240
Page 1 2011 4059 0001 02 80 Parliament / State/ Union Territory Legislatures Capital Outlay on Public Works State/Union Territory Legislatures General 101 103 051 Legislative Assembly Legislative Secretariat Construction Voted: Voted: Voted: Voted: Voted: Charged: Charged: Charged: Charged: Charged: Total Grant or Appropriation Available(+)/over spent(-) balance Amount at the beginning of the Month(Col7 in prev Actual Expenditure for the Current Mont Progressive Expenditure upto the current month Available Balance (+) Over Spent amount(-) %of expenditure (Col6)to total Grant or Appropriation 3510.69 3294.29 200.00 1000.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 255.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3510.69 3294.29 200.00 1000.00 100.00 255.76 0.00 0.00 0.00 0.00 +3510.69 +3294.29 +200.00 +1000.00 +100.00 +255.76 +0.00 +0.00 +0.00 +0.00 281.79 436.07 0.00 0.00 0.00 14.62 0.00 0.00 0.00 0.00 281.79 436.07 0.00 0.00 0.00 14.62 0.00 0.00 0.00 0.00 +3228.90 +2858.22 +200.00 +1000.00 +100.00 +241.14 +0.00 +0.00 +0.00 +0.00 O S R Total +8.03 +13.24 +0.00 +0.00 +0.00 +5.72 +0.00 +0.00 +0.00 +0.00 Report on Expenditure of Grant Number For the month of 04-2021 Government of UTTARANCHAL 8104.98 255.76 0.00 0.00 0.00 0.00 8104.98 255.76 +8104.98 +255.76 717.87 14.62 717.87 14.62 +7387.11 +241.14 Total of Voted: Total of Charged: +8.86 +5.72 Sl 1 2 1 2 3 5 4 6 7 8 (Rupees in Lakhs) Head 03 03 02 03 04 Legislative Assembly Legislative Assembly Secretariat Board Assembly House, Construction of Guest houses etc. Construction of Legislative assembly during summer in Gairsen Pooled Housing Scheme (Ongoing works)

Voted: Total Grant or Appropriation Available(+)/over spent

Embed Size (px)

Citation preview

Page 1

2011

4059

0001

02

80

Parliament / State/

Union Territory

Legislatures

Capital Outlay on

Public Works

State/Union Territory

Legislatures

General

101

103

051

Legislative Assembly

Legislative

Secretariat

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

3510.69

3294.29

200.00

1000.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

255.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3510.69

3294.29

200.00

1000.00

100.00

255.76

0.00

0.00

0.00

0.00

+3510.69

+3294.29

+200.00

+1000.00

+100.00

+255.76

+0.00

+0.00

+0.00

+0.00

281.79

436.07

0.00

0.00

0.00

14.62

0.00

0.00

0.00

0.00

281.79

436.07

0.00

0.00

0.00

14.62

0.00

0.00

0.00

0.00

+3228.90

+2858.22

+200.00

+1000.00

+100.00

+241.14

+0.00

+0.00

+0.00

+0.00

O S R Total

+8.03

+13.24

+0.00

+0.00

+0.00

+5.72

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

8104.98

255.76

0.00

0.00

0.00

0.00

8104.98

255.76

+8104.98

+255.76

717.87

14.62

717.87

14.62

+7387.11

+241.14

Total of Voted:

Total of Charged:

+8.86

+5.72

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

02

03

04

Legislative Assembly

Legislative Assembly Secretariat

Board Assembly House, Construction of Guest houses etc.

Construction of Legislative assembly during summer in Gairsen

Pooled Housing Scheme (Ongoing works)

Page 2

0001

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 3

2012

0002

03

President,Vice-

President/ Governor/

Administrator of

Union Territories

Governor/Administrato

r of Union

Territories

090

101

102

103

Secretariat

Emoluments and

Allowances of the

Governor/Administrato

r of Union

Territories

Discretionary Grants

Househed

Establishment

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

704.76

42.00

75.00

23.90

254.84

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

704.76

42.00

75.00

23.90

254.84

0.01

0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+704.76

+42.00

+75.00

+23.90

+254.84

+0.01

+0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

91.49

7.00

0.15

2.87

32.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

91.49

7.00

0.15

2.87

32.91

0.00

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+613.27

+35.00

+74.85

+21.03

+221.93

+0.01

+0.01

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+12.98

+16.67

+0.20

+12.02

+12.92

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

03

02

03

04

05

Establishment Expenses

Governor

Discretionary Grants by Governor

Employe category

Staff Group

Grant of Maintenance and Renewal of Decorations

Special grant for renewal of Curtains

Page 4

0002

105

106

107

108

Medical Facilities

Entertainment

Expenses

Expenditure from

Contract Allowance

Tour Expenses

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

62.18

7.30

0.68

10.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

62.18

7.30

0.68

10.00

10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+62.18

+7.30

+0.68

+10.00

+10.00

0.00

0.00

0.00

0.00

0.00

6.99

0.00

0.00

0.96

0.00

0.00

0.00

0.00

0.00

0.00

6.99

0.00

0.00

0.96

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+55.19

+7.30

+0.68

+9.04

+10.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+11.24

+0.00

+0.00

+9.64

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00

1190.68

0.00

0.00

0.00

0.00

0.00

1190.68

+0.00

+1190.68

0.00

142.38

0.00

142.38

+0.00

+1048.30

Total of Voted:

Total of Charged:

+0.00

+11.96

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

03

03

04

03

03

Medical Expenses

Entertainment/Protocol Expenses Allowance

Hospitality Allowances

Expenses from Contract Allowance

Tour Expenses

Page 5

2013

4059

0003

00

60

Council of Ministers

Capital Outlay on

Public Works

Other Buildings

101

104

105

108

800

Salary of Ministers

and Deputy Ministers

Entertainment and

Hospitality Expenses

Discretionary Grant

by Ministers

Tour Expenses

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

380.00

5.00

350.00

9500.36

7500.00

100.00

407.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

380.00

5.00

350.00

9500.36

7500.00

100.00

407.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+380.00

+5.00

+350.00

+9500.36

+7500.00

+100.00

+407.20

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

57.87

0.00

0.00

0.00

0.00

0.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.87

0.00

0.00

0.00

0.00

0.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+322.13

+5.00

+350.00

+9500.36

+7500.00

+99.24

+407.20

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+15.23

+0.00

+0.00

+0.00

+0.00

+0.76

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

03

03

05

03

03

Salary and Other Admissible Allowances of Ministers, and Speaker of Legislative Assembly

Amount of Income Tax Payable to the Government of India charged from the State Government

Entertainment & Hospitality Expenses

Discretionary Grant by Chief Minister

Lump-sum Grant amount in favour of Hon'bl Chief Minister's Anouncements etc.

Tour Expenses of Ministers & Deputy Ministers

Miscellaneous Expenditure by Ministers & Deputy Ministers

Page 6

0003

800 Other Expenditure

Voted:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

13920.55 0.00 0.00

0.00 0.00 0.00

13920.55

0.00

+13920.55

+0.00

0.00

0.00

0.00

0.00

+13920.55

+0.00

O S R Total

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

32163.11

0.00

0.00

0.00

0.00

0.00

32163.11

0.00

+32163.11

+0.00

58.63

0.00

58.63

0.00

+32104.48

+0.00

Total of Voted:

Total of Charged:

+0.18

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

02 Lump-sum Grant amount in favour Hon'ble Chief MInister's Anouncements etc.

Page 7

2014

0004

00

Administration of

Justice

102

105

108

114

High Courts

Civil and Session

Courts

Criminal Courts

Legal Advisers and

Counsels

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

179.61

14102.20

1096.52

68.40

7.59

2267.08

1825.95

1337.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5441.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

179.61

14102.20

1096.52

68.40

7.59

2267.08

1825.95

1337.26

5441.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+179.61

+14102.20

+1096.52

+68.40

+7.59

+2267.08

+1825.95

+1337.26

+5441.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.40

15.26

1223.02

63.68

3.18

0.00

197.59

131.24

0.00

530.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.40

15.26

1223.02

63.68

3.18

0.00

197.59

131.24

0.00

530.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-0.40

+164.35

+12879.18

+1032.84

+65.22

+7.59

+2069.49

+1694.71

+1337.26

+4910.29

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

-100.00

+8.49

+8.67

+5.81

+4.65

+0.00

+8.72

+7.19

+0.00

+9.75

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

03

04

06

95

03

03

04

High Court

Central Plan/Centrally Sponsored Schemes

District and Session Judge

Family Court

Court of Railway Magistrate

Regular Establishment

Advocate General

Legal Advisors & Standing Councils

Page 8

4059

0004

60

Capital Outlay on

Public Works

Other Buildings

800

051

Other Expenditure

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4.29

500.84

401.06

755.59

21.04

25.00

377.75

252.66

20.00

300.00

3600.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.29

500.84

401.06

755.59

21.04

25.00

377.75

252.66

20.00

300.00

3600.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4.29

+500.84

+401.06

+755.59

+21.04

+25.00

+377.75

+252.66

+20.00

+300.00

+3600.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

56.66

23.74

44.13

1.07

0.00

16.95

2.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56.66

23.74

44.13

1.07

0.00

16.95

2.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4.29

+444.18

+377.32

+711.46

+19.97

+25.00

+360.80

+250.48

+20.00

+300.00

+3600.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+11.31

+5.92

+5.84

+5.10

+0.00

+4.49

+0.86

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

04

05

06

07

08

09

10

12

13

01

Uttarakhand State Low Commission

Public Service Tribunal

State Legal Service Authority

District Legal Service Authority

Office of the Chief Administrator, Nainital

Transfer of amount in Advocates Welfare Fund equal to its Treasury Receipts

Uttarakhand Judicial and Legal Academy

Lok Adalat

State Legal Assistance Fund

Page 9

0004

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

1500.00

420.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

1500.00

420.00

0.00

0.00

0.00

0.00

+10.00

+1500.00

+420.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+1500.00

+420.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

29072.84

5441.00

0.00

0.00

0.00

0.00

29072.84

5441.00

+29072.84

+5441.00

1779.09

530.71

1779.09

530.71

+27293.75

+4910.29

Total of Voted:

Total of Charged:

+6.12

+9.75

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

04

05

95

Central Plan/Centrally Sponsored Scheme

Residential/Non-residential Buildings

Construction work in the State Administrative Academy, Nainital

Page 10

2015

0005

00

Elections

103

105

106

109

Preparation and

Printing of Electoral

Rolls

Charges for conduct

of Elections to

Parliament

Charges for conduct

of elections to

State/Union Territory

Legislature

Charges for conduct

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

650.00

1053.50

1442.86

682.50

50.08

0.11

8280.31

285.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

650.00

1053.50

1442.86

682.50

50.08

0.11

8280.31

285.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+650.00

+1053.50

+1442.86

+682.50

+50.08

+0.11

+8280.31

+285.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.17

70.99

0.00

0.00

0.00

0.00

7.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.17

70.99

0.00

0.00

0.00

0.00

7.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+650.00

+1053.33

+1371.87

+682.50

+50.08

+0.11

+8280.31

+277.05

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.02

+4.92

+0.00

+0.00

+0.00

+0.00

+2.79

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

05

95

03

04

03

05

Central Plan/Centrally Sponsored Scheme

Legislative Assembly and Parliament (50 per cent Centrally Sponsored)

Establishment Expenditure of Election (50% Centrally Sponsored)

General Election

By-election

General Election-State Legislative Assembly

By-election State Legislative Assembly

Page 11

4059

0005

60

Capital Outlay on

Public Works

Other Buildings

051

of election to

Panchyats

Construction

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

288.88

1016.78

750.00

787.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

288.88

1016.78

750.00

787.50

0.00

0.00

0.00

0.00

+288.88

+1016.78

+750.00

+787.50

+0.00

+0.00

+0.00

+0.00

12.89

1.29

0.00

0.00

0.00

0.00

0.00

0.00

12.89

1.29

0.00

0.00

0.00

0.00

0.00

0.00

+275.99

+1015.49

+750.00

+787.50

+0.00

+0.00

+0.00

+0.00

O S R Total

+4.46

+0.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

15287.52

0.00

0.00

0.00

0.00

0.00

15287.52

0.00

+15287.52

+0.00

93.29

0.00

93.29

0.00

+15194.23

+0.00

Total of Voted:

Total of Charged:

+0.61

+0.00

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

02

03

01

95

State Election Commission (for local bodies etc.)

State Election Commission district level

Central Plan/Centrally Sponsored Scheme

Page 12

2029

2052

0006

00

Land Revenue

Secretariat - General

Services

001

101

103

Direction and

Administration

Collection Charges

Land Records

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

598.83

224.50

66.67

8663.80

416.85

15972.72

0.03

300.00

176.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

598.83

224.50

66.67

8663.80

416.85

15972.72

0.03

300.00

176.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+598.83

+224.50

+66.67

+8663.80

+416.85

+15972.72

+0.03

+300.00

+176.86

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

37.74

0.00

0.00

490.25

0.00

1044.05

0.00

0.00

9.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37.74

0.00

0.00

490.25

0.00

1044.05

0.00

0.00

9.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+561.09

+224.50

+66.67

+8173.55

+416.85

+14928.67

+0.03

+300.00

+167.16

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+6.30

+0.00

+0.00

+5.66

+0.00

+6.54

+0.00

+0.00

+5.49

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

06

03

01

03

05

06

07

Land Acquisition-General RevenueExpenses

Strengthening of Revenue Police

Land acqisiton rehabilitation and resettlement authority

Collection Charges of Land Revenue, Taquavi Canals & Other Misellaneous Government Dues

Central Plan/Centrally Sponsored Schemes

District Establishment

National Land Resources Management Work

Expenditure on written test for selection/training of Revenue Sub inspector(Patwari/Accountant)

Revenue

Page 13

2053

2062

0006

00

00

00

District

Administration

Vigilence

vigilance

099

093

101

103

105

Board of Revenue

District

Establishments

Commissioners

Lokayukata/Up-

Lokayukata

Other Vigilence

Agencies

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

544.48

17487.88

2600.00

150.00

586.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

244.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

544.48

17487.88

2600.00

150.00

586.09

0.00

0.00

0.00

0.00

0.00

0.00

244.55

+544.48

+17487.88

+2600.00

+150.00

+586.09

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+244.55

26.62

1162.94

0.00

0.00

25.94

0.00

0.00

0.00

0.00

0.00

0.00

27.74

26.62

1162.94

0.00

0.00

25.94

0.00

0.00

0.00

0.00

0.00

0.00

27.74

+517.86

+16324.94

+2600.00

+150.00

+560.15

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+216.81

O S R Total

+4.89

+6.65

+0.00

+0.00

+4.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+11.34

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

05

03

02

Revenue Commissioner Establishment

Establishment of Collectorate

Untied Fund on the disposal of District Magistrate

Regarding the arrangement during the vidhan Sabha sessiion in the Fairsen (Bhardisain) district Chamol

Headquarter

Lok aayukt organisation

Page 14

2070

0006

00

Other Administrative

Services

003

104

105

106

107

Training

Vigilance

Special Commission of

Enquiry

Civil Defence

Home Guards

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1188.81

301.04

1001.51

5.00

0.20

7.16

164.56

11168.80

1208.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1188.81

301.04

1001.51

5.00

0.20

7.16

164.56

11168.80

1208.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1188.81

+301.04

+1001.51

+5.00

+0.20

+7.16

+164.56

+11168.80

+1208.33

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

127.67

20.86

21.51

0.00

0.00

0.00

3.30

658.33

75.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

127.67

20.86

21.51

0.00

0.00

0.00

3.30

658.33

75.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1061.14

+280.18

+980.00

+5.00

+0.20

+7.16

+161.26

+10510.47

+1132.66

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+10.74

+6.93

+2.15

+0.00

+0.00

+0.00

+2.01

+5.89

+6.26

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

04

03

07

04

03

03

03

04

Vigilance Establishment

Right to Service Commission

State Administrative Academy, Nainital

Training under RTI

Vigilance Establishment

State Commission & Committee

Establishment (25 per cent CentrallySponsored)

General Establishment

Page 15

2245

0006

05

Relief on account of

Natural Calamities

State Disaster

Response Fund

800

101

Other Expenditure

Transfer to Reserve

Funds and Deposit

Accounts Calamity

Relief Fund

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

40.00

20.00

1175.11

386.13

1.00

3.00

93700.00

104100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40.00

20.00

1175.11

386.13

1.00

3.00

93700.00

104100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+40.00

+20.00

+1175.11

+386.13

+1.00

+3.00

+93700.00

+104100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

432.41

25.58

0.00

0.00

0.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

432.41

25.58

0.00

0.00

0.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+40.00

+20.00

+742.70

+360.55

+1.00

+3.00

+93700.00

+103100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+36.80

+6.63

+0.00

+0.00

+0.00

+0.96

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

09

10

11

13

15

16

01

02

Part Payment of Expenditure by Government of India (25 per cent)

Home Guards Welfare Fund

Payment of Premium for the Insurance of Home guards

Arrangment of Kumboh Mela

Establishment of Information Commission

Panel formation for Right to Information

Police recruitment and other operational Programmes

Central Plan/Centrally Sponsored Scheme

Disaster relief fund expenditure

Page 16

0006

80 General

901

102

Deduct - Amount met

from Calamity Relief

Fund

Management of Natural

Disasters,

Contingency Plans in

disaster prone areas

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10400.00

-104100.00

300.00

689.58

2000.00

338.01

435.53

0.01

500.00

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10400.00

-104100.00

300.00

689.58

2000.00

338.01

435.53

0.01

500.00

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10400.00

-104100.00

+300.00

+689.58

+2000.00

+338.01

+435.53

+0.01

+500.00

+400.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

3.76

4.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.76

4.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10400.00

-104100.00

+300.00

+689.58

+2000.00

+334.25

+431.15

+0.01

+500.00

+400.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+1.11

+1.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

01

01

02

04

05

07

08

09

10

Central Plan/Centrally Sponsored Scheme

Central Plan/Centrally Sponsored Scheme

Disaster Management Authority

Rehabilitation of the households affected by natural disasters

Operation of District Emergency Center

District Disaster Management Authority

Tambakani Nala shoot Treatment work under Vrunawat mountain

Retrofitting of govermment office toprotect against earthquakes and other disasters

State relief fund

Page 17

2506

4059

0006

00

60

Land Reforms

Capital Outlay on

Public Works

Other Buildings

800

102

051

Other Expenditure

Consolidation of

Holdings(2)

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1300.00

2000.00

6053.73

1486.43

1200.00

50.00

50.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1300.00

2000.00

6053.73

1486.43

1200.00

50.00

50.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1300.00

+2000.00

+6053.73

+1486.43

+1200.00

+50.00

+50.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

95.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

95.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1300.00

+2000.00

+6053.73

+1391.31

+1200.00

+50.00

+50.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+6.40

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

7

8

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

11

97

01

03

03

07

09

12

Disaster reduction fund

External Aided schemes (SDMA)

Central Plan/Centrally Sponsored Scheme

kheton kee chakabandee

Construction of Residential/non-residential Buildings of Tehsils

Construction of Collectorate Buildings

Construction of Patwari Chowkies

Construction of non-residential building of headquarter of district home guards offices, district training

Page 18

4070

4250

0006

00

00

Capital Outlay on

other Administrative

Services

Capital Outlay on

Other Social Services

003

101

Training

Natural Calamities

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2600.00

100.00

35000.00

390.00

300.00

40.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2600.00

100.00

35000.00

390.00

300.00

40.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2600.00

+100.00

+35000.00

+390.00

+300.00

+40.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2600.00

+100.00

+35000.00

+390.00

+300.00

+40.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

223892.66

244.55

0.00

0.00

0.00

0.00

223892.66

244.55

+223892.66

+244.55

5265.86

27.74

5265.86

27.74

+218626.80

+216.81

Total of Voted:

Total of Charged:

+2.35

+11.34

Sl

9

10

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

15

16

97

02

02

04

05

Rehabilitation of damaged assets with disaster for Distrist Collectors

Construction work in ATI

External Aided schemes (SDMA)

Treatment of Varunavat Pravat Under Tambakhani nala shut

Maintenance of District Disaster Management Centers

Disaster Management Authority

Page 19

0006

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 20

2030

0007

01

02

03

Stamps and

Registration

Stamps-Judicial

Stamps-Non-Judicial

Registration

101

102

101

102

001

Cost of stamps

Expenses on sale of

Stamps

Cost of stamps

Expenses on sale of

Stamps

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

20.00

80.00

20.00

300.00

312.85

1067.53

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

80.00

20.00

300.00

312.85

1067.53

20.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+80.00

+20.00

+300.00

+312.85

+1067.53

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.12

8.45

21.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.12

8.45

21.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+80.00

+20.00

+299.88

+304.40

+1045.81

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.04

+2.70

+2.03

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

03

03

03

04

05

Judicial Stamps

Judicial Stamps

Non-judicial Stamps

Non-Judicial Stamps

Headquarter

District Expenses

Page 21

2040

2043

0007

00

00

Taxes on Sales, Trade

etc.

Collection Charges

under State Goods and

Services Tax

Collection Charges

under State Goods and

Services Tax

001

800

001

101

Direction and

Administration

Other Expenditure

Direction and

Administration

Collection Charges

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

153.56

4000.00

1106.05

0.11

90.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

153.56

4000.00

1106.05

0.11

90.00

0.00

0.00

0.00

0.00

0.00

0.00

+153.56

+4000.00

+1106.05

+0.11

+90.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

92.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

92.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+153.56

+4000.00

+1013.34

+0.11

+90.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+8.38

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

05

03

05

06

Compensation of Stamp Registration in Local Bodies Area

Establishment of Commercial Tax Authority

Returns under Value Added Tax (VAT)

Establishment

Establishment of commercial Tax Advisor Committe

Insurance Scheme for Registered Dealers

Page 22

2045

2047

0007

00

00

Other Taxes and

Duties on Commodities

and Services

Other Fiscal Services

102

800

103

103

800

Interest paid on

delayed Refunds of

SGST

Other Expenditure

Collection Charges-

Electricity Duty

Promotion of small

Savings

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

9214.95

1.00

450.00

223.04

448.23

147.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9214.95

1.00

450.00

223.04

448.23

147.67

0.00

0.00

0.00

0.00

0.00

+9214.95

+1.00

+450.00

+223.04

+448.23

+147.67

+0.00

+0.00

+0.00

+0.00

+0.00

652.77

0.00

0.00

0.00

24.66

8.79

0.00

0.00

0.00

0.00

0.00

652.77

0.00

0.00

0.00

24.66

8.79

0.00

0.00

0.00

0.00

0.00

+8562.18

+1.00

+450.00

+223.04

+423.57

+138.88

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.08

+0.00

+0.00

+0.00

+5.50

+5.95

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

02

02

03

03

03

Commercial Tax Establishment

Interest paid on delayed Refunds of SGST

State share in GSTN

Directorate of Electricity Security

State Small Saving Organisation

Page 23

2048

2049

0007

00

01

Appropriation for

reduction or

avoidance of Debt

Interest Payments

Interest on Internal

Debt

797

101

Transfer from/to

Reserved Funds and

Deposited Accounts

Interest on Market

Loans

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25000.00

5000.00

12158.00

15442.00

24240.00

19561.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25000.00

5000.00

12158.00

15442.00

24240.00

19561.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+25000.00

+5000.00

+12158.00

+15442.00

+24240.00

+19561.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2097.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2097.50

0.00

0.00

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+25000.00

+5000.00

+10060.50

+15442.00

+24240.00

+19561.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+17.25

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

6

7

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

22

23

24

25

26

Establishment of Implementing Indian Partnership Act, Societies, Chit fund Act

Transferring of Consolidated Debt clearance Fund of the State Development Loan

Transfer of Securities to Corresponding Debt Redemption Fund given by the State Governmen

State Development Loan received in2011-12

State Development Loan received in2012-13

State Development Loan received in2013-14

State Development Loan received inthe year 2014-15

Page 24

0007

115

123

200

Interest on Aurthopay

Advance from RBI

Interest on Special

Securities issued to

National Small

Savings Fund of the

Central Government by

State Government.

Interest on Other

Internal Debts

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34259.00

40795.90

51489.40

52894.50

36797.00

42968.00

30000.00

4000.00

100000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34259.00

40795.90

51489.40

52894.50

36797.00

42968.00

30000.00

4000.00

100000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+34259.00

+40795.90

+51489.40

+52894.50

+36797.00

+42968.00

+30000.00

+4000.00

+100000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

997.50

4764.60

4541.50

3037.50

2047.50

7834.00

0.00

0.82

4312.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

997.50

4764.60

4541.50

3037.50

2047.50

7834.00

0.00

0.82

4312.24

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+33261.50

+36031.30

+46947.90

+49857.00

+34749.50

+35134.00

+30000.00

+3999.18

+95687.77

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2.91

+11.68

+8.82

+5.74

+5.56

+18.23

+0.00

+0.02

+4.31

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

27

28

29

30

31

32

02

03

03

State Development Loan, Receive in year 2015-16

State development loan which receive in year 2016-17

State Development Loans, which was received in 2017-18

State Development Loans, which was received in 2018-19

Market loan received in the financial year 2019-20

Market loan received in the financial year 2020-21

Interest on Ways and Means advances

Interest on Loans for State Development from small Saving Organisations

Page 25

0007

03 Interest on Small

Savings, Provident

Fund, etc.-

305

104

108

Management of Debt

Interest on State

Provident Funds

Interest on Insurance

and Pension Fund

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2500.00

0.01

28000.00

0.01

800.00

70000.03

450.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2500.00

0.01

28000.00

0.01

800.00

70000.03

450.00

0.01

0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2500.00

+0.01

+28000.00

+0.01

+800.00

+70000.03

+450.00

+0.01

+0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.00

0.00

0.00

0.00

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2500.00

+0.01

+28000.00

+0.01

+787.00

+70000.03

+450.00

+0.01

+0.01

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+1.63

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

07

12

03

03

04

05

06

03

Interest on Loan received from National Co-operative Development Corporation

Interest on Erstwhile Uttar Pradesh Negotiable Loans

Loan received from NABARD and Interest on Other

Interest on Loans received from R.E.C.

