27
# Name Duration Start Date 1 Active Directory 626 days 4/14/11 10:00 AM 2 Project Initiation 287.25 days 4/14/11 10:00 AM 3 Needs Analysis 10 days 4/14/11 12:00 PM 4 Create high-level design diagram 10 days 4/28/11 12:00 PM 5 Develop project plan 8 wks 5/12/11 12:00 PM 6 Complete project plan 227 days 7/11/11 12:00 PM 7 Procurement 40 days 4/14/11 10:00 AM 8 Preparation of Procurement Docs 10 days 4/14/11 10:00 AM 9 Approval of Funds 10 days 4/28/11 10:00 AM 10 Determine Hardware Requirements 10 days 5/12/11 10:00 AM 11 Determine Software Requirements 10 days 5/12/11 10:00 AM 12 Receive Hardware and Software 10 days 5/26/11 10:00 AM 13 Project Start 10 days 6/11/12 12:00 PM 14 Informational Update 10 days 6/11/12 12:00 PM 15 Active Directory Design and Implementation 334 days 6/18/12 10:00 AM 16 Phase 1 (Training) 26 days 6/25/12 12:00 PM 17 AD Training Program 20 days 6/25/12 12:00 PM 18 Microsoft Consultation and Review 5 days 6/25/12 12:00 PM 19 Training Review 1 days 7/24/12 12:00 PM 20 Document Requirements 5 days 7/25/12 12:00 PM 21 Develop High-Level Design (Infrastructure Placement) 1 days 7/25/12 12:00 PM 22 Phase 2 (Analysis and Design) 231.25 days 6/18/12 10:00 AM 23 Banner Integration 35 days 6/18/12 10:00 AM 24 Review MC Network Overhaul 1 days 7/25/12 12:00 PM 25 Identify Target Services 45 days 7/25/12 12:00 PM 26 Macintosh Services Planning 5 days 7/25/12 12:00 PM 27 Review AD Structure to Account for Target Services 15 days 7/31/12 12:00 PM 28 Data Clean-up and File Structure 164 days 7/26/12 12:00 PM 29 Complete Object Naming Conventions 5 days 3/28/13 12:00 PM Project: Active Directory Planned Start: 4/14/11 Projected Start: 9/20/10 Planned Completion: 10/18/13 Projected Completion: 10/18/13 Printed On: 7/24/12 Page 1 This project is to replace the existing Novell eDirectory with Microsoft’s Active Directory. Implementation will occur in conjunction with our move to the new Network Infrastructure. Planned Overdue Critical Path In Progress Summary Complete Milestone Predecessor ©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

# Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

  • Upload
    vutram

  • View
    219

  • Download
    4

Embed Size (px)

Citation preview

Page 1: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

# Name Duration Start Date

1 Active Directory 626 days 4/14/11 10:00 AM2 Project Initiation 287.25 days 4/14/11 10:00 AM3 Needs Analysis 10 days 4/14/11 12:00 PM4 Create high-level design diagram 10 days 4/28/11 12:00 PM5 Develop project plan 8 wks 5/12/11 12:00 PM6 Complete project plan 227 days 7/11/11 12:00 PM7 Procurement 40 days 4/14/11 10:00 AM8 Preparation of Procurement Docs 10 days 4/14/11 10:00 AM9 Approval of Funds 10 days 4/28/11 10:00 AM10 Determine Hardware Requirements 10 days 5/12/11 10:00 AM11 Determine Software Requirements 10 days 5/12/11 10:00 AM12 Receive Hardware and Software 10 days 5/26/11 10:00 AM13 Project Start 10 days 6/11/12 12:00 PM14 Informational Update 10 days 6/11/12 12:00 PM15 Active Directory Design and Implementation 334 days 6/18/12 10:00 AM16 Phase 1 (Training) 26 days 6/25/12 12:00 PM17 AD Training Program 20 days 6/25/12 12:00 PM18 Microsoft Consultation and Review 5 days 6/25/12 12:00 PM19 Training Review 1 days 7/24/12 12:00 PM20 Document Requirements 5 days 7/25/12 12:00 PM21 Develop High-Level Design (Infrastructure Placement) 1 days 7/25/12 12:00 PM22 Phase 2 (Analysis and Design) 231.25 days 6/18/12 10:00 AM23 Banner Integration 35 days 6/18/12 10:00 AM24 Review MC Network Overhaul 1 days 7/25/12 12:00 PM25 Identify Target Services 45 days 7/25/12 12:00 PM26 Macintosh Services Planning 5 days 7/25/12 12:00 PM27 Review AD Structure to Account for Target Services 15 days 7/31/12 12:00 PM28 Data Clean-up and File Structure 164 days 7/26/12 12:00 PM29 Complete Object Naming Conventions 5 days 3/28/13 12:00 PM

