11
BSCPL Project Office: Door No 37-1-406(4A). llnd Lane, Bhagya Nagar, e, Pr asam - 523 001 Tele: +91 8592-223699, Fax: +91 8592-223699. E:simhapuriexpressw @gmail.com Register Office : D.No. 1-80/40/. SPl58-65, Shilpa Homes Layout, Gachibowli, Hyderabad - 500 032 Ph: +9140-23189999, Fax: +91 40-23189000,E.info@kmcgroup.co.in,www.kmcgroup.co.in We are here with submitting the scope specified in some of 6 lane project of NHA1 & summarizing as tabulatedbelow for a better clarity. As there is a difference in understanding the CA provisions between the TL office and us, we have gone through the provisions with other 6 lane projects under execution in NHAI. • In the given table, locations of street lighting are indicated village wise and on the Bypass with specific locations. The total length of main carriageway indicated there in is 31.610 Km. Since there is an arithmetical error, the correct total works out to 30.71 Km. Further, out of these specified locations, the total length of the locations of Service Road indicated in Schedule-B, which blends I merges with that of locations specified in Schedule -C is only 20.621 km. Further, Schedule-C under para 2.3 (b) Street lighting specifies as "Provide Street lighting for Service road and Main carriageway at locations specified in Table 2.3(b y· The Concessionaire's obligation of Providing street lighting for Service road and Main carriageway are limited to 2.3 (b) of schedule-C. Please refer to our earlier submissions vide letter ref 1 &2 where in we have represented that, In reference to the above subject, it is to submit that Team Leader without furnishing any justifications, communicated to Project Director N1-W vide letter cited above, that Concessionaire has to execute 30710 mts (LHS/SR) and 30710 mts (MCW) & 30710 mts (RHS/SR). Dear Sir, Ref: 1. SEL/SPV/CN/NH-16/IE/Cont/2015/61/1435 dated 10.04.2015 2. SEL/SPV/CN/NH-16/IE/Cont/2015/61/1579 dated 15.06.2015 3. ICT: NH-16: TL: 3390 dated 04.02.2016 Sub: Six LaningofChilak.aluripet - Nellore Section of NH-16 from Km 1182.802 to 1366.547 (Length - 183.620) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT(Toll) Project onDBFOT Pattern-Street Lighting- Reg. To Mr.Lt Gen. (Rtd) S. Ravishankar, Independent Engineer, ICT, A8, Green Park, New Delhi Date:lOth Feb 2016 LtrNo:SEL/SPV/CN/NH-16/IE/Cont/2016/611W'38 Simhapuri Expressway Limited

-Ill - nhai.org.innhai.org.in/spw/CorrespondenceIssues/SEL 2038.pdf · Cc: I. The CGM, RO, Hyderabad, for information 2. The Project Director, PIU-NHAI, Nellore, for information 3

Embed Size (px)

Citation preview

BSCPL

Project Office: Door No 37-1-406(4A). llnd Lane, Bhagya Nagar, e, Pr asam - 523 001 Tele: +91 8592-223699, Fax: +91 8592-223699. E:simhapuriexpressw @gmail.com

Register Office : D.No. 1-80/40/. SPl58-65, Shilpa Homes Layout, Gachibowli, Hyderabad - 500 032 Ph: +9140-23189999, Fax: +91 40-23189000,[email protected],www.kmcgroup.co.in

We are here with submitting the scope specified in some of 6 lane project of NHA1 & summarizing as tabulatedbelow for a better clarity.

• As there is a difference in understanding the CA provisions between the TL office and us, we have gone through the provisions with other 6 lane projects under execution in NHAI.

• In the given table, locations of street lighting are indicated village wise and on the Bypass with specific locations. The total length of main carriageway indicated there in is 31.610 Km. Since there is an arithmetical error, the correct total works out to 30.71 Km. Further, out of these specified locations, the total length of the locations of Service Road indicated in Schedule-B, which blends I merges with that of locations specified in Schedule -C is only 20.621 km.

• Further, Schedule-C under para 2.3 (b) Street lighting specifies as "Provide Street lighting for Service road and Main carriageway at locations specified in Table 2.3(b y·

• The Concessionaire's obligation of Providing street lighting for Service road and Main carriageway are limited to 2.3 (b) of schedule-C.