Expenditure on Loan Management

Provident Fund

Interest on Provident Fund of IAS Officers

Interest on Contributory Provident Fund

Interest on Contributory Provident Pension Fund

Interest on Employees Group Insurance Scheme

Page 26

0007

04

05

60

Interest on Loans and

Advances from Central

Government-

Interest on Reserve

Funds

Interest on Other

Obligations-

101

105

101

701

Interest on loan for

State/Union Territory

Plan Schemes

Interest on General

and other Reserve

Funds

Interest on Deposits

Miscellaneous

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

350.00

6500.00

5500.00

7500.00

35.00

0.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

350.00

6500.00

5500.00

7500.00

35.00

0.75

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+350.00

+6500.00

+5500.00

+7500.00

+35.00

+0.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+350.00

+6500.00

+5500.00

+7500.00

+35.00

+0.75

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

02

03

03

04

05

Share of Interest on Central Government Loans under UP Reorganisation Act, 2000

Interest on State Disaster Response Fund

Interest on Employees Provident (balance as per PLA of Treasuries )

Interest on late payments for death & Retirement Benefits

Payment on Interest on late payments of Pension/leave Encashment

Page 27

2052

0007

00

Secretariat - General

Services

090 Secretariat

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

17399.40

2.00

100.52

40.00

20.54

86.38

5.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2000.00

22.00

17000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17399.40

2.00

100.52

40.00

20.54

86.38

5.00

20.00

2000.00

22.00

17000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+0.00

+17399.40

+2.00

+100.52

+40.00

+20.54

+86.38

+5.00

+20.00

+2000.00

+22.00

+17000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

2071.74

0.00

9.56

0.00

0.00

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2071.74

0.00

9.56

0.00

0.00

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+0.00

+15327.66

+2.00

+90.96

+40.00

+20.54

+81.63

+5.00

+20.00

+2000.00

+22.00

+17000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+11.91

+0.00

+9.51

+0.00

+0.00

+5.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

8

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

08

03

04

05

08

11

12

13

14

Interest for New Pension Scheme

Interest on Library Development Fund

Transfer of interest of campa fund

Secretariat-Establishment

Development and Extention of Secretariat Documentation Centre and Library

Establishment of Residence Commissioner, New Delhi

Expenditure on Natioanl Festivals and Feasts

Establishment of Secretariate Training & Management Institute

Establishment of Legal Cell

Honorarium to Private Staff of Speaker

Grant-in-Aid for various Sports Tournaments in Secretariat

Page 28

0007

091

092

Attached Offices

Other Ofices

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

15.00

6254.34

156.18

57.96

57.55

43.30

140.73

83.26

97.70

7.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

350.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

6254.34

156.18

57.96

57.55

43.30

140.73

83.26

97.70

7.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

350.00

+15.00

+6254.34

+156.18

+57.96

+57.55

+43.30

+140.73

+83.26

+97.70

+7.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+350.00

0.00

189.61

5.91

2.68

3.07

0.00

16.25

3.93

8.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

189.61

5.91

2.68

3.07

0.00

16.25

3.93

8.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+15.00

+6064.73

+150.27

+55.28

+54.48

+43.30

+124.48

+79.33

+89.33

+7.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+350.00

O S R Total

+0.00

+3.03

+3.78

+4.62

+5.33

+0.00

+11.55

+4.72

+8.57

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

19

03

04

05

07

09

10

12

15

16

02

03

Gopan Vibhag

State-Estate Department

Directorate of Budget, Treasury Planning and Resources

Lump-sum arrangement for surplusStaff of various Departments in different Districts

Inspection Offices

Establishment of Institutional Finance Cell

Directorate of Finance Commission

Establishment of Finance Audit Cell

Establishment of Pay Commission Cell

D.b.t. cell

Payment to government employees againsts employee provident fund deposit insurance scheme

Funds relating to decree by Hon. Courts

Page 29

2054

0007

00

Treasury and Accounts

Administration

003

095

097

098

Training

Directorate of

Accounts and

Treasuries

Treasury

Establishment

Local Fund Audit

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

300.00

4000.00

30.10

662.83

192.69

1429.50

7231.55

172.62

308.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

4000.00

30.10

662.83

192.69

1429.50

7231.55

172.62

308.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+4000.00

+30.10

+662.83

+192.69

+1429.50

+7231.55

+172.62

+308.59

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

58.52

12.22

0.00

674.84

14.15

25.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

58.52

12.22

0.00

674.84

14.15

25.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+4000.00

+30.10

+604.31

+180.47

+1429.50

+6556.71

+158.47

+282.71

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+8.83

+6.34

+0.00

+9.33

+8.20

+8.39

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

9

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

97

02

03

05

07

03

04

05

Financial Training and Research Institution

Project Funded by USDAID

Establishment of Treasury and Financial Services

Establishment of Departmental Accounts

Financial data center

Treasury Establishment

Pay & Account Office in Uttarakhand Niwas, New Delhi

Accounts Organisation of District Panchayats & Regional Committee

Page 30

2070

2071

0007

00

01

Other Administrative

Services

Pension and Other

Retirement Benefits

Civil

003

101

102

Training

Superannuation and

Retirement Allowances

Commuted value of

Pensions

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1225.27

100.00

220000.00

37000.00

72.00

18500.00

5000.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1225.27

100.00

220000.00

37000.00

72.00

18500.00

5000.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1225.27

+100.00

+220000.00

+37000.00

+72.00

+18500.00

+5000.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

93.65

0.00

17360.23

2282.60

0.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

93.65

0.00

17360.23

2282.60

0.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1131.62

+100.00

+202639.77

+34717.40

+71.57

+18500.00

+5000.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.64

+0.00

+7.89

+6.17

+0.59

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

10

11

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

02

03

04

07

03

04

05

Directorate of Audit

Supranuation and Retirement Allowances

Uttar Pradesh State Electricity Board before partition

Roadways Employees retired from Transport Corporation

Commuted Value of Pension

UP State Electricity Board before Partition

Page 31

0007

103

104

105

106

Compassionate

allowance

Gratuities

Family Pensions

Pensionary charges in

respect of High Court

Judges

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

0.02

31000.00

800.00

96200.00

5500.00

0.01

200.00

27.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.02

31000.00

800.00

96200.00

5500.00

0.01

200.00

27.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.02

+31000.00

+800.00

+96200.00

+5500.00

+0.01

+200.00

+27.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

21.25

0.00

9478.04

504.31

0.00

0.00

0.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.25

0.00

9478.04

504.31

0.00

0.00

0.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.02

+30978.75

+800.00

+86721.96

+4995.69

+0.01

+200.00

+26.92

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.07

+0.00

+9.85

+9.17

+0.00

+0.00

+0.31

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 998385.77 +998385.77 56557.06 56557.06 +941828.71Total of Voted: +5.66

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

07

03

03

04

03

04

05

06

07

Commutation to the Employees of Khadi Gramodyog Board

Retired Employees from Transport Corporation

Compassionate Allowance

Gratuties

U.P. Electricity Board prior to partition

Family Pension

UP State Electricity Board before partition

Family Pension to Khadi Gramodyog Board

Indian Administrative Service Pensioner

Retired Employees from Transport Corporation

Page 32

0007

107

108

109

111

115

Contributions to

Pensions and

Gratuities

Contributions to

Provident Funds

Pension to Employees

of State Aided

Educational

Institutions

Pensions to

Legislature

Leave Encashment

Benifits

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.01

0.02

0.01

51500.00

0.01

16000.00

49000.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.01

0.02

0.01

51500.00

0.01

16000.00

49000.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.01

+0.02

+0.01

+51500.00

+0.01

+16000.00

+49000.00

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

2.53

0.00

0.00

4756.99

0.00

1463.38

4166.74

38.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.53

0.00

0.00

4756.99

0.00

1463.38

4166.74

38.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+97.48

+0.02

+0.01

+46743.01

+0.01

+14536.62

+44833.26

+1461.18

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+2.53

+0.00

+0.00

+9.24

+0.00

+9.15

+8.50

+2.59

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Total of Charged:

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

03

03

04

05

06

03

Contribution to Pension and Gratuities

Contribution to Pensions and Gratuties

Contribution to Provident Funds

Facilities to Aided Non-Government Higher Secondary Schools

Retirement Facilities to the Teaching/Non-teaching Staff of Non-Government Aide Degree Coll

Pension to the teaching/Non-teaching Staff of Government Universities

Retirement benefits to the Teaching/Non-teaching Staff of Basic Education

Pension to MLC Member of State Legislative Council

Page 33

2515

3435

0007

00

Other Rural

Development

Programmes

Ecology and

Environment

117

200

800

102

Government

Contribution for

Defined Contribution

Pension Scheme

Other Pensions

Other Expenditure

Community Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

34815.03

70000.00

0.02

300.00

2500.00

5.00

54505.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34815.03

70000.00

0.02

300.00

2500.00

5.00

54505.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+34815.03

+70000.00

+0.02

+300.00

+2500.00

+5.00

+54505.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

692.77

2489.33

0.00

0.00

10.74

0.00

0.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

692.77

2489.33

0.00

0.00

10.74

0.00

0.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+34122.26

+67510.67

+0.02

+300.00

+2489.26

+5.00

+54504.27

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+1.99

+3.56

+0.00

+0.00

+0.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

12

13

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

03

06

04

09

91

Leave Encashment benefits at Retirement/Dismissal

State Government Contribution

Ex-gratia Pension to the TemporaryGovernment Staff on being Blind orHandicapped during Service

Payment to CRA under New Pension Scheme

Assistance to Special Medical Treatment to Retired Officers/Officials of State Governme

Allowances to the domestic servantsfor retired Officers of State Judicial /Higher Judicial Service

District Plan

Page 34

3451

3454

0007

03

00

Secretariat -Economic

Services

Census,Surveys and

Statistics

Environment Research

and Ecological

Regeneration

102

092

Environmental

Planning and

Coordination

Other Offices

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

239.55

558.48

300.00

9.21

0.01

355.00

109.20

5.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

239.55

558.48

300.00

9.21

0.01

355.00

109.20

5.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+239.55

+558.48

+300.00

+9.21

+0.01

+355.00

+109.20

+5.03

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

41.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+239.55

+516.58

+300.00

+9.21

+0.01

+355.00

+109.20

+5.03

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+7.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

14

15

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

05

07

08

10

11

Environment Directorate

Planning Establishment

Valuation of Planned Development Programs

Establishment of Border (Seemant) Area Development Authority

Formation of Project Development Fund

Scheme for Strengthening of Training Programs

Establishment of PPP Cell

Youth commission Uttarakhand

Page 35

3604

0007

01

02

00

Compensation and

Assignments to Local

Bodies and Panchayati

Raj Institutions

Census

Surveys and

Statistics

001

112

800

200

Direction and

Administration

Economic Advice and

Statistics

Other Expenditure

Other Miscellaneous

Compensation and

Assignments

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.05

2145.48

114.77

5.00

92.79

80410.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.05

2145.48

114.77

5.00

92.79

80410.07

0.00

0.00

0.00

0.00

0.00

0.00

+0.05

+2145.48

+114.77

+5.00

+92.79

+80410.07

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

210.18

6.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

210.18

6.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.05

+1935.30

+107.96

+5.00

+92.79

+80410.07

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+9.80

+5.93

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

16

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

03

05

01

CSS

Establishment of Economics and Statistics

Establishment of twenty point program Implementation

Grant-in-Aid to NIC State Unit

Establishment of GIS cell and GO portal

CSS

Page 36

4059

0007

01

80

Capital Outlay on

Public Works

Office Buildings

General

051

051

800

Construction

Construction

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

122028.00

150.00

10.00

98.99

200.00

10500.00

2014.96

15000.00

5000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

122028.00

150.00

10.00

98.99

200.00

10500.00

2014.96

15000.00

5000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+122028.00

+150.00

+10.00

+98.99

+200.00

+10500.00

+2014.96

+15000.00

+5000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

9024.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9024.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+113003.16

+150.00

+10.00

+98.99

+200.00

+10500.00

+2014.96

+15000.00

+5000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.40

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

17

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

03

04

03

01

08

17

18

State finance commission

Construction of Treasury/Sub-Treasury building

Finance Training and Research Institute

State planning commission/Directorate building construction

Construction of Legislative assembly during summer in Gairsen

Central Plan/Centrally Sponsored Scheme

Acquisitian of Land/ Building for Offices Subordinate to Finance Deptt.

Important installation work

Page 37

4216

0007

01

02

Capital Outlay on

Housing

Government

Residential Buildings

Urban Housing

700

800

Other Housing-Scheme

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.00

500.00

0.01

100.00

20.00

3000.00

100.00

50.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

500.00

0.01

100.00

20.00

3000.00

100.00

50.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+500.00

+0.01

+100.00

+20.00

+3000.00

+100.00

+50.00

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+500.00

+0.01

+100.00

+20.00

+3000.00

+100.00

+50.00

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

18

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

11

12

14

15

16

17

18

Construction of Chief Secretary level Residential Building

Construction of Residential/ Non-Residential Buildings by State Estate Department

Extention, Renewal etc. of Uttarakhand Residence, New Delhi

Acquisition of Radha Bhawan Estate for State Guest House in Mussoriee

Establishment of Uttarakhand Emporium & Building at Mumbai

Construction of new Buildings of Uttarakhand Niwas (New Delhi) after Demolation of old Building

Renovation of State Guest House, Nainital

Construction of State Guest House at Rudraprayag and Haridwar

Construction of Secretariat Building(Phase-1) at Raipur (Dehradun)

Legislative Assembly and other establishment construction related work at Bharisen (Gairsen) (SPA)

Page 38

6003

0007

80

00

Internal Debt of the

State Government

General

001

101

105

108

Direction and

Administration

Market Loans

Loans from the

National Bank for

Agricultural and

Rural Development

Loans from National

Co-operative

Development

Corporation

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1500.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

140000.00

3.89

85000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1500.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

140000.00

3.89

85000.00

+1500.00

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+140000.00

+3.89

+85000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50000.00

0.00

0.00

+1500.00

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+90000.00

+3.89

+85000.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+35.71

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

19

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

19

02

03

04

03

04

Construction of Mini Secretariat in District Chamoli at Bharisen (Gairsen)

Unnecessary building demolition/Re-formation/Renovation in Secretariat C

Payment of Market Loans bearing interest

Payment of Market Loans not bearing interest

Re-payment of Loans to NABARD

Page 39

6004

0007

01

02

Loans and Advances

from the Central

Government

Non-Plan Loans

Loans for State /

109

110

111

800

800

Loans from other

Institution

Ways and Means

Advances from the

Reserve Bank of India

Special Securities

issued to National

Small Saving Fund of

the Central

Government

Other Loans

Other Loans

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2000.00

10.00

110000.00

80000.00

22.00

110.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2000.00

10.00

110000.00

80000.00

22.00

110.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2000.00

+10.00

+110000.00

+80000.00

+22.00

+110.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5368.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5368.05

0.00

0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2000.00

+10.00

+110000.00

+74631.95

+22.00

+110.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+6.71

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

20

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

03

03

03

Payment of Loans to National Co-operative Development Corporation

Loan from Other Institutions

Repayment of Ways & means Advances

Payment of Loan of National Small Saving Fund

Other Loans

Repayment of Loans received at the time of Partition UP and Government of India

Page 40

7610

7615

0007

03

04

00

Loans to Government

Servants etc.

Miscellaneous Loans

Union Territory Plan

Schemes

Loans for Central

Plan Schemes

Loans for Centrally

Sponsored Plan

Schemes

101

800

800

201

Blocks Loans

Others Loans

Others

House Building

Advance

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

0.00

0.00

10.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7000.00

1.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

30.00

7000.00

1.00

10.00

0.00

0.00

+0.00

+0.00

+0.00

+10.00

+30.00

+7000.00

+1.00

+10.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+0.00

+0.00

+10.00

+30.00

+7000.00

+1.00

+10.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

21

22

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

03

03

04

Lump-sum Borrowings

Development Loan

Co-operative

Construction/repair Advance to IAS Officers

Advance to State Employees for Construction/repair of House

Page 41

0007

00

200 Miscellaneous Loans

Voted:

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

100.00

0.00

0.00

+10.00

+100.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+100.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

998385.77

1059769.51

0.00 0.00 1059769.51 +1059769.51 85014.21 85014.21 +974755.30 +8.02

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

02

03

Loans to MLA s for purchase of Motor Vehicles

Loans for purchasing vehicles for legislators

Page 42

2039

0008

00

State Excise

001 Direction and

Administration

Voted:

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

829.12

2678.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

829.12

2678.03

0.00

0.00

+829.12

+2678.03

+0.00

+0.00

58.88

184.63

0.00

0.00

58.88

184.63

0.00

0.00

+770.24

+2493.40

+0.00

+0.00

O S R Total

+7.10

+6.89

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

3507.15

0.00

0.00

0.00

0.00

0.00

3507.15

0.00

+3507.15

+0.00

243.51

0.00

243.51

0.00

+3263.64

+0.00

Total of Voted:

Total of Charged:

+6.94

+0.00

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

03

04

Establishment

Distilleries

Page 43

2051

4059

0009

00

60

Public Service

Commission

Capital Outlay on

Public Works

Other Buildings

102

103

051

Public Service

Commission

Staff Selection

Commission

Construction

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

1519.45

0.01

0.00

0.00

0.00

0.00

0.00

0.00

2698.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1519.45

0.01

2698.01

0.00

0.00

+0.00

+1519.45

+0.01

+2698.01

+0.00

+0.00

0.00

19.00

0.00

200.68

0.00

0.00

0.00

19.00

0.00

200.68

0.00

0.00

+0.00

+1500.45

+0.01

+2497.33

+0.00

+0.00

O S R Total

+0.00

+1.25

+0.00

+7.44

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

1519.46

2698.01

0.00

0.00

0.00

0.00

1519.46

2698.01

+1519.46

+2698.01

19.00

200.68

19.00

200.68

+1500.46

+2497.33

Total of Voted:

Total of Charged:

+1.25

+7.44

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

03

03

02

State Public Service Commission

Uttarakhand Junior Service Selection Commission

Construction of non-residential buildings for Uttarakhand Subordinate Services Selection

Page 44

2055

0010

00

Police

001 Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

332.01

4710.74

8040.51

0.13

122.84

63.00

200.00

2.00

1082.86

581.61

150.00

3195.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

332.01

4710.74

8040.51

0.13

122.84

63.00

200.00

2.00

1082.86

581.61

150.00

3195.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+332.01

+4710.74

+8040.51

+0.13

+122.84

+63.00

+200.00

+2.00

+1082.86

+581.61

+150.00

+3195.57

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

352.06

749.80

0.00

8.64

0.00

0.00

0.00

75.38

19.37

9.28

25.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

352.06

749.80

0.00

8.64

0.00

0.00

0.00

75.38

19.37

9.28

25.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+332.01

+4358.68

+7290.71

+0.13

+114.20

+63.00

+200.00

+2.00

+1007.48

+562.24

+140.72

+3170.14

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+7.47

+9.33

+0.00

+7.03

+0.00

+0.00

+0.00

+6.96

+3.33

+6.19

+0.80

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

05

06

08

09

11

13

14

15

16

CSS

Headquarter

Establishment of Fire protection andcontrol

Rajya Andoolankari Kalyan Parishd

Establishment of District Level Police Complaints Authority

State Women help cell

State Human Rights Commission

State activist Welfare Fund

Establishment prosecution

State crime inspection bureau

Loktantra Senani tatha unake ashritoko pension yojnana

Page 45

0010

003

101

104

Education and

Training

Criminal

Investigation and

Vigilance

Special Police

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.00

1631.59

0.05

8967.56

2916.85

1449.22

190.30

32.40

27480.57

12615.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

1631.59

0.05

8967.56

2916.85

1449.22

190.30

32.40

27480.57

12615.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+1631.59

+0.05

+8967.56

+2916.85

+1449.22

+190.30

+32.40

+27480.57

+12615.09

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

150.48

0.00

795.61

185.74

136.20

20.94

0.00

3242.45

1469.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150.48

0.00

795.61

185.74

136.20

20.94

0.00

3242.45

1469.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+1481.11

+0.05

+8171.95

+2731.11

+1313.02

+169.36

+32.40

+24238.12

+11145.51

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+9.22

+0.00

+8.87

+6.37

+9.40

+11.00

+0.00

+11.80

+11.65

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

17

04

01

03

04

05

06

07

03

04

Kumbh/Ardha Kumbh Mela Arrangements

Chardham yarta Arrangements

Education & Training (main)

Central Plan/Centrally Sponsored Scheme

Vigilance Section

Security Arrangement

Criminal Investigation

Strengthening of Vigilance at Indo-Nepal Border

State Arms Constabulary-Main

Establishment of Indian Reserve wahini

Page 46

0010

108

109

State Headquarters

Police

District Police

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

485.05

3000.00

150.00

5175.40

116626.61

6125.06

4989.13

495.80

7.00

19.41

300.00

101.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

485.05

3000.00

150.00

5175.40

116626.61

6125.06

4989.13

495.80

7.00

19.41

300.00

101.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+485.05

+3000.00

+150.00

+5175.40

+116626.61

+6125.06

+4989.13

+495.80

+7.00

+19.41

+300.00

+101.57

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

56.85

0.00

0.00

538.97

11423.29

471.18

312.66

40.86

0.00

0.00

0.00

10.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56.85

0.00

0.00

538.97

11423.29

471.18

312.66

40.86

0.00

0.00

0.00

10.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+428.20

+3000.00

+150.00

+4636.43

+105203.32

+5653.88

+4676.47

+454.94

+7.00

+19.41

+300.00

+91.05

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+11.72

+0.00

+0.00

+10.41

+9.79

+7.69

+6.27

+8.24

+0.00

+0.00

+0.00

+10.36

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

02

03

04

03

04

05

07

09

11

13

14

STF

Election

Crime victim assistance fund

State Disaster Response Force

District Police (Chief)

Radio Establishment

Establishment of Motor Transport

Police Horserider Unit

Water Police

Dog Squad

Police Station miscellaneous necessary work fund

District level police complaint authority

Page 47

0010

110

111

113

115

Village Police

Railway Police

Welfare of Police

Personnel

Modernisation of

Police Force

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

566.01

1051.50

2164.67

474.69

75.00

225.00

20.00

20.14

405.06

127.00

47.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

566.01

1051.50

2164.67

474.69

75.00

225.00

20.00

20.14

405.06

127.00

47.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+566.01

+1051.50

+2164.67

+474.69

+75.00

+225.00

+20.00

+20.14

+405.06

+127.00

+47.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

252.96

46.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

252.96

46.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+566.01

+1051.50

+1911.71

+428.42

+75.00

+225.00

+20.00

+20.14

+405.06

+127.00

+47.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+11.69

+9.75

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

16

03

03

04

05

09

10

11

01

02

95

For implementation of traffic light

Establishment of Village Police

Chief

Hospital Expenses

Expenses on sports Fund, Sport functions & Tournments

Special Grant for Police Welfare

Assistance/Awards for Police for Death in Encounter/Bravery Activity

Central Plan/Centrally Sponsored Scheme

Modernization of State Police Forces

Page 48

2056

4055

0010

00

00

Jails

Capital Outlay on

Police

116

117

001

207

Forensic Science

Internal Security

Direction and

Administration

State Police (1) (3)

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

495.40

100.01

1000.00

123.65

6728.29

187.13

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

495.40

100.01

1000.00

123.65

6728.29

187.13

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+495.40

+100.01

+1000.00

+123.65

+6728.29

+187.13

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

37.15

0.00

0.00

0.00

491.26

7.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37.15

0.00

0.00

0.00

491.26

7.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+458.25

+100.01

+1000.00

+123.65

+6237.03

+179.81

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.50

+0.00

+0.00

+0.00

+7.30

+3.91

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

02

04

03

04

02

Forensic Laboratory

CSS

Payment to central Police Forces forinternal Security etc.

Establishment of ERSS

Jail Establishment

Jail Headquarter

Page 49

4059

0010

80

Capital Outlay on

Public Works

General

210

211

051

Research Education

and Training

Police Housing

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

2000.00

600.00

100.00

700.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

2000.00

600.00

100.00

700.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+2000.00

+600.00

+100.00

+700.00

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+2000.00

+600.00

+100.00

+700.00

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

230400.73

0.00

0.00

0.00

0.00

0.00

230400.73

0.00

+230400.73

+0.00

20930.27

0.00

20930.27

0.00

+209470.46

+0.00

Total of Voted:

Total of Charged:

+9.08

+0.00

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

04

06

08

09

02

Fire and Emergency Sevrvices

Establishment of Police Training College

Construction of Residential/Non-residential Buildings for Police Department

Establishment of Indian Reserve Wahini

State Disaster Response Force

Construction of police department building

Board Assembly House, Construction of Guest houses etc.

Page 50

0010

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 51

2202

0011

01

General Education

Elementary Education

001

101

102

Direction and

Administration

Government Primary

Schools

Assistance to Non

Government Primary

Schools

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

582.98

272430.01

51.80

307.00

4500.00

2400.00

12000.00

700.00

1026.00

700.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

582.98

272430.01

51.80

307.00

4500.00

2400.00

12000.00

700.00

1026.00

700.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+582.98

+272430.01

+51.80

+307.00

+4500.00

+2400.00

+12000.00

+700.00

+1026.00

+700.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

66.15

19539.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66.15

19539.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+516.83

+252890.68

+51.80

+307.00

+4500.00

+2400.00

+12000.00

+700.00

+1026.00

+700.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+11.35

+7.17

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

07

08

12

13

07

14

18

20

Directorate Establishment

Provincilisation of Basic Education Board

Organizing sports competitions

Model school at block level

Development of infrastructure facilities in primary schools

Assistance to Aided Junior High Schools and K.G/nursary Schools

Grant-in-Aid to Primary Section attached to added Higher SecondarySchools

Payment of Honorarium to the Shikshya Mitra

Page 52

0011

02 Secondary Education

104

106

112

001

Inspection

Teachers and other

Services

National programe of

mid day meals in

schools

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

11940.18

1560.87

4046.86

12.27

12600.00

2831.87

10.00

1470.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11940.18

1560.87

4046.86

12.27

12600.00

2831.87

10.00

1470.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11940.18

+1560.87

+4046.86

+12.27

+12600.00

+2831.87

+10.00

+1470.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

119.98

279.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

119.98

279.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11940.18

+1440.89

+3767.51

+12.27

+12600.00

+2831.87

+10.00

+1470.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+7.69

+6.90

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

24

03

05

02

01

02

03

95

Distribution of Education Material/free Books to Students

Compensation under Right to Education

Regional Inspection

Establishment of Sub-education Officer's offices at Block Development Level

Education

CSS

Uniforms for bhojan mata under the Mid day Meal Scheme

Reinforcement of Mid-day Meal Scheme

Page 53

0011

004 Research and Training

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

955.53

210.96

83.75

2.00

0.01

500.00

25.00

50.00

40.00

9.50

180.00

1217.13

220.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

955.53

210.96

83.75

2.00

0.01

500.00

25.00

50.00

40.00

9.50

180.00

1217.13

220.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+955.53

+210.96

+83.75

+2.00

+0.01

+500.00

+25.00

+50.00

+40.00

+9.50

+180.00

+1217.13

+220.31

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

52.39

23.09

4.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

52.39

23.09

4.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+903.14

+187.87

+78.78

+2.00

+0.01

+500.00

+25.00

+50.00

+40.00

+9.50

+180.00

+1217.13

+209.54

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+5.48

+10.95

+5.93

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+4.89

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

06

08

09

10

11

12

13

14

15

01

03

Establishment of Secondary Education

Office of the Director General of School Education

Office of the Director General of School Education

Display of Tableaux On the occasion of Republic Day

Grantin regard to Water Supply for Sainik School, Ghordhakhal Nainital

Maintenance/Operating fund grants for Sainik for School, Ghordhakhal Nainital

Cubs scout

Grants to Doon Library and Research Center

Kamla Nehru Award for the mothers of students in State who attain more than 75% markers in inte

Organizing the public culture on thebirth anniversary of Late Shri Indramani Baroni

Strengthening of library in various districts

Central Plan/Centrally Sponsored Scheme

Establishment of Semaate

Page 54

0011

101

105

107

Inspection

Teachers Training

Scholarships

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

7.67

2871.47

3926.69

26.81

1.80

3.00

6.50

0.60

2.00

16.00

50.00

0.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.67

2871.47

3926.69

26.81

1.80

3.00

6.50

0.60

2.00

16.00

50.00

0.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7.67

+2871.47

+3926.69

+26.81

+1.80

+3.00

+6.50

+0.60

+2.00

+16.00

+50.00

+0.21

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

231.75

279.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

231.75

279.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7.67

+2639.72

+3646.74

+26.81

+1.80

+3.00

+6.50

+0.60

+2.00

+16.00

+50.00

+0.21

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+8.07

+7.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

03

04

02

01

13

15

16

17

18

19

95

Regional Inspection

Establishment of Offices for Education Officer at Block Level

Empowerment of DEIT for Training

Central Plan/Centrally Sponsored Scheme

Scholarships for R.I.M.C Students of Dehradun uttarakhand

Sports Scholarship

Dr. Shivanand Nautiyal Memorial Scholarship

Scholarships to the Students of Uttarakhand seeking education in Army Schools outside the State

