Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 1 of 43
-.4
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 2 of 43
Enbridge Pipelines Inc. Major Projects ENBRIDGE
Hydrostatic Test Site Summary Line 3R — Spread 9 — Gretna Tie-in Spool Section Test AFE #: 1440024A80 (LNS)
The hydrostatic test of 121.6m of 914.4mm O.D. (NPS36), 12.7mm W.T., Grade 483 pipeline
was successfully completed on October 26, 2018. All equipment that was used (recorders,
deadweight, gauges, thermometer) was supplied with valid calibration certificates. Test heads
with acceptable documentation were utilized. Safety precautions were discussed and
communicated to all personnel involved within the testing scope. The test adhered to Enbridge
Pipelines PCS-005 and CSA Z662. More than 4m of heavy wall pipe (NPS36, 15.1mm WT,
Grade 483) was welded to the test heads as to ensure that a hoop stress greater than 90% of
SMYS did not occur within 4m of the test head connection.
The test section was made up of one pipeline class:
1.) 914.4mm OD, 12.7mm WT, SAW Spiral Seam, Grade 483, MOP 9,930 kPa
The test medium was water obtained from a municipal fill station. The section was filled, and
hydrostatic testing of the line commenced on October 26, 2018. The pipe was pressurized in
stages, with leak & equipment calibration checks conducted at 3,225 kPa and 6,505 kPa. All
leak checks were found to be acceptable. As pressure that would result in exceeding 100%
SMYS of the 12.7mm WT pipe was not achieved, a yield plot was not conducted.
The strength test commenced at 12:05 PM, October 26, 2018, and held for 1h 15m. The
pressure remained steady during the test at 13,000 kPa at the test point. The pressure test
exceeded the minimum requirement of 12,413 kPa (125% MOP) and was determined to be
acceptable.
Following the strength test, the pressure was reduced for the leak test. The leak test pressure
was below 90% SMYS of the 12.7mm WT pipe as to allow for a visual leak inspection of the
pipeline. The leak test began at 1:35 PM, on October 26, 2018, at a pressure of 11,300 kPa,
and held for 30 minutes. The pressure increased 10 kPa over the duration of the leak test,
which can be attributed to atmospheric conditions (warming air temperature). The leak test
Hydrostatic Test Site Summary
AFE #: 1440024A80 Test #: Line 3R — Spread 9 — Gretna Tie-in Spool Section Test
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 3 of 43
Enbridge Pipelines Inc.
Major Projects ENBRIDGE
exceeded the minimum requirement of 10,923 kPa (110% MOP) and no leaks were visually
identified. The leak test was determined to be acceptable.
Prepared By:
Dmitri Pria ka, P. Eng.
Enbridge Pipelines Inc.
Hydrostatic Test Site Summary
AFE #: 1440024A80 Test #: Line 3R — Spread 9 — Gretna Tie-in Spool Section Test
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 4 of 43
DIR
EC
TIO
N O
F
CO
NS
TR
UC
TI O
N
Hydro Test Section: Gretna Station Hydro Test NPS 36 - Gretna Station - Above Ground Hydro Test
Project: En bridge L3R Spread 9
Date: October 26, 2018
Rev 01
Page 1 of 2
WEST END TEST HEAD SERIAL NO.= E—L3R—TH-028
ELEV=252.93 L3R-9—TH-0012 LSD 8-8-1-1-1
1
Drawing STA. 1096.563
Drawing STA. 1096.605
1096+562.89 Pipe No. 15051 Heat No. RS1892 15.1mm W.T. Pipe No. 41656 Heat No. 523105 12.7mm W.T.
Pipe No. 41629 Heat No. 404170 12.7mm W.T.
1096+605.32
Test End: Pressure Recorder 1: BK-366 Pressure Recorder 2: BK-520 Digital Deadweight/Gauge: BK-477 Mechanical Deadweight: BK-324 Pressure Gauge: TES-002 Temperature Recorder: BK-313 Liquid in Glass Thermometer: 351066
ro L3R-9—SC-0164 r0 4 3-00 OB
to L3R-9—SC-0135
ro 4 3-45 SAG
• L3R-9—SC-0161
LOW POINT 3-45 SAG ELEV=252.62
12.7mm W.T. Installed = 121.63 15.1mm W.T. Installed = 9.75
Note: See Attached Pipelog for complete Pipe Data for Gretna Station Above Ground Hydro Test.
Pipe No. 41279 Heat No. 521531 12.7mm W.T.
Pipe No. 41632 Heat No. 404172 12.7mm W.T. Pipe No. 10139 Heat No. M17903 15.1mm W.T.
1096+694.27
Far End: Pressure Recorder: BK-330 Pressure Gauge: TES-005
o L3R-9—SC-0080
Temperature Recorder: BK-373
CNI L3R-9—SC-0142
(\I
L3R-9—SC-0163/Transition
rri L3R-9—TH-0011 ELEV=253.01 HIGH POINT
TEST HEAD EAST END SERIAL NO.= E—L3R—TH-025
LSD 1-8-1-1-1 Drawing STA. 1096.694
NOTES:
10 . Outside Diameter is 914.4mm Wall Thickness 12.7mm & 15.1mm Grade 483
Line Fill Volume 512.5 bbls, 81.5 m 3 Total Length DOES NOT Include Test Heads Chainages and Lengths are Generated from Top of Pipe (TOP.) Contour Chainage Elevations shown are to Top of Pipe (TOP.)
EMI EP17.-.41 12.!"UN :ANN MM0111 MM. MINN
Meridian Surveys
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 5 of 43
October 26, 2018
Enbridge - Line 3 Replacement - Spread 9 - NPS 36 Pipelog for Above Ground Hydro Test - Gretna Station
MFR 0.0. X
W.T.
Coating Seam Grade Approx. Dwg
Chainage Weld
Number
Pipe
Number
Heat
Number
Coating
Number
TJ/DJ
Number
Factory
Length
(m)
Individual Meas.
Joint Length
(m)
Measured Length
(m)
Bends
West End
Test Head Serial No.: E-L3R-TH-028
1096+562.89 L3R-9-TH-0012 Evraz Camrose
Evraz Regina
914.4x15.1 FBE Long 483 1096+562.89 11111111111111W
15051 RS1892 N/A DJ3216 24.42 4.01 4.01
483 1096+566.90 1096+566.90 914.4x12.7 FBE Spiral 41656 523105 2257 N/A 24.33 24.33 24.33 3-00 OB ,
914.4x12.7 1096+591.23
Evraz Regina FBE Spiral 483 1096+591.23 1096+615.56
41629 404170 2238 N/A 24.32 24.33 24.33 345 SAG
Evraz Regina 914.4x12.7 FBE Spiral 483 1096+615.56 41601 404171 2230 N/A 24.35 24.35 24.35
914.4x12.7 FBE 1096+639.91
Evraz Regina Spiral 483 1096+639.91 41279 521531 2236 N/A 24.29 24.30 24.30
Spiral 483 1096+664.21 1096+664.21 Evraz Regina 914.4x12.7 FBE 41632 404172 2240 N/A 24.31 24.32 24.32 1096+688.53
Evraz Camrose 914.4x15.1 FBE Long 483 1096+688.53 10139 M17903 N/A DJ743 19.03 5.74 5.74 1096+694.27 L3R-9-TH-0011
Test Head Serial No.: E-L3R-TH-025
East End
TOTAL LENGTH 131.38
Enbridge - L3R Spread 9 - NPS 36 - Rev01 Meridian Surveys Page 2 of 2
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 6 of 43
MP-CPCS-GUID-001F7 REV 1 TEST INSTRUMENTATION CALIBRATION TRACKING FORM ENBRIDGE AFE No: 1440024A80 (LNS) Date yyyy/mm/dd: 2018/10/26
Project Name: Line 3 Replacement Province/State: Manitoba
Spread: Spread 9, batch 1 Contractor/Vendor: Testco (subed by SAEG)
Note: Please refer to the most up to date Hydrotestinq Specification for limits Pressure testing equipment shall be field validated for function prior to and following each test
Type of Instrument Model # Serial # Manufacturer .
