25
Page 1 t F.No. PD(SPDI-25t2016-17 Dated 03.03.2017 PLANNING DEPATMENT (STATE PLAN DtVtStON) GOVERNMENT OF ARUNACHAL PRADESH Revised Estimate, 2016 -17 Name of the Department: (Rs. ln lakh) Sl No. Head of Development ADA, 20't6-17 by the SDC RE, 2016-17 Remarks 2 3 4 5 Developmental proiects/scheme (a) Roads & Bridqes 1 C/o ltanaqar-Jote road (24.00 km) 1200.00 1200.0c 2 Jullv road 1300.00 1300.0c 3 C/o Bage -Tinali - RGU road 650.00 650.0c 4 C/o Khola Camp Tinali - Doimukh- Gumto Check Post road 800.00 800.0c 5 C/o Subansiri Hotel- Panchali BSI road (5.20 km) 280.00 280.0c 6 C/o bridqe at Chandra Naqar 100.00 100.0c 7 Maintenance of district roads @ Rs. 200.00 lakh each excludinq Papum Pare 3800.00 3800.0c 8 Hiqhwav maintenance 800.00 800.0c I lmprovement of road from Arun Subansiri Hotel to Donyi Polo School 400.00 400.0c 10 Construction of road from Pattar Gao to Manna ll (3 km) 200.00 200.0c 11 Road Safetv 100.00 100.00 12 C/o Link road from 5.00 Km point of Chowkham-Wakro road to Tiyanq river via Coconut oarden 100.00 100.0c 13 lmprovement of Wakro Townshio road (5.00 Km) 150.00 150.0c 14 C/o road from NH-52 to Krishi Vigyan Kendra at Momong under Chowkham circle 200.00 200.0c 15 Road from Bhodra chuk to Kharia Chuk (0.70 Km) SH:GSB, WBM-Il & RCC culvert 1 m span 3 nos. 40.00 40.0c 16 Road from Rangali beel to Raja beel (5.00 Km) SH: EA/V & RCC Slab Culvert 1 mtr span-10 nos 175.00 175.0C 17 C/o Village link road from NH-52 to Kongma Kham model village (9.00 Km) SH: Earth work and Culvert and WBM 250.0c 250.0c '18 C/o Road from Lathao NH-52 to Lal Pahar Meditation Centre (7.00 Km) SH:WBM-I and Culvert 150.00 150.00 19 C/o road and bridqe at Forest colonv damsite Naharlaqun 60.00 60.00 20 Approach road Abotani colonv 70.00 70.00 21 Cio Special repair and renovation lnternal road of Ward no 16 P&C Sector ltanaoar 100.00 100.00 22 C/o Cement concrete road from CM bungalow to Division-lV PWD road (2.5 Km) 200.00 200.00 23 C/o Cement concrete road from CM bungalow no 17 upto Nabam Taqi's residential complex (1.5 Km) 100.00 100.00 24 C/o RCC Bridge over Namchik river to connect Hetlong villaoe 75.00 75.00 25 C/o CC road from Damsite Bailey Bridge point to Hoching colonv at Damsite Naharlaoun 78.00 78.00 26 Widening and improvement of Renuk circle HQ road, Rima Putok CO HQ roads. Lonotoi Lvnook CO HQ road 75.00 75.00 27 C/o road from 8.00 Km point PMGSY road Nere village to proposed site of CO hq and CD block at Debeyer (2.00 Km) 50.00 50.00 28 C/o road from Ferom 12 Km point of PMGSY road Seba village to tourist rafting centre at Papu river (1.00 Km) Stage- I 25.00 25.00 29 C/o Rinq road from EAC Hq"Bana , East Kamenq district 50.00 50.00 30 C/o Steel bridge in between Pakoti to Loffa village over Pakoti river 70.00 70.00 ) Einector {State Govt. of A.P Itanagar

Revised Estimate, 2016 - Arunachal Planning

Embed Size (px)

Citation preview

Page 1

t

F.No. PD(SPDI-25t2016-17Dated 03.03.2017

PLANNING DEPATMENT(STATE PLAN DtVtStON)

GOVERNMENT OF ARUNACHAL PRADESHRevised Estimate, 2016 -17

Name of the Department:(Rs. ln lakh)

Sl No. Head of Development ADA,20't6-17 bythe SDC

RE,2016-17

Remarks

2 3 4 5Developmental proiects/scheme

(a) Roads & Bridqes1 C/o ltanaqar-Jote road (24.00 km) 1200.00 1200.0c2 Jullv road 1300.00 1300.0c3 C/o Bage -Tinali - RGU road 650.00 650.0c4 C/o Khola Camp Tinali - Doimukh- Gumto Check Post road 800.00 800.0c

5 C/o Subansiri Hotel- Panchali BSI road (5.20 km) 280.00 280.0c6 C/o bridqe at Chandra Naqar 100.00 100.0c7 Maintenance of district roads @ Rs. 200.00 lakh each

excludinq Papum Pare3800.00 3800.0c

8 Hiqhwav maintenance 800.00 800.0cI lmprovement of road from Arun Subansiri Hotel to Donyi

Polo School400.00 400.0c

10 Construction of road from Pattar Gao to Manna ll (3 km) 200.00 200.0c11 Road Safetv 100.00 100.0012 C/o Link road from 5.00 Km point of Chowkham-Wakro road

to Tiyanq river via Coconut oarden100.00 100.0c

13 lmprovement of Wakro Townshio road (5.00 Km) 150.00 150.0c14 C/o road from NH-52 to Krishi Vigyan Kendra at Momong

under Chowkham circle200.00 200.0c

15 Road from Bhodra chuk to Kharia Chuk (0.70 Km) SH:GSB,WBM-Il & RCC culvert 1 m span 3 nos.

40.00 40.0c

16 Road from Rangali beel to Raja beel (5.00 Km) SH: EA/V &RCC Slab Culvert 1 mtr span-10 nos

175.00 175.0C

17 C/o Village link road from NH-52 to Kongma Kham modelvillage (9.00 Km) SH: Earth work and Culvert and WBM

250.0c 250.0c

'18 C/o Road from Lathao NH-52 to Lal Pahar Meditation Centre(7.00 Km) SH:WBM-I and Culvert

150.00 150.00

19 C/o road and bridqe at Forest colonv damsite Naharlaqun 60.00 60.0020 Approach road Abotani colonv 70.00 70.0021 Cio Special repair and renovation lnternal road of Ward no

16 P&C Sector ltanaoar100.00 100.00

22 C/o Cement concrete road from CM bungalow to Division-lVPWD road (2.5 Km)

200.00 200.00

23 C/o Cement concrete road from CM bungalow no 17 uptoNabam Taqi's residential complex (1.5 Km)

100.00 100.00

24 C/o RCC Bridge over Namchik river to connect Hetlongvillaoe

75.00 75.00

25 C/o CC road from Damsite Bailey Bridge point to Hochingcolonv at Damsite Naharlaoun

78.00 78.00

26 Widening and improvement of Renuk circle HQ road, RimaPutok CO HQ roads. Lonotoi Lvnook CO HQ road

75.00 75.00

27 C/o road from 8.00 Km point PMGSY road Nere village toproposed site of CO hq and CD block at Debeyer (2.00 Km)

50.00 50.00

28 C/o road from Ferom 12 Km point of PMGSY road Sebavillage to tourist rafting centre at Papu river (1.00 Km) Stage-I

25.00 25.00

29 C/o Rinq road from EAC Hq"Bana , East Kamenq district 50.00 50.0030 C/o Steel bridge in between Pakoti to Loffa village over

Pakoti river70.00 70.00

)

Einector {StateGovt. of A.P

Itanagar

ffioa>. (ab Page 2

(Rs. ln lakh)

sNd:

W\ W&Head of Development ADA,

2016-17 bythe SDC

RE,20'16-17

Remarks

1\ tv 2 3 4 5

31 lmprovement of road from NH 415 to VKV school and WRDSE office. ltanaoar

20.00 20.00

32 Special maintenance of road from MJ road to Dharampur 57.50 57.5033 lmprovement & widening of quarry road from Rengo village

to Simang-Siang confluence at Boleng in Siang district(960.00 mtrs)

40.64 40.64

34 C/o Foot wire rope suspension bridges (span 200 mtrs) overriver Pale under Tali circle of Kra Dadi district

142.00 142.00

35 Steel girder bridge, protection wall and approach road frosteel qirder bridqe at Janqda Nallah

41.50 41.50

JO Maintenance of Sod susoension bridqe 10.00 10.0037 Maintenance of Burum susoension bridoe 10.00 10.0038 Maintenance of Chimou suspension bridqe 15.00 15.0039 Maintenance of Soorts Comolex susoension bridqe 15.00 15.0040 Wldening and extension of Perang-Lampang and Panging

township road100.00 100.00

41 Maintenance of sectoral roads in ltanaqar Naharlaqun 1000.00 1000.0042 C/o New Road at Donvi Colony near Ganqa 300.00 300.0043 C/o road from Baptist church bridge point at upper Model

Villaqe at Naharlaqun150.00 150.00

44 Maior maintenance of Tawanq Township road 200.00 200.0045 Land development and construction of road from BRTF road

to newly developed Boori boot Yullo ground at Raga (3 KM)258.00 258.00

46 C/o approach road around Nyapin l.B. in Kurung KumeyDistrict

100.00 100.00

47 C/o road from Deed-Sito PMGSY road to Pulyi Happa (Miya

villaqe150.00 150.00

48 Special maintenance of PWD roads under Jang PWDdivision

100.00 100.00

49 Back cutting, widening and gradient alignment of Shyaro-Janqda road, under Jano PWD division

200.00 200.00

50 lmorovement of Boleno-Sine road in Sianq districl 250.00 250.0051 C/o approach road from Khade Nallah to Jawa (Wesh-ll

villaqe 2 Km100.00 100.00

52 C/o Approach road from Jullang highway to Ashram colony,Itanaoar

150.00 150.00

53 C/o road from Kivit to Konqtin 15.00 0.0054 C/o Suspension bridge over Panyu river in between Nyapin.

Ziro PWD road to Kebriang village & C/o porter track roacfrom Langth-loth village to Malu village via Guha, Dolo ancGrrnnep rrillrne r rnder Nrranin

45.00 45.00

55 Strengthening of road from Bomparong to Yinang village(Senoe)

15.00 15.00

56 Construction & widening of road with carpeting (approx. 500mtrs) from Pullong bridge point to Borduria CO HQ (5.5 Km)

350 3s0

57 Construction of RCC Retainino Wall at P-Sector 71.11 71.1158 C/o Protection wall at Panchali, ltanagar (SH Storm water

drain. R-wall)200.00 200.00

(o C/o RCC Retainino wall at G-Sector, ltanaqar 15.00 15.0060 C/o Retaining wall at Mowb-ll on way to CRPF camp (Senki

view). ltanaoar100.00 100.00

61 C/o RCC Slab culvert 6.00 m span 1 No including approachroad to 0.150 Km in between Ronalibeel and Bhugamor

25.00 25.00

62 C/o Protection Wall to protect VIP road at NlTl vihar nearenerqv park, ltanaoar (9 m heioht)

100.00 't00.00

63 C/o Storm water drain at Khonsa 10.00 10.0064 C/o RCC wall & drainage system measuring 30 mtrs at Doni

Colonv20.00 20.00 I il

*,0##6rcl-,"tGovt. of

Itanagar

4*% Page 3

(Rs. ln lakh)stl{ld

\ *B# Head or DeveroPment ADA,

2016-17 bythe SDC

RE,20'16-17

Remarks

1 Y92 3 4 565 C/o Storm water drainage & RCC wall at ltanagar, Mowb-ll 150.0c 150.00

66 3/o RCC protection wall and storm water drain and Mowb-|,tanaqar near UD Office

150.0c 150.00

67 3/o storm water drainage near Ebenezer School at Pupu-llvillaoe. Naharlaoun

49.0C 49.00

68 3/o RCC slab culvert-6 mtr Span 1 no & 'l mtr span 02 Nos.lnder Sunpura townshio

