Upload
unikarta
View
0
Download
0
Embed Size (px)
Citation preview
FAKULTAS TEKNIK
UNIVERSITAS KUTAI KARTANEGARA
TENGGARONG (KAL-TIM)
Volume 2 (No. 6) Juni 2009
DAFTAR ISI
Halaman
Studi RUP (Recommendation For User’s Profit)
Ibnu Hasyim................................................................................................. 1
Potensi Batubara Berdasarkan Kondisi Geologi Daerah Pondok Labu
Kabupaten Kutai Kartanegara, Kalimantan Timur
Sujiman........................................................................................................ 10
Penanganan Areal Bekas Penambangan Koperasi Batubara
Tri Budi Amperadi........................................................................................ 22
Study Laju Penetrasi Dalam Pembuatan Lubang Ledak Di PT. Cipta
Kridatama Tenggarong
Akhmad Rifandy………………………………………………………………….... 35
Analisis Pencemaran Air Permukaan Dan Pengendalian Polutan
Air Asam Tambang Pada Penambangan Batubara
Diyah Ayu Purwaningsih……………………………………………......... 44
ISSN 1978-0672
JURNAL FAKULTAS TEKNIK UNIKARTA
Journal Published by Unikarta Technic Faculty
Pelindung : Rektor Universitas Kutai Kartanegara
(Prof. Dr. H. M. Aswin, MM)
: Dekan Fakultas Teknik Universitas Kutai Kartanegara
(Ir. Tri Budi Amperadi, MT)
Pengarah : Dr. Ir. Sujiman, MT
Ketua Dewan Redaksi : Akhmad Rifandy, ST., MT
Anggota Dewan Redaksi : Ir. Ibnu Hasyim, MT
Triono, ST, MT
Mulyono Dwiantoro, ST., MT
Tata Usaha dan Sirkulasi : Diyah Ayu Purwaningsih, ST., MT
Dwi Yoga Sapto Hadi, A.Md
Inan Fahrudin, A.Md
Sundek Hariyadi, A.Md
Alamat Redaksi : Fakultas Teknik Universitas Kutai Kartanegara
Jl. Gunung Kombeng No. 27 Tenggarong, Kalimantan
Timur. P.O Box 133. Telp/ Fax (0541) 664007
JGP (Jurnal Geologi Pertambangan) merupakan media komunikasi ilmiah yang
digunakan untuk menyampaikan informasi ilmiah dari hasil penelitian dan hasil
tulisan konseptual/ pikiran kritis oleh civitas akademika Universitas Kutai
Kartanegara, para alumnus, dan para pembaca yang berminat menulis tulisan
yang berhubungan dengan ilmu-ilmu keteknikan geologi dan pertambangan.
JGP diterbitkan dua volume dalam setahun, yaitu bulan (Januari dan Juni).
Redaksi menerima naskah tulisan yang belum pernah diterbitkan pada jurnal
lain, baik dalam maupun luar negeri. Penyunting berhak mengubah redaksional,
dan sistematika penulisan, tanpa mengubah makna isi naskah. Tulisan akan
dimuat bila mengikuti pedoman penulisan naskah dan gaya selingkung JGP
sebagaimana tercantum pada sampul belakang.
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
1
JGP (Jurnal Geologi Pertambangan)
JURNAL ILMU-ILMU GEOLOGI PERTAMBANGAN
Dari Redaksi
Pembaca yang kami hormati,
Puji syukur kami panjatkan kehadirat Tuhan Y.M.E karena dengan
limpahan rahmat dan karunia-Nya JGP (Jurnal Geologi Pertambangan) Volume
2 (No. 6) Juni 2009 dapat hadir dihadapan pembaca. JGP menyajikan tulisan hasil
penelitian dan konseptual (pikiran kritis) yang berhubungan dengan bidang ilmu-
ilmu geologi-pertambangan.