State Eligilibilty Scholarship

Page 55

0011

108

109

Examinations

Government Secondary

Schools

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

829.00

1019.56

306494.00

2670.57

106.10

7000.00

100.04

40.00

90.00

25.00

1600.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

829.00

1019.56

306494.00

2670.57

106.10

7000.00

100.04

40.00

90.00

25.00

1600.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+829.00

+1019.56

+306494.00

+2670.57

+106.10

+7000.00

+100.04

+40.00

+90.00

+25.00

+1600.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

49.59

22069.59

92.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49.59

22069.59

92.37

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+829.00

+969.97

+284424.41

+2578.20

+106.10

+7000.00

+100.04

+40.00

+90.00

+25.00

+1600.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+4.86

+7.20

+3.46

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

03

07

15

16

17

18

19

20

21

Secondary Education Board

Establishment of Secondary Education Board

Boys & Girls

Establishment of Rajive Gandhi Navodaya Schools

Establishment of Rajiv Gandhi Abhinav School

Honorarium of visiting Teachers

Establishment of Model School at Block Development level (Secondary)

Conducting of District Board and State level exhibitions

Participation in Sports at Block / District / State and National Level

Arrangements of Science Kit of government Secondary School

Girls Education incentives(bicyles) scheme

Page 56

0011

03 University and Higher

Education

110

113

001

102

Assistance to Non-

Govt. Secondary

Schools

samagra shiksha

Direction and

Administration

Assistance to

Universities

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

113.00

46000.00

100.00

90153.17

3024.63

634.50

6091.85

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

113.00

46000.00

100.00

90153.17

3024.63

634.50

6091.85

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+113.00

+46000.00

+100.00

+90153.17

+3024.63

+634.50

+6091.85

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

45.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+113.00

+46000.00

+100.00

+90153.17

+3024.63

+588.87

+6091.85

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+7.19

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

22

26

03

04

01

95

03

03

05

Laptop / mobile distribution to poor meritorious students

Uttarakhand residential school Jaiharikhal

Grant for Non-Government Recognised Schools

Assistance to Non-Government Higher Secondary Schools

CSS

Directorate of Higher Education

Kumaon University

Doon University

Page 57

0011

103 Government Colleges

and Institutes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

800.00

550.00

519.94

50.00

5.00

3050.00

929.60

30738.98

0.01

25.00

0.01

56.00

41.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

800.00

550.00

519.94

50.00

5.00

3050.00

929.60

30738.98

0.01

25.00

0.01

56.00

41.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+800.00

+550.00

+519.94

+50.00

+5.00

+3050.00

+929.60

+30738.98

+0.01

+25.00

+0.01

+56.00

+41.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2554.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2554.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+800.00

+550.00

+519.94

+50.00

+5.00

+3050.00

+929.60

+28184.71

+0.01

+25.00

+0.01

+56.00

+41.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+8.31

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

07

08

09

11

12

01

03

05

12

13

14

16

Establishment of Sanskrit University

State's Open University

Sri Devsuman University

Establishment of National Law University

Grant-in-aid to Uttarakhand Open University for Technology based education center

Almora residential University

CSS

Training for Competative Examinations

Grant to Government Degree Colleges for Development Work from University grants Commission

Awards to Students selected in NDA and IMA

Modernization of university campuses

Strengthening of Colleges to NAC Accreditation

Page 58

0011

104

105

Assistance to Non-

Government Colleges

and Institutes

Faculty Development

Programme

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

60.00

100.00

20.00

50.00

3.00

20.00

10.00

244.02

10452.67

200.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.00

100.00

20.00

50.00

3.00

20.00

10.00

244.02

10452.67

200.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+60.00

+100.00

+20.00

+50.00

+3.00

+20.00

+10.00

+244.02

+10452.67

+200.00

+1.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+60.00

+100.00

+20.00

+50.00

+3.00

+20.00

+10.00

+244.02

+10452.67

+200.00

+1.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

17

18

19

20

21

22

23

95

03

05

02

Education in State College/Universitys through EDUSET

Establishment E-library in State college

Mukhiya Mantri Navachar Yojana

Ek Bharat Shreshtra Bharat

Incentive Scheme for meritorious students of the State

BHAKT DARSHAN PURASKAAR VITRAN

Grant-in-aid to Non-Government Degree Colleges

Increase in establishment Expenditure Due to Pay Revision

Page 59

0011

05 Language Development

001

102

103

Direction and

Administration

Modern language

modernisation

Sanskrit Education

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2.00

16.00

79.87

2.00

101.72

142.47

2550.00

119.13

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

16.00

79.87

2.00

101.72

142.47

2550.00

119.13

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2.00

+16.00

+79.87

+2.00

+101.72

+142.47

+2550.00

+119.13

+25.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

4.67

0.00

0.00

17.23

0.00

7.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.67

0.00

0.00

17.23

0.00

7.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2.00

+16.00

+75.20

+2.00

+101.72

+125.24

+2550.00

+111.43

+25.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+5.84

+0.00

+0.00

+12.09

+0.00

+6.46

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

03

03

04

03

04

06

07

08

Grant for Professors attend conferences/Seminars abroad

Students facilities to Uttarakhand Girls In Banasthali Vidhyapeeth

Honorioum to members etc. for committee established for Admission procedure regulation

Establishment of Directorate of Sanskrit Education

Indian Language Centre, Dehradun

Establishment of Uttarakhand Bhasha Sansthan

Government Sanskrit Schools

Grant-in-Aid to Sanskrit Schools

Control and supervision of Sanskrit Education at District Level

Publication & Free Distribution of Sanskrit Syllabus Books

Page 60

2203

0011

80

00

Technical Education

General

001

003

107

Direction and

Administration

Training

Scholarships

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

72.49

0.01

3.00

112.26

2179.93

54.89

3890.99

152.30

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72.49

0.01

3.00

112.26

2179.93

54.89

3890.99

152.30

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+72.49

+0.01

+3.00

+112.26

+2179.93

+54.89

+3890.99

+152.30

+0.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

5.10

0.00

0.00

12.02

104.46

1.06

0.00

6.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.10

0.00

0.00

12.02

104.46

1.06

0.00

6.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+67.39

+0.01

+3.00

+100.24

+2075.47

+53.83

+3890.99

+145.79

+0.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.03

+0.00

+0.00

+10.70

+4.79

+1.92

+0.00

+4.27

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 945077.16 +945077.16 46636.46 46636.46 +898440.70Total of Voted: +4.93

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

09

11

03

04

05

01

03

02

Formation of Uttarakhand Education Board

Grant-in-aid to Sanskrit University

Scholorship to bright students of Sanskrit colleges

Establishment of Directorate of NCC

National cadet team

Establishing Air Squardron NCC

Central Plan/Centrally Sponsored Schemes

Government Training Institutes (Primary) (Boys)

CM Scholarship Scheme for NCC cadets

Page 61

0011

001

104

105

112

Direction and

Administration

Assistance to Non-

Government Technical

Colleges and

Institutes

Polytechnics

Engineering/Technical

Colleges and

Institute

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

158.35

285.92

109.13

270.00

535.00

12406.82

4.20

2750.00

1740.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

158.35

285.92

109.13

270.00

535.00

12406.82

4.20

2750.00

1740.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+158.35

+285.92

+109.13

+270.00

+535.00

+12406.82

+4.20

+2750.00

+1740.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

33.15

13.49

4.11

0.00

0.00

805.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33.15

13.49

4.11

0.00

0.00

805.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+125.20

+272.43

+105.02

+270.00

+535.00

+11601.42

+4.20

+2750.00

+1740.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+20.93

+4.72

+3.77

+0.00

+0.00

+6.49

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

03

01

03

95

03

04

Technical Education and Examination Council

Directorate of Technical Education

Sanukta Pravesh Priksha avem Prashikshan anusandhan vikas parakoshth

K.L. Polytechnic, Roorkee

Central Plan/Centrally Sponsored Scheme

General Polytechnic

Grant-in-Aid to Pant College of Technology, Pant Nagar

Grant-in-Aid to Engineering College Dwarahat (Almora)

Page 62

2204

0011

00

Sports and Youth

Services

001 Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2070.00

40.00

39.00

947.76

1897.66

68.88

10.00

35.00

2576.00

10.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2070.00

40.00

39.00

947.76

1897.66

68.88

10.00

35.00

2576.00

10.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2070.00

+40.00

+39.00

+947.76

+1897.66

+68.88

+10.00

+35.00

+2576.00

+10.00

+1.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

74.56

91.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

74.56

91.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2070.00

+40.00

+39.00

+873.20

+1805.84

+68.88

+10.00

+35.00

+2576.00

+10.00

+1.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+7.87

+4.84

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

11

01

03

04

05

06

09

10

11

16

Grant-in-Aid to Engineering College Ghur Dauri (Pauri)

Awards to the Students selected in meritorius Commercial and Technical Institutes

Central Plan/Centrally Sponsored Scheme

Directorate of Sports

State Development Board and Youth Welfare

Grant to Youth Welfare Board

Development of Youth Hostels

Relief to Young Associations

Duputing of PRD in various polling booths

Organising National Youth Festival

Page 63

0011

104 Sports and Games

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

9.00

906.15

60.00

25.00

0.03

2250.00

0.02

1.00

15.00

40.00

900.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

906.15

60.00

25.00

0.03

2250.00

0.02

1.00

15.00

40.00

900.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+9.00

+906.15

+60.00

+25.00

+0.03

+2250.00

+0.02

+1.00

+15.00

+40.00

+900.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+9.00

+906.15

+60.00

+25.00

+0.03

+2250.00

+0.02

+1.00

+15.00

+40.00

+878.86

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2.35

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

17

18

19

20

21

22

95

03

05

07

08

10

Seema Sparsh Yojna

Adventure Training Centre Maintenence and Training

Rural sports competition organized by the Youth Walfare Department

Youth physical development and encouragement Training by the youth Welfare Department

Ardh Sainik Training to P.R.D Volunteers

Financial Assistance to Ex-famous Players and Wrestlers

Development of Playgrounds

State Level Awards to Special Players

Grant to Nehru Mountaineering Institute

Awards to the National TournamentWinner Players

Page 64

0011

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

30.00

618.00

7.00

8.00

22.00

200.00

10.00

6.00

0.01

4.00

63.00

3000.00

100.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

30.00

618.00

7.00

8.00

22.00

200.00

10.00

6.00

0.01

4.00

63.00

3000.00

100.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+30.00

+618.00

+7.00

+8.00

+22.00

+200.00

+10.00

+6.00

+0.01

+4.00

+63.00

+3000.00

+100.80

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+30.00

+618.00

+7.00

+8.00

+22.00

+200.00

+10.00

+6.00

+0.01

+4.00

+63.00

+3000.00

+100.80

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

11

12

13

14

15

16

21

22

24

28

29

30

31

32

Arrangement of Kit for the Players of State Team for participating in National Tornaments

Non-recurring Grants to Sports Union, Clubs & Other Sports Unionfor organising Tournamants and purc

Grant-in-Aid to Sports College

Organising Sports & Games Competition

Organising Training Centres

Purchase of Permanent Sports Materials

International Tournaments

Financial Assistance to Provincial Sports Associations and Clubs

Establishment of Welfare Fund for Players participating in Civil Services Examinations

Civil Services Institute

Scholarships to porlific Players

Pt. NainSingh Surveyor Mountaineering Training Centre

Organizing of 38th National Game

Page 65

2205

0011

00

Art and Culture

001

101

102

Direction and

Administration

Fine Arts Education

Promotion of Arts and

Culture

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

500.00

0.01

50.00

5.00

821.44

30.00

18.08

270.95

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

0.01

50.00

5.00

821.44

30.00

18.08

270.95

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+0.01

+50.00

+5.00

+821.44

+30.00

+18.08

+270.95

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+0.01

+50.00

+5.00

+821.44

+30.00

+18.08

+270.95

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

33

34

35

36

03

04

05

03

03

Pithauragarh Sport College

special training camp for state players before 38th National Games

Lump sum Grant to Rajiv Gandhi International cricket stadium society, dehradun for manage of ice

Rural soprts and health promotion plan

Establishment of Sports Academy inprivate areas

Cultural Arts Directorate

Artist Welfare Fund

Establishment of Endowment, Pilgrimage, Management and Religious fair

Bhatkhande Hindustani Sangeet Mahavidalaya

Page 66

0011

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

23.18

20.00

20.00

60.00

15.01

31.48

5.00

10.00

10.00

10.00

10.00

10.00

120.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23.18

20.00

20.00

60.00

15.01

31.48

5.00

10.00

10.00

10.00

10.00

10.00

120.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+23.18

+20.00

+20.00

+60.00

+15.01

+31.48

+5.00

+10.00

+10.00

+10.00

+10.00

+10.00

+120.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+23.18

+20.00

+20.00

+60.00

+15.01

+31.48

+5.00

+10.00

+10.00

+10.00

+10.00

+10.00

+120.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

06

08

09

12

13

19

23

25

32

33

34

35

Grant to Autonomous Bodies

Late Govind Vallabh Pant Lok KalaSansthan

Establishment of Arts Litrature Council

Establishment of Rang Mandal

Monthly Pension to Old Artists, Writers

Myrters Memorials

Uday Shankar Dance Academy

Purchase of Historical and Cultural Important Articles

Anniversary Celebration of Prominant Persons

Scholarship Scheme for Junior and Senior Artists

Establishment of Lalit Kala and Sangeet Natak Academy in Dehradun

Financial Aid to Writers for publishing Books

Economic Assistance to local Residents of province for their religious voyages

Page 67

0011

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

20.00

143.46

100.00

10.00

50.00

85.00

10.00

0.01

1000.00

14.00

15.00

0.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

20.00

143.46

100.00

10.00

50.00

85.00

10.00

0.01

1000.00

14.00

15.00

0.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+20.00

+143.46

+100.00

+10.00

+50.00

+85.00

+10.00

+0.01

+1000.00

+14.00

+15.00

+0.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+20.00

+143.46

+100.00

+10.00

+50.00

+85.00

+10.00

+0.01

+1000.00

+14.00

+15.00

+0.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

36

38

39

41

42

43

44

45

46

47

48

49

50

Financial Assistance for organising Customary Fair Committees & Other fairs

Audio-Visual Recordings on various Dimensions of Sanskrit Language

Badri kedar Festival

Organizing of Herala Festival

Preservation and Promotion of Intangible Cultural Heritage of Stateconservation

Organizing of chaitula Fund / Chaitula Festival

Rajayotsav (Organizing of State-level folk music / folk art cometition)

Annual maintenance of Himalayn Cultural Center Dehradun

Preservation and promotion of building built in the typical style/architecture

Uttarakhandi language institute

Grant to shrine board

Maintenance / operation of Nehru Heritage Center

Operating the art gallery

Page 68

0011

103

104

105

107

Archaoelogy

Archives

Public Libraries

Museums

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1.18

105.00

7.31

199.38

144.32

6.00

221.09

4.20

129.45

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.18

105.00

7.31

199.38

144.32

6.00

221.09

4.20

129.45

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1.18

+105.00

+7.31

+199.38

+144.32

+6.00

+221.09

+4.20

+129.45

+2.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1.18

+105.00

+7.31

+199.38

+144.32

+6.00

+206.22

+4.20

+129.45

+2.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+6.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

51

95

02

03

03

01

03

95

03

05

Implementation 0f Antiquities and Valuable Artwork Act 1972

Archeological Establishment

State Archives

Central Plan/Centrally Sponsored Scheme

Central State Library

Establishment Expenses

Page 69

4202

0011

01

Capital Outlay on

Education, Sports,

Art and Culture

General Education

201

202

Elementary Education

Buildings

Secondary Education

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2.00

1000.00

0.01

10700.01

1100.00

400.00

50.00

10.00

100.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

1000.00

0.01

10700.01

1100.00

400.00

50.00

10.00

100.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2.00

+1000.00

+0.01

+10700.01

+1100.00

+400.00

+50.00

+10.00

+100.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2.00

+1000.00

+0.01

+10700.01

+1100.00

+400.00

+50.00

+10.00

+100.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

03

05

01

11

16

18

19

20

24

Strengthening and Development of Primary Schools

Construction of Buildings for Directorate of Primary Education

Central Plan/Centrally Sponsored Schemes

Construction of Building for Government Higher Secondary Schools and Government High Scho

Construction of Buildings for Rajeev Gandhi Navodya Vidyalaya

Construction of Library Buildings

Construction of Building for DistrictEducation & Training Institutes

Up-gradation of Kasturba Gandhi Girls Boarding Schools upto High school Level

Establishment of Doon Library and Research Centre

Page 70

0011

203 University and Higher

Education

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

400.00

700.00

100.00

500.00

1155.00

3000.00

2800.00

2000.00

0.01

10.00

25.00

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

400.00

700.00

100.00

500.00

1155.00

3000.00

2800.00

2000.00

0.01

10.00

25.00

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+400.00

+700.00

+100.00

+500.00

+1155.00

+3000.00

+2800.00

+2000.00

+0.01

+10.00

+25.00

+250.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+400.00

+700.00

+100.00

+500.00

+1155.00

+3000.00

+2800.00

+2000.00

+0.01

+10.00

+25.00

+250.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

29

30

31

32

95

98

01

03

04

05

13

14

Construstion Of Rajiv Gandhi Abhinav residential School building

Construction of model schools Building

Construction of Sainik Schools Jkholi

Building construction of Uttarakhand residential School Jaiharikhal

NABARD funded

Central Plan/Centrally Sponsored Scheme

Completion of under construction Buildings of Government Degree Colleges

Purchase of Land/Buildings for Government Degree Colleges

Construction of Building for Directorate of Higher Education Haldwani, Uttarakhand

Operation of Self-financed B.Ed Classes under Society Mode

Page 71

0011

02 Technical Education

205

600

104

Languages Development

General

Polytechnics

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

500.00

150.00

0.01

10.00

50.00

300.00

735.00

150.00

50.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

150.00

0.01

10.00

50.00

300.00

735.00

150.00

50.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+150.00

+0.01

+10.00

+50.00

+300.00

+735.00

+150.00

+50.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+150.00

+0.01

+10.00

+50.00

+300.00

+735.00

+150.00

+50.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

15

16

17

18

19

23

95

05

08

02

Kumaon University

Doon University

Sanskrit University

Open University

Affiliated University

National Law University

Almora Residential University

Construction of Residential Buildings for Uttarakhand Sanskrit Academy

Construction of Building of Government Sanskrit Model Residential Schoool

Construction of NCC training Academy

Page 72

0011

03 Sports and Youth

Services

105 Engineering/Technical

Colleges and

Instiutes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

90.00

50.00

10.50

1000.00

100.00

0.01

0.01

20.00

20.00

20.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

50.00

10.50

1000.00

100.00

0.01

0.01

20.00

20.00

20.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+90.00

+50.00

+10.50

+1000.00

+100.00

+0.01

+0.01

+20.00

+20.00

+20.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+90.00

+50.00

+10.50

+1000.00

+100.00

+0.01

+0.01

+20.00

+20.00

+20.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 0.00 +0.00 0.00 0.00 +0.00Total of Charged: +0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

16

95

98

05

06

08

10

11

12

13

Central Plan/Centrally Sponsored Scheme

Purchase of Land/construction of Buildings for Three new Polytechnics

NABARD Funded

Engineering College Dwarahat (Almora)

Pant College of Technology, Pant Nagar

Government Girls Engineering College, Dehradun

Engineering College, Tanakpur

Engineering College, Uttarkashi

Frontier Industrial Institute at Pithoragarh (SPA)

Construction of building for Engineering College Salt (Almora)

Page 73

0011

102 Sports Stadium

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5300.00

300.00

1000.00

0.01

0.01

100.00

200.00

50.00

1100.00

400.00

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5300.00

300.00

1000.00

0.01

0.01

100.00

200.00

50.00

1100.00

400.00

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5300.00

+300.00

+1000.00

+0.01

+0.01

+100.00

+200.00

+50.00

+1100.00

+400.00

+0.01

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5300.00

+300.00

+1000.00

+0.01

+0.01

+100.00

+200.00

+50.00

+1100.00

+400.00

+0.01

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

04

05

06

08

09

13

14

15

16

17

18

19

Central Plan/Centrally Sponsored Scheme

Construction of Sprots Stadium (New Work)

Construction of Sports Stadium (Running Work)

Establishment of Civil Services Institute

Establishment of Directorate of Sports

Maintenance of Sewarage Facility

Construction of Dehradun Sports Building

Construction of Sports College Building, Pithoragarh

Mini Stadium in Rural Areas

Construction of Outdoor Fields, In-door Halls and Mini Stadium

Construction of International Cricket Stadium

Special Plan Assistance

Haldwani Stadium (Phase-2)

Page 74

0011

04 Art and Culture

800

106

Other Expenditure

Musiums

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

20.00

30.00

300.00

3000.01

200.00

240.00

300.00

50.00

500.00

50.00

63.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

20.00

30.00

300.00

3000.01

200.00

240.00

300.00

50.00

500.00

50.00

63.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+20.00

+30.00

+300.00

+3000.01

+200.00

+240.00

+300.00

+50.00

+500.00

+50.00

+63.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+20.00

+30.00

+300.00

+3000.01

+200.00

+240.00

+300.00

+50.00

+500.00

+50.00

+63.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

20

21

22

24

26

03

01

03

04

06

08

95

Construction of Pavillion Ground

Maintenance/construction of Residential Buildings

Establishment of TripenSingh Negi Youth Development Centre at State Level

Pt. NainSing Surveyor Mountaineering Traininig Centre

Organizing of 38th National Game

Central Plan/Centrally Sponsored Scheme

Construction of Museum Building

Construction of Monuments/Statues of Renowned Persons

Construction of Auditorium

Culture village

Page 75

0011

800 Other Expenditure

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

0.00

0.00

+200.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

945077.16

0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

03 Art & Culture Promotion

Page 76

2210

0012

01

Medical and Public

Health

Urban Health

Services-Allopathy

001

110

Direction and

Administration

Hospital and

Dispensaries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2277.38

0.02

1350.02

42553.00

2672.98

77.69

279.50

103.52

2500.00

125.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2277.38

0.02

1350.02

42553.00

2672.98

77.69

279.50

103.52

2500.00

125.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2277.38

+0.02

+1350.02

+42553.00

+2672.98

+77.69

+279.50

+103.52

+2500.00

+125.46

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

219.80

0.00

0.00

2545.88

197.59

2.81

25.04

5.15

0.00

7.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

219.80

0.00

0.00

2545.88

197.59

2.81

25.04

5.15

0.00

7.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2057.58

+0.02

+1350.02

+40007.12

+2475.39

+74.88

+254.46

+98.37

+2500.00

+117.78

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+9.65

+0.00

+0.00

+5.98

+7.39

+3.62

+8.96

+4.98

+0.00

+6.12

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

01

03

05

10

11

14

15

16

Headquarters Establishment

Management of Smart Card Schemefor Medical Re-imbursement

Central Plan/Centrally Sponsored Scheme

Integrated Allopathy Hospital & Dispensaries

T.B. Clinics

Establishment of Clinic in Hon'ble High Court Campus

Establishment of Blood Bank

Establishment of Government Allopathy Dispensary in Uttarakhand Vidhan Sabha

Grant to Government Aided Hospitals

Establishment of Government Allopathy Dispensary in Uttarakhand Secretariat and Uttarakh

Page 77

0012

200

800

Other Health Schemes

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2595.15

41.92

770.61

244.32

200.00

157.50

20000.00

165.14

953.82

8.50

233.63

15.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2595.15

41.92

770.61

244.32

200.00

157.50

20000.00

165.14

953.82

8.50

233.63

15.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2595.15

+41.92

+770.61

+244.32

+200.00

+157.50

+20000.00

+165.14

+953.82

+8.50

+233.63

+15.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

235.26

0.00

0.00

7.46

0.00

0.00

0.00

10.30

74.85

0.00

18.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

235.26

0.00

0.00

7.46

0.00

0.00

0.00

10.30

74.85

0.00

18.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2359.89

+41.92

+770.61

+236.86

+200.00

+157.50

+20000.00

+154.84

+878.97

+8.50

+215.27

+15.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+9.07

+0.00

+0.00

+3.05

+0.00

+0.00

+0.00

+6.24

+7.85

+0.00

+7.86

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

18

20

23

24

25

95

97

01

03

05

07

08

06

Establishment of Chief Medical Officer

Medical arrangement for Hon'ble Governor & Chief Minister's Residence

Establishment of Gandhi Century Eye Science Center

Uttarakhand Medical Services Selection Board

Biomedical waste disposal in Hospitals

External Aided Projects

Central Plan/Centrally Sponsored Schemes

Prevention of Blindness in the State

Mental Hospital Authority

Establishment of State Mental Health Institute

Consolidation of Birth and death registration programme

Page 78

0012

02 Urban Health

Services-Other

systems of Medicine

101

102

Ayurveda

Homeopathy

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

201.51

2250.00

1653.06

411.40

70.00

50.00

19978.05

3100.00

262.50

199.66

976.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

201.51

2250.00

1653.06

411.40

70.00

50.00

19978.05

3100.00

262.50

199.66

976.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+201.51

+2250.00

+1653.06

+411.40

+70.00

+50.00

+19978.05

+3100.00

+262.50

+199.66

+976.26

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

145.06

26.24

0.00

0.00

1887.72

0.00

0.00

8.48

80.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

145.06

26.24

0.00

0.00

1887.72

0.00

0.00

8.48

80.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+201.51

+2250.00

+1508.00

+385.16

+70.00

+50.00

+18090.33

+3100.00

+262.50

+191.18

+895.82

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+8.78

+6.38

+0.00

+0.00

+9.45

+0.00

+0.00

+4.25

+8.24

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

05

06

08

11

95

03

04

Cleanliness/medical Facility at Piligrims Way

Central Plan/Centrally Sponsored Schemes

Direction & Administration

Herbs Manufacturing Department

Hospitals and Clinics

Grant-in-Aid to Non-Government Bodies (Ayurved)

Ayurvedic

Grant-in-Aid to Ayurvedic University

Establishment of Homeopathic Dispensaries

Hospitals & Dispensaries

Page 79

0012

03

04

Rural Health

Services-Allopathy

Rural Health

Services-Other

101

103

104

110

800

Health Sub-centres

Primary Health

Centres

Community Health

Centres

Hospitals and

Dispensaries

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

7.00

5555.75

13854.52

17653.02

27000.00

11922.41

3150.01

109.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

5555.75

13854.52

17653.02

27000.00

11922.41

3150.01

109.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7.00

+5555.75

+13854.52

+17653.02

+27000.00

+11922.41

+3150.01

+109.18

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

466.75

713.95

862.73

0.00

791.03

0.00

8.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

466.75

713.95

862.73

0.00

791.03

0.00

8.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7.00

+5089.00

+13140.57

+16790.29

+27000.00

+11131.38

+3150.01

+100.48

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+8.40

+5.15

+4.89

+0.00

+6.63

+0.00

+7.97

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

03

03

03

01

17

95

01

Other Expenses

Arrangement of Pharmacists in Sub-centres of Remote Areas

Establishment of Primary Health Centres

Establishment of Community Health Centres

Central Plan/Centrally Sponsored Schemes

Establishment of Government Allopathic Hospitals

Central Plan/Centrally Sponsored Schemes

Page 80

0012

05

06

Systems of Medicine

Medical Education,

Training and Research

Public Health

102

105

003

101

Homeopathy

Allopathy

Training

Prevention and

Control of diseases

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2369.08

50.03

35353.77

1552.85

130.10

0.02

347.99

116.71

17046.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2369.08

50.03

35353.77

1552.85

130.10

0.02

347.99

116.71

17046.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2369.08

+50.03

+35353.77

+1552.85

+130.10

+0.02

+347.99

+116.71

+17046.20

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

229.75

0.00

1105.32

38.92

8.47

0.00

30.25

4.51

141.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

229.75

0.00

1105.32

38.92

8.47

0.00

30.25

4.51

141.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2139.33

+50.03

+34248.45

+1513.93

+121.63

+0.02

+317.74

+112.20

+16904.84

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+9.70

+0.00

+3.13

+2.51

+6.51

+0.00

+8.69

+3.86

+0.83

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

04

05

09

10

03

01

03

Hospitals & Dispensaries

Education

Medical College

Nursing and Paramedical Education

Directorate of Medical Education

Medical Education University

Divisional Health and Family Planning Training Centres

Central Plan/Centrally Sponsored Scheme

Page 81

0012

102

104

113

Prevention of Food

Adulteration

Drug Control

Public Health

Publicity

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4760.83

852.03

40.01

66.21

100.00

3500.00

911.09

810.00

94.50

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4760.83

852.03

40.01

66.21

100.00

3500.00

911.09

810.00

94.50

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4760.83

+852.03

+40.01

+66.21

+100.00

+3500.00

+911.09

+810.00

+94.50

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

366.49

59.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

366.49

59.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4394.34

+792.06

+40.01

+66.21

+100.00

+3500.00

+911.09

+810.00

+94.50

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.70

+7.04

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

06

08

12

13

99

04

01

95

03

Public Health

Maternity and Child Welfare

Assistance to Leprosy Patients

Assistance under State Aids Scheme

Establishment of Appelllate Tribunal under food Protection Act

Treatment of a patients suffering from a rare disease

Various Health Schemes Organised by the State Government under Public Co-relation

