Upload
randell-matthews
View
216
Download
3
Embed Size (px)
Citation preview
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
Update for Low Income
Public Meeting
August 13, 2008
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
We’re starting to recreate our relationship with customers
and transforming our company
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
SDG&E’s Business Case Overview• Approved April 2007
• Since then field tests complete and conducted 2nd RFP
• Install 1.4 million smart/AMI electric meters for all customers
• Solid-state electric meter technology
• 2-way communications
• 4 channels
• Next-day data for customers online/phone
• Remote disconnect/connect integrated within meter
• Programmable load limiting switch
• Adding module to existing 900,000 gas meters
• Home area network (HAN)
• Local connectivity to remote devices, load control technology
• Programmable communicating thermostats (PCTs) for Small/Medium C&I
• Vendor and technology neutral
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
SDG&E’s Business Case Overview cont.
• Electric interval data reads – residential hourly, C&I every 15 mins.
• Daily gas reads
• On demand reads, demand reset
• Support price responsive tariffs (TOU, CPP, PTR)
• Information systems, integration with legacy systems
• Firmware downloadable to the meter
• Remote device configuration/firmware & feature updates
• Tamper/theft
• Voltage
• Outage/restoration
• Security architecture
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
2-Way Communications
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
Schedule
• Q4 2007 – Field tests complete
• Q2/3 2008 – Initial installations of technology in Tierrasanta
• July 2008 – Final technology contract signed with Itron (meters/modules/networks comms)• Will be responsible for managing installation vendor
• Q1 2009 – Mass installations begin
• 2011 – Mass installations complete
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
2008 Initial Installations
• 3,500 electric meters
• 2,000 gas meter modules
• Network communications
• Test vendor performance
• Meter readers will manually reading
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
Integrated Communications
• Test everything possible that will be used in mass deployment – dress rehearsal
• Maintain positive customer experience
• Manage expectation of functionality
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
Monthly Deployment Rate 2.3 Million Electric Meters and Gas Modules
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Preliminary DRAFT
© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved
For More Info
• Internet: www.sdge.com/smartmeter
• E-Mail us at: [email protected]
Thank you!