LG URB 0.002 PRELDES2020 0.049 0.049 CONINSPSTBG LG URB 2022

CONINSP 0.012 0.012 2022NFA 0.414 0.414 CONSTSTBG LG URB 2022

CONST 0.103 0.103 2022NFA

RENSSELAER CO

176176

SNYDERS LAKE ROAD (CR 68) FROM CR 65 (BLOOMINGROVE DRIVE) TO TROY AVENUE: OVERLAY

TOWN OF NORTH GREENBUSH, RENSSELAER COUNTY. R337

0.582 0.004 0.000 0.578 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.002 0.002 DETLDESSTBG FLEX 2021 0.002 0.002 PRELDESSTBG FLEX 2021 0.032 0.032 CONINSPSTBG FLEX 2022

CONINSP 0.008 0.008 2022NFA 0.278 0.278 CONSTSTBG FLEX 2022

CONST 0.070 0.070 2022NFA

RENSSELAER CO

176177

BEST ROAD (CR 55) : OVERLAY, FROM SAND LAKE TOWN LINE TO NY 150

TOWN OF SAND LAKE, RENSSELAER COUNTY. R332

0.392 0.000 0.004 0.388 0.000 AQC:A10Z TOTAL 4YR COST :RENSSELAER TPC : < $0.75 M

0.074 0.074 DETLDESSTBG-OFF 2021DETLDES 0.018 0.018 2021NFA

0.074 0.074 PRELDESSTBG-OFF 2021PRELDES 0.018 0.018 2021NFA

0.012 0.012 ROWACQUSTBG-OFF 2021ROWACQU 0.003 0.003 2021NFA

0.101 0.101 CONINSPSTBG-OFF 2022CONINSP 0.025 0.025 2022NFA

0.840 0.840 CONSTSTBG-OFF 2022CONST 0.210 0.210 2022NFA

SARATOGA CO

176178

COONS CROSSING ROAD OVER ANTHONY KILL BRIDGE REPLACEMENT TOWN OF HALFMOON, SARATOGA COUNTY, BIN 2202750.SA317

1.375 0.000 0.199 1.176 0.000 AQC:A19Z TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

0.046 0.046 DETLDESSTBG FLEX 2022DETLDES 0.011 0.011 2022NFA

0.046 0.046 PRELDESSTBG FLEX 2022PRELDES 0.011 0.011 2022NFA

0.063 0.063 CONINSPSTBG FLEX 2023CONINSP 0.016 0.016 2023NFA

0.526 0.526 CONSTSTBG FLEX 2023CONST 0.131 0.131 2023NFA

SARATOGA CO

176179

LASHER ROAD BRIDGE OVER THE MOURNING KILL REHABILITATION, ELEMENT SPECIFIC REPAIRS

TOWN OF BALLSTON, SARATOGA COUNTY, BIN 3304700. SA318

0.850 0.000 0.000 0.114 0.736 AQC:A19Z TOTAL 4YR COST :SARATOGA TPC : $0.6-$1.5 M

Page 40: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 40 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.031 0.031 DETLDESHSIP 2021DETLDES 0.003 0.003 2021NFA

0.031 0.031 PRELDESHSIP 2021PRELDES 0.003 0.003 2021NFA

0.045 0.045 CONINSPHSIP 2022CONINSP 0.005 0.005 2022NFA

0.411 0.411 CONSTHSIP 2022CONST 0.046 0.046 2022NFACONST 0.285 0.285 2022NFA

TN OF COLONIE

176180

ALBANY SHAKER ROAD (CR 151), WOLF ROAD TO EVERETT ROAD: SAFETY IMPROVEMENTS

SPEED LIMIT REDUCTION, ADDITIONAL PEDESTRIAN IMPROVEMENTS AT SELECT INTERSECTIONS & A NEW TRAFFIC SIGNAL AT SHAKER ELEMENTARY .

TOWN OF COLONIE, ALBANY COUNTY. A603

0.860 0.000 0.068 0.792 0.000 AQC:K1Z TOTAL 4YR COST :ALBANY TPC : $0.6-$1.5 M

0.114 0.114 DETLDESTAP FLEX 2021DETLDES 0.029 0.029 2021NFA

0.115 0.115 PRELDESTAP FLEX 2021PRELDES 0.028 0.028 2021NFA

0.180 0.180 CONINSPTAP FLEX 2022CONINSP 0.045 0.045 2022NFA

1.796 1.796 CONSTTAP FLEX 2022CONST 0.449 0.449 2022NFA

TN OF ROTTERDAM

176182

NY ROUTE 5S PEDESTRIAN/BICYCLE ACCESS IMPROVEMENTS FROM NY 103 / BRIDGE STREET TO PARKIS STREET AND ON IROQUOIS STREET

INCLUDES: CONCRETE SIDEWALK; PAVED, COLORED BIKE LANES; HIGH-VISIBILITY CROSSWALKS; SIGNS; SHARROWS; INTERPRETIVE SIGNAGE; AND LANDSCAPING.

TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S267

2.756 0.000 0.286 2.470 0.000 AQC:C2 TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M

0.124 TAP FLEX 0.124 DETLDES2020DETLDES 0.031 0.031 2020NFA

0.124 TAP FLEX 0.124 PRELDES2020PRELDES 0.031 0.031 2020NFA

0.221 0.221 CONINSPTAP FLEX 2022CONINSP 0.055 0.055 2022NFA

1.987 1.987 CONSTTAP FLEX 2022CONST 0.497 0.497 2022NFA

CITY OF RENSSELEAR

176183

RENSSELEAR BICYCLE & PEDESTRIANS ACCESS IMPROVEMENTS

1.8 MILE PAVED, OFF-ROAD TRAIL THROUGH THE HOLLOW, 0.81 MILES OF ON-ROAD SHARROWS & SIGNAGE, & PEDESTRIAN CROSSING PROVEMENTS AT FIVE INTERSECTIONS.

CITY OF RENSSELEAR, RENSSELEAR COUNTY. R345

3.070 0.310 0.000 2.760 0.000 AQC:C2 TOTAL 4YR COST :RENSSELAER TPC : $2-$4 M

0.120 0.120 DETLDESTAP FLEX 2021DETLDES 0.030 0.030 2021NFA

0.032 0.032 PRELDESTAP FLEX 2021PRELDES 0.008 0.008 2021NFA

0.072 0.072 CONINSPTAP FLEX 2022CONINSP 0.018 0.018 2022NFA

0.489 0.489 CONSTTAP FLEX 2022CONST 0.122 0.122 2022NFA

VIL OF SCOTIA

176184

WASHINGTON AVENUE BIKE/PED CONNECTION

INCLUDES A MULTI-USE PATH, SIDEWALK & CROSSWALKS CONNECTING RESIDENTIAL NEIGHBORHOODS TO THE COLLINS LAKE ACCESS AREA AND TO AN EXISTING TRAIL CONNECTOR.

VILLAGE OF SCOTIA, SCHENECTADY COUNTY. S268

0.891 0.000 0.190 0.701 0.000 AQC:C2 TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M

Page 41: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 41 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.112 CMAQ 0.112 DETLDES2020DETLDES 0.028 0.028 2020NFA

0.100 CMAQ 0.100 PRELDES2020PRELDES 0.025 0.025 2020NFA

0.032 CMAQ 0.032 ROWINCD2020ROWINCD 0.008 0.008 2020NFA

0.168 0.168 ROWACQUCMAQ 2021ROWACQU 0.041 0.041 2021NFA

0.213 0.213 CONINSPCMAQ 2022CONINSP 0.053 0.053 2022NFA

1.210 1.210 CONSTCMAQ 2022CONST 0.303 0.303 2022NFA

SCHENECTADY CO

176186

ROSENDALE ROAD/OLD RIVER ROAD INTERSECTION IMPROVEMENTS

TRAFFIC SIGNAL, WIDER TRAVEL LANES AND SHOULDERS, AND TURN LANES. PROVIDE STANDARD STOPPING SIGHT DISTANCES & WIDER AREAS FOR ERRANT VEHICLES.

TOWN OF NISKAYUNA, SCHENECTADY COUNTY. S269

2.293 0.305 0.209 1.779 0.000 AQC:D1 TOTAL 4YR COST :SCHENECTADY TPC : $2-$4 M

0.075 TAP RURAL 0.075 DETLDES2020DETLDES 0.019 0.019 2020NFA

0.100 TAP RURAL 0.100 PRELDES2020PRELDES 0.025 0.025 2020NFA

0.092 0.092 CONINSPTAP RURAL 2021CONINSP 0.023 0.023 2021NFA

0.548 0.548 CONSTTAP RURAL 2021CONST 0.137 0.137 2021NFA

TOWN OF WARRENSBURG

176187

REPLACEMENT OF 6100 FT OF DETERIORATED SIDEWALK AND 2,900 FT NEW SIDEWALK ON RIVER STREET BETWEEN PERRY LANE AND JOHNSON DRIVE, TOWN OF WARRENSBURG, WARREN COUNTY. INCLUDES CROSSWALKS AND ADA DETECTABLE WARNING PLATES AND PEDESTRIAN SIGNING AND STRIPING.

1.019 0.219 0.800 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M

0.042 TAP FLEX 0.042 DETLDES2020DETLDES 0.011 0.011 2020NFA

0.064 TAP FLEX 0.064 PRELDES2020PRELDES 0.016 0.016 2020NFA

0.060 0.060 CONINSPTAP FLEX 2022CONINSP 0.015 0.015 2022NFA

0.823 0.823 CONSTTAP FLEX 2022CONST 0.206 0.206 2022NFA

CITY OF GLENS FALLS176188

NEW CONNECTIONS BETWEEN THE CITY OF GLENS FALLS AND REGIONAL TRAIL INFRASTRUCTURE INCLUDING THE WARREN COUNTY BIKEWAY AND THE FEEDER CANAL.

