SmartPlant Engineering & Schematic in Production
Frank JoopGlobal Business DevelopmentIntergraph
November, 2011
June 2011 SmartPlant Engineering & Schematics
Proof of Value is with the Customers
Use cases of SmartPlant Engineering & Schematic– Bayer Antwerp
– OMV Petrom Petrobrazi Refinery Romania
– ORLEN Projekt SA Poland
– ECM Mining Brazil
Different industriesDifferent driverOne common goal:
Improve business and lower operational risk
June 2011 SmartPlant Engineering & Schematics
Engineering & Schematics Seat count (SP P&ID, SP Instrumentation, SP Electrical)
0
5 000
10 000
15 000
20 000
25 000
30 000
35 000
40 000
2005 2006 2007 2008 2009 2010 2011
16,000
21,000
28,00031,000
29,000
36,000
* Estimated
36,000
41,000*
June 2011 SmartPlant Engineering & Schematics
Solving the Business Problems
Overall Solution Focus– Cost of ownership– Value proposition– Integration– Automation (API)– Task focused– Complete and reliable
June 2011 SmartPlant Engineering & Schematics
Putting the Solution in Perspective
Designing the Process– SP P&ID
Safety and Risk Mitigation– SP Process Safety
Controlling the Process– SP Instrumentation
Powering the Process– SP Electrical B&D
Value add Engineering– SmartSketch– SP Explorer
Validating the Design– ETAP– SmartPlant P&ID Engineering Integrity
Power
Process
Controls
Safety
Motor Operated Control valve
June 2011 SmartPlant Engineering & Schematics
From Requirement to Implementation
PFD
RelationshipsRules
The SmartPlant Difference
June 2011 SmartPlant Engineering & SchematicsSmartPlant Engineering & Schematics
Bayer Antwerp BelgiumPlant owner
June 2011 SmartPlant Engineering & Schematics
Full year sales: EUR 35.1 billion112,500 employees
291 subsidiariesR&D expenditures: EUR 3.1 billion
As of December 31, 2010 / Employees: March 31, 2011
June 2011 SmartPlant Engineering & Schematics
Key Locations / Regions
Europe
Africa / Middle East
North America
Asia / Pacific
LatinAmerica
The Bayer Group is a global enterprise with companies in almost every country
June 2011 SmartPlant Engineering & Schematics
SPPID / SPI @ Bayer in facts & figures
Licenses covered by “Global Alliance Agreement” (BTS)Other used SmartPlant products:– SmartSketch– SmartPlant Electrical– SmartPlant Explorer
SPPID SPI2 Data / Application Servers(Leverkusen, Caojing)
3 Data / Application Servers(Pittsburgh, Leverkusen, Caojing)
All use Version SPID 2009 SP1 All use Version SPI 2009, SP2
Local installations at small sites
+- 25 User +- 200 User
3.500 P&ID’s 80.000 Loops
June 2011 SmartPlant Engineering & Schematics
Integration concept
Basic idea– Multidisciplinary sharing of plant information– One point of entry to ensure consistent as built documentation– One stop shop principle to gather information– Documentum folders structured according the plant naming convention– Automated interfaces with engineering tools and SAP
Benefits– Guaranteed consistent as built data Safety!– Reduce the search time for accurate information by maintenance
personnel (“An engineer spends 40 % of his time just by searching the right document”)
– Low cost solution, no investment needed– Super fast maintenance workflow, initiated in the SAP notification
June 2011 SmartPlant Engineering & SchematicsSmartPlant Engineering & Schematics
OMV PetromPetrobrazi RefineryPlant Owner
June 2011 SmartPlant Engineering & Schematics
P����� �� ��� L������ R������� C������
Petrom is the largest refinery owner andoperator in Romania, accounting for 40%of country’s ����� ������ ��������
���������
Petrom – P���������
Petrom – A�������
R�������� P���������
L����� P�������
R��� O�����
1 2
3
R�������� V���
S����� R�����
O���� ����������
June 2011 SmartPlant Engineering & Schematics
D������������ �� OMV P����� ����������
B����������
– �� ��� �� ��� ��� ������� �� R������� ���������� ������������� ��� ��������� ����
�� ���� ������
– I� 2005 P����� ������ ������ �� OMV G����
– ����� 2007� OMV P����� ��� ���� ������� �� ����� ������������� �� ���������� ������
C������ �� ������������� �����������
– ������� ���� ��� ����������� ��� ��������� ������������� �� ���������� ������
– ��� ����������� ��� ��������� ������� �� �������������
June 2011 SmartPlant Engineering & Schematics
D������������ ���� I��������� �����
I��������� ����� ��� �������� ��������������
– S����P���� E�������
– S����P���� PID
– PDS
– S����P���� I���������
– S����P���� R�������� D���B���
G������ ������������� ���� ������ �������
– ���� ������
– ����� ��� ����� �����������
– ����������
June 2011 SmartPlant Engineering & Schematics
D������������ ���� I��������� �����
C�������� I��������� ����� �� ���������� ���� �� ���� ���� ����������
– I��� T�� ����������
– ������� ���������
– ����� ������ ��� �����������
U���� I��������� �������� ��� �� ����� ��������������
– �������� �������
– checking OPC’s– �������� �������� �����������
M���� ������� ��� �� ��� ����������� �� �� ���� �������� �� ��� ���� ������
���� �� ����� ������ ���� �������� ���������
June 2011 SmartPlant Engineering & Schematics
D������������ ���� I��������� �����
I���������� �� ������������� ���� ��������� ������
– SP E������� � D����������
����� ������� ������������ �� �������� ��� ��������� ������ �� ��������
I���������� ������ OMV D������������ D����������� ��� I��������� �����
����������
– ��� ������� ��������
– ����� ��������������
– ������� R�������� D��� B��� �� ����� ���� ���� �������
– ������� ���������� �� ������ ������������� ��� ����������� �� I��������� �����
June 2011 SmartPlant Engineering & Schematics
W������ ���� �������� ��������
P��������� R������� ����������� ��� 2010�2015�
– investment program of 750�000�000 EUR �� �������� P��������� �� ��� �� ��� ���� ���������
������� �� ��� �������� ���������
P������� ���� �� � ����� �������� ����
Working for projects with Intergraph tools – ����������
own set-up’sD����� G����� ��� ��� �������
– SPPID� � ������� ��������� ��������
� ����� ��������� ���������
� ������� ���������
– PDS� � OMV P����� PDS P������
– RDB� � �������� ���� ������� ���� ����� ��� PDS� SP I��������� ��� SP 3D
– SP ����������
� ������ �� �� ���� ��� ����������
June 2011 SmartPlant Engineering & Schematics
B������� ��� �� ������� ���� I��������� �����
A� ����� ������������� ���� ������� ������ �������� ������
D�������� ��������� ����� ���������� ������ ��� ������
I��������� ����������� ��� ��������� �������������
U���� ������ �� �� ����� ���� �� ��� �������
P����� ���� ��� ������������ �������� ����������� �����
S����� ��������� ��������� �� ��������� ������� ���������
�������������
S������ �� ��������� ������ ����� ��� ��������
June 2011 SmartPlant Engineering & Schematics
N��� ����� ��� ������ �����������
C������� ������� ���� �������� �� ��� ������
C������� ������ ��� I��������� ����� ���� �� �������
G���� ��� S����P���� 3D� ��������� ���� ��������� �� ��� PDS
D��������� �� �� ����� ���� ������������� ������ ��� ������
P�������� ������ ��� ������������ ��� ������ ����� �� ���
������������� ������
June 2011 SmartPlant Engineering & SchematicsSmartPlant Engineering & Schematics
ORLEN Projekt SAEPC
June 2011 SmartPlant Engineering & Schematics
Almost 40 years on the market
180 employees
Cooperation with biggest European companies
Entering into EPC market
25
Who is ORLEN Projekt SA ?
June 2011 SmartPlant Engineering & Schematics 26
Who is ORLEN Projekt SA ?
… Since 1998 we have delivered over 2500 projectsfor oil & gas, refinery, chemical, power generation and environment protection industries.
June 2011 SmartPlant Engineering & Schematics
1998 2006 2007 2008 2010 2011
Engineering, Procurement & ConstructionEngineering
General Agreement with Intergraph for software and
services
Co-operation with Intergraph
SPPID & PDS integration
First testswith SPF
June 2011 SmartPlant Engineering & Schematics
SmartPlant 2D main features:
Data centric tools
Rules-driven software
Basic source of technicalinformation for 3D model
Working with P&ID is a realdesigningnot only sketching
Life cycle control system solution from specification to ordering, installation, construction, and operations
29
Why SP Engineering & Schematics
June 2011 SmartPlant Engineering & Schematics
SPP&ID in use:
produce drawings and reports faster and with high quality
holds all process data we need in one place
propagate data to other tools without retyping them
propagate topology of pipelines to 3D
30
SP E&S applications integrated environment
June 2011 SmartPlant Engineering & Schematics
SPP&ID customization:
new attributes for valves, instruments
ItemTag.dll configuration
Templates for dwgs, reports
31
SP E&S applications integrated environment
June 2011 SmartPlant Engineering & Schematics
SPI in use:
produces loop drawings,
generates specifications of instruments and cables