38.9C 38.90

69 l/o retainino wall at Enoineer colonv Khonsa 70.0c 70.0070 3/o protection wall at Mission Colonv. Khonsa 50.0c 50.0071 3/o road from Motum to Mebo 100.0c 100.0072 l/o drainaqe svstem at Kakoi township 30.0c 30.0073 3/o retaining wall at right bank of Dikrong river, Dikrong

lolonv. Niriulv97.0C 97.00

74 Clearance of pending liabilities in connection with MoneySuit No.18/2014

39.1 6

75 Vlaintenances work at Lanvqvar Hoqu to ADC HQ road 50.00Sub Total : (a 16758.65 16832.81

(b) Housinq1 Special renovation and maintenance of Govt. residential qtrs

under PWD SH: Type-lV 2 nos., Type-lll 18 nos., fype-l|42nos and Type-l 34 Nos. and B/barracks 55 Units at Namsai

200.0c 200.00

2 3/o Hunli and Desali insoection Bunoalow 85.76 85.76e Special renovation of Guard quarter of Bungalow no. 4 Senki

park, ltanaqar15.00 15.00

4 C/o Double storied Residential qtrs for govt staff at ManmaoEAC Headouarter

75.00 75.00

5 Construction of retaining wall to protect Type-ll quarter atGovt Colleoe Yachuli

10.00 10.00

6 Special repair of Govt. qtr no. 18. H Sector ltanaqar 7.00 7.007 C/o retaining wall to protect Govt qtr no. T-llC-91 at Mow-1

Itanaoar7.00 7.00

8 On-qoinq scheme (residential buildinos) 953.62 953.62Sub Total : (bl 13s3.38 1353,38

(c) Public Works1 A.P. Civil Secretariat buildinq (Final lnstallment) 467.00 467.042 Leqislative Assemblv (Final lnstallment) 5700.00 5700.003 Maintenance of Residential and non-residential buildings 2500.00 2500.00

4 On-ooino scheme (non-residential buildinos) 500.00 500.005 C/o water supplv scheme at Konqmukhan villaqe 100.00 100.00o lnstallation of CCTV and Biometric attendance system

for PWD Western Zone100.00 100.0c

7 C/o Communitv plav qround at Anqo-Lamdak 100.00 100.0c8 lmprovement of Children Park at Mahadevpur 32.00 32.0C9 C/o Boundary wall at Sports Complex at Namsai district 150.00 150.0c10 Conference Hall at Circuit house Namsai 60.00 60.0c11 Construction of Rehabilitation centre at Hayuliang in Anjaw

District70.50 70.5C

12 C/o RCC wall consist of Length 250 Mtrs height along theriver near Arunachal Baotist Church Council

50.00 50.0c

13 C/o Boundary wall around Chow Sali Memorial Govt UpperPrimarv School at Sunpura

48.96 48.9€

14 lnfrastructure development at Bolenq and Panqin 150.00 150.0c15 C/o Helipad qround at Taliha HQ (Phase-l) 85.00 85.0C16 C/o Multiouroose Cultural hall (Ph-ll) at Namsai 300.00 300.0c17 C/o SP type Buddhist Temp,le at Mayudia in Lower Dibang

vallev50.00 50.0c

18 lnstallation of CCTV Surveillance system in ArunachalBhawan in Kolkata

9.63 9.6n

a*"IN>,Director (State I

Govt. of A.P.Itanagar

)'

K*+b Page 4

ilffi\o (Rs. ln lakh)

)3Head of Development ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

?dar v 2 3 4 519 C/o Wing wall, protection wall and other ancillary works for

operationalizing the Steel Girder bridge at Jungda Nallah41.50 41.5C

20 Multipurpose community hall at Taliha HQ (Phase-l) 100.00 100.0c21 C/o boundary wall at ADC Office, Chayangtajo under East

Kamenq district100.00 100.0c

22 C/o 5 nos of classrooms for Chow Sali Memorial Govt UpperPrimarv school at Sunoura

5'1.46 51.46

23 C/o Compound wall at Newly Constructed Nirman BhawanPWD near TT Plant O-ooint Tinali ltanaoar

100.00 100.00

24 C/o Security Compound Wall around forest rest house,Nafra

21.OC 21.00

25 C/o boundary wall for various quarters of PWD 75.0C 75.0026 C/o Boundary wall at PWD office, Store cum garage at

Chavano Taio100.0c 100.00

27 Special repair of Arunachal Bhawan at Shillonq 46.0C 46.0028 C/o 2 nos. septic tank for H.S. School at Jeko (SH: 1 No

septic tank for teacher quarter and 01 No. girl and boyshnstel\

1.61 1.61

29 Renovation of Govt. H.S. School at Jeko 4.0c 4.0030 Special repair and renovation of Lohit House at Tezu 5.0c 5.0031 Soecial reoair and renovation of Govt. H.S. School, Tezu 3.0c 3.0032 Special repair and renovation of girls hostel at Govt. H.S.

School.Tezu3.0c 3.00

33 Soecial reoair and renovation of District Hosoital. Tezu 4.0c 4.0034 Special repair and renovation of IGG Colleqe, Tezu 6.2C 6.2035 C/o 4(Four) unit toilet for girls and boys at ALC line Govt.

Primarv School, Tezu6.'1 6.15

36 Renovation of room no.204 & Annual maintenance /repair ofArunachal Bhawan & House at New Delhi

90.0c 90.00

37 C/o Sewa Kendra in APCA ltanaqar 200.0c 200.0038 C/o Circuit House in Bhalukpono 500.0c 500.0039 C/o Circuit House in Aalo 500.0c 500.0040 C/o Parkino lot Jano Market 60.0c 60.0041 C/o Compound wall at Tallang Primary School under Seppa

Circle20.0c 20.00

42 lnfrastructure development of Tajam Nabam Memorial FootBall Ground at Pakke Kessang in East Kameng District/HCI\t!'q Annnr rnccment\

100.0c 100.00

43 C/o Arunivoti centre in Lonqdinq 10.0c 10.0044 Construction of 2 GA ouarter in Wakka 30.0c 30.0045 C/o Communitv hall at Hiia Ziro 150.0c 150.0046 Development of infra at Giidinotko festival ground at

Pasiqhat100.0c 100.00

47 lnfrastructure development at Khonsa 100.0c 100.0048 Cio landing area/dock/pier for boats for recreational/tourism

purposes at Komliqhat at Pasiqhat100.00 100.00

49 Extension of Yid-qa-choszin 100.00 100.0050 lnstallation of lift (final ohase) in Tawano Monasterv 17.OO 17.0051 Protection wall at Khonsa bazaar 7.00 7.0052 Construction of Community Health Centre at Yangfo-l under

ADC Chavanotaio. East Kameno100.00 100.00

53 C/o boundarv cum Compound wall around Lazu lB 100.00 100.0054 C/o store-cum-Enouirv office at l.G.Park ltanaqar 70.00 70.0055 C/o retaining to protect Govt. building near Dr. Wangchuck's

residence at Bomdila2€.00 20.00

56 C/o security compound wall for PWD Division office atBomdila (Sh: Comoound wall lenoth = 169.76 mtr)

14.79 14.79

57 C/o Multipurpose Communitv hall at Lonqdinq 90.00 90.0c58 C/O new school buildino at Gonokhar School 100.00 100.0c59 C/o boundary wall around CHC Rumqong 30.00 30.00

E!rector (StaGovt. of ,

Itanaql

PI an)

rqPs{h Page 5

f-i/ r (Rs. ln lakh)Sl No.

WffiPorDeveroPmentADA,

2016-17 bythe SDC

RE,2016-17

Remarks

1 VlaneaaDr 2 3 4 560 C/o inspeciiffiiFungalow, Residential quarters and approaCh

road at CO HQ Borduria150.00 150.0c

6'l Development of Polo Ground cum Picnic Spot at Mebo 20.0c 20.0c62 C/o Conference hall at Mebo lB 50.0c 50.0063 C/o SchoolAuditorium at GSS Kivit 60.00 60.0064 C/o RCC MIP at Motum 195.00 0.0065 Land protection work at Siku river 50.00 0.0066 Land protection work at Kivit 10.00 0.0067 C/o Conference hall in Sakrin villaqe 25.00 25.0068 C/o Gallery at Bhalukponq General Field 100.00 100.0069 lnfrastructure of Sarok festival qround in Yanqsev, Bana 200.00 200.0070 C/o Communitv centre at Bamenq 25.00 25.0071 C/o Classrooms at Middle School Kadevano 10.00 10.0072 C/o Community hall at Sawa circle of East Kameng District 100.00 100.00

IJ C/o Priest Guest House at Sanglo Putung (Gophur Tinali,Itanaoar)

92.50 92.50

74 lmprovement in TDL Cultural centre in Dirano 90.00 90.0075 C/o Community Hall at Yapak villaqe under Kolorianq 35.00 35.0076 C/o Community hall at Daqam villaqe. Taliha 20 00 20.0c77 C/o Communitv dere Nacho 20.0c 20.0c78 C/o Common staff room for Chow Sali memorial Govt. Upper

Primary School Sunpura16.44 16.44

79 Completion of 8 roomed double stories circuit house withannexed conference hall at Raoa

184.0C 184.00

80 C/o VIP suite with conference hall at Tezu circuit house inLohit district

49.0C 49.00

81 C/o Dormitiry for 10 persons at VIP suite, Tezu under Lohitdistrict

51 .71 51 .71

82 C/o PWD Sub-Division Office buildino at Piou 100.0c 100.0083 Special maintenance/repairing works against official building

Bunqalow no. 5 at ESS Sector. ltanaoar15.0C 15.00

84 Clearance of pending liabilities for Special repairs of roadsfrom ltanagar to Banderdewa (NH-a51) during 2015-16

2600.00

85 Clearance of liabilities against works undertaken at RajBhawan

59.74

86 Calendar Bill for the year 2013-14 in respect of Sri. CCSinooho. former HPS(Finance)

4.81

87 Furnishinq of Block-l of A.P. Civil Secretariat. ltanaqar 100.0c88 C/o Arunachal State Guest House at Guwahati 100.0c89 Renovation of Golden Jubilee Banquet Hall, ltanaqar 100.0c90 Repair & Maintenance of PWD road from Jirdin Tri-junction

to TarsuMobuk (Kombo). West Siano Distt.50.0c

91 Repair & Maintenance of Aalo Township road, West SiangDist

50.0c

92 C/O protection wall between the DDK office and newlyconstructed CC pavement at ltanaoar

38.0C

93 C/O Kuruno River bridoe 200.0c94 C/O office cum Guest House for All Arunachal Pradesh

GaonBurah and GaonBuri at Dobam villaqe, Karsinqsa200.00

95 C/O approach road from SippiSiga PMGSY road to Bida inChetam Circle under U/SubasiriDist

100.00

96 C/O approach road to Abotani colony E Sector to F Sector 100.00

o-7 C/O approach road from helipad to Pudum colony nearmodel villaqe via FSB Naharlaoun

150.00

98 lmprovement of approach road and RCC retaining wall alPWD lB at Lumdanq

100.00

99 Strengthening and widening of road of road NH 22€(Lumdanq to Naraba and Rotewo via Liso)

100.00 ) il(Eirector (State t

(:nvt of A.P,

n

Govt. ot A.

