Chapter 1 - Safety in the Engine Room Original Date: 01 Mar. 2008 Version No.1 Page: Revision Date: Revisio n No:0 1 of 24 1. Safety in the Engine Room Safety is paramount to any working environment. Working on ships especially in the engine room where considered a high hazard area, safety procedure must be in placed at all times to prevent any uncontrollable circumstances. Safety procedures and accident prevention measures shall be reviewed periodically and crew motivation and awareness shall be enhanced continuously to adapt the working situation. Fig. 1-1 Safety Concerns 1.1 Principles to be observed in the Conduct of an Engineering Watch In the conduct of watch in the engine room the following principles should be observed:

› 1 NYK Engine Cadet Course Handouts(Safety)

Embed Size (px)

Citation preview

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 1 of 18

1.

Safety in the Engine Room Safety is paramount to any working environment. Working on ships especially in the engine room where considered a high hazard area, safety procedure must be in placed at all times to prevent any uncontrollable circumstances. Safety procedures and accident prevention measures shall be reviewed periodically and crew motivation and awareness shall be enhanced continuously to adapt the working situation. Fig. 1-1 Safety Concerns

1.1

Principles to be observed in the Conduct of an Engineering Watch In the conduct of watch in the engine room the following principles should be observed: a. The Chief Engineer is the officer in-charge of the engineering watch and is primary responsible at all times for the safe and efficient operation, maintenance and inspection of machineries affecting the safety of the ship, its personnel and the environment. b. The Chief Engineer representative or the engineer officers in charge of the engineering watch when designated must be responsible in lieu of the Chief Engineers primary responsibility in an engineering watch. c. Watch arrangement is adequate and arranged suitable to the prevailing circumstances and in accordance to safety management system.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 2 of 18

d. When taking over the watch, the engineer officer in charge of the engineering watch shall not hand-over the watch to the relieving officer if there is reason to believe that the relieving officer is not capable of carrying out watchkeeping duties effectively and in which case the Chief Engineer shall be informed accordingly. e. The relieving duty engineer shall ensure that the members of the relieving duty personnel are fully capable of performing their duties effectively. f. Prior taking over of watch, the relieving duty engineer shall satisfy themselves to the engine room conditions relating to safety, operation and maintenance conditions of machineries, standing orders and special instructions, etc. g. When performing the engineering watch, the designated duty engineer shall ensure that: i. ii. the established watchkeeping arrangements are maintained; any machinery not functioning properly, expected to malfunction or requiring special services or attention shall be noted including the action already taken; iii. the duty engineer at all times is readily capable of operating the propulsion equipment in response to needs for changes in direction or speed; iv. the duty engineer shall be immediately available and on call to attend the machinery spaces during UMS operation; v. all bridge orders are promptly executed; vi. all machinery and equipment which maybe used related to maneuvering is in a state of immediate readiness and that available reserve power is available for steering gear and other requirements when the engine room is put on stand-by condition; vii. the duty engineer make himself free of any obligatory function other than supervising and assisting the personnel working under his watch, safe and efficient operation and upkeep of machinery and the conduct of adequate rounds in the machinery spaces to prevent any malfunction. He must devote his time during his watch in maintaining the safe and efficient operation of the engine room until he is relieved; viii. duty engineer must notify the Chief Engineer in any event such as abnormality of critical machineries, emergency stop of the main engine, electric power supply is lost, unusual increase of bilge water, there is order from bridge to change the engine speed, hazards to navigation, injury to personnel, and danger of polluting the sea. 1.2 Watchkeeping Arrangement in Engine Room Suitable watchkeeping arrangement shall be employed in the engine room in consultation with company SMS procedures, the master of the ship and the prevailing circumstances as deems Chief engineer judgment may not be impaired that all aspects of safe watchkeeping procedures are in placed keeping in foremost the following objectives; Safety of Life at Sea, Safe Operation of Ships, Environmental Protection and Security. 1.2.1 Unmanned Machinery Spaces (UMS) Watch