Uttharakhand food safety and drug administrarion establishment

CSS

Publicity of Public Health in the State

Page 82

2211

0012

00

Family Welfare

800

001

003

101

102

Other expenditure

Direction and

Administration

Training

Rural Family Welfare

Services

Urban Family Welfare

Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

801.72

50.00

4253.68

0.01

1010.54

412.13

13628.85

613.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

801.72

50.00

4253.68

0.01

1010.54

412.13

13628.85

613.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+801.72

+50.00

+4253.68

+0.01

+1010.54

+412.13

+13628.85

+613.38

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

57.27

21.87

893.13

24.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.27

21.87

893.13

24.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+801.72

+50.00

+4253.68

+0.01

+953.27

+390.26

+12735.72

+588.49

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+5.67

+5.31

+6.55

+4.06

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

07

11

14

01

01

01

01

Central Plan/Centrally Sponsored Schemes

Maintenance and Operation of Vehicles

Extra Honorarium to Part-time Wet-nurse

Strengthening PPP Plans under health department

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Page 83

4210

0012

01

02

Capital Outlay on

Medical and Public

Health

Urban Health Services

Rural Health Services

110

103

104

110

Hospital and

Dispensaries

Primary Health

Centres

Community Health

Centres

Hospitals and

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

100.00

500.00

400.00

2400.00

600.00

500.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

100.00

500.00

400.00

2400.00

600.00

500.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+100.00

+500.00

+400.00

+2400.00

+600.00

+500.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+100.00

+500.00

+400.00

+2400.00

+600.00

+500.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

14

17

23

30

03

03

Contruction of Morturies

Construction of Blood Bank, ICU etc

Arrangement for Residential Buildings

High level maintenance, Extension and Construction of Non-residentialBuildings

Construction of Base Hospital-Pithoragarh

Mental Hospital Selakuin

Construction of Primary Health Centres Building (State Schemes)

Establishment of Community Health Centres

Page 84

0012

03 Medical Education

Training and Research

800

101

103

105

Dispensaries

Other Expenditure

Ayurveda

Unani

Allopathy

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1000.00

0.10

800.00

100.00

100.00

1.00

25545.30

200.00

0.01

3000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1000.00

0.10

800.00

100.00

100.00

1.00

25545.30

200.00

0.01

3000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1000.00

+0.10

+800.00

+100.00

+100.00

+1.00

+25545.30

+200.00

+0.01

+3000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1000.00

+0.10

+800.00

+100.00

+100.00

+1.00

+25545.30

+200.00

+0.01

+3000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

12

03

01

05

95

02

01

03

04

08

Hospital Doiwala

State Sector

Construction of building of Government Auyrvedic Clinics

Establishment of Unani College at Piran Kaliyar

Central Plan/Centrally Sponsored Scheme

Establishment of Medical College atSrinagar

LLand acquisition/compensatory Plantation and payment of NPV for construction Works

Page 85

4211

0012

00

Capital Account of

Family Welfare

101 Rural Family Welfare

Service

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

500.00

200.00

50.00

3500.00

1200.00

0.01

3067.80

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

200.00

50.00

3500.00

1200.00

0.01

3067.80

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+200.00

+50.00

+3500.00

+1200.00

+0.01

+3067.80

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.00

+200.00

+50.00

+3500.00

+1200.00

+0.01

+3067.80

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

318895.47

0.00

0.00

0.00

0.00

0.00

318895.47

0.00

+318895.47

+0.00

11323.45

0.00

11323.45

0.00

+307572.02

+0.00

Total of Voted:

Total of Charged:

+3.55

+0.00

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

09

10

11

12

13

14

95

03

Establishment of Doon Medical College

Establishment of Medical College and attached Hospitals at Haldwani

Establishment of Nursing Colleges

Establishment of Nursing School

Establishment of Nursing College Almora

Establishment of Nursing Colleges (Champawat, Bajpur and Guptkashi)

Medical Education University Building construction

Construction of Buildings for Sub-centres

Page 86

0012

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 87

2215

0013

01

Water Supply and

Sanitation

Water Supply

001

005

052

101

Direction and

Administration

Survey and

Investigation

Machinery and

Equipment

Urban Water Supply

Programmes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

16.50

10.00

700.00

600.00

1000.00

220.00

49.00

20375.57

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16.50

10.00

700.00

600.00

1000.00

220.00

49.00

20375.57

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+16.50

+10.00

+700.00

+600.00

+1000.00

+220.00

+49.00

+20375.57

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+16.50

+10.00

+700.00

+600.00

+1000.00

+220.00

+49.00

+20375.57

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

02

02

03

01

05

06

Drinking Water Advisory Committee

Consultancy, remote sensing and master Plan

Grant for rainwater harvesting

Construction of DPR

Water meters in urban areas

Installation of energy efficient pumps in pumping drinking water schemes

Central Plan/Centrally Sponsored Scheme

Water Supply-Urban

Page 88

0013

102

190

Rural Water Supply

Programmes

Assistance to Public

Sector and Other

Undertakings

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

22.05

500.00

4729.22

50.00

8000.00

50.00

100.00

0.01

536.42

800.00

2500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22.05

500.00

4729.22

50.00

8000.00

50.00

100.00

0.01

536.42

800.00

2500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+22.05

+500.00

+4729.22

+50.00

+8000.00

+50.00

+100.00

+0.01

+536.42

+800.00

+2500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+22.05

+500.00

+4729.22

+50.00

+8000.00

+50.00

+100.00

+0.01

+536.42

+800.00

+2500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

97

01

04

07

09

10

14

95

97

03

Providing Drinking Water facility atChardham/Tourist's Voyage

xternal / worldback supported

Central Plan/Centrally sponsored Schemes

Maintenance and Renovation of Water Resources

Payment of Departmental Fees payable at Centrally Sponsored Schemes

Grant-in-Aid for renovation of deadly different source for River Bank Filitration Technique

Grant-in-Aid Scheme for renovation of Water filtration Machine under Rural Drinking Wat

Incentives on construction, development of Chal Khal and water bonus subsidy on water conser

External Aided Project

Page 89

0013

02 Sewerage and

Sanitation

800

105

106

107

Other Expenditure

Sanitation Services

Prevention of Air and

Water Pollution

Sewerage Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

600.00

4000.00

400.00

440.00

404.10

47.15

2000.00

0.01

990.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

600.00

4000.00

400.00

440.00

404.10

47.15

2000.00

0.01

990.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+4000.00

+400.00

+440.00

+404.10

+47.15

+2000.00

+0.01

+990.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+4000.00

+400.00

+440.00

+404.10

+47.15

+2000.00

+0.01

+990.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

05

06

08

01

95

03

05

02

Payment of Retirement benefits to the Staff of Water Corporation

Grant-in-Aid for Gartuity payment to Jal Nigam Employees

Grant of the Supply of gap wages ofthe payable to the drinking water corporation

Due to disaster overcrowding and cloud burst due to drinking water schemes, grant for alternative arrang

Central Plan/Centrally Sponsored Schemes

Grant to Jal Nigam for Maintenanceof Ganga under Ganga Action Plan (phase 1, 2)

To make Pollution Free Ganga, Yamuna and its Tributaries

Grant for operation of and maintenance Sewage treatment plant and sewerage schemes

Page 90

2216

2217

0013

80

03

Housing

Urban Development

General

Integrated

Development of Small

and Medium Towns

800

001

051

Other Expenditure

Direction and

Administration

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.00

98.40

587.61

40.15

1300.00

68.88

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

98.40

587.61

40.15

1300.00

68.88

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+98.40

+587.61

+40.15

+1300.00

+68.88

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+98.40

+587.61

+40.15

+1300.00

+68.88

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

06

07

09

95

02

Bhagirathi Nadi Ghati Vikas Pradhikaran

CSS

Establishment of Urban and Rural Development

Establishment of Prescribed Officers

payment of salary and other expenses of Metro Rail Personnel

Page 91

0013

191

800

Assistance to Local

bodies C0orporations,

Urban Development

Authorities, Town

Improvement Boards

etc.

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.00

13810.00

1443.60

20.00

20.00

10.00

150.00

0.01

3234.50

3875.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

13810.00

1443.60

20.00

20.00

10.00

150.00

0.01

3234.50

3875.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+13810.00

+1443.60

+20.00

+20.00

+10.00

+150.00

+0.01

+3234.50

+3875.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+13810.00

+1443.60

+20.00

+20.00

+10.00

+150.00

+0.01

+3234.50

+3875.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

03

04

05

06

08

10

95

97

Grant for EWS's houses

Central Plan/Centrally Sponsored Schemes

Integrated Development of Cities

Health ascent scheme for sanitation workers

Reward scheme for sanitation workers

Assistance for Street vendors, Ferry,Beggars, garbage pickers, Snake Charmer etc.

Real Estate Authority

Maintenance of ICCC center

External Aided Projects

Page 92

0013

04

80

Slum Area Improvement

General

001

001

Direction and

Administration

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

133.33

300.00

100.00

50.00

429.98

5289.17

370.08

73.65

20.34

96.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

133.33

300.00

100.00

50.00

429.98

5289.17

370.08

73.65

20.34

96.49

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+133.33

+300.00

+100.00

+50.00

+429.98

+5289.17

+370.08

+73.65

+20.34

+96.49

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

18.02

0.00

12.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.02

0.00

12.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+133.33

+300.00

+100.00

+50.00

+411.96

+5289.17

+357.36

+73.65

+20.34

+96.49

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+4.19

+0.00

+3.44

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

12

18

19

03

02

03

04

05

06

Central Plan/Centrally Sponsored Scheme

Survey of Metro Train/DPR

District level development authority

Refund of deposit amount to free hold nazul land

Establishment of Directorate of Urban Development

Temporary Establishment or Haridwar Kumbh / Ardh Kumbh Mela

Election in Nagar Panchayats

Sweeper Employees Commission Uttarakhand

Urban Land Border planting

Page 93

4215

0013

01

Capital Account of

Water Supply and

Sanitation

Water Supply

800

101

102

Other expenditure

Urban Water Supply

Rural Water Supply

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

46.00

300.54

6850.00

100.00

1100.00

100.00

42200.01

1200.00

0.01

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46.00

300.54

6850.00

100.00

1100.00

100.00

42200.01

1200.00

0.01

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+46.00

+300.54

+6850.00

+100.00

+1100.00

+100.00

+42200.01

+1200.00

+0.01

+400.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+46.00

+300.54

+6850.00

+100.00

+1100.00

+100.00

+42200.01

+1200.00

+0.01

+400.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

07

10

03

04

05

97

01

03

04

06

Urban Environmental Protection Council

Grant for organizing Kawad Mela

Drinking Water-Urban

Almora-Saryu Seraghat Pumping Drinking Scheme (MPA)

Urban Drinking Water

External Aided Schemes

Central Plan/centrally Sponsored Scheme

Drinking Water Rural Sector

National Rural Drinking Water Programme (NRDWP 50 per cent State's Share)

Page 94

4216

4217

0013

02

80

01

Capital Outlay on

Housing

Capital Outlay on

Urban Development

Sewerage and

Sanitation

General

State Capital

Development

106

800

Sewerage Services

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4431.01

40000.00

18000.00

6300.00

735.00

3500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4431.01

40000.00

18000.00

6300.00

735.00

3500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4431.01

+40000.00

+18000.00

+6300.00

+735.00

+3500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4431.01

+40000.00

+18000.00

+6300.00

+735.00

+3500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 265005.29 +265005.29 12651.65 12651.65 +252353.64Total of Voted: +4.77

Sl

5

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

97

98

01

95

02

Establishment of hand pumps (Rural)

External/World Bank aided projects

NABARD Funded

CSS

Development of infrastructure facilities

Page 95

0013

03 Integrated

Development of Small

and Medimum Towns

051

051

191

800

Construction

Construction

Assistance to Local

Bodies,Corporations

etc.

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

7000.00

18870.00

10.00

2200.00

5000.00

9901.50

10100.00

2500.00

2000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7000.00

18870.00

10.00

2200.00

5000.00

9901.50

10100.00

2500.00

2000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7000.00

+18870.00

+10.00

+2200.00

+5000.00

+9901.50

+10100.00

+2500.00

+2000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

4000.00

0.00

78.91

0.00

8542.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4000.00

0.00

78.91

0.00

8542.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+7000.00

+14870.00

+10.00

+2121.09

+5000.00

+1359.50

+10100.00

+2500.00

+2000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+21.20

+0.00

+3.59

+0.00

+86.27

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

03

04

05

95

97

97

01

Construction of Metro Rail

CSS

Construction of Directorate Building for Urban Development

Intergrated development of towns

External aided projects

External Aided Projects

Central Plan/Centrally Sponsored Scheme

Page 96

0013

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

265005.29

0.00

0.00 0.00 0.00 +0.00 0.00 0.00 +0.00Total of Charged: +0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 97

2220

0014

01

60

Information and

Publicity

Films

Others

105

001

101

102

103

106

Production of Films

Direction and

Administration

Advertising and

visual Publicity

Information Centres

Press Information

Services

Field Publicity

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

571.72

5100.00

921.31

15205.59

61.34

25.06

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

571.72

5100.00

921.31

15205.59

61.34

25.06

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+571.72

+5100.00

+921.31

+15205.59

+61.34

+25.06

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

2.55

0.00

35.46

5.77

5.67

0.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.55

0.00

35.46

5.77

5.67

0.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+569.17

+5100.00

+885.85

+15199.82

+55.67

+24.38

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.45

+0.00

+3.85

+0.04

+9.25

+2.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

06

03

05

03

04

04

Establishment

Establishment of Film Board

Establishment Expenses

Establishment

Establishment of information Centre

Haldwani Media Centre

Establishment of Journalists welfareFund

Page 98

4059

0014

60

Capital Outlay on

Public Works

Other Buildings

107

109

110

800

051

Song and Drama

Services

Photo Services

Publications

Other Expenditure

Construction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

377.20

23.00

66.13

5063.58

100.00

60.00

50.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

377.20

23.00

66.13

5063.58

100.00

60.00

50.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+377.20

+23.00

+66.13

+5063.58

+100.00

+60.00

+50.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

17.42

0.00

2.87

2.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17.42

0.00

2.87

2.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+359.78

+23.00

+63.26

+5061.18

+100.00

+60.00

+50.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+4.62

+0.00

+4.35

+0.05

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

27724.93 0.00 0.00 27724.93 +27724.93 72.83 72.83 +27652.10Total of Voted: +0.26

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

02

03

03

03

06

07

04

Establishment

Song and theatrical plan

Establishment

Establishment

Expenditure on Independence and Republic Day etc. (except Uttarakhand Secretariat)

Reimbursement of Medical Expenses ShramJeevi Journalists

Formation of Advisory Media Committee in the State

Residential/Non-residential Buildings

Page 99

0014

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 0.00 0.00 +0.00 0.00 0.00 +0.00Total of Charged: +0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 100

2225

0015

01

03

Welfare of Scheduled

Castes, Scheduled

Tribes, Other

Backward Classes and

Miniorities

Welfare of Scheduled

Castes

Welfare of Backward

Classes

001

102

800

001

Direction and

Administration

Economic Development

Other expenditure

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

432.20

1427.80

95.31

10.00

0.01

64.32

10.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

432.20

1427.80

95.31

10.00

0.01

64.32

10.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+432.20

+1427.80

+95.31

+10.00

+0.01

+64.32

+10.63

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

46.55

97.96

0.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46.55

97.96

0.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+385.65

+1329.84

+95.22

+10.00

+0.01

+64.32

+10.63

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+10.77

+6.86

+0.10

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

06

02

04

04

05

Headquarter & Divisional Establishment

Establishment of District Offices

Social Welfare Board-State (50 per cent centrally sponsored)

Financial Assistance to Uttarkhand Multipurpose Finance and Development Corporation

Economic assistance to UttarakhandMultipurpose Finance DevelopmentCorporation

Organisation of Other Backward Classes in Uttarakhand

OBC Welfare Council

Page 101

0015

04 Welfare of Minorities

102

277

800

001

Economic Development

Education

Other expenditure

District

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2616.00

398.51

5.00

5.00

408.50

29.77

5.00

50.00

69.60

73.89

140.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2616.00

398.51

5.00

5.00

408.50

29.77

5.00

50.00

69.60

73.89

140.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2616.00

+398.51

+5.00

+5.00

+408.50

+29.77

+5.00

+50.00

+69.60

+73.89

+140.06

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.51

11.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.51

11.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2616.00

+398.51

+5.00

+5.00

+408.50

+29.77

+5.00

+50.00

+69.60

+72.38

+128.67

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2.04

+8.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

01

02

06

95

07

09

02

03

04

05

Central Plan/centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Corpus Fund for Shaheed Udham Singh Kamboj Scholarship

Corpus fund for Raja Sohail Dev scholarship scheme

Gorkha Welfare Council

Baba Sahed Phule Sheme

Assistance to Uttarakhand Waqf Board

Grants to Provincial Haj Committee

Establishment of Minorities Commission

Page 102

0015

190

277

800

Assistance to Public

Sector and Other

Undertakings

Education

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

144.40

80.02

23.56

203.00

10.00

30.00

200.00

70.86

1.50

100.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

144.40

80.02

23.56

203.00

10.00

30.00

200.00

70.86

1.50

100.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+144.40

+80.02

+23.56

+203.00

+10.00

+30.00

+200.00

+70.86

+1.50

+100.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

14.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+130.36

+80.02

+23.56

+203.00

+10.00

+30.00

+200.00

+70.86

+1.50

+100.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+9.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

02

01

02

03

04

05

06

95

02

Minority Welfare Directorate

Establishment of District Minority Welfare Offices

Assistance to Minority Finance andDevelopment Corporation for the operation development work

CSS

Scholarship to minority community students from classes 1 to 10

CM minority Incentive Scheme

Maulana Azad Education Finance Foundation

CM meritorius minority girls incentive scheme

Arabic Persian Madrasa Board

Miscellaneous grant for Madrasa

Page 103

2235

0015

01

02

Social Security and

Welfare

Rehabilitation

Social Welfare

202

101

Other Rehabilitation

Schemes

Welfare of

Handicapped

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

15.24

300.00

10.00

300.00

6.50

8.75

63.88

80.00

5.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.24

300.00

10.00

300.00

6.50

8.75

63.88

80.00

5.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+15.24

+300.00

+10.00

+300.00

+6.50

+8.75

+63.88

+80.00

+5.81

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+15.24

+300.00

+10.00

+300.00

+6.50

+8.75

+63.88

+80.00

+5.81

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

06

07

08

09

10

02

Expenditure on the implementation of the fifteen-point program

Minority Development Fund

Minority Rights Day

Operationalization of CM skills scheme

Uttarakhand Waqf Development Council

Uttarakhand Minority skills council

Assitance for the Waqf Tribunal

Grants to Arabia Madarasa

Rehabilitation of Kashmiri migrants

Page 104

0015

102 Child Welfare

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

773.70

126.68

9.00

25.00

5.00

10.00

35.92

20.00

100.00

0.01

50.00

9140.72

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

773.70

126.68

9.00

25.00

5.00

10.00

35.92

20.00

100.00

0.01

50.00

9140.72

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+773.70

+126.68

+9.00

+25.00

+5.00

+10.00

+35.92

+20.00

+100.00

+0.01

+50.00

+9140.72

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

6.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+773.70

+119.94

+9.00

+25.00

+5.00

+10.00

+35.92

+20.00

+100.00

+0.01

+50.00

+9140.72

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+5.32

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

04

05

07

08

09

11

13

16

17

19

20

21

Centrally Sponsored Scheme

Workshops & Training Centres for different Classes of Handicapped

State Level Awards to Skilled Handicapped Workers and their Employees

Marriage Incentives to HandicappedBoys/Girls

Arrangement of Handicapped Camps/Seminars

Scholarship/stipend to Handicapped Students

Programme for Implementation of Handicapped Act, 1995

Livelihood Incentive Scheme for Handicapped Persons

District Handicapped RehabilitationCentre in every District Headquarterof State

Re-imbursement of free Travelling Expenses in State Transport Corporation Buses for disabled pers

Financial assistance to disabled persons for purchase of Artificial Parts, Hearing Aid etc.

Grant-in-Aid to Blind, Deaf, Dumband Handicapped person for their Livelihood

Barrier free transportation facility under sugam Uttarakhand campaign

Page 105

0015

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

46011.96

7500.00

356.18

40.91

114.51

894.13

5.78

0.02

0.01

100.00

0.01

1725.20

2475.00

10.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46011.96

7500.00

356.18

40.91

114.51

894.13

5.78

0.02

0.01

100.00

0.01

1725.20

2475.00

10.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+46011.96

+7500.00

+356.18

+40.91

+114.51

+894.13

+5.78

+0.02

+0.01

+100.00

+0.01

+1725.20

+2475.00

+10.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

23.60

1.71

0.00

51.99

0.00

0.00

0.00

0.00

0.00

2.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23.60

1.71

0.00

51.99

0.00

0.00

0.00

0.00

0.00

2.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+46011.96

+7500.00

+332.58

+39.20

+114.51

+842.14

+5.78

+0.02

+0.01

+100.00

+0.01

+1722.65

+2475.00

+10.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+6.63

+4.17

+0.00

+5.81

+0.00

+0.00

+0.00

+0.00

+0.00

+0.15

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

05

06

07

09

10

11

12

14

15

16

17

Central Plan/Centrally Sponsored Scheme

Nutrition, Fuel, Raw Material etc. provided by the State Government under Nutrients Programe for Integra

Probation Service Group

Establishment of Child Welfare Court Board

Miscellaneous Schemes for Child Welfare

Direction to Institutions/homes

"Tilu Rauteli" State Award

Orphanage for Street Children

Monitoring & Valuation of Supplementary Nutrition (State Scheme)

Indira Women Consolidated Development Scheme (State Plan)

Nutritional Measurement/breast Feeding Scheme (State Scheme)

Arrangement of Additional Staff forDirectorate

Chief Minister's Child Nurtrition Mission Scheme (100 per cent State Assistance)

Page 106

0015

103 Women's Welfare

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1300.00

50.00

7695.62

0.02

0.02

11.51

113.46

60.00

167.74

18814.21

5.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1300.00

50.00

7695.62

0.02

0.02

11.51

113.46

60.00

167.74

18814.21

5.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1300.00

+50.00

+7695.62

+0.02

+0.02

+11.51

+113.46

+60.00

+167.74

+18814.21

+5.00

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1300.00

+50.00

+7695.62

+0.02

+0.02

+11.51

+113.46

+60.00

+167.74

+18814.21

+5.00

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

18

19

95

01

03

09

10

13

14

15

16

17

Establishment of Teenager Justise Fund

Mukhiyamantri Anchal Amrit Yojana

Assistance to physically disabled persons for buying artificial limbs, hearing aids etc.

