Upload
mary-hood
View
217
Download
0
Embed Size (px)
Citation preview
© Dipl.-Ing. Alfred Klees, Head of Department “Gas Supply“, DVGW Bonn 5TH EUROPEAN FORUM GAS 2007
12th and 13th September 2007, Paris
Development of a responsibility management system in
Germany─
A complete solution for fulfillment of a company‘s legal responsibilities
1. Necessity of ER | EM | ES
2. Use of ER | EM | ES
3. Technical implementation of ER | EM | ES
Roadmap:
A wide variety of laws and technical rules must be respected
Stations and facilities on site
WHGWHG
AbwasserVAbwasserV VAwSVAwS VwVwSVwVwSIndEinIV
Eigenkontrolle
IndEinIVEigenkontroll
eWGWG SchutzgebietsVSchutzgebietsV
Techn. Regeln, Normen
Techn. Regeln, Normen
ATV Regelw.
ATV Regelw.
TA Luft, TA LärmTA Luft, TA Lärm
20. BImSchV20. BImSchV BImSchGBImSchG
2. BImSchV2. BImSchV
UmweltHGUmweltHG
PrüfzV,WasBauPVO
PrüfzV,WasBauPVO
Landesbau-ordnungenLandesbau-ordnungen
BBauGBBauGEG-Bau-Produkten
Richtl.
EG-Bau-Produkten
Richtl.
Richtlinien,Normen
Richtlinien,Normen
KrW/AbfGKrW/AbfG
NachwV,AbfVerzVNachwV,AbfVerzV
ChemGChemG
GefStoffVGefStoffV
TRGSTRGS
GSGGSG
ArbSchGArbSchG
BetrSichVBetrSichV
BG Regelwerk
BG Regelwerk
Quelle: Dr. Gerhard Winter, Leiter Abteilungen Umwelt- und Arbeitsschutz, DaimlerChrysler AG, Untertürkheim
automatic provision of sound expert knowledge (laws, technical rules, etc. along with use-oriented, practical interpretation)
Supporting and easing the burden on technical managers through
Objective:
maximisation of legal certainty
automatic warning and verification mechanism
The network of experts is competent, neutral and independent.
Gas
WastewaterWater
Heating
Electricity
High-calibre, industry-specific expert network
Examples of objects
Complex technical facilities
Production equipment such as welding tools
Company staff
Organisational or qualification systems
Which laws and technical rules apply to a given object?
AD-Merkblätter
AfK-Empfehlungen
ArbSchG, ASiG
ArbStättV, ASR
BetrSichV
BImSchG,BImSchV
BGV BO der Länder
ChemG, GefStoffV EichG, EO
GPSGVEnWG, GasHL-VO
FeuV
GPSG
PSA-BV
PTB-Richtlinien
SchfG, KÜO der Länder
VDE-Bestimmungen
DVGW-VP
Example of an “object“:Pressure regulating station
1. Necessity of ER | EM | ES
2. Use of ER | EM | ES
3. Technical implementation of ER | EM | ES
Roadmap:
Predefined integrated workflows ensure that no required action is overlooked
Technical managers are relieved of routineduties
Required maintenance
measures
Required maintenance
measures
Data acquisition on company
facilities
Data acquisition on company
facilities
Object typeObject type
Classification of facilities / object type
Classification of facilities / object type
E-mail notificationFacility manager
E-mail notificationFacility manager
Scheduling of measure
Scheduling of measure
Documentation of result
Documentation of result
Implementation of measure
Implementation of measure
Confirmation of scheduling in
system
Confirmation of scheduling in
system
Determination of frequency of
measure
Determination of frequency of
measure
−
E
xper
ts
− E
xper
ts
Warning and stepped-up warning mechanism by e-mail for looming omissions
Time
Facility
Notification ofresponsible staff
Notification ofqualified staff /works manager
Notification of topexecutive
Pre-warningperiod
Escalation 1
Escalation 2Measureoverdue
Deadline formeasure
Measure
Predefined integrated workflows ensure that no required action is overlooked
Technical managers are relieved of routineduties
Required maintenance
measures
Required maintenance
measures
Data acquisition on company
facilities
Data acquisition on company
facilities
Object typeObject type
Classification of facilities / object type
Classification of facilities / object type
E-mail notificationFacility manager
E-mail notificationFacility manager
Scheduling of measure
Scheduling of measure
Documentation of result
Documentation of result
Implementation of measure
Implementation of measure
Confirmation of scheduling in
system
Confirmation of scheduling in
system
Determination of frequency of
measure
Determination of frequency of
measure
−
E
xper
ts
− E
xper
ts
1. Necessity of ER | EM | ES
2. Use of ER | EM | ES
3. Technical implementation of ER | EM | ES
Roadmap:
Technical implementation through Internet technology
Employees
Object Network of experts
Service provider
Benefits to companies
Updated expert knowledge
Automatic warning and verification mechanism
Best possible assurance of exoneration
Integrated quality management documentation
Bundling of measures
Tool for analysis
The solution for implementation of operational requirements in companies
Current users of responsibility management systems are enterprises of all industries and
sizes such as
S C H O P P E & S C H U L T Z
F E I N E S C H O K O L A D E N P R O D U K T E
Thank you for your attentionwww.dvgw.de