G(}A-IDC Business Reform Action Plan 201 7 by DIPP Procedurc and comprehensive list of documents to tre submittcd for pre- construction and post-construction NoCs, registrations and other mandatory state approvals for Building Plan Approval in Industrial Estates. I. I're-construction l. Procedure lbr obtaining amalgarnation perrnission prior to construction in industrial llstates a) [rlorvchart: Area: Building Plan Approval Recommendation 234: Publish inlbrmation aboul the proccdure ancl a conrprehensive list ol'documents including pre-construction and post-construction No Objection Ccrtificates (NOCs), registrations ancl otlrer mandatory State approvals (prior to plinth and pre - occu pancy) on the wcb site STARI' Applicant to submit application for amalgamation and amalgamation plan with Field Manager of concerned lndustrial Estate Field Manager scrutinizes the application and sends it to Regional Manager/ Deputy General Manager of the corresponding industrial area for their scrutiny alongwith scrutiny through General Manager (Engineering) place the applications for amalgamation before the 378 Regional Manager Manager post 37 B Committee evaluates the applications Application approval General Manager (Engineering section) issues approval letter STOP Yes No

 · Created Date: 10/26/2017 5:47:32 PM

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · Created Date: 10/26/2017 5:47:32 PM

G(}A-IDC

Business Reform Action Plan 201 7 by DIPP

Procedurc and comprehensive list of documents to tre submittcd for pre-construction and post-construction NoCs, registrations and other

mandatory state approvals for Building Plan Approval in Industrial Estates.

I. I're-construction

l. Procedure lbr obtaining amalgarnation perrnission prior to construction inindustrial llstatesa) [rlorvchart:

Area: Building Plan Approval

Recommendation 234: Publish inlbrmation aboul the proccdure ancl aconrprehensive list ol'documents including pre-construction and post-constructionNo Objection Ccrtificates (NOCs), registrations ancl otlrer mandatory Stateapprovals (prior to plinth and pre - occupancy) on the wcb site

STARI'

Applicant to submit application for amalgamation andamalgamation plan with Field Manager of concerned

lndustrial Estate

Field Manager scrutinizes the application and sends it toRegional Manager/ Deputy General Manager of the

corresponding industrial area for their scrutiny alongwith

scrutiny through General Manager (Engineering) place

the applications for amalgamation before the 378

Regional Manager Manager post

37 B Committee evaluates the applications

Application approval

General Manager (Engineering section) issues approval

letter

STOP

YesNo

Page 2:  · Created Date: 10/26/2017 5:47:32 PM

2. Procedurc for obtaining pennission to develop the land prior to construction inindustrial Estates

a. Flolvchart:

No Yes

b. Document checklist for Permission to develop the land (pre-construction) in

industrial Estates

o Application for land development-4 copies

o Contour Plano PhotograPhs of site

o Section plan showing the cutting and filling depths

o Allotment order

o Possession letter of ProPertY

o Drawings showing drainage and retaining r'valls

START

Applicant to submit application for land developmentand land development plan with Field Manager of

concerned I ndustrial Estate

Regional Manager and General Manager of thecorresponding industrial area for their scrutiny alongwith

nager scrutinizes application and sends to

scrutiny though General Manager (Engineering) place theapplications for amalgamation before the 378

Manager

37 B Committee evaluates the applications

Application approval

General Manager (Engineering section) approves land

development plan

STOP

Page 3:  · Created Date: 10/26/2017 5:47:32 PM

IL Post-Constructionl. Proceclure for Application lor NOC lor power connection in industrial area

a. Flowchart:

b. Document checklist for NOC lor power connection post-constructionin industrial Estates

. Application lbr NOC for power conncction

'l

START

Applicant to submit application for NOC for powerconnection with Field Manager of concerned lndustrial

E sta te

Manager scrutinizes the application and sends it toRegional Manager and Deputy General Manager of the

corresponding industrial area for their scrutiny alongwith

Regional Manager/ Deputy General Manager post theirscrutiny send it to General Manager (Engineering) for

approval

General Manager (Engineering section) provides NOC forpower connection post construction

STOP

Page 4:  · Created Date: 10/26/2017 5:47:32 PM

a

Ease of Doing Business Reforms 2017

Goa !ndustrial Development Corporation

Procedure and checklist for obtaining NOC for Water connection in lndustrialareas for the size 3/4th inch and below.

Ftowchart: Procedure for obtaining NOC for water connection in industrial areas

na Manager, Dcputy Gcncra Managcr C

conccrned industrial cstatcsign and issuc thc order for water connection post

Document checklist for issuance of NOC for water connection

. Application for water connection

. Copy of Occupancy Certificate

I

I

STAR]

Applicant to submit duly filled application form for watcrconnection with conccrncd Ficld Managcr/Arca Managcr

of respectivc lndustrial Estate

Field Managcr/Arca Managcr forwards thc application toRcgional Managcr/Dcputy Gencral Managcr of thcconcerned industrial cstatc for thcir evaluation and

Regional Manager/ Deputy Gcneral Manager post thcircvaluation, approve the application form and scnd it

back to Ficld Managcr/ Arca Managcr for acceptance ofpayment of watcr connection chargcs and dcposit

amount

Field Managcr/Area Manager accepts thc payment andputs up thc ordcr for signature of Regional

Manager/Dcputy Gcncral Managcr of thc conccrncdindustrial cstatc

STOP

Page 5:  · Created Date: 10/26/2017 5:47:32 PM

a Procedure and checklist for obtaining NOC for Water connection in lndustrialareas for the size above 3/4th inch.

Flowchart: Procedure for obtaining NOC for water connection in industrial areas

Regional Managcr/Deputy General Manager signs andissues the order for water connection, copy scnt to

concerned t.ield Manager/Accounts/Appl icant

Document checklist for issuance of NOC for water connection

. Application for water connection

. Copy of Occupancy Certificate

v

V

v

SIARI

Applicant to submit duly filled application form for watcrconnection with concerned Ficld Manager/Area Manager

of respectivc lndustrial trstate

Field Manager/Area Manager forwards the application toRegional Manager/Deputy Gencral Manager of the

concerned industrial cstate for their cvaluation

Itegional Managcr/ Deputy General Manager post theircvaluation, send it to General Managcr (Lnginee ring) for

approval

General Manager (tnginecring) approves the applicationand sends it through Regional Manager/ Deputy Ge neralManager to the concerned l-ield Manager/ Area Managcrfor acceptancc of payment of water conncction charges

and dc arnou nt

Field Manager/Area Manager accepts the payment andputs up the ordcr for signature of Regional Manager/Deputy General Manager of the concerned industrial

estate

SIOP

V

Page 6:  · Created Date: 10/26/2017 5:47:32 PM

a Procedure and checklist for obtaining NOC for Bank Loan in lndustrial areas

Flowchart: Procedure for obtaining NOC for Bank Loan in industrial areas

Document checklist for issuance of NOC for Bank Loan

. Application for NOC for Bank Loan

. Payment of relevant processing Fees by chequeo Letter from concerned Bank for mortgage of Lease Deed stating the sanctioned amount

SIART

Bank loan to Managing Dircctor, GoalDC cnclosing;relcvant processing fccs by chequc and lcttcr f rom

nApplicant to submit app ning NOC

Managing Dircctor post evaluation of submittcddocumcnts and clcarance of arrcars (if any), approvcs

the application and issucs the NOC for Bank Loan.

STOP