Centrallly Plan/Center Sponsor Scheme

Scheme for Valuation of Women's Programs

Establishment of Additional Rehabilitation Organisations under Prostitution Abolition Act, 1956

Establishment of State Women Commission

Protection of women against molestation at working places , early marriage and domestic violenc

Establishment of Residential Home for Mentally Retarded Women

Grant-in-Aid to Independent Widows for their Livelihood and Education to their Children

Granr-in-Aid for Rehabilitation and Training to the Person freed from various Departmental Institutio

Scholarships to Women for Training

Page 107

0015

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

25.00

95.57

600.00

200.00

50.00

0.01

100.00

0.01

200.00

12000.00

0.01

15.00

1750.00

360.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

95.57

600.00

200.00

50.00

0.01

100.00

0.01

200.00

12000.00

0.01

15.00

1750.00

360.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+95.57

+600.00

+200.00

+50.00

+0.01

+100.00

+0.01

+200.00

+12000.00

+0.01

+15.00

+1750.00

+360.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

4.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+91.10

+600.00

+200.00

+50.00

+0.01

+100.00

+0.01

+200.00

+12000.00

+0.01

+15.00

+1750.00

+360.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+4.68

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

18

19

20

21

22

23

24

26

27

29

30

31

32

34

Arrangement of Staff at Hostels of Working Women

Headquarter of Probationay Services

Livelihood Grant to Divorcee/helpless Women and Wife of Mental Person

Welfare Fund for Anganbari Workers (State Plan)

Grant to abondaned Womens for their daugher's marriage

Nirbhaiya Scheme

Women Chief Minister's Life-time earning Scheme

State Women Welfare Empowerment Council

Arrangement of sanitary napkins foradolescent girls

Nanda Gaura Yojana

Pandit Deendayal Social Security Fund

Uttarakhand Women and Child Development Society Scheme

Mukhiya Mantri Saubhagiyawati Yojana

Page 108

0015

104

107

200

Welfare of Aged,

Infirm and Destitute

Assistance to

Voluntary

Organisations

Other Programmes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

25.00

69.12

321.88

88.71

0.01

260.00

20.00

10.00

60.00

494.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

69.12

321.88

88.71

0.01

260.00

20.00

10.00

60.00

494.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+69.12

+321.88

+88.71

+0.01

+260.00

+20.00

+10.00

+60.00

+494.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

1.92

7.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.92

7.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+69.12

+319.96

+81.23

+0.01

+260.00

+20.00

+10.00

+60.00

+494.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.60

+8.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

35

01

03

04

06

08

03

06

07

01

CSS

Residences for Aged & Infirm Persons

Prevention of begging

Old Age Women Chief Minster's Nutrition Scheme

Assistance to voluntary organizations for the care of the elderly

Grant to Recognised Technical Institutes

Grant to Volunteer Organisation/Institutions for cremation/burial of Orphans

Assistance to Voluntary organization for operation of residential Houses for mentally Chal

CSS

Page 109

0015

03 National Social

Assistance Programme

800

101

Other expenditure

National Oldage

pension scheme

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

750.00

10.00

8.00

5.00

9.30

25.06

0.50

13.07

23.80

15.31

1189.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

750.00

10.00

8.00

5.00

9.30

25.06

0.50

13.07

23.80

15.31

1189.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+750.00

+10.00

+8.00

+5.00

+9.30

+25.06

+0.50

+13.07

+23.80

+15.31

+1189.45

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+750.00

+10.00

+8.00

+5.00

+9.30

+25.06

+0.50

+13.07

+23.80

+15.31

+1189.45

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

05

06

07

08

09

10

11

95

14

01

Grant for the marriage of the daughter of destitute widows

Incentive for inter caste/inter-religious marriages

Training scheme for Skill enhancement for education unemployed Physically Disabled Per

Evaluation of Scheme, Publicity

Senior citizens and aged peoples wefare committee

Monitoring Committe of Social welfare schemes,

Implementation of Beggary Control Act

Advisor of Chief Ministers (Social Welfare)

Implementation of Forest Rights Act , 2006

CSS

Page 110

0015

60 Other Social Security

and Welfare

Programmes

102

102

107

200

National Family

Benefit Scheme

Pensions under Social

Security Schemes

Swatantrata sainik

samman Pension scheme

Other Programmes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5000.00

696.55

970.90

45126.35

3200.00

50.00

50.00

2400.00

3818.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5000.00

696.55

970.90

45126.35

3200.00

50.00

50.00

2400.00

3818.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5000.00

+696.55

+970.90

+45126.35

+3200.00

+50.00

+50.00

+2400.00

+3818.68

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

157.97

44.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

157.97

44.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5000.00

+696.55

+970.90

+45126.35

+3200.00

+50.00

+50.00

+2242.03

+3773.87

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+6.58

+1.17

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

01

95

05

06

07

08

03

03

Centrally sponsord scheme

Old Age Pension under Social Securities

Farmers Pension Scheme

Pension Scheme for above Sixty Priests residing in Hilly Areas

Dangarion and jagerio monthly pension

Pension to Freedom Fighters and their Dependents

Welfare of Soldiers

Page 111

2251

4225

0015

00

Secretariat - Social

Services

Capital Outlay on

Welfare of Scheduled

Castes, Scheduled

Tribes, other

Backward Classes &

Minorities

092 Other Offices

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.30

2506.81

0.01

0.01

3.00

20.00

0.07

0.01

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.30

2506.81

0.01

0.01

3.00

20.00

0.07

0.01

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.30

+2506.81

+0.01

+0.01

+3.00

+20.00

+0.07

+0.01

+3.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.30

+2506.81

+0.01

+0.01

+3.00

+20.00

+0.07

+0.01

+3.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

07

08

03

04

05

06

07

08

Assistance to Riot affected Persons

Establishment of Corpus Fund for Pensionary Benefits to State Agitators

Facility to the State Agitators for free Travelling in the Buses of Uttarakhand Transport Corporation

Grant-in-Aid to Freedom Fighters Birth Centenary etc. by Swantantra Sangram Sanai Sansthan

Economic Assistance to dependents of deceased freedom fighters for their cremation

Reward and Other Assistance to the Freedom Fighters

Freedom Fighters and their Heir's Welfare Board

Free Travelling Facililties in Corporate Transportation Buses to the Freedom Fighters

Re-imbursement of Medical Expenses to the Freedom fighters and their family

Page 112

0015

03

04

Welfare of Backward

Classes

Welfare of minorities

190

277

190

277

800

Investment in Public

Sector and Other

Undertakings

Education

Assistance to Public

Sector and other

undertakings

Education

Other Receipt

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

5.00

5.25

50.00

0.01

3600.00

420.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

5.00

5.25

50.00

0.01

3600.00

420.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+5.00

+5.25

+50.00

+0.01

+3600.00

+420.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+5.00

+5.25

+50.00

+0.01

+3600.00

+420.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

95

02

03

01

95

02

Share Capital for Backward Caste Finance and Development Corporation

Central Plan/Centrally Sponsored Scheme

Share Capital for Minority Finance and Development Corporation

Share capital for National Minority Development and Finance Corporation

CSS

Construction of Haj House building

Page 113

4235

0015

02

Capital Outlay on

Social Security and

Welfare

Social Welfare

101

102

Welfare of

Handicapped

Child Welfare

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

0.01

300.00

1000.01

0.01

187.40

1750.01

0.01

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

300.00

1000.01

0.01

187.40

1750.01

0.01

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.01

+300.00

+1000.01

+0.01

+187.40

+1750.01

+0.01

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.01

+300.00

+1000.01

+0.01

+187.40

+1750.01

+0.01

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

06

07

06

01

03

04

Implementati on of master plan at Kaliyar Sharif complex

Minority Welfare Building

Devolpment works in Minority-dominated areas

Construction of boundary wall in cemeteries

Construction of Musafir Khana in Dehradun

Constrction of houses for mentally treated or disabled men / women andboys / girls

Central Plan/Centrally Sponsored Scheme

Construction of Home for Street Children

Construction of State Level Rehabilitation Centres for Adolscence

Page 114

0015

60 Other Social Security

and Welfare

Programmes

103

104

800

Women's Welfare

Welfare of Aged,

Infirm and Destitute

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2000.00

262.50

100.00

200.00

400.00

0.01

150.00

50.00

20.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2000.00

262.50

100.00

200.00

400.00

0.01

150.00

50.00

20.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2000.00

+262.50

+100.00

+200.00

+400.00

+0.01

+150.00

+50.00

+20.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2000.00

+262.50

+100.00

+200.00

+400.00

+0.01

+150.00

+50.00

+20.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

95

06

09

10

01

08

10

03

Construction of Buildings for Anganbari Centres

Construction of Homes under Kishore Nyay Act, 2000 (Boys)

Construction of State Level (UttarRakshya) Homes for above 18years Girls/Women

Working Women's Hostels (State Scheme) SPA

Central Plan/Centrally Sponsored Scheme

Construction of Building of Govt. old age ashram

Sugamiya Bharat

Soilder Welfare

Page 115

4250

0015

00

Capital Outlay on

Other Social Services

203

800

Employment

Other Expenditure

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

200.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

200.00

0.01

0.00

0.00

0.00

+0.01

+200.00

+0.01

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+200.00

+0.01

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

198842.98

0.00

0.00

0.00

0.00

0.00

198842.98

0.00

+198842.98

+0.00

474.78

0.00

474.78

0.00

+198368.20

+0.00

Total of Voted:

Total of Charged:

+0.24

+0.00

Sl

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

04

02

12

Gallantry

Self-employment scheme for minorities

Implementation of Forest Right Act,2006

Page 116

2210

2230

0016

01

01

Medical and Public

Health

Labour and Employment

Urban Health

Services-Allopathy

Labour

102

001

101

102

Employees State

Insurance Scheme

Direction and

Administration

Industrial Relations

Working Conditions

and Safety

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10921.00

1000.00

337.06

923.18

37.60

218.19

117.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10921.00

1000.00

337.06

923.18

37.60

218.19

117.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10921.00

+1000.00

+337.06

+923.18

+37.60

+218.19

+117.94

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

18.44

47.94

0.45

12.67

6.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.44

47.94

0.45

12.67

6.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10921.00

+1000.00

+318.62

+875.24

+37.15

+205.52

+111.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+5.47

+5.19

+1.19

+5.81

+5.88

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

03

03

04

05

03

Central Plan/Centrally Sponsored Schemes (88 per cent Central Assistance)

Establishment of Labor Court

Enforcement of various Labor Act

State Labour Advisory Contract Board

Establishment of Industrial Tribunal& Labour Court

Inspection Establishment

Page 117

0016

02 Employment Service

103

001

004

101

General Labour

Welfare

Direction and

Administration

Research, Survey and

Statistics

Employment Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

53.41

15.00

50.00

50.00

3.00

0.01

500.00

1100.59

35.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53.41

15.00

50.00

50.00

3.00

0.01

500.00

1100.59

35.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+53.41

+15.00

+50.00

+50.00

+3.00

+0.01

+500.00

+1100.59

+35.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

3.41

0.00

0.00

0.00

0.00

0.00

0.00

62.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.41

0.00

0.00

0.00

0.00

0.00

0.00

62.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+15.00

+50.00

+50.00

+3.00

+0.01

+500.00

+1038.49

+35.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+6.39

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+5.64

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

07

09

10

12

16

17

03

01

01

Various Schemes of Labor Welfare/welfare Centre

Decentralization and strengthening of Enforcement of Labour Department

Surveying and identifying of workers in the unorganized sector

Online Registration / Renewal of Unorganized sector Workers

Online Registration and Renewal Under Deferent Adhiniyam

Common man insurance scheme (BPL) (state sheyar)

Return of funds of building and other construction workers welfare cess

Establishment of Employment

CSS

Page 118

0016

03 Training

001

003

102

Direction and

Administration

Training of Craftsmen

and Supervisors

Apprenticeship

Training

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

148.00

10.51

9.20

496.92

1175.60

11533.77

0.09

105.00

6000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

148.00

10.51

9.20

496.92

1175.60

11533.77

0.09

105.00

6000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+148.00

+10.51

+9.20

+496.92

+1175.60

+11533.77

+0.09

+105.00

+6000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

5.37

0.00

0.00

30.40

0.00

625.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.37

0.00

0.00

30.40

0.00

625.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+142.63

+10.51

+9.20

+466.52

+1175.60

+10908.39

+0.09

+105.00

+6000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+3.63

+0.00

+0.00

+6.12

+0.00

+5.42

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

08

03

01

03

08

95

97

CSS

Establishment of educationl and Guidance Centres

Strenghting of Employment Career Counselling centers

Coaching arrangements of competitive examinations for talented students of poor class

Training and Employment-related establishment

Central Plan/Centrally Sponsored Schemes

Craftsman Training Scheme and Establishment

Indutrial Training Advisory Committee

External assistance project

Page 119

4059

4216

0016

60

80

Capital Outlay on

Public Works

Capital Outlay on

Housing

Other Buildings

General

051

001

003

Construction

Direction and

Administration

Training

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2851.00

1600.00

200.00

1.00

8000.00

200.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2851.00

1600.00

200.00

1.00

8000.00

200.00

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2851.00

+1600.00

+200.00

+1.00

+8000.00

+200.00

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2851.00

+1600.00

+200.00

+1.00

+8000.00

+200.00

+1000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

48693.08 0.00 0.00 48693.08 +48693.08 813.09 813.09 +47879.99Total of Voted: +1.67

Sl

3

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

04

05

01

97

07

98

CSS

State Skill Development Programme

Chief minister shikshuta scheme

Central Plan/Centrally Sponsored Scheme

External Aided schemes (SDMA)

Strengthening of Inter State Industrial Training Institutes (with SPA)

NABARD Funded

Page 120

0016

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 0.00 0.00 +0.00 0.00 0.00 +0.00Total of Charged: +0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 121

2401

0017

00

Crop Husbandry

001 Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

17503.21

11476.95

602.03

44.41

45.00

400.00

22.80

29.00

1200.00

100.00

2000.00

8.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17503.21

11476.95

602.03

44.41

45.00

400.00

22.80

29.00

1200.00

100.00

2000.00

8.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+17503.21

+11476.95

+602.03

+44.41

+45.00

+400.00

+22.80

+29.00

+1200.00

+100.00

+2000.00

+8.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

939.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

939.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+17503.21

+10537.49

+602.03

+44.41

+45.00

+400.00

+22.80

+29.00

+1200.00

+100.00

+2000.00

+8.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+8.19

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

04

05

06

07

08

11

12

15

16

18

19

CSS

General Establishment of Agriculture Department

Trenghthening of Agricultural inputs godown and training centers

Watershed Management Directorate/ PMKS

Creation of Farmers Friend Council

Polly House diversification and scheme sprinkler water pump set

State Watershed Council

Constitution of State Farmers Commission

Integrated agricultural Village Scheme

Doubling the income of farmers

Mukhiya Mantri Krishi Vikas Yojana

Page 122

0017

102

103

105

108

Food Grain Crops

Seeds

Manures and

Fertilizers

Commercial Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2042.04

14381.38

100.00

3024.00

54.50

150.00

2221.25

20.00

13.95

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2042.04

14381.38

100.00

3024.00

54.50

150.00

2221.25

20.00

13.95

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2042.04

+14381.38

+100.00

+3024.00

+54.50

+150.00

+2221.25

+20.00

+13.95

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

134.78

0.00

0.00

0.00

0.00

275.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

134.78

0.00

0.00

0.00

0.00

275.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2042.04

+14246.60

+100.00

+3024.00

+54.50

+150.00

+1945.96

+20.00

+13.95

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.94

+0.00

+0.00

+0.00

+0.00

+12.39

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

97

03

06

03

04

03

05

06

07

Agricultural production cost survey

External Aided projects

Incentive Scheme for Local Crops

Organic Mandua Production Programme

Experimental Sub-area Exhibition and Sub-area Seed Upgradation

Strengthening of Bio-products Board

Establishment of Sugar Industry andSugarcane Development

Sugarcane Development Advisory Committee at State Level

Sugarcane and Sugar Development Industry Board

Reimbursing Commission payment against Sugarcane purchase

Page 123

0017

109

110

111

Extension and

Farmers' Training

Crop Insurance

Agricultural

Economics and

Statistics

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

24500.00

0.01

0.01

106.90

100.00

4862.70

8.00

567.55

200.00

210.00

34.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24500.00

0.01

0.01

106.90

100.00

4862.70

8.00

567.55

200.00

210.00

34.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+24500.00

+0.01

+0.01

+106.90

+100.00

+4862.70

+8.00

+567.55

+200.00

+210.00

+34.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+24500.00

+0.01

+0.01

+106.90

+100.00

+4862.70

+8.00

+567.55

+200.00

+210.00

+34.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

08

09

10

11

12

01

04

95

01

95

01

Payment of balance amount of Sugar Cane price

Payment of Incentive Bonus to Sugar Cane Farmer

Refund/Payment of Sale Tax

Workers of work Payments of Artificial road construction plans

Grants for workers working in sugarcane development/training institute

Central Plan/centrally Sponsored Scheme

Strengthening Information AdvisoryCentres

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Page 124

2415

0017

80

Agricultural Research

and Education

General

114

120

Development of Oil

Seeds

Assistance to Other

Institutions

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

45.00

5.25

20500.00

1800.00

50.00

100.00

200.00

150.00

190.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

45.00

5.25

20500.00

1800.00

50.00

100.00

200.00

150.00

190.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+45.00

+5.25

+20500.00

+1800.00

+50.00

+100.00

+200.00

+150.00

+190.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+45.00

+5.25

+20500.00

+1800.00

+50.00

+100.00

+200.00

+150.00

+190.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

95

03

04

05

08

09

13

14

Agricultural insurance survey

Central Plan/Centrally Sponsored Schemes

Grant-in-Aid to Pantnagar Agriculture University, Uttarakhand

Uttrakhand Horticulture & Forestry University, Bharsar

Construction of External Research Centres in Pantnagar University

Special Scheme for Strengthening of Agriculture University, Pantnagar

Establishing Institute of Organic Technology at Patwadagar

Hilly Agriculture Degree College, Jakholi

Hilly Agriculture Degree College, Bharisain

Page 125

4401

0017

00

Capital Outlay on

Crop Husbandry

103

107

108

Seeds

Plant Protection

Commercial Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

160.00

15.00

10.00

36.00

0.00

0.00

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

160.00

15.00

10.00

36.00

0.00

0.00

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+160.00

+15.00

+10.00

+36.00

+0.00

+0.00

+0.01

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

-55.34

-59.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-55.34

-59.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+160.00

+15.00

+10.00

+36.00

+55.34

+59.25

+0.01

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

-100.00

-100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

15

20

21

24

03

03

03

04

05

Food Processing Institute, Doiwala

Gardening Training Centre run by Bharsaar University at PratapNagar (Tehri)

Primises of Bharsaar University at Jkhinda (Tehri)

Flower seeds and training Centre Selequi

Cost of Foodgrains/pulses/oilseeds with relevant Expenses

Purchase of Insecticides and cost of Micronutrients including Incidental Charges

Construction of Residential/non-residential Buildings for Sugarcane Development Department

Share Capital to Sugar Cane Mills

Establishment of Water and Wind anti pollution machine in Public/Cooperative Sugar Mil

Page 126

6401

0017

00

Loans for Crop

Husbandry

113

119

800

109

Agriculture

Horticulture and

Vegetable Crops

Other Expenditure

Commercial Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

300.00

200.00

20.00

0.01

1000.00

0.01

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

200.00

20.00

0.01

1000.00

0.01

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+200.00

+20.00

+0.01

+1000.00

+0.01

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+200.00

+20.00

+0.01

+1000.00

+0.01

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

110869.76

0.00

0.00

0.00

0.00

0.00

110869.76

0.00

+110869.76

+0.00

1234.94

0.00

1234.94

0.00

+109634.82

+0.00

Total of Voted:

Total of Charged:

+1.11

+0.00

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

05

07

98

03

10

Special grant for Govind Vallabh Pant University of Agriculture and Technology, Pantnagar

Development of infrastructure for the University Bharsar

Construction and Maintenance of Departmental Buildings

Construction of Girls Hostels at Pantnagar University

NABARD Funded

Loan for Construction of N.C.D.C Manure Godown Plan

Loan to Mills of Uttaraskhand Co-operative Sectors/Nigams

Page 127

0017

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 128

2425

0018

00

Co-operation

001

003

106

107

108

Direction and

Administration

Training

Assistance to

multipurpose rural

co-operatives

Assistance to Credit

Co-operatives

Assistance to Other

Co-operatives

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

3683.24

120.90

70.80

26.50

10.00

125.00

200.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3683.24

120.90

70.80

26.50

10.00

125.00

200.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+3683.24

+120.90

+70.80

+26.50

+10.00

+125.00

+200.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

268.21

2.90

1.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.21

2.90

1.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+3415.03

+118.00

+68.81

+26.50

+10.00

+125.00

+200.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+7.28

+2.40

+2.81

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

06

07

06

02

03

02

General Establishment and Supervision

Tribunal Co-operative

Co-operative Election Authority

Creation and administration of Cooperative Council

Grant-in-Aid for organising Co-operative Training Centre

Transport subsidy on fertilizers

Integrated Cooperative Development Project

Special Component Plan for Scheduled Castes

Page 129

4425

6425

0018

00

00

Capital Outlay on Co-

operation

Loans for Co-

operation

800

200

108

Other Expenditure

Other Investments

Loans to Other

Cooperatives

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

20.00

953.25

0.01

0.01

4000.00

2000.00

0.00

8000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

953.25

0.01

0.01

4000.00

2000.00

0.00

8000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+953.25

+0.01

+0.01

+4000.00

+2000.00

+0.00

+8000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

-5.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-5.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+953.25

+0.01

+0.01

+4000.00

+2000.00

+5.50

+8000.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

-100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

06

28

29

31

32

03

02

Subsidy for cooperative institutionalservices

Uttarakhand State Employee Welfare corporation

State aid on interest due to flood / heavy ain

Deen Dayal Upadhyaya Cooperative Farmer Welfare Scheme

Investment in Capital Share of Societies (National Co-operative Development Corporation)

Page 130

0018

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00 0.00 0.00 0.00 +0.00 0.00 0.00 +0.00

O S R Total

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

19229.71

0.00

0.00

0.00

0.00

0.00

19229.71

0.00

+19229.71

+0.00

267.59

0.00

267.59

0.00

+18962.12

+0.00

Total of Voted:

Total of Charged:

+1.39

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 131

2501

2505

2515

0019

06

02

00

Special Programmes

for Rural Development

Rural Employment

Other Rural

Development

Programmes

Self employement

programmes

Rurual Employment

102

101

001

national rural

ajiwika mission

National Rural

Employment Programmes

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5050.00

450.00

16000.00

5600.00

412.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5050.00

450.00

16000.00

5600.00

412.66

0.00

0.00

0.00

0.00

0.00

+5050.00

+450.00

+16000.00

+5600.00

+412.66

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

22.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22.24

0.00

0.00

0.00

0.00

0.00

+5050.00

+450.00

+16000.00

+5600.00

+390.42

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+5.39

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

95

03

04

CSS

CSS

Rural Development/regional headquarter/regional Office Establishment

Page 132

0019

003

101

102

Training

Panchayati Raj

Community Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

172.33

5355.70

1067.11

125.00

1171.12

26.16

59.64

6100.42

8012.24

16248.82

8077.56

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

172.33

5355.70

1067.11

125.00

1171.12

26.16

59.64

6100.42

8012.24

16248.82

8077.56

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+172.33

+5355.70

+1067.11

+125.00

+1171.12

+26.16

+59.64

+6100.42

+8012.24

+16248.82

+8077.56

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

19.28

391.38

65.65

0.00

106.78

1.45

6.72

527.08

0.00

1278.12

526.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19.28

391.38

65.65

0.00

106.78

1.45

6.72

527.08

0.00

1278.12

526.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+153.05

+4964.32

+1001.46

+125.00

+1064.34

+24.71

+52.92

+5573.34

+8012.24

+14970.70

+7551.27

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+11.19

+7.31

+6.15

+0.00

+9.12

+5.55

+11.27

+8.64

+0.00

+7.87

+6.52

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

03

04

03

17

18

20

01

03

05

12

Establishment of Panchayati Raj Directorate

Rural Engineering Services

Training to Staff of (Regional/Zila Gram Vikas Sansthan)

Training in Uttarakhand Rural Development Institute

Establishment of Panchayati Raj

Van Panchayat

Panchayat Monitoring Cell

Panchyat (Village Panchyat officer, Assistant Development officer Panchyat

Central Plan/Centrally Sponsored Scheme

Establishment

Establishment of Pradhanmantri Gram Sarak Yojna

Page 133

0019

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

40.00

50.24

42.16

400.00

20.00

1561.75

131.66

5575.01

0.01

2000.00

0.01

3000.00

1800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40.00

50.24

42.16

400.00

20.00

1561.75

131.66

5575.01

0.01

2000.00

0.01

3000.00

1800.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+40.00

+50.24

+42.16

+400.00

+20.00

+1561.75

+131.66

+5575.01

+0.01

+2000.00

+0.01

+3000.00

+1800.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

2.57

2.56

0.00

0.00

126.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.57

2.56

0.00

0.00

126.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+40.00

+47.67

+39.60

+400.00

+20.00

+1435.04

+131.66

+5575.01

+0.01

+2000.00

+0.01

+3000.00

+1800.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+5.11

+6.07

+0.00

+0.00

+8.11

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

13

18

26

28

29

32

34

35

37

38

39

40

41

DeenDayal Uttarakhand Rural Housing Scheme

Grant to Publicity Training Centres for Training

Establishment of State Level Monitoring Cell for Rashtriya Gramin Rojgar Guaranteed Yojna

D.R.D.A Cell

Payment of subsidy under Indra Ama Bhojnalay (Restaurant) Scheme

Payment of Administrative Expenseunder State Project Management Unit

Establishment of Poverty eradication capacity development and Employment Cell

Grmiya Vikas Avam Playan Ayog

Chief Minister Women Self Help Group Empowerment Scheme

Special area development Scheme

Centage charge payment under PMGSY. SQCC, and PMC

Rural business Incubator

Repair of constructed roads under Pradhan Mantri Gram Sadak Yojana

Page 134

4515

0019

00

Capital Outlay on

other Rural

Development

Programmes

101

102

Panchayati Raj

Community Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1996.70

500.00

2000.00

89145.00

10000.00

20.00

2000.00

20501.25

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1996.70

500.00

2000.00

89145.00

10000.00

20.00

2000.00

20501.25

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1996.70

+500.00

+2000.00

+89145.00

+10000.00

+20.00

+2000.00

+20501.25

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

9702.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9702.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1996.70

+500.00

+2000.00

+79442.67

+10000.00

+20.00

+2000.00

+20501.25

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+10.88

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

97

02

01

03

04

05

07

09

Mukhiya Mantri Palayan Roktham Yojana

Eternal Aided Projects (IFED)

Central Plan/Centrally Sponsored Scheme

Repairing of Roads under construction of Prime Minster GramSarak Yojna

Construction of Residiential/non-residential Buildings for Publicity Training Centres

Excess Expenditure payment under Prime Minister's Grameen Sarak Yojna

MLA's Fund

Uttarakhand Frontier and Backward Area Development Fund

Page 135

0019

103 Rural Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

700.00

0.01

0.01

2000.00

500.00

10400.25

0.01

0.01

50.00

500.00

2500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

700.00

0.01

0.01

2000.00

500.00

10400.25

0.01

0.01

50.00

500.00

2500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+0.01

+0.01

+2000.00

+500.00

+10400.25

+0.01

+0.01

+50.00

+500.00

+2500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

6403.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6403.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+0.01

+0.01

+2000.00

+500.00

+3997.25

+0.01

+0.01

+50.00

+500.00

+2500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+61.57

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

231362.86

0.00

0.00

0.00

0.00

0.00

231362.86

0.00

+231362.86

+0.00

19182.15

0.00

19182.15

0.00

+212180.71

+0.00

Total of Voted:

Total of Charged:

+8.29

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

12

15

19

20

21

95

97

98

02

03

98

My Village my road

Construction of office Building of Uttarakhand Village Road Development Agency

Construction of residential/non-residential buildings of Commissioner, Rural Development,

Devlopment scheme for Chief Minister marginal Area

Emergency fund Primeminister Village road scheme

IFAD externally aided projects

NABARD Funded

Construction of residential/Non residential building of Rural works department

Rural Roads and Drainage

NABARD Funded

Page 136

0019

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 137

2700

2701

0020

80

03

15

Major Irrigation

Medium Irrigation-

General

Medium Irrigation-

Commercial

Maintenance of

Residential/non-

001

005

101

District

investigation

na

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4864.27

27801.71

150.00

18.84

9.56

1000.00

300.00

8300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4864.27

27801.71

150.00

18.84

9.56

1000.00

300.00

8300.00

0.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

+4864.27

+27801.71

+150.00

+18.84

+9.56

+1000.00

+300.00

+8300.00

+0.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

413.04

2260.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

413.04

2260.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4451.23

+25541.14

+150.00

+18.84

+9.56

+1000.00

+300.00

+8300.00

+0.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+8.49

+8.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

05

06

97

02

03

Direction

Executive Establishment

Establishment for daily wages workers and workshops personals (Irrigation deptt.) one time

Establishment Irrigation Advisory Committee

Uttarakhand Water Resource Management and Regulatory Commission

External aided project

Construction for DPR

Page 138

2702

0020

17

80

02

03

Minor Irrigation

residential Buildings

na

General

Ground water

Maintenance

101

101

001

005

101

Maintenance and

Repair

na

Direction

Investigation

Water Tank

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

700.00

3500.00

30.00

3653.22

14.16

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

700.00

3500.00

30.00

3653.22

14.16

10.00

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+3500.00

+30.00

+3653.22

+14.16

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

266.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

266.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+3500.00

+30.00

+3387.15

+14.16

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+7.28

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

02

03

05

06

Other Maintenance Expenditure

Estimate and Strengthening underground Water Survey

Minor Irrigation Advisory Committee

For the construction of DPR

Page 139

2711

4700

0020

80

01

00

01

Flood Control and

Drainage

Capital Outlay on

Major Irrigation(1)

General(1)

Flood Control

Major Irrigation-

Commercial

005

800

103

001

Investigation

Other Expenditure

Civil Works

District

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

700.00

190.04

0.01

800.00

2250.01

262.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

700.00

190.04

0.01

800.00

2250.01

262.50

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+190.04

+0.01

+800.00

+2250.01

+262.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+700.00

+190.04

+0.01

+800.00

+2250.01

+262.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

01

03

01

95

Private small irrigation schemes

CSS

Central Plan/Centrally Sponsored Scheme

Civil Construction Work

CSS

Page 140

0020

02

13

15

18

Major Irrigation-Non-

Commercial

Saung Dam

Construction

Rehabilitation of

Tehri Dam Project

Construction Barraze

001

001

001

001

001

District

District

District

District

District

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

0.01

300.00

15000.00

15000.00

25.00

900.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

300.00

15000.00

15000.00

25.00

900.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.01

+300.00

+15000.00

+15000.00

+25.00

+900.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+0.01

+300.00

+15000.00

+15000.00

+25.00

+900.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

02

98

02

02

02

Other maintenance expenses

Other maintenance expenses

Page 141

4701

0020

80

00

80

Capital Outlay on

Medium Irrigation

General

General

001

001

001

District

District

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

22000.00

1000.00

700.00

1500.00

15.00

300.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22000.00

1000.00

700.00

1500.00

15.00

300.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+22000.00

+1000.00

+700.00

+1500.00

+15.00

+300.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+22000.00

+1000.00

+700.00

+1500.00

+15.00

+300.00

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

97

02

05

02

04

05

Other maintenance expenses

Fund for Land Acquisition for Jamrani Dam Project

External aided project

(Construction of Reservoirs for water conservation, and drinking water etc.