Itanagar

V^oePIfffi-q Page 6

+ (Rs. rn raKn)w Head of DeveloPment ADA,2016-17 bythe SDC

RE,20'16-17

Remarks

1 2 3 4 5

100 lmprcvement of road from circuit house to Old Upper Gompa(Shanti Deva School) Bomdila

100.00

101 C/O conference hall in SDO Office at Sangram in Kurung

kumey

72.2C

102 CIO netipaO at Lanqrh, Nvobia CO HQ Kq1Uru-lg-rngy- 55.0C

103 Land development and protection works for circuit House al

Lanorh. Nvobia CO HQ Kurung kumeY

60.00

104 Repar and mainlenance of Govt Banglow No. 2 at Niti

Vihar

50.00

105 Extension and protection of Geneal ground at Length

Lanqrh, Nvobia CO HQ Kurung kumey

45.00

107 C/O Road from Ralung to Ruksin (4Km) 150.00

108 C/O Ruksin townshiP road 54.00

109 C/O Bilat township road 51.00

110 lmprovement of road from Tezu to Sunpura 200.00

111 C/OfM/all and CC drain near Telephone Exchange inBoleno Township of Sianq district

20.00

112 CIO nruUatt and CC Drain near Dagoria stream (Pahung

vallev) in Bolenq TownshiP

25.00

113 CIO CC Orain for BK Mission road in Boleng Township (Ph-l)(Lenoth 1 Km)

20.0c

114 Clo nCC retainingwallat Polo @ 70.0c

115 CIO Storm water drain near SY Handloom lndustry al

Paounallah. Naharlaqun

80.00

116 C/O Protection wall near SY Handloom lndustry at

Paounallah, Naharlaqun

50.00

117 C/O Dree Festival Ground at Nago Putu Biirii 200.00

118 C/o RCC Land Protection wall at Jamo village 100.00

119 CIO AounOary wall, CC footpath, cc drainage and overall

renovation of carpet weaving Centre, Lumla

30.00

120 C/O Tv-ll Staff ouarter at Carpet weaving centre Lumla 14.00

121 C/O tourist lodqe at Sangti Dirang 100.00

IZZ lCtO RCC retaining wall to protect land at Adi Basti ltanagar 30.00

123-lspectal repair and renovation of Govt quarter under

lLonodino district

100.00

1U TCIO CC pavement, culvert and RCC Retaining wall at Doli

I Koto villaoe. Banderdewa

55.0C

1r5 laTO approach road to Ngudang-l village to New Sagalee

lo.g rm100.00

A6IAO CC step from APEDA Colony to Rigzin Weseling

lmonastery, Bomdila

10.00

tzl lCtO Toilets at St. Xavier's School Buragaon 6.00

128 Fcampus dev of Govt. Hr. Sec School Lumla 250.00

129 lClO RCC & Breast wall to protect New Helipad site Lumla 100.00

130 lMaintenance of roads under Yingkioltg Divisiuon 100.00

@pment of waterfall near Pinjuli at

lBhalukoono. West Kamenq district

70.00

82 lClO approach road to Upper Gai village 100.00

@oad (SH:- Re-alignment at MidPui

lJunction from chainaqe 0.200 to 1.200 Km)

150.00

134 3/O approaCh road to Sagalee Circle SE PWD office

:omolex at Bobia

100.0c

135 C/O road from Pan to Panior bridge point 4.00 Km 100.0c

136 e/o road from Popu-ll Baptist Church to Lower Popu-ll

village, Naharlagun (Sh: CC pavement, CC drain, retaining

wall & Box culvert)

98.00

137 C/O cultural Centre at Khrim.u, Tawang 70.00

138 C/O Parkinq place at Tawang Museum 30.00

139 Dev. Of Children Park at Tawang 20.00 h A

/,,0JDirector (Sta

Govt. of r

Itanaoz

n)

ffis Page 7

3 (Rs. ln lakh)Sl No. \*\ &b yF/ of DeveroPment

\"X''i6lADA,

2016-'17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5140 C/O lB at Kharsaneno 't00.0c

141 C/O Culture Centre at Dharmakano 20.0c142 C/O bridoe near Gvanoono Ani Gomoa 25.0C143 Maintenance of PWD road near Maniushri Area 35.0C144 C/O culture centre at Thonomen. Tawano 30.0c145 C/O 8 Nos meditation centre at Thesoa Culture Centre 60.0c146 C/O Guest House at Thespa. Tawanq 80.0c147 C/O Compound wall, protection wall, retaining wall and

drainage under Seppa township100.0c

148 C/O CC approach road to Govt. Primary School at NanamKhamvano-l villaoe (250 M). Namsai

15.0C

149 Providing special fund for renovation of helipad ground atPaveno circle.

75.0C

150 C/O WRSB over River Pare at ALC Line Sagalee (120 Mtrsoan)

100.0c

151 Mainenance of Sibu bridge under Darak Circle West Siang 80.0c

152 C/O CC steps from Gab village to Primary School under Gabunder Manchal Circle

5.0c

153 C/O CC steps from Lautul village to connect Chiretong underManchal Circle

5.0c

154 C/O cc steos at Zono villaoe under Manchal circle 5.0c155 C/O cc steps from BRTF road to Krowti FS bridge under

Walono circle5.0c

156 C/O drainage system of road from SP Office to ESS Sector,Itanaoar

50.0c

't57 C/O two bus stand at Karbak/Jere under 27 Liromobaconstituencv

10.0c

158 C/O Protection wall at streams/Liromoba/Gemo Tali/ BijiHibu/ Ruvi/ Ashe Tamen/ avil Esko

32.OC

159 C/O cc foot oath at Libu Bene and Sari Likar 12.OC

160 C/O Children park at Dapo Geku and construction of Tourislrecreation centre at Yomcha

15.0C

161 C/O new l;and development and protection works at LekaRijo/ Sumpi/ Mali/ Sibi/ Pimi rao/ moya rijo/ & Yomcha

28.0C

162 C/O football field at Deqi Potom & Povom 20.00163 C/O CC foot path at 15 different villages under Kamba circle 25.00

164 lnfrastructure development of various works of helipad at

Seqi under Gusar circle in upper Subansiri distt100.00

165 Repair and renovation of EE, CD-B's office building atSenkhi Park. ltanaor

50.00

166 lmprovement and re-carpeting of Miao Township road - 1C

Km150.00

167 C/O sector roads of Tezu townshio in Lohit district 50.00168 C/O road from Kharsiangsaz to Dasang Namchang village 200.00

169 C/O road from NH 515 to Tourist Lodge via ADSJ courtcomnlex Pasiohal

100.00

170 C/O Rostrum and gallery at Boori Boot Yullo Ground Raga 150.00

171 C/O Retaining/Breast wall at Boori Boot Yullo Ground, Raga 150.00

172 C/O Priest House at Raqa 30.00173 C/O aoproach road to Nvomsa Gompa at Janq 95.00174 C/o Boundarv wall at Kharsa Communitv hall 100.00175 Development of Lha Soi Ground at Flakshimanq Janq 50.00176 C/O Helioad at Jano 200.00177 Maintenance and protection works of office and staff quarter

at Lhou100.00

n ll

'*t o-

!3irector (StateGovt. of A.P

Itanagar

iePjrrNPage BrdZ-*aat\%)

* (Rs. ln lakh)

W W Head of DeveloPment ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5178 Site development of Guru Padmasambhava at Lumpo 50.00179 C/O Steel bridge over Tessa nallah connecting CO Hq

Borduria and Pullono bridoe ooint100.00

180 C/O communitv hall at Kapu villaoe 40.00181 Maintenance of Yinqkionq township road 50.00182 C/O Retaining walls at various location and re-carpeting ol

Bomdir Maniushri road200.00

183 Maintenance of Dambuk to Nizamqhat road 50.00184 Maintenance of Tezu townshio road 50.00185 Renovation of Dirang township road 100.0c186 C/O one layer of WBM & Carpeting of OKSRT road to

Sheroaon villaoe40.0c

187 Excavation of chureknyu Baw road by 600 mtr, c/o 6 metreculvert, side drains, & providing of one layer of sollingwherever required

60.0c

188 C/O internal road and drainage system of Rupa township 60.0c

189 Carpeting of internal road of Morshing and Kalaktangtownship

50.00

190 C/O communitv hall for students at Denqzi 25.00191 C/O single court badminton hall at Jiqaon 25.00192 C/O Ty-lV quarter for Principal of Govt. Hr. Sec. School

Rupa20.00

193 C/O retaining wall / breast wall on Gacham, Morshing 8Gorbow, Dikshi road

50.00

194 C/O boundary wall around PWD Colony including Store anclB at Charduar, Assam

100.00

195 lmprovement of various roads under Naharlaqun townshipdurinq 2016-1 7

100.0c

196 Maintenance of Manjushri Bomdir & Khrimu road 300.00197 C/o Boundary wall and maintenance of Govt. Secondary

School, at Bhalukoon.25.00

198 Extension of School building at Govt. Middle School atLepanqhuda vlllaqe.

20.00

199 C/o General Ground at Wanohoo Villaoe 25.00200 C/o General qround at CO Hq, Jamiri 25.00201 C/o Staqinq hut at oicnic soot. Tiooi 400202 C/o Boundary wall at Govt. H.S School, Thrinzino 20 0c203 C/o circuit house at Ramda Villaoe 15.0C204 C/o road from 52.30 KM point of Trans High way near Palizi

to Fubonq Ruqro (1.00 km)20.0c

205 mprovement of Circuit House at Jamiri CO Hq 25.00206 C/o Road from main road Jamiri to Circuit House at Jamiri. 17.00

207 C/o CC Drain at Bazaar Line, Lower Bhalukpong back side. 30.00

208 C/o protection wall at lower back side of Bhalukpong Bazaarline.

20.00

209 Maintenance of Nyetchidow Festival Ground at Bhalukpong. 20.00

210 C/o Guest House at Subu 50.00211 lmprovement of approach road to New slite of Govt. College

Bomdila (SH: Widenino-2.0040.00

212 Cio protection owrk for Annexure of Circuit House atBomdila (SH; RANall-30 m(3 mtr.Heiqht))

10.00

213 lmprovemnt of road from BRTF road near Thinley Garrage toPedung Welcome gate near trijunction at CH-1.950 km, NewBomdila

50.00

Govt. of A.P.Itanagar I

45 Page 9

rD (Rs. ln lakh)Sl No.

\F\ gi 'r9or Deveropment

V6\3.":l/-.ZADA,

2016-',17 bythe SDC

RE,2016-'t7

Remarks

I Ngarly 2 3 4 5214 Cio protection work for 3 mtr, Span culverts on both bank of

up/down streams of road from BRTF road near ThinleyGarrage to Pedung Welcome gate near trijunction at Ch-1.950 km, New Bomdila (SH Construction of Boulder Cratedwall-170m)

20.00

215 C/o CC Shoulder of CC road under Bomdila township (

L=3.00km)20.00

216 lmprovement of approach road to upper Sera village fromHotel S. Phono.

20.00

217 C/o Approach road to PWD Annexure of CircuitHouse.(SH:CC Pavement(O 130 km)

20.00

218 C/o RCC wall at CH-0.11 km on approach road from powerhouse to Bomdila main bazar

10.00

219 Cio Protection wall at back side of Nafra Bazar line on leftbank of Bichhom river

50.00

220 C/o Protection and Boundary wall for medical colony atNafra.

30.00

221 Cio Protection wall near PWD gate on Sangji nallah atNafra.

20.00

222 lmprovement of road from Khazlang to Lapusa. (SH: RCCslab culvert-2 Nos

15.00

223 C/o approach road to Assembly ground of green mountschool at Nafra (SH:CC pavement)

10.00

224 C/o approach road from Lower Dzang to Ditchik village atNafra.(SH: Drain and orotection wall)

10.00

225 C/o protection wall of Govt. Middle school at Saddle underNafra circle.

10.00

226 C/o protection wall nachiban village to Ditchik village underNafra circle.

15.00

227 C/o protection wall for EAC office at Nafra fro protection fromBichhom river at downstream.

10.00

228 lmprovement of road from Nafra to Nakhu 30.00229 Providing of furniture items for the o/o Minister Power, i/c

residence70.00

230 Repair and renovation of banqalow No. 17 60.00231 C/O road from VKV School Koloriano to Taioa Ph-l 30.00232 C/O road from Sarli Town to Helioad oround Ph-l 30.00233 C/o WRSB and porter tract at international border areas

under Koloriang, Damin, Parsi Parlo, Paniasang, Sarli andPolosanq administrative Circles Ph-l

50.00

234 Renovation and maintenance of School building ofKoloriang, Damin, Sarli, Parsi-Parlo, Paniasang andPolosanq administrative circles Ph-l

50.00

235 C/O RCC retaining wall near transport colony at polo colonyNaharlaqun

100.00

236 C/O retaining wall (100 Mtr) along Papu Nallah at SijuColonv. Naharlaoun

30.00

237 3/O office building and staff qtr of PWD Division atSinvorianq under Koloriano Ph-l

50.00

238 3/O football qround at Patuk, Parsi Parlo Ph-l 50.00239 C/O retaining wall around agriculture Office & Tourist lodge

at Bomdila50.00

240 l/O boys hostel at Govt. Secondary School, Lazu 40.00241 3/O one VIP suite at Lazu Circuit House 50.00242 3/O CC pavement road & RCC retaining wall at Museum

3olonv ltanaoar30.00

243 Reoair & renovation of airoort Guest House at Guwahati 5.00244 3/o Type-ll staff Quarter at Mahadevpur 15.00245 Special repair and Building fenovation of Staffs Quarter al