1.237 0.133 0.000 1.104 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $0.6-$1.5 M

Page 42: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 42 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.240 STBG FLEX 0.240 PRELDES2020PRELDES 0.060 0.060 2020NFA

0.008 STBG FLEX 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.240 0.240 DETLDESSTBG FLEX 2021DETLDES 0.060 0.060 2021NFA

0.032 0.032 ROWACQUSTBG FLEX 2021ROWACQU 0.008 0.008 2021NFA

0.264 0.264 CONINSPSTBG FLEX 2022CONINSP 0.066 0.066 2022NFA

2.360 2.360 CONSTSTBG FLEX 2022CONST 0.590 0.590 2022NFA

NYSDOT

176190

TAHAWUS ROAD BRIDGE (BIN 3302690) OVER SANFORD LAKE, TOWN OF ELIZABETHTOWN, ESSEX COUNTY, BRIDGE REPLACEMENT

3.930 0.310 0.340 3.280 0.000 AQC:EXEMPT TOTAL 4YR COST :ESSEX TPC : $3.3-$5.6 M

0.128 0.128 DETLDESSTBG FLEX 2021DETLDES 0.032 0.032 2021NFA

0.128 0.128 PRELDESSTBG FLEX 2021PRELDES 0.032 0.032 2021NFA

0.008 0.008 ROWACQUSTBG FLEX 2022ROWACQU 0.002 0.002 2022NFA

0.008 0.008 ROWINCDSTBG FLEX 2022ROWINCD 0.002 0.002 2022NFA

0.160 0.160 CONINSPSTBG FLEX 2023CONINSP 0.040 0.040 2023NFA

1.240 1.240 CONSTSTBG FLEX 2023CONST 0.310 0.310 2023NFA

NYSDOT

176191

CR 61 RIVER ROAD BRIDGE (BIN 3302910) REPLACEMENT OVER COXSACKIE CREEK, NEW BALTIMORE, GREENE COUNTY

2.090 0.000 0.320 0.020 1.750 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $1.2-$2.5 M

0.128 0.128 DETLDESSTBG FLEX 2021DETLDES 0.032 0.032 2021NFA

0.128 0.128 PRELDESSTBG FLEX 2021PRELDES 0.032 0.032 2021NFA

0.160 0.160 ROWACQUSTBG FLEX 2022ROWACQU 0.040 0.040 2022NFA

0.016 0.016 ROWINCDSTBG FLEX 2022ROWINCD 0.004 0.004 2022NFA

0.144 0.144 CONINSPSTBG FLEX 2023CONINSP 0.036 0.036 2023NFA

1.280 1.280 CONSTSTBG FLEX 2023CONST 0.320 0.320 2023NFA

NYSDOT

176192

CR 40 MAPLECREST RD BRIDGE OVER BATAVIA KILL (BIN 3302860) REPLACEMENT OVER THE BATAVIA KILL. TOWN OF WINDHAM, GREENE COUNTY

2.320 0.000 0.320 0.220 1.780 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $2-$4 M

Page 43: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 43 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.128 0.128 DETLDESSTBG FLEX 2021DETLDES 0.032 0.032 2021NFA

0.128 0.128 PRELDESSTBG FLEX 2021PRELDES 0.032 0.032 2021NFA

0.016 0.016 ROWACQUSTBG FLEX 2022ROWACQU 0.004 0.004 2022NFA

0.016 0.016 ROWINCDSTBG FLEX 2022ROWINCD 0.004 0.004 2022NFA

0.144 0.144 CONINSPSTBG FLEX 2023CONINSP 0.036 0.036 2023NFA

1.296 1.296 CONSTSTBG FLEX 2023CONST 0.324 0.324 2023NFA

NYSDOT

176193

BRIDGE STREET BRIDGE (BIN 3201430) REPLACEMENT OVER SCHOHARIE CREEK, TOWN OF HUNTER, GREENE COUNTY

2.160 0.000 0.320 0.040 1.800 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $2-$4 M

0.480 NHPP 0.480 OPER2020OPER 0.120 0.120 2020NFA

0.480 0.480 OPERNHPP 2021OPER 0.120 0.120 2021NFA

0.480 0.480 OPERNHPP 2022OPER 0.120 0.120 2022NFA

NYSDOT

180661

HIGHWAY EMERGENCY LOCAL PATROL (HELP) PROGRAM

PROVIDES ASSISTANCE TO STRANDED MOTORISTS ON SELECTED PORTIONS OF INTERSTATE ROADS IN THE CAPITAL DISTRICT. RG37

1.800 0.600 0.600 0.600 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.149 0.149 DETLDESSTBG FLEX 2023DETLDES 0.037 0.037 2023NFA

0.151 0.151 PRELDESSTBG FLEX 2023PRELDES 0.035 0.035 2023NFA

0.020 0.020 SCOPINGSTBG FLEX 2023SCOPING 0.005 0.005 2023NFA

NYSDOT

180902

SLOPE REPAIR SFY 24, TO ADDRESS SPECIFIC NEEDS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.397 0.000 0.000 0.000 0.397 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.120 NHPP 0.120 MISC2020MISC 0.030 0.030 2020NFA

0.120 0.120 MISCNHPP 2021MISC 0.030 0.030 2021NFA

0.120 0.120 MISCNHPP 2022MISC 0.030 0.030 2022NFA

NYSDOT

180950

TMC ITS PROJECTS

WITHIN ALBANY, RENSSELAER, SARATOGA AND SCHENECTADY COUNTIES. RG37C

0.450 0.150 0.150 0.150 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 44: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 44 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.181 NHPP 0.181 CONINSP2020CONINSP 0.045 0.045 2020NFA

2.463 NHPP 2.463 CONST2020CONST 0.616 0.616 2020NFA

0.025 STBG FLEX 0.025 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.175 STBG FLEX 0.175 CONST2020CONST 0.044 0.044 2020NFA

NYSDOT

181014

CULVERT REPAIR OR REPLACEMENT SFY19 AT THE FOLLOWING LOCATIONS IN REGION 1.

CULVERTS REPLACED:C170024 (WILL BEREPLACED WITH A 4-SIDED BOX) 9N-1702-1325, HAGUE, WARRENCOUNTY. CULVERTSREPAIRED: CA00335, 9-1211-2369,NORTH HUDSON, ESSEXCOUNTY C120145, 87I-1211-1175,NORTH HUDSON, ESSEXCOUNTY C120149, 87I-1211-1194,NORTH HUDSON, ESSEXCOUNTY C120158, 87I-1211-1225,NORTH HUDSON, ESSEXCOUNTY C120177, 87I-1211-1265,ELIZABETHTOWN, ESSEXCOUNTY C180011, 4-1803-1269, FORTANN, WASHINGTON COUNTY C180031,22-1808-1610, DRESDEN, WASHINGTONCOUNTY, C120198, 87I-1211-1458SB, LEWIS, ESSEX COUNTY

3.555 3.555 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.014 NHPP 0.014 DETLDES2020DETLDES 0.003 0.003 2020NFA

0.028 STBG FLEX 0.028 DETLDES2020DETLDES 0.007 0.007 2020NFA

0.004 STBG FLEX 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.030 0.030 CONINSPNHPP 2021CONINSP 0.007 0.007 2021NFA

0.200 0.200 CONSTNHPP 2021CONST 0.050 0.050 2021NFA

0.040 0.040 CONINSPSTBG FLEX 2021CONINSP 0.010 0.010 2021NFA

0.400 0.400 CONSTSTBG FLEX 2021CONST 0.100 0.100 2021NFA

NYSDOT

181016

TRAFFIC SIGNALS REBUILD SFY19 (WAS 1T0852) ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.894 0.057 0.837 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 45: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 45 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.225 NHPP 0.225 CONINSP2020CONINSP 0.056 0.056 2020NFA

2.415 NHPP 2.415 CONST2020CONST 0.604 0.604 2020NFA

NYSDOT

181026

NY 911F (FREEMANS BRIDGE) OVER THE MOHAWK RIVER/ERIE CANAL

BRIDGE REHAB TO ADDRESS CONDITION RATING, AND ADDITION OF A MULTI-USE PATH ON THE BRIDGE

TOWN OF GLENVILLE, SCHENECTADY COUNTY, BIN 4050330. S238

3.300 3.300 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :SCHENECTADY TPC : $3.3-$5.6 M

0.122 HSIP 0.122 CONST2020CONST 0.013 0.013 2020NFA

0.120 STBG LG URB 0.120 CONINSP2020CONINSP 0.030 0.030 2020NFA

1.120 STBG LG URB 1.120 CONST2020CONST 0.280 0.280 2020NFA

0.216 STBG LG URB 0.216 ROWACQU2020ROWACQU 0.054 0.054 2020NFA

0.030 STBG LG URB 0.030 ROWINCD2020ROWINCD 0.007 0.007 2020NFA

NYSDOT

181029

ADA COMPLIANCE ON NY 4 AND NY 9/20

UPGRADE PEDESTRIAN FACILITIES TO ADA COMPLIANCE, UPGRADE TRAFFIC SIGNAL AT NY 9/20 AND ELLIOT ROAD, & INSTALL SAFETY FEATURES IDENTIFIED IN PSAP.

NY 4: NY 9/20 TO DENET ELEMENTARY SCHOOL

NY 9/20: HAYS ROAD TO NY 4

EAST GREENBUSH, RENSSELAER COUNTY, R349

1.992 1.992 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :RENSSELAER TPC : $2-$4 M

0.200 NHPP 0.200 CONINSP2020CONINSP 0.122 0.122 2020NFA

3.200 NHPP 3.200 CONST2020CONST 0.800 0.800 2020NFA

0.408 NHPP 0.408 DETLDES2020DETLDES 0.102 0.102 2020NFA

NYSDOT

181034

BRIDGE PRESERVATION SFY19 ON FEDERAL AID ELIGIBLE STATE HIGHWAYS: RT 140 OVER ALBANY RAIL TRAIL (BIN 1095909), TOWN OF BETHLEHEM, ALBANY COUNTY. WASHINGTON AVE EXT OVER I-87 (BIN 1093209), CITY OF ALBANY, ALBANY COUNTY.

4.832 4.832 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $4.6-$7.5 M

Page 46: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 46 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.254 STBG FLEX 0.254 DETLDES2020DETLDES 0.064 0.064 2020NFA

0.016 STBG FLEX 0.016 ROWACQU2020ROWACQU 0.004 0.004 2020NFA

0.010 STBG FLEX 0.010 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.235 0.235 CONINSPNHPP 2021CONINSP 0.059 0.059 2021NFA

1.565 1.565 CONSTNHPP 2021CONST 0.391 0.391 2021NFA

0.225 0.225 CONINSPSTBG FLEX 2021CONINSP 0.056 0.056 2021NFA

1.500 1.500 CONSTSTBG FLEX 2021CONST 0.375 0.375 2021NFA

NYSDOT

181035

CULVERT REPAIR/REPLACE SFY 20 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS: CA00265 (DESIGN APPROVAL 1810.09) IN WARREN COUNTY AND C120192 (DESIGN APPROVAL 1810.14), C120207 (DESIGN APPROVAL 1810.14), C120213 (DESIGN APPROVAL 1810.14), C120020, C120022, C120092 IN ESSEX COUNTY.

