93-1440024A80-HYD-9007 Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4) Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019 Page 1 of 43

KODAK Capture Pro Software

Embed Size (px)

Citation preview

93-1440024A80-HYD-9007

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 1 of 43

-.4

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 2 of 43

Enbridge Pipelines Inc. Major Projects ENBRIDGE

Hydrostatic Test Site Summary Line 3R — Spread 9 — Gretna Tie-in Spool Section Test AFE #: 1440024A80 (LNS)

The hydrostatic test of 121.6m of 914.4mm O.D. (NPS36), 12.7mm W.T., Grade 483 pipeline

was successfully completed on October 26, 2018. All equipment that was used (recorders,

deadweight, gauges, thermometer) was supplied with valid calibration certificates. Test heads

with acceptable documentation were utilized. Safety precautions were discussed and

communicated to all personnel involved within the testing scope. The test adhered to Enbridge

Pipelines PCS-005 and CSA Z662. More than 4m of heavy wall pipe (NPS36, 15.1mm WT,

Grade 483) was welded to the test heads as to ensure that a hoop stress greater than 90% of

SMYS did not occur within 4m of the test head connection.

The test section was made up of one pipeline class:

1.) 914.4mm OD, 12.7mm WT, SAW Spiral Seam, Grade 483, MOP 9,930 kPa

The test medium was water obtained from a municipal fill station. The section was filled, and

hydrostatic testing of the line commenced on October 26, 2018. The pipe was pressurized in

stages, with leak & equipment calibration checks conducted at 3,225 kPa and 6,505 kPa. All

leak checks were found to be acceptable. As pressure that would result in exceeding 100%

SMYS of the 12.7mm WT pipe was not achieved, a yield plot was not conducted.

The strength test commenced at 12:05 PM, October 26, 2018, and held for 1h 15m. The

pressure remained steady during the test at 13,000 kPa at the test point. The pressure test

exceeded the minimum requirement of 12,413 kPa (125% MOP) and was determined to be

acceptable.

Following the strength test, the pressure was reduced for the leak test. The leak test pressure

was below 90% SMYS of the 12.7mm WT pipe as to allow for a visual leak inspection of the

pipeline. The leak test began at 1:35 PM, on October 26, 2018, at a pressure of 11,300 kPa,

and held for 30 minutes. The pressure increased 10 kPa over the duration of the leak test,

which can be attributed to atmospheric conditions (warming air temperature). The leak test

Hydrostatic Test Site Summary

AFE #: 1440024A80 Test #: Line 3R — Spread 9 — Gretna Tie-in Spool Section Test

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 3 of 43

Enbridge Pipelines Inc.

Major Projects ENBRIDGE

exceeded the minimum requirement of 10,923 kPa (110% MOP) and no leaks were visually

identified. The leak test was determined to be acceptable.

Prepared By:

Dmitri Pria ka, P. Eng.

Enbridge Pipelines Inc.

Hydrostatic Test Site Summary

AFE #: 1440024A80 Test #: Line 3R — Spread 9 — Gretna Tie-in Spool Section Test

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 4 of 43

DIR

EC

TIO

N O

F

CO

NS

TR

UC

TI O

N

Hydro Test Section: Gretna Station Hydro Test NPS 36 - Gretna Station - Above Ground Hydro Test

Project: En bridge L3R Spread 9

Date: October 26, 2018

Rev 01

Page 1 of 2

WEST END TEST HEAD SERIAL NO.= E—L3R—TH-028

ELEV=252.93 L3R-9—TH-0012 LSD 8-8-1-1-1

1

Drawing STA. 1096.563

Drawing STA. 1096.605

1096+562.89 Pipe No. 15051 Heat No. RS1892 15.1mm W.T. Pipe No. 41656 Heat No. 523105 12.7mm W.T.

Pipe No. 41629 Heat No. 404170 12.7mm W.T.

1096+605.32

Test End: Pressure Recorder 1: BK-366 Pressure Recorder 2: BK-520 Digital Deadweight/Gauge: BK-477 Mechanical Deadweight: BK-324 Pressure Gauge: TES-002 Temperature Recorder: BK-313 Liquid in Glass Thermometer: 351066

ro L3R-9—SC-0164 r0 4 3-00 OB

to L3R-9—SC-0135

ro 4 3-45 SAG

• L3R-9—SC-0161

LOW POINT 3-45 SAG ELEV=252.62

12.7mm W.T. Installed = 121.63 15.1mm W.T. Installed = 9.75

Note: See Attached Pipelog for complete Pipe Data for Gretna Station Above Ground Hydro Test.

