Portcoast has been the first-ranked consultant in design engineering, supervision consultancy and verification consultancy in waterways - port sector of Vietnam by the Vietnam Ministry of Transport (MOT) in five consecutive years (2012, 2013, 2014, 2015 and 2016) (On 15/01/2018, the MOT stopped the performance appraisal and ranking for consultancy organizations and of construction contractor)

Portcoast Consultant Corporation (Portcoast) has been being operated since 23 December 2004 under the Business Registration Certificate no. 0303592115 issued by the Department of Planning and Investment of Ho Chi Minh City, Vietnam. The current charter capital of Portcoast is approximately USD 6.00 million. Portcoast is now recognised as the leading consultant in Vietnam in the fields of surveying and consultancy services for port, maritime structures development and coastal works. We have been successfully performing the study, survey and design for many port, waterway and coastal projects across Vietnam, Cambodia, Myanmar, UAE and Pakistan.

Portcoast has legal ownership and usersʼ licenses for application of the most modern and advanced equipment, technologies and software in carrying out the survey, investigation, design and other related consultancy services.

Portcoast delivers its services to the highest quality and ceaselessly strives to improve the quality of its services, according to international standards. To this end Portcoast has achieved establishment of a quality control and management system which has been certified by AFAQ-AFNOR International (France) and the International Quality Certification Network IQNet since 2004.

INTRODUCTIONBRIEF

PORTCOAST | 2021 |

Portcoast currently employs around 160 permanent staff including 11 professors/doctors of engineering, 15 masters of engineering and more than 130 engineers, BAs and technicians specialized in different fields such as ports, waterways, bridges, roads, geology, topography, hydrology, environment, electrical-electronics, water supply & drainage, economy, finance, business management. A number of Portcoast staff have been trained and graduated abroad.

PORTCOAST | 2021|

HUMAN RESOURCES CORE BUSINESS

The core business activities of Portcoast are rendering technical consultancy services for development projects of ports, waterways, coastal and marine engineering works, building works, including:

- Preparation of Master Planning and DetailedPlanning;

- Topographic and Bathymetric Survey, Soil/Geotechnical Investigation, HydrologicalSurvey, Geophysical Survey;

- Feasibility Study, Basic Design, Feed Design,Detailed Design, Cost Estimation and TotalCost Estimation;

- Environmental Impact Assessment;- Mathematical Modelling;- Structural Verification;- Bidding Consultancy;- Construction Supervision, Administration and

Project Management.

"Most of port, waterway, maritime and coastal Projects with foreign investments in Vietnam have been participated and carried out by Portcoast"

PORTCOAST | 2021 |

EQUIPMENTSOFTWARE

Portcoast has legal ownership and usersʼ licenses for application of the most modern, advanced equipment, technologies and frequently updated software in carrying out the survey, investigation, design and other related consultancy services. The typical software that is currently used for our business is as follows: - General office tasks: Microsoft Office, Adobe Acrobat Pro DC, etc.- Construction Schedule Control and Management: Microsoft Project- Geographic Information System (GIS): ENVI, GeoTool- Geotechnical Modelling:(i) Numerical model calculation for foundations: Plaxis V8, Plaxis Flow, Plaxis 3DFoundation, Plaxis 3D Tunnel, Geo-Studio 2019, Geo5 (2019)...(ii)Processing and analyzing for Pile Driving Analyzer (PDA) testing: CAPWAP, GRLWeap- Imaging and graphics:(i) Raster graphics and image editing and enhancing: Adobe Photoshop Elements 2020;(ii) Animations and video editing: iMovie, Final Cut Pro, Motion ...- Hydrodynamics Modelling: Numerical model calculation for water environments: MIKE11,MIKE21 (2019), MIKE21MA - Mooring Analysis (2019), MIKE3, LITPACK, etc.- Reporting and Drawing:(i) Creation and modification of the most optimized 2D and 3D drawings, design

sketches, maps: Autodesk Revit, AutoCAD, Civilcad, Microstation...(ii) Render and creation a simulation: 3DS Max, Lumion, Unity, Unreal Engine, Reallusion

- Ship Maneuvering Modelling: SHIPMA V7.4.2 (2018)

- Structural Modelling:(i) Structural analysis and design: SAP 2000 (v21), Autodesk AEC Collection (2020)

- Topography and Bathymetry: HypackMax, Hysweep; Topcon Tools, Pix4D, CivilCad...- Laser Scanner 3D software: Leica, FARO, Stormbee, Topcon, Trimble, Teledyn(https://leica-geosystems.com/) Leica Cyclone REGISTER Permanent, Leica CloudWorx UltimatePermanent, Leica JetStream Enterprise Permanent, Leica Cyclone Connector Permanent, LeicaCyclone PUBLISHER Pro Permanent, Leica TruView Enterprise Permanent(http://constructionbim.faro.com/sg/): FARO Scene, FARO As-built for Autodesk Revit, FARO BuildITConstruction, FARO As-built for AutoCAD, FARO Zone 2D ,(http://www.stormbee.com): Beeflex sofware.(https://www.topconpositioning.com/): Magnet Collage.(https://www.trimble.com/): Trimble Bussiness Center.(https://www.teledyne.com/en-us): Atlascan.

PORTCOAST | 2021 |

SOFTWAREEQUIPMENT

TELEDYNE TECHNOLOGIES

EverywhereyoulooK

PORTCOAST | 2021 |

EQUIPMENTSOFTWARE

LASER SCANNER 3D- Leica ScanStation P50- Leica RTC360 3D LaserScanner- FARO Focus Laser ScannerS350A- FARO Scanplan 2DHandheld Mapper- FARO Freestyle 3DScanner

- TOPCON GLS-2200

- Trimble SX12 Scanning Total Station

- Polaris TLS LR

- Trimble Mobile Mapping MX50

STORMBEE UAV

SOFTWAREEQUIPMENT

UAV - MOBILE MAPPING

Matrice RTK 300 - ZENMUSE L1 - ZENMUSE P1

PORTCOAST | 2021 |

PORTCOAST | 2021 |

SOFTWAREEQUIPMENT

USV - MULTIBEAM SONAR SYSTEM - iLIDAR

USV OTTER PRO

NORBIT iWBMS multibeam sonar systemNORBIT iLidar System

EQUIPMENTSOFTWARE

TOPOGRAPHIC & HYDROGRAPHICAL SURVEY

PORTCOAST | 2021 |

PORTCOAST | 2021 |

EQUIPMENTSOFTWARE

SOIL INVESTIGATION

PortcoastTypical Projects

Cai Mep International Terminal (CMIT)Site: Ba Ria - Vung Tau Province, VietnamClient: JV of APMT is part of the Danish-based Maersk Group), Vinalines and Saigon Port.Total area: 48ha, Container berths: 2, Quay length: 600m, Container ships with load up to 160,000 – 200,000DWT.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study & Basic Design, EIA Report.• Detailed Design.• Tender documents.• Project Management, Construction Supervision. Mathematical Modelling,

Real Time Simulation and Maritime Safety Plan Preparation.

Cai Mep International Terminal (CMIT)

Duyen Hai 1 Thermal Power Plant Coal Unloading JettySite: Tra Vinh Province, Vietnam.Owner: GENCO 1 - EVN.Coal Unloading Jetty consists one Coveyor trestle and two Import Berths for Bulk carriers of up to 30,000 DWT and one oil crude Berth for tankers 1,000 DWT, The Northern Breakwater (length of 3.0km), Approach channel & Turning basin and other Civil work items. Our services include:• Topographic & Hydrographical surveys.• Soil Investigation & Geophysical survey; Hydrological survey.• Feasibility Study & Basic Design; EIA Report.• Detailed Design review, Tender Preparation and Evaluation.• Construction supervision.

Coal Unloading Jetty Duyen Hai 1 Thermal Power Plant (1,245 MW)

Duyen Hai 3 Extension Thermal Power Plant Coal Unloading JettySite: Tra Vinh Province, Vietnam.Owner: GENCO 1 - EVN.EPC Contractor: Sumitomo Corporation.Subcontractor: Mitsui Engineering & Shipbuilding.Our services include:

• Detailed design Coal Unloading Jetty – Trestle 898.87m in length and12.4m in width & Wharf 247.0m in length and 21.7m in width capable toaccommodate 30,000DWT bulk carriers.

• Sedimentation Study of aterfront Area and CW Intake Canal.

Coal Unloading Jetty Duyen Hai 3 Extension Thermal Power Plant (660MW)

Hutchison Ports SITVSite: Ba Ria - Vung Tau Province, Vietnam.Total area: 33.7ha, Container berths: 3, Quay length: 730m, Container quay crane: 6, RTG crane: 11 Vessels, container ships with load up to 80,000DWT. Our services include:• Topographic & Hydrographical surveys, Geotechnical Investigation.• Feasibility Study & Basic Design; EIA Report, Detailed Design .• Tender Preparation and Evaluation.• Construction supervision and Project Management• EIAR preparation and Independent Site Audit for Twilight warehouse;• Port Announcement for 100,000 DWT Vessel Accommodation

Hutchison Ports SITV Saigon International Terminals Vietnam

Hutchison Ports PakistanSite: Karachi, Pakistan.Hutchison Ports Pakistan is Pakistan's premier container terminal operator. It is located within the Port of Karachi, a natural deep-water harbor west of the Indus Delta on the Arabian Sea. The Facility have 4 berths, the equipped with modern container-handling equip. Area: 85 ha, Quay length: 1,500m, Berths: 4, Quay cranes:16, RTG crane: 52, Draft: 16m (final 18m) .Our services include:

• Project management - Container Yard and Building Phase 1.• Independent Design Checking Service & Project management - Container

Yard and Building Phase 2.

Hutchison Ports Pakistan South Asia Pakistan Terminals

SSIT International PortSite: Ba Ria - Vung Tau Province, Vietnam Client: JV of SSA Marine (USA), Vinalines and Saigon PortTotal area: 60.55ha, Container berths: 2, Quay length: 600m, Containerships with load up to 160.000DWTOur services include:

SP-SSA International Container Terminal (SSIT)

2006 - 2012: • Topographic and Hydrographical survey,• Geotechnical Investigation,• Feasibility Study, Basic Design, EIA Report,• Detailed Design,• Tender documents,• Project Management, Construction Supervision2019-2020: Structural inspection, 3D Laser Scan, Detailed design fordemolition and resconstruction work, Project Management andConstruction Supervision for the SSIT's berth after collision incident of theFareast Honesty Vessel.

CICT TerminalSite: Cai Lan - Quang Ninh Province, Vietnam. Client: JV of SSA Marine (USA), Vinalines and Quang Ninh Port. Berths 2, 3, 4 of CICT for vessel up to 50,000 DWT, access road, bank protection, dredging of water area and other civil work items.Our services include:• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study, Basic Design, EIA Report.• Detailed Design.• Tender documents.• Project Management; Construction Supervision.

Cai Lan International Container Terminal (CICT)

Myanmar International Terminals Thilawa Port (MITT)MITT is located near the Yangon estuary, approximately 25 km in northwest direction far from Yangon (Myanmar).Our services include:

• Inspection existing structure of MITT Port (Section S6 & S7): Piles, Beams, Deckslabs, Quay crane tracks, Bollards & Fenders…,

• Verify load carrying capacity of wharf structure.• Detailed design for additional tie-down for new quay cranes & RTG cranes.• Review container yard design for plinth beam & RTG Runway.

Myanmar International Terminals Thilawa (MITT)

Hutchison Ajman New Port Site: Ajman, United Arab Emirates.Client: Hutchison Ajman International Terminals Limited - F.Z.E. Consultant: CH2M Partnership.Our services include:

• Data collection.• Design verification and Cost estimation.• Preparation of Bidding documents and evaluation of bidding documents for

breakwaters, quay ports and wharves under Ajman port development studyproject.

Hutchison Ports Ajman Ajman New Port

Package 5A: Breakwater (1.6 Km long) Package 5B: Jetty (6 berths for tankers in the range of 5,000 to 50,000 DWT) Site: Quang Ngai Province, Vietnam.Owner: Petrovietnam.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical investigations.• Computer simulation and modelling.• Foundation analysis and Detailed design.

Dung Quat Refinery Package 5A & 5B

Posco steel mill

Posco Port (Posco Vietnam & Posco SS-VINA)Site: Ba Ria - Vung Tau Province, Vietnam.Client: Posco Vietnam Co. Ltd and Posco SS-VINA Co., Ltd (Two of the main affiliates of Posco - South Korea). Posco Vietnam: Port area 15ha, berths: 2, Quay length: 333m, ships with load up to 60,000DWT.Posco SS-VINA: Port area 12ha, berths: 2, Quay length: 267m, ships with load up to 50,000DWT.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study, Basic Design, EIA Report.• Detailed Design.

Posco Port (Posco Vietnam & Posco SS-VINA)

SP-PSA International PortSite: Ba Ria - Vung Tau Province, Vietnam.Client: JV of PSA Singapore, Vinalines and Saigon Port. Total area: 56ha, Container berths: 2, Quay length: 600m, Containerships with load up to 80,000-120,000DWT.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study, Basic Design, EIA Report.• Detailed Design.

SP-PSA International Port

Comprehensive Development Project for the Cai Mep - Thi Vai Navigational Channel Site: Ba Ria Vung Tau Province, Vietnam.Client: Vinamarine - Vietnam Ministry of Transport The channel, along the Cai Mep-Thi Vai River, 50km from southern Ba Ria - Vung Tau to Dong Nai, is expected to be upgraded to receive ships up to 100,000DWT in route to ports on the Cai Mep – Thi Vai river, 60,000DWT to ports in My Xuan – Phuoc An and 30,000DWT to ports in Go Dau. Our services include:

• Hydrographical survey; Soil Investigation; Hydrological survey.• Feasibility study, Basic design.• Hydrodynamic model.• Fast-time & Real-time simulation in Channel Design.

Comprehensive Development Project for the Cai Mep - Thi Vai Navigational Channel

• Site selection; Preliminary Design of marine structures (loading / unloading jetties,construction phaseʼs quays, Approach Channel and Single point mooring).

• Hydrographical Survey, Side scan & Sub-bottom Profiling survey, Wave &Current monitoring…

• Geotechnical Investigation.

Nghi Son Refinery and Petrochemical Project Vietnam Client: Nghi Son Refinery and Petrochemical LLC sponsored by PetroVietnam, Kuwait Petroleum Europe B.V. (KPE) , Idemitsu Kosan Co., Ltd and Mitsui Chemical, Inc. Location: Nghi Son Economic Zone (Thanh Hoa Province), Marine facilities at the Nghi Son refinery include single point mooring (SPM) for 320.000DWT VLCC, a breakwater, crude oil import pipelines, loading / unloading jetties for 50.000DWT Oil Tankers, a service ship quay & material offloading quays.A 48 in-diameter and 35km-long crude oil pipelineOur services include:

Nghi Son Refinery and Petrochemical Project (NSRP)

Hyosung Vina Chemicals PortSite: Ba Ria - Vung Tau Province, Vietnam Client: Hyosung Corporation/Hyosung Vina Chemicals Total area: 10ha, Jetty for 60.000DWT LPG Tankers Our services include:

Hyosung Vina Chemicals Port

2016 - 2020: • Updated & Revised Masterplan• Topographic and Hydrographical survey,• Geotechnical Investigation,• Feasibility Study, Basic Design, EIA Report, Detailed Design,• Hydrodynamic modelling & Ship Maneuvering Simulation Study,• Construction Supervision, Laser Scanner 3D

Long Son Petrochemicals Co., Ltd.Site: Long Son island in Ganh Rai bay, North of Vung Tau, Vietnam. Owner: Siam Cement Group of Thailand (SCG)

Our services include:

2012-2013: Feasibiity Study and Basic Design of the Seaport Facilities for this plant. The design scope included 3 jetties for import vessels with feedstock for the plant and for export of liquid petrochemical and chemical products as well a coal vessel receiving facility and a construction quay. 2017-2018: Topographic & Hydrographic Survey, Geophysical Investigation, Sub- bottom Profiling & Soil Investigation, Detail Design Review and Simulation.2019 - 2021: Construction Supervision

Long Son Petrochemicals Co., Ltd.

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study & Basic Design, EIA Report.• Detailed Design Review.• Ground improvement Monitoring & Testing.

Saigon Premier Container Terminal (SPCT)Site: Ho Chi Minh city, Vietnam. Client: JV of DP World (UAE) and Tan Thuan IPC.Total area: 40ha, Container berths: 3, Quay length: 950m, Containerships with load up to 50,000 – 75,000DWT.Our services include:

Saigon Premier Container Terminal (SPCT)

• Topographic Survey, Hydrographical Survey, Geotechnical Survey,Geophysical Survey, Hydrological Survey, Mathematical Modeling, FeasibilityReport (Phase 1 & Phase 2) in year 2008-2010.

• Planning Preparation, Detailed Planning and Detailed Design of Son DuongPort (phase 1) in year 2009-2013.

• Hydrographical Survey in 2016-2017.• Settlement monitoring in 2018 -2020

Son Duong Port Site: Vung Ang Economic Zone in Ha Tinh Province, Vietnam. Owner: Formosa Ha Tinh Steel Corporation (FHS).Son Duong Port and Integrated Steel Mill Complex is currently the biggest FDI project in Vietnam . Capacity 28 Million Tons Cargo Handling, with Port Functions: Harbour Area: 930ha, Breakwater 5,2m, Approach Channel: 9km - depth of 23.5mTotal number of wharves is 32 & investment in 2 phases: Phase 1: 11 wharfs (2 wharves for 200,000DWT vessel and 9 wharves 10,000-50,000DWT vessel)Phase 2: 32 wharves (6 wharves for 200,000-300,000DWT vesse, 20 wharves for 30,000-50,000DWT vessel and 6 wharves for 10,000DWT vessel).Our services include:

Formosa Ha Tinh Son Duong Port

ODA Cai Mep International Terminal

ODA Thi Vai International Terminal

THI VAI

CAI MEP

Cai Mep - Thi Vai International Terminal (Japanese ODA loan)Site: Ba Ria - Vung Tau Province, Vietnam.Client: Vietnam Ministry of Transport/ JICA (Japan). Infrastructure development, including: 02 container berths in Cai Mep with total berth length of 600m, total area of 48ha, accommodation of 100,000 DWT vessels and 02 container berths in Thi Vai with total berth length of 600m, total area of 27ha, accommodation of 80,000 DWT vessels - Navigation channel from Buoy “0” accessing to Thi Vai berth - Road of 6.5 km with 04 lanes connecting National Highway. Our services include:

• Topographic; Hydrographical & Hydrological surveys.• Geotechnical Investigations.• Feasibility Study; EIA report; Basic design.• Detailed Design; Tender documents.• Project Management; Construction Supervision.

ODA Cai Mep - Thi Vai International Terminal

Cruise Terminal in Phu Quoc Island Site: Phu Quoc Island, Kien Giang Province, Vietnam Clients: - Vinamarine - MOT (2014),- Kien Giang Province (2015 - 2016)The terminal is located in the town of Duong Dong for luxurycruise ships carrying 5,000 - 6,000 passengers & 20,000DWT.Our services include:• Topographic, Bathymetric survey & Hydrographical survey;• Geotechnical Investigation;• Computer simulation and modeling;• Master Plan;• Feasibility Study, EIA report, Basic design;• Foundation analysis and Detailed design;• Construction Supervision.

Cruise Terminal in Phu Quoc Island

Lach Huyen Port Infrastructure Construction ProjectJapanese ODA loans (Component A)The Port will be developed in two phases, and will be equipped with comprehensive infrastructure and handling technology. It will be able to accommodate container ships between 4,000TEU and 6,000TEU, with the potential to accomodate 8,000TEU ships after expansion. The port is being constructed south of Lach Huyen's river estuary on Cat Hai Island. It will have a berth of approximately 8,000m, a route length of 18km. Two components, A and B. Component A is being managed by the Vietnam Ministry of Transport (MOT), The works will include construction of a one-lane access channel, anchorages, a 3,230m-long breakwater, a turning basin, a 7,600m-long sand control dyke, an internal road system, soft-soil ground improvement, temporary berths, roads in the administration area, and an administration office building.Our services include:

• 2010 - 2015: Feasibility Study Review; Updated Feasibility Study Review; Detailed Design Review.Client: Vinamarine (Presented by Project Management Unit No.2).

• 2011: Soil investigation; Hydrological Survey for the Detailed Design.Client: Jica Study Team (Presented by Oriental Consultants Co. Ltd.,).

• 2013-2019: Construction Supervision (JV comprising Nippon Koei, JPC, Portcoast and NK Vietnam).Client: Vietnam MOT (Presented by Project Management Unit No.2).

Lach Huyen Port Infrastructure Construction Project

Sai Gon Hiep Phuoc PortSite: Soai Rap river, Hiep Phuoc Industry Zone, Ho Chi Minh city, Vietnam. Client: Saigon Port.Muti-purpose port terminal with 800m berth length, 60m width to accommodate ship of 50,000 DWT.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study & Basic Design; EIA Report.• Detailed Design.• Supervision.

Sai Gon Hiep Phuoc Port

Phu My PortSite: Ba Ria - Vung Tau Province, Vietnam. Client: Baria Serece JSC.Multi-Purpose Port Terminal, Quay length: 463m (5 sections) to accommodate ships of 80,000DWTOur services include:

• 2005 - 2006: Topographic & Hydrographic Surveys; Soil Investigation; Basic Design;Detailed Design to accommodate ships of 60,000DWT.• 2009: Surveys and Verification of the existing quay, EIA Report and Detailed Designof the Upgrade Structure to accommodate ships of 80,000DWT.• 2015 - 2016: Assessment of damages of the Section 1 (103m) after Ship collision;Detailed Design for Re-construction.• 2019: Surveys and Verification of the existing quay, Laser Scanner 3D

Phu My Port Baria Serece Port

Project of New Entrance Channel to the Bassac RiverLocation: Duyen Hai and Tra Cu districts, Tra Vinh province, Mekong Delta, Vietnam.Actually 70-80% of volume of exports/imports of the Mekong Delta has to be transferred to Ho Chi Minh city, overloading the traffic infrastructure in Ho Chi Minh city. Meanwhile, the Existing navigational channel (Dinh An channel) can accommodate vessels with a tonnage of about 5,000 DWT only at spring tide. In addition, the dredging work has to be executed at great cost as a result of speedy sedimentation.The alternative of New navigation channel had been studied for 20 years. However, the alternative of Bypass channel via Quan Chanh Bo Canal to the Bassac river recommended by SNC - Lavalin (Canada) & Portcoast was approved by the Vietnamese Prime Minister in 2007 for its technical and economical feasibilities.The project is inclusive of main work items: one-way channel of 40 km long (Bypass channel of 9 km long) for 10,000 DWT fully-loaded and 20,000 DWT partially-loaded vessels, breakwater (length of 2.4km), 30-km-long bank protection dike, ferry, navigation AIDS, etc.Our services include:

• 2004: Soil Investigation; Topographic, Hydrographic & Hydrological surveys (SNC-Lavalin is a Leader of JV).Client: Project Management Unit of Waterways - Vietnam MOT.•2005 -2015: Topographic & Hydographic Surveys; Geotechnical Investigation; Geophysical & Hydrological Surveys;Feasibility Study & Basic Design; Mathematical Modeling; Detail Design; Construction Supervision.Client: Maritime Project Management Unit 3 - Vinamarine - Vietnam MOT.

Project of New Entrance Channel to the Bassac River

Vietnam Lee & Man Paper International PortSite: Hau Giang Province, Vietnam.Client: Vietnam Lee & Man Paper MFG. Ltd. (Hong Kong). Berths: 2, Quay length: 481m, 10,000 DWT fully-loaded and 20,000 DWT partially-loaded vessels, 1100m long for bank protection.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Feasibility Study, Basic Design, EIA Report.• Detailed Design.

Vietnam Lee & Man Paper International Port

Chan May Port - Upgrading existing JettySite: Thua Thien - Hue Province, Vietnam.Client: Chan May Port - Royal Caribbean International. Chan May port is a general seaport with total wharf length of 480m. Chan May Port cooperated with Royal Caribbean Cruises to accommodate the Luxury Cruise ship (over 362m in length and total gross tonnage of 225,282 GRT) in year 2015 (After Upgrading the existing Jetty).Our services include:

• Data collection; Topographic & Hydrographical Surveys; Side Scan survey.• FS and Basic Design; Detailed Design for Upgrading existing Jetty.• Tender Document; Construction Supervision.