4.756 0.350 4.406 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.320 NHPP 0.320 MISC2020MISC 0.080 0.080 2020NFA

NYSDOT

181046

TMC OPERATIONS 19-20 (WAS PIN 180948)

11/1/2019-10/31/2020

PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A

0.400 0.400 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $2-$4 M

1.080 NHPP 1.080 MISC2020MISC 0.270 0.270 2020NFA

NYSDOT

181051

FUNDING TMC ENGINEERING SUPPORT FROM 9/1/2020 TO 7/31/21 (REPLACED PIN 180949). RG37B

1.350 1.350 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 47: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 47 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONINSP 0.006 0.006 2020NFACONST 0.061 0.061 2020NFA

0.309 NHPP 0.309 CONINSP2020CONINSP 0.078 0.078 2020NFA

1.842 NHPP 1.842 CONST2020CONST 0.460 0.460 2020NFA

0.012 NHPP 0.012 DETLDES2020DETLDES 0.003 0.003 2020NFA

0.309 STBG FLEX 0.309 CONINSP2020CONINSP 0.078 0.078 2020NFA

1.729 STBG FLEX 1.729 CONST2020CONST 0.432 0.432 2020NFA

0.012 STBG FLEX 0.012 DETLDES2020DETLDES 0.003 0.003 2020NFA

NYSDOT

181055

RUSTIC RAIL REPLACEMENT SFY20, ROUTE 73 AND ROUTE 3 IN ESSEX COUNTY; AND ROUTES 9N, 418 AND 912Q IN WARREN COUNTY. EMPIRE STATE TRAIL SIGN INSTALLATION IN ALBANY, SARATOGA, AND WASHINGTON COUNTIES UTILIZING NON-FEDERAL FUNDS RG119

5.334 5.334 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.024 HSIP 0.024 CONINSP2020CONINSP 0.003 0.003 2020NFA

0.224 HSIP 0.224 CONST2020CONST 0.025 0.025 2020NFACONINSP 0.014 0.014 2020NFACONST 0.124 0.124 2020NFA

0.192 NHPP 0.192 CONINSP2020CONINSP 0.048 0.048 2020NFA

1.748 NHPP 1.748 CONST2020CONST 0.437 0.437 2020NFA

0.112 NHPP 0.112 DETLDES2020DETLDES 0.028 0.028 2020NFA

0.048 NHPP 0.048 PRELDES2020PRELDES 0.012 0.012 2020NFA

0.098 STBG FLEX 0.098 CONINSP2020CONINSP 0.024 0.024 2020NFA

0.896 STBG FLEX 0.896 CONST2020CONST 0.224 0.224 2020NFA

0.112 STBG FLEX 0.112 DETLDES2020DETLDES 0.028 0.028 2020NFA

0.048 STBG FLEX 0.048 PRELDES2020PRELDES 0.012 0.012 2020NFA

NYSDOT

181057

DURABLE PAVEMENT MARKINGS SFY20 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.

4.481 4.481 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 48: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 48 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.084 0.084 DETLDESNHPP 2021DETLDES 0.021 0.021 2021NFA

0.036 0.036 PRELDESNHPP 2021PRELDES 0.009 0.009 2021NFA

0.084 0.084 DETLDESSTBG FLEX 2021DETLDES 0.021 0.021 2021NFA

0.036 0.036 PRELDESSTBG FLEX 2021PRELDES 0.009 0.009 2021NFA

0.120 0.120 CONINSPNHPP 2022CONINSP 0.030 0.030 2022NFA

1.200 1.200 CONSTNHPP 2022CONST 0.300 0.300 2022NFA

0.120 0.120 CONINSPSTBG FLEX 2022CONINSP 0.030 0.030 2022NFA

1.200 1.200 CONSTSTBG FLEX 2022CONST 0.300 0.300 2022NFA

NYSDOT

181058

SLOPE REPAIR SFY 25, PREVENTIVE AND/OR DEMAND, TO ADDRESS SPECIFIC NEEDS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.600 0.000 0.300 3.300 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.022 STBG FLEX 0.022 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.022 STBG FLEX 0.022 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.020 0.020 CONINSPNHPP 2021CONINSP 0.005 0.005 2021NFA

0.200 0.200 CONSTNHPP 2021CONST 0.050 0.050 2021NFA

0.110 0.110 CONINSPSTBG FLEX 2021CONINSP 0.028 0.028 2021NFA

0.500 0.500 CONSTSTBG FLEX 2021CONST 0.125 0.125 2021NFA

0.004 0.004 ROWACQUSTBG FLEX 2021ROWACQU 0.001 0.001 2021NFA

0.004 0.004 ROWINCDSTBG FLEX 2021ROWINCD 0.001 0.001 2021NFA

NYSDOT

181063

TRAFFIC SIGNALS REBUILD SFY21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.104 0.056 1.048 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 49: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 49 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.095 NHPP 0.095 PRELDES2020PRELDES 0.024 0.024 2020NFA

0.360 0.360 CONSTHSIP 2021CONST 0.040 0.040 2021NFA

0.200 0.200 CONINSPNHPP 2021CONINSP 0.050 0.050 2021NFA

1.500 1.500 CONSTNHPP 2021CONST 0.375 0.375 2021NFA

0.095 0.095 DETLDESNHPP 2021DETLDES 0.024 0.024 2021NFA

0.050 0.050 CONINSPSTBG FLEX 2021CONINSP 0.012 0.012 2021NFA

0.600 0.600 CONSTSTBG FLEX 2021CONST 0.150 0.150 2021NFA

0.016 0.016 CONINSPSTBG LG URB 2021CONINSP 0.004 0.004 2021NFA

0.160 0.160 CONSTSTBG LG URB 2021CONST 0.040 0.040 2021NFA

NYSDOT

181065

DURABLE PAVEMENT MARKINGS SFY21 ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.

3.795 0.119 3.676 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

CONINSP 0.205 0.205 2020NFACONST 2.053 2.053 2020NFA

0.240 NHPP 0.240 CONINSP2020CONINSP 0.060 0.060 2020NFA

2.401 NHPP 2.401 CONST2020CONST 0.600 0.600 2020NFA

0.085 NHPP 0.085 DETLDES2020DETLDES 0.021 0.021 2020NFA

0.261 STBG FLEX 0.261 CONINSP2020CONINSP 0.065 0.065 2020NFA

2.607 STBG FLEX 2.607 CONST2020CONST 0.652 0.652 2020NFA

NYSDOT

181066

PAVEMENT MAINTENANCE SFY20A:ROUTE 86 S.H. 1151, 1177, 1178 RM 86-1202-1017 (-543) TO RM 86-1202-1085 (-400) (TOWN OF NORTH ELBA & VILLAGE OF LAKE PLACID)ROUTE 196 S.H. 9312, 1080, 720, 720A RM 196-1801-1001 (-509) TO RM 196-1801-1013 (+154) (VILLAGE OF HUDSON FALLS AND TOWN OF KINGSBURY)ROUTE 9N S.H. 843, 418 RM 9N-1702-1133 (-685) TO RM 9N-1702-1222 (+625) (TOWNS OF LAKE GEORGE AND BOLTON)ROUTE 149 S.H. 9359 RM 149-1701-1006 (-300) TO RM 149-1701-1026 (+30) (TOWN OF QUEENSBURY)ROUTE 149 S.H. 104, 5404, 9320 RM 149-1802-1251 (-370) TO RM 149-1802-1260 (+26) AND RM 149-1802-1262 TO RM 149-1802-1265 (+624) (VILLAGE OF GRANVILLE) HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.

9.250 9.250 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

Page 50: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 50 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONINSP 0.455 0.455 2020NFACONST 4.554 4.554 2020NFA

0.488 NHPP 0.488 CONINSP2020CONINSP 0.122 0.122 2020NFA

4.876 NHPP 4.876 CONST2020CONST 1.219 1.219 2020NFA

0.079 STBG FLEX 0.079 CONINSP2020CONINSP 0.020 0.020 2020NFA

0.793 STBG FLEX 0.793 CONST2020CONST 0.198 0.198 2020NFA

0.084 STBG FLEX 0.084 DETLDES2020DETLDES 0.022 0.022 2020NFA

NYSDOT

181067

PAVEMENT MAINTENANCE SFY20 - ON FEDERAL AID ELIGIBLE STATE HIGHWAYS: NY ROUTE 2 FROM RM 1033 TO RM 1036, TOWN OF COLONIEUS 9W FROM RM 1104 TO RM 1121, TOWN OF BETHLEHEMNY 397 FROM RM 1000 TO RM 1031, TOWN OF GUILDERLAND/VILLAGE OF ALTAMONTNY 910B (WOLF ROAD) FROM RM 1000 TO RM 1018, TOWN OF COLONIE/VILLAGE OF COLONIENY 296 FROM RM 1000 TO RM 1028, TOWNS OF JEWETT AND HUNTER/VILLAGE OF HUNTERUS 20 FROM RM 1000 TO RM 1039, TOWN OF DUANESBURGNY 32 FROM RM 1000 TO RM 1060, TOWNS OF WESTERLO AND COEYMANSUS 9W FROM RM 1000 TO RM 1060, TOWN OF CATSKILL/VILLAGE OF CATSKILLNY 406 FROM RM 1000 TO RM 1035, TOWNS OF PRINCETOWN AND ROTTERDAM

12.910 12.910 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

CONINSP 0.756 0.756 2020NFACONST 6.872 6.872 2020NFA

0.209 NHPP 0.209 CONINSP2020CONINSP 0.052 0.052 2020NFA

1.896 NHPP 1.896 CONST2020CONST 0.474 0.474 2020NFA

0.245 STBG FLEX 0.245 CONINSP2020CONINSP 0.061 0.061 2020NFA

2.231 STBG FLEX 2.231 CONST2020CONST 0.558 0.558 2020NFA

NYSDOT

181068

PAVEMENT MAINTENANCE AT THE FOLLOWING SITES: US ROUTE 9 FROM LANSING LANE TO STATE ROUTE 146 IN THE TOWN OF HALFMOON AND STATE ROUTE 9N FROM MYRTLE STREET TO NORTH GREENFIELD ROAD/SPIER FALLS ROAD IN THE CITY OF SARATOGA SPRINGS AND TOWN OF GREENFIELD; SARATOGA COUNTY. AND US ROUTE 2 FROM STEWART ROAD TO THE MASSACHUSETTS STATE LINE IN THE TOWN OF PETERSBURGH AND STATE ROUTE 150 FROM US ROUTES 9/20 TO BEST ROAD IN THE TOWNS OF SAND LAKE AND SCHODACK; RENSSELAER COUNTY. HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.

13.354 13.354 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

Page 51: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 51 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.086 NHPP 0.086 PRELDES2020PRELDES 0.022 0.022 2020NFA

0.560 0.560 CONINSPNHPP 2021CONINSP 0.140 0.140 2021NFA

5.811 5.811 CONSTNHPP 2021CONST 1.453 1.453 2021NFA

0.086 0.086 DETLDESNHPP 2021DETLDES 0.022 0.022 2021NFA

0.400 0.400 CONINSPSTBG FLEX 2021CONINSP 0.100 0.100 2021NFA

4.116 4.116 CONSTSTBG FLEX 2021CONST 1.029 1.029 2021NFA

NYSDOT

181069

PAVEMENT MAINTENANCE SFY21 2ND PROJECT - ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS:PAVEMENT MAINTENANCE SFY21 2ND PROJECT:RT 9 FROM DUNNING ST TO SARATOGA SPRINGS CITY LIMIT, TOWN OF MALTA AND CITY OF SARATOGA SPRINGS, SARATOGA COUNTYNY 8 FROM SUMMIT DR TO NY 9N, TOWN OF HAGUE, WARREN COUNTYNY 9L (RIDGE RD) FROM RT 254 (QUAKER RD) TO SUNNYSIDE RD, TOWNS OF QUEENSBURY AND LAKE GEORGE, WARREN COUNTYNY 9L (RIDGE RD) FROM CLEMENTS RD TO PILOT KNOB RD, TOWNS OF QUEENSBURY AND LAKE GEORGE, WARREN COUNTYNY 149 (ANN ST) FROM WASHINGTON COUNTY LINE TO RT 4, TOWN OF KINGSBURY, WARREN COUNTY.