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 1

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 2: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

# Name Duration Start Date

30 End-User Group Membership Structure 20 days 3/28/13 12:00 PM31 Logging and Auditing Plan 2 days 8/29/12 12:00 PM32 Establish Password Policies 3 days 8/6/12 12:00 PM33 Design Backup Solutions 5 days 8/31/12 12:00 PM34 Determine End-User Cutover Plan 15 days 8/7/12 10:00 AM35 Develop and Document Administration Procedures 20 days 4/25/13 12:00 PM36 Phase 3 (Pre-Pilot) 116.75 days 6/25/12 12:00 PM37 Install Win2008 AD Servers as VMware Guests 5 days 6/25/12 12:00 PM38 Harden Servers 3 days 7/2/12 12:00 PM39 Configure Basic AD & DNS 10 days 8/29/12 12:00 PM40 Implement AD Structure 5 days 9/13/12 12:00 PM41 Implement Centrify 20 days 9/10/12 9:00 AM42 Implement Banner Integration 67 days 8/7/12 10:00 AM43 Testing 70.75 days 8/29/12 12:00 PM44 Test Banner Integration 20 days 11/9/12 10:00 AM45 Test AD Replication 5 days 9/13/12 12:00 PM46 Test PC Authentication 10 days 8/29/12 12:00 PM47 Test Mac Authentication 5 days 10/8/12 9:00 AM48 Test Perform End-User Transition 5 days 11/12/12 10:00 AM49 Test Banner User Creation 7 days 11/12/12 10:00 AM50 Test Security 5 days 8/29/12 12:00 PM51 Documentation and Process Management 10 days 11/21/12 10:00 AM52 Phase 4 (Pilot) 14 days 12/7/12 10:00 AM53 Select Users (Collegewide) 14 days 12/7/12 10:00 AM54 Phase 5 (Deployment) 180 days 1/4/13 10:00 AM55 Administrative 180 days 1/4/13 10:00 AM56 OITB 26 days 1/4/13 10:00 AM57 Germantown Campus 26 days 2/12/13 10:00 AM58 Takoma Park Campus 26 days 3/20/13 10:00 AM

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 2

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 3: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

# Name Duration Start Date

59 HSC (Silver Spring Campus) 26 days 4/26/13 10:00 AM60 Offsite (Remote) Locations 26 days 6/4/13 10:00 AM61 Rockville Campus (Staff) 25 days 7/11/13 10:00 AM62 Rockville Campus (Faculty) 25 days 8/15/13 10:00 AM63 Academic 63 days 5/27/13 9:00 AM64 Project Completion 10 days 9/20/13 10:00 AM65 Close-Out 2 wks 9/20/13 10:00 AM66 Project End 10 days 10/4/13 10:00 AM67 Q & A 2 wks 10/4/13 10:00 AM

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 3

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 4: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