Date of Calibration Calibration Expiry
Date (30 days) Must Be Used By Date of 1st use
Expiry Date (if applicable)
1 LIG Thermometer N/A 351066 THERMCO 9/20/2018 Lifetime Lifetime 10/2/2018 Project Valid
3 Pressure Gauge 901 TES-005 CPVV 9/20/2018 30 10/20/2018 10/2/2018 Project Valid
6 Pressure Gauge 901 TES-002 CPW 9/20/2018 30 10/20/2018 10/2/2018 Project Valid
8 Mechanical DW 35255-01K BK-324 Refinery Supply 9/20/2018 30 10/20/2018 10/2/2018 Project Valid
11 Pressure Recorder N/A BK-330 Barton 9/20/2018 30 ,0on1 ' 10/2/2018 12/1/2018
12 Pressure Recorder N/A BK-520 Barton 9/20/2018 30 9/30/2018 11/29/2018
13 Pressure Recorder N/A BK-366 Barton 9/20/2018 30 10/20t2, 9/30/2018 11/29/2018
14 Temperature Recorder N/A BK-313 Barton 9/20/2018 30 10/20/2018 10/2/2018 Project Valid
17 Temperature Recorder N/A BK-373 Barton 9/20/2018 30 10/20/2018 9/30/2018 Project Valid
18 Digital OW XP2i 5000 PSI BK-477 (652590) Crystal 9/20/2018 30 10/20/2018 9/30/2018 Project Valid
Page 1 of 5
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 7 of 43
4-
Technician Witness
BERJA METER ec CONTROLS LTD. 831-77'h Avenue Edmonton, AB Canada, T6P 159
Telephone: (780) 440-1234 Facsimile: (780) 440-4775
E-mail: [email protected]
CE IFICAIE OF CALIBRATION
Dead Weight Tester
Customer: Testco Location: Edmonton Manufacturer: Refinery Supply Model #: 35255-01K Serial Number: BK-324 Range: 500 to 21,000 kPa Temperature: 20 C Cal. Date: Sept.20, 2018 Technician: JCL Due Date: Dec.20,2018 Accuracy: +0.1% FS Accuracy
Reference Reading Weight Amount Weight Letter
501 KPA 500 KPA (TA B L El 5 KPA 5 KPA B 5 KPA 5 KPA A
10 KPA 10 KPA C 10 KPA 10 KPA D 10 KPA 10 KPA 10 KPA 10 KPA 51 KPA 50 KPA H
100 KPA 100 KPA J 100 KPA 100 KPA K 100 KPA 100 KPA L 100 KPA 100 KPA M 500 KPA 500 KPA N 500 KPA 500 KPA 0
1000 KPA 1000 KPA P 1000 KPA 1000 KPA S 1000 KPA 1000 KPA R 1000 KPA 1000 KPA Q 4998 KPA 5000 KPA T 4999 KPA 5000 KPA U 4999 KPA 5000 KPA
The above unit was compared to a Crystal Master Deadweight Serial Number 758496, traceable to The National Institute of Standards and Technology (NIST). Calibrations are in accordance with API6A, 17th Edition, Section 7.3
Quality, Service & Integrity Since 1975
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 8 of 43
Model Uncertainty
+/- 2% of span JJF
BERJA Meter & Controls Ltd. 831-77th Avenue, Edmonton, Alberta, Canada 16P 1S9 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shopdberjagroup.com
Certificate of Calibration Report number FASTCAL-003857
Company LocaNan Date of P.O. P.O. Number
Testco(Scrnmerville1 Eamon on 9 /20/2018
Manufacturer Model i Serial Number Calibration Date Expiration Date
Barton Recorder Dual Temperature (-50 to 50C) BK-373 9/20/2018 12/20/2018
Date Forrnat- (nrnidd/vvvy)
As Received Condition: In tolerance As Left Condition: In tolerance
All instrument calibrations are verified for accuracy before they ore shipped. The recommended calibration interval for this instrument is 12 months from the date of verification. Your particular quality assurance requirements may supersede this recommendation.
All calibrations are performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994. MIL-STD 45662A, 10CFR21 and I OCFR50 when specified by customer documentation.
Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RH Pressure 100 to 103 kPa
Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N: 479424
This test instrument is calibrated in compliance with Canadian Standards Association CAN3-Z299-3-85, A.N.S.I. 840-1 and/or API 60, 7.2.0 through the following report numbers:
Manufacturer Model Serial Number Report Number Due Date Ir Reference Uncertainty
Crystal Engineenng
2KPSIXP21 758496 FASTCAL-C38604 5/1/2019 ':•-z-.7, Of S. 0.02% FS. 20%-100% of ,•,:- •:.
c(i.% reading
Fluke 51 i 20640230 112377 12/14/2018 0.05% + 0.3°C
This certificate shall not be reproduced except in full, without written approval.
Laboratory Repre e Quality Representative
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 9 of 43
Test Results Report number FASTCAL-003857
Temperature As Received Test Results
Blue Pen
Reference Reading
Gauge Reading Allowable I
Tolerance Difference
Difference (% of FS)
Condition
3.50 3.20 2.0 -0.3 -0.24% Pass 20.00 2080. 2.Ci 0.8 0.64% Pass 40.20 40.20 2.0 0.0 0.00% Pass
Red Pen
Reference Reading
Gauge Reading Allowable Tolerance
Difference (% of FS)
Condition
1.40 1.90 2.0 0. - 0.407 Pass
20.00 19.80 2.0 -0.2 -0.16% Pass 39.40 39.00 2.0 -0.4 -0.32% Pass
Temperature As Left Test Results
Blue Pen
Reference Reading
Gauge Reading Allowable Tolerance
Difference Difference (% of FS)
Condition
3.5C1 3.20 2.0 -0.3 -0.24% Pass
20.0C1 20.80 2.0 0.8 0.64% Pass 40.20 40.20 2.0 0.0 0.00% Pass
Red Pen
Reference Reading
Gauge Reading Allowable Tolerance
Difference Difference (% of FS) 1
Condition
1.40 1.90 2.0 0.5 0.40% Pass
20.00 19.80 2.0 -0.2 -0.16% Pass
39.40 39.00 2.0 -0.4 -0.32% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 10 of 43
Model Uncertainty Technician
JE 2?; of span lb
Company Location Date of P.O. P.O. Number
Tesrco(Sommen.,ilie) Edmonton 9/20/2018
Model Serial Number Calibration Date Expiration Date
Duo] Temperature (-50 to 50 C) BK-313 9/20/2018 '2/20/2018
Manufacturer
Bob"Peco- der
Data Format- I rom/dd/vvvvl
Quality Representative
This certificate Shall not be reproduced except .n fuli, without written approval.
Laboratory Represe
BERJA Meter & Controls Ltd. 831-77th Avenue, Edmonton. Alberta, Canada T6P 159 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shop 4beriagroup.com
Certificate of Calibration Report number FASTCAL-003670
As Received Condition: In tolerance As Left Condition: In tolerance
All instrument caribrations are verified for accuracy before they are shipped. The recommended calibration interval for this instrument is 12 months from the date of verification. Your particular quality assurance requirements may supersede this recommendation.
All calibrations ore performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994, MIL-STD 45662A, 10CFR21 and 10CFR50 when specified by customer documentation.
Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RH Pressure 100 to 103 kPa
Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N: 479424
This test instrument is calibrated in compliance with Canadian Standards Association CAN3-7299-3-85 A.N.S.I. 840-1 and/or API 60, 7.2.0 through the following report numbers:
Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty
Crysta Engineering
15KPSIXE., -4.7 c 9-' C36192 7/3/2019 F.: PS 2C'7., )0,7, o' FS:
0.1", reoging
Fuke 51 II 20640230 112377 I J21/2019 C, C),': °0.3O
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 11 of 43
Reference Readin
Gauge Reading Allowable Tolerance
Difference Dffference
% of FS Condition
Test Results Report number FASTCAL-003670
Temperature As Received Test Results
Blue Pen
Reference Reading
Gauge Reading Allowable Tolerance
Difference Difference (% of FS)
Condition
-1.20 2.1 0.2 0.16% Pass
14.00 14.51 2.9 0.5 0.40% Pass
46.701 46.5c 2.0 -0.2 -0.16% Pass
Red Pen
Reference Reading
I Gauge Reading
Allowable Tolerance
Difference Difference (% of FS)
Condition
-1.00 -1.20 2.0 -0.2 -0.16% Pass
14.00 14.001 2.0 0.0 0.00% Pass
45.40 46.00 2.0 0.6 0.48% Pass
Temperature As Left Test Results
Blue Pen
Reference Reading
Gauge Reading Allowable Tolerance
r Difference
Difference (% of FS)
Condition
-1.20 -1.00 2.0 0.2 0.16% Pass
14.00 14.50 2.0 0.5 0.40% Pass
46.70 46.50 2.0 -0.2 -0.16% Pass
Red Pen
-1.00 2.Ci 0.0 0.00% Pass
14.00 14.50 2.0 0.5 0.40% Pass
45 40 46.50 2.0 1 1 0.88% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 12 of 43
BERJA METER &
CONTROLS LTD. berjagroup.com 780-440-1234
4 Notes: Accu Accuracy,
aboratory Representative
831 — 77th Avenue Edmonton, Alberta, T6P 1S9 [email protected]
Temperature Comparison Certificate ABSA-Certification of Authorization
Reg. No AQP-21609
Certificate Details Company: Testco(sommerville) Calibration Date- 9/20/2018 Location: Edmonton Certificate Number: TC-1022 Technician: JCL Work Ticket Number: N/A
Instrument Details Manufacturer: THERMCO Description: Glass Thermometer Model: Total immesion Temperature Range: -50°C To 50°C Serial Number: 35 ,C . I,.=',6 Reference Instrument: Fluke 5111 S/N:20640238 Tag Number: N/A
Results Reading Reference Reading Test Instrument thilidirii
1 0.7°C 1.0°C 2 15.0°C 15.5°C 3 33.3°C 34.0°C 4 48.3°C 50.0°C
Room Temperature: 20°C
Berja Meter & Controls Ltd. certifies that the instrument described above meets or exceeds all specifications as stated in the procedure. It has been calibrated using measurement standards traceable to the SI though the National Institute of Standards and Technology (NIST) and is in compliance with Canadian Standard Association CAN3-Z299.3-87(R2007) and A.N.S.I. B40-100-2013
Quality Represent we'
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 13 of 43
I 20/2018 CPWSI 901.0 3000P51
Technician Model Uncertainty
Cl
As Left Condition: In tolerance As Received Condition in tolerance
Model Serial N Manufacturer
Dote Formal,. irnrn 'cicryyyy)
This certificate shall not be reproduced exce.p' n rill vplhou, written approval
Laboratory Representative Quality Representative
BERJA Meter & Controls Ltd. ..,,c)nton , Lierto Canada 161' ist? • Ph. 17801 440-1234 FE (7801 440-4775 email shopii beriagroup con,
Certificate of Calibration Report number FASTCAL-C39593
Company Location Date 01 P.O. P.O. Number
Testcor,ommerville) Edmon lois 9/20/2018
All instrument calibrations are verified for accuracy before they are shipped. The recommended calibration interval for this instrument is
12 months frorr the date of verificofion. Your particular quality assurance requirements may supersede this recommendation.
All calibrations are performed in o controlled environment by qualified personnel using instrumentation and methods which guarantee
that specifications claimed are reliable. Calibrations conform to ANSI/NCR Z540-1-1994. MIL-STD 45662A, 10CFR21 and 10CFR50 when
specified by customer documentation.
Laboratory ambient conditions throughout this calibration were Temperature 20 to 24 *C Humidity 30 to 55% RH Pressure 100 to 103 kPa
Accuracy of actual pressure reading is troceble to NISI Standards on Crystal nvision S/N 479424
This test instrument is calibrated in compkance with Canadian Standards Association CAN3-Z299 3-85 A.N.S.I. 840- 1 and/or API 60. 7.2.0 through the following report numbers:
Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty
ci cit
—
462901 C39056 7/3/2019 ..)-.:01. of rs..0.02". :A i-Sr 20 % • 00% 0 Fr.
t10.1% of Rcigj
J As Received Test Results 3000 PSI
Reference Reading
(PSI)
Gouge Readingl
(PSI)
Allowable
Tolerance Difference (PSI)
Difference
(% of FS) Condition
48,0 500 30 0.40% Pais
1006 1000 30 -0.20% Pass
150 f 1500 30 0.03% Pass
1773 2000 ao 2 7 r--- 0.90% Pass
2477 2500 30 23 0.77% Pass
2776 locto 30 24 0.80% Pass
As Lett Test Results 3000 PSI
[
Reference Reading
(PSI)
Gouge Reading
(PSI)
Allowable
jroleronce Difference (PSI)
Difference
j (% of FS)
Condition
483 .:00. 30 12 0 40 . Pass
700 1000 30 -6 0 20'; Pass
r 150 1 IT 1500 30 L____ 1 0 03''' Pass
I 473 2000 30 2 7 0.90% Pass
247" 2500 30 23 a77% Pass
2q76 J 3000 30 L 24 0.80% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 14 of 43
Company LocaKOn I Date of P.O. P.O.Number
Edmonton 9/20/2018
laboratory Representative Quality Representative
BERJA Meter & Controls Ltd. 831-77th Avenue Edmonton, Alberto. Canada 16P 159 • Ph- (7801 440-1234 Tx: (780) 440-4775 email shop iiberiagroup.com
Certificate of Calibration Report number FASTCAL-C39595
Manufacturer Model Serial Number Calibealion Date
Expiration Date
901.0-3000P3: 9/20/2018
Oahe Formal. (mmiddiyYYY)
Model Uncertainty Technician
A SIDCIn r 71
As Received Condition, in tolerance As Left Condition: In tolerance
All instrument calibrations are verified for accuracy before they ore shipped. The recommenced calibration interval for this instrument is
12 months horn the date of verification. Your particular Quality assurance requirements may supersede this recommendation.
All cahbrations are performed in a controlled environment by qualified personnel using instrumentation cod methods which guarantee
that specifications claimed are reliable. Calbrations conform to ANSI/NCSL 1540- 1 1994, MIL-STD 45662A. 10CFR2 I and 10CfR50 when
specifed by customer documentation.
Laboratory ambient conditions throughout this coNaration were: Temperature 20 to 24° C Humidity 3010 55% RH
Pressure IDO to 103 kPa
Accuracy of actual pressure reading is traceble to NISI Standards on Crystal nVision S/14: 479424
This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85.