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 3 of 18

UMS watch or sometimes called as MO watches is being conducted in the engine room capable of maintaining the operation and relevant safety requirements without any personnel involved at certain periods. The UMS watch must be commenced depending on the Chief Engineer judgment that it is technically practicable in accordance with the UMS Check List and that the machinery space has clear of danger and the safe operation is established. UMS watch is conducted on daily basis commonly during night time and should not be more than 24 hours in duration. Checking of machinery parameters and condition should be done at least once in 24 hours period using the form UMS Checklists. This is to ensure that the machinery spaces operation and safety procedures are in placed. Designated duty engineer (1/E, 2/E and 3/E) of the day to carry out the UMS watch, must make himself available within the nearest areas or in his cabin to ensure that any alarms relating to machinery spaces during the watch should be properly attended to. 1.2.1 Manned Engine Room Watch Manned engine room is a common arrangement in an older designed ships wherein the machinery spaces is kept manned in 24 hours to maintain safe operation and prevents any danger to arise. In the modern ships, manned engine room is also being conducted when the ship is in entering/leaving port situation, during heavy weather condition, etc. Designated duty engineer is taking a 4-hourly watch twice in a day and carrying out maintenance works of machinery assigned to him. A rating is also designated to assist the duty engineer in keeping safe operation and maintenance in the engine room. The watch schedule is as follows: 1st Engineer 2nd Engineer 3rd Engineer 04~0800/16~2000 hours 00~0400/12~1600 hours 08~1200/20~2400 hours

The above schedule is sometimes changed when additional engineer is available onboard and commonly the 1 st Engineer is taking charged of the daily jobs or the maintenance works. 1.2.3 In-Port Watch When the ship is approaching her destination or in the port, the engine room under manned or UMS arrangement should be prepared suitable to the operational demand such as entering/leaving port operation, cargo work operation, etc. Watchkeeping arrangement in the engine room varies depending on the situation and is arranged in accordance with the operational requirements of the machinery.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 4 of 18

Commonly when the ship is entering/leaving port, the Chief Engineer is taking charge of the watch and reinforces the watch arrangement in the engine room. Additional personnel (electrician, cadets, etc.,) are stationed in the engine room to assist in the machinery space operation. 1.3 Routine Operation and Maintenance When conducting routine operation and maintenance in the engine room, the following activities is the norm procedures that are being conducted to ensure that safe and efficient operation and maintenance is adhered to. Safety aspect is also enhanced when various precautionary measures, safety training and hazard prediction activities are applied. 1.3.1 The Toolbox Meeting Toolbox meeting is a meeting conducted to coordinate job description, schedule of the day and other matters to ensure safety in the workplace at all times. The meeting is being conducted at every start and end of work hours. All the crew that are involved to the specific maintenance jobs in the engine room and other places onboard are briefed accordingly, stating the work schedule, various safety procedures, the relevant outcome required and the hazards involved. All crew before carrying out maintenance jobs must make themselves involved in a toolbox meeting at all time. Fig. 1.3.1-1 The Toolbox Meeting The Toolbox MeetingWhat about you, Cadet? Do you have any suggestions regarding our safety procedure?

1.3.2 Pointers in Conducting Toolbox Meeting a. Choose specific jobs to be done during the day. b. Be prepared to discuss hazards involved, safety procedures, company instruction, plans, materials, etc., which are related to the jobs.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 5 of 18

c. Get the crew actively involve in the meeting as: i. Talking about real life example (case study) of safety concerns and hazards related to the job. ii. Let the crew suggest and ask question related to the topics. iii. Ask feed back from them about the meeting. iv. Involve the crew in preparing for and/or leading future meetings. d. Follow up and look back into complaints, suggestions and concerns brought out by the crew, let them informed of the results and keep records of the meeting. e. Conduct Hazard Prediction Training (Kiken Yochi Training (KYT) in Japanese). 1.3.3 Hazards Prediction Training (KYT) KYT is a training method developed by Japanese, which is being conducted through pre-work meetings or other procedures, where workers are given advance warning of various unsafe conditions or unsafe behavior related to the job activity, and thereby ensuring their own personal safety and the safety of others around them. a. Point and Call A method used to prevent accidents by human errors by making every action is clear in which work accuracy is improve. Point and call are applied by confirming correct action before performing it and confirming correct action after performing it. Fig. 1.3.3-1 Point and Call Method Confirm correct action before performing it ! Close the valve, Turn right, OK !

OK, This valve is Closed !

