© 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

Embed Size (px)

Citation preview

Page 1: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

How to Get the Most from Integrated Project Delivery (IPD)David J. PateraTeam Project Manager & VDC Coordinator

Page 2: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Class Summary

Realizing the benefit of a “Connecting” Data Base & why Revit is a part of that Dataset but NOT the Database

Using NOT losing information How to setup the VDC process to aid in the sharing of Data Understanding the difference between Actual and Schematic Data

Page 3: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Learning Objectives

At the end of this class, you will be able to:

Setup the initial Visual VDC connections between Models & Drawings

Develop a Coordination model to facilitate the IPD process

Add Qualitative Data and Non Visual Data to the Dataset

Understand IPD phasing of Actual of Schematic Models

Page 4: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Quick review of How IPD Works…

Page 5: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

The Order not the Process

Page 6: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

What is Data???

Page 7: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Everyone uses the term, but what is it?

Page 8: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

So you have a door…

Frame

Panel

Page 9: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

And it has DATA…

Page 10: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Complexity… What about Rooms…Departments…

Page 11: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Databases… Its What makes IPD Possible

Page 12: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Information Overload and Lost Data

Page 13: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

So what is the solution?

It depend on your firm there is no one size fits all.

3 Principles Simplify input for Users Simplify Data extraction for Users Reduce possibilities for Human error

by developing processes and standards that are not dependent on the User

Page 14: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Schematic vs. Actual

Schematic Data is information collected and developed that gives the instructions for the built environment

Examples: Architectural, MEP, & Structural

Models Civil Drawings Design Notes Equipment providers drawings

Actual is as close to an as-built as possible. It is the data developed from the schematic data

Examples: Contractor’s Model Subcontractors Models CA Documentation Facility Management

Documentation

Page 15: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Learning Objectives

4 Steps:

Setup the initial Visual VDC connections between Models & Drawings

Page 16: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Learning Objectives

4 Steps:

Setup the initial Visual VDC connections between Models & Drawings

Develop a Coordination model to facilitate the IPD process

Add Qualitative Data and Non Visual Data to the Dataset

Page 17: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Learning Objectives

4 Steps:

Setup the initial Visual VDC connections between Models & Drawings

Develop a Coordination model to facilitate the IPD process

Add Qualitative Data and Non Visual Data to the Dataset

Understand IPD phasing of Actual of Schematic Models

Page 18: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Understanding the Timeline

Page 19: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

The Time Crunch

Page 20: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

The Process (One Zone at a time)

Page 21: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

The Process (As a whole)

An

y G

iven

D

ay

An

y G

iven

D

ay

Page 22: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Learning Objectives

4 Steps:

Setup the initial Visual VDC connections between Models & Drawings

Develop a Coordination model to facilitate the IPD process

Add Qualitative Data and Non Visual Data to the Dataset

Understand IPD phasing of Actual of Schematic Models

Now just maintain, report and support…

Page 23: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

How to Get the Most from Integrated Project Delivery (IPD)

Thank You!!!

Contact Information:

David J. Patera

Email: [email protected]: 402.730.0679

Page 24: © 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator

© 2012 Autodesk

Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2012 Autodesk, Inc. All rights reserved.