Completion Date Assignments % Predecessors

10/18/13 10:00 AM 51.1%6/11/12 12:00 PM 100.0%4/28/11 12:00 PM David Maffeo, Andrew Scheppler 100.0%5/12/11 12:00 PM David Maffeo, Andrew Scheppler 100.0% 3e7/11/11 12:00 PM David Maffeo, Andrew Scheppler 100.0% 4e6/11/12 12:00 PM David Maffeo, Andrew Scheppler 100.0% 5e6/10/11 10:00 AM 100.0%4/28/11 10:00 AM Andrew Scheppler, David Maffeo 100.0%5/12/11 10:00 AM David Maffeo, Andrew Scheppler 100.0% 8e5/26/11 10:00 AM Andrew Scheppler, David Maffeo 100.0% 9e5/26/11 10:00 AM Andrew Scheppler, David Maffeo 100.0% 9e6/10/11 10:00 AM Gary Williams, Benjamin Harner 100.0% 11e, 10e6/25/12 12:00 PM 100.0%6/25/12 12:00 PM David Maffeo, Andrew Scheppler 100.0% 6e10/18/13 10:00 AM 37.3%8/1/12 12:00 PM 100.0%7/24/12 12:00 PM David Maffeo, Andrew Scheppler 100.0% 14e7/2/12 12:00 PM Andrew Scheppler, David Maffeo 100.0% 14e7/25/12 12:00 PM David Maffeo, Andrew Scheppler 100.0% 17e, 18e8/1/12 12:00 PM Sharon Kauffman 100.0% 19e7/26/12 12:00 PM Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, 100.0% 19e5/23/13 12:00 PM 47.4%8/7/12 10:00 AM Nell Feldman, Stephen Ambrose, Karen Parsons 85.0%7/26/12 12:00 PM Andrew Scheppler, David Maffeo 100.0% 19e9/27/12 12:00 PM Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen 80.0% 19e8/1/12 12:00 PM Tanuja Shah, Matthew Taylor, Brad Beckman 100.0% 19e8/21/12 12:00 PM Andrew Scheppler, David Maffeo, Tanuja Shah, Brad Beckman 0.0%3/28/13 12:00 PM Loren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew 0.0% 214/4/13 12:00 PM Sharon Kauffman 0.0% 28, 18e, 17e

April 11 May 1110 17 24 1 8

David Maffeo, Andrew Scheppler 100%, 4/28/11David Maffeo, Andrew Scheppler

David Maffeo, Andrew SchepplerDavid Maffeo, Andrew Scheppler

Andrew Scheppler, David Maffeo 100%, 4/28/11David Maffeo, Andrew Scheppler

Andrew Scheppler, David MaffeoAndrew Scheppler, David Maffeo

Gary Williams, Benjamin Harner

David Maffeo, Andrew Scheppler

David Maffeo, Andrew SchepplerAndrew Scheppler, David Maffeo

David Maffeo, Andrew SchepplerSharon Kauffman

Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, Brad Beckman, David Maffeo

Nell Feldman, Stephen Ambrose, Karen ParsonsAndrew Scheppler, David Maffeo

Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen Parsons, Stephen Ambrose, Andrew Scheppler, Phong Banh, Gary Williams, Sharon Kauffman, David MaffeoTanuja Shah, Matthew Taylor, Brad Beckman

Andrew Scheppler, David Maffeo, Tanuja Shah, Brad BeckmanLoren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew Scheppler

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 4

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 5: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

Completion Date Assignments % Predecessors

4/25/13 12:00 PM David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja Shah 0.0% 28, 17e, 18e8/31/12 12:00 PM Sharon Kauffman, Andrew Scheppler, David Maffeo 100.0% 18e8/9/12 12:00 PM Joseph Roundy 0.0% 17e, 18e9/10/12 12:00 PM Tanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo 100.0% 31e8/28/12 10:00 AM Andrew Scheppler, David Maffeo 0.0% 23e5/23/13 12:00 PM Sharon Kauffman 0.0% 32e, 29e, 30e,12/11/12 10:00 AM 12.7%7/2/12 12:00 PM Brad Beckman 100.0% 147/6/12 12:00 PM Brad Beckman 100.0% 37e9/13/12 12:00 PM Tanuja Shah, Brad Beckman 100.0% 38e9/20/12 12:00 PM Tanuja Shah, Brad Beckman 100.0% 39e10/5/12 5:00 PM Brad Beckman, Loren Carter 0.0%11/9/12 10:00 AM Nell Feldman, Stephen Ambrose, Karen Parsons 0.0% 38e, 23e12/11/12 10:00 AM 16.6%12/11/12 10:00 AM Nell Feldman, Stephen Ambrose, Karen Parsons 0.0% 42e9/20/12 12:00 PM Tanuja Shah, Brad Beckman 100.0% 39e9/13/12 12:00 PM Tanuja Shah, Brad Beckman 0.0% 38e10/12/12 5:00 PM Brad Beckman, Loren Carter 0.0% 4111/19/12 10:00 AM Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, 0.0% 46, 34, 42, 38e11/21/12 10:00 AM Nell Feldman, Stephen Ambrose, Karen Parsons 0.0% 42e9/6/12 12:00 PM Brad Beckman, Tanuja Shah, Jay Yu 100.0% 38e12/7/12 10:00 AM Sharon Kauffman, Andrew Scheppler, David Maffeo 0.0% 491/4/13 10:00 AM 0.0%1/4/13 10:00 AM David Maffeo, Andrew Scheppler 0.0% 51e9/20/13 10:00 AM 0.0%9/20/13 10:00 AM 0.0%2/12/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 53e3/20/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 564/26/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 57e