Namsaii Mahadevpur/ Chonqkham25.00

A

246 3/o double unit Tvoe-ll Quarter at Namsai 30.00/-1t,I.",\

iEirec tor (Stateiovt. of A.P

tanagar

6ePerfD'\Page '10{s

c6 (Rs. ln lakh)

Sl NdE

n\- "</tan W

Head of DeveloPment ADA,20'16-17 bythe SDC

RE,20'16-17

Remarks

1 2 3 4 5247 C/o Veterinarv Aid Center Buildino Tvoe-ll at Alubari. 45.00248 C/o RCC protection wall(span 30mtrs) Pachali, ltanagar for

current Financial vear 2016-1720.00

249 C/o Road from PMGSY Deed- Sito Road to Pulyi Happa 80.00250 Construction and lmprovement of Approach road Wakhetna

villaoe (1.30KM)70.00

251 lmprovement of road from Seppa to loffa villaoe 12km 100.00252 Restoration of Flood damage work(road from Nitl Vihar Tri-

junction to Mowb-ll at ltanagar, SH R.C.C. Reatining Wall25.00

253 C/o Multipurpose Hall at Mahabodhi Centre Tawang, Teli 50.00

254 C/o Approach road from SSY road to Bobia-ll village 1.5 Km 50.00

255 C/o Boundary Wall at the proposed site for Rev. SilavanaMahathero Vipassana Centere Complex at Nanam villageunder Lathao Circle. Namsai District AP

25.OC

256 Maintenance of road & Bridges under Ziro Division during2009-1 0

50.0c

257 C) C/o retaining wall to protect Papu Hill section connectedto NH 52A

50.0c

258 l/o road from Nirjuli village -ll (B) to Bichum Yogin villageilenqth 1. km

50.0c

259 C/o Strenothenino CC Pavement road Donvi Colonv 50.0c260 C/o road cutting within the Sango Middle School approad

road80.00

261 Cio Approach road from NH-52A to DC office up to Geology& Mining office and C/o drainage system regaridng

80.00

262 Clearance of Pending Liabilities of M/S LBNT Enterprisesunder Doimukh

20.00

263 C/o RCC Protection wall 6 mtrs hight at backside olMinister's Bunqlow no.7 at ESS sector. ltanaoar

15.00

264 Allocation of Fund for 50 mtrs C/o protection wall at damsite,Naharlaoun

45.00

265 C/o approach road and parking place in ADC office a1

Yachuli, Lower Subansiri Dist.40.00

266 Repair and Maintenance of Type-l & Type-ll Quarter's atMOWB-Il, ltanagar (Type-l Qtr. No. 20 & 21 & Type-ll Qtr.No.22. 23.24 &25\

18.00

267 Allocation of Fund for Clearance of Pendino Bills 15.00268 lmprovement of Ruksin township road 50.00269 C/o RCC R/wall on the backside of Bachelor Barrack of Civil

Supply Department at Polo colonv Naharlaqun28.00

270 Sanction of residential building for Buddhist Temple atKinqko(Menokeno Khamoti) villaoe

13.00

271 C/o Drainage system at Kakoi township 100.00272 C/o road from Roing Santipur road to Remgeng village (1

km)15.00

273 C/o approach road in between Bole PMGSY to Rise village 50.00

274 C/o CC Drain for Tabom Kean Shop to EE, PHE Resident,Daooriio

20.00

275 C/o road from 1 km point to Papu Nallah, ltanagar via DonPolo vidya Bhawan Road to Jame Jate Distance 1 km

40.00

276 C/o Renovation of road of A&B Sector under ward No-18Itanaoar ( R.E.) Scheme 2017-18

80.0c

277 Allocation of fund for Repair renovation and Furnishing olGovt. residental Banglow no. 10 at ESS sector, ltanagar

45.0C

n n

Director {State PGovt. of A"P.

Itanagar

ffi Page 1 1

(Rs. ln lakh)Sl No.

w.#of Deveropment ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

2 3 4 5278 C/o RCC retaininq wall at Gohour Tinali 44.OC279 C/o Meditation Hall at Lalpahar Lathao in Namsai District 150.0c

280 C/o Retainino wall at C Sector ltanaoar 50.0c281 C/o Meditation Hall/ Auditorium at Kumari Adivasi Village,

Lekanq Circle50.0c

282 C/o RCC Bridqe at Banvom Stream 150.0c283 C/o road from NH-52 Kankar Nallah road to Model-lV villaoe 50.0c284 C/o Parking place at Annexe MLA Cottage in between block

No. 1, 2 and block no. 9, 10 at ltanaqar50.0c

285 C/o road from Damsite main to Hochang Colony, nearSachi's residence Naharlaoun

30.0c

286 Renovation and Maintenance of Various Road of Pasighat,East Siano dist. AP

200.0c

287 C/o RCC VIP Gallary cum Stage at Gumin Kiin premises,Aalo

30.0c

288 Site development works for burial cum cremation ground atChimou

200.0c

289 C/O link road at back side of Forest Corporation to VKVChimpu (1 .5 Km) Solino. metallino/retainino wall

150.0c

290 Maint./ repair of road from Ziro to Bopi 150.00291 C/o permanent structure at Festival oround. Namoono '150.00

292 Maintenance of Khonsa Township Road 100.00293 RCC Retaininq wall to protect Hill too colonv 100.0c294 C/o Protection Wall near Niktar Tagio Resident at Dony

Colonv. ltanaoar60.00

295 Beautification and Maintenanace of assests of MechukaTownship

400.00

296 lmprovement of Cooperative colony raod at Polo conlonlNaharlaoun

100.00

297 C/o road from NEC Tamen-Dollungmukh road to YallTagam Tea Estate, Tanio village in Dollungmukh, LowerSubansiri

100.00

298 C/o C.C. road at S.R.P.L. Colonv Chandanaoar 100.00299 Construction & Repairing from Guru village to Gensi road 200.00

300 lmprovement of drainage system at E & F Sector,Naharlaoun

100.00

301 Construction of road side drain at G Sector & G Extension,Nahalaoun

50.00

302 C/o CC Steps and RCC Foot Bridoe at Khonsa 15.00303 C/o Working women hostel in H/Kumev District. 100.00304 C/o a 5 rooms Guest house at lndira Gandhi Govt. College,

Tezu25.00

305 C/o rostrum at play qround of lndira qandhi Govt Colleqe 40.00306 C/o RCC boundary wall in Sille-Ovan Police Station 10.00307 Renovation of police barracks at Ruksin Police Station 30.00308 Renovation of road from Ruksin of Noorluino 100.00309 C/o Road from Shiajakhet to Tehipong (1.00 km to 5.50 km) 100.00

310 C/o Road from Hahshe Rusa to Kamkuh Rusa 100.0c311 C/o road from BSI office to Senki Valley Colony under

Municipal Ward No. 748.0C

312 C/o rostrum with sitting gallery and expansion of generalqround at Wakro

30.0c

313 C/o CC footpath & RCC retaining wall at Newly constructed8 Nos. Staffs quarters near Secretary to Governor'sBunoalow at Rai Bhawan. ltanaoar

22.43

314 C/o approach road for permahent campus of JNV at Gumto 40.00A

315 C/o susoension bridoe over river Siooi at Guha villaoe 60.00(>,t^\ rE-^

Director (State PGovt. of A.P.

Ld

Itanagar

N\*

Page 12

W@(Rs. ln lakh)

V Head of Development ADA,2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5316 Repairing and protection work of Qtr. No. 39 Type-lll B

Sector, ltanaqar18.0C

317 Building for Arunachal Pradesh lnformation Commissionnear Old Planninq Office

100.00

318 Clearance of liabilities for Modification of Guset House intofood processing centre of Muskan Welfare Society, RajBhawan

3.26

319 Clearance of liabilities for Tilling of Footpath arouncHorticulture & Agriculture garden and fish pond at RaBhawan

8.30

320 Clearance of liabilities for providing and fixing M.S. Angleiron post with chain link fencing for Secretary, Comptrolleretc. Near Raj Bhawan Guest House, ltanagar

4.18

321 Clearance of liabilities for repair and maintenance of Type-VQtr of Secretary to Governor at Raj Bhawan Complex,Itanaoar

1.1C

322 Repair from Hapoli to Pine Grove (9 km) '100.00323 C/o septic tank MLA cottage No. 1 to 6 & 2 Nos of Guest

room & Garraqe for Cottaqe No.1 at ltanaqar10.00

324 lnfrastructure development at Rai Bhawan. ltanaoar 200.00325 C/o Suspension bridqe over Doni river at Ruii villaoe 40.00326 Renovation & maintenance of Amtum Nallah of Darak

Villaqe25.00

327 C/o of link road from BRTF road to Tato village near PHCTato

50.00

328 Renovation of badminton court of Officer's Club at GueslHouse, C-Sector. ltanaoar

20.9:

329 C/o routine repair and maintenance of works during 2016-17 39.9C

330 Strengthening of various sector road under Nahalagundurinq 2016-17

150.0c

331 C/o strom water drain at Naharlaoun 150.0c332 Clearance of pending liabilities for "Extension and

renovation of existing office chamber, Public accountCommittee at Laoislative Assemhlv Naharlaorrn

20.91

333 Repair and renovation of Type-lll, Qtr. No. 7 at Mob-ll,Itanaqar

5.25

334 Renovation of APPSC building (PRATIBHA BHAVAN) ar

Itanaoar70.89

335 Committed liabilities of road under PWD Capital Division-Adurinq 31st Statehood Dav Celebratlon

46.50

336 Committted liabilities for construction of RCC protection wallto protect colonies near Naamghar at Chanranaghar,Itanaoar

48.0C

337 C/o strom water drain and retaining along P-Sector Nallah,Itanaoar

40.00

Sub Total : (c'l 15418.4a 33704.87Sub Total : {ll 33530.48 51891.06

lt SIDF1 lmprovement of Township Road at Lumla Headquarter

(19.77 KM.) SH: Re-carpeting/CC Pavement, RArVall,BA/Vall, Slab Culvert, RCC Storm Water Drain, CC Footpath.

400.0c 400.00

2 lmprovement of Township road at Zemithang CircleHeadquarters * 11.56 KMs. SH: Re-carpeting, RCC SlabCulvert, RA//all& BA//all. CC Drain.

150.00 150.0c

3 lmprovement of Township road at Dudunghar CircleHeadquader - 8.70 KMs. SH: Widening, WBM, Carpeting,Slab Culverl, RA//all & BA//all.