"OK, close the valve. Turn right"

Confirm correct action before performing it !

b. Point and Repeat

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 6 of 18

Point and repeat is method by which every crew points to an object together and name it in unison. This aims to focus everyones attention on one goal thereby enhance the team sense of identity and solidarity to achieve the goal. Point and repeat generally conducted at the start and end of the workday. This method is also effective in preventing accidents due to error. One person is asking the task to be done and the other person is confirming and mutually agreeing if the task is correct. Both person are pointing to the object to work on and repeating the task and action for confirmation. In this manner, errors or mistakes are avoided. Fig. 1.3.3-2 Point and Repeat Method

Switch on, OK!

Switch on, OK!

i. Touch and Call It is a type of point and repeat with every crew are in physical contact and chanting a slogan to a certain jobs to be performed. This aims to promote safe actions consciously and unconsciously, prevents careless, absent minded behavior. Fig. 1.3.3-3 Touch and Call Method

"Touch and Call"

"Let's go for zero accidents, OK!"

c. Lock In/Tag-out It is applies to servicing and maintenance of machines and equipment, a method used to ensure that any equipment to be work on is totally isolated, in which the unexpected start up or release of stored energy is not allowed, and lock in that will not cause any harm i.e., putting the switch in off position, removal of fuse in

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 7 of 18

the panel and putting notice tag-out in the source, i.e., control panel, switchboard. The emphasis of this method is to the worker who is doing the jobs and all the control for accident prevention are lie on him Fig. 1.3.3-4 Lock In/Tag-out Method

1.3.4 Near-miss Activities and Reporting in the Engine Room Near-miss is defined as an incident or event happened that does not cause accident or injury to personnel or damage to machinery but has the potential to do so. According to the Heinrich`s Law, there are about 300 near-miss cases and 29 small incidents behind one serious accident. This goes true in daily operation in the engine room and near-miss incidents should be properly identified by reporting activities, compiling and analyzing data to plan for preventative measures. Near-Miss 3000 activities which has introduced by NYK line onboard their vessels are intended to identify and neutralize the factors that could cause accidents/or vessel trouble. NYK believes that near-miss activities alone do not cover the full scope of accidents warnings and causes. As such, the company places importance on uncovering unsafe conditions and acts, addressing relevant issues on a case to case basis as part of the problem identification activities. Examples of such conditions and behavior include slippery passageways or difficulty in seeing safety warnings. NearMiss 3000 reflects the companys recognition of 3000 unsafe acts and conditions, which crews are encouraged to be alert in their working environment.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 8 of 18

Fig.1.3.4-1 Heinrichs Law

1Heinrich's Law

Serious Accident

29 300 3000

Minor Accidents/Troubles

Lapses/Mistakes

Unsafe Acts/Unsafe Conditions

Fig.1.3.4-2 Near-Miss Factors for the Year 2004 (Source: NYK Line)

Procedural violation 26% Others 34% Lack of planning 7% Inadequate knowledge 14% Communication 4%

Poor design 5%

Poor maintenance 9%

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 9 of 18

In engine room, there are many dangerous possibilities lurking behind of near miss. Some of them lead to serious injury. Following cases are examples of incidents that that should be taken seriously and the same situation shall be avoided.

Fig.1.3.4-3 Examples of Near-MissesLOCATION Degree of Serious DEVIL (Unsafe Act and Unsafe Condition) Primary Cause Neglect, Procedural Violation, or Unsafe Act Mis-operation or Error in Working Procedure: due to the poor instruction Inadequate Knowledge/Un derstanding: due to the lack of education DEVIL (Unsafe Act and Unsafe Condition) DEVIL (Unsafe Act and Unsafe Condition) Missing or Disordered Equipment or Documents: due to the bad arrangement Description It was found that some steel pipes in engine room near the boiler were not properly secured. It may cause damage to the boiler and other equipments when the vessel rolls in rough sea area. Every time the washing machine for dirty clothes is being used, low insulation alarm of 100V occurs. It was due to water overflowing of washing machine. Some water splash over washing machine motor and it was grounded. In steering room fresh water tank level gauge valves were always open. To avoid water leaking when the level gauge glass is broken, these valves must be closed.

Workshop/ Machinery space

Crew Accommodation

DEVIL (Unsafe Act and Unsafe Condition)

Others (Specify in Description)

DEVIL (Unsafe Act and Unsafe Condition) Near Miss (Slight trouble or a minor accident was avoided) DEVIL (Unsafe Act and Unsafe Condition) DEVIL (Unsafe Act and Unsafe Condition)

Engine Room

A crewmember was lifting and painting main engine spare exhaust valve. In lunchtime he left engine room without securing the exhaust valve.