A N.S 840. I 6P1 60. 7 .2 C through the to,I.:;wing report numbers:
Manufacturer Model Serial Number 4.Reod Number Due Date Reference Uncertainty
Ei )gif 1,,-!,4 I I PJ
4029J i ,-., i'; )5e, ',"/".20 i 9 !('). :% ...,/ Fticy
As Received Te t Results 3000 PSI
Reference Reading
(PSI)
Gauge Reading Allowable Di Difference (PSI)
(PSI) Tolerance
Difference
(% of FS) Condition
500 30 7 -0.23% F u
1010 1000 jr- 30 J 0 -033"; Pass
1513 1500 30 -13 -0 43 . Pass
2014 I 2000 30 14 -0.47% Pass
2527 2500 30 -20 -0.67% Pass
3011 3000 30 -11 0.37% Puss
As Left Test Results 3000 PSI
Reference Reading1
(PSI)
Gauge Reading
(PSI)
Allowable
Tolerance
I I Difference (PSI)
i Difference
(% of FS) Condition
507 501) 30 0.23'0 Pass
1017 1000 30 IC 0.320 Pass
I 51 :A I 500 if 30 13 -0..120 i Pas
2014 2000 if 30 14 -0.47'; Puss
30 -0.67% if Pass
30 -0.37% Pass
This certificate shall not be reproduced except in full, without written approval.
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 15 of 43
Model Uncertainty Technician
This certificate snail not be reproduced except in tut without written approval.
Laboratory Representative Quality Representative
BERJA Meter & Controls Ltd. 831-77th Avenue Edrnorlon COn0d0 T6P ' S9 • Ph (780) 440-1234 Pic (780) 440-4775 email shop benagroup.com
Certificate of Calibration Report number FASTCAL-003922
Company —T.—location DON of P.O. P.O. Number
- e‘;1•7•.,(50ifitnervile.) 11 Edmonton 9/ 20/2018
Manufacturer Model Sedal Number Calibration Dote Expiration Date ,
Barton Ri,i.ccyder 21000 r Po Single Pen 9/20/2018 12/20/2018
Dole Formal- (rnm/dcl,vvvv)
As Received Condition: In tolerance As Lett Condition: In tolerance
All instrument calibrations ore verified for accuracy before they are shipped. The recommended calibration intervol for this instrument is 12 months from the dale of verification Your particular quality assurance requirements may supersede this recommendation.
All calibrations are performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-I-1994, MIL-STD 45662A. 10CFR2I and 10CFR50 when specified by customer documentation.
Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RN Pressure 100 to 103 kPo
Accuracy of actual pressure reading is traceble to MIST Standards on Crystal nVision S/N: 479424 This lest instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85 A.N.S.I 840-I and/or API 60. 7.2.0 through the following report numbers:
Manufacturer Model Serial Number Report Number Due Date Reference Uncertainly
Enocj 15X•PioTP21 476697 C39055 7/3/20 I ?
- 2ox of is: •/ 0.02% SS 20%400% of Fs - c.,% ,earn,i
I l • SI , i 20640230 11237 7 11/21/2018 ___I
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 16 of 43
Test Results Report number FASTCAL-003922
As Received Test Results 21000 kPa
Reference Reading (kPa)
Gauge Reading (kPa)
Allowable Tolerance
Difference (kPa) I Difference
(% Of FS) Condition
0 210 0 0.00% Pass
4182 4200 210 18 0.09% Pass
8346 8400 210 54 0.26% Pass
12603 12600 210 -3 -0.01% Pass
16801 16800 210 -1 0.00% Pass
21093 21000 210 -93 -0.44% Pass
As Left Test Results 21000 kPa
Reference Reading
, (kPa) Gauge Reading
(kPa)
Allowable Tolerance
Difference (kPa) Difference (% of FS)
Condition
0 0 2101 0 0.007; Pass
4182 4200 210 18 0.09% Pass
8346 8400 210 54 0.26% Pass
12603 12600 910 -3 -0.01% Puss
16801 16800 210 -1 0.00% Pass
21093 21000 210 -93 -0.44% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 17 of 43
Model Uncertainty Technician
As Received Condition: in tolerance As lett Condition: In tolerance
A:)I^AE I A C)7
Company Location Date of P.O. P.O. Number .1lcor2oirr-ier,i1;
i Edfrioril1 9/2012018
Manufacturer Model Serial Number r
Calibration Date Expiration Dote tiorton Pecorder 20220 t Pa Single Pen .lif'3''' Y/20/2r.!18 12/20/2018
Date Format- f mmidd/wwl
This certificate shall not be reproduced except in full, without written approval.
Laboratory Representotive Quail y Representative
BERJA Meter & Controls Ltd. 831-77th Avenue Fdmonton, Alberto Canada T6P 1S9 • Ph: (780) 440-123.4 Fe: (780) 440-4775 email shop 4 beiiagroup.com Certificate of Calibration Report number FASTCAL-003923
All instrument calibrations are verified tor accuracy before they are shipped. The recommended calibration interval for this instrument is 12 months from the dote of verification. Your particular quality assurance requirements may supersede this recommendation.
All calibrations are performed in a controlled environment by quokfied personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL 1540-1-1994 MIL-STD 45662A. 10CFR2 I and 10CFR50 when specified by customer documentation.
Laboratory ambient conditions throughout this calibration were: Temperature 20 lo 24° C Humidity 30 to 55% RH Pressure 100 to 103 kRo
Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N. 479424 This test instrumen is calibrated to compliance with Cr:mar:ion Standards Association CAN3-1299-3-85 A NSI 940- 1 and/or API 60 7 7 C through the following report numbers:
Manufacturer Model Serial Number Report Number j Due Date Reference Uncertainly Crystal
Engineering I SKPSVP21 470697 C 39,i;":5 '. 3/ JO i ? 1 , , 7
0 trt
Fluke -il ii 10040230 ,).0%-, . ti r
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 18 of 43
Test Results Report number FASTCAL-003923
As Received Test Results 21000 kPa
Reference Reactg‘ (kPa)
Gauge Reading
(kPa)
Allowable Tolerance
Difference (kPa) Difference (% of FS)
Condition
0 0 210 0 0.00% Pass
4225 4200 210 -25 -0.12% Pass
8375 8400 210 25 0.12% Pass
12678 12600 210 -78 -0.37% Pass
16757 16800j 210 43 0.20% Pass
20988 21000 210 12 0.06% Pass
As Left Test Results 21000 kPa
Reference Reading (kPa)
Gauge Reading
(kPa)
Allowable Tolerance
Difference (kPa) Difference (% of FS)
Condition
0 0 210 0 0.00% Pass
4225 4200 210 -25 -0.12% Pass
8375 8400 1 210 25 0.12% Pass
12678 12600 210 -78 -0.37% Pass
16757 16800 210 43 0.20% Pass
20988 21000 210 12 0.06% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 19 of 43
This certificate shall not be reproduced except in lull, without written approval.
Laboratory Representative Quality Representative
BERJA Meter & Controls Ltd. 83I-7 7th Avenue Edmonton Alberta Canada T6P I S9 • Ph (780) 440-1234 Ex: (780) 440-4775 email: [email protected]
Certificate of Calibration Report number FASTCAI-C39749
Company Location Date of P.O. P.0• Number 1,-0,-;,)(S -.•,rrir-t),_-:r ,11,,1 Edrn1-0.3n ?, 20/2018 ii
Manufacturer L Model Serial Number Calibration Date Expiration Date , p21 5CC0 '-'31 B. 4Th 85259O 652590i ?;20/2018 9/2()K2':
Data Formot• (mm,c1d,yyyy)
Model Uncertainty Technician i 1'; LE
As Received Condition: In tolerance As Left Condition: In tolerance
All instrument calibrations are verified for accuracy before they ore shipped. The recommended calibration interval for this instrument Is 12 months from the dote of verification. Your particular quality assurance requirements may supersede this recommendation.
