1 - Classification: Internal 2011-04-14

Workshop: Pushing the Oil Recovery Factor Offshore

Statoil experience and ambitionsKristian Sirevaag, Jan Eric Lode, Alastair Buchanan

Statoil Well Technology Group

2 - Classification: Internal 2011-04-14

Agenda

Introduction/background

Riserless

Light Well Intervention (RLWI)

Category B

3 - Classification: Internal 2011-04-14

3

Taking on the High Recovery Challenge

4 - Classification: Internal 2011-04-14

Beautiful but demanding

5 - Classification: Internal 2011-04-14

Technology

and production

Development

path

Closing of the gap must be achieved by developing knowledge and new technology

Disintegration

path

YE

AR

LY

PR

OD

UC

TIO

N O

F O

IL,

GA

S A

ND

LN

G (

MIL

L S

M3

OE)

0

50

100

150

200

250

300

2002 2008 2014 2020 2026 2032 2038 2044 2050

6 - Classification: Internal 2011-04-14

Optimising reservoir recovery from subsea fields

Increased fluid handling capacity

Reduced wellhead pressure

Integrated Operations

Identify −Drainage points

−Well intervention needs and opportunitiesAmbition:

increase subsea recovery Cost effective drainage & well

intervention

7 - Classification: Internal 2011-04-14

7

Cumulative wells –

Statoil NCS

0

100

200

300

400

500

600

700

1980 1990 2000 2010

Dry trees

Wet trees

8 - Classification: Internal 2011-04-14

8

Impact

of

well

intervention

mature

asset

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

No activity Drill New Intervention

OilSm3

/D

9 - Classification: Internal 2011-04-14

RLWI

10 - Classification: Internal 2011-04-14

What is RLWI ?

RLWI = Riserless

Light Well Intervention

Subsea wireline

operations from well intervention vessel

11 - Classification: Internal 2011-04-14

Island Wellserver

Mark II stack

12 - Classification: Internal 2011-04-14

RLWI-

one of the tools to help us reach our goal in IOR

RLWI operations with subsea lubricator

for wireline

work, with or without a well tractor

Enables the application of well tractor technology in subsea wells at a substantially lower cost compared to conventional rig operations

Typical applications:

• Data gathering (PLT)

• Perforating

• Zone isolation (plug/straddle)

• Chemical treatments

• Inspection/repair (DHSV)

Wireline

Subsea lubricator

13 - Classification: Internal 2011-04-14

Other

applications•

Camera inspection

Calliper logging

Well killing operation

Change-out of gas lift valves

Sleeve operations –

DIACS valves

Fill / debris removal (power suction tool)

Well barrier re-establishment prior to rig workover

Milling of scale bridges

Installation/replacement of subsea trees (VXT)

P&A operations of subsea wells

14 - Classification: Internal 2011-04-14

RLWI –

cost effective wireline

solution

Land Platform Rig RLWI

Cos

t

Compared to interventions from a semi submersible rig:

•Reduced operation cost

•Reduction in operating time

•Increased WOW

Resulting in:

•Reduced cost per intervention

•Enabling more interventions that otherwise would not have been performed (typical data acquisition)

15 - Classification: Internal 2011-04-14

Development 2000 -

2010

MSV Regalia

(2003)

MSV Seawell

(2000 & 2004 -

2005)

Island Frontier

(2006 )

Island Wellserver

2009 )

16 - Classification: Internal 2011-04-14

Operational overview

VXT and HXT

Water depth: 75 –

405 m

•2000

-

8 wells

•2003

-

3 wells

•2004

-

4 wells

•2005

-

11 wells

•2006

-

11 wells

•2007

-

17 wells

•2008

-

13 wells

•2009

-

25 wells

•2010

-

36 wells

17 - Classification: Internal 2011-04-14

PCH

18 - Classification: Internal 2011-04-14

Lubricator section

19 - Classification: Internal 2011-04-14

RLWI alliance

ISLAND OFFSHORE

20 - Classification: Internal 2011-04-14

Integrated operations –

IO for RLWI operations

21 - Classification: Internal 2011-04-14

MSV Seawell

-

in operation

22 - Classification: Internal 2011-04-14

Category B

23 - Classification: Internal 2011-04-14

Addressing challenges –

realising opportunities

Scale build-up in the upper completion

Equipment problems SCSSV

Access problems

Restricted production

Water influx

Wellbore scaling

Access problems

Restricted production

Formation damage (scale, fines, etc.)

Restricted production

“Fishes”

Access problems

Restricted production

Water holdup

Wellbore sanding

Access problems

Restricted production

Completion integrity issues

Milling or high pressure jetting to remove scale

Straddles or patches to repair tubing

Wellbore cleanout, fill removal with long or reverse circulation

Selective zonal isolation, mechanical or chemical

Heavy duty fishing with simultaneous removal of fill

Wellbore unloading with nitrogen

Formation matrix or fracture stimulation

Milling and underreaming to remove wellbore scale

Perforating long sections

24 - Classification: Internal 2011-04-14

Category ARLWI

Category BHeavy intervention & TTD

Category CDrilling and completion

•Wireline / tractor only

•Limited bhalength

•Full range of through tubing services

•Limited live well through tubing services

High pressure light weight

riser (8-5/8”)

Low pressure marine riser (21”) standard

HP concentric riser and SSTT required for live well intervention

25 - Classification: Internal 2011-04-14

Cat B –

fit for purpose concept

Lightweight HP riser system (through tubing)

Full DP or mooring assisted station keeping options

Topside system sized for through tubing operations (2⅞” & 3½” drillpipe)

Integrated high capacity coiled tubing package (2 ⅞” / 3½”)

Full handling of live well returns

Semi-submersible rig hull type

26 - Classification: Internal 2011-04-14

Work in progress

TVD MSL

T1T1 T2T2 T3T3 T4T4 T5T5

A record 1744m long through tubing sidetrack

27 - Classification: Internal 2011-04-14

Strategy for subsea well management

Downhole Technology & Solutions•

Develop•

Qualify•

Migrate to lighter conveyance•

Transfer to other op. environments

Shallow / harsh environment•

“Introduce”

Cat B•

Phase out Cat C for WI•

Extend Cat A/B techniques

Deepwater challenges•

Surface solutions

Well control•

Conveyance

Traditional platform activity•

Learning•

Inspiration

28 - Classification: Internal 2011-04-14

Workshop: Pushing the Oil Recovery Factor Offshore Statoil experience and ambitions

Kristian Sirevaag, Jan Eric Lode, Alastair BuchananStatoil Well Technologywww.statoil.com