Engine Room

While overhauling of No.2 ballast pump to replace mechanical seal due to leakage, the valve was accidentally opened, causing possible water flooding on E/R. After a stormy weather, it was found out that emergency generator room was wet because rain came inside. The cause was leakage water into watertight door.

Others (Specify in Description)

In NYK ships, Near-Miss 3000 Activity is being enforced and one of the objectives is to raise the awareness of safety among crewmembers and motivate them to make improvements on the scene. Every crew members are encouraged to participate, identify any near-miss observed and do correction directly as much as possible, report data to the company and to have the company effectively prepare countermeasures against troubles.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 10 of 18

You, as cadet have the potential to cause an accident, and the potential to prevent an accident, improve the state of your ship and nip trouble in the bud and raise your situational awareness. This means that in every activity or working procedure in the engine room shall be incorporated with near-miss identification and correction to prevent an accident. Thus, DEVIL Hunting is introduced and continuously follows up by all crew. It is very essential in keeping the engine room a safe place to work and free of machinery troubles. DEVIL: (Unsafe Act/Condition) or simply Dangerous Events and Irregular Looks. Fig.1.3.4-4 Devil Hunting

Fig.1.3.4-5 Procedures for Near-Miss and Devil Hunting

Step A All crewmembers search for near misses and DEVIL's in the ship, and submit report if found.

Step B The contents of the submitted reports should be confirmed and discussed to determine the necessary measures.

Step D Introduce submitted reports and corrective actions to all crewmembers. Submit reports to the company.

Step C Measures are conducted on the basis of the discussions. And permanent corrective actions are taken, if necessary.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 11 of 18

The above procedure should kept in a continuous cycle and to take improvements whenever is necessary. Fig.1.3.4-6 Near-Miss Report Form, below figure is used to write down datas of any event related to near-miss/DEVIL acts in the engine room by the crew. It should be filed to a near-miss box located at the ships office or at the designated areas.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 12 of 18

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 13 of 18

Fig.1.3.4-7 Cutting of Empty Drum

Please make a water tank with this drum.

Lets cut the lid by gas cutting.

Some oil was still left.

In the figure above, a serious injury occurred to the personnel due to wrong procedure for the work that was carried out. If the near-miss activity was conducted, the possible hazards can be identified and necessary preventative measure can be drawn up and implemented accordingly. 1.4 What To Do in Case of an Emergency It is very essential that every personnel must know how to deal and cope with an emergency or in case of machinery trouble specifically in the engine room. Familiarity of the machinery spaces is a must for all the personnel working in these areas in order for them to act in any prevailing situation. Various situations must be grasps in order for them to act according to what is required in an event of; 1.4.1 Fire Fire is one of the catastrophic scenarios when occurred in the engine room. Combustion mostly occurs when the three elements of fire (heat, fuel and air) are present. These three elements of fire are always presents in the engine room, especially in machinery spaces and working areas. The best method of fighting a fire is prevention. Any flammable materials will not emit fire when properly handled and kept in proper location.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 14 of 18

Fig. 1.4.1-1 Fire in the Engine Room

When occurrence of fire in the engine room is observed, the following measures should be done: a. Keep calm and fight the fire with available fire extinguishing agent at hand when fire has just only started. When two persons detect the fire, another person shall do the raising of the alarm. b. Raise the alarm and inform the bridge of the location, kind of combustible materials, etc., c. Continue to fight the fire if applicable and if impossible, look for a safe place near the location of fire, coordinate with the on-scene leader of the firefighting team and give information such as the cause of fire, any crew in the vicinity of fire, initial firefighting applied, scope of the spread of fire and the estimated time outbreak of the fire. d. When the on-scene leader grasps all the information, ask permission to proceed in your muster station and follow the instruction of your team leader. Notes: i. Best fire fighting agent is prevention. ii. Initial action when fire is detected is foremost important to successfully contain the fire. 1.4.2 Black-out Black-out or electrical power outages is an occurrence when the electrical power generator or other ancillarys related equipment fails the supply of electricity onboard.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 15 of 18