All calibrafions ore performed in a controlled environment by quolified personnel using instrumentation and methods which guarantee that specifications claimed ore ratable. Calibrations conform to ANSI/NCR 1540-1-1994. M1L-STD 45662A. 10CFR21 and 10CFR50 when specified by customer documentation.
Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidly 30 to 55% RH Pressure 10010 103 kPo
Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nvision S/N: 479424 This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85. Ails! B40.1 and/or API 6C 7 2 c ihror.gh the following report numbers
Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty Crystal
Engineenng 479424 U17418 7 /31 /2019 i• 304'. c• F -F. ,L.1.0..3.; .:I Fir JO', 1 .., • .
1.10.1%or Rdg)
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 20 of 43
Cr,
A
, C) -0
..0
A
A
0
0
C..)
,0
0
0
C...)
A
-0
-0
r...) 0
,C
0
r...)
Cr,
CD
CD
N
0
0
0
—
Cr,
0
0
—
0
0
0
Cr.
0
0 0
XI eD
70
0
(D
0: i
r 5 -
ko
(1) =
-c
o in
CD
....
.....
o
4500.0 4000.0
Co
C 0
0
b
CD
3000.0 2500.0 2000.0
(r,
0
0
b
——
0
0
0
b
Cp
0
0
b
Gauge Reading I (PSI)
cn
.r...
..
c.)
C.)
c...)
no
K.)
_ Allowable Tolerance
0 0 0 T
CD
CD 0
Difference (PSI)
CD
f,) 0
0
NJ 0
boob
0
N..) 0
0
IV
0
0.02%
0
b
0
O-9
0
b
0
0
0
b
0
0
0.00%
00
00
00
0 0
Difference (% of FS) I
Pass I
-0
0
ln
- 0
0
1-n
-a
0
ol
-0
0
ca,
Pass
--C
0
in
Passl
'V
0
tn
"0
0
in
-0
0
tn
0
0
7
Q.
ai
0
=
: -A
.0
...
0 -.0
1 4499
-0
-0
.0 (,) .
1 34991
K)
'0
.:',S)
K)
CM
8 N
8
0(1'
—
8
—
0
8 cr
, 8 0
Reference
Reading (PSI)
sooaq 4500.0 4000.0 3500.0
co
0
0
0
.0
2500.0 2000.0
_
C 0
0
1000.0
Cr.
0
00
DC
)
Gauge Reading (PSI)
Cr.
-t....
.1,
(..)
C.,
GI
ND
N
Allowable Tolerance
--.
--.
—.
--. 0 0 0 0 0 r)
0
ai
CD 0 = n
ro
a.,
.11
41)
••=
0
0.02%
pp
00
N..)
1...)
0.02%
0
to o
CD
0
coo
bbQ
bbbc
, o
CD
0
0
0
0
0
c._)
Difference (% of FS)
-0
0
,J7
-0
0
VI
-0
0
VI
-0
0
VI
-0
0
VI
-o
0
VI
Passi
-0
0
Pass]l
-0
00
VP
-o
VI
0
o
=
a
S
o
z
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 21 of 43
Barton Recorder
Technician Model Uncertainty
LF
As Received Condition: In tolerance As Left Condition: In tolerance
Serial Number I Calibration Date Expiration Date
-+ '21J '2018 1 12/20i2018 1
Manufacturer
2 1 000 KPo Single Per,
Dote Format- frnm!ddlvvvvl
Model
This certificate shall not he reproduced except in full, without wntten approval
Loboratory Representative Quality Representative
BERJA Meter & Controls Ltd. 631-77th Avenue Edmonton. Alberta. Canada T6P 159 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shopiberjagroup.com
Certificate of Calibration Report number FAS1CAL-003921
Company LOCOS= Date of P.O. P.O. Number - -
TesicclSor--.nier .ille, Edmonton 9/20/2018
All instrument calibrations are verified for accuracy before they ore shipped. The recommended ca5bration interval for this instrument is 12 months from the dole of verification Your particular quality assurance requirements may supersede this recommendation.
AO calibrations ore performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994. MIL-SID 45662A, 10CFR21 and 10CFR50 when specified by customer documentotion.
Laboratory ambient conditions throughout this calibration were - Temperature 20 to 24°C Humidity 30 to 55% RH Pressure 100 to 103 kPa
Accuracy of actual pressure reacirvg is traceble I NIST Standards on Crystal nVision S/N: 479424 This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85 A.N.5.1. B40-1 and/Or API 60. 7 2.0 througn the following report numbers:
Manufacturer Model Serial Number . Report Number Due Date Reference Uncertainty
Crystal ISKPSIXP21 Engineering 46697 7/3/201
..57% ol FS' • . 0.0.f% is ;0% i Aft vi , • 0 I i reacitna
i
Fluke 51 I 20640230 1 2 ; ' ' 1/21/2018 / 05% . ) l'Ir
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 22 of 43
Test Results Report number FASTCAL-003921
As Received Test Results 21000 kPa
Reference Reading (kPa)
Gauge Reading (kPa)
Allowable Tolerance
Difference (kPa) Difference (% of FS)
Condition
0 0 2 1 0 0 0.00% Pass
4285 4200 210 1 -85 . -0.40% Pass
8436 8406 210 -36 -0.17% Pass
12781 12600 210 -181 -0.86% Pass
16974 16800 210 -174 -0.83% Pass
21134 21000 210 -134 -0.64% Pass
As Left Test Results 21000 kPa
Reference Reading (kPa)
Gauge Reading (kPa)
Allowable Tolerance
Difference (kPa) Difference (% of FS)
Condition
0 210 0 0.00% Pass
4285 4200 210 -85 -0.40% Pass
8436 8400 210 -36 -0.17% Pass
12781 12600 210 -181 -0.86% Pass
16974 16800 210 -174 -0.83% Pass
21134 21000 210 -134 -0.64% Pass
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 23 of 43
Line 3 ReplacemeMoject - Spread 9
Hydrostatic Testiligiculation Sheet
line 3 Replacement
Spread 9
Pipe Diameter (mm): 914.4
Pmax SMYS, Strength Test: 99%
Pmax SMYS, Leak Test: 90%
Strength Test
Test Point 0+000
Test Point Elev. (m) 0.00
Text Pressure - Aim (kPa) 13,000.00
Test Pressure - Mid (kPa) 12,847.50
Test Pressure - Min (kPa) 12,412.50
Test Pressure - Max (kPa) 13,282.50
Leak Test
Test Point 0+000
Test Point Elev. (m) 0.00
Text Pressure - Aim (kPa) 11,300.00
Test Pressure - Mid (kPa) 11,499.00
Test Pressure - Min (kPa) 10,923.00
Test Pressure - Max (kPa) 12,075.00
Calculated By:
Na me Alin /7-111.Ciit4i/
Sign
Date
Project: L3R - Spread 9
Date: 26-Oct-18
Linepipe Section WT(mm) Steel Grade Design MOP (kpa) From KP To KP Test Heads APE 9: 1440024A80
112.7 48319930 10+000 10+000 Owner: Enbridge Test Section: L3R-S9-Gretna Spool
Tags: E-13R-TH-025 & 028 From KP: 0+000
MAWP: 14,890.00 kPa To KP: 0+000
Strength Test
Mainline WT Point of Significance KP Elevation (m) MOP (kPa) 100% SMYS Pv,in (kPa) 1,,,,,„ (kPa) Pauv.i (kPa) PA.., %SMYS Ppc,.., %MOP Range Check Pwv Cal) (kPa) P,„,„ Cap (kPa)
12.7 Section Start 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50
12.7 Critical Low Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50
12.7 Physical Low Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50
12.7 High Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50
12.7 Section End 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50
Leak Test
Mainline WT Point of Significance KP Elevation (m) MOP (kPa) l00% mars Prnin (kPa) Pr... (kPa) Pm (kPa) P5,,„, %WATS P., %MOP Range Check P,„,,, Cap (kPa) P,„„ Cap (kPa)