Chan May Port Upgrading existing Jetty

Cho Gao Canal Upgrading ProjectSite: Tien Giang Province, Vietnam.Client: PMU of Waterways (PMU-W) - Vietnam MOT.The Cho Gao Canal is the Main Inland Waterway linking Ho Chi Minh City with most provinces in the Mekong Delta. The Projectʼs main objectives are to dredge and expand the canal (width of 80m & length of 28.5 km) and to build Bank Protection.Our services include:

• Topographic & Hydrographical surveys.• Geotechnical Investigation.• Mathematical Modeling & Detailed Design.

Cho Gao Canal Upgrading Project

Southern Van Phong General PortSite: Van Phong Economic Zone, Khanh Hoa Province, Vietnam.Owner: Thanh Yen GroupThe deepest is 11meters, the piers is 234meters in length and 35meters in width, vessels, container ships with load up to 70,000DWT.Our services include:

• Topographic, Bathymetric survey & Hydrographical surveys;• Geotechnical Investigation;• Feasibility Study & Basic Design, EIA Report;• Computer simulation & modelling;• Foundation analysis and Detailed design;• Construction Supervision.

Southern Van Phong General Port

Saigon Peninsula ProjectSite: Ho Chi Minh city, Vietnam.Client: The Saigon Peninsula Group Corporation. Saigon Peninsula will feature a multifunctional park, an International Cruise Terminal, office towers, resort villas, apartment blocks, a hotel, and other functional areas and facilities.Our services include:

• Project Management for Revetment.• Topographic & Hydrographical surveys; Soil Investigation;

Feasibility Study & Basic Design and Detailed Design forInternational Cruise Terminal for 50,000-60,000GRT Cruise Ships.

Saigon Peninsula Project

Ong Keo PortSite: Nhon Trach, Dong Nai, Vietnam.Client: Long Thuan Investment Corp.Ong Keo Port serves mainly coal transported from Indonesia, Australia ... The capacity was anticipated approximately 9.5 million tons annually.Our services include:

• Construction Supervision.• Topographic and Soil Investigation, Feasibility Study & Basic

Design for general cargo ports which including 1 berth forvessel up to 50.000DWT and 1 wharf for vessel 5.000DWTand barge up to 2.000DWT.

Ong Keo Port

Van Ninh General PortSite: Quang Ninh Province, Vietnam. Client: Van Ninh International Port JSC.Multi-Van Ninh General Port and the port connecting road, Two development phases:- Phase 1 (2019-2020): 02 berths for 20,000DWT vessels with total berth length of 500m,dredging of water basin, handling equipment and technical infrastructure equipped on the areaof about 25 ha, port connecting road with a length of about 4 km.- Phase 2 (2020 - 2022): 06 berths for 20,000DWT vessels with total berth length of 1,500m,dredging of water basin, handling equipment and technical infrastructure.

Our services include:

• Topographic and Hydrographical Survey;• Soil Investigation;• Detailed Planning 1/500; Feasibility Study, Basic Design and Detailed Design.

Van Ninh General Port

Ca Na General PortSite: Ninh Thuan Province, Vietnam. Client: - Ninh Thuan Province Department of Transport (2016)- Trung Nam Ca Na International Seaport Joint Stock CompanyCa Na - General Port is planned to be a multi-purpose port serving Ca Na Industrial Zone and im-export requirements of the province and nearby provinces. The phase 1 of project comprise: Berth No. 1A & No. 1B with capacity up to 100.000 DWT.Our services include:• Detailed Planning 1/2000; Design for navigation channel, pilotage area.• Topographic, Bathymetric Survey, Hydrographical Survey, Soil Investigation.• Detailed Planning 1/500, Feasibility Study & Environmental Impact Assessment.• Mathematical Modelling.• Basic Design and Detailed Design – 100,000 DWT berth.• Legal Procedures.

Ca Na General Port

My Xuan International General PortSite: Ba Ria - Vung Tau Province, Vietnam.Client: Formosa International Development Corporation

2008: Development of a general and container port comprising 04 berths with total length of 1,100m, to accommodate vessels upto 60,000 DWT. 2019: Development of Phase 1 of the project comprising two 60,000 DWT general and container berths together with warehouse and yard system and auxiliary works to serve operation of the port. The total area is 91ha. The estimated cargo throughput is 2.6 million tons / year.

Our services include:

• Topographic Survey, Soil Investigation;• Feasibility Study, Environmental Impact Assessment, Detailed Design

My Xuan International General Port

Sea Star International SeaportSite: Ba Ria - Vung Tau Province, Vietnam. Client: S.S.I.P CORP

Sea Star International Seaport is planned as an multi-purpose port on the total area of 68.0 ha with total berth length of 900m for 30,000 DWT vessels. Phase 1 of the project focuses on the development of one 30,000 DWT berth covering on an area of 18.48 ha with total berth length of 235m. Estimated cargo throughput is 01 mil general cargo and 01 mil coal/year.Our services include:

• Master plan Update;• Topographic survey, Soil investigation;• Feasibility Study preparation and Basic Design, EIA Report, Detailed Design for Phase 1.

Sea Star International Seaport

Phu My Inland Container Depot (ICD)Phu My Inland Container Depot (ICD)Site: Phu My 3 Specialized Industrial Park, Phuoc Hoa Ward, Phu My Town, Ba Ria – Vung Tau Province Client: Thanh Binh Phu My Joint Stock Company Total area: 25 haIncluding 5 ports, Phu My ICD will provide services: storage, transshipment, warehousing, loading and unloading, and customs clearance,etc. for businesses in Phu My 3 Specialized Industrial Park and surrounding areas.Our services include:• Topographic and Bathymetric Survey;• Investment Proposal,1/500 Detailed Planning Preparation.

Tay Ninh Logistics Center, ICD and General Port

Tay Ninh Logistics Center, ICD and General PortSite: Hung Thuan Commune, Trang Bang Town, Tay Ninh ProvinceClient: Tay Ninh International Logistics Corporation Total area: 50.77 ha ICD, 160.85 ha Logistics Center, and 53.24 ha General Port to receive ships of 2,000 tonsDevelopment of a modern Logistics Center, ICD and General port on the Saigon River at international level as a transshipment point for goods from ASEAN countries.Our services include:

• Topographic and Bathymatric Survey;• Detailed Planning 1/500 Prepration.

My Xuan A PortSite: My Xuan commune, Phu My town, Ba Ria - Vung Tau provinceOwner: My Xuan International Port Ltd. (MIP)Total area: 55haBerth length of up to 486m, and can handle international ships/barges and domestic ships/barges up to 30,000 DWT. And the dedicated barge berth can accommodate barge up to 2,500 DWT serving for domestic and foreign owners in My Xuan area, Phu My Town, Ba Ria-Vung Tau province.Our services include:• Topographic survey, Geological survey, Hydrological survey;• Detailed planning 1/500, Basic Design and Detailed Design;• Construction permit.

My Xuan A Port

Phuoc An Port and Logistic zone Phuoc An Port and Logistic zoneSite: Nhon Trach District, Dong Nai ProvinceClient: PetroVietnam Phuoc An Port Investment & Operation Joint Stock Company (PAP)Total area: 183haTotal lenght of Berth is 670m, with 02 Container berths to accommodate 10,000 - 60,000 DWT vessel.Our services include:

• 2009 - 2010: Detailed Plan with the scale of 1/2000 and 1/500,Investement report, and Feasibility Study & Basic Design

• 2020 - 2021: Topographic and Geotechnical Survey, Basic design, Detaileddesign and related legal procedures - Phase 2

Gemadept - Terminal Link Cai Mep TerminalSite: Ba Ria - Vung Tau Province, Vietnam.Client: Gemadept - Terminal Link Cai Mep JSC.Main project features: The Project studies the extension of Gemalink Terminal for a further towards downstream, and to upgrade container vessel size from 200,000DWT to 250,000DWT.Our services include:

• Detailed planning on the scale of 1/500; Environment Impact Assessment Report and legal procedures

• Bathymetric survey; Soil investigation; Feasibility study report• Environment Impact Assessment Report and legal procedures

Gemadept - Terminal Link Cai Mep Terminal

Cai Mep Ha Logistics CenterSite: Ba Ria - Vung Tau Province, Vietnam.Client: Department of Transport of Ba Ria - Vung Tau Province.Total area:1,763 ha; 5.76km (246 ha) berth for vessels up to 200,000DWT; 2.70km (90ha) berth for barges up to 5,000T.

Consultant J/V: Nippon Koei – Portcoast – Nippon

Koei VietnamOur services include (2019 - 2020): • Preparing Planning Task of Zoning plan at scale of 1/2,000• Bathymetric Survey• Preparing Zoning plan at scale of 1/2,000

Cai Mep Ha Logistics Center

Berth number 5 & number 6 at Lach Huyen deep-sea port area belonging to Hai Phong SeaportSite: Lach Huyen deep-sea port area, Cat Hai island, Hai Phong city, Vietnam.

Client: Hateco Group Joint Stock Corporation.Total area:Project goals are to invest and construct two container berths number 5 & number 6 capable to accommodate 18,000 TEUs vessels at Lach Huyen deep-sea port area, Hai Phong CityOur services include:

• Feasibility Study; Basic Design; Detail Design

Berth number 5 & number 6 at Lach Huyen deep-sea port area belonging to Hai Phong Seaport

Vung Ang Logistics CenterSite: Ha Tinh Province, Vietnam. Client: Ha Tinh Province Investment and Development Fund.Our services include:

• 2018: Basic design, Construction design of Survey and DataCollection about the Socioeconomic, Ports Infrastructure,Logistics Industry, Infrastructure of Transportation in Vung Angand Ha Tinh province, Study Report Preparation.

• 2017-2018: Additional planning, Topographic survey, Soilinvestigation, Detailed Planning, Mathematical model.

• 2007-2008: Topographic survey, Soil investigation, DetailedPlanning, Mathematical model.

Vung Ang Logistics Center

Berth number 5 & number 6 at Lach Huyen deep-sea port area belonging to Hai Phong SeaportSite: Lach Huyen deep-sea port area, Cat Hai island, Hai Phong city, Vietnam.

Client: Hateco Group Joint Stock Corporation.Total area:Project goals are to invest and construct two container berths number 5 & number 6 capable to accommodate 18,000 TEUs vessels at Lach Huyen deep-sea port area, Hai Phong CityOur services include:

• Feasibility Study; Basic Design; Detail Design

Berth number 5 & number 6 at Lach Huyen deep-sea port area belonging to Hai Phong Seaport

Vung Ang Logistics CenterSite: Ha Tinh Province, Vietnam. Client: Ha Tinh Province Investment and Development Fund.Our services include:

• 2018: Basic design, Construction design of Survey and DataCollection about the Socioeconomic, Ports Infrastructure,Logistics Industry, Infrastructure of Transportation in Vung Angand Ha Tinh province, Study Report Preparation.

• 2017-2018: Additional planning, Topographic survey, Soilinvestigation, Detailed Planning, Mathematical model.

• 2007-2008: Topographic survey, Soil investigation, DetailedPlanning, Mathematical model.

Vung Ang Logistics Center

No. Name of Projects Location Client / Owner Our servicesContract

Duration

I

37 Phu My ICD Port ProjectBa Ria -

Vung Tau Province

Thanh Binh Phu My Joint Stock Company

2020: Bathymetric survey, Investment Proposal and 1/500 Detailed Planning preparation. 2021: Bathymetric survey, Geotechnical Survey, Feasibility Study, Basic Design and Detailed design for Berth No.1

2020;2021

36 Tan Thanh ICD and Logistics services area

Ba Ria - Vung Tau Province

Logistics Cai Mep Joint Stock Company

Adding port into Detailed planning of inland waterways; Topographic Survey and Soil Investigation; Feasibility Study Report and Basic Design; Environmental Impact Assessment Report; Detailed Design and Construction permit

2021

35Vinh Long Petro Petroleum General Depot Port

Vinh Long Province

Vinh Long Petro Petroleum Company Limited

Topographic and Bathymetric survey, Soil Investigation, Adding port into Detailed planning of Mekong Delta Seaports Group, Feasibility Study Report and Basic DesignDetailed Design

2021

34Tay Ninh General Port, ICD port and Logistics services area

Tay Ninh Province

Tay Ninh International Logistics Corporation

Topographic Survey and Detailed Planning 1/500 Preparation 2021

33 Cai Mep Logistics Center and ICD port

Ba Ria - Vung Tau Province

Cai Mep International Logistics Ltd

Topographic Survey and Detailed Planning 1/500 Preparation 2021

32 Ca Na Port Area Phase 1 - Ca Na General Seaport

Ninh Thuan Province

Trung Nam Ca Na International Seaport Joint

Stock Company

Adjustment of detailed planning of Ca Na port area phase 1 2021

31 My Xuan A International Port

Ba Ria - Vung Tau Province

My Xuan International Port Ltd

Topographic survey, Geological survey, Hydrological survey, Detailed Planning 1/500, Basic Design and Detailed Design and construction permit

2021

30 LNG terminal for Ca Na Power Complex

Ninh Thuan Province

Vietnam A&A Technology and Investment Company

Limited

Master Planning Revision of LNG terminal for Ca Na Power Complex 2020

29Son Duong Logistics Center and Services Project

Ha Tinh Province

Ha Tinh Economic Zone Authority

Topographic survey, Detailed Planning 1/500 preparation 2020

28 Phuoc Thuan General Domestic Port

Ba Ria - Vung Tau Province

Phuoc Thuan Logistics Service Port Join Stock

Company

Topographic and Geotechnical Survey, 1/500 Detailed planning, Basic design and Detailed design

2020

27 Cai Mep Ha Logistics Center Project

Ba Ria - Vung Tau Province

Department of Transport of Ba Ria - Vung Tau

Province

2019: Preparation of Planning Task of Zoning Plan at scale of 1/20002020: Preparation of zoning plan with scale of 1/2000; Topographical Survey & Benchmark installation

2019 - 2020

26 Nha Trang Cruise Terminal Nha Trang City Nha Trang Terminal Joint Stock Company

Detailed Planning 1/500 for the 220,000 GT passenger terminal 2019

25Mo Nhat Inland Waterway Port and General Warehouse

Ba Ria - Vung Tau Province

Dai Dat Trading Construction Company

Limited

Topographic and Hydrographical Survey, Soil Investigation, Detailed Planning 1/500, Feasibility Study, Environmental Impact Assessment and Detailed Design

2019

PROJECTS FOR PORT PLANNING

1/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

24 Van Ninh General Port Quang Ninh Province

Van Ninh International Port JSC

Detailed Planning 1/500, Topographic and Hydrographical Survey, Soil Investigation, Feasibility Study, Basic Design and Detailed Design

2019

23

Hoa Binh - Bai Vong Cruise Terminal and Logistics Services Complex

Kien Giang Province

Hoa Binh Ham Ninh Joint Stock Company

Topographic survey, Soil investigation, Detailed Planning scale 1/500, Feasibility Study preparation and Detailed Design for phase 1

2016 - 2020

22 Long Son Petrochemical Port (LSP)

Ba Ria - Vung Tau Province

- Long Son Petrochemicals Co., Ltd (LSP) (a Joint Venture between Siam Cement

Group of Thailand, Qatar Petroleum and Petrovietnam

- Posco Engineering and Construction Co., Ltd.

- The Consortium of TPSK.

2008-2013: Topographic & Hydrographical Survey and Hydrological Survey (02 times in 2008 & 2009), Geotechnical Survey (04 times in 2008, 2009 and 2013) and Detail Planning in 2008;2012-2013: Mathematical model, Basic Design, EIA Report;2017-2018: Topographic & Hydrographic Survey, Sub- bottom Profiling & Soil Investigation, Detailed Design Review and Simulation Model, Magnetometer and Sidescan Sonar Survey - Package F2018: Topographic and Soil Investigation Survey -Package L2018 - 2020: Soil Investigation - Package A12019 - 2021: Construction Supervision; Bathymetric Survey after Dredging and Design review - Package F

2008-2013& 2017, 2018, 2019 - 2021

21 Southern Van Phong General Port

Khanh Hoa Province

Thanh Yen - Van Phong Joint Stock Company

2011: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Supervision, Design of upgrading for wharf of 50,000 DWT.2018: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Design for wharf of 20,000DWT and 5.000DWT.2018: Design of two-way navigational channel and turning basin for arrival of 70,000DWT vessels; Environmental Impact Assessment.2019: Port operation announcement2021: Survey and Design for berth No.2

2011; 2018;2019

;2021

20 Hoa Sen Ca Na - Ninh Thuan General Port

Ninh Thuan Province

- Department of Transport - Ninh Thuan Province

(2016)- Hoa Sen Group (2017)

2016: Topographic and Hydrographical Survey and Planning 1/20002017-2019: Detailed Planning, 1/500, Topographic and Hydrographical Survey, Soil Investigation, Feasibility Study & Environmental Impact Assessment; Mathematical Modelling; Detailed Design – 70,000 DWT berth

2016;2017 - 2019

2/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

19 Detailed Planning for Seaports System - Group 5

Ho Chi Minh City, Dong Nai Province and Ba Ria Vung Tau Province

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

2011: Survey and data collection about the Socioeconomic, Ports Infrastructure, Infrastructure of Transportation in Group 5, Master Planning Report Preparation;2013: Master Planning Revision Report Preparation2017: Master Planning Revision Report Preparation.

201020132017

18 Vinh Dam Complex Kien Giang Province

Saigon Investment Construction And

Commerce Co.Ltd &Toan Hai Van JSC.

- 2007-2008: Topographic survey, Soil investigation, Detailed Planning, Mathematical model- 2017-2018: Additional planning, Topographic survey, Soil investigation, Detailed Planning, Mathematical model- 2018: Basic design, Construction design of seaports No. 1 & 2 with a tonnage of 3,000 DWT - K1-K8 bank embankment, Chanel - Waterfront of the wharf and signaling buoys system- 2018: Topographic survey, Geophysical survey, Soil investigation, Hydrographic Survey for items of Ocean Lotus Island, Breakwater, Beaches 2A&2C

2007-2008& 2017 -

2019

17 Rach Gia Cruise Terminal Kien Giang Province

Kien Giang Province’s Management Board for

Transport Works

2016 - 2017: Topographic & Hydrographical Survey, Geotechnical Investigations, Detailed Plan with the scale of 1/5002019: Topographical survey, Soil investigation, Feasibility Study

2016-2017; 2019

16 Ha Tien Terminal Kien Giang Province

Department of Transport Kien Giang Province

Topographic & hydrographical Survey, Detailed Plan with the scale of 1/2000 and 1/500 2016-2017

15 Ninh Chu Terminal Ninh Thuan Province

Department of Transport Ninh Thuan Province

Topographic & Hydrographical Survey, Plan with the scale of 1/2000 2016-2017

14 Cruise Terminal in Phu Quoc Island

Kien Giang Province

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT) (2014),Department of Transport- Kien Giang province

(2015-2018)

Topographic & Hydrographical Survey, Geotechnical Investigations, Computational Simulation and Modelling, Detailed Plan, Feasibility Study, Basic Design, EIA report, Foundation Analysis, Detailed Design and Construction Supervision.

2014-2020

13

Detail Planning of Logistics Service Development in Vung Ang Province and Overall Planning of Logistics Service Development in Ha Tinh Province

Ha Tinh Province

Ha Tinh Province Investment and

Development Fund &Department of Transport

- Ha Tinh Province

Survey and Data Collection about the Socio- economic, Ports Infrastructure, Logistics Industry, Infrastructure of Transportation in Vung Ang and Ha Tinh province, Study Report Preparation

2015-2016

3/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

12Detailed Planning for Seaports System in Mekong Delta (Group 6)

Mekong Delta

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

2010: Survey and data collection about the Socioeconomic, Ports Infrastructure, Infrastructure of Transportation, Master Planning Report Preparation.2015: Master Planning Revision Report Preparation.

20102015

11 FHS Son Duong Port Ha Tinh Province

Owner: Formosa Ha Tinh Steel Corporation (FHS)Main Investor: Formosa Plastics Group, China

Steel, JFE Steel / CECI Engineering Consultants,

inc., Taiwan

2008 - 2010: Topographic Survey, Hydrographical Survey, Geotechnical Survey, Geophysical Survey, Hydrological Survey, Mathematical Modeling, Feasibility Report (Phase 1 & Phase 2)2009 - 2013: Planning Preparation, Detailed Planning and Detailed Design of Son Duong Port (phase 1) with International Partner CECI Engineering Consultants.Inc. (Taiwan - China) 2016 - 2017: Hydrographical Survey.201 8 -2020: settement monitoring

2008-2020

10

Vietnam Seaport System Master Plan till year 2020 and orientation to year 2030

Vietnam

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

2007: Data Collection, Survey and Master Plan Preparation for Vietnam Seaport System till year 2020 and orientation to year 2030.2013: Master Planning Revision Report Preparation

20072013

9Logistics Development in the field of Transport till year 2020

Vietnam

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

Survey and Data Collection about the Socio- economic, Ports Infrastructure, Logistics Industry, Infrastructure of Transportation on Nationwide; Study Report Preparation

2013

8Logistics Development Scheme in Ba Ria Vung Tau province

Ba Ria - Vung Tau Province

Department of Transport- Ba Ria Vung Tau

Province

Survey and Data Collection about the Socio- economic, Ports Infrastructure, Logistics Industry, Infrastructure of Transportation in Ba Ria Vung Tau Province, Study Report Preparation

2013

7 Planning of mud dumping sites in Ba Ria Vung Tau

Ba Ria - Vung Tau Province

Department of Transport Ba Ria - Vung Tau

provinceDetailed plan 2008

& 2010

6 Van Phong International Transshipment Port

Khanh Hoa Province

Vietnam National Shipping Lines

& Vietnam MaritimeAdministration

(Vinamarine)/ Ministry of Transport (MOT)

Topographic survey & hydrographical survey, Geotechnical investigations, Detailed Plan, Feasibility Study and Detailed design.

2005-2006& 2007-

2009

5 Phuoc An Port, Access Road and Logistics Area

Dong Nai Province

Phuoc An Port Investment and Operation JSC.