Pipe No. 41279 Heat No. 521531 12.7mm W.T.

Pipe No. 41632 Heat No. 404172 12.7mm W.T. Pipe No. 10139 Heat No. M17903 15.1mm W.T.

1096+694.27

Far End: Pressure Recorder: BK-330 Pressure Gauge: TES-005

o L3R-9—SC-0080

Temperature Recorder: BK-373

CNI L3R-9—SC-0142

(\I

L3R-9—SC-0163/Transition

rri L3R-9—TH-0011 ELEV=253.01 HIGH POINT

TEST HEAD EAST END SERIAL NO.= E—L3R—TH-025

LSD 1-8-1-1-1 Drawing STA. 1096.694

NOTES:

10 . Outside Diameter is 914.4mm Wall Thickness 12.7mm & 15.1mm Grade 483

Line Fill Volume 512.5 bbls, 81.5 m 3 Total Length DOES NOT Include Test Heads Chainages and Lengths are Generated from Top of Pipe (TOP.) Contour Chainage Elevations shown are to Top of Pipe (TOP.)

EMI EP17.-.41 12.!"UN :ANN MM0111 MM. MINN

Meridian Surveys

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 5 of 43

October 26, 2018

Enbridge - Line 3 Replacement - Spread 9 - NPS 36 Pipelog for Above Ground Hydro Test - Gretna Station

MFR 0.0. X

W.T.

Coating Seam Grade Approx. Dwg

Chainage Weld

Number

Pipe

Number

Heat

Number

Coating

Number

TJ/DJ

Number

Factory

Length

(m)

Individual Meas.

Joint Length

(m)

Measured Length

(m)

Bends

West End

Test Head Serial No.: E-L3R-TH-028

1096+562.89 L3R-9-TH-0012 Evraz Camrose

Evraz Regina

914.4x15.1 FBE Long 483 1096+562.89 11111111111111W

15051 RS1892 N/A DJ3216 24.42 4.01 4.01

483 1096+566.90 1096+566.90 914.4x12.7 FBE Spiral 41656 523105 2257 N/A 24.33 24.33 24.33 3-00 OB ,

914.4x12.7 1096+591.23

Evraz Regina FBE Spiral 483 1096+591.23 1096+615.56

41629 404170 2238 N/A 24.32 24.33 24.33 345 SAG

Evraz Regina 914.4x12.7 FBE Spiral 483 1096+615.56 41601 404171 2230 N/A 24.35 24.35 24.35

914.4x12.7 FBE 1096+639.91

Evraz Regina Spiral 483 1096+639.91 41279 521531 2236 N/A 24.29 24.30 24.30

Spiral 483 1096+664.21 1096+664.21 Evraz Regina 914.4x12.7 FBE 41632 404172 2240 N/A 24.31 24.32 24.32 1096+688.53

Evraz Camrose 914.4x15.1 FBE Long 483 1096+688.53 10139 M17903 N/A DJ743 19.03 5.74 5.74 1096+694.27 L3R-9-TH-0011

Test Head Serial No.: E-L3R-TH-025

East End

TOTAL LENGTH 131.38

Enbridge - L3R Spread 9 - NPS 36 - Rev01 Meridian Surveys Page 2 of 2

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 6 of 43

MP-CPCS-GUID-001F7 REV 1 TEST INSTRUMENTATION CALIBRATION TRACKING FORM ENBRIDGE AFE No: 1440024A80 (LNS) Date yyyy/mm/dd: 2018/10/26

Project Name: Line 3 Replacement Province/State: Manitoba

Spread: Spread 9, batch 1 Contractor/Vendor: Testco (subed by SAEG)

Note: Please refer to the most up to date Hydrotestinq Specification for limits Pressure testing equipment shall be field validated for function prior to and following each test

Type of Instrument Model # Serial # Manufacturer .