13.825 0.108 13.717 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

0.800 0.800 MISCNHPP 2021MISC 0.200 0.200 2021NFA

NYSDOT

181070

TMC OPERATIONS 20-21 (WAS PIN 180948)

11/1/2020-10/31/2021

PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A

1.000 0.000 1.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.600 0.600 MISCNHPP 2021MISC 0.150 0.150 2021NFA

NYSDOT

181071

FUNDING TMC ENGINEERING SUPPORT FROM 8/1/2021 TO 4/30/2022 (REPLACED PIN 180949). RG37B

0.750 0.000 0.750 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.038 STBG FLEX 0.038 DETLDES2020DETLDES 0.009 0.009 2020NFA

0.038 STBG FLEX 0.038 PRELDES2020PRELDES 0.009 0.009 2020NFA

0.305 0.305 CONINSPNHPP 2021CONINSP 0.034 0.034 2021NFA

2.540 2.540 CONSTNHPP 2021CONST 0.282 0.282 2021NFA

0.100 0.100 CONINSPSTBG FLEX 2021CONINSP 0.025 0.025 2021NFA

0.782 0.782 CONSTSTBG FLEX 2021CONST 0.196 0.196 2021NFA

NYSDOT

181073

RUSTIC RAIL SFY21 VARIOUS LOCATIONS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS: ROUTE 73 FROM RM 73-1201-1539 (GILMORE HILL ROAD) TO 1656 (NEWMAN ROAD), ESSEX COUNTYI-87 FROM RM 87I-1211-1133 (BLUE RIDGE ROAD) TO 1572 (BRIDGE OVER AUSABLE RIVER), ESSEX COUNTYI-87 EXITS 21, 22, 23, AND 24, WARREN COUNTYROUTE 22 FROM RM 22-1209-1000 (WASHINGTON COUNTY LINE) TO 1021 (LAWSON LANE), ESSEX COUNTYROUTE 22 FROM RM 22-1808-1736 (ESSEX COUNTY LINE) TO 1570 (CATDEN ROAD), WASHINGTON COUNTY

4.358 0.094 4.264 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 52: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 52 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.160 NHPP 0.160 CONINSP2020CONINSP 0.040 0.040 2020NFA

2.200 NHPP 2.200 CONST2020CONST 0.550 0.550 2020NFA

0.400 STBG FLEX 0.400 CONINSP2020CONINSP 0.100 0.100 2020NFA

3.400 STBG FLEX 3.400 CONST2020CONST 0.850 0.850 2020NFA

0.032 STBG FLEX 0.032 ROWACQU2020ROWACQU 0.008 0.008 2020NFA

NYSDOT

181074

MENANDS BIKE/PED CONNECTOR & NY 32 RESURFACE

NY 32 RESURFACING, INCLUDES ROAD DIET AND AN UPGRADED TRAFFIC SIGNAL, AND IS A DRAWDOWN ON RG136 .

CONSTRUCT TRAIL CONNECTION WITH BIKE/PED BRIDGE OVER I-787 ALONG NY 913T (ACCESS RAMPS TO I-787) FROM NY 32 TO MOHAWK HUDSON BIKE HIKE TRAIL

MENANDS, ALBANY COUNTY,

7.740 7.740 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :ALBANY TPC : $7.5-$12 M

0.175 NHPP 0.175 DETLDES2020DETLDES 0.044 0.044 2020NFA

0.175 NHPP 0.175 PRELDES2020PRELDES 0.044 0.044 2020NFA

0.868 0.868 CONINSPNHPP 2021CONINSP 0.217 0.217 2021NFA

5.200 5.200 CONSTNHPP 2021CONST 1.300 1.300 2021NFA

NYSDOT

181081

BRIDGE PRESERVATION SFY 20, BINS 1007620 & 1054460 RT. 9W OVER I-787, CITY OF ALBANY, ALBANY COUNTY BIN 1033210 SITTERLY RD. OVER I-87, TOWN OF CLIFTON PARK, SARATOGA COUNTY BIN 1038670 RT. 156 OVER BEAVERDAM CREEK, TOWN OF BERNE, ALBANY COUNTY BIN 1017930 RT. 23A OVER EAST KILL, TOWN OF JEWETT, GREENE COUNTY BIN 1017799 RT. 23 OVER RT. 911V, TOWN OF CATSKILL, GREENE COUNTY

8.023 0.438 7.585 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.175 NHPP 0.175 PRELDES2020PRELDES 0.044 0.044 2020NFA

0.175 0.175 DETLDESNHPP 2021DETLDES 0.044 0.044 2021NFA

0.868 0.868 CONINSPNHPP 2022CONINSP 0.217 0.217 2022NFA

5.200 5.200 CONSTNHPP 2022CONST 1.300 1.300 2022NFA

NYSDOT

181082

BRIDGE PRESERVATION SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

8.023 0.219 0.219 7.585 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

Page 53: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 53 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.175 0.175 PRELDESNHPP 2021PRELDES 0.044 0.044 2021NFA

0.175 0.175 DETLDESNHPP 2022DETLDES 0.044 0.044 2022NFA

0.868 0.868 CONINSPNHPP 2023CONINSP 0.217 0.217 2023NFA

3.200 3.200 CONSTNHPP 2023CONST 0.800 0.800 2023NFA

NYSDOT

181083

BRIDGE PRESERVATION SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

5.523 0.000 0.219 0.219 5.085 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.175 0.175 PRELDESNHPP 2022PRELDES 0.044 0.044 2022NFA

0.175 0.175 DETLDESNHPP 2023DETLDES 0.044 0.044 2023NFA

NYSDOT

181084

BRIDGE PRESERVATION SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.438 0.000 0.000 0.219 0.219 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.175 0.175 PRELDESNHPP 2023PRELDES 0.044 0.044 2023NFA

NYSDOT

181085

BRIDGE PRESERVATION SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.219 0.000 0.000 0.000 0.219 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 54: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 54 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.127 NHPP 0.127 PRELDES2020PRELDES 0.032 0.032 2020NFA

0.127 STBG FLEX 0.127 PRELDES2020PRELDES 0.032 0.032 2020NFA

0.127 0.127 DETLDESNHPP 2021DETLDES 0.032 0.032 2021NFA

0.004 0.004 ROWINCDNHPP 2021ROWINCD 0.001 0.001 2021NFA

0.127 0.127 DETLDESSTBG FLEX 2021DETLDES 0.032 0.032 2021NFA

0.004 0.004 ROWINCDSTBG FLEX 2021ROWINCD 0.001 0.001 2021NFA

0.178 0.178 CONINSPNHPP 2022CONINSP 0.044 0.044 2022NFA

2.225 2.225 CONSTNHPP 2022CONST 0.556 0.556 2022NFA

0.025 0.025 CONINSPSTBG FLEX 2022CONINSP 0.006 0.006 2022NFA

0.175 0.175 CONSTSTBG FLEX 2022CONST 0.044 0.044 2022NFA

NYSDOT

181088

CULVERT REPAIR/REPLACE SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.899 0.318 0.328 3.253 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 55: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 55 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.127 0.127 PRELDESNHPP 2021PRELDES 0.032 0.032 2021NFA

0.127 0.127 PRELDESSTBG FLEX 2021PRELDES 0.032 0.032 2021NFA

0.127 0.127 DETLDESNHPP 2022DETLDES 0.032 0.032 2022NFA

0.004 0.004 ROWINCDNHPP 2022ROWINCD 0.001 0.001 2022NFA

0.127 0.127 DETLDESSTBG FLEX 2022DETLDES 0.032 0.032 2022NFA

0.004 0.004 ROWINCDSTBG FLEX 2022ROWINCD 0.001 0.001 2022NFA

0.178 0.178 CONINSPNHPP 2023CONINSP 0.044 0.044 2023NFA

2.225 2.225 CONSTNHPP 2023CONST 0.556 0.556 2023NFA

0.025 0.025 CONINSPSTBG FLEX 2023CONINSP 0.006 0.006 2023NFA

0.325 0.325 CONSTSTBG FLEX 2023CONST 0.081 0.081 2023NFA

NYSDOT

181089

CULVERT REPAIR/REPLACE SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

4.086 0.000 0.318 0.328 3.440 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.254 0.254 PRELDESNHPP 2022PRELDES 0.064 0.064 2022NFA

0.254 0.254 DETLDESNHPP 2023DETLDES 0.064 0.064 2023NFA

0.008 0.008 ROWINCDNHPP 2023ROWINCD 0.002 0.002 2023NFA

NYSDOT

181090

CULVERT REPAIR/REPLACE SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.646 0.000 0.000 0.318 0.328 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.254 0.254 PRELDESNHPP 2023PRELDES 0.064 0.064 2023NFA

NYSDOT

181091

CULVERT REPAIR/REPLACE SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.318 0.000 0.000 0.000 0.318 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 56: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 56 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.024 NHPP 0.024 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.024 NHPP 0.024 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.024 STBG FLEX 0.024 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.024 STBG FLEX 0.024 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.167 0.167 CONINSPNHPP 2021CONINSP 0.042 0.042 2021NFA

1.120 1.120 CONSTNHPP 2021CONST 0.280 0.280 2021NFA

0.061 0.061 CONINSPSTBG FLEX 2021CONINSP 0.015 0.015 2021NFA

0.400 0.400 CONSTSTBG FLEX 2021CONST 0.100 0.100 2021NFA

NYSDOT

181093

GUIDERAIL REPLACEMENT SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

2.305 0.120 2.185 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.048 0.048 DETLDESSTBG FLEX 2021DETLDES 0.012 0.012 2021NFA

0.048 0.048 PRELDESSTBG FLEX 2021PRELDES 0.012 0.012 2021NFA

0.064 0.064 CONINSPNHPP 2022CONINSP 0.016 0.016 2022NFA

0.400 0.400 CONSTNHPP 2022CONST 0.100 0.100 2022NFA

0.064 0.064 CONINSPSTBG FLEX 2022CONINSP 0.016 0.016 2022NFA

0.400 0.400 CONSTSTBG FLEX 2022CONST 0.100 0.100 2022NFA

NYSDOT

181094

GUIDERAIL REPLACEMENT SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.280 0.000 0.120 1.160 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 57: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 57 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.048 0.048 DETLDESSTBG FLEX 2022DETLDES 0.012 0.012 2022NFA

0.048 0.048 PRELDESSTBG FLEX 2022PRELDES 0.012 0.012 2022NFA

0.064 0.064 CONINSPNHPP 2023CONINSP 0.016 0.016 2023NFA

0.360 0.360 CONSTNHPP 2023CONST 0.090 0.090 2023NFA

0.064 0.064 CONINSPSTBG FLEX 2023CONINSP 0.016 0.016 2023NFA

0.440 0.440 CONSTSTBG FLEX 2023CONST 0.110 0.110 2023NFA

NYSDOT

181095

GUIDERAIL REPLACEMENT SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.280 0.000 0.000 0.120 1.160 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.048 0.048 DETLDESSTBG FLEX 2023DETLDES 0.012 0.012 2023NFA

0.048 0.048 PRELDESSTBG FLEX 2023PRELDES 0.012 0.012 2023NFA

NYSDOT

181096

GUIDERAIL REPLACEMENT SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.120 0.000 0.000 0.000 0.120 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.095 0.095 PRELDESNHPP 2021PRELDES 0.024 0.024 2021NFA

0.360 0.360 CONSTHSIP 2022CONST 0.040 0.040 2022NFA

0.200 0.200 CONINSPNHPP 2022CONINSP 0.050 0.050 2022NFA

1.500 1.500 CONSTNHPP 2022CONST 0.375 0.375 2022NFA

0.095 0.095 DETLDESNHPP 2022DETLDES 0.024 0.024 2022NFA

0.050 0.050 CONINSPSTBG FLEX 2022CONINSP 0.012 0.012 2022NFA

0.600 0.600 CONSTSTBG FLEX 2022CONST 0.150 0.150 2022NFA

0.020 0.020 CONINSPSTBG LG URB 2022CONINSP 0.005 0.005 2022NFA

0.300 0.300 CONSTSTBG LG URB 2022CONST 0.075 0.075 2022NFA

NYSDOT

181098

DURABLE PAVEMENT MARKINGS SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.