2009 - 2010: Detailed Plan with the scale of 1/2000 and 1/500, Investement report, and Feasibility Study & Basic Design2020 - 2021: Topographic and Geotechnical Survey, Basic design modification and Detailed design - Package 1

20092021

4/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

4Infrastructure Investment in Hiep Phuoc Terminal in Hiep Phuoc Industrial Park

Ho Chi Minh City

Tan Thuan Industrial Promotion Co., Ltd (Tan

Thuan IPC)Detailed Plan 2008

3 Con Dao IslandBa Ria -

Vung Tau Province

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT)

Detailed Plan 2007

2

Overall and Comprehensive Study of Inland Waterway Development in Mekong Delta to 2010 and orientation to 2020

Mekong Delta

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT)

Overall Plan 2005

1Coal and Thermal Power Plants in the South of Vietnam

South Vietnam Vietnam Electricity (EVN) Detailed Plan 2005

II

95

Port No. 5 and Port No. 6 project of Lach Huyen Port Group in Hai Phong Seaport

Hai Phong City Hateco Group JSC Preparation of Feasibility Study, Detailed Design and Cost Estimates 2021

94 GEMALINK Container Terminal Vietnam

Ba Ria - Vung Tau Province

Gemadept Terminal Link Cai Mep Terminal Joint

Stock Company

2007 - 2009: Topographic Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA Report, Detailed Design2021: Preparation of Marine Safety Plan for container vessel of 200,000 DWT entering Gemadept – Terminal Link Cai Mep Port2021 - 2022: Detailed planning on the scale of 1/500; Bathymetric survey, soil investigation; Feasibility study report; Environment Impact Assessment Report and legal procedures (Gemadept – Terminal Link Cai Mep Port - Phase 2

2007;2021-2022

93 Sai Gon Hiep Phuoc Port Ho Chi Minh City

Sai Gon - Hiep Phuoc Port Joint Stock Company

2005 - 2011: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision2021: 3D laser scanning,3D Modeling and Building Visualization for Port Digitization

2005 -2011; 2021

PROJECTS FOR SURVEY, FEASIBILITY STUDY, BASIC DESIGN, DETAILED DESIGN

5/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

92 SP– SSA InternationalTerminal (SSIT)

Ba Ria - Vung Tau Province

SP-SSA International Container Services Joint Venture Company (SSIT) (a Joint Venture of SSA Marine (USA), Saigon

Port, and Vinalines)

2006 - 2012: Topographic & Hydrographical, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender documents and Project Management2019: Structural inspection by 3D Laser Scan, Detailed design for demolition and resconstruction work, Project Management and Construction Supervision for the SSIT's berth after collision incident of the Fareast Honesty.2020: Structural Verification for upgrading SSIT barge berth from 500 DWT to 2,500 DWT 2021: Preparation of structural assessment for existing quay deck, turning basin, navigational channel; Preparation of Maritime Safety Plan and Port Operation Announcement Decision to allow accommodation of vessels up to 200,000 DWT at SSIT

2006-2012; 2019; 2020; 2021

91 Cai Mep Ha Downstream Port

Ba Ria - Vung Tau Province

Saigon Newport One Member Limited Liability

Corporation

Topographic and bathymetric survey, hydrological survey, numerical modelling and Pre-Feasibility study report

2021

90 Cai Mep Ha General and Terminal Terminal

Ba Ria - Vung Tau Province

Saigon Newport One Member Limited Liability

Corporation

Topographic and bathymetric survey, hydrological survey, numerical modelling and Pre-Feasibility study report

2021

89Ca Na LNG Power Center Phase 1 - 1500 MW and Ca Na LNG Port

Ninh Thuan Province

Trung Nam Construction Investment Corporation

- Soil investigation of 03 onshore drilling holes for Preparation of pre-feasibility study report of port construction items- Preparation of pre-feasibility study report of port construction items

2021

88 Ca Na Port Area Phase 1 - Ca Na General Seaport

Ninh Thuan Province

Trung Nam Ca Na International Seaport Joint

Stock Company

- Modification of the detailed design of ancillary works in Phase 1 to serve the operation of Berth 1A and detailed design of synchronous infrastructure (including detailed cost estimates)- Adjustment of detailed planning of Ca Na port area phase 1- Survey, design and port annoucement decision for Ca Na General Seaport 1A- Topographic and Bathymetric survey, Hydrological survey, Soil Investigation detailed design for Ca Na General Seaport 1B- Detailed design of internal road for Ca Na General Seaport 1A

2021

87 Hon Dau luxury resort Hai Phong City Him Lam Corporation

Topographic and Bathymetric survey, Hydrological survey, Soil Investigation and wave transport modeling for design of embankment

2021

6/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

86 Tan Thanh ICD and Logistics services area

Ba Ria - Vung Tau Province

Logistics Cai Mep Joint Stock Company

Adding port into Detailed planning of inland waterways; Topographic Survey and Soil Investigation; Feasibility Study Report and Basic Design; Environmental Impact Assessment Report; Detailed Design and Construction permit

2021

85Vinh Long Petro Petroleum General Depot Port

Vinh Long Province

Vinh Long Petro Petroleum Company Limited

Topographic and Bathymetric survey, Soil Investigation, Adding port into Detailed planing of Mekong Delta Seaports Group, Feasibility Study Report and Basic DesignDetailed Design

2021

84 Phuoc Dong Industrial Park and Port

Long An Province

IMG Phuoc Dong Joint Stock Company

2020:Topographic and Bathymetric survey and back filling quantity calculation2021: Topographic and Bathymetric survey, Hydrological survey, Soil Investigation and design embankment, yard, and wharf for ships of 20,000 DWT for wharf, yard and embankment project

2020; 2021

83Ca Na I LNG Combined Cycle Gas Turbine Power Plant (1500 Mw)

Ninh Thuan Province

Novatek Gas & Power Asia Pte Ltd

Topographic and Bathymetric survey, Hydrological survey and Soil Investigation 2021

82Tra Vinh V1-2 48MW Offshore Wind Power Plant

Tra Vinh Province

HDEC-SINOHYDRO China Consortium Permanent navigator design 2021

81 My Xuan A International Port

Ba Ria - Vung Tau Province

My Xuan International Port Ltd

Topographic survey, Geological survey, Hydrological survey, Detailed Planning 1/500, Basic Design and Detailed Design and construction permit

2021

80 PTSC Downstream PortBa Ria -

Vung Tau Province

PT. Meindo Elang Indah

Inspection and assessment of the port structure of PTSC, running the real time model, navigation channel assessment, maritime safety measurement plan under the Sao Vang - Dai Nguyet project

2020 - 2021

79 Phuoc An port, Access Road and Logistics Area

Dong Nai Province

PetroVietnam Phuoc An Port Investment and

Operation JSC.

2009 - 2010: Detailed Plan with the scale of 1/2000 and 1/500, Investement report, and Feasibility Study & Basic Design2020 - 2021: Topographic and Geotechnical Survey, Basic design modification and Detailed design - Package 1

20092021

78 Port of Marine Mechanical Industry Service Zone

Ba Ria - Vung Tau Province

Hai Duong Company Limited

Planning and Feasibility Study Phase: Additional Planning, Topographic Survey and Soil Investigation, Feasibility Study Report and Basic DesignDetailed Design Phase: Soil Investigation and Detailed Design - Phase 1

2020

7/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

77 Vung Tau International Cruise Terminal

Ba Ria - Vung Tau Province

Department of Transport of Ba Ria - Vung Tau

Province

Topographic survey, Bathymetric Survey, Hydrological Survey, Mathematical Modelling; Site selection and assessment

2020

76 Tra Vinh Phase 3 Project in Vietnam

Tra Vinh Province Safelane Global Limited Seaspy magnetometers và sidescan 2019;

2020

75Son Duong Logistics Center and Services Project

Ha Tinh Province

Ha Tinh Economic Zone Authority

Topographic survey, Detailed Planning 1/500 preparation 2020

74 Phuoc Thuan General Domestic Port

Ba Ria - Vung Tau Province

Phuoc Thuan Logistics Sevice Port Join Stock

Company

Topographic and Geotechnical Survey, 1/500 Detailed planning, Basic design and Detailed design

2020

73 Phu My ICD Port ProjectBa Ria -

Vung Tau Province

Thanh Binh Phu My Joint Stock Company

2020: Bathymetric survey, Investment Proposal and 1/500 Detailed Planning preparation. 2021: Bathymetric survey, Geotechnical Survey, Feasibility Study, Basic Design and Detailed design for Berth No.1

2020;2021

72 Cai Mep Ha Logistics Center Project

Ba Ria - Vung Tau Province

Department of Transport of Ba Ria - Vung Tau

Province

2019: Preparation of Planning Task of Zoning Plan at scale of 1/20002020: Preparation of zoning plan with scale of 1/2000; Topographical Survey & Benchmark installation

2019 - 2020

71 Bao Long – Phu My Domestic Port

Ba Ria – Vung Tau Province

Bao Long – Phu My Investment And

Development Company Limited

Basic Design and Detailed Design, 1/500 detailed Planning, Construction Supervision

2020 - 2021

70

Coal Transshipment Terminal for Thermal Power Plants in Mekong Delta

Tra Vinh Province

Vietnam National Coal - Mineral Industries Group

(Vinacomin)SUMITOMOCorporation

EVN/ Power Project Management 2

2011 – 2014; 2015 – 2016: Topographic & Hydrographic survey, Soil Investigation, Feasibility Study & Basic Design2020: Study for site selection for coal transshipment terminal

2011 -2014

2015-20162020

69 Tra Vinh 78mw Offshore Wind Farm Project

Tra Vinh Province

PowerChina International Group Limited Hiep Thanh

Wind

Hydrological Survey; Temporary jetty design, permit,consultant and permanent navigator design, permit; Geo-physical survey

2019-2020

8/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

68 Binh Dai Wind Power Plan Project

Ben Tre Province

PowerChina International Group Limited Binh Dai

Wind

Hydrological Survey, Seabed And Coastal Erosion Study;Temporary jetty design, permit,consultant and permanent navigator design, permit; Geo-physical survey

2019-2020

67 Thanh Long Bay Resort Complex

Bình Thuận Province

Nam Investment Joint Stock Company

2019: Bathymetric Survey and Soil Investigation2020: Topographic urvey, Geological survey, Hydrological survey, Mathematical Modelling, Pre-feasibility Study report, Feasibility Study report, Basic Design, Detailed Design for Breakwater and Marina.

2019-2020

66Professional Study Service For Supply Base Site Selection

Kien Giang Province

Phu Quoc Petroleum Operating Company

(PQPOC)

Potential Site Assessment, Existing Ports Status and Port Development Plan Updates, Assessment of ability of the existing and planned ports, Transportation Assessment.

2019

65 Prime Resorts And Hotels Khanh Hoa Province

Cam Lam Investment Co., Ltd

Laser Scan and Building Information Model (BIM) for current status of the Prime Resorts and Hotels

2019

64 Quang Binh Wind Farm Quang Binh Province

B&T Wind Farm Joint Stock Company

Geological-Geotechnical site investigations and Laboratory test, Geophysical survey 2019

63Mo Nhat Inland Waterway Port and General Warehouse

Ba Ria - Vung Tau Province

Dai Dat Trading Construction Company

Limited

Topographic and Hydrographical Survey, Soil Investigation, Detailed Planning 1/500, Feasibility Study, Environmental Impact Assessment and Detailed Design

2019

62 Van Ninh General Port Quang Ninh Province

Van Ninh International Port JSC

Detailed Planning 1/500, Topographic and Hydrographical Survey, Soil Investigation, Feasibility Study, Basic Design and Detailed Design

2019

61 My Xuan International General Port Project

Ba Ria - Vung Tau Province

Formosa International Development Corporation

Topographic Survey, Geological Investigation, Feasibility Study, Environmental Impact Assessment, Detailed Design and Port Construction License

2008-20102018-2020

60 Long Son LNG Complex Ba Ria -

Vung Tau Province

The Power Engineering Consulting Joint Stock

Company.

Study and assessment of the maritime traffic and assessment of the possibility of LNG vessels to operate at the area.

2018

59 UPC-Vinh Loi / Wind Farm Bac Lieu Province UPC Vietnam (HK) Limited Geotechnical Work 2018

58 PTSC Downstream PortBa Ria -

Vung Tau Province

McDERMOTT ASIA PACIFIC SDN BHD

Inspection and assessment of the port structure of PTSC and Vietsopetro, running the real time model, navigation channel assessment, maritime safety measurement plan under the Sao Vang - Dai Nguyet project

2018 - 2019

57 Saigon Co.op port Ho Chi Minh City Saigon Co-op Cooperation Topographic survey, Soil investigation and

Feasibility Study preparation 2018

9/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

56 Sea Star International Seaport

Ba Ria - Vung Tau Province

S.S.I.P CORP

2009; 2018: Additional planning, Topographic survey, Soil investigation, Feasibility Study preparation and Basic Design, EIA Report, Detailed Design for Phase 1, Construction License2021: Project Managerment Service for Soil Improvement Construction

2009 & 2018 &

2021

55Hoa Binh Bai Vong passenger port and logistic service complex

Kien Giang Province

Hoa Binh Ham Ninh Joint Stock Company

- Topographic survey, Soil investigation, Detailed Planning scale 1/500, Feasibility Study preparation and construction design - Stage 1.- Construction supervision

2016 - 2020

54Duyen Hai 1 thermal Power Plant (1,245MW)- Coal Unloading Jetty

Tra Vinh Province

GENCO 1 - Vietnam Electricity (EVN)

Topographic and Hydrographical survey, Soil Investigations, Geophysical Survey, Hydrological survey, Feasibility Study & Basic Design, EIA report, Tender Preparation and Evaluation, Detailed Design Review, Construction Supervision.

2009-2017

53 Cai Mep International Terminal (CMIT)

Ba Ria - Vung Tau Province

Cai Mep International Terminal Ltd., Co.

(a Joint Venture of APM Terminals, Vinalines and

Saigon Port)

2006 - 2012: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents and Project Management2016: Structural Appraisal for Berth, First Time, 5 Year Interval2018: Mathematical Modelling, Real Time Simulation and Maritime Safety Plan Preparation of 180,000 TEU Vessel 2020: Structural Appraisal of the Existing CMIT Terminal and Maritime Safety Plan Preparation for Capability Possibilities Study of CMIT Terminal to Accommodate 214,000 TEU Vessel2021: Extension of testing and commissioning period of CMIT Terminal to accommodate upto 214,121 DWT vessels and Operation Announcement Obtainment for CMIT Terminal to accommodate upto 214,121 DWT vessels

2006-2012; 2016; 2018; 2020; 2021

52Duyen Hai 3 thermal Power Plant (660MW) - Coal Unloading Jetty

Tra Vinh Province

GENCO 1 - Vietnam Electricity (EVN)

Detailed Design Coal Unloading Jetty – Trestle to Accommodate 30,000DWT Bulk Carriers; Sedimentation Study of waterfront Area and CW Intake Canal

2015-2017

51Myanmar International Terminals ThilawaPort (MITT)

Yangon, Myanmar

Myanmar International Terminals Thilawa (MITT) / China Habour Engineering

Co. (CHEC)

Inspection existing structure of MITT Port (Section S6 & S7): Piles, Beams, Deck slabs, Quay crane tracks, Bollards & Fenders…, Verify load carrying capacity of wharf structure Detailed design for additional tie-down for new quay cranes & RTG cranes.

2017

10/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

50 Long Son Petrochemical Port (LSP)

Ba Ria - Vung Tau Province

- Long Son Petrochemicals Co., Ltd (LSP) (a Joint Venture between Siam Cement

Group of Thailand, Qatar Petroleum and Petrovietnam

- Posco Engineering and Construction Co., Ltd.

- The Consortium of TPSK.

2008-2013: Topographic & Hydrographical Survey and Hydrological Survey (02 times in 2008 & 2009), Geotechnical Survey (04 times in 2008, 2009 and 2013) and Detail Planning in 2008;2012-2013: Mathematical model, Basic Design, EIA Report;2017-2018: Topographic & Hydrographic Survey, Sub- bottom Profiling & Soil Investigation, Detailed Design Review and Simulation Model, Magnetometer and Sidescan Sonar Survey - Package F2018: Topographic and Soil Investigation Survey -Package L2018 - 2020: Soil Investigation - Package A12019 - 2021: Construction Supervision; Bathymetric Survey after Dredging and Design review - Package F

2008-2013& 2017, 2018, 2019 - 2021

49Lach Huyen Port Infrastructure Construction Project

Hai Phong City

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT)

- 2010-2015: Feasibility Study Review, Updated Feasibility Study Review, Detailed Design Review - Client: Vinamarine (Presented by Project Management Unit No.2);- 2011: Soil investigation, Hydrological Survey for the Detailed Design - Client: Jica Study Team (Presented by Oriental Consultants Co. Ltd.,);- 2013-2017: Construction Supervision (JV comprising Nippon Koei, JPC, Portcoast and NK Vietnam) - Client: Vietnam MOT (Presented by Project Management Unit No.2)

2010-2019

48 Southern Van Phong General Port

Khanh Hoa Province

Thanh Yen - Van Phong Joint Stock Company

2011: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Supervision, Design of upgrading for wharf of 50,000 DWT.2018: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Design for wharf of 20,000DWT and 5.000DWT.2018: Design of two-way navigational channel and turning basin for arrival of 70,000DWT vessels; Environmental Impact Assessment.2019: Port operation announcement and Channel Opening Announcement for 70,000 DWT Berth 2021: Survey and Design for berth No.2

2011; 2018;2019

;2021

11/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

47 Saigon Peninsula Project Ho Chi Minh City

The Saigon Peninsula Group Corporation

Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, EIA report and Detailed Design for International Cruise Terminal for 50.000- 60.000GRT Cruise Ships.Project Management for Revetment.

2016-2018

46 Hyosung Vina Chemicals Port

Ba Ria - Vung Tau Province

Hyosung Corporation/Hyosung Vina

Chemicals Co., Ltd

Planning Add, Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, Environmental Impact Assessment Report; Hydrodynamic modelling & Ship Maneuvering Simulation Study, Detailed Design; Construction Supervision; Port Operation announcement; Surveying and inspecting construction quality of revetment structure and soft soil improvement

2016-2017; 2019

45 Hoa Sen Ca Na - Ninh Thuan General Port

Ninh Thuan Province

- Department of Transport - Ninh Thuan Province

(2016)- Hoa Sen Group (2017)

2016: Topographic and Hydrographical Survey and Planning 1/20002017-2019: Detailed Planning, 1/500, Topographic and Hydrographical Survey, Soil Investigation, Feasibility Study & Environmental Impact Assessment; Mathematical Modelling; Detailed Design – 70,000 DWT berth

2016;2017 - 2019

44ICD Long Binh Transshipment Port Project

Ho Chi Minh City Duc Khai Corporation

Detailed Planning 1/500, Topographic Survey, Soil Investigation, Hydrological Survey, Feasibility Study for Phase 1

2016-2017

43 Cai Mep General PortBa Ria -

Vung Tau Province

Thuan Hai CorporationTopographic & Hydrographic Survey, Soil Investigation, Feasibility Study & Basic Design, Detailed Design

2016-2017

42 PTSC Downstream PortBa Ria -

Vung Tau Province

PTSC Mechanical & Construction Co., Ltd.

(PTSC M&C)

2017: Provision of Technical Consultancy Service for Marine Spread Going Inward/Outward of Song Dinh Channel and Berthing at PTSC Downstream Port2021: Inspection and Structural verification

2017; 2021

41 Vinh Dam complex project Kien Giang Province

Saigon Investment Construction And

Commerce Co.Ltd &Toan Hai Van JSC.

- 2007-2008: Topographic survey, Soil investigation, Detailed Planning, Mathematical model- 2017-2018: Additional planning, Topographic survey, Soil investigation, Detailed Planning, Mathematical model- 2018: Basic design, Construction design of seaports No. 1 & 2 with a tonnage of 3,000 DWT - K1-K8 bank embankment, Chanel - Waterfront of the wharf and signaling buoys system- 2018: Topographic survey, Geophysic survey, Soil investigation, Hydrographic Survey for items of Ocean Lotus Island, Breakwater, Beaches 2A&2C

2007-2008& 2017 -

2019

12/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

40 Rach Gia Cruise Terminal Kien Giang Province

Kien Giang Province’s Management Board for

Transport Works

2016 - 2017: Topographic & Hydrographical Survey, Geotechnical Investigations, Detailed Plan with the scale of 1/5002019: Topographical survey, Soil investigation, Feasibility Study

2016-2017; 2019

39 Ha Tien Terminal Kien Giang Province

Department of Transport Kien Giang Province

Topographic & Hydrographical Survey, Detailed Plan with the scale of 1/2000 and 1/500 2016-2017

38

Comprehensive Development Project for Cai Mep - Thi Vai Navigational Channel

Ba Ria - Vung Tau Province

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT)

Topographic & Hydrographical survey, Soil Investigation, Hydrological Survey, Feasibility Study, Basic Design, Hydrodynamic Model, Fast-time & Real-time Simulation in Channel Design

2012-2016

37Nghi Son Refinery and Petrochemical Complex (NSRP)

Thanh Hoa Province

Nghi Son Refinery and Petrochemical LLC / JGCS

Corporation/Toyo Construction Co,. Ltd.

Site Selection, Preliminary Design of Marine Structures (Loading/Unloading Jetties, Construction Phase’s Quays, Approach Channel and Single Point Mooring); Topographic & Hydrographic Survey, Side scan & Sub bottom Profile survey, Wave & Current Monitoring, Hydrological Survey, and Geotechnical Survey.

2003-2016

36 Cruise Terminal in Phu Quoc Island

Kien Giang Province

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT) (2014),Department of Transport- Kien Giang Province

(2015-2018)

Topographic & Hydrographical Survey, Geotechnical Investigations, Computational Simulation and Modelling, Detailed Plan, Feasibility Study, Basic Design, EIA report, Foundation Analysis, Detailed Design and Construction Supervision.

2014-2020

35 Phu My PortBa Ria -

Vung Tau Province

Ba Ria Joint Stock Company of Services for Import Export of Agro - Forestry Products and

Fertilizers(Baria Serece)

- 2005 - 2006: Topographic survey, Soil investigation, Basic design, Construction design for vessels of 60.000 DWT - 2009: Survey and inspection on the existing jetty, EIA report and design of upgrading for wharf of 80,000 DWT. - 2015: Monitoring displacement of bridge segment 103M Phu My Port in the moving process of cranes- 2015 - 2016: Assessment of damage level of the segment 103m; Survey, design dismantling and repair design of segment 103m of Phu My Port.- 2017 - 2018: Inspection of upgrading Phu My jetty to accommodate ships with a maximum capacity of 80,000 DWT; Upgrading river pier No. 2 - Phu My port to 1,500-2,000 DWT; Inspection on River Pier No. 5 and construction maintenance process- 2020: Inspection and verification, 3D laser scanning and design for reinforcing structures for 72m trestle and 132m jetty service- 2021: Study on the cargo handling capacity enhancement of Baria Serece port

2005-2018; 2020; 2021

13/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

34 Vietnam Lee & Man Paper International Port

Hau Giang province

Vietnam Lee & Man Paper MFG. Ltd. (Hong Kong)

Topographic & Hydrographical survey, Geotechnical Investigation, Detailed Planning, Feasibility Study, Basic Design, EIA Report, Detailed Design

2014-2016

33 Chan May Port - Upgrading Existing Jetty Hue Province

Royal Carribbean Cruise Ltd. /Chan May Port Ltd.,

Co.

Data collection, Topographic & Hydrographical Survey, Side Scan survey, Feasibility Study and Basic Design, Detailed Design, Tender Document, Construction Supervision.

2014-2016

32 Cho Gao Canal Upgrading Project

Tien Giang Province

Ministry of Transport (MOT)

Topographic and Hydrographical survey, Geotechnical Investigation, Mathematical Modeling & Detailed Design.

2010-2016

31 Ong Keo General Port Dong Nai Province

Long Thuan Investment Corporation.

2015 - 2016: Topographic & Hydrographic survey, Soil investigation, Environmental Impact Assessment, Feasibility Study & Basic Design, Detailed Design;2018: Construction Supervision for 5,000 DWT barge berth;2020: Structural inspection survey and verification report, Maritime Safety Report preparation for internal berth to receive ships of up to 5,000 DWT; Topographic survey, Geotechnical survey and modification design for outer berth to receive ships of 50,000 DWT and barges of 20,000 DWT.

2015-2016& 2018 &2020

30Annual Dredging and Maintenance of Navigation Channels

Hai Phong, Sai Gon - Vung

Tau, Vung Tau - Thi Vai, Quy Nhon, Nghi

Son, Dinh An - Can Tho, Da Nang, Soai Rap - Hiep Phuoc, Anh Thoi channel

Southern Vietnam Maritime Safety

Corporation (VMS-S) &Vietnam Maritime

Administration (Vinamarine)/ Ministry of

Transport (MOT)

Hydrographical survey 2013 - 2020

29 The Kampot Port Project (KSP)

Kampot, Cambodia

TRY PHEAP GROUP CO,. LTD.

2016 - 2017: Topographic survey, Port planning and Preparation of bidding documents2017 - 2018: Installation of navigation aids at Papa Petroleum Port

2016-2017& 2017 - 2019

28

Establishment of Navigational Channel and Maritime Signal System for Dong Tranh River and Navigational Channel from Tat Ong Cu - Tat Bai Confluence to Go Gia River

Ho Chi Minh City

Southern Vietnam Maritime Safety

Corporation (VMS-S)

Topographic & Hydrographical Survey, Geotechnical Investigation, Construction Economic Technical Report.