April 11 May 1110 17 24 1 8

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja ShahSharon Kauffman, Andrew Scheppler, David Maffeo

Joseph RoundyTanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo

Andrew Scheppler, David MaffeoSharon Kauffman

Brad BeckmanBrad Beckman

Tanuja Shah, Brad BeckmanTanuja Shah, Brad Beckman

Brad Beckman, Loren CarterNell Feldman, Stephen Ambrose, Karen Parsons

Nell Feldman, Stephen Ambrose, Karen ParsonsTanuja Shah, Brad Beckman

Tanuja Shah, Brad BeckmanBrad Beckman, Loren Carter

Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, Tanuja ShahNell Feldman, Stephen Ambrose, Karen Parsons

Brad Beckman, Tanuja Shah, Jay YuSharon Kauffman, Andrew Scheppler, David Maffeo

David Maffeo, Andrew Scheppler

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 5

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 6: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

Completion Date Assignments % Predecessors

6/4/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 58e7/11/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 59e8/15/13 10:00 AM Job Role: Desktop Engineering, Victor Huang 0.0% 60e9/20/13 10:00 AM Victor Huang, Job Role: Desktop Engineering 0.0% 61e8/23/13 5:00 PM Job Role: Desktop Engineering, Victor Huang 0.0%10/4/13 10:00 AM 0.0%10/4/13 10:00 AM Andrew Scheppler, David Maffeo 0.0% 62e10/18/13 10:00 AM 0.0%10/18/13 10:00 AM Sharon Kauffman 0.0% 65e

April 11 May 1110 17 24 1 8

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 6

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 7: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

May 11 June 11 July 11 August 11 September 118 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25

100%, 4/28/11100%, 5/12/11

David Maffeo, Andrew Scheppler 100%, 7/11/11David Maffeo, Andrew Scheppler

100%, 6/10/11100%, 4/28/11

100%, 5/12/11100%, 5/26/11100%, 5/26/11

Gary Williams, Benjamin Harner 100%, 6/10/11

David Maffeo, Andrew Scheppler

David Maffeo, Andrew SchepplerAndrew Scheppler, David Maffeo

David Maffeo, Andrew SchepplerSharon Kauffman

Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, Brad Beckman, David Maffeo

Nell Feldman, Stephen Ambrose, Karen ParsonsAndrew Scheppler, David Maffeo

Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen Parsons, Stephen Ambrose, Andrew Scheppler, Phong Banh, Gary Williams, Sharon Kauffman, David MaffeoTanuja Shah, Matthew Taylor, Brad Beckman

Andrew Scheppler, David Maffeo, Tanuja Shah, Brad BeckmanLoren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew Scheppler

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 7

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 8: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

May 11 June 11 July 11 August 11 September 118 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja ShahSharon Kauffman, Andrew Scheppler, David Maffeo

Joseph RoundyTanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo

Andrew Scheppler, David MaffeoSharon Kauffman

Brad BeckmanBrad Beckman

Tanuja Shah, Brad BeckmanTanuja Shah, Brad Beckman

Brad Beckman, Loren CarterNell Feldman, Stephen Ambrose, Karen Parsons

Nell Feldman, Stephen Ambrose, Karen ParsonsTanuja Shah, Brad Beckman

Tanuja Shah, Brad BeckmanBrad Beckman, Loren Carter

Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, Tanuja ShahNell Feldman, Stephen Ambrose, Karen Parsons

Brad Beckman, Tanuja Shah, Jay YuSharon Kauffman, Andrew Scheppler, David Maffeo

David Maffeo, Andrew Scheppler

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 8

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 9: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

May 11 June 11 July 11 August 11 September 118 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 9

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 10: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

October 11 November 11 December 11 January 12 February 1225 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12