3.975 0.000 0.119 3.856 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 58: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 58 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.095 0.095 PRELDESNHPP 2022PRELDES 0.024 0.024 2022NFA

0.360 0.360 CONSTHSIP 2023CONST 0.040 0.040 2023NFA

0.200 0.200 CONINSPNHPP 2023CONINSP 0.050 0.050 2023NFA

1.500 1.500 CONSTNHPP 2023CONST 0.375 0.375 2023NFA

0.095 0.095 DETLDESNHPP 2023DETLDES 0.024 0.024 2023NFA

0.050 0.050 CONINSPSTBG FLEX 2023CONINSP 0.012 0.012 2023NFA

0.600 0.600 CONSTSTBG FLEX 2023CONST 0.150 0.150 2023NFA

0.020 0.020 CONINSPSTBG LG URB 2023CONINSP 0.005 0.005 2023NFA

0.300 0.300 CONSTSTBG LG URB 2023CONST 0.075 0.075 2023NFA

NYSDOT

181099

DURABLE PAVEMENT MARKINGS SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.

3.975 0.000 0.000 0.119 3.856 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.095 0.095 PRELDESNHPP 2023PRELDES 0.024 0.024 2023NFA

NYSDOT

181100

DURABLE PAVEMENT MARKINGS SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE.

0.119 0.000 0.000 0.000 0.119 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.600 0.600 MISCNHPP 2022MISC 0.150 0.150 2022NFA

NYSDOT

181102

FUNDING TMC ENGINEERING SUPPORT FROM 2/1/22 TO 10/31/22(REPLACED PIN 180949). RG37B

0.750 0.000 0.000 0.750 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.800 0.800 MISCNHPP 2022MISC 0.200 0.200 2022NFA

NYSDOT

181107

TMC OPERATIONS 21-22

PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A

1.000 0.000 0.000 1.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 59: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 59 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.448 STBG FLEX 0.448 PRELDES2020PRELDES 0.112 0.112 2020NFADETLDES 1.040 1.040 2021NFA

0.640 0.640 CONINSPNHPP 2021CONINSP 0.160 0.160 2021NFA

6.400 6.400 CONSTNHPP 2021CONST 1.600 1.600 2021NFA

0.070 0.070 CONINSPSTBG FLEX 2021CONINSP 0.018 0.018 2021NFA

5.184 5.184 CONSTSTBG FLEX 2021CONST 1.296 1.296 2021NFA

0.600 0.600 CONSTHSIP 2022CONST 0.067 0.067 2022NFA

NYSDOT

181112

PAVEMENT CORRECTIVE MAINTENANCE SFY 21A: RT 32 FROM WATERVLIET CITY LINE TO COHOES CITY LINE, TOWN OF COLONIE, ALBANY COUNTYRT 396 FROM RT 144 (RIVER ROAD) TO BLODGETT HILL ROAD, TOWN OF BETHLEHEM, ALBANY COUNTYRT 296 FROM RT 23A TO RT 23, TOWN OF HUNTER, GREENE COUNTYUS 9W FROM THRUWAY TO RT 32, TOWN OF BETHLEHEM, ALBANY COUNTYNY 67 FROM HUNT ROAD TO WASHINGTON COUNTY LINE, TOWN OF HOOSICK, RENSSELAER COUNTYNY 29 (SPRING STREET) FROM BRYANT BRIDGE ROAD TO ROUTE 4/32, TOWN OF SARATOGA, SARATOGA COUNTYUS 20 FROM MUDGE ROAD TO NY 7, TOWN OF DUANESBURG, SCHENECTADY COUNTY

17.635 0.560 16.408 0.667 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $15-$25 M

0.832 0.832 DETLDESNHPP 2022DETLDES 0.208 0.208 2022NFA

0.448 0.448 PRELDESNHPP 2022PRELDES 0.112 0.112 2022NFA

0.600 0.600 CONSTHSIP 2023CONST 0.067 0.067 2023NFA

0.340 0.340 CONINSPNHPP 2023CONINSP 0.085 0.085 2023NFA

3.400 3.400 CONSTNHPP 2023CONST 0.850 0.850 2023NFA

0.080 0.080 CONINSPSTBG FLEX 2023CONINSP 0.020 0.020 2023NFA

0.800 0.800 CONSTSTBG FLEX 2023CONST 0.200 0.200 2023NFA

NYSDOT

181113

PAVEMENT CORRECTIVE MAINTENANCE SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT.

8.042 0.000 0.000 1.600 6.442 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.832 0.832 DETLDESNHPP 2023DETLDES 0.208 0.208 2023NFA

0.448 0.448 PRELDESNHPP 2023PRELDES 0.112 0.112 2023NFA

NYSDOT

181114

PAVEMENT CORRECTIVE MAINTENANCE SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.600 0.000 0.000 0.000 1.600 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

Page 60: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 60 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.104 0.104 DETLDESNHPP 2023DETLDES 0.026 0.026 2023NFA

0.056 0.056 PRELDESNHPP 2023PRELDES 0.014 0.014 2023NFA

NYSDOT

181116

TRAFFIC SIGNALS REBUILD SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.200 0.000 0.000 0.000 0.200 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.054 0.054 CONINSPNHPP 2021CONINSP 0.006 0.006 2021NFA

0.450 0.450 CONSTNHPP 2021CONST 0.050 0.050 2021NFA

NYSDOT

181120

SIGN REPLACEMENT PROJECT SFY 21 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).

0.560 0.000 0.560 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.036 0.036 DETLDESNHPP 2021DETLDES 0.004 0.004 2021NFA

0.023 0.023 PRELDESNHPP 2021PRELDES 0.003 0.003 2021NFA

0.054 0.054 CONINSPNHPP 2022CONINSP 0.006 0.006 2022NFA

0.460 0.460 CONSTNHPP 2022CONST 0.051 0.051 2022NFA

NYSDOT

181121

SIGN REPLACEMENT PROJECT SFY 22 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).

0.637 0.000 0.066 0.571 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.023 0.023 PRELDESNHPP 2022PRELDES 0.003 0.003 2022NFA

0.046 0.046 CONINSPNHPP 2023CONINSP 0.005 0.005 2023NFA

0.460 0.460 CONSTNHPP 2023CONST 0.051 0.051 2023NFA

0.036 0.036 DETLDESNHPP 2023DETLDES 0.004 0.004 2023NFA

NYSDOT

181122

SIGN REPLACEMENT PROJECT SFY 23 ON VARIOUS FEDERAL AID ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT LOCATIONS TO BE DETERMINED).

0.628 0.000 0.000 0.026 0.602 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.135 0.135 CONINSPNHPP 2021CONINSP 0.015 0.015 2021NFA

1.350 1.350 CONSTNHPP 2021CONST 0.150 0.150 2021NFA

0.036 0.036 DETLDESNHPP 2021DETLDES 0.004 0.004 2021NFA

NYSDOT

181123

NAVIGATIONAL LIGHTS PROGRAM SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.690 0.000 1.690 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 61: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 61 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.253 STBG FLEX 0.253 PRELDES2020PRELDES 0.063 0.063 2020NFA

0.253 0.253 DETLDESSTBG FLEX 2021DETLDES 0.063 0.063 2021NFA

1.100 1.100 CONSTNHPP 2022CONST 0.275 0.275 2022NFA

0.506 0.506 CONINSPSTBG FLEX 2022CONINSP 0.126 0.126 2022NFA

2.500 2.500 CONSTSTBG FLEX 2022CONST 0.625 0.625 2022NFA

NYSDOT

181124

RUSTIC RAIL REPLACEMENT ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN ESSEX, WARRENT AND WASHINGTON COUNTIES: (EXACT LOCATIONS TO BE DETERMINED).

5.764 0.316 0.316 5.132 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.253 0.253 PRELDESSTBG FLEX 2021PRELDES 0.063 0.063 2021NFA

0.253 0.253 DETLDESSTBG FLEX 2022DETLDES 0.063 0.063 2022NFA

1.100 1.100 CONSTNHPP 2023CONST 0.275 0.275 2023NFA

0.506 0.506 CONINSPSTBG FLEX 2023CONINSP 0.126 0.126 2023NFA

2.500 2.500 CONSTSTBG FLEX 2023CONST 0.625 0.625 2023NFA

NYSDOT

181125

RUSTIC RAIL REPLACEMENT AT VARIOUS LOCATIONS, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN ESSEX, GREENE, WARREN, AND WASHINGTON COUNTIES(EXACT LOCATIONS TO BE DETERMINED).