Please refer to our earlier submissions vide letter ref 1 &2 where in we have represented that,

In reference to the above subject, it is to submit that Team Leader without furnishing any justifications, communicated to Project Director N1-W vide letter cited above, that Concessionaire has to execute 30710 mts (LHS/SR) and 30710 mts (MCW) & 30710 mts (RHS/SR).

Dear Sir,

Ref: 1. SEL/SPV/CN/NH-16/IE/Cont/2015/61/1435 dated 10.04.2015 2. SEL/SPV/CN/NH-16/IE/Cont/2015/61/1579 dated 15.06.2015 3. ICT: NH-16: TL: 3390 dated 04.02.2016

Sub: Six LaningofChilak.aluripet - Nellore Section of NH-16 from Km 1182.802 to 1366.547 (Length - 183.620) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT(Toll) Project onDBFOT Pattern-Street Lighting- Reg.

To Mr.Lt Gen. (Rtd) S. Ravishankar, Independent Engineer, ICT, A8, Green Park, New Delhi

Date:lOth Feb 2016 LtrNo:SEL/SPV/CN/NH-16/IE/Cont/2016/611W'38

Simhapuri Expressway Limited

From the above information it can be understood that, if nothing is mentioned specifically as an annexure or in table, the Concessionaire shall provide the facility at locations specified under schedule". If chainages are given in table without mentioning MCW I Service roads, the concessionaire shall follow the locations specified in table for both.

no clarity on street lighting locations on the main

carriage way and service roads (Exists) 111 the locations specified in the Appendix.

The chainages mentioned in the lengths are given in Appendix-II with a foot note that Highway lighting should be as per schedule­ D and in general should be provided at the locations a) All other locations b) All bridge location c) Bus bays, d)Truckbays, e )Interchanges /Intersections f) Toll Plazas.

No specificchainages are given.

Proposed Street lighting along the service road locations are clearly mentioned in Schedule --C as Appendix -Ill

No specific Chainages are mentioned.

Provide Street lighting at locations specified Appendix-ID(b),

of Highway lighting details are given 111

- Appendix-II

Lighting shall be provided for Main carnage way and service road at the stretches having service road, built up areas, flyovers, underpasses (PUP and VUP), Toll plaza and its approaches, Rest areas, Truck Lay Byes and Bus stops as per Schedule D

Street lighting shall be provided along the service roads in built up areas as mentioned in Appendix-III

Street Lighting along flyovers/Underpasses, High mast Lighting at major Junctions in Urban/Densely populated areas/Toll Plazas and installations (sub stations, transformers etc) required on the Project Highway shall be provided by the Concessionaire.

Sixlaningof Chilakaluripet to Vijaywada-NH-5 in state of Andhra Pradesh

Six laning gurgoon Kotpulli-Jaipur section of NH-8

Six laning ofNH-4, Walajahpet - Poonamallee in

state of Tamilandu

Six laning of Chennai to Thada Section ofNH-5

Six laning of Surat­ Dahisar section of NH-8

5

4

3

2

1 Remarks Scope Covered Project Details S.No

Simhapuri Expressway Limited

Cc: I. The CGM, RO, Hyderabad, for information 2. The Project Director, PIU-NHAI, Nellore, for information 3. The Team Leader, ICT-SNC Lavalin JV, Ongole.for information.

Encl: As above

rao Project Director

Simhapuri Expressway Limited

Yours faithfully,

Thanking you and assuring our best services at all times.

Further, we earnestly request the Independent Engineer to please assess the obligations of the Concessionaire and to take up the matter with the Authority for issue of Change of Scope Notice, for any additional quantity required beyond the obligations of the Concessionaire.

In view of the above, we disagree with the decision of the Team Leader communicated in the letter cited under reference.

As 20.671 Km service Road only proposed in the Chainges given in the table 2.3(b), under per the provisions of the Concession Agreement, the obligation of the Concessionaire limits to in providing street lighting for Service road 20.621 Km only and Main carriageway 30. 71 Km respectively.

• But in our Concessionaire Agreement under schedule C Table 2.3(b) it is specified that the Concessionaire shall provide Street lighting for Service road and Main carriage way at locations specified in the table.