Nomor kali ini JGP memuat tulisan mengenai studi RUP
(Recommendation for User’s Profit), Potensi Batubara Berdasarkan Kondisi
Geologi Daerah Pondok Labu Kabupaten Kutai Kartanegara, Kalimantan Timur,
Penanganan Areal Bekas Penambangan Koperasi Batubara, Study Laju Penetrasi
Dalam Pembuatan Lubang Ledak di PT. Cipta Kridatama Tenggarong, dan
Analisis Pencemaran Air Permukaan dan Pengendalian Polutan Air Asam
Tambang Pada Penambangan Batubara.
Semoga berguna dan bermanfaat.
Tenggarong, Juni 2009
RedaksiRedaksiRedaksiRedaksi
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
2
STUDI RUP (RECOMMENDATION FOR USER’S PROFIT)
Oleh :
Ibnu Hasyim1)`
ABSTRAK
RUP adalah Recommendation for User’s Profit,yang artinya suatu anjuran
atau saran perbaikan terhadap aktifitas kerja yang berhubungan dengan pengguna
atau pemakai alattepatnya untuk meningkatkan effisiensi kerja dengan melakukan
pengamatan pengamatan langsung. Sebagai tujuan untuk menekan waktu edar unit
yang berproduksi dengan cara mereduce.
Sebagai hasil melakukan langkah perbaikan dengan mengacu parameter
parameter, sehingga waktu edar ( Cycle time ) akan berkurang dan productivity
akan naik.
Kata kunci : Me-reduce, Cycle time turun, Productivity naik
PENDAHULUAN
Dengan disusunnya RUP ( Recommendation for User’s Profit )
memberikan kontribusi atau saran perbaikan terhadap kinerja operasional,
khususnya pekerja tambang ( produksi )karena yang berhubungan langsung
dengan pemakai alat atau departemen lainnya yang terkait.
Maksud dan tujuan dari study RUP ( Recommendation for User’s Profit )
adalah membuat evaluasi dan analisis dari efisiensi kerja peralatan sehingga
diperoleh rekomendasi dan saran perbaikan ( Out Put ) sehingga ini dapat
memperbaiki kinerja para pengawas yang berada dilapangan berdasarkan
parameter yang dianjurkan.
PENGAMATAN LAPANGAN
Peralatan pengambilan Data :
- Stop Watch 4 ( empat ) pcs
- Alat Ukur Theodolit untuk membuat :
- Gambar situasi tambang
- Grade jalan/elevasi
- Jarak
Dll.
- Meteran ( untuk mengukur lebar jalan )
1) Dosen Fakultas Teknik Universitas Kutai Kartanegara Tenggarong
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
3
Team Pengamatan terdiri :
- 1 ( satu ) team leader
- 5 ( lima ) orang memegang stop watch
- 3 ( tiga ) orang mengukur peta situasi
TAHAPAN PENYUSUNAN STUDY :
1. Pengambilan data cycle time dilapangan per Fleet
( didukung dengan alat ukur theodolit )
2. Processing ( pengolahan data )meliputi :
- Evaluasi
- Analisis
3. Out Put :
- Saran perbaikan yang berupa rekomendasi bagi
pengguna jalan.
- Membuat parameter yang dijadikan acuan perencanaan
( SOP : standart operation prosedur ).