This scenario is very rare to occur but proper knowledge in prevention and countermeasures is a must for engineer officers to take charge of an engineering watch. When Black-out occurrence prevails, do the following: a. Initially, the duty engineer must check and try to recover the electrical power supply and report the situation to the bridge and to the Chief Engineer. b. Identify the direct cause and judge the possibility of restarting the main electric power supply, or of starting the auxiliary or stand-by generator and closing ACB, etc. c. Restart the auxiliary or stand-by generator automatically or manually and close the ACB. d. Stop, slow-down and restart the operation of the main engine as occasion demands. e. Sequentially restart the vital auxiliary machinery or manually restart them in succession as occasion demands while watching the electrical loads. f. Restart the other auxiliary machinery such as purifier, air cond. system, etc. g. Recover and maintain the operating parameters of the main engine. h. Investigate the cause and take countermeasures. 1.4.3 Flooding Flooding is an occurrence when there is breakage of sea water piping or tearing of the ships hull that will cause flowing of sea water in the engine room. When flooding is detected in the engine room, you should: a. Raise alarm to crew around, notify the bridge and give information regarding the situation and inform the Chief Engineer. b. Conduct initial damage control bearing in mind the following concerns: i. Isolation of the affected area. ii. Protects all machinery especially those used for damage and flooding control such as the electrical equipments, pumps, etc. c. When the on-scene leader has arrived, brief him regarding the situation such as the location of source of water, the possible cause, etc. d. When all relevant information has given to the on-scene leader, ask permission to proceed to your muster station and follow the order of your team leader. 1.5 Hazards Related to Job Activities in the Engine Room Various hazards are involved while working in the engine room. Some cases are discussed here are to be used for guidance and may not be complete. It is recommended that hazards related to job activities are to be identified and discussed among the crew to improve the safety procedures and to prevent accidents. a. Drilling hole on metal using bench drill machine.

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 16 of 18

Point of Hazards: i. Not wearing of safety goggles or glass. Metal chip/ powder may likely enter the eyes. ii. Wearing of gloves. The hands maybe caught by the rotating elements of the machine. iii. Work piece is unsecured and is using the hand. Work piece must be fastened by securing tool to avoid swinging and thrown due to rotating force that may cause injury to a person (Fig. 1.6-1 Drilling Hole).

b. Grinding work on bench grinder. Point of Hazards: i. Work supporting block clearance (d) is too big. Block clearance must be adjusted to minimum distance to support the work piece and to avoid flying off. ii. Work piece is secured by pliers. Pliers cannot support the work piece securely and may cause the work piece to fly-off (Fig. 1.6-2 Grinding).

c. De-burring work. Point of Hazards: i. The work is not secured completely, it maybe sent off flying. ii. The air sander may jump-off from the hand that can hurt the user (Fig. 1.6-3 De-burring work).

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 17 of 18

d. Cleaning of filter elements in the workshop. Point of Hazards: i. Cleaning of filter while welding jobs is being carried out on the other side. This can cause fire in the area, if the chemical is combustibles and used as cleaning materials. ii. Do not work at welding area as this may injured your eyes. iii. Water shall not be used near the welding area otherwise electric shock may occur (Fig. 1.6-4 Filter Cleaning). e. Lifting/Carrying of objects while in the Engine Room Point of Hazards: i. Lifting position. Even though the lifting position is correct and the weight is enough, never attempt to lift object above you. This will cause tip-off especially when the ship experience rolling or pitching. ii. Non-secure objects. Avoid manual lifting of heavy object and as much as possible ensure that it is fully secure. Use lifting devices as necessary or ask assistance when carrying heavy objects. Be careful with stairs. When lifting object in stairs, always free up one hand to hold on rail (Fig. 1.6-5 Lifting Object). f. Working with ladder. Point of Hazards: i. Falls from height above the ground. Select the right ladder for the job. Never splice two ladders at a time. ii.Falling tool and equipment. Secure all tools that are being used on top. iii. Slips. Be sure to position the ladder and properly secured (Fig. 1.6-6 Work with Ladder).

Chapter 1 - Safety in the Engine Room

Original Date: 01 Mar. 2008 Revision Date:

Version No.1 Revision No:0

Page: 18 of 18

g. When entering a tank for inspection or maintenance. Point of Hazards: i. Asphyxiation from oxygen deficiency. Oxygen content of the tank must be continuously monitored as most of accidents inside the tanks are caused by oxygen deficiency. ii.Falls As the tank was not cleaned, be precautious in stepping at the steps and flooring. iii. Communication Failure. Common problems when entering tanks is communication. Use buddy system and always confirm that proper communication is established at all times (Fig. 1.6-7 Entering a Tank).