Simhapuri Expressway Limited

PageC-3

Su Laning of Surai-Dahisar Section of NH-8 from .bn 263.00 to km 501.00(Length-km139.00) in the S(tlfe of Gvjarat!Maliarashtra under NHDP Phase Vas BOT (l'oll) on DBFO Pattern

(e) Traffic Blinker Signal (L.E.D) at intersections

Traffic Blinker signal (L.E.D) shall be provided at all at-grade intersections and median openings as per the design standards indicated in Schedule D.

2.3 ffighway Lighting Lighting along Flyovers/Underpasses, High Mast lighting at major junctions in Urban/densely populated areas/Toll Plazas and installations (sub stations, transformers etc) required on the Project Highway shall be provided by the Concessionaire. Lighting in the form of recessed fixtures shall be provided in th/-e~""""-- Pedestrian/Vehicular Underpasses. , ,_J .l> o,.

;//"A~~ The lighting shall be as per the standards set out in Schedule D. {~\ i!~~\" ' ..

\\Wt ~ 2 4 Pedestrian Facilities . .-.. •• ~ <::>"'

• • U>U> i\r :f. -N"°" Additional Pedestrian facilities shall be provided at 12 locations listed in the Appendix - VI of Schedule B. Addition, Improvement or Modification, if any, shall be done in

. .J

All the route marker signs shall be provided conforming to "IRC-2:1968 Route Marker Signs for National Highways".

All the boundary stones shall be provided conforming to "IRC-25:1967 Type Designs for Boundary Stones".

All the Kilometre stones shall be provided conforming to ''IRC-8:1980 Type Designs for Highway Kilometre Stones".

••

Hectometre I Kilometre I Boundary I Route Marker Signs

All the Hectometre stones shall be provided-conforming to "IRC-26:1967 Type Design for 200-Metre Stones".

(d)

ii) W-beam metal Crash Barners shall be provided on the outer side of carriageway wherever the embankment height is more than 3m and wherever there are retaining wall and toe wall on the outer side of the carriageway. Concrete Crash Barriers shall be provided on the outer side of the carriageway in the approaches of flyovers and major bridges and on both the side of carriageways in the approaches of major bridge wherever the new bridge is at an offset away from the old bridge location and also in flyovers and major bridges.

(c) The existing Metal Beam Crash barriers shall be removed carefully and will be used for replacing the damaged W beams.

(i) Delineators bollards and other safety devices shall be provided on all horizontal curves on either side of the carriageway as per design standards indicated in Schedule D and other locations as directed by IE.

(ii) Guard post shall be provided on either side of the carriageway, at location where embankment height varies between 2 to 3m as per design standards indicated in Schedule D.

Highway shall be as per the design standard indicated in Schedule-D and the location for various treatments shall be finalized in consultation with_ the Independent Engineer.

(b) Guard Rails and Traffic Safety Devices (i) For the safety of pedestrians at the Junctions, the guardrails shall be provided to enhance the safety in

Urban/Semi-Urban locations.

Volume ll: Schedules &:.Annexures National Highways Alllharity of India

Page C ·-I

Six Laning of Chennai to Tada Section ofNH-5 from km 11.00 10 km 5.J.40 (Length- km 43 . ./0) in the State of Tamil Nad11 under NllDP Phase I' as BOT (Toll) 011 DBFO Pattern

2.7 Bus-bays and bus shelters

2.6 Truck lay-byes Truck parking facility shall be provided at km 21/000 on both sides of the main highway as per the layout and specifications given in Schedule D.

1. Median Plantation: at locations where the median width is 3 & 4.Sm as mentioned in the Appendix -VJ.

u. Landscaping: In addition landscaping shall be provided at locations of entry and exit ramps as mentioned in Appendix -Il of Annex -I to this Schedule B and Proposed Toll Plaz.a location as mentioned in para 2.1 (a) of this annexure. Landscaping shall be provided at all major junctions underneath the flyovers/overpasses locations mentioned in Schedule B.

2.5 Landscaping and tree plantation The landscaping and tree plantation shall include the provision of the;

iv. Foot over bridges: Nil

m. Pedestrian Crossings: Provide pedestrian crossing facilities at all the major junctions mentioned in Appendix -XJ of Annex- I to this schedule B.

n, Pedestrian walkway: The pedestrian walkways shall be provided along the service road at the locations mentioned in Appendix-V.