Regeneration work of rivers and lakes

Reserveand building fund for upper yamuna river board

Flood Plain Zoning

Inspection / office buildings construction

Page 142

4702

0020

00

Capital Outlay on

Minor Irrigation

003

004

005

190

101

102

Training

Research

Survey and

Investigation

Investments in Public

Sector and other

Undertakings

Surface Water

Ground Water

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1500.00

20.00

50.00

100.00

100.00

5400.00

630.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1500.00

20.00

50.00

100.00

100.00

5400.00

630.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1500.00

+20.00

+50.00

+100.00

+100.00

+5400.00

+630.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1500.00

+20.00

+50.00

+100.00

+100.00

+5400.00

+630.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

7

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

04

03

03

03

01

95

01

Treatment of BALIA NALA

Upgradation for Traning Center

Construction Work

Construction Work

Share Capital to Uttarakhand Project Development and Construction Corporation

CSS

Page 143

4711

0020

01

03

Capital Outlay on

Flood Control

Projects

Flood Control

Drainage

800

051

103

103

Other Expenditure

construction

Civil Works

Civil Works

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

820.00

94.00

2000.00

0.05

1000.00

1000.00

4500.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

820.00

94.00

2000.00

0.05

1000.00

1000.00

4500.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+820.00

+94.00

+2000.00

+0.05

+1000.00

+1000.00

+4500.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+820.00

+94.00

+2000.00

+0.05

+1000.00

+1000.00

+4500.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

8

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

98

98

01

07

98

02

CSS

NABARD

NABARD Funded

Central Plan/Centrally Sponsored Scheme

Editing flood protection works during the monsoon period/Rebuilding damaged alliances

NABARD Funded

Other maintenance work

Page 144

0020

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

128808.39

300.00

0.00

0.00

0.00

0.00

128808.39

300.00

+128808.39

+300.00

2939.68

0.00

2939.68

0.00

+125868.71

+300.00

Total of Voted:

Total of Charged:

+2.28

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 145

2801

2810

4801

0021

05

00

01

Power

New and Renewable

Energy

Capital Outlay on

Power Projects

Transmission and

Distribution(4)

Hydel Generation

001

800

190

Direction and

Administration

Other Expenditure

Investments in Public

Sector and Other

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.90

228.00

172.00

201.79

788.00

15.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.90

228.00

172.00

201.79

788.00

15.25

0.00

0.00

0.00

0.00

0.00

0.00

+10.90

+228.00

+172.00

+201.79

+788.00

+15.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.90

+228.00

+172.00

+201.79

+788.00

+15.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

02

03

04

95

Management of Energy Development Fund

CSS

Assistance to UREDA for solar energy program

.Assistance to UREDA for solar Photovoltaic scheme

Administrative expenses

Page 146

6801

0021

05

Loans for Power

Projects

Transmission and

Distribution

190

undertakings

Investments in Public

Sector and other

undertakings

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

7000.00

1000.00

1000.00

1000.00

1000.01

6000.00

0.01

3000.00

3009.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

7000.00

1000.00

1000.00

1000.00

1000.01

6000.00

0.01

3000.00

3009.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+7000.00

+1000.00

+1000.00

+1000.00

+1000.01

+6000.00

+0.01

+3000.00

+3009.36

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+7000.00

+1000.00

+1000.00

+1000.00

+1000.01

+6000.00

+0.01

+3000.00

+3009.36

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

06

10

11

12

97

04

06

07

97

Investment in Energy Development Fund

Investment in Uttaranchal Jal Vidyut Nigam Limited for Hydro-electric Projects

Investment in Kissou corporation Ltfor hydropower projects

Externally Aided Scheme

Share Capital to Power Transmission Corporation of Uttarakhand

Investment for Transmission Projects

Investment in Uttarakhand Power Corporation Limited for transmission of Scheme

External Aided Projects

Page 147

0021

00

190 Loans to Public

Sector and Other

undertakings

Voted:

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4800.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4800.00

0.01

0.00

0.00

+4800.00

+0.01

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4800.00

+0.01

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

29225.34

0.00

0.00

0.00

0.00

0.00

29225.34

0.00

+29225.34

+0.00

0.00

0.00

0.00

0.00

+29225.34

+0.00

Total of Voted:

Total of Charged:

+0.00

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

97

98

Externally aided scheme

NABARD Funded

Page 148

2059

2216

0022

01

80

80

Public Works

Housing

Office Buildings

General

General

053

001

051

053

001

Maintenance and

Repairs

Direction and

Administration

Construction

Maintenance and

Repairs

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00

5957.20

400.00

48482.90

230.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

367.00

0.00

0.00

0.00

0.00

105.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5957.20

400.00

48482.90

230.00

0.00

367.00

0.00

0.00

0.00

0.00

105.00

+0.00

+5957.20

+400.00

+48482.90

+230.00

+0.00

+367.00

+0.00

+0.00

+0.00

+0.00

+105.00

0.00

389.40

0.00

3603.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

389.40

0.00

3603.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.00

+5567.80

+400.00

+44878.96

+230.00

+0.00

+367.00

+0.00

+0.00

+0.00

+0.00

+105.00

O S R Total

+0.00

+6.54

+0.00

+7.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

05

03

02

02

Maintenance and Repairs (charged)

Direction

Payment of Wages to Workcharged Employees

Development/construction Work Division

Circuit House oversight building and maintenance of office buildings - Normal and special

Rajbhawan (Dehradun and Nainital)

Page 149

3054

4059

0022

01

03

04

Roads and Bridges

Capital Outlay on

Public Works

National Highways

State Highways

District and Other

Roads (2)

337

337

337

Road Works

Road Works

Road Works

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

590.00

5000.00

500.00

700.00

33374.23

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

590.00

5000.00

500.00

700.00

33374.23

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.00

+590.00

+5000.00

+500.00

+700.00

+33374.23

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+590.00

+5000.00

+500.00

+700.00

+33374.23

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+500.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

04

05

03

05

06

Maintenance of Government Residential/ non residentional buildings

Central Plan/Centrally Sponsored Schemes

Arrangement of Outsourcing Staff for Maintaining Roadways Tasks

Road safety

Maintenance and Repairs

Arrangement of Outsourcing Staff for Maintaining Raodwys Tasks

Payment of Decree to courts (Charge)

Page 150

5054

0022

80

03

04

Capital Outlay on

Roads and Bridges

General

State Highways

District & Other

Roads

051

052

101

337

Construction

Machinery and

Equipment

Bridges

Road Works

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

470.00

100.00

300.00

2682.70

14000.00

85368.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

470.00

100.00

300.00

2682.70

14000.00

85368.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+470.00

+100.00

+300.00

+2682.70

+14000.00

+85368.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+470.00

+100.00

+300.00

+2682.70

+14000.00

+85368.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

05

03

01

03

05

Board Assembly House, Construction of Guest houses etc.

Construction of Legislative assembly during summer in Gairsen

Purchase of Machinery & Equipments

New purchasing

Construction and Strengthening of Bridges

CSS

State Sector

Page 151

0022

05

80

Roads

General

337

190

Road Works

Investments in Public

sector and other

undertakings

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1710.00

560.98

300.00

33000.00

1000.00

500.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1710.00

560.98

300.00

33000.00

1000.00

500.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1710.00

+560.98

+300.00

+33000.00

+1000.00

+500.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1710.00

+560.98

+300.00

+33000.00

+1000.00

+500.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

235936.71

972.00

0.00

0.00

0.00

0.00

235936.71

972.00

+235936.71

+972.00

3993.34

0.00

3993.34

0.00

+231943.37

+972.00

Total of Voted:

Total of Charged:

+1.69

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

97

98

02

03

03

Reconstruction of roads damaged from floods and landslides

Provision for the treatment of chronic Slip Zone

Strengthening under external aided project /ADB/World Bank aided project

NABARD Funded

Construction of bridges/roads under SPA

Laying of Ducts in major urban cities

Share Capital to Uttarakhand Infrastructure Deploment Corporation

Page 152

0022

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 153

2058

2851

0023

00

00

Stationery and

Printing

Village and Small

Industries

001

104

101

102

Direction and

Administration

Cost of Printing by

Other Sources

Industrial

Estates(3)l

Small Scale

Industries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1247.15

15.00

3000.00

0.01

2142.08

6.35

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1247.15

15.00

3000.00

0.01

2142.08

6.35

50.00

0.00

0.00

0.00

0.00

0.00

0.00

+1247.15

+15.00

+3000.00

+0.01

+2142.08

+6.35

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

82.18

0.00

0.00

0.00

203.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

82.18

0.00

0.00

0.00

203.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1164.97

+15.00

+3000.00

+0.01

+1938.21

+6.35

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+6.59

+0.00

+0.00

+0.00

+9.52

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

03

04

01

03

18

19

Roorkee Establishment- Government Press

Printing Cost

Grant under Mega Industrial / Mega Textile Policy

Central Plan/Centrally Sponsored Scheme

Establishment Expenses

Establishment of Uttarakhand Tourism and International Trade Office

Page 154

0023

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

100.00

3500.00

30.05

10.00

50.00

700.00

3500.00

0.01

0.01

200.00

200.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

100.00

3500.00

30.05

10.00

50.00

700.00

3500.00

0.01

0.01

200.00

200.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+100.00

+3500.00

+30.05

+10.00

+50.00

+700.00

+3500.00

+0.01

+0.01

+200.00

+200.00

+6.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

2.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+100.00

+3500.00

+27.84

+10.00

+50.00

+700.00

+3500.00

+0.01

+0.01

+200.00

+200.00

+6.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+7.35

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

20

21

23

25

27

29

30

32

33

34

35

36

37

Assistance to Rajya Udyog Mitra and Udyamita Vikas Parishad

Establishment of Udyamita Vikas Sansthan

Cluster Development Scheme

Special State Capital Upadan assistance to Remote Areas

Establishment of Chief Investment Commissioner, New Delhi

Grant-in-Aid for Clay Art Board

M.S.M.E Establishment Development Fund

Special Incentive Scheme for Women Entrepreneurs

Assistance Scheme for Micro, Smalland Medium Industries

Training Scheme For skill Development

Establishment of MSME project Managment Unit (PMU)

Startup & Standup India Enterpreneurship Development

Exhibition Industrial fair/National and international symposium, seminars and publicity

Page 155

0023

103 Handloom Industries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

600.00

600.00

0.01

100.00

50.00

1000.00

4000.00

0.01

150.00

0.01

0.01

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

600.00

600.00

0.01

100.00

50.00

1000.00

4000.00

0.01

150.00

0.01

0.01

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+600.00

+0.01

+100.00

+50.00

+1000.00

+4000.00

+0.01

+150.00

+0.01

+0.01

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+600.00

+0.01

+100.00

+50.00

+1000.00

+4000.00

+0.01

+150.00

+0.01

+0.01

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

38

40

42

47

48

49

50

97

07

10

11

12

Award scheme to encourage enterprenurs

Is of doing Business

International investment fair

Incentives to service sector units

State Share of MSME CSS Schemes

Establishment of Growth Center

Grant to various industrial for different Police

Mukhiya Mantri Swarojgar Yojana

External Aided Scheme in MSME

Assistance to Uttarakhand Handloom and Handicrafts Development Board

Nanda Devi Scheme

Assistance to Khadi Agencies

Pension Scheme for Craftsman

Page 156

2853

0023

02

Non-ferrous Mining

and Metallurgical

Industries

Regulation and

Development of Mines

105

001

Khadi and Village

Industries

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

5.00

5.00

20.00

80.00

1250.00

500.00

1434.91

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

5.00

5.00

20.00

80.00

1250.00

500.00

1434.91

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+5.00

+5.00

+20.00

+80.00

+1250.00

+500.00

+1434.91

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+5.00

+5.00

+20.00

+80.00

+1250.00

+500.00

+1377.87

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+3.98

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

13

14

16

17

18

03

21

03

04

Development Scheme for poor workers, weavers/artisans etc.

Uttarakhand Rajya shilp Ratna award scheme

Aid to Handlooms, spinning-weaving women workers

Modernisation of the State Design Center Kashipur and the April traning scheme

State Share of Ministry of Textile GOI Schemes

Assistance to Khadi & Gramodyog Board

Discount on sales of Khadi clothes

Mining Administration Establishment

State Minerals Development council

Page 157

3425

0023

60

Other Scientific

Research

Others

102

004

600

Mineral Exploration

Research and

Development

Other Schemes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

25.00

53.00

227.00

600.00

287.70

200.00

151.00

900.00

1500.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

53.00

227.00

600.00

287.70

200.00

151.00

900.00

1500.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+53.00

+227.00

+600.00

+287.70

+200.00

+151.00

+900.00

+1500.00

+5.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+25.00

+53.00

+227.00

+600.00

+287.70

+200.00

+151.00

+900.00

+1500.00

+5.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

07

09

14

15

02

03

04

Measurement and Estimation Scheme for Environment

Mining Surveillance

Grant-in-Aid to Space Industry Centre

Assistance to Science and Technology Board

Establishment of Uttarakhand Science and Training Centre

Grant-in-aid for Biotechnology Program

Vigyan Dham

Strengthening of the State Information Technology

Implementation of SWAN

Page 158

4851

4859

0023

00

Capital Outlay on

Village and Small

Industries

Capital Outlay on

Telecommunication and

102

103

Small Scale

Industries

Handloom Industries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

70.00

900.00

0.01

1500.00

105.00

0.01

1000.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

70.00

900.00

0.01

1500.00

105.00

0.01

1000.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+70.00

+900.00

+0.01

+1500.00

+105.00

+0.01

+1000.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+70.00

+900.00

+0.01

+1500.00

+105.00

+0.01

+1000.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

01

10

11

95

97

98

02

Reimbursement/Grants under State IT Policy

Centrally sponsared scheme

Establishment National Institute of fashion technology

Operation of Growth Center

External Aided Schemes

NABARD Funded

Establishment and assistance to Hariram Tamta traditional craft upgradation Institute

Page 159

0023

02

Electronic Industries

Electronics

004

800

Research and

Development

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1206.00

1109.00

200.00

90.00

50.00

200.00

100.00

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1206.00

1109.00

200.00

90.00

50.00

200.00

100.00

250.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1206.00

+1109.00

+200.00

+90.00

+50.00

+200.00

+100.00

+250.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1206.00

+1109.00

+200.00

+90.00

+50.00

+200.00

+100.00

+250.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

35325.36

0.00

0.00

0.00

0.00

0.00

35325.36

0.00

+35325.36

+0.00

345.30

0.00

345.30

0.00

+34980.06

+0.00

Total of Voted:

Total of Charged:

+0.98

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

11

12

13

15

16

Central Plan/Centrally Sponsored Scheme

Construction of Uttarakhand Space Utillity Center (U-sek) building

Wie fie Zone Established in State Public place

Convenience of video conferencing at tahsil and block level

Implementation of Regional Extension Network (SWAN)

Page 160

0023

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 161

2041

3053

3055

0024

00

02

80

Taxes on Vehicles

Civil Aviation

Road Transport

Air Ports

General

800

102

003

Other Expenditure

Aerodromes

Training and

Education

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

36.75

1000.00

2000.00

250.00

105.00

146.13

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36.75

1000.00

2000.00

250.00

105.00

146.13

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+36.75

+1000.00

+2000.00

+250.00

+105.00

+146.13

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

14.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+36.75

+1000.00

+2000.00

+250.00

+105.00

+131.49

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+10.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Total of Voted:

Sl

1

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

09

10

95

03

04

Establishment of State Transport Appellate

Centrally sponsored sheme

Uttarakhand Civil Aviation Development Authority

Grant by State Govt.under UDAN scheme

Civil Aviation

Grant for Disaster Search and Rescue operation

Page 162

5053

0024

00

02

Capital Outlay on

Civil Aviation

Air Ports

001

190

800

102

Direction and

Administration

Assistance to Public

Sector and Other

Undertakings

Other Expenditure

Aerodromes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4384.85

16.87

500.00

2000.00

6000.00

842.50

98.20

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4384.85

16.87

500.00

2000.00

6000.00

842.50

98.20

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4384.85

+16.87

+500.00

+2000.00

+6000.00

+842.50

+98.20

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

297.42

0.00

0.00

0.00

1734.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

297.42

0.00

0.00

0.00

1734.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4087.43

+16.87

+500.00

+2000.00

+4266.00

+842.50

+98.20

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+6.78

+0.00

+0.00

+0.00

+28.90

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

07

09

03

12

01

95

02

Transportation Establishment

Establishment related to Uttarakhand Road Security Board

Grant to the committee for implementation of Uttarakhand roadsafety fund

Payment of Surcharge to Corporation for the facility of Free Travelling by Buses of Transport Co

Reimbursement of equivalent amount of loss due to Bus Operationin Mountain Routes by Uttarkhand tr

CSS

Strengthening of the runway and associated construction works

Page 163

5055

0024

00

Capital Outlay on

Road Transport

050 Lands and Buildings

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

600.00

15000.00

2000.01

1170.00

10.00

0.01

7000.00

200.00

50.00

1000.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

600.00

15000.00

2000.01

1170.00

10.00

0.01

7000.00

200.00

50.00

1000.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+15000.00

+2000.01

+1170.00

+10.00

+0.01

+7000.00

+200.00

+50.00

+1000.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+600.00

+15000.00

+2000.01

+1170.00

+10.00

+0.01

+7000.00

+200.00

+50.00

+1000.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

07

08

01

03

05

06

07

08

10

13

Construction of Helipad and hangar

Payment of compensation for the land acauistion / acquire /NPV for the construction of the Runway

Purchase of Land for Non-residential Buildings for Transport Commissioner/District Office

Surcharge of Land acquisition for construction of Broad Guage Railway Tracks in Kiccha, Khatima

Construction of Muzzafarnagar-Roorkee Railway Line

Establishment of Automated Testing Lab at Rishikesh

Purchase of Land/construction of Building for Driver's Training Institute at Haldwani

Establishment of ISBT at Haldwani

Establishment of International Bus Dipo in Ram Nagar

Page 164

7055

0024

00

Loans for Road

Transport

190

800

101

Investments in Public

Sector and Other

Undertakings

Other Expenditure

Loans in Perpetuity

to Road Transport

Corporations

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

1000.00

100.00

241.50

0.01

100.00

1000.00

1000.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

1000.00

100.00

241.50

0.01

100.00

1000.00

1000.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+1000.00

+100.00

+241.50

+0.01

+100.00

+1000.00

+1000.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+1000.00

+100.00

+241.50

+0.01

+100.00

+1000.00

+1000.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

49051.84 0.00 0.00 49051.84 +49051.84 2046.07 2046.07 +47005.77Total of Charged: +4.17

Sl

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

14

15

16

95

01

03

05

06

Construction of I.S.B.T in Almora

Construction of buses Stops

Construction of bus stand at Narendra Nagar

Loan/investment in Share Capital in Uttarakhand Transport Corporation

Scheduled Caste candidate's free Training in Driver Testing Institute at Dehradun

Grants for payment of interest on loan for purchase of buses

Loan to Uttarakhand Transport Corporation for VRS

Page 165

0024

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

0.00 0.00 0.00 0.00 +0.00 0.00 0.00 +0.00 +0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 166

2408

3456

0025

01

00

Food Storage and

Warehousing

Civil Supplies

Food

001

102

001

Direction and

Administration

Food Subsidies

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4491.22

70.34

300.00

15.00

5000.00

1000.00

4000.00

9.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4491.22

70.34

300.00

15.00

5000.00

1000.00

4000.00

9.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4491.22

+70.34

+300.00

+15.00

+5000.00

+1000.00

+4000.00

+9.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

220.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

220.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4270.59

+70.34

+300.00

+15.00

+5000.00

+1000.00

+4000.00

+9.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+4.91

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

06

01

05

06

01

Establishment Expenses (Food & Supply)

State Food Commission

.Food ware houses / building repair and maintenance

Central Plan/Centrally Sponsored Scheme

Payment of Transportation and Tax under Distribution of Sugar Scheme

State Food Scheme

Central Plan/Centrally Sponsored Schemes

Page 167

3475

4408

0025

00

01

Other General

Economic Services

Capital Outlay on

Food Storage and

Warehousing

Food

102

106

101

Civil Supplies Scheme

Regulation of Weights

and Measures

Procurement and

Supply

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

640.12

1.06

25.00

200.00

595.60

301.50

100.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

640.12

1.06

25.00

200.00

595.60

301.50

100.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+640.12

+1.06

+25.00

+200.00

+595.60

+301.50

+100.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

53.98

0.00

0.00

0.00

48.12

-97.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53.98

0.00

0.00

0.00

48.12

-97.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+586.14

+1.06

+25.00

+200.00

+547.48

+398.85

+100.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+8.43

+0.00

+0.00

+0.00

+8.08

-32.29

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

95

02

01

03

01

95

Establishment of Directorate under Consumer Protection Program

Grant to poor families for cooking gas

Central Plan/Centrally Sponsored Scheme

Establishment Expenses

CSS

Page 168

0025

02 Storage and

Warehousing

800

800

Other Expenditure

Other Expenditure

Voted:

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

150.00

0.00

0.00

+50.00

+150.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+150.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

16949.36

0.00

0.00

0.00

0.00

0.00

16949.36

0.00

+16949.36

+0.00

225.39

0.00

225.39

0.00

+16723.97

+0.00

Total of Voted:

Total of Charged:

+1.33

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

08

06

Construction of Divisional food controller / VV officer / Garhwal and kumaon Deputy Commissioner (

Construction of Godowns for new Public Distribution System in Uttarakhand

Page 169

3452

0026

80

Tourism

General

001

104

Direction and

Administration

Promotion and

Publicity

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5840.00

23.82

437.36

510.00

100.00

128.77

1500.00

416.76

200.00

500.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5840.00

23.82

437.36

510.00

100.00

128.77

1500.00

416.76

200.00

500.00

1500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5840.00

+23.82

+437.36

+510.00

+100.00

+128.77

+1500.00

+416.76

+200.00

+500.00

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

50.71

1.09

46.56

0.00

0.00

9.28

0.00

17.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.71

1.09

46.56

0.00

0.00

9.28

0.00

17.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5789.29

+22.73

+390.80

+510.00

+100.00

+119.49

+1500.00

+398.88

+200.00

+500.00

+1500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.87

+4.60

+10.65

+0.00

+0.00

+7.21

+0.00

+4.29

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

09

11

12

07

18

24

25

26

Uttarakhand State Tourism Development Board

Establishment of Travelling Administration Organisation

Government Employees Establishment (Headquarter)

KedarNath and Tehri Tourist Special Area Development Authority

My Elder My Shrine Scheme

Hotel Management Institute, New Tehri

Loan/self employment Scheme (District Plan)

Establishment of Government HotelManagement & Catering Institute

Uttarakhand's Yoga Festiva

Deen Dayal Upadhyay (Home stay) Development Plan

Page 170

5452

0026

01

80

Capital Outlay on

Tourism

Tourist

Infrarastructure

General

101

104

800

Tourist Centre

Promotion and

Publicity

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

500.00

450.00

6093.00

500.00

300.66

3800.00

596.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

500.00

450.00

6093.00

500.00

300.66

3800.00

596.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+500.00

+450.00

+6093.00

+500.00

+300.66

+3800.00

+596.15

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+500.00

+450.00

+6093.00

+500.00

+300.66

+3800.00

+596.15

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

97

03

01

04

09

95

97

02

Grant to Uttarakhand Tourism Policy 2018

External aided project

Eco Tourism

Central Plan/Centrally Sponsored Scheme

State Sector

Uttarakhand Rural Tourism Up-gradation Scheme

External Aided Projects

Page 171

0026

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.00 0.00 0.00 0.00 +0.00 0.00 0.00 +0.00

O S R Total

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

23596.52

0.00

0.00

0.00

0.00

0.00

23596.52

0.00

+23596.52

+0.00

125.53

0.00

125.53

0.00

+23470.99

+0.00

Total of Voted:

Total of Charged:

+0.53

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Special Component Plan for Scheduled Caste

Page 172

2406

0027

00

01

Forestry and Wild

Life

Forestry

101

001

003

004

Forest Conservation,

Development and

Regeneration

Direction and

Administration

Education and

Training

Research

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

318.08

48826.06

0.11

3.23

32.59

0.11

106.16

89.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

318.08

48826.06

0.11

3.23

32.59

0.11

106.16

89.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+318.08

+48826.06

+0.11

+3.23

+32.59

+0.11

+106.16

+89.51

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

3141.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3141.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+318.08

+45684.18

+0.11

+3.23

+32.59

+0.11

+106.16

+89.51

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+6.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

05

06

07

08

02

Central Plan/Centrally Sponsored Schemes

General Administration

Forest and Environment Advisory Committee

Creation of Uttarakhand Forest Development Fund

Uttarakhand Forest Panchayat Advisory Council

Uttarakhand Eco Tourism Advisory Council

Work planning and revision work

HRD of officials and employees

Page 173

0027

070

101

Communications and

Buildings

Forest

Conservation,Developm

ent and Regeneration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

102.30

200.00

3956.20

16.00

1408.26

794.83

300.00

360.00

182.32

220.00

150.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

102.30

200.00

3956.20

16.00

1408.26

794.83

300.00

360.00

182.32

220.00

150.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+102.30

+200.00

+3956.20

+16.00

+1408.26

+794.83

+300.00

+360.00

+182.32

+220.00

+150.00

+150.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

5.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+102.30

+200.00

+3956.20

+16.00

+1402.59

+794.83

+300.00

+360.00

+182.32

+220.00

+150.00

+150.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.40

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

01

04

05

06

07

08

09

10

11

12

Research and Technology Development (State sector)

Means of Telecommunication in Forest-Bridge, Telephone and Building

CSS

Forest Settlement

Protection of forests from fire (state sector)

Multipurpose plantation and protection of forests

Compensation to in lieu of life of Government employees or public and property damage by wild animal

Forest protection scheme

Strengthening scheme of Van Panchayats

Protection and Promotion of Meadows

Rain Water Protection scheme

Page 174

0027

102 Social and Farm

Forestry

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

500.24

252.14

85.00

800.00

90.00

621.00

155.00

56.02

75.00

39.70

21.00

33.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.24

252.14

85.00

800.00

90.00

621.00

155.00

56.02

75.00

39.70

21.00

33.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.24

+252.14

+85.00

+800.00

+90.00

+621.00

+155.00

+56.02

+75.00

+39.70

+21.00

+33.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.24

+252.14

+85.00

+800.00

+90.00

+621.00

+155.00

+56.02

+75.00

+39.70

+21.00

+33.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

13

14

15

17

18

95

04

06

07

08

09

10

Land slide treatment Yojana

Protection of civil Soyam and panchayat forest from fire

Eco Tourism

Rehabitation of Gujjar and other affected people

Strengthening of forest motorways, track routes and earth routes

Strengthening of forest Residential /non-residential buildings

Plantation of Bamboo and Bio-fuel Breeds

Preservation and plantation of Medicinal Plants

Uttarakhand Bamboo and Fibre Development Board

Nursery development work under Women Component

Hamara ped hamara dhan

Page 175

0027

02 Environmental

Forestry and Wild

Life

105

800

Forest Produce

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

150.00

110.00

11000.00

100.00

3546.25

1002.12

17.00

240.92

3.50

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150.00

110.00

11000.00

100.00

3546.25

1002.12

17.00

240.92

3.50

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+150.00

+110.00

+11000.00

+100.00

+3546.25

+1002.12

+17.00

+240.92

+3.50

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+150.00

+110.00

+11000.00

+100.00

+3546.25

+1002.12

+17.00

+240.92

+3.50

+0.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

11

12

97

03

04

14

31

50

51

54

Our school our tree scheme

Bagaan

Plant distribution scheme in the Harela

Forestry Projects (sponsored by World Bank)

Forest Production Timber, Coal etc.