100%, 4/28/11100%, 5/12/11

100%, 7/11/11

100%, 6/10/11100%, 4/28/11

100%, 5/12/11100%, 5/26/11100%, 5/26/11

100%, 6/10/11

David Maffeo, Andrew Scheppler

David Maffeo, Andrew SchepplerAndrew Scheppler, David Maffeo

David Maffeo, Andrew SchepplerSharon Kauffman

Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, Brad Beckman, David Maffeo

Nell Feldman, Stephen Ambrose, Karen ParsonsAndrew Scheppler, David Maffeo

Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen Parsons, Stephen Ambrose, Andrew Scheppler, Phong Banh, Gary Williams, Sharon Kauffman, David MaffeoTanuja Shah, Matthew Taylor, Brad Beckman

Andrew Scheppler, David Maffeo, Tanuja Shah, Brad BeckmanLoren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew Scheppler

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 10

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 11: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

October 11 November 11 December 11 January 12 February 1225 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja ShahSharon Kauffman, Andrew Scheppler, David Maffeo

Joseph RoundyTanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo

Andrew Scheppler, David MaffeoSharon Kauffman

Brad BeckmanBrad Beckman

Tanuja Shah, Brad BeckmanTanuja Shah, Brad Beckman

Brad Beckman, Loren CarterNell Feldman, Stephen Ambrose, Karen Parsons

Nell Feldman, Stephen Ambrose, Karen ParsonsTanuja Shah, Brad Beckman

Tanuja Shah, Brad BeckmanBrad Beckman, Loren Carter

Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, Tanuja ShahNell Feldman, Stephen Ambrose, Karen Parsons

Brad Beckman, Tanuja Shah, Jay YuSharon Kauffman, Andrew Scheppler, David Maffeo

David Maffeo, Andrew Scheppler

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 11

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 12: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

October 11 November 11 December 11 January 12 February 1225 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 12

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 13: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

February 12 March 12 April 12 May 12 June 12 July 1212 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1

100%, 6/11/12100%, 4/28/11

100%, 5/12/11100%, 7/11/11

100%, 6/11/12100%, 6/10/11

100%, 4/28/11100%, 5/12/11

100%, 5/26/11100%, 5/26/11

100%, 6/10/11100%, 6/25/12

David Maffeo, Andrew Scheppler 100%, 6/25/12

David Maffeo, Andrew SchepplerAndrew Scheppler, David Maffeo

David Maffeo, Andrew SchepplerSharon Kauffman

Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, Brad Beckman, David Maffeo

Nell Feldman, Stephen Ambrose, Karen ParsonsAndrew Scheppler, David Maffeo

Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen Parsons, Stephen Ambrose, Andrew Scheppler, Phong Banh, Gary Williams, Sharon Kauffman, David MaffeoTanuja Shah, Matthew Taylor, Brad Beckman

Andrew Scheppler, David Maffeo, Tanuja Shah, Brad BeckmanLoren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew Scheppler

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 13

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 14: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

February 12 March 12 April 12 May 12 June 12 July 1212 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja ShahSharon Kauffman, Andrew Scheppler, David Maffeo

Joseph RoundyTanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo

Andrew Scheppler, David MaffeoSharon Kauffman

Brad BeckmanBrad Beckman

Tanuja Shah, Brad BeckmanTanuja Shah, Brad Beckman

Brad Beckman, Loren CarterNell Feldman, Stephen Ambrose, Karen Parsons

Nell Feldman, Stephen Ambrose, Karen ParsonsTanuja Shah, Brad Beckman

Tanuja Shah, Brad BeckmanBrad Beckman, Loren Carter

Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, Tanuja ShahNell Feldman, Stephen Ambrose, Karen Parsons

Brad Beckman, Tanuja Shah, Jay YuSharon Kauffman, Andrew Scheppler, David Maffeo

David Maffeo, Andrew Scheppler

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 14

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 15: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

February 12 March 12 April 12 May 12 June 12 July 1212 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 15

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 16: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

July 12 August 12 September 12 October 12 November 121 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18

100%, 6/11/12100%, 4/28/11

100%, 5/12/11100%, 7/11/11

100%, 6/11/12100%, 6/10/11

100%, 4/28/11100%, 5/12/11

100%, 5/26/11100%, 5/26/11

100%, 6/10/11100%, 6/25/12100%, 6/25/12

100%, 8/1/12100%, 7/24/12

100%, 7/2/12David Maffeo, Andrew Scheppler 100%, 7/25/12

Sharon Kauffman 100%, 8/1/12Gary Williams, Andrew Scheppler, Tanuja Shah, Benjamin Harner, Brad Beckman, David Maffeo 100%, 7/26/12