12.7 Section Start 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00
12.7 Critical Low Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00
12.7 Physical Low Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00
12.7 High Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00
12.7 Section End 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 24 of 43
ENB-CFCS-PROC-002F413
ENBR1DGE PRESSURE TEST FORM I el AFE No. 1440024A80 Province/State Manitoba
'roject Name L3 Replacement Station Name Gretna
Contractor/Vendor/PLM Testco Western/SAEG Location/Milepost SE 8-1-1 W1M
Contract Ref. No.: e.g. (WO, PO, CWP) CWP #510-809 Date: YYYY/MM/DD N/A
Identify Metric or units: kPa El or psi CI L [E] or gal. 111 or °F LI m or ft ICI
PRESSURE TEST INFORMATION
Test Date: YYYY/MM/DD 2018/10/26 Test No. Spread 9-Gretna tie-in section test
Drawing No.(s) and rev:
N/A
Test Media
Test Media Type Water ' Air NI Water with Additives E
Approximate Test Media Volume 82 m3 Type of Additive N/A
Were permits for the use and disposal of water obtained? Yes Ii No Permits were required •
PIPE SPECIFICATIONS ,
Manufacturer Grade NPS/OD Wall
Thickness (USA
Length
only)
Seam Type
Evraz 483 36" 12.7 mm 121.6 m spiral seam
TEST EQUIPMENT DATA
Equipment Type Make Range Serial No. Precision Reference pressure tester Refinery Supply 500-21000 kPa BK-324
Continuous pressure recorder Barton Recorder 0-21000 kPa BK-366 / BK-520 / BK-330
Pressure Gauge Crystal 0-34400 kPa BK-477
Liquid in Glass Thermometer Thermo° -50°C to +50°C 351066
Ambient Air Temp Recorder N/A N/A N/A
Test Medium Temp Recorder Barton Recorder -50 C to +50 C BK-313 / BK-373
Ground Temp Recorder Barton Recorder -50 C to +50 C BK-313 / BK-373
ACY VERIFICATION
Test Equipment Pressure Verification Before Test Pressure Verification After Test
% of Test Pressure 25% 50% 100% 100% 50% Precision Reference pressure tester 3225 6505 13005 13000 6505
Oontinuous pressure recorder 3200 6500 13000 13000 6500
ilDressure Gauge 3228 6505 13007 13000 6505
Version 3 (Revised 2018-03-01) Internal Document Page 1 of 4
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 25 of 43
‘L4NBRIDGE PRESSURE TEST FORM ENB-CFCS-PROC-002F413
I 41. I
MAINLINE USE ONLY Pressure recorder and
Precision Reference Tester Elevation High Point Elevation Critical Low Point Elevation
Location N/A N/A N/A
Pressure N/A N/A N/A
First 2 upstream and downstream welds
Location of Test Limits
Upstream Weld ID Coordinates (lat and long.) Downstream Weld ID Coordinates (lat. and long.)
No. 1 N/A N/A N/A N/A
No. 2 N/A N/A N/A N/A
PRESSURE TESTING REQUIREMENTS Note 1: Manually record temperatures to ensure equilibrium has been reached before pressurization according to FCS-014 or PCS-005 Note 2: Charts must be signed using ENB-CFCS-PROC-002F414 Pressure Test Chart ID Label
PRESSURE TESTING DESIGN REQUIREMENTS AND DURATION
Maximum Operating Pressure i 9,930 kPa
Can the entire piping system be visually inspected for leaks? Yes i4 No •
Test Type Design Min Pressure Design Max Pressure Time On Time Off Duration Required
Strength 12,413 kPa 13,283 kPa N/A N/A 1 hour
Leak 10,923 kPa 12,075 kPa N/A N/A 1 hour
ACTUAL TEST PRESSURES ACHIEVED AND DURATIONS .
Time Ori TiMe--• ctua ota a urabon Test Type Actual Min Pressure— -:r..essure - Actua) ax
Strength 13,000 kPa 13,000 kPa 12:05 1:20 1 hour 15 min
Leak 11,300 kPa 11,310 kPa 1:35 2:05 30 min
Time (approx. 15 min
intervals)
PRESSURE TESTING DATA
Ground Temp.
Test No.
(Weather,
Spread 9-Gretna tie-in section
test
Remarks Volumes Added/Bled Off)
Reference Pressure
Ambient Air Temp.
Test Medium Temp.
1hr Before Test BK-313
Above ground
10:40 2095 10°C 10.5°C N/A Check instrumentation
10:56 2095 10°C 10.5°C N/A Started squeezing to 25% of Test Pressure
11:00 3225 10°C 10.5°C N/A At 25% of TP; checking for leak
11:14 3225 10°C 10.5°C N/A Perform calibration check
11:16 3225 10°C 10.5°C N/A Started to squeeze to 50% of TP
11:27 6505 10°C 10.5°C N/A At 50% of TP; perform leak check
11:32 6505 10°C 10.5°C N/A Perform calibration check
11:40 6505 10°C 10.5°C N/A Started squeezing to 100% of TP
12:02 13005 10°C 10.5°C N/A At 100% of TP
12:04 13005 10°C 10.5°C N/A Perform calibration check
12:05 13000 10°C 10.5°C N/A Started strength test
Version 3 (Revised 2018-03-01) Internal Document Page 2 of 4
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 26 of 43
ENB-CFCS-PROC-002F413
ENBRIDGE PRESSURE TEST FORM itap
PRESSURE TESTING DATA Spread 9-Gretna tie-in section
Test No. test
Time (approx. 15 min
intervals)
Precision Reference Pressure
Ambient Air Temp.
Temperature
Test Medium Temp.
Ground Temp.
Remarks (Weather, Volumes Added/Bled Off)
12:15 13000 10°C 10.5°C N/A Raining since noon
12:25 13000 10°C 10.5°C N/A Still raining
12:35 13000 10°C 10.5°C N/A Still raining
12:45 13000 10°C 10.5°C N/A
12:55 13000 10°C 10.5°C N/A
1:05 13000 10°C 10.5°C N/A
1:15 13000 11°C 10.5°C N/A
1:20 13000 11°C 10.5°C N/A End of strength test
1:21 13000 11°C 10.5°C N/A Perform calibration check
1:25 13000 11°C 10.5°C N/A Begin de-pressurising to leak test pressure
1:34 11300 11°C 10.5°C N/A At leak pressure; perform leak check
1:35 11300 11°C 10.5°C N/A Started leak test
1:45 11300 11°C 10.5°C N/A
1:55 11305 12°C 10.5°C N/A
2:05 11310 12°C 10.5°C N/A End of leak test
2:08 11310 12°C 10.5°C N/A Started de-pressurising to 50% of TP
2:40 6505 12°C 10.5°C N/A At 50% of TP
2:45 6505 12°C 10.5°C N/A Calibration check
2:55 6510 12°C 10.5°C N/A Started de-pressurising pipe
Comments
DOCUMENT REVIEW,SIGNOFF
Contractor Rep Print DaneAke, \; ic4cs Sign jetil/c ,--- Date: YYYY/MM/DD 6/01V1 pfc910
Enbridge Rep Print Ruslan Hutsulyak Sign iotiv/c/lit/1// Date: YYYY/MM/DD 2018/10/26
Version 3 (Revised 2018-03-01) Internal Document Page 3 of 4
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 27 of 43
ENBR1DGE
HYDROSTATIC TESTING NOTIFICATION FORM - LP/MP (CANADA)
Complete the form and submit it to the regional or project Environment representative. Follow the instructions and submittal timelines as outlined in the Instructions section of this document. If any information on this form changes after submittal, a new form will be required.