150.00 150.0c

4 l/o Convention Hall at Dudunqhar 50.00 50 0c A

Eilr,"u(r (State )

Govt. of A.P.Itanagar

trffiffi Page 1 3

*\t (Rs. ln lakh)Sl No.

ffilzad or DeveloPment ADA,

20'16-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 55 C/o RA/Vall at Sports Complex, Lumla 25.00 25.006 C/o Cultural Centre & C/o Volley Ball Stadium at Old Lumla 50.00 50.00

7 C/o Staff Quarters at Dugunghar Type-ll-2 Nos., Type-lll-1Nos.

50.00 50.00

8 C/o Staff Quarters at Zemithang Type-ll-2 Nos., Type-lll-1Nos.

50.00 50.00

I C/o RA//all & BANall for protection of newly constructedResidential buildings under PWD and GA at Lumla ADCHeadquarter. SH: RA//all & BA/t/all - 200 Mt

75.00 75.00

10 C/o Community hall at Craft Centre, Urgyelling Lebrang &Krallinq-Boxer.

150.00 150.00

11 C/o cultural centre at Teli, Surbi & Tsaiqhar villaqes. 60.00 60.0012 lmprovement of PWD road Network under Tawang

Constituencv100 00 100.00

13 C/o Communitv hall at Bomba & Bomdir. 50.00 50.0014 Maintenance of road to Khinmev Gomoa. 25.00 25.0015 C/o lndoor Badminton Club at Tawano Parade Ground 70.00 70.0016 C/o Zomkhanq hall 105.00 105.0017 C/o lndoor Badminton Club at Gvanohkhar villaoe. 80.00 80.0018 C/o 2 Nos Tvpe-lV Qtr for doctors at CHC Janq 80.00 80.0019 C/o of Tvpe-ll Staff ouarter at Jano CHC 25 00 25.0020 Cio new police station at Janq ADC Hq. 200.00 200.0021 C/o lB at Maoo 150.00 150.0022 Clo Communitv hall at Thinobu 100.00 100.0023 C/o Auditorium at Lhou 150.00 150.0024 Cio Mini stadium at Dirano Villaoe 80.00 80.0025 C/o Mini stadium at Senoe Villaoe 30.00 30.0026 C/o Mini stadium at Sanqti Villaqe 30.00 30.0027 C/o Mini stadium at Menchano Villaoe 30.00 30.0028 C/o Mini stadium at Salari Villaqe 30.00 30.0029 C/o Mini stadium at Namshu Villaoe 30.00 30.0030 C/o Cultural Centre and C/o Public Toilet at Lish Villaqe. 20.00 20.0031 C/o Cultural Centre and C/o Public Toilet at Rahung Village 20.00 20.00

32 C/o Cultural Centre and C/o Public Toilet at Khalibok. 20.00 20.0033 C/o Cultural Hall and C/o Public Toilet at Zimthuno. 20.00 20.0034 C/o School buildinq of Secondary School at Rama Camp 30.00 30.0035 C/o Primary School at Broksarthang and Drainage system

works at Lubrano villaoe.20.00 20.00

36 C/o School Boundary wall for Dirang village and C/cTraditional Gate.

35.00 35.00

37 C/o Middle school at Thembano villaoe 30.00 30.0038 C/o School plav qround for Secondarv School Namshu 20.00 20.0039 C/o Road from Jyotinaqar to Yewanq Villaqe (Phase-ll 50.00 50.0040 Re-Carpetinq of Sanoti road (12.00 KM) 50.00 50.0041 C/o Bridge at Pangma Road and C/o Link Road at Cherrong

villaoe.20.00 20.00

42 C/o Road from Sharada Mission School to Runoiapam 20.00 20.0043 C/o Village Link road from BRTF road to Primary School

Melongkhang village and C/o Village Link road from PrimarySchool Khamkhar to Cultural Centre Khamkhar village

30.00 30.00

44 C/o Villaqe Link road from Darbu villaqe to Rahuno Nallah 30.00 30.0045 C/o Link Road from PWD Road to ADC staff Colonv. 25.00 25.0046 Clo Clo Link Road and providing of Electricity for Umling

(Naqa G.G) cultural centre25.00 25.00

47 C/o Public Toilets, Changing Room and Beautification of HotSorino Dirano

20.00 20.00

48 Soil develooment work at Bishum ohuduno 20.00 20.00 A49 Soil development work at Namthunq 20.00 20.00 n

,,ll,.lte I

APEirecl :or (Str

invt ofItanagar

Page 14

q) (Rs ln lakh)tsFlliL/tana y Head of Development ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 550 3/o Protection work for stadium 20.00 20.0c51 Clo Cremation ground and Clo CC Footpath for

Mandalaphudung village and drainage system at variouslocation in and around Mandalanhrrdrrno villaoe

45.00 45.0C

52 Construction of Circuit House at Rupa (2nd and final phase) 200.00 200.0c

53 Construction of community Health Center building atKalaktanq (3rd and Final phase)

150.00 150.00

54 Construction of approach road to aqricultural fields 200.0c 200.0055 Construction of road to Dachalok at Kalaktanq. 50.00 50.0056 Construction of boys hostel at Shergaon VKV School anc

girls hostel at Kalaktang (for balance work to completebuildinqs)

20.00 20.00

57 Construction of Gavion type brass wall 30 mtr and providingone layer of GSBC on Bilubow road.

25.00 25.00

58 Construction of community meeting hall with Kachungpa(watchmen) residential accommodation.

125.OO 125.0C

59 Kalaktano townshio road 40.00 40.0060 C/o ADC Headquarter at Kalaktang (clearance of liabilities) 50.00 50.00

61 Wheel track sollinq of iiqaon Muchaksino road. 50.0c 50.0062 C/o road to proposed Yokmuzor Roqonq Buddha Park. 40.0c 40.0063 C/o R/B wall & Sollinq of Rupa sumuoichi road. 50.0c 50.0064 C/o CC Drain at Lower Bhalukoono 25.0C 25.0065 C/o CC Drain at Lower Bhalukponq colonv Road 25.0C 25.0066 C/o Storm Drain at Lower Bhalukpono Townshio 25.0C 25 0067 C/o Protection Wall near Ruth Foundation School at Lower

Bhalukponq25.0C 25.0C

68 Clo Protection wall to protect Water Tank at UpperBhalukponq

45.00 45.0C

69 C/o Protection wall at various locations at Upper Bhalukpong 30.00 30.0c

70 C/o Storm water and CC Drain at Upper BhalukpongTownship.

50.00 50.00

71 C/o Teachers Quarter and Community Hall Gohainthan (a)T-l Qtr -1 nos (b) Communitv hall

35.00 35.00

72 C/o Teachers Quarter T-ll (1 nos) including CC foot path alElephant.

20.00 20.00

73 C/o inspection Bungalow i/c Boundary wall at Sessa (c)

!nspection Bungalow (d) Boundary wall35.00 35.00

74 C/o Boundary Wall around EAC Office at Buraqaon. 20.00 20.0075 C/o Approach road to EAC office at Buraqaon. 20.00 20 0076 C/o uncovered CC Gallery with railing at Football ground,

Buragaon.25.OO 25.0C

77 C/o Teachers Quarter T-l (2 nos.) at Hussioaon 20.00 20.0078 C/o Circuit House at Palizi 50.0c 50.0079 C/o Circuit House at Wanqhoo 50.0c 50.0080 C/o Site development for model villaoe at Samioam 100.0c 100.0081 Approach Road to D.C. Bunglow at Bomdila. A) RCC slab

culvert 3.00 mtr. Span 1 mp. B) Retaining wall i) 8.00 mtrheight-12mtrs. Length ii) Retaining wall 6.00 mtr height -38mtr. Length c) Brest Wall i) 6 mtrs ht. - 30 mtr.length d)Retaininq Wall 6 mtr ht - 30 mtr lenoth

100.0c 100.00

82 Strom water Drain within Bomdila township (length 200.0Cmt0

25.00 25.0C

83 Retaining wall near Manjushree School at Bomdila 6 mtr ht.-40.00 mtr Lenqth

25.00 25.0C

84 Approach road to Petrol Pump. i)RCC slab culvert 3.00 mtr.Span -1 no ii)CC drain - 60.00 mtr. iii) Retaining wall 4.00mtr. Ht- 30.00 mtr lenoth

25.00 25.OC

Dire

fffi Page 15

: (Rs. ln lakh)a'\\ffi/

Head of DeveloPment ADA,2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 585 Approach road to Sera Village. a)RCC Retaining Wall 5.00

mtr. Ht.-30.00 mtr length b) RRM Breast Wall 7.00 mtr. Ht.-30.00 mtr lenoth

50.0c 50.00

86 RRM Protection wall near PWD Annexe Building of Bomdilacircuit house. - 8.00 mtr. Ht.- 25mtr. Lenoth

25.0C 25.00

87 3/o Guest house at Bomdila. (SH:1st floor) 25.0C 25.0088 RRM protection wall for PWD Enquiry office building at

Bomdila.(SH:- 4.00 mtr. Ht- 56.00 mtr. lenqth)20.00 20.00

89 C/o T-l qtr.- 2 Nos for PWD staff at Bomdila 30.00 30.0090 Approach road to APEDA colony at Bomdila. (SH:-RRM wall

4.00 mtr. Ht-70 mtr lenoth.)25.OO 25.00

91 C/o CC step and R/wall within Medical colony at Bomdila 25.00 25.00

92 Approach road to Pedung Gompa (SH:-Retaining wall - 4.00mtr. Ht-70 mtr. lenqth)

25.00 25.OC

93 Staqinq Hut at Peduno Villaoe. Bomdila (Ph-ll) 25.00 25.0C94 C/o cc Road at Nafra township (Lenqth- 0.520 km) 50.00 50.0c95 C/o CC Road from Nachin PWD segment to Jangblo at

Nachiban villaoe. (Lenoth -0.350 km)25 00 25.0C

96 Clo Porter Track Connecting Dibrick-Wathung- Dilliun-Dishinq Villaoe.

25.00 25.0C

97 C/o Protection wall at Baphevanq area at Khellonq villaqe 30.00 30.0c98 C/o 2 roomed staqinq Hut at Naiano villaoe. 25.00 25.0C99 C/o Cultural & recreation hall at Upper Dzong village (Ph-l) 45.00 45.0C

100 C/o Boundary wall around Govt. Middle School at Nakhuvillaqe. (Ph-)

25.00 25.0C

101 C/o Boundary wall around Govt. Middle school saddle. 20.00 20.0c102 C/o Medical sub-centre building and 1 no Staff Qtr. At

Jeiqaon40.00 40.0c

103 C/o Plavqround at Dtichik villaoe (Ph-l) 20.0c 20.0c104 C/o Porter Track from Khoina to Dinqchanq villaqe. 20.0c 20.0c105 C/o Road from Main Bazar line to Police Station at Bameng

ADC, Hq (SH: Formation cutting, cross drainage, CC drain,RCC Breast wall & Shifting of Electric poles and water pipelines)

150.00 150.00

'106 C/o RCC Retaining wall and breast wall to protect Helipacqround at Bameno ADC. HO.

1 10.00 1 10.00

107 lmprovement of Bameng Township Road (SH: C/o RCCBreast wall & CC Pavements)

100.00 100.00

108 Land development in Khenewa Town in East KamengDistrict. (A)

60.00 60.00

109 lmprovement of Khenewa township (SH: C/o RCC retainingwall and CC oavemenf)

80.00 80.00

110 Cio Bve-pass road at Javanq Baoano PMGSY road. 200.00 200.00111 C/o Land Protection wall at ADC office, Chavano Taio 20.00 20.00112 C/o Bye-pass road from Meome Turning point to connect

Circuit House road, Chayanq Taio.600.00 600.00

113 C/o RCC culvert over Kotte Bung near Kotte Camp PWDroad to Pipu.

23 31 23.31

114 C/o C.C pavement road from NH to Wessang collegeincludino protection wall

225.00 225.00

115 C/o new Circuit house for WlPs '100.00 100.00116 C/o steel suspension bridge at Pacha Morang over river

Kameno and Kacha river.150.00 150.00

117 Development of football qround, Seopa 75.00 75.00118 Foot suspension bridge at Pacha river, Pabua vill, Jeju Dada

vill, LayimoVa vill, Serewa, Nerewa vill50.00 50.00

119 lmprovement of road under'Seopa township 100.0c 100.0c120 C/o Culverts and RA//all, Bana to Silla road (SH-3 Nos o1

culverts Span-6 Mtr)100.0c 100.0c

n Alt

Eirecl :or (S1

iovt. o:ate I

rA.P.n)

Itanagar

ffis Page '16

(Rs. ln lakh)

IW.\_-__-.f

-/rana{v ADA,2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5

121 C/o wire Rope Suspension Bridge over Kameng River tcconnect Lelluno villaoe (Soan-140 mtr)

100.00 100.0c

122 C/o Wire Rope Suspension Bridge over Bichom River in

between Old Sopun to New Sopung village (Span-125 mtr)50.00 50.00

123 C/o road from Naria 2 km point of Silla road to Kitchangvillaoe (3.5 km)

100.0c 100.00

124 C/o road from 23 km point of NF-229 to Mejingwa at Bana,Kameng and Bichom rover confluence angling point.

50.0c 50.00

125 C/o road from 30 km point of NH-229 Seppa-Sagalle road toRotewo at Pappu valley in East Kameng Dist. (SH- F/C &E/Drain-5 km)

150.0c 150.00

126 C/o road from 10 km point of NH-229 to Bongsho andRetaining wall at Ramgang (SH-F/C-300 Mtr, R/wall-50 mtr)

50.00 50.00

127 C/o infrastructure Development at Bana PWD Sub-Division. 100.00 '100.00

128 C/o Approach road from main road to new ADC office at A-ll,Seiiosa.

20.00 20 00

129 C/o Teachers Quarter at Govt. Residential School, at Sede. 20.00 20.0c

130 C/o approach road (Short cut) from NABARD road tcNiveditha qirls hostel & school at Seiiosa.

50.00 50.00

131 C/o Boundary wall to protect Pvt. Building and school atPakke Bazarline near Saha residence.

20.00 20.00

132 C/o approach road from Arunachal Transroad to Lonoouno lV school (Pakke Kessano)

Highway mair 50.00 50.00

133 C/o Auditorium cum Badminton Hall (2 court) at Borum 200.00 200.00134 C/o link road with culvert. 2 Nos. Soo Villaqe. 80.00 80.00135 C/o Road from Tapiso to Lao under Sangdupota Circle i