2014-2015

14/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

27

Mekong Delta Region Urban Upgrading Project (MDR-UUP) - My Tho city sub-project- Item of Tien River Embankment

Tien Giang Province

Project Management Unit of Mekong Delta Region Urban Upgrading Project(MDRUUP) - My Tho city

sub-project

Topographic & Hydrographical Survey, Geotechnical Investigation, Geophysical Survey, Hydrological Survey, Modifying the basic design, Detail Design and Tender Document

2014-2015

26

Vinh Tan Power Complex Infrastructure Project - Coal Unloading Jetty for Vinh Tan 2 Thermal Power Plant (2x622MW)

Binh Thuan Province

GENCO 3 - Vietnam Electricity (EVN)

Detailed Design Review and Construction Supervision 2012-2015

25

Vinh Tan Power Complex Infrastructure Project - Land reclaimation for Vinh Tan 4 thermal Power Plant (2x600MW)

Binh Thuan province

GENCO 3 - Vietnam Electricity (EVN)

Detailed Design Review and Construction Supervision 2014-2015

24The Improvement project of Navigational Channel to the Bassac River

Tra Vinh Province

Vietnam Maritime Administration Vinamarine)

- Ministry of Transport (MOT)

2004: Soil Investigation, Topographic, Hydrographic & Hydrological survey (SNC- Lavalin is a Leader of JV) Client: Project Management Unit of Waterways - Vietnam MOT2005-2015: Topographic & Hydrographical Survey, Geotechnical Investigation, Geophysical Survey, Hydrological Survey, Feasibility Study & Basic Design, Mathematical Modeling, Detail Design, Construction Supervision. Client: Maritime Project Management Unit 3 - Vinamarine - Vietnam MOT

2005-2014

23 Tien Sa port extension and upgrade project Da Nang City

Da Nang Port SJC. &Project Management Unit

85- Ministry of Transport

(MOT)

Topographic survey & hydrographical survey; Geotechnical survey, Feasibility Study Preparation & Basic Design; Environmental Impact Assessment, Site clearance

2013-2014

22 FHS Son Duong Port Ha Tinh Province

Owner: Formosa Ha Tinh Steel Corporation (FHS)Main Investor: Formosa Plastics Group, China

Steel, JFE Steel / CECI Engineering Consultants,

inc., Taiwan

2008 - 2010: Topographic Survey, Hydrographical Survey, Geotechnical Survey, Geophysical Survey, Hydrological Survey, Mathematical Modeling, Feasibility Report (Phase 1 & Phase 2)2009 - 2013: Planning Preparation, Detailed Planning and Detailed Design of Son Duong Port (phase 1) with International Partner CECI Engineering Consultants.Inc. (Taiwan - China) 2016 - 2017: Hydrographical Survey.201 8 -2020: settlement monitoring

2008-2020

21 Study for Port Project in Cambodia (SITC)

Sihanoukville, Cambodia Confidential

Topographic & Hydrographic Survey, Geotechnical Investigation, Hydrological Survey, Numerical Modeling, Basic Design

2012-2013

15/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

20Pilot Pick-up and Drop- off Zone in Ba Ria - Vung Tau Province

Ba Ria - Vung Tau Province

Vung Tau Port Authority - Vinamarine Topographic & Hydrographical survey 2013

19Saigon International Terminals Vietnam (Hutchison Ports SITV)

Ba Ria - Vung Tau Province

Saigon International Terminals Vietnam Limited

(SITV)

Topographic & Hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents, Construction Supervision Project Management; Instruments and monitoring works during the construction implementation; Engineering work for upgrading up to 100,000DWT vessels berthing; Structural appraisal for berth, first time, 5 year interval; Design review, EIAR preparation and Independent Site Audit for Twilight warehouse; Port Announcement for 100,000 DWT Vessel Accommodation

2006-2012, 2015-

2017& 2018-2019

18 Cai Lan International Container Terminal (CICT)

Quang Ninh Province

Cai Lan International Container Limited Liability

Company (CICT)(a Joint Venture of SSA Marine (USA), Vinalines

and Quang Ninh Port)

Topographic & Hydrographical Survey, Geotechnical Investigation, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender Documents and Project Management

2008-2012

17Posco Port (Posco Vietnam and Posco SS - Vina)

Ba Ria - Vung Tau Province

Posco Vietnam Co. Ltd and Posco SS VINA Co.,

Ltd (Two of the main affiliates of Posco - South

Korea)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Verification of the existing berth structure for 60,000DWT vessels berthingTopographic Survey and Construction2013 - 2017: Supervision for annually dredging 2018: Port maintenance procedure preparation2019: On the preparation of environmental impact assessment report for dumping dredged material within Posco Vietnam Co., Ltd’s land area

2006-2008; 2012-2017; 2018; 2019

16 SP-PSA International Port (SP-PSA)

Ba Ria - Vung Tau Province

SP-PSA International Port Company Ltd.

(a Joint Venture of PSA Singapore, Vinalines and

Saigon Port)

2006 - 2009: Topographic & Hydrographical Survey, Geotechnical investigation, Feasibility Study & Basic Design, EIA report, Detailed Design 2016 - 2017: Specifying the capacity of general cargo vessels equivalent to container vessel of 120,000 DWT in/out- 2020: Port Structural verification

2006-20092016-2017

2020

16/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

15 PVGas PortBa Ria -

Vung Tau Province

PetroVietnam Gas Corporation (PVGAS)

2012: Site survey of existing structure, bathymetric survey, Basic Design, FEED Design and cost estimation and Marine Navigation Study2013: Topographic & Bathymetric Survey and Side Scan Survey and obtainment of Marine Notice (annually)

2012-2017

14

Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1)

Ho Chi Minh City

Ho Chi Minh City People's Committee Management

Authority for Urban Railways

Topographic and Geotechnical Survey 2012

13Studying of Vessel berthing area in Ba Ria Vung Tau province

Ba Ria - Vung Tau Province

Vung Tau Port Authority - Vinamarine Topographic & hydrographical Survey, Design 2012

12Coal Unloading Jetty of Quang Trach Thermal Power Plant

Quang Binh Province

Vung Ang - Quang Trach PetroElectric Project Management Unit - PetroVietnam (PVN)

Topographic & Hydrographical Survey, Geotechnical Survey, Detailed Design 2011-2012

11Cai Mep -Thi Vai International Terminal (ODA loan)

Ba Ria - Vung Tau Province

Ministry of Transport (MOT) /

JICA Study Team

Topographic & Hydrographical survey, Hydrological Survey, Geotechnical Investigation, Feasibility Study, Basic Design, EIA Report, Detailed Design, Tender Documents, Project Management, Construction Supervision.

2005-2011

10 My Xuan International General Port Project

Ba Ria - Vung Tau Province

Formosa International Development Corporation

Topographic & hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design

2008-20102018-2020

9Dredging of Soai Rap River Navigation Channel - Phase II

Ho Chi Minh City

Tan Thuan Industrial Promotion Co., Ltd. (Tan

Thuan IPC)

Topographic and Hydrographical Survey, Geotechnical Investigation, Hydrodynamic Model, Feasibility Study, Basic Design, EIA Report, Detailed Design.

2007-2010

8 Saigon Premier Container Terminal (SPCT)

Ho Chi Minh City

Saigon Premier Container Terminal (SPCT)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review and Project ManagementInstruments and monitoring works during the construction implementation

2005-2009

7 Van Phong International Transshipment Port

Khanh Hoa Province

Vietnam National Shipping Lines

& Vietnam MaritimeAdministration Vinamarine)

- Ministry of Transport (MOT)

Topographic survey & hydrographical survey, Geotechnical investigations, Detailed Plan, Feasibility Study and Detailed design.

2005-2006& 2007-

2009

6 Dung Quat Refinery - Package 5A & 5B

Quang Ngai province

Vietnam Oil and Gas Group (PetroVietnam)

Topographic and hydrographical surveys, Geotechnical Investigations, Computational Simulation and Modelling , Foundation Analysis and Detailed Design

2004-2007

5 Cai Mep Petroleum Port Project

Ba Ria - Vung Tau Province

Vungtau Petro JSC. Detailed Design 2007

17/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

4 Petec Cai Mep PortBa Ria -

Vung Tau Province

PETEC Trading and Investment Corporation Detailed Design 2007

3Improvement Project for 2 Southern Waterway Routes and Can Tho Port

Can Tho City

Vietnam Inland Waterways Administration (VIWA) /

Project Management Unit of Waterways

(PMU-W)

Surveys and Feasibility Study Preparation for Ca Mau - Nam Can Waterway Upgrading Technical Design for Bank Protection Work for Cho Gao Channel

2002-2003& 2004-

2005

2Sea Entrance and Construction of Sa Huynh Fish port

Quang Ngai Province

Department of AquicultureQuang Ngai province Topographic Survey and Detailed Design 2001-2004

1 Port of Phu My Steel PlantBa Ria -

Vung Tau Province

Southern Steel Company Technical Design, Construction Supervision. 2002-2003

III

29 GEMALINK Container Terminal Vietnam

Ba Ria - Vung Tau Province

Gemadept Terminal Link Cai Mep Terminal Joint

Stock Company

2007 - 2009: Topographic Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA Report, Detailed Design2021: Preparation of Marine Safety Plan for container vessel of 200,000 DWT entering Gemadept – Terminal Link Cai Mep Port2021 - 2022: Detailed planning on the scale of 1/500; Bathymetric survey, soil investigation; Feasibility study report; Environment Impact Assessment Report and legal procedures (Gemadept – Terminal Link Cai Mep Port - Phase 2

2007;

2021-2022

28 Tan Thanh ICD and Logistics services area

Ba Ria - Vung Tau Province

Logistics Cai Mep Joint Stock Company

Adding port into Detailed planning of inland waterways; Topographic Survey and Soil Investigation; Feasibility Study Report and Basic Design; Environmental Impact Assessment Report; Detailed Design and Construction permit

2021

27 Hyosung Vina Chemicals Port

Ba Ria - Vung Tau Province

Hyosung Corporation/Hyosung Vina

Chemicals Co., Ltd

Planning Add, Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, Environmental Impact Assessment Report; Hydrodynamic modelling & Ship Maneuvering Simulation Study, Detailed Design; Construction Supervision; Port Operation Announcement; Surveying and inspecting construction quality of revetment structure and soft soil improvement

2016-2017; 2019

26Mo Nhat Inland Waterway Port and General Warehouse

Ba Ria - Vung Tau Province

Dai Dat Trading Construction Company

Limited

Topographic and Hydrographical Survey, Soil Investigation, Detailed Planning 1/500, Feasibility Study, Environmental Impact Assessment and Detailed Design

2019

PROJECTS FOR ENVIRONMENT IMPACT ASSESSMENT

18/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

25 My Xuan International General Port Project

Ba Ria - Vung Tau Province

Formosa International Development Corporation

Topographic Survey, Geological Investigation, Feasibility Study, Environmental Impact Assessment, Detailed Design and Port Construction License

2008-20102018-2020

24 Sea Star International Seaport

Ba Ria - Vung Tau Province

S.S.I.P CORP

2009; 2018: Additional planning, Topographic survey, Soil investigation, Feasibility Study preparation and Basic Design, EIA Report, Detailed Design for Phase 1, Construction License2021: Project Management Service for Soil Improvement Construction

2009 & 2018 &

2021

23 Cai Mep International Terminal (CMIT)

Ba Ria - Vung Tau Province

Cai Mep International Terminal Ltd., Co.

(a Joint Venture of APM Terminals, Vinalines and

Saigon Port)

2006 - 2012: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents and Project Management2016: Structural Appraisal for Berth, First Time, 5 Year Interval2018: Mathematical Modelling, Real Time Simulation and Maritime Safety Plan Preparation of 180,000 TEU Vessel 2020: Structural Appraisal of the Existing CMIT Terminal and Maritime Safety Plan Preparation for Capability Possibilities Study of CMIT Terminal to Accommodate 214,000 TEU Vessel2021: Extension of testing and commissioning period of CMIT Terminal to accommodate upto 214,121 DWT vessels and Operation Announcement Obtainment for CMIT Terminal to accommodate upto 214,121 DWT vessels

2006 - 2012; 2016; 2018; 2020; 2021

22Duyen Hai 1 thermal Power Plant (1,245MW)- Coal Unloading Jetty

Tra Vinh Province

GENCO 1 - Vietnam Electricity (EVN)

Topographic and Hydrographical survey, Soil Investigations, Geophysical Survey, Hydrological survey, Feasibility Study & Basic Design, EIA report, Tender Preparation and Evaluation, Detailed Design Review, Construction Supervision.

2009-2017

21 Long Son Petrochemical Port (LSP)

Ba Ria - Vung Tau Province

- Long Son Petrochemicals Co., Ltd (LSP) (a Joint Venture between Siam Cement

Group of Thailand, Qatar Petroleum and Petrovietnam

- Posco Engineering and Construction Co., Ltd.

- The Consortium of TPSK.

2008-2013: Topographic & Hydrographical Survey and Hydrological Survey (02 times in 2008 & 2009), Geotechnical Survey (04 times in 2008, 2009 and 2013) and Detail Planning in 2008;2012-2013: Mathematical model, Basic Design, EIA Report;2017-2018: Topographic & Hydrographic Survey, Sub- bottom Profiling & Soil Investigation, Detailed Design Review and Simulation Model, Magnetometer and Sidescan Sonar Survey - Package F2018: Topographic and Soil Investigation Survey - Package L2018 - 2020: Soil Investigation - Pkg A12019 - 2021: Construction Supervision; Bathymetric Survey after Dredging and Design review - Package F

2008-2013& 2017, 2018, 2019 - 2021

19/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

20 Southern Van Phong General Port

Khanh Hoa Province

Thanh Yen - Van Phong Joint Stock Company

2011: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Supervision, Design of upgrading for wharf of 50,000 DWT.2018: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Design for wharf of 20,000DWT and 5.000DWT.2018: Design of two-way navigational channel and turning basin for arrival of 70,000DWT vessels; Environmental Impact Assessment.2019: Port operation announcement and Channel Opening Announcement for 70,000 DWT Berth 2021: Survey and Design for berth No.2

2011; 2018;2019

;2021

19 Saigon Peninsula Project Ho Chi Minh City

The Saigon Peninsula Group Corporation

Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, EIA report and Detailed Design for International Cruise Terminal for 50.000- 60.000GRT Cruise Ships.Project Management for Revetment.

2016-2018

18 Hyosung Vina Chemicals Port

Ba Ria - Vung Tau Province

Hyosung Corporation/Hyosung Vina

Chemicals Co., Ltd

Planning Add, Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, Environmental Impact Assessment Report; Hydrodynamic modelling & Ship Maneuvering Simulation Study, Detailed Design; Construction Supervision; Port Operation Announcement; Surveying and inspecting construction quality of revetment structure and soft soil improvement

2016-2017; 2019

17 Hoa Sen Ca Na - Ninh Thuan General Port

Ninh Thuan Province

- Department of Transport - Ninh Thuan Province

(2016)- Hoa Sen Group (2017)

2016: Topographic and Hydrographical Survey and Planning 1/20002017-2019: Detailed Planning, 1/500, Topographic and Hydrographical Survey, Soil Investigation, Feasibility Study & Environmental Impact Assessment; Mathematical Modelling; Detailed Design – 70,000 DWT berth

2016;2017 - 2019

16 Cai Mep General PortBa Ria -

Vung Tau Province

Thuan Hai Corporation

2016 - 2017: Topographic & Hydrographic Survey, Soil Investigation, Feasibility Study & Basic Design, Detailed Design2019 – 2020: Soil Investigation after soil improvement

2016-2020

20/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

15 Cruise Terminal in Phu Quoc Island

Kien Giang Province

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT) (2014),Department of Transport- Kien Giang province

(2015-2018)

Topographic & Hydrographical Survey, Geotechnical Investigations, Computational Simulation and Modelling, Detailed Plan, Feasibility Study, Basic Design, EIA report, Foundation Analysis, Detailed Design and Construction Supervision.

2014-2016

14 Phu My PortBa Ria -

Vung Tau Province

Ba Ria Joint Stock Company of Services for Import Export of Agro - Forestry Products and

Fertilizers (Baria Serece)

- 2005 - 2006: Topographic survey, Soil investigation, Basic design, Construction design for vessels of 60.000 DWT - 2009: Survey and inspection on the existing jetty, EIA report and design of upgrading for wharf of 80,000 DWT. - 2015: Monitoring displacement of bridge segment 103M Phu My Port in the moving process of cranes- 2015 - 2016: Assessment of damage level of the segment 103m; Survey, design dismantling and repair design of segment 103m of Phu My Port.- 2017 - 2018: Inspection of upgrading Phu My jetty to accommodate ships with a maximum capacity of 80,000 DWT; Upgrading river pier No. 2 - Phu My port to 1,500-2,000 DWT; Inspection on River Pier No. 5 and construction maintenance process'- 2020: Inspection and verification, 3D laser scanning and design for reinforcing structures for 72m trestle and 132m jetty service- 2021: Study on the cargo handling capacity enhancement of Baria Serece port

2005-2018; 2020; 2021

13 Vietnam Lee & Man Paper International Port

Hau Giang province

Vietnam Lee & Man Paper MFG. Ltd. (Hong Kong)

Topographic & Hydrographical survey, Geotechnical Investigation, Detailed Planning, Feasibility Study, Basic Design, EIA Report, Detailed Design

2014-2016

12 Ong Keo General Port Dong Nai Province

Long Thuan Investment Corporation.

2015 - 2016: Topographic & Hydrographic survey, Soil investigation, Environmental Impact Assessment, Feasibility Study & Basic Design, Detailed Design;2018: Construction Supervision for 5,000 DWT barge berth;2020: Structural inspection survey and verification report, Maritime Safety Report preparation for internal berth to receive ships of up to 5,000 DWT; Topographic survey, Geotechnical survey and modification design for outer berth to receive ships of 50,000 DWT and barges of 20,000 DWT.

2015-2016& 2018 &2020

21/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

11 Tien Sa port extension and upgrade project Da Nang City

Da Nang Port SJC. &Project Management Unit 85 - Ministry of Transport

(MOT)

Topographic survey & hydrographical survey; Geotechnical survey, Feasibility Study Preparation & Basic Design; Environmental Impact Assessment, Site clearance

2013-2014

10Saigon International Terminals Vietnam (Hutchison Ports SITV)

Ba Ria - Vung Tau Province

Saigon International Terminals Vietnam Limited

(SITV)

Topographic & Hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents, Construction Supervision Project Management; Instruments and monitoring works during the construction implementation; Engineering work for upgrading up to 100,000DWT vessels berthing; Structural appraisal for berth, first time, 5 year interval; Design review, EIAR preparation and Independent Site Audit for Twilight warehouse; Port Announcement for 100,000 DWT Vessel Accommodation

2006-2012, 2015-

2017& 2018-2019

9 SP– SSA InternationalTerminal (SSIT)

Ba Ria - Vung Tau Province

SP-SSA International Container Services Joint Venture Company (SSIT) (a Joint Venture of SSA Marine (USA), Saigon

Port, and Vinalines)

2006 - 2012: Topographic & Hydrographical, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender documents and Project Management2019: Structural inspection by 3D Laser Scan, Detailed design for demolition and resconstruction work, Project Management and Construction Supervision for the SSIT's berth after collision incident of the Fareast Honesty.2020: Structural Verification for upgrading SSIT barge berth from 500 DWT to 2,500 DWT 2021: Preparation of structural assessment for existing quay deck, turning basin, navigational channel; Preparation of Maritime Safety Plan and Port Operation Announcement Decision to allow accommodation of vessels up to 200,000 DWT at SSIT

2006-2012; 2019; 2020; 2021

8 Cai Lan International Container Terminal (CICT)

Quang Ninh Province

Cai Lan International Container Limited Liability

Company (CICT)(a Joint Venture of SSA Marine (USA), Vinalines

and Quang Ninh Port)

Topographic & Hydrographical Survey, Geotechnical Investigation, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender Documents and Project Management

2008-2012

22/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

20Posco Port (Posco Vietnam and Posco SS - Vina)

Ba Ria - Vung Tau Province

Posco Vietnam Co. Ltd and Posco SS VINA Co.,

Ltd (Two of the main affiliates of Posco - South

Korea)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Verification of the existing berth structure for 60,000DWT vessels berthingTopographic Survey and Construction2013 - 2017: Supervision for annually dredging 2018: Port maintenance procedure preparation2019: On the preparation of environmental impact assessment report for dumping dredged material within Posco Vietnam Co., Ltd’s land area

2006-2008; 2012-2017; 2018; 2019

6 SP-PSA International Port (SP-PSA)

Ba Ria - Vung Tau Province

SP-PSA International Port Company Ltd.

(a Joint Venture of PSA Singapore, Vinalines and

Saigon Port)

2006 - 2009: Topographic & Hydrographical Survey, Geotechnical investigation, Feasibility Study & Basic Design, EIA report, Detailed Design 2016 - 2017: Specifying the capacity of general cargo vessels equivalent to container vessel of 120,000 DWT in/out- 2020: Port Structural verification

2006-20092016-2017

2020

5 Sai Gon Hiep Phuoc Port Ho Chi Minh City

Sai Gon - Hiep Phuoc Port Joint Stock Company

2005 - 2011: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision2021: 3D laser scanning,3D Modeling and Building Visualization for Port Digitization

2005 -2011; 2021

4 My Xuan International General Port

Ba Ria - Vung Tau Province

Formosa International Development Corporation

Topographic & hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design

2008-20102018-2020

3Dredging of Soai Rap River Navigation Channel - Phase II

Ho Chi Minh City

Tan Thuan Industrial Promotion Co., Ltd. (Tan

Thuan IPC)

Topographic and Hydrographical Survey, Geotechnical Investigation, Hydrodynamic Model, Feasibility Study, Basic Design, EIA Report, Detailed Design.

2007-2010

1 Saigon Premier Container Terminal (SPCT)

Ho Chi Minh City

Saigon Premier Container Terminal (SPCT)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review and Project ManagementInstruments and monitoring works during the construction implementation

2005-2009

IV

19

Upgrading wharf K15B, K15C for accommodate partial loaded vessels up to 60,000 DWT - Ben Nghe Port

Ho Chi Minh City

Ben Nghe Port Company Limited

Existing structural survey and inspection report of wharf K15B, K15C to accommodate partial loaded vessels up to 60,000 DWT

2021

18Vietnam International Container Terminals (VICT)

Ho Chi Minh City

First Logistics Development Joint Venture Company

Inspection of seaport infrastructure 2021

PROJECTS FOR STRUCTURAL VERIFICATION

23/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

17 SP-PSA International Port (SP-PSA)

Ba Ria - Vung Tau Province

SP-PSA International Port Company Ltd.

(a Joint Venture of PSA Singapore, Vinalines and

Saigon Port)

2006 - 2009: Topographic & Hydrographical Survey, Geotechnical investigation, Feasibility Study & Basic Design, EIA report, Detailed Design 2016 - 2017: Specifying the capacity of general cargo vessels equivalent to container vessel of 120,000 DWT in/out- 2020: Port Structural verification

2006-20092016-2017

2020

16 SP– SSA InternationalTerminal (SSIT)

Ba Ria - Vung Tau Province

SP-SSA International Container Services Joint Venture Company (SSIT) (a Joint Venture of SSA Marine (USA), Saigon

Port, and Vinalines)

2006 - 2012: Topographic & Hydrographical, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender documents and Project Management2019: Structural inspection by 3D Laser Scan, Detailed design for demolition and resconstruction work, Project Management and Construction Supervision for the SSIT's berth after collision incident of the Fareast Honesty.2020: Structural Verification for upgrading SSIT barge berth from 500 DWT to 2,500 DWT 2021: Preparation of structural assessment for existing quay deck, turning basin, navigational channel; Preparation of Maritime Safety Plan and Port Operation Announcement Decision to allow accommodation of vessels up to 200,000 DWT at SSIT

2006-2012; 2019; 2020; 2021

15 Thi Vai General PortBa Ria -

Vung Tau Province

Thi Vai General Port

Technical assessment & verification for upgrading load support capability of existing jetty 75,000DWT up to 93,000DWT 2017

14 PTSC Downstream PortBa Ria -

Vung Tau Province

McDERMOTT ASIA PACIFIC SDN BHD

Inspection and assessment of the port structure of PTSC and Vietsopetro, running the real time model, navigation channel assessment, maritime safety measurement plan under the Sao Vang - Dai Nguyet project

2018 - 2019

13 Cai Mep International Terminal (CMIT)

Ba Ria - Vung Tau Province

Cai Mep International Terminal Ltd., Co.