85%, 8/7/12Andrew Scheppler, David Maffeo 100%, 7/26/12

Loren Carter, Tanuja Shah, Benjamin Harner, Brad Beckman, Karen Parsons, Stephen Ambrose, Andrew Scheppler, Phong Banh, Gary Williams, Sharon Kauffman, David Maffeo 80%, 9/27/12Tanuja Shah, Matthew Taylor, Brad Beckman 100%, 8/1/12

Andrew Scheppler, David Maffeo, Tanuja Shah, Brad Beckman 0%, 8/21/12Loren Carter, David Maffeo, Tanuja Shah, Brad Beckman, Andrew Scheppler

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 16

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 17: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

July 12 August 12 September 12 October 12 November 121 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja ShahSharon Kauffman, Andrew Scheppler, David Maffeo 100%, 8/31/12

Joseph Roundy 0%, 8/9/12Tanuja Shah, Brad Beckman, Andrew Scheppler, David Maffeo 100%, 9/10/12

Andrew Scheppler, David Maffeo 0%, 8/28/12Sharon Kauffman

100%, 7/2/12100%, 7/6/12

Tanuja Shah, Brad Beckman 100%, 9/13/12Tanuja Shah, Brad Beckman 100%, 9/20/12

Brad Beckman, Loren Carter 0%, 10/5/12Nell Feldman, Stephen Ambrose, Karen Parsons 0%, 11/9/12

Nell Feldman, Stephen Ambrose, Karen ParsonsTanuja Shah, Brad Beckman 100%, 9/20/12

Tanuja Shah, Brad Beckman 0%, 9/13/12Brad Beckman, Loren Carter 0%, 10/12/12

Andrew Scheppler, Loren Carter, Brad Beckman, David Maffeo, Tanuja ShahNell Feldman, Stephen Ambrose, Karen Parsons

Brad Beckman, Tanuja Shah, Jay Yu 100%, 9/6/12Sharon Kauffman, Andrew Scheppler, David Maffeo

David Maffeo, Andrew Scheppler

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 17

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 18: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

July 12 August 12 September 12 October 12 November 121 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 18

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 19: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

December 12 January 13 February 13 March 13 April 1318 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7

100%, 6/11/12100%, 4/28/11

100%, 5/12/11100%, 7/11/11

100%, 6/11/12100%, 6/10/11

100%, 4/28/11100%, 5/12/11

100%, 5/26/11100%, 5/26/11

100%, 6/10/11100%, 6/25/12100%, 6/25/12

100%, 8/1/12100%, 7/24/12

100%, 7/2/12100%, 7/25/12

100%, 8/1/12100%, 7/26/12

85%, 8/7/12100%, 7/26/12

80%, 9/27/12100%, 8/1/12

0%, 8/21/120%, 3/28/13

Sharon Kauffman 0%, 4/4/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 19

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 20: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

December 12 January 13 February 13 March 13 April 1318 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7

David Maffeo, Andrew Scheppler, Brad Beckman, Tanuja Shah100%, 8/31/12

0%, 8/9/12100%, 9/10/12

0%, 8/28/12Sharon Kauffman

13%, 12/11/12100%, 7/2/12

100%, 7/6/12100%, 9/13/12

100%, 9/20/120%, 10/5/12

0%, 11/9/1217%, 12/11/120%, 12/11/12

100%, 9/20/120%, 9/13/12

0%, 10/12/120%, 11/19/12

0%, 11/21/12100%, 9/6/12

0%, 12/7/120%, 1/4/13

David Maffeo, Andrew Scheppler 0%, 1/4/13

Desktop Engineering, Victor Huang 0%, 2/12/13Desktop Engineering, Victor Huang 0%, 3/20/13

Desktop Engineering, Victor Huang

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 20

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 21: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

December 12 January 13 February 13 March 13 April 1318 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7

Desktop Engineering, Victor HuangDesktop Engineering, Victor Huang

Desktop Engineering, Victor HuangVictor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 21

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 22: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

April 13 May 13 June 13 July 13 August 137 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25