PROSES PENGAMBILAN DATA
I. Data diambil dari cycle time Dump Truck
1. Fleet I terdiri :
Alat Muat Type Hitachi EX 1100-01
Alat Hauling : - Volvo VA 35004
- Volvo VA 35003
- Volvo VA 35001
Grade jalan : 1,7 %
Jarak : 195 meter
Lebar jalan : 15 meter
Jenis material : Mud ( tanah loose )
2. Fleet II terdiri :
Alat Muat Type Hitachi EX 1100-01
Alat Hauling : - Volvo VA 35004
- Euclid EU 35001
Grade jalan : 1,7 %
Jarak : 195 meter
Lebar jalan : 16 meter
Jenis material : Mud ( tanah loose )
3. Fleet III terdiri :
Alat Muat Type Catterpilar CE 375
Alat Hauling : - Euclid EU 35004
- Euclid EU 35006
Grade jalan : 9,7 %
Jarak : 347 meter
Lebar jalan : 15 meter
Jenis material : Loading Rippingan
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
4
4. Fleet IV terdiri :
Alat Muat Type Catterpilar CE 375
Alat Hauling : - Euclid EU 35001
- Euclid EU 35004
- Euclid EU 35006
Grade jalan : 10,1 %
Jarak : 233 meter
Lebar jalan : 15 meter
Jenis material : Loading stock
PROSES PRHITUNGAN DATA
1. Unsur Cycle time alat hauling
a. Wait ( waktu tunggu diloading point )
b. D/T set ( waktu maneuver )
c. Wait ( waktu tunggu mundur diloading point
d. Load ( waktu isi )
e. Haul ( angkut isi )
f. Wait ( waktu tunggu akan mundur di disposal )
g. Turn ( Waktu mundur di disposal )
h. Wait ( waktu tunggu akan dumping 0
i. Dump ( waktu dumping )
j. Return ( waktu kembali kosong )
2. Hasil perhitungan actual
Tabel 1. Perhitungan actual
Desc FLEET I FLEET II
Alat Load EX 1100 EX 1100
Alat Haul VA35004 VA35003 VA35001 VA35004 EU35001
Eff. Kerja % 85.5 81.7 91.4 77.6 77.2
Productivity 180.5 159.6 174.2 145.8 120.8
Grade Jln % 1.7 1.7 1.7 1.7 1.7
Jarak 195 195 195 195 195
Lebar Jln 15 15 15 16 16
Jenis material Mud Mud Mud Mud Mud
FLEET III FLEET IV
CE 375 CE 375
EU35004 EU35006 EU35001 EU35004 EU35006
90.3 92.5 93.3 93.8 84.3
183.1 183.5 188.9 190 156.6
9.7 9.7 10.7 10.7 10.7
347 347 233 233 233
15 15 15 15 15
Ripping Ripping stock stock stock
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
5
3. Perhitungan setelah dilakukan Reduce terhadap :
a. Pra Loading ( waiting ) sebesar 50 %
b. Dumping sebesar 75 %
c. Return sebesar 70 %
Desc FLEET I FLEET II
Alat Load EX 1100 EX 1100
Alat Haul VA35004 VA35003 VA35001 rata-rata VA35004 EU35001
rata-
rata
Prod'ty actual 180.5 159.6 174.2 171.4 145.8 120.8 133.3
Pra Load (50%) 192.6 172.8 180.8 182.1 162.8 134.9 148.9
Dumping(75
%) 185.9 162 179.5 175.8 148.5 123.3 135.9
Returm ( 70 %
) 194 175.2 190.1 186.4 154.6 129.8 142.2
Desc FLEET III FLEET IV
Alat Load CE 375 CE 375
Alat Haul EU35004 EU35006 rata-rata EU35001 EU35004 EU35006
rata-
rata
Prod'ty actual 183.1 183.5 183.3 188.9 190 156.6 178.5
Pra Load (50%) 191.4 190.1 190.8 193.8 194 166.8 184.9
Dumping(75
%) 186.5 187.7 187.1 192.2 195.1 158.3 181.9
Returm ( 70 %
) 197.7 199.5 198.6 211.3 211.2 177.8 200.1
ANALISIS DAN EVALUASI
1. Untuk meningkatkan effisiensi kerja, hal-hal yang perlu ditekan ( di reduce )
terhadap
a. Pra Loading ( Waktu tunggu di loading point) sebesar 50 %, berarti bisa
menaikkan productiviy sebesar
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
6
Fleet I
UNIT ACTUAL Praloading Kenaikan
50% %