(a Joint Venture of APM Terminals, Vinalines and

Saigon Port)

2006 - 2012: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents and Project Management2016: Structural Appraisal for Berth, First Time, 5 Year Interval2018: Mathematical Modelling, Real Time Simulation and Maritime Safety Plan Preparation of 180,000 TEU Vessel 2020: Structural Appraisal of the Existing CMIT Terminal and Maritime Safety Plan Preparation for Capability Possibilities Study of CMIT Terminal to Accommodate 214,000 TEU Vessel2021: Extension of testing and commissioning period of CMIT Terminal to accommodate upto 214,121 DWT vessels and Operation Announcement Obtainment for CMIT Terminal to accommodate upto 214,121 DWT vessels

2006-2012; 2016; 2018; 2020; 2021

24/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

12Myanmar International Terminals ThilawaPort (MITT)

Yangon, Myanmar

Myanmar International Terminals Thilawa (MITT) / China Habour Engineering

Co. (CHEC)

Inspection existing structure of MITT Port (Section S6 & S7): Piles,Beams, Deck slabs, Quay crane tracks, Bollards& Fenders…,Verify load carrying capacity of wharf structure Detailed design for additional tie-down for new quay cranes & RTG cranes.

2017

11 PTSC Downstream PortBa Ria -

Vung Tau Province

PTSC Mechanical & Construction Co., Ltd.

(PTSC M&C)

2017: Provision of Technical Consultancy Service for Marine Spread Going Inward/Outward of Song Dinh Channel and Berthing at PTSC Downstream Port2021: Inspection and Structural verification

2017; 2021

10 Interflour PortBa Ria -

Vung Tau Province

Interflour Vietnam Company Ltd.

Survey and inspection on the existing jetty of Interflour port.Upgrading of the existing 75,000DWT Berth to accommodate vessels up to 93,000 DWT vessels

2017&2019

9 Phuoc Khanh Oil and Gas Terminal

Dong Thap Province

Dong Thap Petroleum Trading Import Export

Company Limited

Infrastructure inspection and upgrading design service for the existing terminal 32,000DWT vessels to accommodate vessels up to 43,000 DWT vessel

2017

8 Thi Vai TerminalBa Ria -

Vung Tau Province

Siam City Cement (Vietnam) Ltd

(former name: Holcim Vietnam Ltd)

- Survey, Status Assessment, Verification & Detailed Design for Repair of 50,000 DWT Jetty'- Technical assessment & verification of load support capacity of existing barge loading jetty and obtaining the seaport operation license with the largest tonnage 1000DWT- Technical assessment & verification for upgrading load support capability of existing jetty 50,000DWT up to 60,000DWT

2011& 2017

7 Port of Hiep Phuoc Power Company

Ho Chi Minh City

Hiep Phuoc Power Co., Ltd. Infrastructure inspection service 2017

6 Chan May Port - Upgrading Existing Jetty Hue Province

Royal Carribbean Cruise Ltd. /Chan May Port Ltd.,

Co.

Data collection, Topographic & Hydrographical Survey, Side Scan survey, Feasibility Study and Basic Design, Detailed Design, Tender Document, Construction Supervision.

2014-2016

5 Navioil Port Ho Chi Minh City

Vietnam Vegetable Oils Industry Corporation -

Acting As JSC. (Vocarimex)

Bathymetric Survey, Inspection and verification of load carrying capacities of existing wharf structure

2015

4 Port of Lafarge Cement Grinding Plant

Dong Nai Province Lafarge Cement Co., Ltd. Infrastructure inspection service 2014

25/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

3 Phu My PortBa Ria -

Vung Tau Province

Ba Ria Joint Stock Company of Services for Import Export of Agro - Forestry Products and

Fertilizers (Baria Serece)

- 2005 - 2006: Topographic survey, Soil investigation, Basic design, Construction design for vessels of 60.000 DWT - 2009: Survey and inspection on the existing jetty, EIA report and design of upgrading for wharf of 80,000 DWT. - 2015: Monitoring displacement of bridge segment 103M Phu My Port in the moving process of cranes- 2015 - 2016: Assessment of damage level of the segment 103m; Survey, design dismantling and repair design of segment 103m of Phu My Port.- 2017 - 2018: Inspection of upgrading Phu My jetty to accommodate ships with a maximum capacity of 80,000 DWT; Upgrading river pier No. 2 - Phu My port to 1,500-2,000 DWT; Inspection on River Pier No. 5 and construction maintenance process'- 2020: Inspection and verification, 3D laser scanning and design for reinforcing structures for 72m trestle and 132m jetty service- 2021: Study on the cargo handling capacity enhancement of Baria Serece port

2005-2018; 2020; 2021

2Saigon International Terminals Vietnam (Hutchison Ports SITV)

Ba Ria - Vung Tau Province

Saigon International Terminals Vietnam Limited

(SITV)

Topographic & Hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents, Construction Supervision Project Management; Instruments and monitoring works during the construction implementation; Engineering work for upgrading up to 100,000DWT vessels berthing; Structural appraisal for berth, first time, 5 year interval; Design review, EIAR preparation and Independent Site Audit for Twilight warehouse; Port Announcement for 100,000 DWT Vessel Accommodation

2006-2012, 2015-

2017& 2018-2019

1Posco Port (Posco Vietnam and Posco SS - Vina)

Ba Ria - Vung Tau Province

Posco Vietnam Co. Ltd and Posco SS VINA Co.,

Ltd (Two of the main affiliates of Posco - South

Korea)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Verification of the existing berth structure for 60,000DWT vessels berthingTopographic Survey and Construction2013 - 2017: Supervision for annually dredging 2018: Port maintenance procedure preparation2019: On the preparation of environmental impact assessment report for dumping dredged material within Posco Vietnam Co., Ltd.'s land area

2006-2008; 2012-2017; 2018; 2019

26/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

V

23 Sea Star International Seaport

Ba Ria - Vung Tau Province

S.S.I.P CORP

2009; 2018: Additional planning, Topographic survey, Soil investigation, Feasibility Study preparation and Basic Design, EIA Report, Detailed Design for Phase 1, Construction License2021: Project Management Service for Soil Improvement Construction

2009 & 2018 &

2021

22 Bao Long – Phu My Domestic Port

Ba Ria – Vung Tau Province

Bao Long – Phu My Investment And

Development Company Limited

Basic Design and Detailed Design, 1/500 detailed Planning, Construction Supervision

2020 - 2021

21 Long Son Petrochemical Port (LSP)

Ba Ria - Vung Tau Province

- Long Son Petrochemicals Co., Ltd (LSP) (a Joint Venture between Siam Cement

Group of Thailand, Qatar Petroleum and Petrovietnam

- Posco Engineering and Construction Co., Ltd.

- The Consortium of TPSK.

2008-2013: Topographic & Hydrographical Survey and Hydrological Survey (02 times in 2008 & 2009), Geotechnical Survey (04 times in 2008, 2009 and 2013) and Detail Planning in 2008;2012-2013: Mathematical model, Basic Design, EIA Report;2017-2018: Topographic & Hydrographic Survey, Sub- bottom Profiling & Soil Investigation, Detailed Design Review and Simulation Model, Magnetometer and Sidescan Sonar Survey - Package F2018: Topographic and Soil Investigation Survey -Package L2018 - 2020: Soil Investigation - Pkg A12019 - 2021: Construction Supervision; Bathymetric Survey after Dredging and Design review - Package F

2008-2013& 2017, 2018, 2019 - 2021

20 Ong Keo General Port Dong Nai Province

Long Thuan Investment Corporation.

2015 - 2016: Topographic & Hydrographic survey, Soil investigation, Environmental Impact Assessment, Feasibility Study & Basic Design, Detailed Design;2018: Construction Supervision for 5,000 DWT barge berth;2020: Structural inspection survey and verification report, Maritime Safety Report preparation for internal berth to receive ships of up to 5,000 DWT; Topographic survey, Geotechnical survey and modification design for outer berth to receive ships of 50,000 DWT and barges of 20,000 DWT.

2015-2016& 2018 &2020

PROJECTS FOR CONSTRUCTION SUPERVISION AND PROJECT MANAGEMENT

27/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

19 Cai Mep International Terminal (CMIT)

Ba Ria - Vung Tau Province

Cai Mep International Terminal Ltd., Co.

(a Joint Venture of APM Terminals, Vinalines and

Saigon Port)

2006 - 2012: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents and Project Management2016: Structural Appraisal for Berth, First Time, 5 Year Interval2018: Mathematical Modelling, Real Time Simulation and Maritime Safety Plan Preparation of 180,000 TEU Vessel 2020: Structural Appraisal of the Existing CMIT Terminal and Maritime Safety Plan Preparation for Capability Possibilities Study of CMIT Terminal to Accommodate 214,000 TEU Vessel2021: Extension of testing and commissioning period of CMIT Terminal to accommodate upto 214,121 DWT vessels and Operation Announcement Obtainment for CMIT Terminal to accommodate upto 214,121 DWT vessels

2006-2012; 2016; 2018; 2020; 2021

18Duyen Hai 1 thermal Power Plant (1,245MW)- Coal Unloading Jetty

Tra Vinh Province

GENCO 1 - Vietnam Electricity (EVN)

Topographic and Hydrographical survey, Soil Investigations, Geophysical Survey, Hydrological survey, Feasibility Study & Basic Design, EIA report, Tender Preparation and Evaluation, Detailed Design Review, Construction Supervision.

2009-2017

17Lach Huyen Port Infrastructure Construction Project

Hai Phong City

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

- 2010-2015: Feasibility Study Review, Updated Feasibility Study Review, Detailed Design Review - Client: Vinamarine (Presented by Project Management Unit No.2);- 2011: Soil investigation, Hydrological Survey for the Detailed Design - Client: Jica Study Team (Presented by Oriental Consultants Co. Ltd.,);- 2013-2019 Construction Supervision (JV comprising Nippon Koei, JPC, Portcoast and NK Vietnam) - Client: Vietnam MOT (Presented by Project Management Unit No.2)

2010-2019

28/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

16 Southern Van Phong General Port

Khanh Hoa Province

Thanh Yen - Van Phong Joint Stock Company

2011: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Supervision, Design of upgrading for wharf of 50,000 DWT.2018: Topographic survey, Soil investigation, Detailed Planning, Feasibility Study preparation and Basic Design, EIA Report, Construction Design for wharf of 20,000DWT and 5.000DWT.2018: Design of two-way navigational channel and turning basin for arrival of 70,000DWT vessels; Environmental Impact Assessment.2019: Port operation announcement and Channel Opening Announcement for 70,000 DWT Berth 2021: Survey and Design for berth No.2

2011; 2018;2019

;2021

15 Saigon Peninsula Project Ho Chi Minh City

The Saigon Peninsula Group Corporation

Topographic and Hydrographical survey, Soil Investigation, Feasibility Study & Basic Design, EIA report and Detailed Design for International Cruise Terminal for 50.000- 60.000GRT Cruise Ships.Project Management for Revetment.

2016-2018

14 Pakistan Deep Water Container Port

Karachi, Pakistan

South Asia Pakistan Terminals Limited (SAPT)

2014 - 2016: Project management - Container Yard and Building Phase 12018: Independent Design Checking Service of the design under Container Yard and Building Phase 22019 - 2012: Project management - Container Yard and Building Phase 22020: 3D Laser Scan for container yard during settlement

2014-2016&2018

&2019 - 2021

13 Cruise Terminal in Phu Quoc Island

Kien Giang Province

Vietnam Maritime Administration

(Vinamarine)/ Ministry of Transport (MOT) (2014),Department of Transport- Kien Giang Province

(2015-2018)

Topographic & Hydrographical Survey, Geotechnical Investigations, Computational Simulation and Modelling, Detailed Plan, Feasibility Study, Basic Design, EIA report, Foundation Analysis, Detailed Design and Construction Supervision.

2014-2020

12 Chan May Port - Upgrading Existing Jetty Hue Province

Royal Caribbean Cruise Ltd. /Chan May Port Ltd.,

Co.

Data collection, Topographic & Hydrographical Survey, Side Scan survey, Feasibility Study and Basic Design, Detailed Design, Tender Document, Construction Supervision.

2014-2016

11

Vinh Tan Power Complex Infrastructure Project - Coal Unloading Jetty for Vinh Tan 2 Thermal Power Plant (2x622MW)

Binh Thuan Province

GENCO 3 - Vietnam Electricity (EVN)

Detailed Design Review and Construction Supervision 2012-2015

29/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

10

Vinh Tan Power Complex Infrastructure Project - Land reclamation for Vinh Tan 4 thermal Power Plant (2x600MW)

Binh Thuan Province

GENCO 3 - Vietnam Electricity (EVN)

Detailed Design Review and Construction Supervision 2014-2015

9The Improvement project of Navigational Channel to the Bassac River

Tra Vinh Province

Vietnam Maritime Administration Vinamarine)

- Ministry of Transport (MOT)

2004: Soil Investigation, Topographic, Hydrographic & Hydrological survey (SNC- Lavalin is a Leader of JV) Client: Project Management Unit of Waterways - Vietnam MOT2005-2015: Topographic & Hydrographical Survey, Geotechnical Investigation, Geophysical Survey, Hydrological Survey, Feasibility Study & Basic Design, Mathematical Modeling, Detail Design, Construction Supervision. Client: Maritime Project Management Unit 3 - Vinamarine - Vietnam MOT

2005-2014

8Saigon International Terminals Vietnam (Hutchison Ports SITV)

Ba Ria - Vung Tau Province

Saigon International Terminals Vietnam Limited

(SITV)

Topographic & Hydrographical survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review, Construction Supervision, Tender documents, Construction Supervision Project Management; Instruments and monitoring works during the construction implementation; Engineering work for upgrading up to 100,000DWT vessels berthing; Structural appraisal for berth, first time, 5 year interval; Design review, EIAR preparation and Independent Site Audit for Twilight warehouse; Port Announcement for 100,000 DWT Vessel Accommodation

2006-2012, 2015-

2017& 2018-2019

7 SP– SSA InternationalTerminal (SSIT)

Ba Ria - Vung Tau Province

SP-SSA International Container Services Joint Venture Company (SSIT) (a Joint Venture of SSA Marine (USA), Saigon

Port, and Vinalines)

2006 - 2012: Topographic & Hydrographical, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender documents and Project Management2019: Structural inspection by 3D Laser Scan, Detailed design for demolition and resconstruction work, Project Management and Construction Supervision for the SSIT's berth after collision incident of the Fareast Honesty.2020: Structural Verification for upgrading SSIT barge berth from 500 DWT to 2,500 DWT 2021: Preparation of structural assessment for existing quay deck, turning basin, navigational channel; Preparation of Maritime Safety Plan and Port Operation Announcement Decision to allow accommodation of vessels up to 200,000 DWT at SSIT

2006-2012; 2019; 2020; 2021

30/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

6 Cai Lan International Container Terminal (CICT)

Quang Ninh Province

Cai Lan International Container Limited Liability

Company (CICT)(a Joint Venture of SSA Marine (USA), Vinalines

and Quang Ninh Port)

Topographic & Hydrographical Survey, Geotechnical Investigation, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender Documents and Project Management

2008-2012

20Posco Port (Posco Vietnam and Posco SS - Vina)

Ba Ria - Vung Tau Province

Posco Vietnam Co. Ltd and Posco SS VINA Co.,

Ltd (Two of the main affiliates of Posco - South

Korea)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Verification of the existing berth structure for 60,000DWT vessels berthingTopographic Survey and Construction2013 - 2017: Supervision for annually dredging 2018: Port maintenance procedure preparation2019: On the preparation of environmental impact assessment report for dumping dredged material within Posco Vietnam Co., Ltd.'s land area

2006-2008; 2012-2017; 2018; 2019

4Cai Mep -Thi Vai International Terminal (ODA loan)

Ba Ria - Vung Tau Province

Ministry of Transport (MOT) /

JICA Study Team

Topographic & Hydrographical survey, Hydrological Survey, Geotechnical Investigation, Feasibility Study, Basic Design, EIA Report, Detailed Design, Tender Documents, Project Management, Construction Supervision.

2005-2011

3 Sai Gon Hiep Phuoc Port Ho Chi Minh City

Sai Gon - Hiep Phuoc Port Joint Stock Company

2005 - 2011: Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision2021: 3D laser scanning, 3D Modeling and Building Visualization for Port Digitization

2005-2011; 2021

2 Saigon Premier Container Terminal (SPCT)

Ho Chi Minh City

Saigon Premier Container Terminal (SPCT)

Topographic & Hydrographical Survey, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design Review and Project ManagementInstruments and monitoring works during the construction implementation

2005-2009

1 Port of Phu My Steel PlantBa Ria -

Vung Tau Province

Southern Steel Company Technical Design, Construction Supervision. 2002-2003

VI

8

Mekong Delta Region Urban Upgrading Project (MDR-UUP) - My Tho city sub-project- Item of Tien River Embankment

Tien Giang Province

Project Management Unit of Mekong Delta Region Urban Upgrading Project(MDRUUP) - My Tho city

sub-project

Topographic & Hydrographical Survey, Geotechnical Investigation, Geophysical Survey, Hydrological Survey, Modifying the basic design, Detail Design and Tender Document

2014-2015

PROJECTS FUNDED BY ODA LOAN, INTERNATIONAL FINANCE CORP. (IFC), ASIAN DEVELOPMENT BANK

(ADB) AND WORLD BANK (WB)

31/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

7Lach Huyen Port Infrastructure Construction Project

Hai Phong City

Vietnam Maritime Administration

(Vinamarine)/Ministry of Transport (MOT)

- 2010-2015: Feasibility Study Review, Updated Feasibility Study Review, Detailed Design Review - Client: Vinamarine (Presented by Project Management Unit No.2);- 2011: Soil investigation, Hydrological Survey for the Detailed Design - Client: Jica Study Team (Presented by Oriental Consultants Co. Ltd.,);- 2013-2019: Construction Supervision (JV comprising Nippon Koei, JPC, Portcoast and NK Vietnam) - Client: Vietnam MOT (Presented by Project Management Unit No.2)

2010-2019

6The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh Province

Vietnam Maritime Administration Vinamarine)

- Ministry of Transport (MOT)

2004: Soil Investigation, Topographic, Hydrographic & Hydrological survey (SNC- Lavalin is a Leader of JV) Client: Project Management Unit of Waterways - Vietnam MOT2005-2015: Topographic & Hydrographical Survey, Geotechnical Investigation, Geophysical Survey, Hydrological Survey, Feasibility Study & Basic Design, Mathematical Modeling, Detail Design, Construction Supervision. Client: Maritime Project Management Unit 3 - Vinamarine - Vietnam MOT

2005-2014

5 SP– SSA InternationalTerminal (SSIT)

Ba Ria - Vung Tau Province

SP-SSA International Container Services Joint Venture Company (SSIT) (a Joint Venture of SSA Marine (USA), Saigon

Port, and Vinalines)

2006 - 2012: Topographic & Hydrographical, Geotechnical survey, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender documents and Project Management2019: Structural inspection by 3D Laser Scan, Detailed design for demolition and resconstruction work, Project Management and Construction Supervision for the SSIT's berth after collision incident of the Fareast Honesty.2020: Structural Verification for upgrading SSIT barge berth from 500 DWT to 2,500 DWT 2021: Preparation of structural assessment for existing quay deck, turning basin, navigational channel; Preparation of Maritime Safety Plan and Port Operation Announcement Decision to allow accommodation of vessels up to 200,000 DWT at SSIT

2006-2012; 2019; 2020; 2021

4 Cai Lan International Container Terminal (CICT)

Quang Ninh Province

Cai Lan International Container Limited Liability

Company (CICT)(a Joint Venture of SSA Marine (USA), Vinalines

and Quang Ninh Port)

Topographic & Hydrographical Survey, Geotechnical Investigation, Feasibility Study & Basic Design, EIA report, Detailed Design, Construction Supervision, Tender Documents and Project Management

2008-2012

32/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

3

Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1)

Ho Chi Minh City

Ho Chi Minh City People's Committee Management

Authority for Urban Railways

Topographic and Geotechnical Survey 2012

2Cai Mep -Thi Vai International Terminal (ODA loan)

Ba Ria - Vung Tau Province

Ministry of Transport (MOT) /

JICA Study Team

Topographic & Hydrographical survey, Hydrological Survey, Geotechnical Investigation, Feasibility Study, Basic Design, EIA Report, Detailed Design, Tender Documents, Project Management, Construction Supervision.

2005-2011

1Improvement Project for 2 Southern Waterway Routes and Can Tho Port

Can Tho Province

Vietnam Inland Waterways Administration (VIWA) /

Project Management Unit of Waterways

(PMU-W)

Surveys and Feasibility Study Preparation for Ca Mau - Nam Can Waterway Upgrading Technical Design for Bank Protection Work for Cho Gao Channel

2002-2003& 2004-

2005

VII

7 Naval Berths 5-14, Naval Dockyard, Karachi Port

Karachi, Pakistan

M/s. Exponent Engineers (Pvt) Ltd. Design Validation 2021

6 Port for Shunying Pulp and Paper Mill

Kampot, Cambodia

Shunying Pulp and Paper Company Limited

Concept design, Bathymetric, Sides Can Sonar, Magnetometer & Sub-Bottom Profiling Survey, Geotechnical investigation, Basic design and Detail design for Phase 1

2021

5 Ajman New Port Ajman, United Arab Emirates

Investor: Hutchison Ajman International Terminals

Limited - F.Z.E/ Consultant: Halcrow

International Partnership, Dubai Branch

Data collection; design verification and cost estimation; Preparation of bidding documents and evaluation of bidding documents for breakwaters, quay ports and wharves under Ajman port development study project

2018

4Myanmar International Terminals ThilawaPort (MITT)

Yangon, Myanmar

Myanmar International Terminals Thilawa (MITT) / China Habour Engineering

Co. (CHEC)

Inspection existing structure of MITT Port (Section S6 & S7): Piles, Beams, Deck slabs, Quay crane tracks, Bollards & Fenders…, Verify load carrying capacity of wharf structure Detailed design for additional tie-down for new quay cranes & RTG cranes.

2017

3 The Kampot Port Project (KSP)

Kampot, Cambodia

TRY PHEAP GROUP CO,. LTD.

2016 - 2017: Topographic survey, Port planning and Preparation of bidding documents2017 - 2018: Installation of navigation aids at Papa Petroleum Port

2016-2017& 2017 - 2019

OVERSEA PROJECTS

33/34

No. Name of Projects Location Client / Owner Our servicesContract

Duration

2 Pakistan Deep Water Container Port

Karachi, Pakistan

South Asia Pakistan Terminals Limited (SAPT)

2014 - 2016: Project management - Container Yard and Building Phase 12018: Independent Design Checking Service of the design under Container Yard and Building Phase 22019 - 2021: Project management - Container Yard and Building Phase 22020: 3D Laser Scan for container yard during settlement

2014-2016&2018

&2019 - 2021

1 Study for Port Project in Cambodia (SITC)

Sihanoukville, Cambodia Confidential

Topographic & Hydrographic Survey, Geotechnical Investigation, Hydrological Survey, Numerical Modeling, Basic Design

2012-2013

34/34

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

Ho Chi Minh CityVietnam

Tel: +84 28 62970341Fax: +84 28 62970344Email: [email protected]

TOPOGRAPHIC AND HYDROGRAPHIC SURVEY

August 2017

tamtrinh
Typewritten Text
tamtrinh
Typewritten Text

"""""#####$$$$$#####%%%%%&&&&&'''''$$$$$((((()))))*****! +++++,,,,,&&&&&-----...../!/!/!/!/!.....00000,,,,,)))))$$$$$11111.....22222"""""!

+*++++****#####$$$$$.....! #####33333! +.+.++.+.+..&&&&&-----)))))*****.....!

! All kinds of topographic survey for construction project;

! Structural Deformation Monitoring;

! Hydrographic survey;

! Marine construction positioning.