0 New Form g Amendment to an Existing Form
Description of the Amendment: Notification for the hydrostatic test of Gretna Station Tie-in Section @ 1096+744/1096+872
Information Provided By: Date: Phone Number:
Danielle Vickers October 25, 2018 (587) 832-5455
A. PROJECT INFORMATION
Project Name: Line 3 Replacement On-site Contractor Name:
(responsible for the hydrotest)
Testco - SA Energy Group, 3rd Party Subcontractor
Project Location: (KP/KM Range, Terminal/Pump Station Name)
From 1000+363.8 in SW-19-4-8-mm to 1096+872.0
in SE-8-1-1-W1M.
Hydrotest Contractor Foreman Name:
Fraser Hyde
Enbridge Site Rep. Name: Dmitri Priadka — Enbridge Field Engineer Contractor Address: 110— 9th Avenue SW, Suite 300, Calgary, AB, T2P OT1
Enbridge Site Rep. Phone Number: Dmitri Priadka > (587) 334-0594 On-site Contractor Phone Number:
Testco: Fraser Hyde > (204) 781-6946 SAEG: Paul Prive > (780) 886-5257
Test Package or AFE #: (if applicable)
AFE #1440024A80 (LNS) Contract #510-809
Hydrotest Date Range: October 25, 2018 to October 31, 2018
Rev. 1 (September 2015) - Page 7
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 28 of 43
ENBRIDGE
B. INFRASTRUCTURE INFORMATION Infrastructure to be tested: • Mainline/Lateral/Connector • Facility Piping
apply, check other.
Tank • Other _indicate what will be tested. If none of the options
# New or Existing
Infrastructure
Pipe or Tank Description NPS (inside diameter in mm/
Tank Diameter (m)
Pipe Length (m)
Tank Height (m)
Hydro #2 New Pretest NPS 36, Grade 483, 12.7 mm WT line pipe section to be installed via open cut of the tie-in from mainline to Gretna station piping at approximately 1096+744 to 1096+872.
Inside diameter is 889.0 mm 128.0 m of pipe + 24.0 m of test heads =
—152.0 m Total Section Length
Note: If more than one water diversion source and/or water release location is proposed, please complete a row for each water diversion and water release location.
Rev. 1 (September 2015) - Page 7
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 29 of 43
ENBR1DGE C. WATER DIVERSION INFORMATION
#
Location of Source
(Diversion Site)
Water
Source
Type,
Name of
Water
Body
Type of
Additive
and Mix
Ratio (if
applicable)
Flow Rate
(m3/sec)
or Surface
Area (ha) of
Water Source
Location of the Start
and End Site(s) of
the Pipeline/Tank to
be Tested
Volume of
Water to be
Diverted
(m3)
Rate of
Diversion
(m3/sec)
or (m3/hr.)
Proposed
Date Rangel
to Divert
Water
(mm/dd/yy)
Diversion
Method
Transportation
Method
Legal Land Description
Start/
End
Legal Land Description
Hydro
#2
(Option 1)
Frieda Fill Station: LSD of Proposed Fill Water
Source is a well operated by the RM of Stanley
located in
SW-23-2-4-W1M.
Well N/A High flow rate
from pressure '
pump.
Start SE 8-1-1 W1M 100 m3 with allowance for
water to
pressure up the
section.
2 to 3 m3/minute
October 25, 2018 to October 31,
2018
Water
Pump -
+1- 4"
Truck water from
well operated by
RM of Stanley End SE 8-1-1 W1M
Hydro
#2
(Option 2)
Gnedentha/ Fill Station:
LSD of Proposed Fill Water Source is a well operated
by the RM of Rhineland located in NW-4-2-3-W1M.
Well N/A High flow rate
from pressure
pump.
Start SE 8-1-1 W1M 100 m3 with
allowance for
water to
pressure up the
section.
2 to 3
m3/minute
October 25, 2018
to October 31,
2018
Water
Pump -
+/- 4"
Truck water from
well operated by
RM of Rhineland End SE 8-1-1 W1M
Hydro #2
(Option 3)
Morden Lake Fill Station: LSD of Proposed Fill Water
Source is a well operated by the RM of Stanley located in
SW-6-3-5-W1M.
Well N/A High flow rate from pressure pump.
Start SE 8-1-1 W1M 100 m3 with allowance for
water to pressure up the section.
2 to 3 m3/minute
October 25, 2018 to October 31,
2018
Water Pump -
+1-4"
Truck water from well operated by
RM of Stanley End SE 8-1-1 W1M
Rev. 1 (September 2015) - Page 7
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 30 of 43
ENBRIDGE
It
Location of all Site(s) to
which Water will be
Released
Receiving Location
(e.g., Land, Water Body Type
and Name, Other Location
Description)
D. WATER RELEASE INFORMATION
Propose Date
Rangel to
Release Water
(mm/dd/yy)
Provide Description of the Treatment
and Mitigation Methods to be
Undertaken Prior to and During Release
Volume of Water
to be Released
(m3)
Rate of Release
(m3/hr)
Legal Land Description
Hydro
#2
LSD of Proposed Test Water
Release to Land is North of the
ROW in SE 8-1-1 W1M.
Released to vegetated/crop land in LSD
SE 8-1-1 W1M.
100 m3 Maximum 2
m3/minute
October 25, 2018
to October 31,
2018
Water will be released to a vegetated/crop land
that the right-of-way runs along on the North side.
Water will be run through a silt collecting bag and
erosion control measure that are deemed
necessary to protect the site will be in place.
1 — The date range of the withdrawal and release shall be within a maximum range of thirty [30] days.
Rev. 1 (September 2015) - Page 7
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 31 of 43
UTM NiE 5430685 m
605701 m CM:-99
Lat / Long 4a019991
-97.554262 Bev: 25 m
(SL, -1-1-W1 470 m North 342 m West
Bearing: 48° (TN) GPS: -±5 m Road 1N Road 4W
t..- 0: 43*
, ' v :I
Gretna Station pretest (Alternate) dewaic'r tr'nation
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 32 of 43
Legend
Feature 1
Gretna Test Section - Dewater KP 1096.6 ROW-CTL
ROW-CTL-Ver12 0
Temporary Workspace
The 49th Parallel Boundary, Prairie Section
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 33 of 43
3
4
16ft
ca
tII r.
11, m
nite
ralu
m
istr
umai
111
R
ultu
ninn
unun
stos
sost 41
mil
s go
lie w
ool
oiow
000 0
0••
•••/
Iffifili.
Na
mil 0/ .1.1,11
1
ii0
wirM
iM
witW
oo
1•01 •
••■ 0 1
mo
mmo ow
e°
17
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 34 of 43
4°• 0
. . . . le
.47
C zg' 0 •
w.... (,, 4. '0 $' ‘ZP V
cS.,,e 4' ? , .6' K •
41. ii. c• c., • • \- __0* .. _ k ke, • .
k' k • g' 0 0 4' '''' e' ,1/4. q-' 0 4,
.Z. 0 n;:. "s. Q. '(' q c• q C.. 4 q
0k 0 O'b '‘.9 e c'' ,c•F" :Cc ei,..?