Date of Calibration Calibration Expiry

Date (30 days) Must Be Used By Date of 1st use

Expiry Date (if applicable)

1 LIG Thermometer N/A 351066 THERMCO 9/20/2018 Lifetime Lifetime 10/2/2018 Project Valid

3 Pressure Gauge 901 TES-005 CPVV 9/20/2018 30 10/20/2018 10/2/2018 Project Valid

6 Pressure Gauge 901 TES-002 CPW 9/20/2018 30 10/20/2018 10/2/2018 Project Valid

8 Mechanical DW 35255-01K BK-324 Refinery Supply 9/20/2018 30 10/20/2018 10/2/2018 Project Valid

11 Pressure Recorder N/A BK-330 Barton 9/20/2018 30 ,0on1 ' 10/2/2018 12/1/2018

12 Pressure Recorder N/A BK-520 Barton 9/20/2018 30 9/30/2018 11/29/2018

13 Pressure Recorder N/A BK-366 Barton 9/20/2018 30 10/20t2, 9/30/2018 11/29/2018

14 Temperature Recorder N/A BK-313 Barton 9/20/2018 30 10/20/2018 10/2/2018 Project Valid

17 Temperature Recorder N/A BK-373 Barton 9/20/2018 30 10/20/2018 9/30/2018 Project Valid

18 Digital OW XP2i 5000 PSI BK-477 (652590) Crystal 9/20/2018 30 10/20/2018 9/30/2018 Project Valid

Page 1 of 5

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 7 of 43

4-

Technician Witness

BERJA METER ec CONTROLS LTD. 831-77'h Avenue Edmonton, AB Canada, T6P 159

Telephone: (780) 440-1234 Facsimile: (780) 440-4775

E-mail: [email protected]

CE IFICAIE OF CALIBRATION

Dead Weight Tester

Customer: Testco Location: Edmonton Manufacturer: Refinery Supply Model #: 35255-01K Serial Number: BK-324 Range: 500 to 21,000 kPa Temperature: 20 C Cal. Date: Sept.20, 2018 Technician: JCL Due Date: Dec.20,2018 Accuracy: +0.1% FS Accuracy

Reference Reading Weight Amount Weight Letter

501 KPA 500 KPA (TA B L El 5 KPA 5 KPA B 5 KPA 5 KPA A

10 KPA 10 KPA C 10 KPA 10 KPA D 10 KPA 10 KPA 10 KPA 10 KPA 51 KPA 50 KPA H

100 KPA 100 KPA J 100 KPA 100 KPA K 100 KPA 100 KPA L 100 KPA 100 KPA M 500 KPA 500 KPA N 500 KPA 500 KPA 0

1000 KPA 1000 KPA P 1000 KPA 1000 KPA S 1000 KPA 1000 KPA R 1000 KPA 1000 KPA Q 4998 KPA 5000 KPA T 4999 KPA 5000 KPA U 4999 KPA 5000 KPA

The above unit was compared to a Crystal Master Deadweight Serial Number 758496, traceable to The National Institute of Standards and Technology (NIST). Calibrations are in accordance with API6A, 17th Edition, Section 7.3

Quality, Service & Integrity Since 1975

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 8 of 43

Model Uncertainty

+/- 2% of span JJF

BERJA Meter & Controls Ltd. 831-77th Avenue, Edmonton, Alberta, Canada 16P 1S9 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shopdberjagroup.com

Certificate of Calibration Report number FASTCAL-003857

Company LocaNan Date of P.O. P.O. Number

Testco(Scrnmerville1 Eamon on 9 /20/2018

Manufacturer Model i Serial Number Calibration Date Expiration Date

Barton Recorder Dual Temperature (-50 to 50C) BK-373 9/20/2018 12/20/2018

Date Forrnat- (nrnidd/vvvy)

As Received Condition: In tolerance As Left Condition: In tolerance

All instrument calibrations are verified for accuracy before they ore shipped. The recommended calibration interval for this instrument is 12 months from the date of verification. Your particular quality assurance requirements may supersede this recommendation.

All calibrations are performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994. MIL-STD 45662A, 10CFR21 and I OCFR50 when specified by customer documentation.

Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RH Pressure 100 to 103 kPa

Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N: 479424

This test instrument is calibrated in compliance with Canadian Standards Association CAN3-Z299-3-85, A.N.S.I. 840-1 and/or API 60, 7.2.0 through the following report numbers:

Manufacturer Model Serial Number Report Number Due Date Ir Reference Uncertainty

Crystal Engineenng

2KPSIXP21 758496 FASTCAL-C38604 5/1/2019 ':•-z-.7, Of S. 0.02% FS. 20%-100% of ,•,:- •:.

c(i.% reading

Fluke 51 i 20640230 112377 12/14/2018 0.05% + 0.3°C

This certificate shall not be reproduced except in full, without written approval.

Laboratory Repre e Quality Representative

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 9 of 43

Test Results Report number FASTCAL-003857

Temperature As Received Test Results

Blue Pen

Reference Reading

Gauge Reading Allowable I

Tolerance Difference

Difference (% of FS)

Condition

3.50 3.20 2.0 -0.3 -0.24% Pass 20.00 2080. 2.Ci 0.8 0.64% Pass 40.20 40.20 2.0 0.0 0.00% Pass

Red Pen

Reference Reading

Gauge Reading Allowable Tolerance

Difference (% of FS)

Condition

1.40 1.90 2.0 0. - 0.407 Pass

20.00 19.80 2.0 -0.2 -0.16% Pass 39.40 39.00 2.0 -0.4 -0.32% Pass

Temperature As Left Test Results

Blue Pen

Reference Reading

Gauge Reading Allowable Tolerance

Difference Difference (% of FS)

Condition

3.5C1 3.20 2.0 -0.3 -0.24% Pass

20.0C1 20.80 2.0 0.8 0.64% Pass 40.20 40.20 2.0 0.0 0.00% Pass

Red Pen

Reference Reading

Gauge Reading Allowable Tolerance

Difference Difference (% of FS) 1

Condition

1.40 1.90 2.0 0.5 0.40% Pass

20.00 19.80 2.0 -0.2 -0.16% Pass

39.40 39.00 2.0 -0.4 -0.32% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 10 of 43

Model Uncertainty Technician

JE 2?; of span lb

Company Location Date of P.O. P.O. Number

Tesrco(Sommen.,ilie) Edmonton 9/20/2018

Model Serial Number Calibration Date Expiration Date

Duo] Temperature (-50 to 50 C) BK-313 9/20/2018 '2/20/2018

Manufacturer

Bob"Peco- der

Data Format- I rom/dd/vvvvl

Quality Representative

This certificate Shall not be reproduced except .n fuli, without written approval.

Laboratory Represe

BERJA Meter & Controls Ltd. 831-77th Avenue, Edmonton. Alberta, Canada T6P 159 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shop 4beriagroup.com

Certificate of Calibration Report number FASTCAL-003670

As Received Condition: In tolerance As Left Condition: In tolerance

All instrument caribrations are verified for accuracy before they are shipped. The recommended calibration interval for this instrument is 12 months from the date of verification. Your particular quality assurance requirements may supersede this recommendation.

All calibrations ore performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994, MIL-STD 45662A, 10CFR21 and 10CFR50 when specified by customer documentation.

Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RH Pressure 100 to 103 kPa

Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N: 479424

This test instrument is calibrated in compliance with Canadian Standards Association CAN3-7299-3-85 A.N.S.I. 840-1 and/or API 60, 7.2.0 through the following report numbers:

Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty

Crysta Engineering

15KPSIXE., -4.7 c 9-' C36192 7/3/2019 F.: PS 2C'7., )0,7, o' FS:

0.1", reoging

Fuke 51 II 20640230 112377 I J21/2019 C, C),': °0.3O

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 11 of 43

Reference Readin

Gauge Reading Allowable Tolerance

Difference Dffference

% of FS Condition

Test Results Report number FASTCAL-003670

Temperature As Received Test Results

Blue Pen

Reference Reading

Gauge Reading Allowable Tolerance

Difference Difference (% of FS)

Condition

-1.20 2.1 0.2 0.16% Pass

14.00 14.51 2.9 0.5 0.40% Pass

46.701 46.5c 2.0 -0.2 -0.16% Pass

Red Pen

Reference Reading

I Gauge Reading

Allowable Tolerance

Difference Difference (% of FS)

Condition

-1.00 -1.20 2.0 -0.2 -0.16% Pass

14.00 14.001 2.0 0.0 0.00% Pass

45.40 46.00 2.0 0.6 0.48% Pass

Temperature As Left Test Results

Blue Pen

Reference Reading

Gauge Reading Allowable Tolerance

r Difference

Difference (% of FS)