- We were and are doing many projects using RTK (Real Time Kinematic) technology

for onshore and offshore area. This is a modern technology, combined dual frequency

Topcon GPS receivers (Japan) with echo sounder Odom (USA) and professional

software HypackMax (Coastal Oceanographics, Inc. - USA) (for offshore surveying).

- Motion sensor and Sound velocimeter are also used in the bathymetric survey to

improve the accuracy.

- Besides, we have applied remote sensing (using satellite images) in the topographic

survey to hasten the progress and save cost.

- Portcoast have many kinds of modern and high technique equipment (cetificated

testing periodly and satisfy all survey requirements of various projects) include:

- Some of modern equipment at Portcoast for hydrological survey as folowing:

! GPS : have 8 dual frequency Topcon GPS receivers (Japan) GB-1000, GB-500, LegacyH

& HiperGD, Hiper Ga/Gb, Hiper+ and 2 single frequency GPS receiver Promark2.

!/678' !99:;69<'=>?6?@9A' !99:;69<'=,%BA'

"#$%%%&"#'%%!()!*+,-./0&012+)!

0!3!455!6!%7'225!8!3!'55!6!%7'225!

0!3!$%55!6!$7%225!8!3!$'55!6!$7%225!

09:;<!0!3!455!6!%7'225!8!3!'55!6!%7'225!

0!3!$%55!6!$7%225!8!3!$'55!6!$7%225!

:)(5-)=>! 0!3!!'55!6!$225!8!3!$%55!6!>225!

&!

! 49CD' >D:EF8;?! [email protected]+D! -! CB-A! E)+FB+@./! +.G(! D(B@C+)! HC(5! ;.G(I)-.!JK999! -@C! -D1@,A+!E)+FB+@./!+.G(!D(B@C+)!HC(5!0/C)(I)-.7

/678' !99:;69<' 08G?C'

;.G(I)-.!

%7%$5!6!%7$LM!N!>%%=0O!%7$5!6!%7$LM!N!44=0O!%7$P5!6!%7$LM!N!$>=0O!

%7>!Q!>%%5!N!>%%=0O!%7'!Q!$'%%5!N!44=0O!$!Q!R%%%5!N!$>=0O!

4.%'*/(!5!()$.&! %67888!5!%6988!

()$.&!%:;%<! ()$.&!$=>?! $&#1'&@A!

"

! 5:H?@I867'89CD'>D:EF8;!?!1D!IG+!5-.G1@+!C+D1,@+C!I(!1@.)+-D+!S-IG/5+I)1.!2)(CB.I1T1I/-@C! .-@! DB)T+/! D5-AA! C+I-1A! U!! >.5V! )+A/! (@!WP%! I)-@D51I! S+-5D7!JBAI1S+-5! U-@C!<XKD/DI+5V!1D!BD+C!I(!.G+.=!IG+!S-IG/5+I)1.!)+DBAI7

Figure.. ES3M’s result

! 5D?@DE'>8E>D;'051JKL?! 1D!152()I-@I!+FB125+@I!I(!+Y-.IA/!.())+.I!+.G(!D(B@C+)ZD!C-I-79@! IG+! D+-[)1T+)! DB)T+/\! IG+! )+DBAI! 1D! -EE+.I+C!5B.G!(@! IG+! DI-SA+@+DD!(E! DB)T+/!5+-@DUS(-I\!DG12V7!]G+@!IG+!DB)T+/!S(-I! 1D!(D.1AA-I+C!S/!^-T+\!^1@C\!.B))+@I\! IG+!)+DBAI!G-D!-S1,!+))()7

1@)))! (/B&#"&'*!

#&).2")2%!%$+?!CDE .+F1!1,4")6.'1!.+F1!

#

! 1D:EF' M8HD9@78?8;' 0@N@I6;*;D?! 1D! -AD(! -@! 152()I-@I! +FB125+@I! I(! .())+.I! +.G(D(B@C+)ZD!C-I-!I((7!XG+!T+A(.1I/!5+-DB)+5+@I!1D!5-C+!E)(5!^-I+)!DB)E-.+!I(!IG+!S(II(5-@C!)+T+)D+7!XG+!5+-@!T+A(.1I/!T-AB+! 1D!BD+C!-D!D(B@C!T+A(.1I/! I(!2)(.+DD!S-IG/5+I)1.C-I-7

! 1@F8'>96E'>DE6;?!_1C+!D.-@!D(@-)!(EE+)D!-!G1,G&)+D(ABI1(@!I((A! IG-I!2)(T1C+D!-!,+@+)-AC+21.I1T+!5-2!(@!S(IG!D1C+D!(E!-!DB)T+/!T+DD+A`D!2-IG

$! 1:IJID??D7' 4FN8%89C' OPKKJQ1' =5RA?! XG+! ;C,+X+.G! X(2D1C+! :)(.+DD()! ^1IG! 1ID

M9_aH8;<!D(EI^-)+!D+)T+D!-D! IG+!.(@I)(A!-@C!C-I-!-.FB1D1I1(@!DBS&D/DI+5! E()!C1D2A-/\DI()-,+!-@C!2)1@I1@,!(E!D(@-)!C-I-! E)(5!;C,+X+.GZD! E-51A/!(E!_BS&#(II(5!:)(E1A+)D!-@C_1C+!_.-@!_(@-)D7

! 56NE8?D78?8;' 1861*&S'b!5-,@+I1.! ,)-C1(5+I+)! 5+-DB)+D! 5-,@+I1.! ,)-C1+@I! 1@! (@+C15+@D1(@! S/! DBSI)-.I1@,! IG+! C1EE+)+@.+! S+I^++@! I^(! 1@C+2+@C+@I! 5-,@+I1.! D+@D()D7J-)1@+! J-,@+I1.D! (EE+)D! +-.G! (E! IG+D+! ,)-C1(5+I+)! .(@E1,B)-I1(@D7! 9@! -CC1I1(@\! -AA_+-_:c! 5-,@+I(5+I+)D! -)+! .(52-I1SA+\! +@-SA1@,! +Y1DI1@,! _+-_:c! .BDI(5+)D! I(B2,)-C+! IG+1)! 5-,@+I(5+I+)! I(! IG+! ,)-C1(5+I+)! .(@E1,B)-I1(@! (E! IG+1)! .G(1.+\! -D! IG+/@++C!I(7

! %D?6H'>?6?@DE!?!G-D!W!D+ID!(E!X(2.(@!Ud-2-@V!^1IG!G1,G!2)+.1D1(@7

/678' !99:;69<'=>@F8A' !99:;69<'=6ENH8A'

"X_&>>4! 6U>55e>225V! 4f!":X&R%%$a!g!":X&h%%$! 6U455e>225V! $f!":X&h'%$! 6U>55e>225V! $f!

!"#!"#$$$%%&%%&%%&' !!("("$$$)**+,)**+,)**+,' !!("("("$$-**+-**+' !!("("$$$-.*+-.*+-.*+'

%

!6'"(/1."&)*!".*(2#4#%/6'"(/1."&)*!".*(2#4#%/!

! [email protected]+D!-!X(2.(@!bX&"4\!-!bX&">!-@C!I^(!*+1.-!ib>!^1IG!>!D+ID!(E!51.)(5+I+)g!9@T-!)(CD7

/678' !99:;69<'=8H8M6?@DEA' !99:;69<' /D?8'

X(2.(@!bX&"4! 6%74f! 6$7'55[$=5!

X(2.(@!bX&">! 6%74f!6%7h55[$=5! ]1IG(BI!DA1C1@,&!D.-AI!6%7W55[$=5! ]1IG!DA1C1@,&!D.-AI!

*+1.-!ib>! 6%74f!6%7h55[$=5! ]1IG(BI!DA1C1@,&!D.-AI!6%7455[$=5! ]1IG!DA1C1@,&!D.-AI!

! -6EFC8HF'+*1?! G-D! -!"-)51@!J-2! >%$%\! -!"-)51@! hRa_\! I^(!"-)51@! R%a_Y! -@C! -"-)51@!$>j*7!

! b@C! (IG+)! 1@DI)B5+@ID\! I((AD! -D! ^+AA! -D! 2)(E+DD1(@-A! D(EI^-)+D! DB.G! -D?! 0/2-.=J-Y\X(2DB)T+/\!:1@@-.A+\!X(2I((AD\!a1C-A-\!a1T1Aa-C\k

,%B! U,+-A!%15+!B1@+5-I1.V! I+.G@1FB+! 1D! BD+C! I(! +-I-SA1DG! IG+!S-IG/5+I)1.!5-27!XG1D! 1D! -!5(C+)@! DB)T+/! 5+IG(C! IG-I! G-D! -! G1,G! -..B)-./\! BD+D! >! CB-A! E)+FB+@./! ":_! )+.+1T+)D!X(2.(@!^1IG!IG+!CB-A!E)+FB+@./!+.G(!D(B@C+)!HC(5!-@C!J(I1(@!D+@D()7!J(I1(@! D+@D()! .-@! )+.()C!5(I1(@D! (E! DB)T+/! S(-I! UDB.G! -D! DG-=+\! )(I-I+! -@C! D^1@,V! IG-I!-EE+.I+C!S/!^-T+\!^1@C\k!]1IG!5(I1(@!D+@D()\!S-IG/5+I)1.!)+DBAI!1D!5B.G!S+II+)7!

!"#$%&'()*+%,-.%/'%+'0,12/'+%-0%3*44*506

!"#!"#!"#$"%"%"%&&'('('($ "%"%&&'#'#'#$

"-)51@!$>j*7!

1'$!A878! GH*+! H8*+I! 7AJ4!

&

!"#$%&$'()!*+!&**#,$%-.)!'*/$.$*%$%0!$%!123!.)&4%$56)!XG+!-S(T+!E1,B)+!C+D.)1S+D!(2+)-I1(@!2)[email protected]+!(E!<XK!I+.G@1FB+7!XG+!S-D+!DI-I1(@!1D!D+I!(@!IG+!=@(^@!.(@I)(A!2(1@I! UjS\!cS\!0SV\! IG+@!.(()C1@-I+D!(E! IG+! )(T+)!DI-I1(@! 1D!C+E1@+C!S/! IG+!E()5BA-)?! ! ! j)!3!jS!e!Cj!

c)!3!cS!e!Cc!0)!3!0S!e!C0!

9@^G1.G!Cj\!Cc\!C0!!-)+!C1EE+)+@I!.(()C1@-I+D!S+I^++@!IG+!S-D+!DI-I1(@!-@C!IG+!)(T+)!DI-I1(@!IG-I!-)+!.-A.BA-I+C!-I!)1,GI!(E!+-.G!DB)T+/!I15+7!<XK!I+.G@1FB+!,1T+D!IG+!-..B)-./!B2I(!55!1@!G()1O(@I-A!-@C!.5!1@!T+)I1.-A7%

123!7).4*,!81)-(!2$7)!3$%)7-.$&9!! The figure above describes principle of determining the river floor height by using

RTK method, where:

Xb

Yb

Hb

Xr = Xb + dX

Yr = Yb + dY Hr = Hb + dH

dX, dY, dH

Xb, Yb, Hb

'

HB = HC – D

'

"h different height between two antennas of the base station and the rover station.

HA is elevation of benchmark with reference elipsoid surfce.

Hc is elevation of sensor with reference elipsoid surfce.

hA is antenna height at the base station, measured by tape with accuracy of about 5mm.

hB is height from the antenna of the GPS receiver at the rover station (on boat) to transduce of echo sounder

D is river-bottom depth, measured by an echo sounder.

HB is river-bottom height, calculated by formula.

HC= hA+HA-"h-hB is the instant height of water level.!

_(!<XK!2)(T1C+D!S(IG!+Y-.I!T+)I1.-A!-@C!2(D1I1(@!(E!-@I+@@-!-I!5+-DB)1@,! I15+7!lD1@,! IG1D!T+)I1.-A!-..B)-./\!^+!.-@!C+I+)51@+!^-I+)!A+T+A!.())+.I1(@D!UI1C+!.())+.I1(@V7!XG1D!+A151@-I+D!IG+!@++C!I(!BD+!.(@T+@I1(@-A!I1C+!,-B,+D!()!I(!-DD1,@!2+)D(@@+A!I(!5(@1I()!I1C+!DI-EED7!

:&4*!/*6%,)#!:&4*.#-&!;3<<<!-%,!=>"?@3!;?A!/*+.B-#)!

]G+@!^+!DI-)I!IG+!S-IG/5+I)1.!DB)T+/1@,\!-!S-D+!DI-I1(@!1D!D+I!B2!-I!IG+!.(@I)(A!2(1@I!-@C!-!)(T+)!DI-I1(@!1D!(@!-!S-IG/5+I)1.!S(-I7!]G+@!IG+!S-IG/5+I)1.!S(-I!DI-)ID!5(T1@,\!IG+!A-2I(2!D.)++@! 1D!C1D2A-/1@,! IG+!S(-I!2(D1I1(@7!_(\!^+!.-@!.(@I)(A! IG+!S(-I! I(! E(AA(^!C+D1,@+C! A1@+D!+Y-.IA/7!M+2IG\!.(()C1@-I+!5+-DB)+D!-)+!C1D2A-/+C!(@!A-2I(2!-@C!DI()+C!1@!A-2I(2ZD!G-)C!C1D=!IG)(B,G!0/2-.=!J-Y!D(EI^-)+7!

Odom Echotrac MKIII

(!702.8%02.84'/'-&%',)*%0*9.+'16

XG+! D/DI+5! [email protected]+D! IG+!CB-A! E)+FB+@./!+.G(! D(B@C+)!HC(5!;.G(I)-.!JK999\!J(I1(@!D+@D()!-@C!-!2-1)!(E!<XK!":_!)+.+1T+)D! 1D!BD+C7!XG1D! 1D!-!5(C+)@!DB)T+/!D/DI+5!^1IG!G1,G!-..B)-./!1@!.(()C1@-I+!-@C!+A+T-I1(@7!

!C$06#)D!:&4*.#-&!;3<<<!E!;*.$*%!/)%/*#!F;GHIJK!

!702.8%&94(2/'-&%',)*%0*9.+'16m()! 1@.)+-D1@,! )+A1-S1A1I/! (E! DB)T+/! )+DBAI\! IG+! )+DBAI! 1D! .G+.=+C! S/! -@(IG+)! D/DI+5!1@C+2+@C+@IA/7! XG+! D/DI+5! [email protected]+D!JBAI1S+-5! ;_4J! -@C! <XK!":_! )+.+1T+)D7! ;_4J! 1D! -!.(5S1@-I1(@! (E! -! 5BAI1S+-5! +.G(! D(B@C+)! ;_4! (E! HC(5! Ul_bV! -@C! -! J(I1(@! D+@D()! (E!X+A+C1@+!X__!Ua-@-C-V7!XG+!D/DI+5!1D!1@I+,)-I1(@!(E!>!+FB125+@ID!1@!^G1.G!1@DI-AA-I1(@!+))()!1D!O+)(7!XG-I!G+A2D!E1II1@,!B2!-@C!-CnBDI1@,!I(!S+!C(@+!FB1.=A/7!JBAI1S+-5'1D!IG+!5-.G1@+!C+D1,@+C!I(!1@.)+-D+!S-IG/5+I)1.!2)(CB.I1T1I/!-@C!.-@!DB)T+/!1@!4M!D(!1I!.-@!DB)T+/!D5-AA!C+I-1A!U!!>.5V!)+A/!(@!WP%!I)-@D51I!S+-5D7!!9I!.-@!D-/D!IG-I!^+!C(!@(I!51DD!(BI!-@/!IG1@,!-I!^-I+)&S(II(5!^G+@!^+!BD+!;_4Jo!

#+D1C+D! I^(!-S(T+! DB)T+/! D/DI+5\!:2+'%:,-.%:*.-1! 1D! -AD(!BD+C! I(! .G+.=!C)+C,+C!)+DBAI7!]1IG!_1C+!_.-@!_(@-)\!^+!.-@! E++A!D+.B)+! IG-I!C)+C,+C!FB-@I1I/!^1AA!@(I!S+!51DD+C!(BI7!

)*(/B&#%&'$()*!+,&-./!.0,)$1.2"(/B&#%&'$()*!+,&-./!.0,)$1.2"

Some of modern equipment at Portcoast for hydrological survey as folowing?!

EQUIPMENT MOBILISATION TO SITE FOR SURVEYING:

))

AWAC (ACOUSTIC WAVE AND CURRENT METER) – AS:

* Features: * Application:

• External battery pack and cable.

• Base mounting plate.

• Internal compass/Tilt sensor.

• Temperature Sensor.

• Measuring tidal.

• Measuring current direction and

current velocity.

• Measuring frequency and direction

)!• Internal recorder.

• Pressure sensor.

• Installing work mode, analyzing and

processing data by software.

spectrum of wave.

• Located at the sea/river bed.

T!34'U'.2,,4/%'54%4,'V'1(/%4B'!,+(/!2%S'

* Features: * Application:

• Argonaut-XR (3.0 MHz, 1.5 MHz, hay

0.75 MHz).

• External battery pack and cable.

• Multi cell current profiling (10 cells

plus one dynamic cell).

• Base mounting plate.

• Compass/Tilt Sensor.

• Temperature Sensor.

• Internal recorder.

• Pressure sensor.

• Measuring tide, speed and direction

current.

• Located at the sea bed.

)"WAVE GAUGE - SONTEK TRITON:

* Features: * Application:

• Small dimension, light weight.

• Integrated temperature and pressure

sensor.

• Internal compass/Tilt sensor.

• Internal batteries.

• Set up, analyzed and processed by

software.

• Measuring tidal and wave.

• Located at sea bed.

)#AWS2-METEOROLOGICAL

* Features: * Application:- Wind speed:

• Range : 0.1 ÷ 45m/s..

• Accuracy : ± 2% full scale.

- Wind direction:

• Range : 0.10 ÷ 359.9

0.

• Accuracy : ± 10.

- Air temperature:

• Range : -400 ÷ 100

0.

• Accuracy : ± 0.10C-20 ÷ 60

0 ±

0.20C.

- Barometric pressure:

• Range : 600 ÷ 1100hPa..

• Accuracy : ± 2%.

- Rain gauge:

• Range : up to 720mm/hr..

• Accuracy : ± tip per rainfall event.

- Solar radiation:

• Range : 0 ÷ 2000W/m2.

• Accuracy : ± 5%.

- Humidity:

• Range : 0 ÷ 100%RH.

• Accuracy : RH ± 2%.

• Measuring Wind speed.

• Measuring Wind direction.

• Measuring Air temperature.

• Measuring Barometric pressure.

• Measuring Rain gauge.

• Measuring Solar radiation.

• Measuring Humidity.

)$NRG-METEOROLOGICAL

* Features: * Application:- Wind speed:

• Range : 1 ÷ 96m/s..

• Accuracy : ± 1% full scale.

- Wind direction:

• Range : 00 ÷ 360

0.

• Measuring Wind speed.

• Measuring Wind direction.

• Measuring Air temperature.

• Measuring Barometric pressure.

• Measuring Rain gauge.

)&LEVEL METER - LEVEL2000

)'CONTINUOS LEVEL MEASUREMENT - SITRANS PROBE LU HART

)(WATER QUALITY OBSERVATOR - OBS-3A:

WATER QUALITY OBSERVATOR - OBS-5:

C I S: A AI A I C C MPA

ocation: hu uoc sland, ien iang rovince, ietnam

• Bathymetric survey, scale 1/10.000, 2m contour line: 28 ha.• Wave measurement: 2 stations/ days.• urrent measurement: 2 stations/ days.• urrent measurement: 1 section/ days.• Tide gauge: 1 station/ days.• Water sampling and analysis: 24 samples• Bottom sampling and analysis: 20 samples.

(201 )

C I S: R P AP R UP C (CAM IA)

ocation: West South ampot province am odia and orth hu uoc sland, ien iang rovince ietnam

• Bathymetric survey, scale 1/25.000, 2m contour line: 6696ha• Topographic survey, scale 1/1000 scale, 1m contour line: ha

(201 )

C I S: A R UP ( I AM)

ocation: an hong conomic one, hanh oa rovince, ietnam

• Bathymetric survey, scale 1/500, 1m contour line: 68ha• Topographic survey, scale 1/500, 1m contour line: 11ha

(201 )

C I S: I AMARI - I AM MI IS R RA SP R

ocation: Ba ia ung Tau rovince, ietnam

• Bathymetric survey, scale 1/5000, 2m contour line: 2280 ha.• Bathymetric survey, scale 1/1000, 1m contour line: 240 ha.• Sidescan survey: 2280 ha.• Topographic survey, scale 1/2000, 1m contour line: 90 ha.• Wave and marine stream measurement: 6 stations/15 days.• Tide gauge: 4 station/ 1 year.

(2012)

C I S: I IA PR I C

ocation: hu uoc sland, ien iang rovince, ietnam

• Topographic survey, scale 1/1.000, 1m contour: 1.2ha scale 1/5.000, 2m contour line: 21ha.• Bathymetric survey, scale 1/1.000, 1m contour line: 44.45ha scale 1/5.000, 2m contour line:

1112ha and scale 1/10.000, 2m contour line: 1658ha.• Wave measurement: 2 stations/1 month.• urrent measurement: 2 stations/1 month.• Tide gauge: 1 station/ 1 month.

(201 201 )

(201 201 )

C I S: I S R I R A P R C MICA C

ocation: ghi Son conomic one Thanh oa rovince , ietnam

• Bathymetric survey, scale 1/1.000, 1m contour line: 184 .6ha.• Topographic survey, scale 1/1.000, 1m contour line: 45. ha.• Side scan survey: 184 .6ha.• Su ottom pro ile survey: 184 .6ha.• agnetic survey: 184 .6ha.• Wave measurement: 2 stations/40 months.• urrent measurement: 2 stations/40 months.• Tide gauge: 2 stations/ 40 months.• Wave measurement: 1 station at S Berth/ 1 months.• urrent measurement: 1 station at S Berth/ 1 months.• Tide gauge: 1 station at S Berth/ 1 months.• eteorological survey: 1 station/ 6 months.

(200 201 )

C I S: I AM A I A C A A MI RA I US RI S R UP ( I AC MI )

ocation: e ong elta , ietnam

• Bathymetric survey, scale 1/5.000, 2m contour line: 504ha.• Wave measurement: 2 stations/1 month.• servation o lo velocity, direction measuring tur idity, salinity and temperature

o sea ater: 2 stations/1 month.• Tide gauge: 1 station/ 1 month.• Water sampling and analysis: 20 samples• Bottom sampling and analysis: samples.

(201 )

C I S: U C IS P R I S ( - C I A)

ocation: Sihanou ville province ampodia

• Bathymetric survey, scale 1/5000, 1m contour line : 800 ha.• Bathymetric survey, scale 1/25000, 2m contour line: 150 m2• Topographic Survey, scale 1/5000, 2m contour line: 1 0 ha.• Sidescan survey: 800 ha.• Su ottom ro iling Survey: 800 ha.• agnetic Survey: 800 ha.• Wave and Sea current o servation: stations/ days.• Tide gauge: 1 station/ 1 month.

( )

( ) (2012)

C I S: RM SA A I S C RP RA I ( S) Cor oration ( S)

ocation: ung ng conomic one in a Tinh rovince, ietnam

• Topographic survey, scale 1/10.000: 20 ha, scale 1/5.000: 60ha in ort rea and scale 1/2.000:2095ha in and rea.

• Bathymetric survey, scale 1/10.000: 8416ha, scale 1/5.000: 910ha in ort rea• eophysical rospecting Su ottom ro iling : 26 m• Wave measurement: 1 station/12 months.• Wind o servation: 1 station/12 months.• servation o lo velocity, direction measuring tur idity, salinity and temperature o sea

ater: 4 stations/ days.• Tide gauge: 1 station/ 6 months.

(200 200 )

Client: Chan May Port - Royal Caribbean International (USA)

ocation: Thua Thien ue province, ietnam

• Bathymetric survey, scale 1/2000, 1m contour line: 46.5 ha.• Sidescan survey: 46.5 ha.