5.764 0.000 0.316 0.316 5.132 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.212 NHPP 0.212 DETLDES2020DETLDES 0.024 0.024 2020NFA

0.428 0.428 CONINSPNHPP 2021CONINSP 0.048 0.048 2021NFA

2.843 2.843 CONSTNHPP 2021CONST 0.316 0.316 2021NFA

NYSDOT

181126

INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 20, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.871 0.236 3.635 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.212 0.212 DETLDESNHPP 2021DETLDES 0.024 0.024 2021NFA

0.428 0.428 CONINSPNHPP 2022CONINSP 0.048 0.048 2022NFA

2.843 2.843 CONSTNHPP 2022CONST 0.316 0.316 2022NFA

NYSDOT

181127

INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.871 0.000 0.236 3.635 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 62: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 62 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.126 0.126 CONINSPNHPP 2021CONINSP 0.032 0.032 2021NFA

0.800 0.800 CONSTNHPP 2021CONST 0.200 0.200 2021NFA

0.063 0.063 DETLDESNHPP 2021DETLDES 0.016 0.016 2021NFA

NYSDOT

181128

BRIDGE WASHING SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.237 0.000 1.237 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.063 0.063 PRELDESNHPP 2021PRELDES 0.016 0.016 2021NFA

0.126 0.126 CONINSPNHPP 2023CONINSP 0.032 0.032 2023NFA

0.800 0.800 CONSTNHPP 2023CONST 0.200 0.200 2023NFA

0.063 0.063 DETLDESNHPP 2023DETLDES 0.016 0.016 2023NFA

NYSDOT

181129

BRIDGE WASHING SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

1.316 0.000 0.079 0.000 1.237 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.063 NHPP 0.063 PRELDES2020PRELDES 0.016 0.016 2020NFA

0.126 0.126 CONINSPNHPP 2022CONINSP 0.032 0.032 2022NFA

1.600 1.600 CONSTNHPP 2022CONST 0.400 0.400 2022NFA

0.063 0.063 DETLDESNHPP 2022DETLDES 0.016 0.016 2022NFA

NYSDOT

181130

BRIDGE WEATHERING STEEL WASHING, SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

2.316 0.079 0.000 2.237 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.253 0.253 PRELDESNHPP 2021PRELDES 0.063 0.063 2021NFA

0.253 0.253 DETLDESNHPP 2022DETLDES 0.063 0.063 2022NFA

0.400 0.400 CONINSPNHPP 2023CONINSP 0.100 0.100 2023NFA

2.000 2.000 CONSTNHPP 2023CONST 0.500 0.500 2023NFA

NYSDOT

181131

BRIDGE DECK REPLACEMENT PROJECT SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.632 0.000 0.316 0.316 3.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 63: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 63 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.253 0.253 PRELDESNHPP 2022PRELDES 0.063 0.063 2022NFA

0.253 0.253 DETLDESNHPP 2023DETLDES 0.063 0.063 2023NFA

NYSDOT

181132

BRIDGE DECK REPLACEMENT PROJECT SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.632 0.000 0.000 0.316 0.316 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.253 0.253 PRELDESNHPP 2023PRELDES 0.063 0.063 2023NFA

NYSDOT

181133

BRIDGE DECK REPLACEMENT PROJECT SFY 25, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.316 0.000 0.000 0.000 0.316 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.108 0.108 PRELDESNHPP 2021PRELDES 0.012 0.012 2021NFA

0.108 0.108 DETLDESNHPP 2022DETLDES 0.012 0.012 2022NFA

0.288 0.288 CONINSPNHPP 2023CONINSP 0.032 0.032 2023NFA

2.700 2.700 CONSTNHPP 2023CONST 0.300 0.300 2023NFA

NYSDOT

181134

INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

3.560 0.000 0.120 0.120 3.320 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.108 0.108 DETLDESNHPP 2023DETLDES 0.012 0.012 2023NFA

0.108 0.108 PRELDESNHPP 2023PRELDES 0.012 0.012 2023NFA

NYSDOT

181135

INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED).

0.240 0.000 0.000 0.000 0.240 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.080 NHPP 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.080 NHPP 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.192 0.192 CONINSPNHPP 2021CONINSP 0.048 0.048 2021NFA

1.200 1.200 CONSTNHPP 2021CONST 0.300 0.300 2021NFA

NYSDOT

181138

BRIDGE DECK REPLACEMENT PROJECT SFY21, ON VARIOUS FEDERAL AID ELIGIBLESTATE HIGHWAYS IN THE FOLLOWING 8COUNTIES: ALBANY, ESSEX, GREENE,RENSSELAER, SARATOGA, SCHENECTADY,WARREN, WASHINGTON (EXACT LOCATIONSTO BE DETERMINED).

1.940 0.200 1.740 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 64: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 64 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.135 0.135 DETLDESHSIP 2021DETLDES 0.015 0.015 2021NFA

0.056 0.056 DETLDESSTBG FLEX 2021DETLDES 0.014 0.014 2021NFA

0.180 0.180 CONINSPHSIP 2022CONINSP 0.020 0.020 2022NFA

0.900 0.900 CONSTHSIP 2022CONST 0.100 0.100 2022NFA

0.024 0.024 CONINSPNHPP 2022CONINSP 0.006 0.006 2022NFA

0.114 0.114 CONSTNHPP 2022CONST 0.029 0.029 2022NFA

0.036 0.036 CONINSPSTBG FLEX 2022CONINSP 0.009 0.009 2022NFA

0.164 0.164 CONSTSTBG FLEX 2022CONST 0.041 0.041 2022NFA

0.016 0.016 CONINSPSTBG LG URB 2022CONINSP 0.004 0.004 2022NFA

0.082 0.082 CONSTSTBG LG URB 2022CONST 0.020 0.020 2022NFA

NYSDOT

181139

WRONG WAY DRIVING INITIATIVE TO ADDRESS @ 250 LIMITED ACCESS EXIT RAMPS WITH SIGNING AND POSSIBLE PAVEMENT MARKINGS. LOW CLEARANCE BRIDGE INITIATIVE WILL UPGRADE SIGNS TO MEET SIGNING AND REFLECTIVITY STANDARDS.THIS IS A REGION-WIDE PROJECT WITH A PORTION OF THE TOTAL LISTED FUNDS TO SPENT WITHIN THE A/GFTC AREA.

1.965 0.000 0.220 1.745 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.456 FTA 5339 0.456 MISC2020MISC 0.114 0.114 2020NFA

0.082 0.082 MISCFTA 5307 2021MISC 0.020 0.020 2021NFA

0.522 0.522 MISCFTA 5339 2021MISC 0.131 0.131 2021NFA

0.083 0.083 MISCFTA 5307 2022MISC 0.021 0.021 2022NFA

0.533 0.533 MISCFTA 5339 2022MISC 0.133 0.133 2022NFA

0.085 0.085 MISCFTA 5307 2023MISC 0.021 0.021 2023NFA

0.543 0.543 MISCFTA 5339 2023MISC 0.136 0.136 2023NFA

CDTA

182037

STAR BUS REPLACEMENT AND EXPANSION

REPLACEMENT OF STAR (SPECIAL TRANSIT SERVICE AVAILABLE BY REQUEST) CUSTOM VEHICLES FOR PARATRANSIT USE. INCLUDEDS FUNDS FOR EXPANSION OF THE STAR FLEET. T6B

2.880 0.570 0.755 0.770 0.785 AQC:B10P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 65: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 65 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

1.231 FTA 5339 1.231 MISC2020MISC 0.307 0.307 2020NFA

1.746 1.746 MISCFTA 5307 2021MISC 0.436 0.436 2021NFA

0.813 0.813 MISCFTA 5339 2021MISC 0.203 0.203 2021NFA

1.794 1.794 MISCFTA 5307 2022MISC 0.448 0.448 2022NFA

0.837 0.837 MISCFTA 5339 2022MISC 0.209 0.209 2022NFA

1.842 1.842 MISCFTA 5307 2023MISC 0.460 0.460 2023NFA

0.854 0.854 MISCFTA 5339 2023MISC 0.213 0.213 2023NFA

CDTA

182048

TRANSIT BUS REPLACEMENT/EXPANSION.

PURCHASE OR LEASE TRANSIT BUSES IN A MANNER TO MAINTAIN EXISTING SERVICE LEVELS. T17

11.393 1.538 3.198 3.288 3.369 AQC:B10P TOTAL 4YR COST :MULTI TPC : $32-$50 M

0.160 FTA 5307 0.160 MISC2020MISC 0.040 0.040 2020NFA

0.147 0.147 MISCFTA 5307 2021MISC 0.037 0.037 2021NFA

0.150 0.150 MISCFTA 5307 2022MISC 0.037 0.037 2022NFA

0.153 0.153 MISCFTA 5307 2023MISC 0.038 0.038 2023NFA

CDTA

182118

PASSENGER FACILITY IMPROVEMENTS AT VARIOUS LOCATIONS

IMPROVEMENTS AND ADDITIONS TO PASSENGER AMENITIES INCLUDING REPAIR, UPGRADE AND REPLACEMENT OF BUS SHELTERS AND BUS STOP SIGNAGE. T11

0.762 0.200 0.184 0.187 0.191 AQC:B8P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.208 FTA 5339 0.208 MISC2020MISC 0.052 0.052 2020NFA

0.163 0.163 MISCFTA 5339 2021MISC 0.041 0.041 2021NFA

0.166 0.166 MISCFTA 5339 2022MISC 0.042 0.042 2022NFA

0.170 0.170 MISCFTA 5339 2023MISC 0.042 0.042 2023NFA

CDTA

182180

TRANSIT SUPPORT VEHICLES

REPLACEMENT OF NON-REVENUE SUPPORT VEHICLES FOR SUPERVISORY AND MAINTENANCE USE, T16

0.884 0.260 0.204 0.208 0.212 AQC:B2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 66: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 66 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONST 0.063 0.063 2020NFA 0.080 STBG FLEX 0.080 CONINSP2020

CONINSP 0.020 0.020 2020NFA 0.697 STBG FLEX 0.697 CONST2020

CONST 0.174 0.174 2020NFA 0.400 TAP FLEX 0.400 CONINSP2020

CONINSP 0.100 0.100 2020NFA 3.184 TAP FLEX 3.184 CONST2020

CONST 0.796 0.796 2020NFA

CDTA

182215

WASHINGTON/WESTERN BRT PHASE 2

CONSTRUCTION TRANSIT, ROADWAY, AND PEDESTRIAN INFRASTRUCTURE FOR THE FUTURE WASHINGTON-WESTERN BUS RAPID TRANSIT LINE IN THE CITY OF ALBANY ADJACENT TO THE UNIVERSITY AT ALBANY’S DOWNTOWN CAMPUS AND THE NEW ETEC CAMPUS, T122

CITY AND COUNTY OF ALBANY

STP-FLEX IS A DRAWDOWN ON THE BRT SET-ASIDE CDTC31.

