Business Reform Action Plan 201 7 by DIPP
Procedurc and comprehensive list of documents to tre submittcd for pre-construction and post-construction NoCs, registrations and other
mandatory state approvals for Building Plan Approval in Industrial Estates.
I. I're-construction
l. Procedure lbr obtaining amalgarnation perrnission prior to construction inindustrial llstatesa) [rlorvchart:
Area: Building Plan Approval
Recommendation 234: Publish inlbrmation aboul the proccdure ancl aconrprehensive list ol'documents including pre-construction and post-constructionNo Objection Ccrtificates (NOCs), registrations ancl otlrer mandatory Stateapprovals (prior to plinth and pre - occupancy) on the wcb site
STARI'
Applicant to submit application for amalgamation andamalgamation plan with Field Manager of concerned
lndustrial Estate
Field Manager scrutinizes the application and sends it toRegional Manager/ Deputy General Manager of the
corresponding industrial area for their scrutiny alongwith
scrutiny through General Manager (Engineering) place
the applications for amalgamation before the 378
Regional Manager Manager post
37 B Committee evaluates the applications
Application approval
General Manager (Engineering section) issues approval
letter
STOP
YesNo
2. Procedurc for obtaining pennission to develop the land prior to construction inindustrial Estates
a. Flolvchart:
No Yes
b. Document checklist for Permission to develop the land (pre-construction) in
industrial Estates
o Application for land development-4 copies
o Contour Plano PhotograPhs of site
o Section plan showing the cutting and filling depths
o Allotment order
o Possession letter of ProPertY
o Drawings showing drainage and retaining r'valls
START
Applicant to submit application for land developmentand land development plan with Field Manager of
concerned I ndustrial Estate
Regional Manager and General Manager of thecorresponding industrial area for their scrutiny alongwith
nager scrutinizes application and sends to
scrutiny though General Manager (Engineering) place theapplications for amalgamation before the 378
Manager
37 B Committee evaluates the applications
Application approval
General Manager (Engineering section) approves land
development plan
STOP
IL Post-Constructionl. Proceclure for Application lor NOC lor power connection in industrial area
a. Flowchart:
b. Document checklist for NOC lor power connection post-constructionin industrial Estates
. Application lbr NOC for power conncction
'l
START
Applicant to submit application for NOC for powerconnection with Field Manager of concerned lndustrial
E sta te
Manager scrutinizes the application and sends it toRegional Manager and Deputy General Manager of the
corresponding industrial area for their scrutiny alongwith
Regional Manager/ Deputy General Manager post theirscrutiny send it to General Manager (Engineering) for
approval
General Manager (Engineering section) provides NOC forpower connection post construction
STOP
a
Ease of Doing Business Reforms 2017
Goa !ndustrial Development Corporation
Procedure and checklist for obtaining NOC for Water connection in lndustrialareas for the size 3/4th inch and below.
Ftowchart: Procedure for obtaining NOC for water connection in industrial areas
na Manager, Dcputy Gcncra Managcr C
conccrned industrial cstatcsign and issuc thc order for water connection post
Document checklist for issuance of NOC for water connection
. Application for water connection
. Copy of Occupancy Certificate
I
I
STAR]
Applicant to submit duly filled application form for watcrconnection with conccrncd Ficld Managcr/Arca Managcr
of respectivc lndustrial Estate
Field Managcr/Arca Managcr forwards thc application toRcgional Managcr/Dcputy Gencral Managcr of thcconcerned industrial cstatc for thcir evaluation and
Regional Manager/ Deputy Gcneral Manager post thcircvaluation, approve the application form and scnd it
back to Ficld Managcr/ Arca Managcr for acceptance ofpayment of watcr connection chargcs and dcposit
amount
Field Managcr/Area Manager accepts thc payment andputs up thc ordcr for signature of Regional
Manager/Dcputy Gcncral Managcr of thc conccrncdindustrial cstatc
STOP
a Procedure and checklist for obtaining NOC for Water connection in lndustrialareas for the size above 3/4th inch.
Flowchart: Procedure for obtaining NOC for water connection in industrial areas
Regional Managcr/Deputy General Manager signs andissues the order for water connection, copy scnt to
concerned t.ield Manager/Accounts/Appl icant
Document checklist for issuance of NOC for water connection
. Application for water connection
. Copy of Occupancy Certificate
v
V
v
SIARI
Applicant to submit duly filled application form for watcrconnection with concerned Ficld Manager/Area Manager
of respectivc lndustrial trstate
Field Manager/Area Manager forwards the application toRegional Manager/Deputy Gencral Manager of the
concerned industrial cstate for their cvaluation
Itegional Managcr/ Deputy General Manager post theircvaluation, send it to General Managcr (Lnginee ring) for
approval
General Manager (tnginecring) approves the applicationand sends it through Regional Manager/ Deputy Ge neralManager to the concerned l-ield Manager/ Area Managcrfor acceptancc of payment of water conncction charges
and dc arnou nt
Field Manager/Area Manager accepts the payment andputs up the ordcr for signature of Regional Manager/Deputy General Manager of the concerned industrial
estate
SIOP
V
a Procedure and checklist for obtaining NOC for Bank Loan in lndustrial areas
Flowchart: Procedure for obtaining NOC for Bank Loan in industrial areas
Document checklist for issuance of NOC for Bank Loan
. Application for NOC for Bank Loan
. Payment of relevant processing Fees by chequeo Letter from concerned Bank for mortgage of Lease Deed stating the sanctioned amount
SIART
Bank loan to Managing Dircctor, GoalDC cnclosing;relcvant processing fccs by chequc and lcttcr f rom
nApplicant to submit app ning NOC
Managing Dircctor post evaluation of submittcddocumcnts and clcarance of arrcars (if any), approvcs
the application and issucs the NOC for Bank Loan.
STOP