100%, 6/11/12100%, 4/28/11

100%, 5/12/11100%, 7/11/11

100%, 6/11/12100%, 6/10/11

100%, 4/28/11100%, 5/12/11

100%, 5/26/11100%, 5/26/11

100%, 6/10/11100%, 6/25/12100%, 6/25/12

100%, 8/1/12100%, 7/24/12

100%, 7/2/12100%, 7/25/12

100%, 8/1/12100%, 7/26/12

47%, 5/23/1385%, 8/7/12

100%, 7/26/1280%, 9/27/12

100%, 8/1/120%, 8/21/12

0%, 3/28/130%, 4/4/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 22

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 23: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

April 13 May 13 June 13 July 13 August 137 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25

0%, 4/25/13100%, 8/31/12

0%, 8/9/12100%, 9/10/12

0%, 8/28/12Sharon Kauffman 0%, 5/23/13

13%, 12/11/12100%, 7/2/12

100%, 7/6/12100%, 9/13/12

100%, 9/20/120%, 10/5/12

0%, 11/9/1217%, 12/11/120%, 12/11/12

100%, 9/20/120%, 9/13/12

0%, 10/12/120%, 11/19/12

0%, 11/21/12100%, 9/6/12

0%, 12/7/120%, 1/4/130%, 1/4/13

0%, 2/12/130%, 3/20/13

0%, 4/26/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 23

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 24: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

April 13 May 13 June 13 July 13 August 137 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25

Desktop Engineering, Victor Huang 0%, 6/4/13Desktop Engineering, Victor Huang 0%, 7/11/13

Desktop Engineering, Victor Huang 0%, 8/15/13Victor Huang, Desktop Engineering

Desktop Engineering, Victor Huang

Andrew Scheppler, David Maffeo

Sharon Kauffman

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 24

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 25: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

September 13 October 13 November 13 December 13 January 1425 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12

51%, 10/18/13100%, 6/11/12

100%, 4/28/11100%, 5/12/11

100%, 7/11/11100%, 6/11/12

100%, 6/10/11100%, 4/28/11

100%, 5/12/11100%, 5/26/11100%, 5/26/11

100%, 6/10/11100%, 6/25/12100%, 6/25/12

37%, 10/18/13100%, 8/1/12

100%, 7/24/12100%, 7/2/12

100%, 7/25/12100%, 8/1/12

100%, 7/26/1247%, 5/23/13

85%, 8/7/12100%, 7/26/12

80%, 9/27/12100%, 8/1/12

0%, 8/21/120%, 3/28/13

0%, 4/4/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 25

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 26: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

September 13 October 13 November 13 December 13 January 1425 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12

0%, 4/25/13100%, 8/31/12

0%, 8/9/12100%, 9/10/12

0%, 8/28/120%, 5/23/13

13%, 12/11/12100%, 7/2/12

100%, 7/6/12100%, 9/13/12

100%, 9/20/120%, 10/5/12

0%, 11/9/1217%, 12/11/120%, 12/11/12

100%, 9/20/120%, 9/13/12

0%, 10/12/120%, 11/19/12

0%, 11/21/12100%, 9/6/12

0%, 12/7/120%, 1/4/130%, 1/4/13

0%, 9/20/130%, 9/20/13

0%, 2/12/130%, 3/20/13

0%, 4/26/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 26

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.

Page 27: # Name Duration Start Date 1 Active Directory 626 days 4 ...cms.montgomerycollege.edu/uploadedFiles/OIT/Network_And_Computing/...Completion Date Assignments % Predecessors 10/18/13

September 13 October 13 November 13 December 13 January 1425 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12

0%, 6/4/130%, 7/11/13

0%, 8/15/130%, 9/20/13

0%, 8/23/130%, 10/4/13

Andrew Scheppler, David Maffeo 0%, 10/4/130%, 10/18/13

Sharon Kauffman 0%, 10/18/13

Project: Active DirectoryPlanned Start: 4/14/11 Projected Start: 9/20/10Planned Completion: 10/18/13 Projected Completion:

10/18/13Printed On: 7/24/12

Page 27

This project is to replace the existing NovelleDirectory with Microsoft’s Active Directory.Implementation will occur in conjunction with ourmove to the new Network Infrastructure.

Planned OverdueCritical Path In Progress

Summary CompleteMilestone Predecessor

©2000-2012 Licensed Copyright by AtTask, Inc. All rights reserved.