Leesa (Secretion)

Reward/assistance to Forest Officers/employees while Encounteror on Government Duty

Strengthening of Information Technology Cell

Human-Monkey Encounter Moderation Scheme

Rural Eco Tourism Scheme

Cartridge distribution Scheme for Forest Pig Hunting

Page 176

0027

04 Deforestation and

Ecology Development

110

103

Wild Life

Preservation

State Compensatory

afforesation Deposite

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4436.06

150.00

55.00

405.00

432.00

251.00

1200.00

13.00

22.00

538.00

7500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4436.06

150.00

55.00

405.00

432.00

251.00

1200.00

13.00

22.00

538.00

7500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4436.06

+150.00

+55.00

+405.00

+432.00

+251.00

+1200.00

+13.00

+22.00

+538.00

+7500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4436.06

+150.00

+55.00

+405.00

+432.00

+251.00

+1200.00

+13.00

+22.00

+538.00

+7500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

05

06

08

09

10

12

13

95

02

Central Plan/Centrally Sponsored Schemes

Assistance to Wildlife Board

Formation of Directorate of Environment

Remedial Measures against Human Wild Animals Encounter

Wild animal preservation, protection and development of Zoological Park

Development of habitat sites

Conservation and Development Plan of Carbate and Rajaji Tiger Reserves

Conservation of birds and development of their habitats

Preservation of Snow Leopard in Gangotri National Park

Page 177

4406

0027

01

Capital Outlay on

Forestry and Wild

Life

Forestry

070

101

Communication and

Building

Forest Conservation,

Development and

Regeneration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

12000.00

6000.00

500.00

2000.00

1500.00

180.00

73.00

350.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12000.00

6000.00

500.00

2000.00

1500.00

180.00

73.00

350.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+12000.00

+6000.00

+500.00

+2000.00

+1500.00

+180.00

+73.00

+350.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+12000.00

+6000.00

+500.00

+2000.00

+1500.00

+180.00

+73.00

+350.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

05

06

07

02

01

03

Compensatory afforestation, Additional compensatory afforestation, Penal compensatory af

Net present value and penal net present value under CAMPA

Catchment area treatment plan under CAMPA

Integrated water and land management program (IWLMP) under CAMPA

Excess from interest earned from CAMPA

Other Plantation, safety zone development, felling of trees, fencing, other-1, other-2 under CAM

NTFP Construction Centre of Excellence in IT Park in Dehradun

Central Plan/centrally Sponsored Schemes

Strengthening of Forest Motor Roads

Page 178

0027

102 Social and Farm

Forestry

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

300.00

450.00

50.00

3000.00

50.00

221.33

202.36

100.00

100.00

200.00

8.50

100.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

450.00

50.00

3000.00

50.00

221.33

202.36

100.00

100.00

200.00

8.50

100.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+450.00

+50.00

+3000.00

+50.00

+221.33

+202.36

+100.00

+100.00

+200.00

+8.50

+100.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+450.00

+50.00

+3000.00

+50.00

+221.33

+202.36

+100.00

+100.00

+200.00

+8.50

+100.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

07

08

09

10

11

12

13

14

15

95

03

97

Construction of Residential/non-residential Buildings of Forest Department

Plantation by Eco Task Force

Protection of forests from fire

Multipurpose tree planting and conservation of forests

Protection of forests from fire

Forest protection scheme

Strengthening scheme of Van Panchyats

Rain water Protection scheme

Land slide treatment yojana

Mukhiya Mantri Uttarakhand Rajya Vanya Jeevo se kheti suraksha yojna

Protection of Medicinal plants

Page 179

0027

02 Environmental

Forestry and Wild

Life

800

110

111

Other Expenditure

Wild Life

Zoological Park

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

100.00

100.00

1305.01

0.01

100.00

50.00

300.00

153.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

100.00

1305.01

0.01

100.00

50.00

300.00

153.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+100.00

+1305.01

+0.01

+100.00

+50.00

+300.00

+153.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+100.00

+100.00

+1305.01

+0.01

+100.00

+50.00

+300.00

+153.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

09

11

01

02

03

04

06

95

02

External Aided Scheme

Eco-tourism

Capital Work under Human-monkey

Central Plan/Centrally Sponsored Schemes

Creation of zoo in Haldwani

Wild aniamal preservation, protection and development of Zoological parks

Development of habitat sites

Human Wildlife Conflict Prevention

Expansion and strengthening of Malsi zoo

Page 180

0027

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

AppropriationO S R Total

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

120658.98

0.00

0.00

0.00

0.00

0.00

120658.98

0.00

+120658.98

+0.00

3147.55

0.00

3147.55

0.00

+117511.43

+0.00

Total of Voted:

Total of Charged:

+2.61

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

Page 181

2403

0028

00

Animal Husbandry

001

101

102

106

Direction and

Administration

Veterinary Services

and Animal Health

Cattle and Buffalo

Development

Other Live Stock

Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

23270.11

856.71

0.02

105.60

485.00

1000.00

0.01

150.00

51.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23270.11

856.71

0.02

105.60

485.00

1000.00

0.01

150.00

51.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+23270.11

+856.71

+0.02

+105.60

+485.00

+1000.00

+0.01

+150.00

+51.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

1901.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1901.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+21368.91

+856.71

+0.02

+105.60

+485.00

+1000.00

+0.01

+150.00

+51.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+8.17

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

10

95

01

09

10

11

95

Directorate

Central Plan/Centrally Sponsored Schemes

Operation and maintenance of various veterinary hospitals at the block level

Centrally sponsord scheme

Grant For sex classifieds semen to cattlemen

Personnel Parasites protection

Artificial Insemination Scheme of Paravat

Page 182

2404

0028

00

Dairy Development

107

113

001

102

Fodder and Feed

Development

Administrative

Investigation and

Statistics

Direction and

Administration

Dairy Development

Projects

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

20.00

250.00

105.00

500.00

69.21

112.04

0.01

1280.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

250.00

105.00

500.00

69.21

112.04

0.01

1280.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+250.00

+105.00

+500.00

+69.21

+112.04

+0.01

+1280.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

110.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

110.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+250.00

+105.00

+500.00

+69.21

+112.04

+0.01

+1170.02

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+8.64

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

07

14

98

03

01

95

03

Scheme for protection of Animals from Infectious Diseases

Establishment of Cow Shed

Womb goat rearing scheme

NABARD Funded

Establishment of Fodder Bank (store room/distribution house) (State Sector)

Central Plan/Centrally Sponsored Schemes

Establishment of Milk Supply

Page 183

2405

0028

00

Fisheries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

250.00

331.32

30.00

50.00

2200.00

600.00

100.00

2500.00

300.00

52.50

700.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

250.00

331.32

30.00

50.00

2200.00

600.00

100.00

2500.00

300.00

52.50

700.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+250.00

+331.32

+30.00

+50.00

+2200.00

+600.00

+100.00

+2500.00

+300.00

+52.50

+700.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+250.00

+331.32

+30.00

+50.00

+2200.00

+600.00

+100.00

+2500.00

+300.00

+52.50

+700.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

04

08

10

11

12

14

15

16

95

98

Central Plan/Centrally Sponsored Scheme

Dairy Development Scheme

Women Dairy Development Scheme

Establishment of Co-operative Dairy Training Institute

Strengthening Dairy

Milk price Incentive to Milk producers

Ganga Gaay Women Diary Development Scheme

Voluntary Retirement Scheme for Dairy Union

Sailase & Milch Animal Nutrition Scheme

Cattle transport grant scheme

NABARD

Page 184

4403

0028

00

Capital Outlay on

Animal Husbandry

001

101

800

101

Direction and

Administration

Inland Fisheries

Other Expenditure

Veterinary Services

and Animal Health

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

27.00

1218.23

3.15

1588.72

150.00

100.00

199.05

1.00

0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27.00

1218.23

3.15

1588.72

150.00

100.00

199.05

1.00

0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+27.00

+1218.23

+3.15

+1588.72

+150.00

+100.00

+199.05

+1.00

+0.10

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

108.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

108.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+27.00

+1110.13

+3.15

+1588.72

+150.00

+100.00

+199.05

+1.00

+0.10

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+8.87

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

95

01

02

04

95

01

95

CSS

Establishment

Central Plan/Centrally Sponsored Schemes (75 per cent Central Assistance )

Scheme for construction of AadarshFish pond in Hilly Areas

Expansion and Strengthening of Manasi Mini Zoo

Central Plan/Centrally Sponsored Schemes

Page 185

4404

4405

0028

00

00

Capital Outlay on

Dairy Development

Capital Outlay on

Fisheries

106

102

001

Other Live Stock

Development

Dairy Development

Projects

Direction and

Administration

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

18.00

5.00

50.00

2.10

700.00

20.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.00

5.00

50.00

2.10

700.00

20.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+18.00

+5.00

+50.00

+2.10

+700.00

+20.00

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+18.00

+5.00

+50.00

+2.10

+700.00

+20.00

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

5

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

09

10

95

98

04

03

Central Plan/Centrally Sponsored Scheme

Different Constructive Work under Animal Husbandry Department (State Sector)

Construction of Veterinary/animal Husbandry Centres

NABARD Funded

Construction work in Dairy Development Directorate

Construction of Residential/non-residential Buildings for Fishery Department

Page 186

0028

101 Inland Fisheries

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

847.00

97.20

1000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

847.00

97.20

1000.00

0.00

0.00

0.00

+847.00

+97.20

+1000.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+847.00

+97.20

+1000.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

41455.80

0.00

0.00

0.00

0.00

0.00

41455.80

0.00

+41455.80

+0.00

2120.00

0.00

2120.00

0.00

+39335.80

+0.00

Total of Voted:

Total of Charged:

+5.11

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

01

95

98

Central Plan/Centrally Sponsored Schemes

NABARD

Page 187

2401

0029

00

Crop Husbandry

119 Horticulture and

Vegetable Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

6219.02

19703.61

1708.31

1641.99

0.02

1000.00

48.58

5.87

44.37

100.00

5.50

45.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

162.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6219.02

19703.61

1708.31

1641.99

0.02

1000.00

48.58

5.87

44.37

100.00

5.50

45.00

0.00

162.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+6219.02

+19703.61

+1708.31

+1641.99

+0.02

+1000.00

+48.58

+5.87

+44.37

+100.00

+5.50

+45.00

+0.00

+162.43

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

1207.82

0.00

134.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1207.82

0.00

134.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.42

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+6219.02

+18495.79

+1708.31

+1507.24

+0.02

+1000.00

+48.58

+5.87

+44.37

+100.00

+5.50

+45.00

+0.00

+158.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+6.13

+0.00

+8.21

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+2.72

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

06

07

08

09

10

12

13

14

16

18

Central Plan/Centrally Sponsored Scheme

Horticulture Development

Tea Development Scheme

Mulberry Agriculture and Silk Development

Import of Fruit Plants for Dense Plantation

Grant-in-Aid to Herb Research Institute

Bee-farming Scheme

Establishment/seminar for Food processing Industry in Uttarakhand

Mushroom Production and Marketing Scheme

Renovation of Old Horticulture

Human Resources Development Scheme

Page 188

0029

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

150.00

8.00

1850.00

70.00

175.00

0.18

2.11

300.00

10.00

1700.00

735.25

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

150.00

8.00

1850.00

70.00

175.00

0.18

2.11

300.00

10.00

1700.00

735.25

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+150.00

+8.00

+1850.00

+70.00

+175.00

+0.18

+2.11

+300.00

+10.00

+1700.00

+735.25

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+150.00

+8.00

+1850.00

+70.00

+175.00

+0.18

+2.11

+300.00

+10.00

+1700.00

+735.25

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

20

23

25

26

27

28

29

30

31

32

34

95

97

Herb Development Crops

Grants to Aromatic Plants center Selequi

Anti-Hail Net Scheme (25 per cent State's Share)

Forest Silk Development

Grant to Sagandh Tree Center and Development of Tree cluster (Transfer to 09)

Grant to Herb Research and Development institute/ Herd and Sagandh Tree Cluster Development

Support price for Agriculture and Horticulture products (Malta, Hilly,Lemon , Glgl

Establishment of Horticulture training centre at Rwain Ghati

Establishment of Fruit Protection Center at Chandrnagar (Rudrpryag)

Mission Apple Scheme

Scheme for development and promotion of nurseries of State/bheshaj singh

Page 189

4401

0029

00

Capital Outlay on

Crop Husbandry

119 Horticulture and

Vegetable Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

500.01

0.00

200.00

500.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500.01

0.00

200.00

500.00

500.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.01

+0.00

+200.00

+500.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

-24.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-24.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+500.01

+24.60

+200.00

+500.00

+500.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

-100.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

37922.82

162.43

0.00

0.00

0.00

0.00

37922.82

162.43

+37922.82

+162.43

1317.98

4.42

1317.98

4.42

+36604.84

+158.01

Total of Voted:

Total of Charged:

+3.48

+2.72

Sl

2

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

98

04

13

97

98

External Aided Scheme

NABARD Funded

Diseaseless Potato Seeds/cost of Insecticides

Strengthening of State Horticulture Gardens

External Aided Schemes

NABARD

Page 190

2202

0030

01

02

General Education

Elementary Education

Secondary Education

102

112

106

109

113

Assistance to Non

Government Primary

Schools

National programe of

mid day meals in

schools

Text Books

Government Secondary

Schools

samagra shiksha

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

2755.43

4000.00

500.00

550.00

2000.87

9084.67

1060.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2755.43

4000.00

500.00

550.00

2000.87

9084.67

1060.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2755.43

+4000.00

+500.00

+550.00

+2000.87

+9084.67

+1060.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

164.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

164.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+2755.43

+4000.00

+500.00

+550.00

+1836.83

+9084.67

+1060.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+8.20

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

95

02

02

01

95

Reimbursement under Right to Education Act

CSS

Free textbook to 9th to 12th Scheduled Caste students

Special Component Plan for Scheduled Castes

CSS

Page 191

2203

2204

0030

03

00

00

Technical Education

Sports and Youth

Services

University and Higher

Education

001

103

112

Direction and

Administration

Government Colleges

and Institutes

Engineering/Technical

Colleges and

Institute

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

202.50

23.63

25.00

150.00

10.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

202.50

23.63

25.00

150.00

10.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

+202.50

+23.63

+25.00

+150.00

+10.00

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+202.50

+23.63

+25.00

+150.00

+10.00

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

03

03

04

05

CSS

Training for Competative Examinations

Grant-in-Aid to Pant College of Technology, Pant Nagar

Grant-in-Aid to Engineering College Dwarahat (Almora)

Grant-in-Aid to Engineering College Ghur Dauri (Pauri)

Page 192

2205

2210

0030

00

01

03

Art and Culture

Medical and Public

Health

Urban Health

Services-Allopathy

Rural Health

Services-Allopathy

001

104

102

110

103

Direction and

Administration

Sports and Games

Promotion of Arts and

Culture

Hospital and

Dispensaries

Primary Health

Centres

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

400.00

20.00

75.00

0.01

0.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

400.00

20.00

75.00

0.01

0.15

0.00

0.00

0.00

0.00

+400.00

+20.00

+75.00

+0.01

+0.15

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+400.00

+20.00

+75.00

+0.01

+0.15

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

02

03

03

Special Component Plan for Scheduled Castes

Special Component Plan for Scheduled Castes

Special Component Plan for Scheduled Castes

Integrated Allopathy Hospital & Dispensaries

Page 193

2211

2217

0030

06

00

03

Family Welfare

Urban Development

Public Health

Integrated

Development of Small

and Medium Towns

110

101

800

101

Hospitals and

Dispensaries

Prevention and

Control of diseases

Other expenditure

Rural Family Welfare

Services

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

8000.01

800.00

632.00

0.01

1149.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8000.01

800.00

632.00

0.01

1149.24

0.00

0.00

0.00

0.00

0.00

0.00

+8000.01

+800.00

+632.00

+0.01

+1149.24

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

79.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

79.41

0.00

0.00

0.00

0.00

0.00

0.00

+8000.01

+800.00

+632.00

+0.01

+1069.83

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+6.91

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

6

7

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

99

01

01

Establishment of Primary Health Centres

Central Plan/Centrally Sponsored Schemes

Various Health Schemes Organised by the State Government under Public Co-relation

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Schemes

Page 194

2220

2225

0030

60

Information and

Publicity

Welfare of Scheduled

Castes, Scheduled

Tribes, Other

Others

191

800

107

Assistance to Local

bodies C0orporations,

Urban Development

Authorities, Town

Improvement Boards

etc.

Other Expenditure

Song and Drama

Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5850.00

200.00

680.00

200.00

225.00

27.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5850.00

200.00

680.00

200.00

225.00

27.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5850.00

+200.00

+680.00

+200.00

+225.00

+27.00

+35.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5850.00

+200.00

+680.00

+200.00

+225.00

+27.00

+35.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

8

9

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

03

95

97

01

95

02

Central Plan/Centrally Sponsored Schemes

Integrated Development of Cities

External Aided Projects

Central Plan/Centrally Sponsored Scheme

Song and theatrical plan

Page 195

0030

01

Backward Classes and

Miniorities

Welfare of Scheduled

Castes

001

102

Direction and

Administration

Economic Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

36.06

91.58

93.74

3062.20

19.36

40.00

25.00

152.50

2200.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36.06

91.58

93.74

3062.20

19.36

40.00

25.00

152.50

2200.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+36.06

+91.58

+93.74

+3062.20

+19.36

+40.00

+25.00

+152.50

+2200.00

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

9.35

4.47

0.00

0.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.35

4.47

0.00

0.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+36.06

+82.23

+89.27

+3062.20

+19.00

+40.00

+25.00

+152.50

+2200.00

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+10.21

+4.77

+0.00

+1.86

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

06

07

08

01

03

04

05

06

07

08

Social Welfare Board-State (50 per cent centrally sponsored)

Establishment of SCP/TSP PlanningCell

Establishment Expenditure of Scheduled Castes, Tribes Commission

CSS

Private Industrial Incentive Schemes for Scheduled Caste persons Trained from Industrial Trai

Ajivika Awasar Protsahan scheme for Scheduled Castes

Shilpi Gram Scheme

Implementation of Civil Rights (Protection) Act of 1956

Financial Assistance to Scheduled Caste Individuals for Illness and marriage of daughters of Applicants

Grant on death of sweepers while cleaning Sewerage and Spectic tanks

Page 196

0030

277

283

793

Education

Housing

Special Central

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

78.75

12096.51

354.29

728.08

520.06

609.04

2126.47

302.18

242.50

20.00

524.50

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

78.75

12096.51

354.29

728.08

520.06

609.04

2126.47

302.18

242.50

20.00

524.50

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+78.75

+12096.51

+354.29

+728.08

+520.06

+609.04

+2126.47

+302.18

+242.50

+20.00

+524.50

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

16.12

19.01

0.00

15.41

0.00

7.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16.12

19.01

0.00

15.41

0.00

7.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+78.75

+12096.51

+338.17

+709.07

+520.06

+593.63

+2126.47

+294.79

+242.50

+20.00

+524.50

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+4.55

+2.61

+0.00

+2.53

+0.00

+2.44

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

01

03

06

07

12

16

18

19

20

95

02

Central Plan/Centrally Sponsored Scheme

Running of Industrial Training Centres

Running of Aashram System Schools for Scheduled Castes

Examination Training Plan before Examination of State Services for Scheduled Caste Students

Hostels for Scheduled Castes

Scholarships to the Students studying in class 1 to 10 and Students of Industrial Training Instit

Establishment of Aadarsh Residential School for Scheduled Tribes Students

Grant to Library, Hostels and Schools

Conducting seminars / workshop / surveys / research / Promotion for Scheduled Caste and Scheduled Trib

Atal Awas Yojna

Page 197

2230

2235

0030

02

03

02

Labour and Employment

Social Security and

Welfare

Employment Service

Training

Social Welfare

101

003

102

101

Assistance for

Scheduled Castes

Component Plan

Employment Services

Training of Craftsmen

and Supervisors

Apprenticeship

Training

Welfare of

Handicapped

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

160.00

92.80

109.69

37.82

2391.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

160.00

92.80

109.69

37.82

2391.21

0.00

0.00

0.00

0.00

0.00

+160.00

+92.80

+109.69

+37.82

+2391.21

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+160.00

+92.80

+109.69

+37.82

+2391.21

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

10

11

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

02

02

01

02

Central Plan/Centrally Sponsored Scheme

Education and Guidance Centres

Welfare of Scheduled Castes

CSS

Special Component Plan for Scheduled Castes

Page 198

0030

03 National Social

Assistance Programme

102

103

101

102

Child Welfare

Women's Welfare

National Oldage

pension scheme

National Family

Benefit Scheme

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

885.86

4415.57

967.20

301.05

5485.46

449.00

2000.00

112.76

335.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

885.86

4415.57

967.20

301.05

5485.46

449.00

2000.00

112.76

335.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+885.86

+4415.57

+967.20

+301.05

+5485.46

+449.00

+2000.00

+112.76

+335.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+885.86

+4415.57

+967.20

+301.05

+5485.46

+449.00

+2000.00

+112.76

+335.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

20

01

02

95

02

01

95

01

95

Reimbursement of free travel expenses in the State Transport Corporation buses by the disabled

Grant-in-Aid to Blind, Deaf, Dumband Handicapped person for their Livelihood

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Special Component Plan for Scheduled Castes

CSS

Centrally sponsord scheme

Page 199

2401

0030

60

00

Crop Husbandry

Other Social Security

and Welfare

Programmes

102

001

102

109

Pensions under Social

Security Schemes

Direction and

Administration

Food Grain Crops

Extension and

Farmers' Training

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

11635.21

840.00

4200.31

460.14

350.00

1611.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11635.21

840.00

4200.31

460.14

350.00

1611.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11635.21

+840.00

+4200.31

+460.14

+350.00

+1611.90

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11635.21

+840.00

+4200.31

+460.14

+350.00

+1611.90

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

12

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

01

95

02

01

95

Special Component Plan for Scheduled Castes

Old Age/farmer Pension

CSS

Special Component Plan for Scheduled Castes

Central Plan/centrally Sponsored Scheme

Page 200

2403

0030

00

Animal Husbandry

114

119

101

102

Development of Oil

Seeds

Horticulture and

Vegetable Crops

Veterinary Services

and Animal Health

Cattle and Buffalo

Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

189.40

16.20

1.90

1637.00

520.50

173.00

383.45

44.92

99.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

189.40

16.20

1.90

1637.00

520.50

173.00

383.45

44.92

99.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+189.40

+16.20

+1.90

+1637.00

+520.50

+173.00

+383.45

+44.92

+99.18

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+189.40

+16.20

+1.90

+1637.00

+520.50

+173.00

+383.45

+44.92

+99.18

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

13

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

02

95

01

95

01

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Central Plan/Centrally Sponsored Schemes

Page 201

2404

2405

0030

00

00

Dairy Development

Fisheries

106

113

102

101

Other Live Stock

Development

Administrative

Investigation and

Statistics

Dairy Development

Projects

Inland Fisheries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

11.74

526.50

0.01

45.00

361.18

5.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.74

526.50

0.01

45.00

361.18

5.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11.74

+526.50

+0.01

+45.00

+361.18

+5.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+11.74

+526.50

+0.01

+45.00

+361.18

+5.25

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

14

15

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

02

01

01

02

95

Centrally sponsord scheme

Special Component Plan for Scheduled Castes

Central Plan/Centrally Sponsored Schemes

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Page 202

2406

0030

01

02

Forestry and Wild

Life

Forestry

Environmental

Forestry and Wild

Life

101

102

Forest

Conservation,Developm

ent and Regeneration

Social and Farm

Forestry

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

45.00

63.06

233.11

7.00

400.00

100.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

45.00

63.06

233.11

7.00

400.00

100.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+45.00

+63.06

+233.11

+7.00

+400.00

+100.00

+40.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+45.00

+63.06

+233.11

+7.00

+400.00

+100.00

+40.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

16

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

01

02

95

01

04

95

Fisheries related programs

Expansion and Strengthening of Manasi Mini Zoo

CSS

Multipurpose plantation and conservation of forests

CSS

Plantation of Bamboo and Bio-fuel Breeds

Page 203

2425

2505

0030

04

00

02

Co-operation

Rural Employment

Deforestation and

Ecology Development

Rurual Employment

110

101

800

101

Wild Life

Preservation

National

Afforestation and

Ecology Development

Programme

Other Expenditure

National Rural

Employment Programmes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

228.00

18.40

500.00

21.00

500.00

4050.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

228.00

18.40

500.00

21.00

500.00

4050.00

0.00

0.00

0.00

0.00

0.00

+228.00

+18.40

+500.00

+21.00

+500.00

+4050.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+228.00

+18.40

+500.00

+21.00

+500.00

+4050.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

17

18

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

95

08

01

Central Plan/Centrally Sponsored Schemes

CSS

Arrangement and decoration Grant for establishment of Mini Bank for Primary Co-operative Agriculture L

Page 204

2515

2701

0030

00

80

Other Rural

Development

Programmes

Medium Irrigation-

General

102

001

Community Development

Direction

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

472.50

15655.83

0.01

1000.00

13277.00

1826.51

0.01

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

472.50

15655.83

0.01

1000.00

13277.00

1826.51

0.01

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+472.50

+15655.83

+0.01

+1000.00

+13277.00

+1826.51

+0.01

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+472.50

+15655.83

+0.01

+1000.00

+13277.00

+1826.51

+0.01

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

19

20

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

01

02

03

91

95

97

03

CSS

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Establishment

District Plan

Eternal Aided Projects (IFED)

Page 205

2711

2810

2851

3452

0030

01

00

00

80

Flood Control and

Drainage

New and Renewable

Energy

Village and Small

Industries

Tourism

Flood Control

General

103

800

103

Civil Works

Other Expenditure

Handloom Industries

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

300.00

50.00

100.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.00

50.00

100.00

20.00

0.00

0.00

0.00

0.00

0.00

+300.00

+50.00

+100.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.00

+50.00

+100.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

21

22

23

24

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

02

02

Civil Construction Work

Assistance to UREDA for solar energy program

Special Component Plan for Scheduled Castes

Page 206

4202

0030

01

02

Capital Outlay on

Education, Sports,

Art and Culture

General Education

Technical Education

104

202

104

105

Promotion and

Publicity

Secondary Education

Polytechnics

Engineering/Technical

Colleges and

Instiutes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

250.00

50.00

2000.00

300.00

200.00

100.00

50.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

250.00

50.00

2000.00

300.00

200.00

100.00

50.00

50.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+250.00

+50.00

+2000.00

+300.00

+200.00

+100.00

+50.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+250.00

+50.00

+2000.00

+300.00

+200.00

+100.00

+50.00

+50.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

25

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

01

02

95

03

03

04

Veer Chandra Singh Garhwali tourism self employment scheme

Establishment

Central Plan/Centrally Sponsored Schemes

Special Component Plan for Scheduled Castes

Strengthening /Construction of Buildings for Government Polytechnic Institution (Boys/Girls)

Pant College of Technology, Pant Nagar

Page 207

4210

0030

03

04

02

Capital Outlay on

Medical and Public

Health

Sports and Youth

Services

Art and Culture

Rural Health Services

102

800

104

110

Sports Stadium

Other Expenditure

Community Health

Centres

Hospitals and

Dispensaries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

100.00

50.00

20.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

100.00

50.00

20.00

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+100.00

+50.00

+20.00

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+100.00

+50.00

+20.00

+0.01

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

26

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

05

03

04

03

03

02

Grant-in-Aid to Technical University

Engineering College Dwarahat (Almora)

Construction of Indoor Hall and Hostel

Construction of Sprots Stadium (New Work)

Art & Culture Promotion

Establishment of Community Health Centres

Page 208

4211

4215

0030

00

01

Capital Account of

Family Welfare

Capital Account of

Water Supply and

Sanitation

Water Supply

101

101

102

Rural Family Welfare

Service

Urban Water Supply

Rural Water Supply

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.01

300.00

50.00

181.50

11100.00

430.00

1165.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

300.00

50.00

181.50

11100.00

430.00

1165.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+300.00

+50.00

+181.50

+11100.00

+430.00

+1165.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.01

+300.00

+50.00

+181.50

+11100.00

+430.00

+1165.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

27

28

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

03

05

01

02

95

Special Component Plan for Scheduled Castes

Construction of Morturies

Construction of Non-residential Buildings

Construction of Buildings for Sub-centres

Urban Drinking Water

Central Plan/centrally Sponsored Scheme

Multipurpose plantation and conservation of forests

Page 209

4217

4225

0030

02

03

01

Capital Outlay on

Urban Development

Capital Outlay on

Welfare of Scheduled

Castes, Scheduled

Tribes, other

Backward Classes &

Minorities

Sewerage and

Sanitation

Integrated

Development of Small

and Medimum Towns

Welfare of Scheduled

Castes

106

051

190

Sewerage Services

Construction

Investment in Public

Sector and Other

Undertakings.