0 ,,, 'Z' (4i a, <<; 4' •$, 44 , o-
C)
V-.'S
*5' 0 ,i..• (.• •• ,k <2 <`'
49 (z, 0 et, Q-
0 ,Qo 4., • c A
(I <. • 0.0 0 '7)
0
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 35 of 43
9 09:00
boo
0 0 0
VA Watient
\ AVM
SUS MMUS
es
ji:Altnnin7llol::::
supireginrilln11111111M1
00:2,2
01 6
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 36 of 43
:ppiww/AAAA ale°
quiJd
Va.A • 7Z/Vg/(32 :Pp/ww/AAAA ale
a :u2IS :11.1Pd
3AIIVIN3S3Hd311 3901/JEIN3 3AL1VIN3S3lid3H HOIDVHINOD
sniawamnbai u2!sap e9a1m3 SuRsal
ainssaid fie swain lim
p Japio3ai ainssaJd patpene atu
:Jolop uad w
awai3 anueiadwai
'eSuqi lu
awai3 amleJadwai
:Joio3 uad luawan ainssaid
:auejluawal3 a.mssaid
:•oN lsaiJope.quo3
:.oN qorpope.quoj
Ogig
kitt .ppiww/AAAA alea
firth
-vu/71 :uo!lepoi
TVA& _ ri4
41•7741 -7v,17 :p
alcud
Cfrii?Mhi :*o
N 3JV
uoRe3gRuaPI Ve43 1sai ainssaJd
3901118N3
uogannsuop Ampej
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 37 of 43
• aft.. • r
4.6".%".0‘
..*
....
"%ft.
.9
w.• ctk
wok_ 0
.•,10
0.. .0. ,
a mil 111..........000
%1
2
PR
SITE
D
IN
U.S
.A.
- -0•1
11
-0 --..:1:. - -.... __. N
‘C3 43\4
fa, 101 r4;:a.11
4
aim
I%
(3' -• : 0%
....Oxi -o 0 ; 5-::: --. ......
.. ,..loir• 004.0:4,-0- -r-m
isr.- -=
0
4, 4 ° • 1 ; P
' ` •,..0. 0
_7
10
0 O
rd
1,!..... 24.. ,S
IO. ....,- 11.--0" •7
:**1 rfr ' •
1.',,0_,- .--i_j'- ___
,• „..'salo
t
0 ,,, • r At o l ,
#4
'• • ..,
•• di, - -.7
- ,, ,,- ---. .. ,0 ,,...................
z.ns
70
10
3ra
r.0
0:
0.0
Or%
A
fto. O
W:
•••••••
‘osravir-triety,
11
, S
all%
Ilatatt lettli
'WO
W. 0
1•1
1......m
o
20
100.
•
•
0•0
000.
M
• • •
Va
tessta
nitin
al
41
12
11
11,1"6"161111 llhl
8\ 6.4
< t>
°
0
C<F
't•r> )
„
0
ii
"14"111111111111"1" cO
10
111111111111 • • •
is, • Sr4
•
llftIiUiin
i
sulA
taula
get r
, '1
"•1
13
‘ 0\
1111111111 mffiniumillihmummumbilimmillt1111110111111111
mmine NI 'Immo ii1011111111111111111111 NIMINImumumemoluffintiiiito
r1111,411111111/1
umumniimilowillIII11111111111111014 10410111,1111"1411
1
I
/
/
•
1
I k ,
**** "si 44*
I/1 ift*I
*It
4
‘‹\`'
...II& ,Ir
. .. 10‘ •,;.:
.4,440 .:2
"..%o
„....1
.'
—
''‘' ..1„.1.....„.. .....,.,:__.....,.-.. ...
.,......... j, m
...-
1 \
b41
q 4‘
11
4 14
4 t4
• • • 4 • 4
46
414
%
.%
.
%>
_*.,.. .
......
::::
op
,.,. ..„,,,.,,,...„........7.
...„...: , ...,. ..,
„*...„,....4
...ft.......„........., za-,... _
-,..,...... ...,...,„,.. 4„__,..._,.......
t..............._..,„
. ...:. . ,
. ....._.%.,....„......-.7,_ "ki.
,&•;,... ,---....,
40,
...,,;,,,. .,-,,......... .....
4,44. ....... ___ ..._ ......
-e- „_,... .,„.. 4....7
.
,11.........
Ja
....
....II...2
11 .2
,. .1
01
.,..
01
\
„,,..
7..... .. ...._
, ....._ ,41
,,„„._
,r.:
•-7
. 4,
...
, ...ii. se
,
fif.....
.. .1....ftr
ft. ft. ft. ift,
...0 oft ftft
ot, •0
4.•
.00 0.• eft.
10
%I.
soft
••,....
/
Ave..
....
,
..........:::: 4%.
417 ...._ ........,
tra.....0.1.-0.1.0., ,,,...-
............. ........%
.se...0
0,
...."
..
...
..al.
loP
.0 ..... ..... .00. 4,,
......., .....--0.: 6 ,,,...,
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 38 of 43
Facility Construction ENBRIDGE Pressure Test Chart Identification Label
AFE No.: 1110211EO Project: LAG, 3 S/0,/ Location: //reirl*.- .('*//i4.
Test Date yyyy/mm/dd: 0000/744 Contractor/Job No.: (,1A7? # .70 -go, Contractor Test No.: 6r-04u, 7;?--//7 IL/4K 7-et Pressure Element Range: Pressure Element Pen Color.
Temperature Element Range: — Si& J/ Tern Element Pen Color: !'9'J' 1 ) AL- 614)
rn , -11.‘ The attached pressure recorder chart meets all pressure testing criteria design requirements. CONTRACTOR REPRESENTATIVE
L...
) Print: ‘61e. \Jiciai- Sign: VA... Date yyyy/mm/dd: .00 IS/ )0 /aLo ENBRIDGE REPRESENTATIVE
Print: -4..../Iri P 1...- Sign:
Date yyyy/mm/dd:
•
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 39 of 43
7 19:0
0
8
9
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 40 of 43
:uSIS qu!-Id
TZ/Odt /40 :PP/ww/AAAA alea — /-7
3AI1V1N3S31:1d3k1390121EIN3
0) et 01 s106, :pp/ww/AAAAl
ea
.14474.11 ws!s
vp-jic\
3upd
3AIIVIN3S321d321/1013VIIINO3
-suiawaJpbaJ Asap e!Jalp SuRsal
ainssaid lie slaaw uetp Jape:13w ainssaJd patpeue atu
Jolop uad luawal3 ainleJadwai
luawai3 amleJadwai
:Jolop uad luawai3 amssaJd
C2tZ-0 :aue8 luaLual3 ainssam
k
5- (//-24 —vp.T :o sJope.nuoj
‘Of- ,96
ipy; :.0N clo1pope.nuo3
othoz :pp/ww/AAAA alea
vor • 5 --..1,14)e/ :
uopepoi
rijC/5' —
4v;"rxir
s- --at/7 :p
rom
Olt/I/700W :•oN 3JV
laqei uogeDguuapi 2JL1D saj ainssald
uo!pnusuo3 Ampej
30a1218N3 •
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 41 of 43
9 10
11
mil imeN111111 ""1"1 sou Motallialligunualid
Ittellallia6188318114 Waststswor " ‘s1 '
01 6
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 42 of 43
Print:
Sign:
Pressure Element Pen Color:
Temperature Element Range: - SOZ, DZ..
Temperature Element Pen Color: ted We.) PO_ iltv.A9
The attached pressure recorder chart meets all pressure
testing criteria design requirements.
CONTRACTOR REPRESENTATIVE
Ocantellf, \l‘c.Y4,6
/14/ 19-
• Date yyyy/mm/dd: Si 10/Q lo
ENBRIDGE REPRESENTATIVE
Print: 17 *Ai ici
Sign:
Date yyyy/mm/dd:
Facility Construction ENBRIDGE
Pressure Test Chart Identification Label
AFE No.: 1 11 L(COPIA0 - ( (e#.1 9
ZoigiV 26 tvP- Sin - goj
Tic Spo/ _(14fisi,
Project: LA,. Location:
Test Date yyyy/mm/dd:
Contractor/Job No.:
Contractor Test No.: 6rd IAA,
Pressure Element Range:
Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)
Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019
Page 43 of 43