I. Pedestrian guardrail: shall be provided alone the service road at the locations mentioned in Appendix -IV.

2.4 Pedestrian facilities The pedestrian facilities shall include the provision of the;

b) Street lighting All the built up areas along the project road as already provided with lighting along the median under the 4-Janing project. Street lighting shall be provided along the service roads in built up areas as mentioned in Appendix-III.

All the underpasses mentioned in Appendices -V & VI of Annex -I to Schedule B shall be provided with lighting as per the specifications given in Schedule D. High Mast lighting.. shall be provided at the proposed toll plaza location.

Volume 11: Schedules & Annexures National Highways Authority of India

Page C- 9

Six Laning ennai to Tada Section of Nf/-5 from km I /.(X} to km 54.40 (Length - km 43.40) in the State of Tamil Nadu under NHDP Phase I' as BOT(To/l) on DBFO Pattern

LHS RIIS SL.NO

FROM TO FROM TO

1 11.000 21.400 11.000 21.400

2 26.850 31.530 26.850 31.530

3 38.000 39.100 38.000 39.100

4 43.000 51.000 43.000 51.000

Proposed Street Lighting

Appendix~III

Volume JJ: Schedules & Anne=res National Highways Authority of India

--'-~~ .... ...__-~ .. ~···· \: :-.

20~ Six laning of NH-4 from Walajahpet 10 Poonamallee (Km 106.800 to Km J 3.800, approx. length of 93.000 km). in the State o/Tami/ Nadu under NHDP Phase V co be executed as DBFOT (Toll) Project

Provide the Rest Area as per schedule 'D' al following locations:

Rest Area (Service Area) 2.7 iii. Avenue plantation.

ii. Landscaping: at Toll Plazas, Service area, Flyovers/ Underpasses and Slip Roads.

i. Median Plantation: at locations where the median width is 4.Sm and more

The landscaping and tree plantation shall include the provision of the;

2.6 Landscaping and tree plantation

iv. Pedestrian Crossings: Provide pedestrian crossing facilities on service roads.

ii. Pedestrian walkway: Provide pedestrian walkway in all urban areas as specified in the cross section schedule given in Schedule B.

iii. Ramps/Steps: Provide Ramps/Steps at Flyovers on cross road

i. Pedestrian guardrail: Provide ~ .:.Jm of r~destrian gua;drail at each bus bay location.

. Pedestrian Iacilities shall include the provision of the;

2.5 Pedes_l!ian facilities

(b) Street Lighting Lighting shall be provided for main carriageway and service road at the stretches having service road. built up areas, flyovers, underpasses (PUP and VUP), Toll Plaza and its approaches, Rest areas. Truck Lay Byes and Bus Stops as per Schedule D.

High mast shall be provided al toll plaza ·and flyover locations.

.(b) High Mast

2.4 Highway Lighting:

ix. Hectometre/Kilometre stones: shall be provided for the entire Project Highway.

viii. Boundary stones: shall be provided for the entire Project Highway.

vii. Delineators and studs: The studs (100mm x 100m x 10mm) with reflective panels of dual prismatic· cube capable of providing total reflection of light entering the lens face for lane marking and delineation for night time visibility for the entire Project Highway.

vi. Guard Post: The guard posts shall be provided for a minimum number of 8400. In addition, the guard post as per warrants specified in schedule 'D' shall also be provided

the crash barrier as per warrants spi;cified in schedule 'D' shall also be provided.

SiJr 1-ofa---X«pt.1/i ·Jllir-S.CU-. o{/.'H-8 f,_ .i.. '1.70•t. 21J.DO(Lmg1~ -.bo 111.6()) "'tlwSlnu of tr • ·- • .• ~ ·- ' , •• ,_.., '""" •• ,._ - ••• n--- -

~ ·'

2-8 HighlDy Petrol Highway Petrol writs for the entire highway should be provided strictly as per schedule .. D"

2.9 Ambuunc.cs No. of ambulanc.:s, equipments installed inside lhan. their response lime and requiremcnl of their communication support with oe:ircst traUl'll3 bospit:ils for the e:n1ire highway should be provided strictly as per schedule "D"

2..10_ Cranes Pro\"isioos of cranes 311 along the highway should be strictly as per schedule .. D ".

l.11 Ad\'ana Traffic M:an:agcmcnl System {A TMS) Provisions of all ATMS for the entire highway should be as JX'f schedule "0".

l.7 Bus-byes and Bus Shelter, 51 no Details of Sl Bus Lay- byes is given in Appcndix-V.