5.514 5.514 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :ALBANY TPC : $50-$85 M

4.435 CMAQ 4.435 MISC2020MISC 1.109 1.109 2020NFAMISC 3.806 3.806 2022NFAMISC 3.900 3.900 2023NFA

CDTA

182216

HUDSON RIVER CORRIDOR BRT OPERATIONS

SERVICE AND OPERATIONAL RELATED EXPENSES (SUCH AS DRIVER SALARIES AND BENEFITS, FUEL, BUS MAINTENANCE, ETC.) OF THE RIVER CORRIDOR BUS RAPID TRANSIT PROJECT BEGINNING IN THE FALL OF 2020, T124

ALBANY, MENANDS, WATERVLIET, TROY, COHOES, AND WATERFORDALBANY & RENSSELAER COUNTIES

13.250 5.544 0.000 3.806 3.900 AQC:NON TOTAL 4YR COST :MULTI TPC : $50-$85 M

1.051 FTA 5307 1.051 OPER2020OPER 1.051 1.051 2020NFA

1.072 1.072 OPERFTA 5307 2021OPER 1.072 1.072 2021NFA

1.093 1.093 OPERFTA 5307 2022OPER 1.093 1.093 2022NFA

1.115 1.115 OPERFTA 5307 2023OPER 1.115 1.115 2023NFA

CITY OF GLENS FALLS182217

PUBLIC TRANSPORTATION OPERATING ASSISTANCE, GREATER GLENS FALLS TRANSIT, FEDERAL SHARE OF LISTED AMOUNT = 50%

8.662 2.102 2.144 2.186 2.230 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : $9.5-15.5 M

Page 67: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 67 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.060 FTA 5307 0.060 OPER2020OPER 0.015 0.015 2020NFA

0.060 FTA 5339 0.060 OPER2020OPER 0.015 0.015 2020NFA

0.060 0.060 OPERFTA 5307 2022OPER 0.015 0.015 2022NFA

0.060 0.060 OPERFTA 5339 2022OPER 0.015 0.015 2022NFA

CITY OF GLENS FALLS182218

FACILITY REHABILITATION, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.300 0.150 0.000 0.150 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

0.086 FTA 5307 0.086 OPER2020OPER 0.021 0.021 2020NFA

0.087 0.087 OPERFTA 5307 2021OPER 0.022 0.022 2021NFA

0.089 0.089 OPERFTA 5307 2022OPER 0.022 0.022 2022NFA

0.091 0.091 OPERFTA 5307 2023OPER 0.023 0.023 2023NFA

CITY OF GLENS FALLS182219

GGFT PREVENTATIVE MAINTENANCE, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.441 0.107 0.109 0.111 0.114 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

0.184 FTA 5307 0.184 OPER2020OPER 0.046 0.046 2020NFA

0.184 FTA 5339 0.184 OPER2020OPER 0.046 0.046 2020NFA

CITY OF GLENS FALLS182222

REPLACE ONE (1) 2011 30 FT BUS AND RELATED EQUIPMENT, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.460 0.460 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

0.256 0.256 OPERFTA 5307 2022OPER 0.064 0.064 2022NFA

CITY OF GLENS FALLS182223

REPLACE FOUR (4) 2018 MINI BUSES AND RELATED EQUIPMENT, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.320 0.000 0.000 0.320 0.000 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

0.128 0.128 OPERFTA 5307 2023OPER 0.032 0.032 2023NFA

CITY OF GLENS FALLS182224

REPLACE TWO (2) 2018 PARATRANSIT BUSES AND RELATED EQUIPMENT, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.160 0.000 0.000 0.000 0.160 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

Page 68: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 68 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.090 0.090 OPERFTA 5307 2023OPER 0.023 0.023 2023NFA

0.090 0.090 OPERFTA 5339 2023OPER 0.023 0.023 2023NFA

CITY OF GLENS FALLS182225

REPLACE ONE (1) 2014 TROLLEY BUS AND RELATED EQUIPMENT, GREATER GLENS FALLS TRANSIT.FEDERAL SHARE OF LISTED AMOUNT = 80%

0.226 0.000 0.000 0.000 0.226 AQC:EXEMPT TOTAL 4YR COST :WARREN TPC : < $0.75 M

0.620 FTA 5310 0.620 MISC2020MISC 0.155 0.155 2020NFA

0.620 0.620 MISCFTA 5310 2021MISC 0.155 0.155 2021NFA

0.620 0.620 MISCFTA 5310 2022MISC 0.155 0.155 2022NFA

0.620 0.620 MISCFTA 5310 2023MISC 0.155 0.155 2023NFA

CDTA

182401

ELDERLY AND HANDICAPPED MOBILITY

INCLUDING VEHICLES, THAT IMPROVE ACCESS AND MOBILITY FOR SENIORS AND INDIVIDUALS WITH DISABILITIES. OPERATING AND ADMINISTRATIVE COSTS ARE ALSO ELIGIBLE UNDER THIS PROGRAM, T6A

3.100 0.775 0.775 0.775 0.775 AQC:B10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.058 FTA 5310 0.058 VEHEQUIP2020VEHEQUIP 0.014 0.014 2020NFA

FORT HUDSON NURSING

182460

PURCHASE OF ONE (1) NINE PASSENGER VEHICLE TO REPLACE EXISTING FLEET VEHICLE, FORT HUDSON NURSING CENTER, FOR OPERATION IN WARREN, WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD.

0.072 0.072 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.162 FTA 5310 0.162 VEHEQUIP2020VEHEQUIP 0.040 0.040 2020NFA

COMMUNITY, WORK, AND

182461

PURCHASE OF TWO (2) REPLACEMENT VEHICLES BY COMMUNITY, WORK, AND INDEPENDENCE, INC. (CWI) FOR OPERATIONS IN WARREN, WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD.

0.202 0.202 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.365 FTA 5310 0.365 VEHEQUIP2020VEHEQUIP 0.091 0.091 2020NFA

NYSDOT

182463

CENTER FOR DISABILITY SERVICES, 4 REPLACEMENT VEHICLES- 1 LOT K (28 SEAT) AND 3 LOT I (20 SEAT)

0.456 0.456 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.164 FTA 5310 0.164 VEHEQUIP2020VEHEQUIP 0.041 0.041 2020NFA

NYSDOT

182464

SCHENECTADY COUNTY CHAPTER, NYSARC, 2 REPLACEMENT VEHICLES - LOT I (30 SEAT)

0.205 0.205 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 69: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 69 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.220 FTA 5310 0.220 VEHEQUIP2020VEHEQUIP 0.055 0.055 2020NFA

NYSDOT

182465

NORTHEAST HEALTH FOUNDATION, INC., 4 REPLACEMENT VEHICLES - LOT E (11 SEAT)

0.275 0.275 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.018 FTA 5310 0.018 MISC2020MISC 0.004 0.004 2020NFA

0.055 FTA 5310 0.055 VEHEQUIP2020VEHEQUIP 0.014 0.014 2020NFA

NYSDOT

182466

COLONIE SENIOR SERVICE CENTERS

1 REPLACEMENT VEHICLE - LOT E (11 SEAT) AND 16 UNITS OF HARDWARE AND SOFTWARE (DISPATCH SOFTWARE AND 16 MOBILE TABLETS)

0.091 0.091 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.055 FTA 5310 0.055 VEHEQUIP2020VEHEQUIP 0.014 0.014 2020NFA

NYSDOT

182467

ST. PETER'S HOSPITAL FOUNDATION, 1 REPLACEMENT VEHICLE - LOT E (11 SEAT)

0.069 0.069 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.116 FTA 5310 0.116 VEHEQUIP2020VEHEQUIP 0.029 0.029 2020NFA

NYSDOT

182468

TOWN OF GUILDERLAND, 1 EXPANSION VEHICLE - LOT J (24 SEAT)

0.145 0.145 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.179 FTA 5310 0.179 VEHEQUIP2020VEHEQUIP 0.045 0.045 2020NFA

NYSDOT

182469

NYSARC, SARATOGA COUNTY CHAPTER, 2 REPLACEMENT VEHICLES – 1 LOT K (28 SEATS) AND 1 LOT G (14 SEATS)

0.224 0.224 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.096 0.096 SCOPINGSTBG FLEX 2021SCOPING 0.024 0.024 2021NFA

CDTA

182470

BUS LANE FEASIBILITY STUDY

FUNDS FOR THIS PROJECT WILL BE TRANSFERRED FROM THE TIP TO THE UPWP’S BUS LANE FEASIBILITY STUDY UNDER TRANSIT PLANNING TASK (44.26.6.13).

0.120 0.000 0.120 0.000 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : < $0.75 M

1.200 1.200 MISCSTBG FLEX 2023MISC 0.300 0.300 2023NFA

OTHER

1RB001

BICYCLE/PEDESTRIAN SETSIDE AGFTC, LOCATIONS TO BE DETERMINED MTC200 - BLOCK FUNDING

1.500 0.000 0.000 0.000 1.500 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 70: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 70 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

3.200 3.200 MISCSTBG FLEX 2023MISC 0.800 0.800 2023NFA

LOCAL

1T0430

RURAL LOCAL BRIDGE SETASIDE -GREENE COUNTY - BLOCK FUNDS

4.000 0.000 0.000 0.000 4.000 AQC:EXEMPT TOTAL 4YR COST :GREENE TPC : $3.3-$5.6 M

13.355 FTA 5307 13.355 MISC2020MISC 3.339 3.339 2020NFA

11.200 11.200 MISCFTA 5307 2021MISC 2.800 2.800 2021NFA

11.424 11.424 MISCFTA 5307 2022MISC 2.856 2.856 2022NFA

11.653 11.653 MISCFTA 5307 2023MISC 2.913 2.913 2023NFA

CDTA

1TR604

PREVENTIVE MAINTENANCE FOR TRANSIT PROJECTS

ONGOING ACTIVITIES TO MAINTAIN CAPITAL ASSETS TO ENSURE BUS FLEET AND OTHER CAPITAL ITEMS OPERATE EFFICIENTLY THROUGHOUT THEIR USEFUL LIVES.

T57

59.540 16.694 14.000 14.280 14.566 AQC:B3P TOTAL 4YR COST :MULTI TPC : $70-$130 M

2.643 2.643 MISCNHPP 2021MISC 0.661 0.661 2021NFA

13.957 13.957 MISCSTBG FLEX 2021MISC 3.489 3.489 2021NFA

NYSDOT

1V2101

VPP PAVING PROGRAM SFY 21 ON VARIOUS FEDERAL AID ELIGIBLE STATE ROUTES. SITE SPECIFIC PROJECTS WILL BE DRAWN DOWN FROM THIS BLOCK PROJECT.

20.750 0.000 20.750 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $21-$31 M

CONINSP 0.200 0.200 2021NFA 0.885 0.885 CONSTSTBG FLEX 2021

CONST 0.221 0.221 2021NFA

NYSDOT

1V2121

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 9N FROM RM 1521 (GULF BROOK, KEENE) TO RM 1580 (TRUMBULLS ROAD UPPER, JAY), ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.306 0.000 1.306 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

CONINSP 0.235 0.235 2021NFA 1.138 1.138 CONSTSTBG FLEX 2021

CONST 0.285 0.285 2021NFA

NYSDOT

1V2122

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 73 FROM RM 1408 (2 MILES NORTH OF RT 9) TO RM 1469 (MARKET ST KEENE VALLEY), AND FROM ALAN WASHBOND DRIVE TO AIRPORT ROAD, TOWN OF KEENE, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.658 0.000 1.658 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

CONINSP 0.200 0.200 2021NFA 0.915 0.915 CONSTSTBG FLEX 2021

CONST 0.229 0.229 2021NFA

NYSDOT

1V2123

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 74 FROM RM 1143 (PYRAMID ROAD) TO RM 1203 (RT 9), TOWN OF SCHROON, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.344 0.000 1.344 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $1.2-$2.5 M

Page 71: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 71 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONINSP 0.200 0.200 2021NFA 0.593 0.593 CONSTSTBG FLEX 2021

CONST 0.148 0.148 2021NFA

NYSDOT

1V2124

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 86 FROM RM 1225 (OUTLOOK LANE, WILMINGTON) TO RM 1262 (DANIELLE ROAD, JAY), ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

0.941 0.000 0.941 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $0.6-$1.5 M

CONINSP 0.200 0.200 2021NFA 0.681 0.681 CONSTNHPP 2021

CONST 0.170 0.170 2021NFA

NYSDOT

1V2125

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 9N FROM RM 1000 (WARREN COUNTY LINE) TO RM 1047 (TICONDEROGA MONUMENT), ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.051 0.000 1.051 0.000 0.000 AQC:N/A TOTAL 4YR COST :ESSEX TPC : $0.6-$1.5 M

