© Ameresco, Inc. 2012, All Rights Reserved
Oconto FallsSchool District
October 2012 Update
Energy Performance
Progress Report
© Ameresco, Inc. 2012, All Rights Reserved
Ameresco Update
2
Introduction
This presentation is designed to provide the Oconto Falls School District with a brief update of the project status and the improvements being implemented. Ameresco will be providing these monthly updates until the project is completed.
© Ameresco, Inc. 2012, All Rights Reserved
Ameresco Update
3
Project Summary and Status STATUS
LOCATIONS IMPROVEMENT DISCRIPTIONPRE-
CONSTRUCTIONUNDER
CONSTRUCTIONCOMPLETED
District-wide Lighting retrofits & controls X District-wide Water retrofits X District-wide Building Envelope X
HS & District Office Window Film (exterior low-e) X District-wide Building Automation & Digital Control X District-wide IT Solutions and Printing Savings X
OFHS Domestic Water Heater Replacement X OFHS Electrical Transformer Upgrade X
OFESPartial Boiler Plant Upgrade & Domestic Water Replacement X
HS & WMS Kitchen Modifications X HS Roofing – Old Gym Area C X
WMS Domestic Water Replacement / Expansion X OFES & Abrams Bell / PA System Replacement X (Abrams Complete)
OFES Window Replacement (Phase I) X Abrams Boiler Plant Upgrade X
District-wideExterior Wall Restoration (Does not Inlcude the HS) X
© Ameresco, Inc. 2012, All Rights Reserved
Ameresco Update
4
Bell / PA System ReplacementSTATUS:Abrams Elementary - Complete
Oconto Falls Emanatory School - Not Yet Started
Both Schools were in need of a new Public Address/Bell Notification System upgrade. The Abrams system completely failed as a result of a lighting strike this summer. The Abrams installed system head end(hardware and software) was completed and operational on September 11th.
Benefits/Results♦ School wide notification of activities and events ♦ Capital Budget Savings
Photo taken during installation
© Ameresco, Inc. 2012, All Rights Reserved
Ameresco Update
5
Roof Replacement – HS Old Gym
STATUS:
Pre-Bid Walk through Complete
Roofing section is leaking and in need of a complete replacement. A new 30 year Roof has been designed with construction anticipated for Nov 5th.
Benefits/Results♦ Elimination of the potential for roof leakage causing interior water damage♦ Capital Budget Savings♦ Operational and Maintenance Savings
© Ameresco, Inc. 2012, All Rights Reserved
Ameresco Update
6
Lighting Retrofits and ControlsSTATUS:
LED Pilot Light Study In Progress
Ameresco installed two different manufacturer’s LED lighting systems in August down two separate halls at OFES. Each hall has three fixtures (same type) installed for testing purposes. The information and analysis from this pilot program will be the basis for interior LED lighting upgrades.
Benefits/Results♦ Energy Savings♦ Operational and Maintenance
Savings
© Ameresco, Inc. 2012, All Rights Reserved
7
Timeline
Projected Activity Estimated Date
Contract Signature Complete
- FIM Abrams Bell/PA System Upgrade Complete
- High School (Old Gym) Roofing Replacement November 5th Start date
Project Financing December 2012
Subcontractor Award/Contract November 2012
Construction Start December 2013
Project/Construction Management December 2012- July 2013
Project Completion July 2013
District Project Completion Acceptance July/August 2013
Utility Rebate Applications August 2013
Post Construction Savings Measurement and Verification
August – September 2013
© Ameresco, Inc. 2012, All Rights Reserved
AMERESCO Information and Resources
8
Kent WolfBusiness Development Manager
952.942.5142 ext. 4690Cell: 612.804.6274