- - -··

:) -. - ' -' - - ) - J

"'. -­ . '"\ -··

- - - - 2.6 Truck Lay-byes

Details of 16 truck Lay- byes is given in Appendix-TV.

2.5 L.aa.cbaping; and Tree Plantation Lm:hcaping of the highway shall be done on, bl.c r.ot limited to, the following;

• Median (wherever the width of median is 4.5 m m:l above) • inl='changes • Enny mi Exit ramp· • At grade islands of intersection locations • Toll Plaza Area

All the bndscaping and tree plan~on wotk should be done as per schedule ''IY'.

2..4 Pedestrisa Facilities The ddails of pedestrians guard rails near on the project road are given in Apoendix-!H.

2.3 Highway Lighting Details given in Appendix II.

• 8ouodaty Stones to be laid as per schedule '"D~ • Hcctomc:tcr I Kilometer Stones IO be laid as per schedule "D" • Tnffie Blinku Sign:il (I~E.D) at interseeucas as pa schedule "D"

-

- l - ~

-) _)

\ _.,. . ) - '\ - - ' I -

- Pa:•C-10

- J

- ' . .:; - ' .!,t

- ;) - r-.

.;I

-J

- .) .­

.!/

- J

)

-­ )

- - ,I

SU • ." . - ~ • .JaipwS.cti"" ofJJJ/.8 ft-ii .•!10tob.17J.OO(Looc11t-lm115.60) in1h<tS1au.t{ I~--. li.HDP l'haS< Vos BOT (Toll) on i)l:R} f-.i

(Rda ~ 1,9,10 and 11 of schedule B) (Refer ~ 4,.S and 1 of schedule B) (Rcfc> ~ices 1 of schedule C) (Rcfc:r~iccs 6ofschcdulc C) (Refer ~ 16 of scitcdtllfl3) .• {Re Ies >;>pmdiccs I of .• ~;'" · '·~i.:;\

Notes : Hi:l>ny lii:litb>: sho•ld be as per schedule -0: Md Ml cmual sbo•dd be pr0>idal al the loe11lioos eivtn uod.tt: • All Urban Loations

s, Cloal-lbt) l..mf'lli ( m) l'io. From To

I 42.700 43.000 OJ

2 43.000 45.200 2.2 ; 47.000 43.000 I 4 4&.000 S0.200 2.2 s 50.200 52..000 ._, 6 SS.000 :56.000 I 7 59.500 61.500 2

' 61.000 - . Bibspw"loll plza 9 67.000 73.000 6 10 73.000 74.000 I II 14.000 IS.000 I 12 92-SO<f 95.000 2.5 n 9S.OOO 96.SOO l.S 1• 96.500 99.000 2.5 IS 105.000 106.000 I !6 110.000 - SlW!imamxr toll pl:Jza 17 111.000 ll2.000 I IS 112.000 114.000 2 19 131.000 IJS.000 4 za 153.000 151.500 0 21 151.500 160.000 2.5 n 1n..ooo 174.000 2 23 174.000 176.000 2 24 176.000 1n.soo LS 2S 197.000 201.000 4 26 201.000 203.000 2 27 210.000 - toll plaza 2' 211.000 214.000 3 29 :!14.000 216.000 :! 30 • 216.000 220.000 4 j I 241.000 - Daubl!>ur toll pl.tta ::? Cl.'lOO l.000 ~km~()) n 0.000 2.000 2 bu (Zone C) 34 2.000 4.000 21ai;(Zone C) 35 4.000 6.000 2 km (Zone C) ;6 6.000 3.000 2km (Zone C) j7 l.000 13.703 S.1 km (Zone C)

Highw~ Li:htin;

Vabne II: Sdalliles & ~

Appenmn

Page C-3

Six Laning of Chilkoluripet· Yijaywada Section nf NH-5, from km 355.00 to km 434.15 (Length -82.5 km.) in the State a Andhra Pradesh under NH DP Phase Vas BOT (Toll) on DBFO Pattern

Ambulance(s) Provide the ambulance(s) services covering for the entire Project Highway. These shall conform to the specificati ns mentioned in Schedule D.

