Upload
-
View
233
Download
0
Embed Size (px)
Citation preview
7/31/2019 2 ( lean 1)
1/19
LEAN
(7 Waste )
Fredrick Talor , Henry Ford
Gilbreth
.. 1900 Frederick W. Taylor
(Scientific Management)
7/31/2019 2 ( lean 1)
2/19
1. (Motion)
2. (Defect)
3. (Waiting)
4. (Inventory)
5. (Transportation)
6. (Over Production)
7. (Process itself)
7 7 Wastes
7/31/2019 2 ( lean 1)
3/19
HenryFord Ford
Model T. 720 1 (MassProduction)
7/31/2019 2 ( lean 1)
4/19
1949 Ford 8
Taiichi Ohno Shigeo Shingo JIT Just In Time
7/31/2019 2 ( lean 1)
5/19
MUDA 3
1. JIT
2. Jidoka
3. Kaizen
Just in time
7/31/2019 2 ( lean 1)
6/19
= +
= -
7/31/2019 2 ( lean 1)
7/19
5
Poka-Yoke Jidoka
TPM
Total preventiveMaintenance
kanban SMED
Just in
time
7/31/2019 2 ( lean 1)
8/19
Lead
Time
Cost
Quality
1.2.3.4.
5.6.7. 8.
9.10.11.12.
13.
7/31/2019 2 ( lean 1)
9/19
Lead
Time
Cost
Quality
14.15.16.17.
18.19.20.
7/31/2019 2 ( lean 1)
10/19
1.
2. ( )
3.
7/31/2019 2 ( lean 1)
11/19
1. Maximum Flexibility2. Maximum coordination3. Space utilization
4. Maximum accessibility5. Maximum distance6. Minimum distance7. Minimum handling
9. Safety10. One directional flow
7/31/2019 2 ( lean 1)
12/19
Layout
Raw Material Inventory ( Warehouse)
Manufacturing Line , Assembly Line
Fixed- Position Layout Process Layout Product Layout
Cellular or Combination
7/31/2019 2 ( lean 1)
13/19
Fixed Process Product
,
7/31/2019 2 ( lean 1)
14/19
7/31/2019 2 ( lean 1)
15/19
1 1 hr 40
1 1 hr 40
1 1 hr 200
48hr
2,000
7/31/2019 2 ( lean 1)
16/19
7/31/2019 2 ( lean 1)
17/19
7/31/2019 2 ( lean 1)
18/19
Flow process Chart
7/31/2019 2 ( lean 1)
19/19