CONINSP 0.200 0.200 2021NFA 0.733 0.733 CONSTSTBG FLEX 2021

CONST 0.183 0.183 2021NFA

NYSDOT

1V2131

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 145 FROM RM 1200 (CLAY HILL ROAD) TO RM 1232 (ALBANY COUNTY LINE), TOWNS OF DURHAM AND CAIRO, GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.116 0.000 1.116 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M

CONINSP 0.200 0.200 2021NFA 0.840 0.840 CONSTSTBG FLEX 2021

CONST 0.210 0.210 2021NFA

NYSDOT

1V2132

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 23A FROM RM 1255 TO RM 1286 AND FROM RM 1293 TO RM 1319, TOWN OF CATSKILL, GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.250 0.000 1.250 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $0.6-$1.5 M

CONINSP 0.200 0.200 2021NFA 1.073 1.073 CONSTSTBG FLEX 2021

CONST 0.268 0.268 2021NFA

NYSDOT

1V2133

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 385 FROM RM 1065 (ATHENS) TO RM 1138 (COXSACKIE - RT 9W), GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.541 0.000 1.541 0.000 0.000 AQC:N/A TOTAL 4YR COST :GREENE TPC : $1.2-$2.5 M

CONINSP 0.200 0.200 2021NFA 0.921 0.921 CONSTSTBG FLEX 2021

CONST 0.230 0.230 2021NFA

NYSDOT

1V2152

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 423 FROM RM 1000 (RT 9P) TO RM 1039 (RT 32), TOWN OF STILLWATER, SARATOGA COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.351 0.000 1.351 0.000 0.000 AQC:N/A TOTAL 4YR COST :SARATOGA TPC : $1.2-$2.5 M

CONINSP 0.200 0.200 2021NFA 0.943 0.943 CONSTSTBG FLEX 2021

CONST 0.236 0.236 2021NFA

NYSDOT

1V2171

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 8 (GRAPHITE MOUNTAIN ROAD) FROM RM 1377 (SPUYTENDUIVEL BROOK) TO RM 1418 (NORTH POND) AND FROM RM 1418 TO RM 1443 (SUMMIT DRIVE), TOWNS OF HORICON AND HAGUE, WARREN COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.379 0.000 1.379 0.000 0.000 AQC:N/A TOTAL 4YR COST :WARREN TPC : $1.2-$2.5 M

Page 72: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 72 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

CONINSP 0.400 0.400 2021NFA 1.962 1.962 CONSTNHPP 2021

CONST 0.491 0.491 2021NFA

NYSDOT

1V2181

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 149 FROM RM 1088 (RT 4) TO RM 1168 (RT 40), TOWNS OF KINGSBURY AND HARTFORD, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

2.853 0.000 2.853 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M

CONINSP 0.100 0.100 2021NFA 0.726 0.726 CONSTSTBG FLEX 2021

CONST 0.182 0.182 2021NFA

NYSDOT

1V2182

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 313 FROM RM 1000 (RT 22) TO RM 1045 (EAGLEVILLE ROAD), TOWN OF WHITE CREEK, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

1.008 0.000 1.008 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $0.6-$1.5 M

CONINSP 0.400 0.400 2021NFA 2.172 2.172 CONSTSTBG FLEX 2021

CONST 0.543 0.543 2021NFA

NYSDOT

1V2183

PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT AT RT 4 FROM RM 1000 (SARATOGA COUNTY LINE) TO RM 1098 (VILLAGE OF FORT EDWARD), TOWNS OF GREENWICH AND FORT EDWARD, WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK.

3.115 0.000 3.115 0.000 0.000 AQC:N/A TOTAL 4YR COST :WASHINGTON TPC : $2-$4 M

1.146 FTA 5307 1.146 MISC2020MISC 0.286 0.286 2020NFAOPER 0.400 0.400 2020NFA

1.146 1.146 MISCFTA 5307 2021MISC 0.287 0.287 2021NFAOPER 0.400 0.400 2021NFA

1.170 1.170 MISCFTA 5307 2022MISC 0.292 0.292 2022NFAOPER 0.400 0.400 2022NFA

1.193 1.193 MISCFTA 5307 2023MISC 0.298 0.298 2023NFAOPER 0.400 0.400 2023NFA

CDTA

CDTC08

TRANSIT OPERATIONS SUPPORT FOR SARATOGA SERVICE: PREVENTIVE MAINTENANCE & OPERATING ASSISTANCE

SECTION 5307-SAR FUNDS ARE ALLOCATED FOR TRANSIT (CAPITAL OR OPERATING) USE IN SARATOGA SPRINGS DUE TO ITS SMALL URBAN AREA STATUS. MATCH ON OPERATING ASSISTANCE IS 50%.

TOA FUNDING BEYOND YEAR 1 IS ESTIMATED.

7.418 1.832 1.833 1.862 1.891 AQC:B1P TOTAL 4YR COST :SARATOGA TPC : $9.5-15.5 M

0.096 NHPP 0.096 CONST2020CONST 0.024 0.024 2020NFA

0.800 NHPP 0.800 MISC2020MISC 0.200 0.200 2020NFA

0.096 STBG FLEX 0.096 CONST2020CONST 0.024 0.024 2020NFA

1.958 STBG FLEX 1.958 MISC2020MISC 0.489 0.489 2020NFA

CDTA

CDTC107

HUDSON RIVER CORRIDOR BRT: PHASE 1

PHASE 1 INCLUDES: TRANSIT SIGNAL PRIORITY, STATION SITEWORK, PED INFRASTRUCTURE, UNCLE SAM TRANSIT CENTER AND DESIGN WORK FOR THE TROY BUS GARAGE EXPANSION.

ALBANY, MENANDS, WATERVLIET, TROY AND COHOES.ALBANY & RENSSELAER COUNTY.

3.687 3.687 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $50-$85 M

Page 73: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 73 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

SCOPING 0.483 0.483 2020NFA 0.094 STBG FLEX 0.094 SCOPING2020

SCOPING 0.023 0.023 2020NFA

CDTA

CDTC108

TDM MULTIMODAL IMPLEMENTATION

INCLUDES: GUARANTEED RIDE HOME PROGRAM, TRANSIT PASS SUBSIDIES, PARK & RIDE LEASES, TRY TRANSIT, CAPITAL CARSHARE, AND THE REGIONAL BIKESHARE NETWORK.

THE LOCAL FUNDS REPRESENT A CDTA COMMITTMENT TO MAKING UP FOR THE SAME AMOUNT FUNDING MOVED FROM T108 TO T57 BY AMENDMENT.

0.600 0.600 0.000 0.000 0.000 AQC:EXEMPT TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

14.829 FTA 5309 SS 14.829 CONST2020CONST 4.324 4.324 2020NFA

4.191 FTA 5309 SS 4.191 MISC2020MISC 3.194 3.194 2020NFAMISC 0.084 0.084 2020NFAMISC 2.990 2.990 2020NFA

1.387 FTA 5309 SS 1.387 ROWACQU2020 5.000 FTA 5339 DIS 5.000 MISC2020

CDTA

CDTC122

HUDSON RIVER CORRIDOR BRT: FINAL PHASE

CONNECTS WATERFORD TO DOWNTOWN ALBANY VIA TROY, WATERVLIET, AND MENANDS. INCLUDES BUSES, STATIONS, TRANSIT SIGNAL PRIORITY, REPLACEMENT OF 10 TRAFFIC SIGNALS, QUEUE BYPASS LANES, REAL-TIME BUS ARRIVAL INFORMATION, TWO PARK AND RIDE FACILITIES, EXPANDING A MAINTENANCE AND STORAGE FACILITY AND PROFESSIONAL SERVICES.

FOR 5309, THE DISCRETIONARY ID# IS D2018-NWST-TBD

FOR 5339, THE DISCRETIONARY ID# IS D2018-BUSC-198

ALBANY AND RENSSELAER COUNTIES, T122

42.513 42.513 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : $50-$85 M

1.128 FTA 5307 1.128 MISC2020MISC 0.282 0.282 2020NFA

0.480 0.480 MISCFTA 5307 2021MISC 0.120 0.120 2021NFA

0.480 0.480 MISCFTA 5307 2022MISC 0.120 0.120 2022NFA

0.480 0.480 MISCFTA 5307 2023MISC 0.120 0.120 2023NFA

CDTA

CDTC20

CAPITAL COST OF CONTRACTING FOR COMMUTER SERVICE IN THE CAPITAL DISTRICT TO POINTS NORTH, WEST AND SOUTH

THE SUB-RECIPIENT FOR FUNDS IS CURRENTLY ADIRONDACK TRAILWAYS

3.210 1.410 0.600 0.600 0.600 AQC:B10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 74: ** NEW YORK STATE DEPARTMENT OF ...** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01 TOTAL PROJECT COST NHPP 2020

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Tuesday, November 3, 2020 Page 74 of 74

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 01

TOTAL PROJECT COST

0.282 NHPP 0.282 MISC2020MISC 0.070 0.070 2020NFA

0.223 STBG FLEX 0.223 MISC2020MISC 0.056 0.056 2020NFA

1.944 1.944 MISCNHPP 2021MISC 0.486 0.486 2021NFA

1.096 1.096 MISCSTBG FLEX 2021MISC 0.274 0.274 2021NFA

1.944 1.944 MISCNHPP 2022MISC 0.486 0.486 2022NFA

1.096 1.096 MISCSTBG FLEX 2022MISC 0.274 0.274 2022NFA

2.400 2.400 MISCNHPP 2023MISC 0.600 0.600 2023NFA

0.800 0.800 MISCSTBG FLEX 2023MISC 0.200 0.200 2023NFA

CDTA

CDTC31

BRT IMPLEMENTATION,

DRAWDOWNS FROM THESE BLOCK FUNDS MUST CONSIST OF A NEW TIP PROJECT, RG131

BLOCK FUNDS

12.231 0.631 3.800 3.800 4.000 AQC:NON TOTAL 4YR COST :ALBANY TPC : $40-$60 M

MISC 0.460 0.460 2020NFA 0.112 STBG FLEX 0.112 MISC2020

MISC 0.028 0.028 2020NFAMISC 0.460 0.460 2021NFA

0.112 0.112 MISCSTBG FLEX 2021MISC 0.028 0.028 2021NFAMISC 0.460 0.460 2022NFA

0.112 0.112 MISCSTBG FLEX 2022MISC 0.028 0.028 2022NFAMISC 0.460 0.460 2023NFA

0.112 0.112 MISCSTBG FLEX 2023MISC 0.028 0.028 2023NFA

CDTA

CDTC32

TRAVEL DEMAND MANAGEMENT & MULTIMODAL

DRAWDOWNS FROM THESE BLOCK FUNDS MUST CONSIST OF A NEW TIP PROJECT. RG130

BLOCK FUNDS

2.400 0.600 0.600 0.600 0.600 AQC:J1P TOTAL 4YR COST :MULTI TPC : $2-$4 M