2.8 Highway patrol Provide the facility of highway patrolling covering the entire Project Highway. These shall conform to the specifications mentioned in Schedule D.

Provide the bus-bays and bus shelters at locations specified Appendix-V. Bus-bays and bus shelters 2.7

Provide the truck lay-bys at locations specified Appendix-IV. Truck lay-byes 2.6

Median Plantation: at locations where the median width is 4.5m and more ~, Landscaping: at Toll plaza, Interchanges, Entry/Exit ramps. -:z: .

. {\\'\\\ .1. ... .. .... ~

'-v.''Y '·~r,,>. 'I . '-\ ~1 11~:S>·~~·'t?!J ,\~':I \ ~ \ ttfliJ,°'J!~ ·., \ I ::'i -; !Jf:!J""• ( • _/; I.~ I ~-· 'fl(!-,·:..;' , ~ J / ~-. ~·,\_ . / </

,-}>-.. __ .,/ ·~· / ._:·,,.-!.i~\\·\/ --...___w ___

(i) (ii)

2.5 Landscaping and tree plantation The landscaping and tree plantation shall include the provision of the;

(i) Pedestrian guardrail: Provide 150m of pedestrian guardrail at each bus bay location. (ii) Pedestrian walkway: Provide pedestrian walkway as in all urban areas as specified

in the cross section. (iii) Ramps/Steps: Provide Ramps/Steps at Flyovers on cross roads. (iv) Pedestrian Crossings: Provide pedestrian crossing facilities on service roads. (v) Foot over bridges: Provide foot over bridges as specified in Schedule-B.

2.4 Pedestrian facillties The pedestrian facilities shall include the provision of the;

2.3 Highway lighting: a) High mast

Provide High mast lighting at locations specified Appendix-III(a). b) Street lighting

Provide Street lighting at locations specified Appendix-III (b).

(viii) Hectometer I Kilometer stones: shall be provided for the entire Project Highway.

(vii) Boundary stones: shall be provided for the entire Project Highway

(vi) Delineators: shall be provided for the entire Project Highway.

(v) MS Railing: MS Railing shall be provided for separation of main carriageway and the service road along the urban sections at the locations specified in Appendix-TI.

Yolume II: Sdiedutes & Annexures ~adonol Highways Authority of India

Page C- 12

Six Laning of Chilkaluripet- Yijaywada Section of NH ·5 from km 355.00 to km 434.15 (length - 82.5 km.} in the Stare of Andhra Pradesh under NHDP Phase Vas BOT (Toll) 011 DBFO Pat/em

From Cbainage, Km To Chainage, Km From Chainage, To Chalnage, Km Km

Section from Km 355 to 396.8 Section from Km 0 to 15.2 . - 355.070 355.810 0.0 0.400 358.770 359.510 1.800 2.390 362.000 364.470 3.290 4.150

364.920 365.670 5.770 6.370 366.140 366.890 7.290 8.150

368.140 368.890 9.970 10.520 370.380 37 l.l30 11.750 12.150

373.690 374.320 12.680 13.350 375.430 376.060 14.660 15.200 376.840 377.550 Section from Km 408.4 to 42-0.4 378.100 378.850 408.400 408.600 381.060 381.730 409.160 410.030 383.760 384.390 411.780 412.410 ..

385.280 385.910 414.090 414.800 387.020 387.770 417.200 418.100 387.860 388.530 419.500 420.400 388.940 389.610 Section from Km 0 to 13.S 390.780 391.530 0.0 0.200 393.460 394.130 2.650 3.050 396.370 396.890 3.150 3.840

4.100 4.690

7.100 7.500

9.860 10.530

13.200 13.550

Street Lighting App€ndix-IlI(b)

-----·---- ~-------------------·-·---· volum« ti: S1..ltedult:.t & Annexures Nation"/ Highways Authority of India