Paoum oare District500.00 500.00

136 C/o Suspension Bridge in between Sakiang to Jajing TapMenoio

20.00 20.00

137 C/o Land protection work at Panior bridge point, Mengio. 30.00 30.00

138 Suspension bridge over river Panior in between Kullung andPaqa. Menoio

20.00 20.00

139 C/o road from Sango village to Govt. Residential School playoround. Leooriano

20.00 20.00

140 C/o Road from Leporianq to Rachi. 20.00 20.00141 C/o Medical staff ouarters at Leporianq 30.00 30.00142 C/o Road from Leooriano to Hote villaqe. Leporianq 20.00 20.00143 C/o retainino wall work at Old cattle farm, Niriuli 30.00 30.00144 C/o Teachers quarter at ME School Langtetapu, Leporiang 20.00 20.00

145 C/o Link road from oech (via teviso) to Amsu, Toru 20.o0 20.0c146 C/o aooroach road to oach haooa villaoe. Toru 25.00 25.0C147 C/o approach road from Chilo village to Kheel Panchayat,

Toru20.00 20.0c

148 l/o CC aooroach road at Laotao Villaoe. Toru 20.00 20.0c149 3/o retaining wall and CC drain at Geram Market line, Toru 20.00 20.0c

'150 3/o Teachers Quarter at ME School Laptap 20.00 20.0c151 C/o Teachers quarter at Mowa Primarv School, Toru 20.00 20.0c152 C/o one unit of Teachers barrack at Dakte Hoj ME School,

Toru20.00 20.0c

153 C/o Teacher's barrack at ME School. Kheel. 20.00 20.0c154 C/o Teachers barrack at Seema residential school, Sagalee 20.00 20.00

A

Eirector (State P/an)Govt. of A.P.ll

pffi Page 1 7

o (Rs. ln lakh)SI N\

ffi# Head or DeveloPment ADA,

20'16-'17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5155 Clo Teachers barrack at Khyate village under Salle

Panchavat. Gaoalee.20.00 20.00

156 C/o Teachers Quarter at Khamlee. Saqalee. 20.00 20.00157 C/o Teachers barrack at Girls residential School Sarkhappa,

Saoalee20.00 20.00

158 C/o Communitv Hall at Nimete. Saoalee 25.00 25.00159 C/o Teacher quarter at Humd Panchayat, Saqalee 20.00 20.00160 C/o Land Protection drainage system at Pepso village,

Ompuli20.00 20 00

161 C/o Road from NH-229 to in an around of TouristDestination Development Pava Happa. Yachuli (3 KM)

230.00 230.00

162 Cio improvement of road to Laye at Biirii length 650 mtrs(SH: Toe wall, Sub-base soiling, slab culvert, railing, slabculvert. railino)

120 00 120.00

163 C/o approach road from BRTF road to Mudang Tage Villagelength 320 mtrs (SH: WBM, CC pavement, Toe wall, CCDrain)

30.00 30.00

164 C/o Hiia Siva road lenoth 't km (SH: metallino.) 40.00 40.00165 C/o RCC slab culvert 2 mtr strength 1 no, over Byonii

Siiqanq at Hapoli7.00 7.00

166 C/o BRTF road at Jama Pakho to Myolyibu bridge point (SHSoilino)

18.00 18.0C

167 Construction & improvement of approach road to variouscolonv in Haooli town

45.0C 45.00

168 Construction of Rural link Road Paa Villaoe to Ganote 200.0c 200.00169 Construction of Link Road Rai Villaoe to Sanoo '100.0c 100.00170 Construction of rural link road under Sanqo to Bua 100.0c 100.00171 Restoration of Chambang Township (Culvert/Black

Tooino/Drainaoe etc)75.0C 75.00

172 Restoration of Yangte (Culvert Black Toping/Drainage etc) 100.0c 100.00

173 3onstruction of Jamin HQ road (Slips Clearance/ Drainage/3ulvert etc)

175.0C 175.00

174 Renovation of palin Circuitv House 50.00 50.00175 Restoration of rural link road Govt. Degree collage Langbia

under Palin.50.00 50.00

176 C/o Link Road from Dari Chambang Road to Pry. SchoolRavuno.

100.00 100.0c

177 C/o Road from BRTF Road to Lavino 50.00 50.0c178 C/o Circuit House at Phassang CO HQ. ln Kurung Kumey

district.50.00 50.0c

179 C/o Circuit house at Nyobia CO Hq. ln Kurung KumeyDistrict

50.00 50.0c

180 C/o approach road from PWD road to Garte Colony atNyapin in Kurunq Kumev district.

50.00 50.0c

181 C/o various link road and approach road at Sangram SDOHq. ln Kurunq Kumev district

200.00 200.0c

182 C/o various link and approach road at Nyapin ADC HQ. lnKurunq Kumev District.

100.00 100.0c

183 C/o Soiling/ Drainage/Culvert at Nyobia Township underKuruno Kumev District

100.00 100.0c

184 c/o VARIOUS ROADS UNDER Tali Circle 350.00 350.00185 C/o Community halls and Transit Camps under Tali and

Pipsoranq Circle.100.00 100.00

186 C/o Teacher Quarters and School buildings under Tali andPiosorano.

95.00 95.00

187 CiO CC Footpath from Dotte to Govt. M.E School, Dottee 25.00 25.00

188 Creation of infrastructure Dbvelopment for Koloriang, Sarli,Damin, P/Parlo and Polosang Circle l(Kumey district A.P

1000.00 1000.00

0 h^lr.

Elrector (State PlGovt. of A.P.

Itanagar

6#S Page 1 B

(Rs. ln lakh)

ll Head of DeveloPment ADA,2016-17 bythe SDC

RE,2016-17

Remarks

2 3 4 5

189 CloClo Schooland /Hostelbuildinqs at KGBV' Siyum 100.00 100.00

190 C/o School and Hostel Buildinq at Limeking 100.00 100.00

191 C/o Porter Track, Ladders and Foot Suspension bridge in

rural area

550.00 550.00

192 C/o MIP works at various locations 50.00 50.00

193 elo RoaO from Bridge point to Keojalng,!{rdqe sg!cg!. 120.00 120.00

194 C/o Communitv Plavqround at various locationq. 55.00 55.00

195 C/o Road from BRTF road to Sopin quarry. 25.OC 25.00

196 C/o approach Road from BRTF to Dukom village, under

Taliha circle.

100.00 100.00

197 C/o Security Fencing wall at circuit house, PWD store and

Staff Quarter for AEs/ JEs under PWD, Sub-Division Taliha100.00 100.0c

198 C/o Rest House at Taliha Township, circle Taliha. '100.00 100.0c

199 C/o approach road from BRTF road to Staff colony Taliha

town.

100.00 100.0c

200 C/o Rest House at Bokching Bogne, circle Taliha 100.0c 100.00

201 C/o Retaining wall at Daporijo to town under forest colony at

Mada Lindam colony

20.0c 20.00

202 C/o School Buildinq at Dai Aimy School. 20.0c 20.00

203 C/o School Buildinq at Dabu Primary School. 20.0c 20.00

204 C/o Approach road at Siakriio ll 20.00 20.00

205 Protection of Flood control (FDR) work at Tadak DulomBridoe Daooriio-

40.00 40.00

206 C/O Road from Daporijo-Mona PMGSY Road to Agriculture

field at Tumpe Riio (Sh:F/C)50.00 50.00

207 lmprovement & Upgradation of Daporijo to Mite road via Ligu

& NijiVillage (12KM) (Sh:widening, WBM-l,ll,lll& CC

Pavement)

100.00 100.00

208 C/o Renovation of link road from Bomikoto to Tamri Agri field

area lenqth - 10 KM, Phase-l OKM to 4 KM

100.00 100.00

209 C/O Road from PWD Sub-Divisional office to Muri via Muglivillaoe. Phase-1. 1 KM

50.00 50.00

210 3/o Road from Mona Villaqe to Mona Agri field Area 20.00 20.0c

211 3/o Renovation of Road from BRTF road point to Baja

Villaqe 1 KM

20.00 20.0c

212 C/o Communitv Hall at Laa villaoe 20.00 20.0c

213 C/o Road from BRTF Road Point (4 KM) to Bur-Rijo village,

lenoth 1500 mt

50.00 50.0c

214 C/o Bridge over Pein River connecting Repari Govt M.E

School & BRTF Road Point.

80.0c 80.00

215 C/o communitv Hall at Tamen 20.0c 20.00

216 C/o Community Hall at Mengi Kabak. 20.0c 20.00

217 C/o Communitv Hall at Daah Villaqe. 20.0c 20.00

218 C/o Community Hall at Dugi Village. 20.0c 20.00

219 C/o Approach road from Tamen Tali Road to Govt. PrimarySchool. Rintum & Pahari. 1.5 KM (FC)

20.00 20.00

220 C/o SPT Rostrum at Kamporiio CO HQ 25.00 25.0C

221 C/o Suspension Bridge over Pein River connecting Tamen-

lll & Rakhe villaqe

20.00 20.00

222 C/o Renovation of Road from BRTF Road Point to MilliVillaoeLenoth-3Km

30.00 30.00

223 C/O Road from Gaa Village to Remen Possqllege 20.0c 20.00

224 C/o Semi RCC Type-ll Qtr 1 Nos at Govt. H.S. School'Boasimla.

20.00 20.00

225 3/o Road from Saddle Village to Kigam Govt. L.P School 2b.oo 20.0c

226 C/o WBM-Il Black Topping of road from BRTF road toDiobak villaoe.

25.00 25.0C

227 C/o Road from Dumporijo-Hali road to Jon Muri at Meche

Marde (Formation cuttinq & Jungle cle4qltq)

-

30.0c 30.00

[1it)!

Gr

'-t,l) n)P,lvt. of A.

Itanagar

-..q Ugo\

\o

Page 196t@\Rs. ln lat<h)

ww /</Ig Head of Development ADA,'

2016-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5

228 C/o Securitv fencinq around Govt. l.V. School HalL 20.0c 20.00

229 C/o CC Footoath at Paksok villaqe 15.0C 15.00

230 C/o Road from Dumporijo-Hali road to Aya Nirin (widening &

Kutcha drain)

'15.00 15.00

231 C/o Public rostrum at New Richi village. 20.00 20.00

232 C/o public rostrum at Old Richi village 20.00 20.00

233 C/o Formation cutting of Paka Aranalo road starting from

Yaipu village.

55.00 55.00

234 Clo nCC wall & CC Drain at PWD colony near the residence

of Peeie Uli

80.00 80.0c

235 C/o Public Rostrum at Luchi village. 20.00 20.0c

236 C/o WRSB over river at Ronva village (Phase-l) 20.00 20.0c

237 Formation cutting of approach road from BRTF road to Dula 15.00 15.00

238 3/o WRSB over river Sie at Lebri village 15.0C 15.00

239 C/o WRSB over river Sie at Laiqi villaqe 15.0C 15.00

240 C/o approach road at Lakbak Gongo (Phase !) 20.0c 20.00

241 C/o Public rostrum at Riko village 15.0C 15.00

242 C/o imorovement of road from Haii to Panu Muri. 15.00 15.0C

243 C/o improvement of road from Baririjo to Yoka village(kutcha drain. culvert (2 mtr span) 2 nos

25.00 25.00

244 C/o Black toppinq of Maro to Baririjo road (0 00 to 5 km) 200.00 200.00

245 C/o lmprovement of road from Paka Gongo NEC road to old

Haii. (Distance 3 km (Wideninq)20.00 20.00

246 C/o Porter track with CC Step wherever necessary from Bulo

to Siqi-Gusar circle HQ.