Condition

-1.20 -1.00 2.0 0.2 0.16% Pass

14.00 14.50 2.0 0.5 0.40% Pass

46.70 46.50 2.0 -0.2 -0.16% Pass

Red Pen

-1.00 2.Ci 0.0 0.00% Pass

14.00 14.50 2.0 0.5 0.40% Pass

45 40 46.50 2.0 1 1 0.88% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 12 of 43

BERJA METER &

CONTROLS LTD. berjagroup.com 780-440-1234

4 Notes: Accu Accuracy,

aboratory Representative

831 — 77th Avenue Edmonton, Alberta, T6P 1S9 [email protected]

Temperature Comparison Certificate ABSA-Certification of Authorization

Reg. No AQP-21609

Certificate Details Company: Testco(sommerville) Calibration Date- 9/20/2018 Location: Edmonton Certificate Number: TC-1022 Technician: JCL Work Ticket Number: N/A

Instrument Details Manufacturer: THERMCO Description: Glass Thermometer Model: Total immesion Temperature Range: -50°C To 50°C Serial Number: 35 ,C . I,.=',6 Reference Instrument: Fluke 5111 S/N:20640238 Tag Number: N/A

Results Reading Reference Reading Test Instrument thilidirii

1 0.7°C 1.0°C 2 15.0°C 15.5°C 3 33.3°C 34.0°C 4 48.3°C 50.0°C

Room Temperature: 20°C

Berja Meter & Controls Ltd. certifies that the instrument described above meets or exceeds all specifications as stated in the procedure. It has been calibrated using measurement standards traceable to the SI though the National Institute of Standards and Technology (NIST) and is in compliance with Canadian Standard Association CAN3-Z299.3-87(R2007) and A.N.S.I. B40-100-2013

Quality Represent we'

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 13 of 43

I 20/2018 CPWSI 901.0 3000P51

Technician Model Uncertainty

Cl

As Left Condition: In tolerance As Received Condition in tolerance

Model Serial N Manufacturer

Dote Formal,. irnrn 'cicryyyy)

This certificate shall not be reproduced exce.p' n rill vplhou, written approval

Laboratory Representative Quality Representative

BERJA Meter & Controls Ltd. ..,,c)nton , Lierto Canada 161' ist? • Ph. 17801 440-1234 FE (7801 440-4775 email shopii beriagroup con,

Certificate of Calibration Report number FASTCAL-C39593

Company Location Date 01 P.O. P.O. Number

Testcor,ommerville) Edmon lois 9/20/2018

All instrument calibrations are verified for accuracy before they are shipped. The recommended calibration interval for this instrument is

12 months frorr the date of verificofion. Your particular quality assurance requirements may supersede this recommendation.

All calibrations are performed in o controlled environment by qualified personnel using instrumentation and methods which guarantee

that specifications claimed are reliable. Calibrations conform to ANSI/NCR Z540-1-1994. MIL-STD 45662A, 10CFR21 and 10CFR50 when

specified by customer documentation.

Laboratory ambient conditions throughout this calibration were Temperature 20 to 24 *C Humidity 30 to 55% RH Pressure 100 to 103 kPa

Accuracy of actual pressure reading is troceble to NISI Standards on Crystal nvision S/N 479424

This test instrument is calibrated in compkance with Canadian Standards Association CAN3-Z299 3-85 A.N.S.I. 840- 1 and/or API 60. 7.2.0 through the following report numbers:

Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty

ci cit

462901 C39056 7/3/2019 ..)-.:01. of rs..0.02". :A i-Sr 20 % • 00% 0 Fr.

t10.1% of Rcigj

J As Received Test Results 3000 PSI

Reference Reading

(PSI)

Gouge Readingl

(PSI)

Allowable

Tolerance Difference (PSI)

Difference

(% of FS) Condition

48,0 500 30 0.40% Pais

1006 1000 30 -0.20% Pass

150 f 1500 30 0.03% Pass

1773 2000 ao 2 7 r--- 0.90% Pass

2477 2500 30 23 0.77% Pass

2776 locto 30 24 0.80% Pass

As Lett Test Results 3000 PSI

[

Reference Reading

(PSI)

