BILL OF QUANTITY
REKAPITULASI
Nama Proyek : PEMBANGUNAN RENOVASI MASJID AL FURQONLokasi Kegiatan : PERUMAHAN BINTANG METROPOOL
PEKERJAAN PERSIAPAN ( PEMBONGKARAN ) 20.358.000,00
PEKERJAAN KONSTRUKSI
A PEMBANGUNAN ALFURQON
1 PEKERJAAN STRUKTUR
A PEKERJAAN TANAH, PASIR DAN LANTAI KERJA 25.841.628,57
B PEKERJAAN PONDASI PILE CAP 117.019.000,00
C PEKERAJAAN PONDASI BATU KALI 75.107.250,00
D PEK. STRUKTUR LANTAI BAWAH 665.919.450,00
E PEK. STRUKTUR LANTAI ATAS 542.087.500,00
F PEK. STRUKTUR LANTAI ATAP & TEMPAT WUDHU 232.537.375,00
-
1.658.512.203,57
2 PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING BATA BAWAH 163.043.225,00
B PEKERJAAN PASANGAN DINDING BATA ATAS 79.296.500,00
C WATER PROOFING LT ATAP 23.960.000,00
D PEKERJAAN PELAPIS LANTAI,DINDING LT. BAWAH & ATAS 349.583.440,00
E PEKERJAAN PLAFOND GYPSUM + LIST 112.702.500,00
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA 55.000.000,00
G PEKERJAAN PENGECATAN PLAFOND 35.938.650,00
H DINDING ORNAMEN ( KERAWANGAN ) 518.480.000,00
I PEKERJAAN LIST PROFIL LT ATAS & BAWAH ) 192.941.250,00
J PEKERJAAN RAILING TANGGA & BALKON 60.300.000,00
K CAT DINDING DALAM LANTAI ATAS DAN BAWAH 34.190.700,00
L CAT DINDING LUAR LANTAI ATAS , BAWAH, KUBAH 67.500.000,00
M CAT PLAFOND 35.938.650,00
N KUBAH INDUK , KUBAH KECIL PROFIL & KRAWANGAN 1.005.405.000,00
O PEKERJAAN INTERIOR ( DINDING GRANIT RUANG MIHRAB ) 20.720.000,00
P MENARA ( STRUKTUR & FINISHING ) 84.766.800,00
-
2.839.766.715,00
3 PEKERJAAN MEKANIKAL, ELECTRIKAL & PLUMBING
1 PEKERJAAN INSTALASILISTRIK 45.280.000,00
2 PEKERJAAN INSTALASI SANITER 103.390.000,00
148.670.000,00
4 PEKERJAAN SARANA DAN PRASARANA 71.490.000,00
A HALAMAN PAVING BLOK
B PAGAR TEMBOK PINGGIR SALURAN
C SALURAN AIR
D PINTU BESI
4.738.796.918,57
II
NO SUB JUMLAHURAIAN
I
BILL OF QUANTITY
REKAPITULASI
Nama Proyek : PEMBANGUNAN RENOVASI MASJID AL FURQONLokasi Kegiatan : PERUMAHAN BINTANG METROPOOL
PEKERJAAN PERSIAPAN ( PEMBONGKARAN ) 20.358.000,00
PEKERJAAN KONSTRUKSI
A PEMBANGUNAN ALFURQON
1 PEKERJAAN STRUKTUR
A PEKERJAAN TANAH, PASIR DAN LANTAI KERJA 25.841.628,57
B PEKERJAAN PONDASI PILE CAP 117.019.000,00
C PEKERAJAAN PONDASI BATU KALI 75.107.250,00
D PEK. STRUKTUR LANTAI BAWAH 665.919.450,00
E PEK. STRUKTUR LANTAI ATAS 542.087.500,00
F PEK. STRUKTUR LANTAI ATAP & TEMPAT WUDHU 232.537.375,00
-
1.658.512.203,57
2 PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN DINDING BATA BAWAH 163.043.225,00
B PEKERJAAN PASANGAN DINDING BATA ATAS 79.296.500,00
C WATER PROOFING LT ATAP 23.960.000,00
D PEKERJAAN PELAPIS LANTAI,DINDING LT. BAWAH & ATAS 349.583.440,00
E PEKERJAAN PLAFOND GYPSUM + LIST 112.702.500,00
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA 55.000.000,00
G PEKERJAAN PENGECATAN PLAFOND 35.938.650,00
H DINDING ORNAMEN ( KERAWANGAN ) 518.480.000,00
I PEKERJAAN LIST PROFIL LT ATAS & BAWAH ) 192.941.250,00
J PEKERJAAN RAILING TANGGA & BALKON 60.300.000,00
K CAT DINDING DALAM LANTAI ATAS DAN BAWAH 34.190.700,00
L CAT DINDING LUAR LANTAI ATAS , BAWAH, KUBAH 67.500.000,00
M CAT PLAFOND 35.938.650,00
N KUBAH INDUK , KUBAH KECIL PROFIL & KRAWANGAN 1.005.405.000,00
O PEKERJAAN INTERIOR ( DINDING GRANIT RUANG MIHRAB ) 20.720.000,00
P MENARA ( STRUKTUR & FINISHING ) 84.766.800,00
-
2.839.766.715,00
3 PEKERJAAN MEKANIKAL, ELECTRIKAL & PLUMBING
1 PEKERJAAN INSTALASILISTRIK 45.280.000,00
2 PEKERJAAN INSTALASI SANITER 103.390.000,00
148.670.000,00
4 PEKERJAAN SARANA DAN PRASARANA 71.490.000,00
A HALAMAN PAVING BLOK
B PAGAR TEMBOK PINGGIR SALURAN
C SALURAN AIR
D PINTU BESI
4.738.796.918,57
II
NO SUB JUMLAHURAIAN
I
Lampiran 2 : Rencana Anggaran Biaya Pembangunan Masjid Al Furqan Bintang Metropol
Ket: Rencana Pembangunan M
asjid Al Furqon
Lampiran 3 : G
ambar / D
esain Pengembangan M
asjid Al Furqan Bintang M
etropol
A B C D E F
1
2
3
4
5
6
7
8
9
G H
Ket: Denah Atap Dak
B B D E F G
1
2
3
4
5
6
7
8
9
A H
10
Ket: Denah Lantai 1
A B C D E F
1
2
3
4
5
6
7
8
9
G H
10
Ket: Denah Lantai 2
A B C D E F
1
2
3
4
5
6
7
8
9
G H
10
Ket: Denah Struktur Lantai 2
A B C D E F
1
2
3
4
5
6
7
8
9
G H
10
Ket: Denah Struktur Lantai Atap
B B D E F G
1
2
3
4
5
6
7
8
9
A H
10
Ket: Denah Struktur Lantai 1
B B D E F GA H
Ket: Muka Mihrab
1 2 3 4 5 6 7 8 109Ket: Tampak Belakang
1234567810 9
Ket: Tampak Muka
B B D E F GA HA"
Ket: Tampak Samping
BBDEFG AH A"
Ket: Tampak Kanan