20.00 20.0c

247 C/o WRSB over Sikin Koro at Buivillage. (phe!qll)- 20.00 20.0c

248 C/o approach road from Bui Uli road to Denri Nguki (1 km)(Phase-l)

30.00 30.00

249 l/o CC Step From Old Dusito Upper Dugivillage. 't5 00 '15.00

250 3/o WRSB over Subansiri river at Horo-Gusar 30.0c 30.00

251 C/o Soiling & improvement of road from Belo to Govt. Middle

School Belo (wideninq & culvert)

25.0C 25.00

252 C/o Wel come Gate at Liromoba- 20 CIO Keba dere for GBs

at Liromoba-20

40.00 40.00

253 lmprovement of Likabali Power House to Ma-Malini road at

Likabli

100.00 100.00

254 lmorovement of Taramori to Sibe PWD road 100.00 100.00

255 lmorovement of Garu-Gensi road 100.00 100.00

256 lnfrastructure Development for various Schools under 28th

Likabali Assemblv Constituencv100.00 100.00

257 C/O boundary wall at Gensi EAC/BDO officB 50.00 50.0c

258 C/O approach road at Mingmang Anchal Samity Segment 25.00 25.0C

259 Renovation of Gensi-Siqen Steel bridqe 75.00 75.00

260 lnfrastructure development of roads under PWD Division

Basar.

350.00 350.00

261 C/o all weather road from Yorak PMGSY Road to Kodum-

Nikte CO HQ (PWD road) 10 km

1000.0c 1000.00

262 improvement of RWD Colony road at Aalo-1 KM. (SH: Re-

soilinq. WBM, Carpetinq and side drain)

50.00 50.00

263 C/o RCC Building double storied 50 boarders girls hostel at

Govt. Hiqher Secondary School, Aalo.

80.00 80.00

laq lCto 5 rooms school buildinq at Jomo Middle School 50.00 50.00

zos l-crc appioach road from BRTF Road to Kerang Bridge Point 50.0c 50.00

ZOO TClo Road from Molom village to Yosing village (Ph-l) (10 km) 500.00 500.0c

ffiillages under Rumgong CD Block 200.00 200.00A

zoe lfSa and oorter track in Mechukha Sub-Division. 200.00 200.00

XAnA--l[]ire-ctor (State I

Govt. of A.P.Itanagar

Page 20

ffift\+\ ffi\G;;;

(Rs. ln lakh)

L)+

Head of Development ADA,2016-17 bythe SDC

RE,2016-17

Remarks

K>V 2 3 4 5469 C/o Road from BRTF to Rane Notti 50.00 50.0c

270 C/o Modal villaoe at Bona 50.00 50.00271 C/o Plav qround at Nvukonq and miqoino 50.00 50.00272 lmprovement of Jenoino townshio road 150.00 150.00273 C/o Road from Parsinq to Aronq area 200.00 200.00274 lmorovement of rad from DC office to Marak. '150.00 150.00275 C/o Peqi-Bote Township Road 40.00 40.00276 C/o Road at Rebo Peroino townshio road 40.0c 40.00277 C/o improvement of gradients and widening of road at

various points of Nari to sioak bridoe300.00 300.00

278 C/o improvement and widening of road from koyu to Loglu 300.00 300.00

279 C/o road from Saku to Pikte bridqe point. 200.00 200.00280 C/oroad from Kovu Loqlu road point to Saku 40.00 40.00281 lnfrastructure development under 37 West Pasighat

Assemblv constituencv.310.00 310.00

282 C/oRinq road around Pasiohat market 70.00 70.00283 C/o Road from NH-515 to Solunq qround at Pasiqhat 70.00 70.00284 C/oRoad from NH-515 to Donyi Polo Vidya Niketan (Talom

Rukbo Naqar)40.00 40.00

285 C/o Road from Tolon to Kangkong gate in Yagrung circle,Pasiqhat

50.00 50.00

286 C/o Road from PHE enquiry office to DVO office, Pasighat 40.00 40.00

28 C/o Mirku, Mirsam, Mirbuk road (SH: BT & Seal Coat) 60.00 60.00288 C/o Road from NH-515 to Lower Banskota 50.00 50.00289 C/o community hall at Mongku, Toilet at Mirku Community

hall and land development at Dikino44.0C 44.00

290 Construction of Roads & Bridges under Mebo PWDSubdivision.

500.0c 0.00

291 Extension and improvement of Mebo Township road (Sh:Embankment, WBM-|, WBM-Il, WBM-Ill, BT, CC Drain andCulvert

300.00

292 lmprovement of Nqopok Silluk road (13.54 Km) 200.00293 C/o road from Geku-Katan PMGSY road (Mindi Yorbe) to

Nvovinq/Kobok area.95.0C 95.00

294 C/o CC road from Geku-Katan PMGSY road to Sumsingvillaoe communitv hall

25.00 25.0C

295 C/o road from TAH (Pasi Tinali) to Mopom circle Hq, 45.00 45 0C296 C/o Road from Geku-Katan PMGSY road to Rango Yorbe,

Sika-Dine villaqe. Geku20.00 20.0c

297 Soling and mataling and cross drains from Ratan Tinali toSikenq Damro

70.00 70.0c

298 3io Road from TAH to Pirvino WRC field Silli 20.00 20.0c299 C/o cluster of Culverts, Cross drains at Ligong road (Kumku

to Komkar villaoe.)90.00 90.0c

300 C/O Helipad and lnfrastructure at Annini, Dibang ValleyDistrict, A.P

300.00 300.00

301 C/O Approach road to Helipad at Anini, Dibang ValleyDistrict

200.00 200.00

302 C/o Rostrum & qeneral oround at ADC HQ. Dambuk. 100.0c 100.00303 C/o Rostrum & General qround at CO, HQ Parbuk '100.00 100.00304 lnfrastructure creation at Roinq, Lower Dibanq Vallev. 300.00 300.00305 C/o Police Check Post along with Police Barrack & kitchen

at Dioaru50.00 50.00

306 C/o l.B. at Yealianq (18th mile) 50.oc 50.00307 C/o FSB(Steel Deckinq) at Naraliano. Aniaw 160.00 100.00308 C/o No. of Staff Qrts (T-ll & T-lll) at DC Office Hawai, Anjaw

District400.00

309 Maintenance of Hawai Townshio Road. Aniaw District 160.00 180.00310 C/o communitv hall at Yatono 25.00

) ,, titor (StrGovt. of

:e plan)

Itanagar

6p"; Page 21

'c.Y a$fffio \ (Rs. ln lakh)

',W e%.riHead of Development ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

1 raiJttrV 2 3 4 531'l C/dEfmmunity hall at Siet, Watong, Mailing, Hamaliang,

Halaikrono. Brailiano and Yasono villaoes140.0c

312 lnfrastucture development (Class room, teacher qtr. Etc.) atGovt. ME School Gemlian and Govt. Primary School Tiding

40.0c

313 C/o CHC Chonqkham under Namsai District. 200.00 200.0c314 C/o Primarv Health Centre at Medo under Lohit District 100.00 100.0c315 Uooradation of Namsai Townshio road 100.00 100.0c316 C/o infrastructure for V.K.V School at Namsai 100.00 100.0c317 Up-gradation of infrastructure of Primary Middle Secondary

and Higher Secondary Schools of Namsai, Lathao & PiyongCircle.

100.00 100.0c

318 C/o Up-gradation of critical infrastructure with MedicalEouioments at CHC Namsai

100.00 100.0c

319 Constn. Of Foot Suspension Bridge at Ningrang, Old Plonand Jenqoathar villaoe.

90.00 90.0c

320 Construction of Double Storied Circuit House at Manmao 100.00 100.0c

321 Construction of road with Soiling Metalling and Black toppingof Township Road Jairampur

50.00 50.0c

322 C/o of additional Classrooms at Govt. Hr. Sec. School,Manmao.

30.00 30.0c

323 C/o road from thamiyang Datkan to Tirap river to connectchanolano-Khimivano road at 14 Km (Yanman) villaoe

'100.00 100.0c

324 C/o Transit camp at Bazaar line. 20.00 20.0c325 C/o RLR for Changlang-Khimyang PWD road to upper

Yanman villaoe 1st installment.50.00 50.0c

326 C/o 2 nos of wing wall at Tara river valley bridge in betweenJonoii Havi to Panlom villaoe.

45.00 45.0C

327 C/o Boys Hostel at Govt. Hr.Sec. School, Chanqlanq. 100.00 100.0c328 Construction of view point shed at MC Road -2 Nos. 10.00 10.0c329 C/o Transit camo at chanolano Townshio. 20.00 20.0c330 C/o Laying of 20140 mm stone aggregate at Changlang

Township. (SH-1 CK Road to 1 Mile RF Mandir Point. 2.Bazar line to Officer colony Road. 3. MC road to RangfraSchool Point.)

20.00 20.0c

331 C/o lB at Namtok EAC HQ. 35 00 35.0C332 C/o Road (FC, widening, culverts ) from barrack to Dongrong

villaoe.100.00 '100.0c

333 C/o Road (BT) from New Doidam To Soha villaqe. 200.00 200.0c334 C/o Road from Tutntyu Kolam Road to Nogna under Tirap

District.400.00 400.0c

335 C/o Mini stadium at Old Laiwang village under Bari-Basipcircle Ph - I

150.00 150.0c

336 C/o community hall (Bera villaqe & CO Hq. Dadam) 140.00 140.0c337 C/o EAC Office Buildinq (Lazu Block) 70.00 70.0c338 lnfrastructure development for Circle office Borduria. Clo

Type ll double unit I, extension of water supply & electricityand c/o internal road and black toooino.

100.00 100.0c

339 lnfrastructure development for Circle HQ Longo (Koilam).C/o Type lV quarter-'l nos C/o Type ll Quarter double unit,water suoolv and electrification. C/o internal road.

100.00 100.0c

340 C/o road & WBM from C.K Road point to EklavyaResidential Model School Khela.

100 00 100.0c

341 Development of olavqround at Borduria. 50.00 50.0c342 C/o of 3 (three) nos teacher's quarters at M.E. School

Pumao.45.00 45.0C

343 C/o circuit House at Lonodino. (Phase-l 300.00 300.0c344 C/o PWD lB including site deVelopment at Pangchau

townshio100.00 100.0c

tl

L^n"L)Eirec or (State tla

Govt. of A.P.Itanagar

Page 22ioflarF

{^or7.F.Wdil \

x"^\& \-.\ Head of Development

b,/-11

(Rs. ln lakh)ADA,

2016-17 bythe SDC

RE,2016-',17

Remarks

+f\- ""'-r/rV// 2 J 4 554< WtO lB including site development at Wakka township 100.00 100.00

346 Widening and improvement of road from Khonsa to Khasa. 200.00 200.00

347 Black toppinq of roads at Ponqchau township. 50 0c 50.00348 Black toppino of roads at Wakka townshio. 50.0c 50.00349 Construction of single lane steel Bridge at Sia & Sigut

Korono on J.D Road300.0c 300.00

350 C/o RCC bridqe over Yamso Nallah at Abo Tani Colonv 230.0c 230.00351 C/o bailey bridge over river Pachin near Helipad connecting

Naharlaoun and Borum Villaoe549.49 549.49

352 C/o Concertina/ RBT fencing (security fencing) on theexistinq walls of Rai Bhawan

38.23 38.23

353 C/o Boundary wall, RCC retaining wall, Gate and solarfencing on boundary wall at A.P. Civil Secretariat, ltanagar

741.00 741.0C

354 C/o Japanese ZEN Garden with landscaping of A.P. CivilSecretariat. ltanaoar

250.00 250.0c

355 l/o retaining wall at Old cattle farm at Niriuli 30.00 30.0c356 a)Tezu-Sunpura interstate road (Rs. 23.72 lakh\ 118.62

b)Tezu- Sunpura to Hatiduba road (Rs. 49.70 lakh)c) Tezu-Sunpura road to village link road (Rs. 30.20 lakh)d)Jeko-Sunpura road (Rs. 15.00 lakh)

357 Grant-in Aid to Vivekananda Kendra for infrastructuredevelopment of Schools in Arunachal Pradesh

100.00

358 Cio boundary wall at DC, Bangalow in Upper Subansiri,Daporiio

50.00

359 lmprovement of Ruksin township road 51.00360 C/o road protection wall at Lower Niti Vihar near Maya

Motors80.00

361 C/o Pranabananda Primary School building at PakkeKessanq

50.00

362 C/o road from RWD Colony to General ground at Namsaitownship

40.00

363 C/o road from Jenthu PMGSY to Patheroaon 20.00364 C/o road from 2 mile Diyun road to Kunsenq villaqe 50.00365 C/o Culvert and approach road to VKV school at Namsai He 50.00

366 C/o road from Christian Suk to Arunachal University ofStudies

30.00

367 C/o road from Forest Check gate to 2nd Mile Koseng village 50.00

368 C/o Culvert and apparoach road from Jaipur road toHabigaon

30.0c

369 C/o road from BRTF to Mamono farm land (Ph-l) 60.0c370 C/o road from BRTF road to Alubari Bamun Basti (Ph-l) 60.0c371 Flood protection work at Zalibund Kherem villaoe (Ph-l) 60.0c372 Flood protection work art Alubari Nopatia Kamlang River (ph

r)60.0c

373 Repair of potholes and patches of roads under CD-B 33.0C374 lmprovement of road from Koyu to Ego (SH: slip clearance

from Loqlu villaqe to Gove Stream)30.00

375 C/o Arc Bridge over Kurung River connecting Sangram toParsi-Parlo (Ph-l)

100.00

376 C/o Circle Office buildinq at Nissuk (Ph-l) 100.00377 C/o Type-lV quarters for circle office at Nissuk 25.00378 C/o slab culverts at Helipad road Ponochau townshio 30.00379 Box-cutting, widening & improvement of Helipad road at

Ponqchau townshio40.00

380 C/o RCC retaining wall to protect the Helipad near Govt.secondarv school at Bamenq

46.00An

X,JilN'4[]ire'ctor (State flan

Govt. of A.flItanagar

ffi Page 23

+ 0 (Rs. ln lakh)Sl No.