VA35004 180.5 192.6 6.7
VA35003 159.6 172.8 8.2
VA35001 174.2 180.8 3.7
TOTAL 514.3 546.2 6.2
Fleet II
UNIT ACTUAL Praloading Kenaikan
50% %
VA35004 145.8 162.8 11.6
EU35001 120.8 134.9 11.6
TOTAL 266.6 297.7 11.6
Fleet III
UNIT ACTUAL Praloading Kenaikan
50% %
EU35004 183.1 191.4 4.5
EU35006 183.5 190.1 3.5
TOTAL 366.6 381.5 4
Fleet IV
UNIT ACTUAL Praloading Kenaikan
50% %
EU35001 188.9 193.8 2.5
EU35004 190 194 2.1
EU35006 156.6 166.8 6.5
TOTAL 535.5 554.6 3.5
Saran Perbaikan :
Mengurangi cycle time di Praloading untuk meningkatkan
productivity dengan cara :
a. Memperbaiki front loading point
b. Memperlebar front loading point
c. Posisi Dump Truck siap mundur
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
7
b. Dumping ( Waktu dumping di disposal ) direduce 75 %
berarti menaikkan productivity sebesar :
Fleet I
UNIT ACTUAL Dumping Kenaikan
75% %
VA35004 180.5 185.9 2.9
VA35003 159.6 162 1.5
VA35001 174.2 179.5 3.0
TOTAL 514.3 527.4 2.5
Fleet II
UNIT ACTUAL Dumping Kenaikan
75% %
VA35004 145.8 148.5 1.8
EU35001 120.8 123.3 2.1
TOTAL 266.6 271.8 1.9
Fleet III
UNIT ACTUAL Dumping Kenaikan
75% %
EU35004 183.1 186.5 1.8
EU35006 183.5 187.7 2.3
TOTAL 366.6 374.2 2.1
Fleet IV
UNIT ACTUAL Dumping Kenaikan
75% %
EU35001 188.9 192.2 1.7
EU35004 190 195.1 2.7
EU35006 156.6 158.3 1.1
TOTAL 535.5 545.6 1.9
Saran Perbaikan :
Mengurangi cycle time Dumping dan untuk meningkatkan
productivity dengan cara :
a. Memperbaiki kondisi disposal
b. Lebar disposal sesuai dengan unit yang dumping
c. Drainage disposal jelas arah alirannya
d. Posisi maneuver terarah
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
8
c. Return ( Waktu kembali kosong ) direduce 75 %
berarti menaikkan productivity sebesar :
Fleet I
UNIT ACTUAL Return Kenaikan
70% %
VA35004 180.5 194 7.4
VA35003 159.6 175.2 9,7
VA35001 174.2 190.1 9.1
TOTAL 514.3 559.3 8.7
Fleet II
UNIT ACTUAL Return Kenaikan
70% %
VA35004 145.8 154.6 6.0
EU35001 120.8 129.8 7.4
TOTAL 266.6 284.4 6.7
Fleet III
UNIT ACTUAL Return Kenaikan
70% %
EU35004 183.1 107.7 7.9
EU35006 183.5 199.5 8.7
TOTAL 366.6 397.2 8.3
Fleet IV
UNIT ACTUAL Return Kenaikan
70% %
EU35001 188.9 211.3 11.8
EU35004 190 211.2 11.1
EU35006 156.6 177.8 13.5
TOTAL 535.5 600.3 12.1
Saran Perbaikan :
Mengurangi cycle time Return dan untuk meningkatkan
productivity dengan cara :
a. Memperbaiki kondisi jalan
b. Lebar jalan minimal 15 meter
c. Drainage air harus jelas
d. Grade jalan < 7 %
e. Gelombang jalan dengan diameter 1 meter tidak lebih 10 cm
f. Belokan < 45 derajat
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
9
KESIMPULAN
Dari kajian tersebut direkomendasikan/disarankan :
Untuk meningkatkan Productivity unit dengan menaikkan effisiensi kerja dengan
cara :
a. Menekan waktu ( me-reduce ) Praloading sebesar 50 % maka akan diperoleh
kenaikan productivity rata-rata sebesar : 6,20 % dari productivity actual.
b. Menekan waktu ( me-reduce 75 % ) Dumping sebesar 25 % maka akan
diperoleh kenaikan productivity rata-rata sebesar : 2,10 % dari productivity
actual.
c. Menekan waktu ( me-reduce 75 % ) Return sebesar 25 % maka akan diperoleh
kenaikan productivity rata-rata sebesar : 8,95 % dari productivity actual.