Chan May Port - Upgrading existing Jetty

Chan May Port - Upgrading existing Jetty (2014)

Typical Projects Of Hydrographical Survey

No. Project name Place Clients Duration

1 Dredging maintenance project in 2016for Dinh An - Can Tho Channel Dinh An - Can Tho Vinamarine 2016

2 Dredging and maintenance project in2016 for Nghi Son Channel Thanh Hoa Vinamarine 2016

3 Low Cai Mep Logistics Center Vung Tau Ba Ria Vung Tau Province Department of Transport

2016

4 ICD Long Binh Transshipment Port Project Ho Chi Minh City Duc Khai Corporation 2016

5 Low Cai Mep General Port BRVT Cai Mep General Port

Company Ltd.

2016

6

International Cruise Port Work to DenDo cap park and urban residential area Project at Phu Thuan Ward,District 7, HCMC

HCMC Saigon Peninsula Group

Corporation

2016

7 Kampot multipurpose port development Kampot, Cambodia TRY PHEAP GROUP CO,.

LTD.

2016

8 Transit port providing coal for thermal power centers in the Mekong Delta Tra Vinh

Vietnam National Coal - Mineral Industries Holding

Corporation Ltd (Vinacomin)

2015

9 Phu Quoc International Passenger Port Kien Giang

Department of Traffic and Transport Kien Giang

Province

2015

10 Vinh Tan 1 BOT coal - fired power plan project in Binh Thuan province Binh Thuan China Harbour Engineering

Company Ltd 2015

11 Vietnam Lee & Man Paper International Port Hau Giang

Vietnam Lee & Man Paper Manufacturing Ltd

2015

12 POSCO SS VINA Port Ba Ria Vung Tau POSCO SS-VINA Co., Ltd 2015

13 Cai Mep General Port Ba Ria Vung Tau Cai Mep General Port Co., Ltd 2015

14 Posco Vietnam Port Ba Ria Vung Tau Posco Vietnam Co., Ltd 2015

15 Ong Keo General Port Dong Nai Long Thuan Investment Corp 2015

16 PVGAS Port Vung Tau Ba Ria Vung Tau

PetroVietnam Gas Vung Tau

Processing Company

2015

17 Dredging and maintenance project in2015 for Vung Tau - Thi Vai Channel Ba Ria Vung Tau Vietnam Maritime

Administration 2015

18 Dredging and maintenance project in2015 for Hiep Phuoc - Soai RapChannel Ho Chi Minh City Vietnam Maritime

Administration 2015

19 Dredging and maintenance project in2015 for Nghi Sơn Channel Thanh Hoa Vietnam Maritime

Administration 2015

20 Dredging and maintenance project in2015 for Da Nang Channel Da Nang Vietnam Maritime

Administration 2015

Typical Projects Of Hydrographical Survey

No. Project name Place Clients Duration

21 Dredging and maintenance project in2015 for Quy Nhon Channel Binh Dinh Vietnam Maritime

Administration 2015

22 Dredging and maintenance project in2015 for Dinh An - Can Tho Channel Dinh An – Can Tho Vietnam Maritime

Administration 2015

23 Navigational channel to Gianh estuary Quang Binh Vietnam Construction

Materials Company Ltd

2015

24 Protection bank for Lee&Man plant Viet Nam Hau Giang Vietnam Lee & Man Paper

Manufacturing Ltd 2015

25 Phu Quoc International Passenger Ship Port Kien Giang VINAMARINE 2014

26 Dinh An - Can Tho Channel Tra Vinh Southern Vietnam Maritime Safety Corporation (VMS-

South) 2014

27 Package 6A - The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh

Vinamarine / Maritime Project

Management Unit III

2014

28 Package 6B - The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh

Vinamarine / Maritime Project

Management Unit III

2014

29 Package 9 - The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh

Vinamarine / Maritime Project

Management Unit III

2014

30 Package 10B - The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh

Vinamarine / Maritime Project

Management Unit III

2014

31 Package 11 - The Improvement Project of Navigational Channel to the Bassac River

Tra Vinh

Vinamarine / Maritime Project

Management Unit III

2014

32 Coal Transshipment Terminal Project Tra Vinh Vinacomin /Nippon Koei 2014

33

Establishment of navigational channel and maritime signal system for Dong Tranh river and navigational channel from Tat Ong Cu - Tat Bai confluence to Go Gia river

Dong Nai Southern Vietnam Maritime Safety Corporation (VMS-

South) 2014

34

Mekong Delta Region Urban Upgrading Project (MDR-UUP) - My Tho city sub-project - Item of Tien River Embankment

Tien Giang

Project Management Unit of Mekong Delta Region

Urban Upgrading Project (MDR-

UUP) - My Tho city sub-project

2014

35

Socializion and Dredging to gather products - Dong Tranh and Tat Ong Cu - Tat Bai Navigational Channel to Go Gia river

Dong Nai Hai Hung Thinh Investment Joint Stock Company 2014

36 Quy Nhon channel Binh Dinh Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

37 Soai Rap - Hiep Phuoc Channel HCMC Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

Typical Projects Of Hydrographical Survey

No. Project name Place Clients Duration

38 Vung Tau - Thi Vai Channel Ba Ria – Vung tau Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

39 Cho Gao Upgrading Project - Phase 1 Tien Giang

Vietnam Inland Waterways Administration (VIWA) /

Project Management Unit of

Southern Inland Waterways (PMU-

SIW)

2013

40 Song Dinh Channel Ba Ria – Vung Tau Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

41 Sai Gon - Vung Tau Channel HCMC-BRVT Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

42 Nghi Son Refinery Petrochemical Complex Project Thanh Hoa

Nghi Son Refinery and Petrochemical Limited

Liability Company (NSRP)/ JGCS

2013

43 Sihanoukville International Terminals - SITC Campuchia

Sihanoukville International Terminals Limited /

Hutchison Port Holdings

2013

44 Dinh An - Can Tho Channel Tra Vinh Southern Vietnam Maritime Safety Corporation (VMS-

South) 2013

45 Tien Sa port extension and upgrade project Da Nang

Ministry of Transport (MOT)/

Project Management Unit 85

2013

46 Posco Vietnam Port Ba Ria - Vung Tau Posco Vietnam Co., Ltd. 2013

47 LDC Potential project Ba Ria - Vung Tau LOUIS DREYFUS

COMMODITIES VIETNAM LTD

2013

48 PVGAS Port Ba Ria - Vung Tau PVGAS / Vung Tau Gas Processing Joint Stock

Company 2013

49 Pilot pick-up and drop-off zone at Ba Ria - Vung Tau province Ba Ria - Vung Tau Vung Tau Port Authority 2013

50 Overall and comprehensive study of Cai Mep - Thi Vai Navigational Channel

Ba Ria - Vung Tau Vinamarine / Maritime

Project Management Unit III

2012

51 Posco Vietnam Port Ba Ria - Vung Tau Posco Việt Nam Co, Ltd 2012

52 POSCO SS-VINA Port Ba Ria – Vung Tau Posco SS-VINA Co., Ltd 2011

53 The Integrated Steel Mill and Son Duong Port Formosa Ha Tinh Project Ha Tinh

Formosa Ha Tinh Steel Corporation / Samsung

C&T Corporation

2011

54 Nam Van Phong General Port Khanh Hoa Thanh Yen - Van Phong

Joint Stock Company

2011

55 Preliminary study on site selection for Coal Terminal in Mekong Delta Tra Vinh Vinacomin / Sumitomo

Corporation 2011

Typical Projects Of Hydrographical Survey

No. Project name Place Clients Duration

56 The Improvement project of Navigational Channel to the Bassac River - Package 1

Tra Vinh Vinamarine / Maritime

Project Management Unit III

2011

57 Quang Trach Power Center Infrastructure Construction Project Quang Binh

PetroVietnam Construction Joint Stock Corporation

(PVC) 2011

58 Dredging of Soai Rap River Navigation Channel Project - Phase IIs

HCMC

Tan Thuan Industrial Promotion Co., Ltd (Tan

Thuan IPC)

2011

59 Saigon Center Container Terminal HCMC SAIGON PREMIER

CONTAINER TERMINAL (SPCT)

2011

60 Cai Mep - Thi Vai International Terminal Ba Ria – Vung Tau Project Management Unit

85 2010

61 Cai Lan Port Quang Ninh

Cai Lan Transport and Storage

Joint Stock Company

2010

62 Port at Van Phong - Khanh Hoa Khanh Hoa Luckyland Corporation 2010

63 SP-PSA International Terminal Ba Ria – Vung Tau SP-PSA International Port

Co., Ltd

2010

64 Ba Son Warehouse and Port HCMC PMU No.9 - Department of Defense 2009

65 Saigon Premier Container Terminal HCMC Saigon Premier Container Terminal (SPCT) 2009

66 Soai Rap Channel HCMC Tan Thuan Industrial Promotion Company (IPC) 2009

67 Long Son channel Port Ba Ria – Vung Tau Long Son Petrochemical Complex Ltd. 2009

68 Duyen Hai Sea Port Project Tra Vinh Vietnam Electricity/Thermal Power Project Management

Unit No.3 2009

69 Nghi Son Refinery Petrochemical Complex Project Thanh Hoa

Nghi Son Refinery And Petrochemical Limited

Liability Company

2009

70 The South Vietnam Petrochemical Complex Ba Ria – Vung Tau Long Son Petrochemical

Co.Ltd 2009

71 SP-SSA International Container Terminal Ba Ria – Vung Tau

SP-SSA International Container Services Joint

Venture Company 2008-2011

72 The Integrated Steel Mill and Son Duong Port Ha Tinh Formosa Plastics Group 2008

73 Study of dredging till -11.00 for Soai Rap Navigation Channel - Phase II HCMC Tan Thuan Industrial

Promotion Company 2007-2008

74 My Xuan International General Port Ba Ria – Vung Tau Formosa International Development Company 2007

75 SP-PSA International Terminal Ba Ria – Vung Tau SP-PSA International Port Co.,Ltd 2007

76 VLCC Bonded Warehouse - Port Ba Ria – Vung Tau PETROVINA 2007

!"#$%&'()*+,-%./(01(2"3*+4*&#5$%&'(67*8-"(

9+:( )*+,-%.(;&<-( )'&%-( ='$-;./( >7*&.$+;(

TT" #%,+(:%&"G:+)"A(,5",5%"=-+:%"/4"!aM22"4/$";()5"#+*"ZG5D"]D/-[" L(%)"N(+)'"

=+('/)"J)H%C,*%),"8/)C,$D-,(/)"+)&"8/**%$-%"

@,&O"

122T"

TY" #/)'"<+("G/$," #/)'"<+(" #/)'"<+("G/$,"c/(),"=,/-Q"8/*.+)K" 122T"

T\" G$/&D-,C"%d./$,"0%,,(%C"+)&"*+,%$(+:"(*./$,"0%,,(%C"4/$"F%4()+$K"</O"?" E+"F(+"`";D)'"9+D" GBX"4/$"F%4()%$K"</O"?" 122T"

Y2" =+('/)"95%.";(%,"G/$," E+"F(+"`";D)'"9+D"=+('/)"95%.";(%,"c/(),"

=,/-Q"8/*.+)K"

122T"

Y!" 8+,"@+("G$/&D-,"%d./$,"G/$," >8B8">/:-(*";(%,)+*"c/(),"

;%),D$%"8/*.+)K"

1223"

Y1"@/-+,()'"A(,5"#GN="4/$".$/&D-,"%d./$,"c%,,(%C"7"#D)'"]D+,"F%4()+$K"ZME["

]D+)'"<'+(" GV9FW;JV9<6B" 1223"

Y?" G5D/)'"<+)"GD:."B(::" @/)'"6)" 9F68W#J" 1223"

YI" =+('/)"G$%*(%$"8/)+,()%$"9%$*()+:" >8B8" =G89" 1223"

YM" @/A"8+("B%."8/),+()%$")+&"N%)%$+:"9%$*()+:" E+"F(+"`";D)'"9+D" ;D)',+D"=5(.K+$&" 1223"

Y3" =+('/)"=5(.K+$&" >8B8" =+(C/)"=5(.K+$&OS@,&" 1223"

YT" 8+("B%."J),%$)+,(/+):"9%$*()+:" E+"F(+"`";D)'"9+D" 6GB9" 1223"

YY" E+,5K*%,$(-"CD$H%K"4/$"8+("B%."F(H%$"VC,D+$K"+)&"N+)5"F+("R+K" ;D)'"9+D" ;J<6B6FJ<V" 122M"

Y\" E+,5K*%,$(-"CD$H%K"4/$"#()5"6)"F(H%$"VC,D+$K"+)&"]D+)"85+)5"E/"-5+))%:" 9$+";()5"

P+,%$A+K"G$/0%-,"B+)+'%*%),"

X)(,"122M"

\2" E+,5K*%,$(-"CD$H%K"4/$"=/+("$+."F(H%$"VC,D+$K" >8B8" 9+)"95D+)"J)&DC,$(+:"

G$/*/,(/)"8/*.+)K" 122I"

\!" <'5("=_)"G%,$/7-5%*(-+:"F%4()%$K"8/)0D'+,%"7"95+)5">/+" 95+)5">/+" G%,$/";(%,)+*" 122?"

\1"9/./'$+.5(-"+)&"R+,5K*%,$(-"CD$H%K"4/$"G$/&D-,"Vd./$,"c%,,K"7"#D)'"]D+,"F%4()%$K"

]D+)'"<'+(" G%,$/";(%,)+*" 1221"

Typical Projects Of Hydrological Survey

No. Project name Place Clients Duration

1 Phu Quoc International Passenger Port Kien Giang

Department of Traffic and Transport Kien Giang

Province 2015

2 Nghi Son Petro-Chemical Refinery Conjugate Nghi Son TOYO Construction Co.,

Ltd 2015

3 Navigational channel to Gianh estuary Quang Binh Vietnam Construction Materials Company Ltd 2015

4 Phu Quoc International Passenger Ship Port Kien Giang VINAMARINE 2014

5 Coal Transshipment Terminal Project Tra Vinh Vinacomin /Nippon Koei 2014

6 Tien Sa port extension and upgrade project Da Nang

Ministry of Transport (MOT)/

Project Management Unit 85

2013

7 Nghi Son Refinery Petrochemical Complex Project Thanh Hoa

Nghi Son Refinery and Petrochemical Limited

Liability Company (NSRP)/ JGCS

2013

8 Sihanoukville International Terminals - SITC Campuchia

Sihanoukville International Terminals Limited /

Hutchison Port Holdings

2013

9 Overall and comprehensive study of Cai Mep - Thi Vai Navigational Channel

Ba Ria – Vung Tau Vinamarine / Maritime

Project Management Unit III

2012

10 Study and impact assessment of Vung Tau - Go Cong embankment project to maritime traffic

Cai Mep River, Soai Rap River

Vietnam Port - Waterway - Continental Association 2012

11 Preliminary study on site selection for Coal Terminal in Mekong Delta Tra Vinh Vinacomin / Sumitomo

Corporation 2011

12 Lach Huyen Port Infrastructure Construction Project Hai Phong Vinamarine / JICA Study

Team 2011

13 Quang Trach Power Center Infrastructure Construction Project Quang Binh

Petro Vietnam Construction Joint Stock Corporation

(PVC) 2011

14 Cai Mep Ha General & Container Port Ba Ria – Vung Tau Vung Tau Shipyard Corporation 2011

15 Cai Lan International Container Terminal Quang Ninh

Cai Lan Port Investment Joint Stock

Company

2010

16 Port of Van Phong - Khanh Hoa Khanh Hoa Lucky Land Investment Trading Corporation 2010

17 Low Cai Mep Container and General Terminal Ba Ria-Vung Tau Vung Tau Shipyard 2009

18 SP-SSA International Terminal Ba Ria-Vung Tau SP-SSA International Container Services

Joint Venture Company 2009

19 Long Son General Terminal Ba Ria-Vung Tau Long Son Petrochemical Complex Ltd. 2009

20 The Integrated Steel Mill and Son Duong Port Ha Tinh Formosa Plastics Group 2008

Typical Projects Of Hydrological Survey

No. Project name Place Clients Duration

21 Bathymetric survey for product export jetties and material import jetties for Refinery No. 3

Ba Ria-Vung Tau PMU for Refinery No. 3 2007

22 Detailed Plan with Scale of 1/500 for Vinh Dam (Phu Quoc) Kien Giang

Saigon Investment Construction and

Commerce Ltd.

2007

23 Study of Experimental Dredging till -11.00 for Soai Rap Navigation channel - Phase II

HCMC Tan Thuan Industrial Promotion Company (IPC) 2007

24 Hydrographic survey for Soai Rap River HCMC Tan Thuan Industrial

Promotion Company 2004

25 Cai Mep - Thi Vai area, Ganh Rai bay Ba Ria-Vung Tau VINAMARINE 2003

26 Nghi Sơn Petro-chemical Refinery Conjugate Thanh Hoa Petro Vietnam 2003

27 Cai Mep - Thi Vai General Terminal Ba Ria-Vung Tau

Executing based upon the Agreement between

Vietnam and Belgium Governments

2001

GEOTECHNICALSURVEYHead Office: 92 Nam Ky Khoi Nghia, Dist. 1, Ho Chi Minh City, Vietnam Portcoast Building: 328 Nguyen Trong Tuyen, Ward 2, Tan Binh Distrist, Ho Chi Minh City Tel: +84 28 62970345 Fax: +84 28 62970344Website: www.portcoast.com; www.portcoast.com.vnEmail: [email protected]

PORTCOASTCONSULTANTCORPORATION

Introduction

PORTCOAST Geotechnical Company Limited (PORTCOASTGEO) is A Subsidiary Company of PORTCOAST Consultant Corporation. PORTCOASTGEO is equipped with the advanced software, modern and hi-tech surveying and laboratory equipments.

Company’s laboratory with number sign LAS 493 is standard laboratory recognised by Ministry of Construction. Company’s business and productive activities mainly are in the fields such as geotechnical consultants, geotechnical investigation and laboratory, material laboratory, consultant for soil improvement, monitoring...

Company’s manpower includes the expert staffs trained at home and abroad, the highly skilled and creativeness technicans. Together with the modern equipments and the processing systems with automatically data recording, the advanced geotecnical processing softwares with the new updated version on the world.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Drilling The objective of drilling work is to collect soil sample for testing engineering design and construction. This is the most effective method to evaluate the soil stratum in the construction site. Soil samples are then taken to provide for the determination of soil characteristics in the laboratory. Nowadays, this method is very popular in construction in Vietnam and over the world as well. Having about 10 drilling rigs together with skilled human resources, PortcoastGeo always satisfies the Client’s demands about schedule and also as the harshness of weather condition.

The 20HP drilling rig capacity is enough to make a borehole to 100m depth into soil or rock. The hole is made by rotary method combined with circulatory solution to lift the drilling mud upward. Some in-situ tests are also performed inside the drilled borehole such as: Standard Penetration Test (SPT), Field Vane Shear Test (FVST), Pressuremeter (PMT) and other tests. Besides, the drilled borehole is also used to install geotechnical instrumentations.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Specification of drilling rig

Drilling depth 100 m – 150m

Initial diameter 146 mm

Final diameter 100 mm

Diameter of drilling rod 42 mm

Declination of borehole 900 – 750

Weight of machine withdown engine 500 Kg

Speed of main axis (3 speed)

142 - 285 -

570 rpm

Max pressure of main axis 15 kN

Max pulling force of main axis 10 kN

Field Vane Shear Test The field vane shear test determines the undrained shear strength of clayey soils at site. This test is done in both casing and borehole. When the vane reaches the desired depth, push the vane rods downward direction about 3 times vane diameter from the borehole bottom then rotate the gauge to record moment value. The expected result is the undrained shear strength at the depth.

The field vane shear test is suitable for very soft to medium stiff clayey soils. The vane size is replaced for the proper material. 04 field vane machines doing well and a hydraulic Jack of 15 tons operated to push the casing to the required depth allow the test done quickly.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Piezocone Penetration Test

The Piezocone Penetration Test is a versatile equipment and provide fast in-situ results. Based on recorded data, the soil strata are determined faster than other equipments. Data recorded by sounding transfer from memo-cone to the dataloger on surface. The inclinometer sensor is attached in the memo-cone to control inclination during penetration.

Soil parameters are recorded such as: cone resistance (qc), sleeve friction (fs) …This equipment can also be performed pore water pressure dissipation test at the field – an important soil parameter in term of calculation the horizontal consolidation coefficient.

Having 04 memo-cones, 03 dataloger both C-Mon and PC-Mon and 4 hydraulic jacks from 10 to 20 tons, Portcoast-Geo is proud of being as a leading company in this kind of test and always meet Client’s demand.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

    

  

Pile Driving Analyzer (PDA)

The PDA uses signals from reusable sensors to collect data. It consist of 2 Accelerometers and 2 strain gages. When a hammer or weight strikes top of pile, the compressive stress wave travel down its shaft and reflect up. Soil resistance forces along the shaft and at the toe cause wave reflection and are felt at the top of the pile. The measured force and velocity near pile top thus provides necessary and sufficient information to estimate soil resistance and its distribution. The Pile Driving analyzer technology applies dynamic measurements to solve pilling problems. Force and acceleration measurements taken near the top of a pile during impact provide the necessary information for determining: + Activated bearing capactity + Hammer performance + Maximum driving stresses + Pile or Shaft Integrity PDA test can be applied on all types of pile, such as pre-cast concrete pile, in-cast placed pile, steel pile, timber pile, composite pile… PDA Testing is a quick, low cost and very reliable tool. You save time and money. You gain quality assurance.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

The monitoring system for soil improvement stage

Inclinometer system is used to monitor lateral movement of slope embankment during construction stage or slope protection. The inclinometer probe, datalog box and casing were manufactured by Geokon Co., (USA).

There are 02 types of conventional Piezometer: vibrating-wire piezometer and standpipe piezometer.

Magnetic extensometer is utilized to measure settlement of soft soil under the influence of loading during soil improvement or construction stage. The magnetic extensometer consists of components spider magnet, plate magnet, datum magnet, telescoping coupling, access tube and cable reel with audible.

Observation well is used for monitoring ground water level in a soil layer of stratum.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Pressuremeter Test (PMT) The Pressuremeter Test (PMT) provides a tress-strain response of the insitu soil. A deformation modulus called the pressuremeter modulus (Ep) and a limit pressure (PL) can be obtained from the stress-strain relationship for geotechnical analysis and foundation design.

The pressuremeter test is performed by applying pressure to the sidewalls of a borehole. The pressuremeter consists of two parts, the read-out unit, which rests on ground surface, and the probe that inserted into the borehole. The probe consists of three independent cells, a measuring cell and two guard cells.

Once the probe is at the test depth, the guard cells are inflated to brace the probe in place. Then the measuring cell is pressurized with water, inflating its flexible rubber bladder, which exerts a pressure on the borehole walls. As the pressure in the measuring cell increases, the borehole deforms. The pressure within the measuring cell is held constant for approximately 60 seconds, and the increase in volume required maintaining the constant pressure is recorded. A load-deformation diagram is recorded for each test run.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Laboratory testing for soil

Physical Testing

Grain size distribution analysis: The test is conducted in two stages: sieve analysis for coarse-grained soils (>0.075mm) and hydrometer analysis for fine-grained soils (< 0.075mm).

The results are presented by a grain size distribution curve which is combined as the percentage of sample smaller than, by weight, versus the log of the particle diameter. The curve provides the parameters about effective diameter (D60 & D10) and coefficient of uniformity (Cu). Tests were performed in accordance with ASTM D422.