stores data for junction boxes
propagates list of instruments and their dimensions to 3D
32
SP E&S applications integrated environment
June 2011 SmartPlant Engineering & Schematics 33
SP E&S applications integrated environment
Enhanced
Smart Loop
SPI Instrument Index
JB Layout Cable Schedules
Calculations
Spec Sheet
Process Data
June 2011 SmartPlant Engineering & Schematics
SP E&S applications integrated environment
34
Piping spec remote access
SPE publish/retrieve
SPI – DDP
Calculation of wall thickness, corrosion allowance, etc.Data import also for small none integrated projects
June 2011 SmartPlant Engineering & Schematics
Integrated SPE environment is more effective
One input data – then only reuse
It is faster to publish/retrieve versus exchange of paper documents between departments
No problem with version of dwgs, data –the latest have been just published
Rule-based designing with real influence for 3D model
Easy upgrade to the newest product version of 2D applications
35
Benefits
June 2011 SmartPlant Engineering & SchematicsSmartPlant Engineering & Schematics
ECM BrazilEPC Mining
ABOUT ECM
• ECM is a Brazilian engineering company, founded in 1984
• ECM’s core business is Mineral Industry
• 600 professionals
ECM’s CORE BUSINESS
Mineral processing plants
Pellet plants
Ore handling, stockyards and on shore port facilities
Pipelines & pumping stations
Hydro-metallurgical plants
ITABIRITOS CONCEIÇÃO – VALE, 2008-2012
Itabira / MG – Brazil
12 million t/year of pellet feed from low grade compact ore
Greenfield
U$ 1 billion investment
Under construction
MAJOR PROJECTS
ADEQUAÇÃO DE CONCEIÇÃO AO ROM de 2014 – VALE, 2010-2014
Itabira / MG - Brazil
19.4 million t/year of sinter e pellet feed
Brownfield
U$ 550 million investment
Under detailed engineering
MAJOR PROJECTS
CLIENT’S NEEDS AT PROJECT’S IMPLEMENTATION
• Performance assurance.
• Safety during construction and operation.
• Compliance to CAPEX and schedule.
• Constructability and maintainability assurance.
• Effective bulk materials control.
• Effective physical and financial progress control.
THE BENEFIT OF ENGINEERING & SCHEMATICS
Better inter and multi-disciplinary information
management and control during all stages of the design –
CONSISTENCY
• Less re-work
• Shorter engineering schedule
• Lower engineering cost due to productivity increase
THE USE OF SPPID TO IMPROVE ENGINEERING RESULTS
CONCEPT DEFINITION OF ALL THE OPERATIONS
AND SYSTEMS
GENERATION OF INFORMATION TO BE DIRECTLY USED BY
OTHER DISCIPLINES –
ELECTRICAL & INSTRUMENTATION
MECHANICAL & PIPING
MINERAL PROCESS & UTILITIES
SPPID
• PFD´s
• LEM (Mechanical Equipment List)
• P & ID´s
• List of lines
THE USE OF SPEL TO IMPROVE ENGINEERING RESULTS
GENERATION OF INFORMATION TO
BE USED BY OTHER
DISCIPLINES / PHASES
INSTRUMENTATION
ELECTRICAL
(SP3D – detailed engineering)
ELECTRICAL
SPEL
• single line diagrams
• power demand calculation
• data sheets
• equipment list
• cables list
Input from SPPIDLEM (MOTORS RATING)
Input from ELECTRICALDESIGN CRITERIA
THE USE OF SPI TO IMPROVE ENGINEERING RESULTS
GENERATION OF INFORMATION TO
BE USED BY OTHER DISCIPLINES /
PHASES
INSTRUMENTATION
(SP3D – detailed engineering)
INSTRUMENTATION
SPI
• basic engineering:
instrument list &
instruments data sheets
• detailed engineering:
instrument lists,
cables lists,
I/O list,
interconnection diagrams
Input from SPPID
THE USE OF SPI TO IMPROVE ENGINEERING RESULTS
MORE RELIABLE INFORMATION TRANSMISSION BETWEEN DISCIPLINES “ON LINE” UPDATE
ELIMINATION OF REPETITIVE TASKS AT THE DEVELOPMENT OF INSTRUMENT LISTS (GENERAL AND SPECIFIC PROPERTIES) ERRORS
MINIMIZATION
EXPRESSIVE TIME REDUCTION FOR DELIVERABLES EXECUTION
CHALLENGES
TO IMPROVE SOLUTION TO DELIVER INTERCONNECTION DIAGRAMS AS PER LOCAL ENGINEERING AND CONSTRUCTION PRACTICES
TO DEVELOP SOLUTION TO ALLOW “COPY & PASTE” OFTYPICAL INTERCONNECTING DIAGRAM
AUTOMATION PROJECTS
FOURTH PELLET PLANT PROJECT – SAMARCO, BASIC & DETAILED ENGINEERING
610 mechanical equipment
600 lines
50 MW
4,900 instruments
ITMS – MINA DO PICO –VALE, BASIC ENGINEERING
1,178 mechanical equipment
1,900 lines
140 MW
6,600 instruments
AUTOMATION PROJECTS
June 2011 SmartPlant Engineering & Schematics
Conclusion
Benefits for EPC and OwnersProven on Projects and in OperationsFit different business modelsSP Engineering & Schematic used and driven by the users