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1800.00

210.00

2000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1800.00

210.00

2000.00

0.00

0.00

0.00

0.00

+1800.00

+210.00

+2000.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1800.00

+210.00

+2000.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

29

30

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

97

CSS

External aided projects

Page 210

4235

4406

0030

02

Capital Outlay on

Social Security and

Welfare

Capital Outlay on

Social Welfare

277

800

102

Education

Other Expenditure

Child Welfare

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

30.00

310.88

0.01

300.00

0.01

160.88

3000.00

281.86

3.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.00

310.88

0.01

300.00

0.01

160.88

3000.00

281.86

3.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+30.00

+310.88

+0.01

+300.00

+0.01

+160.88

+3000.00

+281.86

+3.73

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+30.00

+310.88

+0.01

+300.00

+0.01

+160.88

+3000.00

+281.86

+3.73

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

31

32

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

03

05

06

95

03

01

95

Scheduled Castes Development Corporation Share Capital for Self Employment

Central Plan/Centrally Sponsored Scheme

Construction of Industrial Training Centre Building for Scheduled Castes

Construction of Residential School in every District for Scheduled Caste Boys/girls

Building Construction Rajkiya Ashram Paddti Vidhiyalaya

Swerage Development Facilities in Scheduled Castes Dominated Areas

Central Plan/Centrally Sponsored Scheme

Page 211

4515

4700

0030

01

00

04

Forestry and Wild

Life

Capital Outlay on

other Rural

Development

Programmes

Capital Outlay on

Major Irrigation(1)

Forestry

Construction of Tube-

wells

101

102

001

Forest Conservation,

Development and

Regeneration

Community Development

District

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

360.01

0.01

3300.00

5058.75

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

360.01

0.01

3300.00

5058.75

100.00

0.00

0.00

0.00

0.00

0.00

+360.01

+0.01

+3300.00

+5058.75

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+360.01

+0.01

+3300.00

+5058.75

+100.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

33

34

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

01

02

04

02

Construction of Residential/non-residential Buildings of Forest Department

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Construction of Residiential/non-residential Buildings for Publicity Training Centres

Other maintenance expenses

Page 212

4702

4711

0030

06

00

01

Capital Outlay on

Minor Irrigation

Capital Outlay on

Flood Control

Projects

Irrigation Canals

under

Construction/Other

Schemes

Flood Control

001

101

102

800

District

Surface Water

Ground Water

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

2992.50

200.00

349.13

100.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

2992.50

200.00

349.13

100.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+2992.50

+200.00

+349.13

+100.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+2992.50

+200.00

+349.13

+100.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

35

36

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

02

95

02

02

Other maintenance expenses

CSS

Other maintenance expenses

Special Component Plan for SCs

Special Component Plan for Scheduled Castes

Page 213

4801

5054

5055

0030

05

04

00

Capital Outlay on

Power Projects

Capital Outlay on

Roads and Bridges

Capital Outlay on

Road Transport

Transmission and

Distribution

District & Other

Roads

103

190

337

190

Civil Works

Investments in Public

Sector and other

undertakings

Road Works

Investments in Public

Sector and Other

Undertakings

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

600.00

500.00

6340.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

600.00

500.00

6340.00

0.00

0.00

0.00

0.00

+200.00

+600.00

+500.00

+6340.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+600.00

+500.00

+6340.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

37

38

39

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

97

02

Special Component Plan for Scheduled Castes

Share Capital to PITCUL against REC Loans

External Aided Projects

Special Component Plan for Scheduled Caste

Page 214

5452

0030

80

Capital Outlay on

Tourism

General

800

104

Other Expenditure

Promotion and

Publicity

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

40.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

40.00

200.00

0.00

0.00

0.00

+200.00

+40.00

+200.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+40.00

+200.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

187701.80

0.00

0.00

0.00

0.00

0.00

187701.80

0.00

+187701.80

+0.00

315.57

0.00

315.57

0.00

+187386.23

+0.00

Total of Voted:

Total of Charged:

+0.17

+0.00

Sl

40

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

03

03

04

Grant-in-Aid to Uttarakhand Transport Corporation for construction of Bus Stand

Scheduled Caste candidate's free Training in Driver Testing Institute at Dehradun

State Sector

Page 215

2202

0031

01

02

General Education

Elementary Education

Secondary Education

102

112

001

106

113

Assistance to Non

Government Primary

Schools

National programe of

mid day meals in

schools

Direction and

Administration

Text Books

samagra shiksha

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

612.32

600.00

66.73

212.18

70.00

1867.18

217.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

612.32

600.00

66.73

212.18

70.00

1867.18

217.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+612.32

+600.00

+66.73

+212.18

+70.00

+1867.18

+217.84

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

13.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.51

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+612.32

+600.00

+66.73

+198.67

+70.00

+1867.18

+217.84

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+6.37

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

95

02

02

01

95

Special Component Plan for Scheduled Castes

CSS

Establishment of Government Secondary Schools

Free textbook to 9th to 12th Scheduled Caste students

CSS

Page 216

2203

2204

0031

03

00

Technical Education

Sports and Youth

Services

University and Higher

Education

001

103

105

112

Direction and

Administration

Government Colleges

and Institutes

Polytechnics

Engineering/Technical

Colleges and

Institute

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

9.90

101.70

11.87

40.00

0.01

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.90

101.70

11.87

40.00

0.01

20.00

0.00

0.00

0.00

0.00

0.00

0.00

+9.90

+101.70

+11.87

+40.00

+0.01

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+9.90

+101.70

+11.87

+40.00

+0.01

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

2

3

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

95

03

04

05

Strengthening of colleges

CSS

General Polytechnic

Grant-in-Aid to Engineering College Dwarahat (Almora)

Grant-in-Aid to Engineering College Ghur Dauri (Pauri)

Page 217

2205

2210

0031

00

00

03

Art and Culture

Medical and Public

Health

Rural Health

Services-Allopathy

001

001

796

110

Direction and

Administration

Direction and

Administration

Tribal Area Sub-Plan

Hospitals and

Dispensaries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

10.00

20.00

30.00

1153.07

344.26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

10.00

20.00

30.00

1153.07

344.26

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+10.00

+20.00

+30.00

+1153.07

+344.26

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

18.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.11

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+10.00

+20.00

+30.00

+1153.07

+326.15

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+5.26

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

4

5

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

02

03

01

02

Special Component Plan for Scheduled Castes

Directorate of Sports

Scheme for documentation,conservation and Upgradation of art and Culture of Sc

Purchase of Traditional Musical Instuments & Costumes

Central Plan/Centrally Sponsored Schemes

Establishment of Community Health Centre

Page 218

2211

0031

04

06

00

Family Welfare

Rural Health

Services-Other

Systems of Medicine

Public Health

796

102

101

800

101

Tribal Area Sub-Plan

Homeopathy

Prevention and

Control of diseases

Other expenditure

Rural Family Welfare

Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

55.59

134.52

0.75

33.68

112.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55.59

134.52

0.75

33.68

112.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

+55.59

+134.52

+0.75

+33.68

+112.00

+2.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

2.23

0.00

0.00

2.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.23

0.00

0.00

2.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+53.36

+134.52

+0.75

+31.50

+112.00

+2.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+4.01

+0.00

+0.00

+6.46

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

6

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

95

06

02

99

02

Assistance to Leprosy Patients

Establishment of Health Sub-centres (State financed)

Special Component Plan for Scheduled Castes

Various Health Schemes Organised by the State Government under Public Co-relation

Additional Honorarium Payment to Part-time Maids

Page 219

2217

2220

0031

03

60

Urban Development

Information and

Publicity

Integrated

Development of Small

and Medium Towns

Others

191

800

107

Assistance to Local

bodies C0orporations,

Urban Development

Authorities, Town

Improvement Boards

etc.

Other Expenditure

Song and Drama

Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

300.34

0.03

150.00

100.00

45.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.34

0.03

150.00

100.00

45.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

+300.34

+0.03

+150.00

+100.00

+45.00

+5.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

9.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+290.72

+0.03

+150.00

+100.00

+45.00

+5.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+3.20

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

7

8

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

03

97

01

95

Central Plan/Centrally Sponsored Schemes

Integrated Development of Cities

External Aided Projects

Central Plan/Centrally Sponsored Scheme

Page 220

2225

0031

02

Welfare of Scheduled

Castes, Scheduled

Tribes, Other

Backward Classes and

Miniorities

Welfare of Scheduled

Tribes

001

102

Direction and

Administration

Economic Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

15.00

303.16

214.97

72.75

31.16

48.62

1620.00

43.87

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

303.16

214.97

72.75

31.16

48.62

1620.00

43.87

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+15.00

+303.16

+214.97

+72.75

+31.16

+48.62

+1620.00

+43.87

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

20.75

2.50

0.00

0.00

0.00

1.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.75

2.50

0.00

0.00

0.00

1.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+15.00

+303.16

+194.22

+70.25

+31.16

+48.62

+1620.00

+41.99

+10.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+9.65

+3.44

+0.00

+0.00

+0.00

+4.29

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

9

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

03

04

05

06

01

02

03

Song and theatrical plan

Operation of Eklavya residential schools

Integrated Scheduled Tribes Development Co-operative Establishment

Establishment of Uttarakhand Scheduled Tribes Commission

Tribal Advisory Council

CSS

Integrated Tribal Development project

Career Opportunities Incentive Scheme

Page 221

0031

277 Education

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

10.00

30.00

100.00

189.00

2184.05

251.52

2742.39

350.00

563.18

1005.00

50.00

70.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

30.00

100.00

189.00

2184.05

251.52

2742.39

350.00

563.18

1005.00

50.00

70.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+30.00

+100.00

+189.00

+2184.05

+251.52

+2742.39

+350.00

+563.18

+1005.00

+50.00

+70.00

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+10.00

+30.00

+100.00

+189.00

+2184.05

+251.52

+2742.39

+350.00

+563.18

+1005.00

+50.00

+70.00

+30.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

05

06

95

01

03

04

05

06

07

09

10

11

Shilpi Gram Yojana

Projects for development of Scheduled Tribes

Development of Buxa and Raji Tribes

Hostels Maintenance for Scheduled Castes Scheduled Tribes Students

Government Aashram System School's Maintenance for Scheduled Tribes Students

Hostel's Maintenance for ScheduledTribes Students

Scholarship and Non-recurring assistance to the Scheduled Tribe Students of Class 1 to 10

Establishment of Government Industrial Training Institutes

Grant to Aided Libraries/hostels andPrimary Schools

Free Laptop distribution Scheme to Scheduled Tribe Students under Medical and Engineering Training

Pre-examination coaching for civil & Allied Services for ST Students

Maharaja Jagat Dev Education Fundfor Buxa tribe

Page 222

2230

0031

02

Labour and Employment

Employment Service

283

794

796

800

001

101

Housing

Special Central

Assistance for Tribal

Sub-Plan

Tribal Area Sub-Plan

Other expenditure

Direction and

Administration

Employment Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

50.00

231.00

150.00

600.00

900.00

500.00

35.25

44.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50.00

231.00

150.00

600.00

900.00

500.00

35.25

44.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+231.00

+150.00

+600.00

+900.00

+500.00

+35.25

+44.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+50.00

+231.00

+150.00

+600.00

+900.00

+500.00

+35.25

+44.13

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

10

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

12

95

02

01

01

21

02

02

Chetak Siksha Protsahan Yojana forTharu Tribes

Atal Awas Yojana

Central Plan/Centrally Sponsored Scheme

Central Plan/Centrally Sponsored Schemes

Grant-in-Aid to Scheduled Tribes for their Daughter's Marriage

(Establishment of Teaching guidance Centre

Page 223

2235

0031

03

02

Social Security and

Welfare

Training

Social Welfare

003

102

101

102

Training of Craftsmen

and Supervisors

Apprenticeship

Training

Welfare of

Handicapped

Child Welfare

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

20.88

15.75

1.84

475.00

5.00

1402.95

125.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.88

15.75

1.84

475.00

5.00

1402.95

125.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.88

+15.75

+1.84

+475.00

+5.00

+1402.95

+125.04

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.88

+15.75

+1.84

+475.00

+5.00

+1402.95

+125.04

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

11

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

01

95

02

03

01

95

Education and Guidance Centres

Craftsman Training Scheme and Establishment

CSS

Special Component Plan for Scheduled Castes

Reimbursement of free travel expenses in the State Transport Corporation buses by the disabled

Central Plan/Centrally Sponsored Scheme

Page 224

0031

03 National Social

Assistance Programme

103

104

200

796

101

Women's Welfare

Welfare of Aged,

Infirm and Destitute

Other Programmes

Tribal Area Sub-Plan

National Oldage

pension scheme

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

868.00

2527.00

125.00

355.36

3.53

36.93

103.69

439.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

868.00

2527.00

125.00

355.36

3.53

36.93

103.69

439.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+868.00

+2527.00

+125.00

+355.36

+3.53

+36.93

+103.69

+439.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+868.00

+2527.00

+125.00

+355.36

+3.53

+36.93

+103.69

+439.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

02

03

03

07

01

95

Special Component Plan for Scheduled Castes

Old age pension

Kisan Pension Yojana

Integrated Child Development Schemes State Government Honorarium on Scheduled Tribal cen

Education Facilities for IndependentWidows Children and Livelihood Grant

Grant-in-Aid to Blind, Deaf, Dumband Handicapped persons for their livelihood

CSS

Page 225

2401

0031

00

Crop Husbandry

102

001

102

109

114

National Family

Benefit Scheme

Direction and

Administration

Food Grain Crops

Extension and

Farmers' Training

Development of Oil

Seeds

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

73.88

70.95

888.31

97.84

150.00

400.40

31.09

2.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

73.88

70.95

888.31

97.84

150.00

400.40

31.09

2.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+73.88

+70.95

+888.31

+97.84

+150.00

+400.40

+31.09

+2.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+73.88

+70.95

+888.31

+97.84

+150.00

+400.40

+31.09

+2.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

12

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

95

02

01

95

01

Centrally sponsord scheme

CSS

Special Component Plan for Scheduled Castes

Central Plan/centrally Sponsored Scheme

Central Plan/Centrally Sponsored Schemes

Page 226

0031

119 Horticulture and

Vegetable Crops

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

0.32

190.00

33.57

73.13

12.00

4.00

4.00

6.00

17.29

5.00

3.00

0.01

5.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.32

190.00

33.57

73.13

12.00

4.00

4.00

6.00

17.29

5.00

3.00

0.01

5.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.32

+190.00

+33.57

+73.13

+12.00

+4.00

+4.00

+6.00

+17.29

+5.00

+3.00

+0.01

+5.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+0.32

+190.00

+33.57

+73.13

+12.00

+4.00

+4.00

+6.00

+17.29

+5.00

+3.00

+0.01

+5.50

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

01

04

05

06

07

08

09

10

11

12

13

14

Central Plan/Centrally Sponsored Scheme

Human Resource Development Scheme

Tea Development Scheme

Mulberry Agriculture and Silk Development

Import of Fruit Plants for Dense Plantation

Grant-in-Aid to Herb Research Institute

Bee-farming Scheme

Silk textile development plan

Establishment/seminar for Food processing Industry in Uttarakhand

Mushroom Production and Marketing Scheme

Page 227

2403

0031

00

Animal Husbandry

101

102

106

Veterinary Services

and Animal Health

Cattle and Buffalo

Development

Other Live Stock

Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

27.00

110.00

22.01

192.26

24.30

51.30

5.99

56.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27.00

110.00

22.01

192.26

24.30

51.30

5.99

56.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+27.00

+110.00

+22.01

+192.26

+24.30

+51.30

+5.99

+56.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+27.00

+110.00

+22.01

+192.26

+24.30

+51.30

+5.99

+56.70

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

13

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

15

16

95

01

95

01

95

02

Renovation of Old Horticulture

Mehal & Other Fruits transplanting Structure (anmwla and Mango) Scheme

Human Resources Development Scheme

Central Plan/Centrally Sponsored Schemes

Centrally sponsord scheme

Special Component Plan for Scheduled Castes

Page 228

2404

2405

2406

0031

00

00

Dairy Development

Fisheries

Forestry and Wild

Life

113

102

101

Administrative

Investigation and

Statistics

Dairy Development

Projects

Inland Fisheries

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

17.64

34.20

0.01

20.00

13.58

70.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17.64

34.20

0.01

20.00

13.58

70.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+17.64

+34.20

+0.01

+20.00

+13.58

+70.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+17.64

+34.20

+0.01

+20.00

+13.58

+70.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

14

15

16

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

01

02

03

02

03

State Animal Husbandry & Agriculture Areas

Cattle Rearing Scheme

Central Plan/Centrally Sponsored Schemes

Special Component Plan for Scheduled Castes

Dairy Development Scheme

Scheme for construction of AadarshFish pond in Hilly Areas

Fisheries related programs

Page 229

2425

2501

0031

01

02

00

Co-operation

Special Programmes

Forestry

Environmental

Forestry and Wild

Life

101

102

110

800

Forest

Conservation,Developm

ent and Regeneration

Social and Farm

Forestry

Wild Life

Preservation

Other Expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

180.00

21.00

230.00

8.01

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

180.00

21.00

230.00

8.01

200.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+180.00

+21.00

+230.00

+8.01

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+180.00

+21.00

+230.00

+8.01

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

17

18

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

01

95

01

95

02

Multipurpose plantation and conservation of forests

CSS

Central Plan/Centrally Sponsored Schemes

Special Component Plan for Scheduled Castes

Page 230

2505

2515

0031

01

02

00

for Rural Development

Rural Employment

Other Rural

Development

Programmes

Integrated Rural

Development Programme

Rurual Employment

003

101

102

Training (will cover

TRYSEM Training of

Rural Youth for Self

Employment)

National Rural

Employment Programmes

Community Development

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

1911.90

203.06

831.38

290.98

3960.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1911.90

203.06

831.38

290.98

3960.01

0.00

0.00

0.00

0.00

0.00

+1911.90

+203.06

+831.38

+290.98

+3960.01

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+1911.90

+203.06

+831.38

+290.98

+3960.01

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

19

20

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

95

01

95

01

03

CSS

CSS

Central Plan/Centrally Sponsored Scheme

Page 231

2701

2711

0031

80

01

80

Medium Irrigation-

Flood Control and

Drainage

General

Flood Control

other

001

103

103

Direction

Civil Works

na

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

246.00

0.01

2150.00

462.00

0.01

20.00

20.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

246.00

0.01

2150.00

462.00

0.01

20.00

20.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+246.00

+0.01

+2150.00

+462.00

+0.01

+20.00

+20.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+246.00

+0.01

+2150.00

+462.00

+0.01

+20.00

+20.00

+300.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

21

22

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

04

91

95

97

04

02

03

Establishment

Member of Legislative Assembly Fund

District Plan

Eternal Aided Projects (IFED)

Page 232

2810

2851

3452

0031

00

00

80

New and Renewable

Energy

Village and Small

Industries

Tourism

General

800

103

104

Other Expenditure

Handloom Industries

Promotion and

Publicity

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

5.00

5.00

10.00

50.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.00

5.00

10.00

50.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

+5.00

+5.00

+10.00

+50.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+5.00

+5.00

+10.00

+50.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

23

24

25

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

04

05

02

Assistance to UREDA for solar energy program

.Assistance to UREDA for solar Photovoltaic scheme

Special Incentive Scheme for Women of Tharoo Boxa and Other Tribes

Re-establishment and VRS Schemefor Sick Weaving Mills of Kashipur,Jaspur

Veer Chandra Singh Garhwali tourism self employment scheme

Page 233

4202

0031

01

02

03

Capital Outlay on

Education, Sports,

Art and Culture

General Education

Technical Education

Sports and Youth

Services

202

203

104

105

Secondary Education

University and Higher

Education

Polytechnics

Engineering/Technical

Colleges and

Instiutes

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

720.00

250.00

84.00

350.00

50.00

5.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

720.00

250.00

84.00

350.00

50.00

5.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+720.00

+250.00

+84.00

+350.00

+50.00

+5.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+720.00

+250.00

+84.00

+350.00

+50.00

+5.00

+0.01

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

26

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

01

02

95

03

03

03

05

Central Plan/Centrally Sponsored Schemes

Special Component Plan for Scheduled Castes

Completion of under construction Buildings of Government Degree Colleges

Strengthening /Construction of Buildings for Government Polytechnic Institution (Boys/Girls)

Pant College of Technology, Pant Nagar

Engineering College Dwarahat (Almora)

Page 234

4215

0031

04

01

02

Capital Account of

Water Supply and

Sanitation

Art and Culture

Water Supply

Sewerage and

Sanitation

101

102

800

102

106

Youth Hostels

Sports Stadium

Other Expenditure

Rural Water Supply

Sewerage Services

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

20.00

100.00

40.00

2491.38

110.00

290.66

568.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

100.00

40.00

2491.38

110.00

290.66

568.80

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+100.00

+40.00

+2491.38

+110.00

+290.66

+568.80

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+20.00

+100.00

+40.00

+2491.38

+110.00

+290.66

+568.80

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

27

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

03

02

01

02

95

01

Pradesik Vikas Dal

Construction of Indoor Hall and Hostel

Construction of Cultural Building inTribal dominate Area / Jan Milan Center etc.

Central Plan/centrally Sponsored Scheme

Multipurpose plantation and conservation of forests

Page 235

4225

0031

02

Capital Outlay on

Welfare of Scheduled

Castes, Scheduled

Tribes, other

Backward Classes &

Minorities

Walfare of Scheduled

Tribes

190

277

800

Investment in Public

Sector and Other

Undertakings

Education

Other expenditure

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

66.36

30.00

100.00

250.00

100.00

0.01

9.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66.36

30.00

100.00

250.00

100.00

0.01

9.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+66.36

+30.00

+100.00

+250.00

+100.00

+0.01

+9.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+66.36

+30.00

+100.00

+250.00

+100.00

+0.01

+9.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

28

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

95

03

05

06

07

10

01

CSS

Self-Employment Share Capital (49Per cent Central Assistance)

Upgradation of Infrastructural facilities in Government Scheduled Tribes Hostels

Upgradation of Infrastructural Facilities in Government Aashram System Hostels

Infrastructure facilities in Government Industrial Training

Construction of the School of Ashram padhati for the boys School Binson in Dehradun

Central Plan/Centrally Sponsored Scheme

Page 236

4515

4700

0031

00

Capital Outlay on

other Rural

Development

Programmes

Capital Outlay on

Major Irrigation(1)

102

796

Community Development

Tribal Area Sub-Plan

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

450.00

0.01

1.05

0.01

205.02

1065.00

400.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

450.00

0.01

1.05

0.01

205.02

1065.00

400.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+450.00

+0.01

+1.05

+0.01

+205.02

+1065.00

+400.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+450.00

+0.01

+1.05

+0.01

+205.02

+1065.00

+400.00

+200.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

29

30

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

95

01

02

04

05

03

Development of Infrastructural facility in Scheduled Tribes Areas

Directorate of Welfare for Scheduled Tribes

Central Plan/Centrally Sponsored Scheme

Special Component Plan for Scheduled Castes

Construction of Residiential/non-residential Buildings for Publicity Training Centres

Excess Expenditure payment under Prime Minister's Grameen Sarak Yojna

My Village My Road

Page 237

4702

0031

04

06

00

Capital Outlay on

Minor Irrigation

Construction of Tube-

wells

Irrigation Canals

under

Construction/Other

Schemes

001

001

101

102

District

District

Surface Water

Ground Water

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

300.00

270.00

90.00

31.50

50.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

300.00

270.00

90.00

31.50

50.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+300.00

+270.00

+90.00

+31.50

+50.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+300.00

+270.00

+90.00

+31.50

+50.00

+20.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

31

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

02

02

01

02

95

02

03

Other maintenance expenses

Other maintenance expenses

CSS

Other maintenance expenses

Special Component Plan for SCs

.C. o.n.s.tr.u. c.t.io.n of Gool, Hauz,Piplines in Tribal Areas

Page 238

4711

4801

5054

0031

01

05

04

Capital Outlay on

Flood Control

Projects

Capital Outlay on

Power Projects

Capital Outlay on

Roads and Bridges

Flood Control

Transmission and

Distribution

District & Other

Roads

103

190

337

Civil Works

Investments in Public

Sector and other

undertakings

Road Works

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

250.00

200.00

115.74

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

250.00

200.00

115.74

10.00

0.00

0.00

0.00

0.00

+250.00

+200.00

+115.74

+10.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+250.00

+200.00

+115.74

+10.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

32

33

34

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

05

97

02

Unexpected Emergency Works, improvement and Erosion in Rivers

Investment in ADB financed Scheme

External Aided Projects

Page 239

5055

5452

0031

00

80

Capital Outlay on

Road Transport

Capital Outlay on

Tourism

General

796

190

800

104

Tribal Area Sub-Plan

Investments in Public

Sector and Other

Undertakings

Other Expenditure

Promotion and

Voted:

Voted:

Voted:

Voted:

Voted:

Voted:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

4500.00

270.00

259.90

26.63

30.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4500.00

270.00

259.90

26.63

30.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4500.00

+270.00

+259.90

+26.63

+30.00

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+4500.00

+270.00

+259.90

+26.63

+30.00

+15.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

Sl

35

36

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

03

04

02

04

03

03

Special Component Plan for Scheduled Caste

State Sector

Land acquistion for bridges/Road/Building etc

Running Work

Grant-in-Aid to Uttarakhand Transport Corporation for construction of Bus Stand

Scheduled Caste candidate's free Training in Driver Testing Institute at Dehradun

Page 240

0031

Publicity

Voted:

Voted:

Charged:

Charged:

Total Grant or Appropriation Available(+)/over

spent(-) balance

Amount at the

beginning of the

Month(Col7 in prev

Actual

Expenditure

for the

Current Mont

Progressive

Expenditure

upto the

current month

Available

Balance (+)

Over Spent

amount(-)

%of expenditure

(Col6)to total

Grant or

Appropriation

200.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

200.00

10.00

0.00

0.00

+200.00

+10.00

+0.00

+0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

+200.00

+10.00

+0.00

+0.00

O S R Total

+0.00

+0.00

+0.00

+0.00

Report on Expenditure of Grant Number

For the month of 04-2021 Government of UTTARANCHAL

54330.11

0.00

0.00

0.00

0.00

0.00

54330.11

0.00

+54330.11

+0.00

70.78

0.00

70.78

0.00

+54259.33

+0.00

Total of Voted:

Total of Charged:

+0.13

+0.00

Sl

1 2 3 54 6 7 8

(Rupees in Lakhs)

Head

Note:

1._____________ Treasury, ___________ PWD and __________ Forest accounts have been excluded in this monthly

account due to their belated non-receipt from the accounts rendering units. The transactions through these

accounts are not included in the booked expenditure.

02

04

Special Component Plan ST/SC

State Sector