W#ead or DeveroPment ADA,

20'16-17 bythe SDC

RE,2016-17

Remarks

1 2 3 4 5381 C/o RCC box culvert at Bamenq township road 22.50382 3/o Auditorium for Hiqher Secondary School Nafra 70.00383 Multipurpose Auditorium. Pakke Kesano 70.00384 Full furnishins of SE PWD office at Bobia (Ph-l 50.00385 3/o boundary wall at the Kherem Buddha Vihara Kherem

uillage under Chongkham circle, Namsai district25.00

386 3io Boundary wall for polytechnic college at Yingkiong (Ph-l) 50.00

387 Clo FC from PMGSY road to Nungsing gamBishamphudung, cultural hall, community hall, communitykitchen, foot track from Shoda village to Ninglong& FloodProtection work for Barchi & Shoda Village, West Kamengdistrict (Ph-l)

40.00

388 3/O Rural Housino under Diranq admn circle (Ph-l) 30.00389 C/O road from Silari village to Dikhyang village, Wesl

Kameno {Ph-l)30.00

390 C/O Guest House at Wanghoo village, West Kameng (Ph-l) 30.00

391 C/O Circuit House at Khuppi old village, West Kameng (Ph-t)

30.00

392 Restoration of flood damage at Saidle in WKameng district 30.00

393 C/o Culture Centre at Kibitho, Aniaw 30.0c394 C/o Culture Centre at Kaho, Aniaw 30.0c395 C/o Culture Centre at Walono. Aniaw 30.0c396 C/o Culture Centre at Donq, Aniaw 30.0c397 C/o Culture Centre at Tinai. Aniaw 30.0c398 C/o Culture Centre at Mubai, Aniaw 30.0c399 Repair & maintenance of suspension bridqe at Kaho 20.0c400 Repair & maintenance of suspension bridqe at Mubai 20.0c401 Repair & maintenance of suspension bridqe at Dono 20.0c402 Repair & maintenance of suspension bridqe at Tinai 20.0c403 C/O Extension of Parking ground with protection wall near

Thembano Gompa30.0c

404 C/o road from Kumev river to Taqnupuk villaqe ph-ll 40.0c405 C/O link road from BRTF road to Siqnvoriano (Ph-l) 45.0C406 C/O Multi-utility lndoor Stadium at Parsi Parlo (Ph-l) 30.0c407 C/O link road from Amtum (ITBP 3'd Gate) to Sipu Puyi

Darka road via Amtum area ( Km) (Ph-l)25.0C

408 Development of culture center at Lhagon Jangchup ChoelingBuddhist cultural Societv Tezu (Ph-l)

35.0C

409 C/O boundary wall for EE & AE's qtr at Janq 50.0c410 C/O approach road to Gompa at Tuting (1.30 Km i/c 30.0C

Mtr soan bridoe) (Ph-l)45.0C

411 C/O Retaininq wall at Senki Park Colonv (Ph-l) 45.0C412 C/O boundarv wall for VKV school at Ramsino 45.00413 Renovation of approach road to Govt. Secondary Schoo

from main sector road at C Sector ltanaoar (Ph-l)40.00

414 C/O Parkinq lot at Janq market (Ph-l) 25.00415 Protection work of Parak Bridge constructed under RIDF

(Padu villaqe to Katan circle) (Ph-l)100.00

Sub-total {ll 30316.03 32737.',15

ilt State Share(a) NLCPR 1728.67

1 C/o road from 80 KM Point on Kimin Ziro BRTF road to KVKat Yachuli.

16.90

2 C/o Motorable Steel Arch Byidge over river Yamne atReqlat (Bvasano).

38.44

3 C/o road from Lofa to Pakoti 14.59 \

K-h*^Eirector (State I

Govt' of A'P'Itanagar

es Page 24

frNq

u\'? Rs. ln lakh)

bitHead of Development ADA,

2016-17 bythe SDC

RE;2016-',17

Remarks

Y 2 3 4 5

4 I mprovement of Jangthung-Cherong-Panchavati-Chingdanroad.

29.53

5 3/o Steel Bridge over river Wome at Pakke Point in

Arunachal Pradesh.

15.37

6 C/o road from ltanagar to Seijosa, Ph-l: Road from Kampo toTaoiaso.

60.00

7 Development of Pakke to Seppi Liya road in East Kamengdistrict.

50.00

8 Upgradation of road from Subansiri Bridge point to Segi CO

Ho.

23.21

I Uporadation of Miao-Namchik-M'Pen road. 69.38

10 C/o road from Murqa bridqe point to Rho village Ph-l) 112.66

11 C/o lnter district road connectivity from Chayangtajo to

Passano CO Circle in l(Kumev (Phase-l).77.06

12 Cio road from BRTF Road (32 KM) to Heya Mara via Poda

Mara, Merring Mara underTaliha Cicle (Phase-l) 15 KM uptoWBM level

46.51

13 C/o Kavinq Gasenq Gate Road (70KM) (Part-A of Ph-l). 52.82

14 C/o road from Pilla to Sakianq (15 KM) upto WBM Level. 50.55

15 C/o road from Neelam to Pistana (Phase-l) (5 KM length

complete upto Black Topping including culverts, bridges

etc.)

16.91

16 C/o road from Rayung to Rungte Rite via Deby, Tudbath,

Patey, Phalap and Gang (30 KM) Phase-l (0.00 to 10.00KM\

44.80

17 C/o road from Yembung-Yemsing road to Tarak village (Ph-

l) in Siano district.

101.46

18 C/o road from Yemsing to Mirem (15 KM) upto WBM Level 65.92

19 3/o road from BRO road (168 KM point) Roing-Aninitolchioo villaoe(12KM) up to B.T.

67.03

20 C/o road from Hawai to Manchal Administrative Circle (55.77

KM) Phase-ll. Part-l thereof.

1 19.93

21 Strengthening & lmprovement of Changlang to KhimiyangRoad (Phase-ll : 0.00 to 45 KM)

25.00

22 C/o road from Kanubari to Bogapani via Ranglua & Lawnu

CO Hq (41 KM) (Phase-l).75.00

23 C/o road from Sumhak to Shelom via U/ Chinhan (1a KM)

upto WBM level.

66.00

24 C/o Road from Pakoti to Kamsha village (6.50 Km) 35.00

25 C/o lnternal/Sectoral Road at Tani Happa (New Sagalee)(SH: S&1, JC, FC, Pavement, CD Works, CC Drain &

Protection works)

35.80

26 C/o Road from Parsi-Parlo (Patuk AD HQ) (Ph-l) (5 Km

length complete up to Black Topping level including culvertsbridoes etc.

35.28

27 C/o Nyodu Sibe Siru Road (23 KM) 70.20

28 C/o road from PMGSY Bongleng road to Khet village inTawano district.

52.00

29 C/o Steel suspension bridge and approach road at Kodaknear Tutinq.

183.23

30 C/o Well equipped 50 bedded Hospital at Yingkiong in

Upper Sianq District.

36.17

31 C/o internal sectoral township road at Tani Happa in

Papumpare District

41.92

(b) NEC 389.93

1 Construction and impvt of Seppa-Chayangtajo road (81.00

Km).

95.00

2 Lonqdinq-Nokaian Road. 38.1 1

J C/o Tamen-Dollunqmukh road (1 07.00Km) 150.00

Director (StaieGovt. of A.

Itanagar

lan)

6s{s ,Page 25

S/ 4*ffit*D,\z (Rs ln lakh)sr No{

;t#ryr# Head of Deve'!opment ADA,

2016-17 bythe SDC

RE,2016-17

Remarks

1 \gar-A-?)/ 2 3 4 54 C/o Giffih-ostel & Teacher quarters at Borduria (SH;T-lV-2

Nos, T-lll-10 Nos43.20

5 lnfrastructure development of Govt. Residential School atTatpu under Sagalee Sub-Division of Papumpare District inA.P

10.62

6 C/o Double Storied Building for Govt. Higher SecondarySchool at Saqalee.

38.00

7 C/o Outdoor stadium at Chayangtajo under East KamengDistrict. A.P.

15.00

Sub Total : (lll 0.00 2118.60

IV RIDF 6983.35 0.001 Maintenance & Up-gradation of Pasighat-Pangin

road(Sector 26 to 76 km.)29.00

2 C/o Motorable suspension bridge over river Subansiri atNacho.

6.56

3 C/o Suspension bailey bridge over River Kamala(100 mtr.Soan)

194.50

4 C/o Road from pine grove to Siro(Outer Ring road)Ziro(17.90 km)

288.00

5 C/o Road from Patum to Rumoono(22.00 km) 430.29o C/o Steel Girder Composite bridge over river Dollung at

Paro.500.00

o C/o Road from New Jenthu to Jona-lll in Namsai district. 250.00o C/o Road from Ephum to lngo via Tingua and lnsa in

Namsai district.400.00

10 C/O lnternal link Roads under Diyun Administrative HQ inChanqlanq District.

300.00

11 C/O Road from Perano to Lamoano. 270.0012 C/O Road from Deke PMGSY road to Essi Lite(phase-l) 300.0013 CiO approach road to proposed polytechnic site at

Yinqkionq in Upper Sianq district.315.00

14 C/O approach roadfrom CO Ho. Dadam to Muuktowa-ll.

900.00

15 C/o Steel Girder Bridge with RCC Decking over river Papumat Ramohat. Paoum Pare District.

300.00

16 C/o RCC Bridge 1 1.00 Km in Wakro Circle, Lohit District. 150.00

17 C/O Road from Votnu village to Khanu village, Wakka circle 350.00

18 C/O Road from Chattonq to via Chopsa 400.0019 C/O Road with CC pavement at Chayangtajo 400.0020 C/O Road from Sangram to Nyapin ADC HQ - Phase -l (

ch. 14th KM to ch. 24th KM )

300.00

21 C/O Arch Bridge with footpath across river Poma at Jollangvillaoe

300.00

22 C/O Steel Suspension bridge over River Pare (75 mtr Span )at Balaou to connect PMGSY Road

300.00

23 C/O Steel Suspension bridge over River Pare (75 mtr Span )to connect Rioo villaoe to Nimte

300.00

Sub-Total(lV) 6983.35 6983.35

V Central/Central lv Sponsored Schemes{CSSs)1 CRF 5500.0c 5669.00 Utilization of fund is

subject to actualrelease of fund fromconcerned Ministry/Department of Gol

2 NLCPR 20s"8.0e 0.003 NEC 1000.0c 0.004 SPA

(i) C/o Mini Secretariat at Chanqlanq 0.0c 556.00Sub Total : {V) 8598.0C 6225.00

Grand Total fl +ll+lll+lv+v) 79427.88 999s5.1 6 n/:t,[)

Director (State PGovt. of A.P.

Itanagar

)'