Atterberg limits test: Atterberg limit test aimed to determine liquid limit (LL) and plastic limit (PL) which are very important indices used for classification of cohesive soil. The testing equipments are manufactured by HUMBOLDT – USA and procedures are according to ASTM, BS.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

    

  

Laboratory testing for soil

Mechanical Testing - Oedometer test  

Laboratory is equipped a Oedometer (or one-dimension consolidometer) test system of 30 sets manufactured by HUMBOLTD (USA) which can be reached to maximum pressure of 64 kG/cm2. Displacement transducer MLT system including 30 channels connected to automatic data acquisition Datalogger supplied by M-System (Japan). During test, data will be controlled and updated by M-System software, continuously. Warning will be activated when strain gauge out of safety limitation. CRCS test: The conventional oedometer test equipment is able to replace by LOADTRAC II integrating with ICON software, the system can complete a consolidation test within one day instead seven by conventional oedometer test. Process of loading and unloading shall be automatically controlled by ICON software. Fully automation of testing procedure aimed to reduce human error and enhance accuracy of testing, that is dependent on the data transmission and processing capacity of transducer reached to 22 bits.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

    

  

Laboratory testing for soil

Mechanical Testing - Direct shear test The Direct Shear test equipment manufactured by Humboldt using Loadcell and MLTs to monitor the shear force and MLTs are used to monitor both vertical and horizontal deformation. The data are automatically recorded and stored by Datalogger. The test purposed to evaluate soil shear strength in condition of undrain and drain according to ASTM 3080. The test equipment can apply maximum normal stress up to 32 kG/cm2, the dimensions of square shear box is appropriate for soil specimen of 2.5 inches in diameter and height of 1 inch. LoadCell with capacity of 1KN. Strain gauge to measuring vertical and horizontal displacement with capacity of 0.6 inch Shear rate ranging of 0.001 to 15mm/min.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

    

  

Laboratory testing for soil

Mechanical Testing - Direct shear test  Triaxial test equipment consists of flow pump system FlowTrac II and machine with multiple capability LoadTrac II manufactured by GeoComp-USA. The system will be connected to the computer network by network card, thereby tesing process will be fully automatical controlled by Triaxial professional programme. It included saturation stage, consolidation stage (Isotropic and K0 condition), and shearing with constant rate or any stress path. In report, the programme will automatically output the detail report for test. Triaxial tests for cohesive soil with models such as: UU, CIU, CID, CKoU, Multistage.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

    

  

PORTCOAST GEOTECHNICAL COMPANY LIMITED

Laboratory testing for soil

Mechanical Testing - Standard Test Method for One - Dimensional Consolidation Properties of Soils Using Controlled Strain Loading (CRS)  CRC test: The conventional oedometer test equipment is able to replace by LOADTRAC II integrating with ICON software, the system can complete a consolidation test within one day instead seven by conventional oedometer test. Process of loading and unloading shall be automatically controlled by ICON software. Fully automation of testing procedure aimed to reduce human error and enhance accuracy of testing, that is dependent on the data transmission and processing capacity of transducer reached to 22 bits.. The CRS test is carried out to determine soil compressibility parameters such as compression index (Cc), recompression index (Cr), reconsolidation pressure (Pmax), and the coefficient of consolidation (Cv90), pore water pressure.

    

  

Laboratory testing for rock

The point load test is used to determine point load strength for rock specimen. In this test, the rock specimen will be placed between two conical platens of compressive machine, and then close the platens to increasing applied load until the specimen fails. The maximum value of load shall be recorded to compute the point load strength. The test conducted according to ASTM 5731. The uniaxial compression test is to measure uniaxial compression strength (qu), deformation modulus (Es50) of cylindrical rock specimen. The test conducted by hydraulic compressive machine TYA-2000 (China), applied load and defomation measured by Loadcell and displacement transducer which are recorded by Datalogger and stored to computer. ASTM D 2938 -95 is used to applying for this test. Direct shear test for rock sample is used to measure the peak shear strength and the residual shear strength and internal friction angle of rock specimen. Insert the test specimen in the bevel die inset after that place beveled die inset between two press platens. The data is measured by loadcell and displacement transducer then stored by datalogger.

PORTCOAST GEOTECHNICAL COMPANY LIMITED

PhuMyPort

 

Phu My Port Site: Ba Ria - Vung Tau Province, Vietnam. Client: Ba Ria Joint Stock Company Of Services For Import Export Of Agroforestry Products And Fertilizers. Our services include: • Structural inspection.

SP–SSAInternationalTerminal(SSIT)

 

SSIT International Port Site: Ba Ria - Vung Tau Province, Vietnam. Client: JV of SSA Marine (USA), Vinalines and Saigon Port. Main project features: SSIT’s berth after collision incident of the Fareast Honesty.

Our services include: • Structural inspection.

CamPhaCementPort

Cam Pha Cement Port Site: Ba Ria - Vung Tau Province, Vietnam. Client: Cam Pha Cement Joint Stock Company Main project features: Cam Pha Cement Port after collision incident

Our services include: • Structural inspection.

PoscoPort

 

Posco Port Site: Ba Ria - Vung Tau Province, Vietnam. Client: Posco Vietnam Co. Ltd.

Our services include: • Structural inspection

HyosungVinaChemicalsPort

 

Hyosung Vina Chemicals Port Site: Ba Ria - Vung Tau Province, Vietnam. Client: Hyosung Vina Chemicals Co. Ltd.

Our services include: • Topographic survey and 3D laser scanning • Surveying existing structure • Verification of revetment and treated soil foundation

VANNINHGENERALCARGOPORT

Van Ninh General Cargo Port Site: Quang Ninh Province, Vietnam. Client: Van Ninh International Port Joint Stock Company. Soil investigation includes: • Offshore boreholes : 69 locations • Total drilling depth : 909.1 m • UD samples : 353 sample • SPT tests : 335 tests • FVT test : 30 tests

B&T Wind Farm Project

B&T Wind Farm Project Site: Quang Binh Province, Vietnam. Client: B&T Wind Farm Joint Stock Company. Main project features: B&T wind farm is a 250 MW wind project located in Quang Binh Province, approximately 125 km to the NW of the City of Hue and between 18 and 35 km to the SE of the Dong Hoi City.

Our services include: • Geological-Geotechnical site investigations, • Laboratory test, • Geophysical survey.

 

HOASENCANANinhThuanGeneralPort

Hoa Sen Ca Na - Ninh Thuan General Port Site: Ninh Thuan Province, Vietnam. Client: • Ninh Thuan Province Department of Transport (2016). • Hoa Sen Ca Na – Ninh Thuan International General Port Company Limited (2017 – 2019).

Hoa Sen Ca Na - Ninh Thuan General Port is planned to be a multi purpose port serving Ca Na Industrial Zone and im-export requirements of the province and nearby provinces. Phase 01 of the project is currently implemented to develop one 100,000 DWT and one 20,000 DWT general cargo berths. Soil investigation includes: • Offshore borehole: 52 BH • Onshore borehole: 12 BH • Total drilling depth: 1,155 m • UD: 136 samples • SPT: 177 tests

Sea Star International SeaportSite: Ba Ria - Vung Tau Province, Vietnam. Client: S.S.I.P CORP

Sea Star International Seaport is planned as a multi-purpose port on the total area of 68.0 ha with total berth length of 900m for 30,000 DWT vessels. Phase 1 of the project focuses on the development of one 30,000 DWT berth covering on an area of 18.48 ha with total berth length of 235m. Estimated cargo throughput is 01 mil general cargo and 01 mil coal/year.Soil investigation includes:

Offshore boreholesTotal drilling depth

Drilling soilDrilling rock

UD samplesSPT tests

: 12 location; : 519m; : 377m;: 142m;: 193 samples; : 193 tests

Sea Star International Seaport

    

SOILINVESTIGATIONWORKATCAIMEPINDUSTRIALZONE

Soil Investigation Work At Cai Mep Industrial Zone Site: Phu My Town, Ba Ria Vung Tau Province. Client: Hyosung Corporation. Soil investigation includes: • Offshore borehole: 08 boreholes • Total drilling depth: 520 m • UD: 204 samples • SPT: 204 tests • RQD: 90 m

VietnamLee&ManPaperInternationalPort

Vietnam Lee & Man Paper International Port

Site: Hau Giang Province, Vietnam. Client: Vietnam Lee & Man Paper MFG. Ltd. (Hong Kong).

Soil investigation includes: • Offshore borehole: 5 boreholes, • Total drilling depth: 255m, • UD Samples: 131 samples, • SPT: 131 tests, • FVT: 2 locations, • Lab test: 131 samples.

DENDOCAPPARKANDURBANRESIDENTIALAREAATPHUTHUANWARD,DISTRICT7,HCMC

Den Do Cap Park and Urban Residential Area Work: International Cruise Port Site: Phu Thuan Ward, District 7, Ho Chi Minh City. Client: Sai Gon Peninsula Group Corporation. Soil investigation includes: • Offshore borehole: 19 boreholes • Total drilling depth: 1400 m • UD: 713 samples • SPT: 713 tests

NghiSonRefineryandPetrochemicalProject

Nghi Son Refinery and Petrochemical Project Vietnam

Site: Nghi Son Economic Zone (Thanh Hoa Province). Client: Nghi Son Refinery and Petrochemical LLC sponsored by PetroVietnam, Kuwait Petroleum Europe B.V. (KPE), Idemitsu Kosan Co., Ltd and Mitsui Chemical, Inc.

Soil investigation includes: • Offshore borehole: 36 boreholes, • Total drilling depth: 965m, • UD Samples: 274 samples, • SPT: 674 tests, • FVT: 14 locations, • CPTu test: 33 locations, • Lab test: 302 samples.

SihanoukvilleInternationalTerminals(2013,2012)

Sihanoukville International Terminals Site: Steung Hav, Sihanoukville, Kingdom of Cambodia. Client: Sihanoukville International Terminals Limited. Soil investigation includes:

2013: • Offshore borehole: 2 BH • Onshore borehole: 4 BH • Total drilling depth: 160.9 m • UD: 14 samples • SPT: 27 tests • RQD : 104 m

2012: • Offshore borehole: 13 BH • Onshore borehole: 14 BH • Total drilling depth: 420.7 m • UD: 63 samples • SPT: 130 tests • RQD : 229 m

DUYENHAISEAPORT

Duyen Hai Sea Port

Site: Duyen Hai District - Tra Vinh. Client: Vietnam Electricity Thermal Power Project Management Board 3.

Soil investigation includes: • Offshore borehole: 32 boreholes, • Onshore boreholes: 7 boreholes, • Total drilling depth: 2800m, • UD Samples: 1832 samples, • SPT: 1380 tests, • FVT: 11 locations, • Downhole test: 4 locations, • Lab test: 1832 samples.

LachHuyenPortInfrastructureConstructionProject

Lach Huyen Port Infrastructure Construction Project Japanese ODA loans (2011)

Site: Ba Ria - Vung Tau Province, Vietnam. Client: JICA team (Joint venture of oriental consultants Co., Ltd and Nippon Koei Co., Ltd and Padeco Co., Ltd and Japan bridge & structure institute Inc.,).

Soil investigation includes: • Offshore borehole: 122 boreholes, • Total drilling depth: 2167m, • UD Samples: 340 samples, • SPT: 1743 tests, • Lab test: 1277 samples.

No. Project name Place Clients Duration

111 Interflour Port Ba Ria - Vung Tau Interflour Viet Nam Co.,Ltd 2020

110 SP-PSA International Port Ba Ria - Vung Tau SP-PSA International Port Co.,Ltd 2020

109 Ong Keo General Port Dong Nai Long Thuan Investment Corporation 2020

108 Thanh Long Bay Resort Complex Binh Thuan Nam Investment Joint Stock Company 2020

107Petrochemical Complex in South of Vietnam: Package A1 – Olefins Plant

Ba Ria - Vung Tau Long Son Petrochemicals Company Limited 2019-2020

106 B&T Wind Farm Project Quang Binh B&T Wind Farm Joint Stock Company 2019

105 Rach Gia Passenger Port Kien GiangDepartment of Traffic and Transport Kien Giang Province

2019

104 Van Ninh General Port Quang Ninh Van Ninh International Port JSC 2019

103Mo Nhat Inland Waterway Port and General Warehouse

Ba Ria - Vung Tau Dai Dat Trading Construction Co., Ltd 2019

102 Go Gia Buoy Station Ho Chi Minh City Long Thuan Investment Corporation 2019

101 Ca Na General port Ninh Thuan Hoa Sen Group 2019

100 Southern Van Phong General Port Khanh Hoa Thanh Yen – Van Phong Joint Stock Company 2019

99 Hyosung Vina Chemicals Port Ba Ria - Vung Tau Hyosung Vina Chemicals Co., Ltd 2019

98 SP-SSA International Terminal Ba Ria - Vung TauSP-SSA International Container Service Joint Venture Co., Ltd

2019

97 Cam Pha cement Plant Ba Ria - Vung Tau Cam Pha cement JSC 2019

96 Posco Port Ba Ria - Vung Tau Posco Vietnam Co., Ltd 2019

95Petrochemical Complex in South of Vietnam – Package L

Ba Ria - Vung Tau Posco Engineering and Construction Co., Ltd 2018

94 Sea Star International Port Ba Ria - Vung Tau Sea Star International Port Corporation 2018

93 UPC – Vinh Loi / Wind Farm Bac Lieu UPC Vietnam (HK) Limited 2018

92 Sai Gon Co.op Port Ho Chi Minh City Saigon Co-op Cooperation 2018

91 Vinh Dam Complex Kien Giang TTC Land Toan Hai Van JSC 2018

90 Southern Van Phong General Port Khanh Hoa Thanh Yen – Van Phong Joint Stock Company 2018

89 River Pier No.2 – Phu My Port Ba Ria - Vung TauBa Ria Joint Stock Company Of Services For Import Export Of Agroforestry Products And Fertilizers

2018

88 International Marina Park Khanh Hoa Ana Marina Nha Trang Co., Ltd 2017

87Hoa Binh - Bai Vong Cruise Terminal and Logistics Services Complex

Kien Giang Hoa Binh Ham Ninh Joint Stock Company 2017

86 Hyosung Vina Chemicals Port Ba Ria - Vung Tau Hyosung Vietnam Co., Ltd 2017

85 Duyen Hai Sea Port Project Tra Vinh China Communications Construction Co., Ltd 2017

84Long Son Petrochemical Complex Project – Package F

Ba Ria - Vung Tau Posco Engineering and Construction Co., Ltd 2017

83International Cruise port Project Den Do Cap Park and Urban Residential Area Project at Phu Thuan Ward, District 7, Ho Chi Minh

Ho Chi Minh City Sai Gon Peninsula Group Corporation 2017

82 Ong Keo General Port Dong Nai Long Thuan Investment Corporation 2017

81Soil investigation work at Cai Mep Industrial zone – CM1 - CM4 area

Ba Ria - Vung Tau Hyosung Corporation 2017

80 Ha Tien Binh An Port Ha Tien Binh An Shipping Co., Ltd 2017

79 Ca Na General port Ninh Thuan Hoa Sen Group 2016

78 Low Cai Mep Logistics Center Vung Tau Ba Ria Vung Tau Province Department of Transport 2016

77 ICD Long Binh Transshipment Port Project Ho Chi Minh City Duc Khai Corporation 2016

76 Low Cai Mep General Port Ba Ria - Vung Tau Cai Mep General Port Company Ltd 2016

75Transit port providing coal for thermal power centers in the Mekong Delta

Tra VinhVietnam National Coal - Mineral Industries Holding Co., Ltd (Vinacomin)

2015

74 Phu Quoc International Passenger Port Kien GiangDepartment of Traffic and Transport Kien Giang Province

2015

73 Vietnam Lee & Man Paper International Port Hau Giang Vietnam Lee & Man Paper Manufacturing Ltd 2015

72 Cai Mep General Port Ba Ria - Vung Tau Cai Mep General Port Co., Ltd 2015

71 Ong Keo General Port Dong Nai Long Thuan Investment Corp 2015

70 Navigational channel to Gianh estuary Quang Binh Vietnam Construction Materials Company Ltd 2015

69 Protection bank for Lee&Man plant Viet Nam Hau Giang Vietnam Lee & Man Paper Manufacturing Ltd 2015

68 Phu Quoc International Passenger Ship Port Kien Giang VINAMARINE 2014

1/3

No. Project name Place Clients Duration

67

Establishment of navigational channel and maritime signal system for Dong Tranh river and navigational channel from Tat Ong Cu - Tat Bai confluence to GoGia river

Dong NaiSouthern Vietnam Maritime Safety Corporation (VMS-South)

2014

66Mekong Delta Region Urban UpgradingProject (MDR-UUP) - My Tho city sub-project - Item of Tien River Embankment

Tien GiangProject Management Unit of Mekong Delta Region Urban Upgrading Project (MDR-UUP) - My Tho city sub-project

2014

65Socializion and Dredging to gather products - Dong Tranh and Tat Ong Cu - Tat Bai Navigational Channel to Go Gia river

Dong Nai Hai Hung Thinh Investment Joint Stock Company 2014

64 Long Son Petrochemical Complex Ba Ria - Vung Tau Long Son Petrochemical Co., Ltd 2013

63 Cho Gao Upgrading Project - Phase 1 Tien GiangVietnam Inland Waterways Administration (VIWA) / Project Management Unit of Southern Inland Waterways (PMU-SIW)

2013

62 Nghi Son Refinery Petrochemical Complex Project Thanh HoaNghi Son Refinery and Petrochemical Limited Liability Company (NSRP)/ JGCS

2013

61 Sihanoukville International Terminals - SITC CampuchiaSihanoukville International Terminals Limited / Hutchison Port Holdings

2013

60 Tien Sa port extension and upgrade project Da NangMinistry of Transport (MOT)/ Project Management Unit 85

2013

59 LDC Potential project Ba Ria - Vung Tau Louis Dreyfus Commodities Vietnam Ltd 2013

58Ho Chi Minh City Urban Railway Construction Project Ben Thanh - Suoi Tien Section (Line 1) Contract Package 2: Civil (Elevated & Depot)

Ho Chi Minh City Management Authority for Urban Railways 2012

57Overall and comprehensive study of Cai Mep - Thi Vai Navigational Channel

Ba Ria - Vung Tau Vinamarine / Maritime Project Management Unit III 2012

56The Integrated Steel Mill and Son Duong Port Formosa Ha Tinh Project

Ha TinhFormosa Ha Tinh Steel Corporation / Samsung C&T Corporation

2011

55 Duyen Hai Seaport Project Tra VinhVietnam Electricity / Thermal Power Project Management Unit 3

2011

54 River Pier No. 3 and 4 - besides Phu My port area Ba Ria - Vung TauBa Ria Joint Stock Company Of Services For Import Export Of Agroforestry Products And Fertilizers

2011

53 Nam Van Phong General Port Khanh Hoa Thanh Yen - Van Phong Joint Stock Company 2011

52The Improvement project of Navigational Channel to the Bassac River - Package 1

Tra Vinh Vinamarine / Maritime Project Management Unit III 2011

51Lach Huyen Port Infrastructure Construction Project

Hai Phong Vinamarine / JICA Study Team 2011

50Quang Trach Power Center Infrastructure Construction Project

Quang BinhPetroVietnam Construction Joint Stock Corporation (PVC)

2011

49 Cai Mep Ha General & Container Port Ba Ria - Vung Tau Vung Tau Shipyard Corporation 2011

48 Cai Lan International Container Terminal Quang Ninh Cai Lan Port Investment Joint Stock 2010

47 Port of Van Phong - Khanh Hoa Khanh Hoa Lucky Land Investment Trading 2010

46 Low Cai Mep Container and General Terminal Ba Ria - Vung Tau Vung Tau Shipyard 2009

45 Ba Son warehouse and port Ho Chi Minh City PMU No.9 - Department of Defense 2009

44 Saigon International Terminals Vietnam Ba Ria - Vung Tau Saigon International Terminal Vietnam 2009

43 Saigon Hiep Phuoc Terminal Ho Chi Minh City Sai Gon Hiep Phuoc Joint Stock Company 2009

42 Southern Petrochemical Complex in Vietnam Ba Ria - Vung Tau Long Son Petrochemical Complex Ltd 2009

41 Long Son General Terminal Ba Ria - Vung Tau Long Son Petrochemical Complex Ltd 2009

40 Saigon Logictics Area Ho Chi Minh City Saigon Port 2009

39 Duyen Hai Sea Port Project Tra VinhVietnam Electricity/Thermal Power Project Management Unit No.3

2009

38 Nghi Son Refinery Petrochemical Complex Project Thanh HoaNghi Son Refinery And Petrochemical Limited Liability Company

2009

37 The South Vietnam Petrochemical Complex Ba Ria - Vung Tau Long Son Petrochemical Co.Ltd 2009

36 SP-SSA International Conatiner terminal Ba Ria - Vung TauSP-SSA Inernational Container Services Joint Venture Company

2008-2011

35 The Integrated Steel Mill and Son Duong Port Ha Tinh Formosa Plastics Group 2008

34 CPTu test: Saigon International Terminal Vietnam Ba Ria - Vung Tau China Harbour Engineering Company Limited (SITV) 2008

33Equipment Installation and horizontal Monitoring for Dock 10.000DWT

Ho Chi Minh City Saigon Shobuilding Industry Company 2008

2/3

No. Project name Place Clients Duration

32 Lotus International Port Ba Ria - Vung Tau GEMADEPT 2008

31 PVD design & Monitoring: SP-PSA Port Ba Ria - Vung Tau SP-PSA International Port Co.,Ltd 2008

30 Installation and Monitoring: SITV Ba Ria - Vung Tau SITV 2008

29 PDA Testing: SP-PSA Port Ba Ria - Vung Tau SP-PSA International Port Co.Ltd 2008

28 PDA testing: Posco Integrated Steel Mill Port Ba Ria - Vung Tau Posco Vietnam Co., Ltd 2008

27 PDA testing: SITV Ba Ria - Vung Tau SITV 2008

26 My Xuan International General Terminal Ba Ria - Vung Tau Formosa International Development Company 2007-2009

25 Saigon East-West Hightway Ho Chi Minh City HCMC People Committee 2007

24Detailed Plan with the scale of 1/500 for Vinh Dam (Phu Quoc)

Kien Giang Saigon Investment Construction and Commerce Ltd. 2007

23 Saigon Thep Viet Port Ba Ria - Vung Tau Thep - Thep Viet Joint Stock Comapny 2007

22 Monitoring for Interflour Port Expansion Ba Ria - Vung Tau Interflour Vietnam Ltd. 2007

21Experimental Dredging till -11.11 for Soai Rap Navigation Channel (Phase II)

Ho Chi Minh City Tan Thuan Industial Promotion Company (IPC) 2007

20 Cai Mep Ha General Container Terminal Ba Ria - Vung Tau Vungtau Shipyard 2006

19 Cai Mep Inernational Terminal Ba Ria - Vung Tau APMT 2006

18 SP-SSA Inernational Container Terminal Ba Ria - Vung Tau SSA Holding International Vietnam 2006

17 Saigon Premier Container Terminal Ho Chi Minh City P&O Ports Ltd. 2006

16 Thi Vai International Terminal Ba Ria - Vung Tau PSA Vietnam PTE. Ltd. 2006

15 Saigon International Terminal Vietnam Ba Ria - Vung Tau Hutchison Port Holdings 2006

14 Phuong Nam Long An TRACODI 2006

13 Monitoring for Saigon Preminer Container Terminal Ho Chi Minh City SPCT 2006

12PDA testing: Product export Jetties - Dung Quat Refinery (5B)

Quang Ngai Petrovietnam 2006

11 PDA testing: Ca Mau Gas-Power-Fertilizer Ca Mau Petrovietnam 2006

10 Saigon Shipyard Ho Chi Minh City Saigon Shipyard Ltd. 2006

9 CPTu test: East - West Hightway Ho Chi Minh City OBAYASHI - P.S MITSUBISHI 2006

8PDA Testing for Product Export Jetty - Dung Quat Refinery

Quang Ngai Petrovietnam 2005

7 General Survey for bottom of the Sea by Stratabox Ho Chi Minh City Tan Thuan Industrial Promotion Company 2005

6 Geotechnical Investigated for Bassac Channel Tra Vinh Waterway Project Management Unit 2005

5Geotechnical Investigated for Saigon Premier Container Terminal

Ho Chi Minh City Tan Thuan IPC - P&O Ports Ltd Joint Venture Company 2005

4Geotechnical Investigated for Cai Mep Container Terminal

Ba Ria - Vung Tau GEMADEPT/ Hutchison Port Holdings 2004

3Geotechnical Investigated for Breakwater - Dung Quat Refinery

Quang Ngai Petrovietnam 2002

2 PDA Testing for Phu My port Ba Ria - Vung TauBa Ria Joint Stock Company Of Services For Import Export Of Agroforestry Products And Fertilizers

2001-2006

1 Ca Mau Gas- Power - Fertilizer Project Ca Mau Petrovietnam 2001-2004