Seandainya kita bisa menekan waktu ke tiga-tiganya ( Praloading, Dumping
dan Return ) maka kita akan mengalami kenaikan sebesar 17,25 % dari
productivity actual.
Mudah-mudahan dapat bermanfaat bagi kita semua.
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
10
DAFTAR PUSTAKA
Budiraharja, Dr. Ir.,” Falsafah Perencanaan Tambang ’’, Bandung, 2000.
CATERPILLAR performance Handbook Edisi 28., Dipakai sebagai acuan
dalam “Perhitungan unit alat berat” yang digunakan
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
11
PEDOMAN PENULISAN
JGP (Jurnal Geologi Pertambangan) diterbitkan oleh Fakultas Teknik
Universitas Kutai Kartanegara yang memuat tulisan hasil-hasil penelitian dan
buah hasil kritis (konseptual).
− Bahasa.
Naskah tertulis dalam bahasa Indonesia atau bahasa Inggris yang
baik dan baku. Penggunaan istilah baru dalam bahasa Indonesia sebaiknya
mengikuti pedoman pembinaan bahasa atau kamus istilah lainnya.
− Bentuk Naskah.
Naskah diketik (print out) komputer dengan kertas kuarto dan
diketik 1 spasi, tipe huruf Times New Roman, Font 12. Batas pinggir kiri 4
cm, kanan 3 cm, atas 4 cm dan bawah 3 cm. Naskah diserahkan 1 eksemplar
beserta copy disket dengan program olah kata Microsoft Word.
− Isi Naskah.
Naskah disusun menurut urutan sebagai berikut :
− Judul Tulisan (berbahasa Indonesia atau bahasa Inggris)
− Nama Penulis (bila lebih dari satu orang ditulis nama secara
berurutan sesuai dengan kode etik penulisan).
− Abstrak (abstract, key word, dan instansi asal penulis dalam bentuk
catatan kaki).
− Isi tulisan mencangkup : Pendahuluan (latar belakang, rumusan
masalah dan tujuan penelitian), metodologi penelitian (bila naskah
hasil penelitian), hasil dan pembahasan, kesimpulan dan saran, dan
daftar pustaka.
− Panjang naskah tidak lebih dari 13 halaman termasuk lampiran
jika ada.
− Tabel dan Gambar.
Judul tabel dituliskan di atas tabel dan judul gambar dituliskan di
bawah gambar. Setiap tabel dan gambar diberi nomor urut dengan angka
arab (1, 2, 3, …….. dst)
− Daftar Pustaka.
Penulisan daftar pustaka disusun berdasarkan abjad nama penulis
yang diketik dengan jarak satu spasi, seangkan diantara dua pustaka
berjarak dua spasi.
JGP (Jurnal Geologi Pertambangan)
Volume 2 (No. 6) Juni 2009
12
JURNAL GEOLOGI PERTAMBANGAN
JJuurrnnaall GGeeoollooggii PPeerrttaammbbaannggaann aaddaallaahh jjuurrnnaall
yyaanngg mmeemmuuaatt ttuulliissaann--ttuulliissaann iillmmiiaahh tteennttaanngg
iillmmuu--iillmmuu GGeeoollooggii mmaauuppuunn PPeerrttaammbbaannggaann
hhaassiill ddaarrii ppeenneelliittiiaann mmaauuppuunn kkoonnsseeppttuuaall
yyaanngg ddiitteerrbbiittkkaann oolleehh FFaakkuullttaass TTeekknniikk
UUnniikkaarrttaa TTeennggggaarroonngg