Upload
baldwin-wood
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
®
Address Quality StrategyUpdate
Transformation Strategies
Reduce Costs
Increase Delivery Point Sequencing to 95%
Improve Service
Reduce UAA by 50%
By 2010 our goal is to:
Address Quality Approach
Education/Awareness
● PCC/NPF
Incentives
● OneCodeACS
Requirements
● CASS™/DPV™
Address QualityAddress Quality
Education/Awareness
NPF / PCC / MTAC
USPS Articles
Trade Press Articles
RIBBS CASS Web Site
NCSC
Sales / BSN / BME
Address QualityAddress Quality
Initiatives to Reduce UAA
Internet Change-of-Address
MTAC Recommended Best Practices
NCOALink™ Match Rates
New Temporary Change-of-Address Policy
Address Element Correction I & II
PARS ( Complete Fall 2007)
Address QualityAddress Quality
Initiatives to Reduce UAA
CASS with DPV – August 1
Move Update Requirement – Every 3 Months
Implement Move Update Requirement for Standard Mail
OneCodeACS for Use on Flats – available May 1
Address QualityAddress Quality
Future Initiatives to Reduce UAA
WG 104 on Mail List Certification
WG 113 Address/Barcode Requirements for FSS
WG 116 Great addressing to increase value of mail
Implement Mailer-specific UAA Measurement
Address QualityAddress Quality
®
CASSCASS™™ CYCLE “L” CYCLE “L”UPDATEUPDATE
®
CASS™ Cycle “L”
CASS Cycle “L” required for automation discounts beginning August 1, 2007
LACSLink™ processing is a requirement under CASS Cycle “L”
DPV™ processing is a requirement under CASS Cycle “L”
®
Performance:
Full DPV (Hash Table) showed an increase in both CPU and wall clock processing
Testing with flat file DPV proved to reduce that impact significantly
DirectDPV has reduced both CPU and wall clock processing time
®
Status:
30 manufactures have passed CASS™ Cycle L Certification on multiple platforms
1 manufacture have failed certification on 2 platforms
A list of CASS vendors is available at www.ribbs.usps.gov
®
What’s Next?
Move Update Federal Register Notice
Expect to publish this week
30-day comment period
Implementation date will be 18 months from date Federal Register Notice Published
®
What’s Next?
CASS Cycle M
Require vendor to enable the interface to SuiteLink product
Make SuiteLink available to customers upon request
®
What’s Next?
CASS Cycle N
SuiteLink required for automation rate mailings
®
Questions?