Gouge Reading

(PSI)

Allowable

jroleronce Difference (PSI)

Difference

j (% of FS)

Condition

483 .:00. 30 12 0 40 . Pass

700 1000 30 -6 0 20'; Pass

r 150 1 IT 1500 30 L____ 1 0 03''' Pass

I 473 2000 30 2 7 0.90% Pass

247" 2500 30 23 a77% Pass

2q76 J 3000 30 L 24 0.80% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 14 of 43

Company LocaKOn I Date of P.O. P.O.Number

Edmonton 9/20/2018

laboratory Representative Quality Representative

BERJA Meter & Controls Ltd. 831-77th Avenue Edmonton, Alberto. Canada 16P 159 • Ph- (7801 440-1234 Tx: (780) 440-4775 email shop iiberiagroup.com

Certificate of Calibration Report number FASTCAL-C39595

Manufacturer Model Serial Number Calibealion Date

Expiration Date

901.0-3000P3: 9/20/2018

Oahe Formal. (mmiddiyYYY)

Model Uncertainty Technician

A SIDCIn r 71

As Received Condition, in tolerance As Left Condition: In tolerance

All instrument calibrations are verified for accuracy before they ore shipped. The recommenced calibration interval for this instrument is

12 months horn the date of verification. Your particular Quality assurance requirements may supersede this recommendation.

All cahbrations are performed in a controlled environment by qualified personnel using instrumentation cod methods which guarantee

that specifications claimed are reliable. Calbrations conform to ANSI/NCSL 1540- 1 1994, MIL-STD 45662A. 10CFR2 I and 10CfR50 when

specifed by customer documentation.

Laboratory ambient conditions throughout this coNaration were: Temperature 20 to 24° C Humidity 3010 55% RH

Pressure IDO to 103 kPa

Accuracy of actual pressure reading is traceble to NISI Standards on Crystal nVision S/14: 479424

This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85.

A N.S 840. I 6P1 60. 7 .2 C through the to,I.:;wing report numbers:

Manufacturer Model Serial Number 4.Reod Number Due Date Reference Uncertainty

Ei )gif 1,,-!,4 I I PJ

4029J i ,-., i'; )5e, ',"/".20 i 9 !('). :% ...,/ Fticy

As Received Te t Results 3000 PSI

Reference Reading

(PSI)

Gauge Reading Allowable Di Difference (PSI)

(PSI) Tolerance

Difference

(% of FS) Condition

500 30 7 -0.23% F u

1010 1000 jr- 30 J 0 -033"; Pass

1513 1500 30 -13 -0 43 . Pass

2014 I 2000 30 14 -0.47% Pass

2527 2500 30 -20 -0.67% Pass

3011 3000 30 -11 0.37% Puss

As Left Test Results 3000 PSI

Reference Reading1

(PSI)

Gauge Reading

(PSI)

Allowable

Tolerance

I I Difference (PSI)

i Difference

(% of FS) Condition

507 501) 30 0.23'0 Pass

1017 1000 30 IC 0.320 Pass

I 51 :A I 500 if 30 13 -0..120 i Pas

2014 2000 if 30 14 -0.47'; Puss

30 -0.67% if Pass

30 -0.37% Pass

This certificate shall not be reproduced except in full, without written approval.

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 15 of 43

Model Uncertainty Technician

This certificate snail not be reproduced except in tut without written approval.

Laboratory Representative Quality Representative

BERJA Meter & Controls Ltd. 831-77th Avenue Edrnorlon COn0d0 T6P ' S9 • Ph (780) 440-1234 Pic (780) 440-4775 email shop benagroup.com

Certificate of Calibration Report number FASTCAL-003922

Company —T.—location DON of P.O. P.O. Number

- e‘;1•7•.,(50ifitnervile.) 11 Edmonton 9/ 20/2018

Manufacturer Model Sedal Number Calibration Dote Expiration Date ,

Barton Ri,i.ccyder 21000 r Po Single Pen 9/20/2018 12/20/2018

Dole Formal- (rnm/dcl,vvvv)

As Received Condition: In tolerance As Lett Condition: In tolerance

All instrument calibrations ore verified for accuracy before they are shipped. The recommended calibration intervol for this instrument is 12 months from the dale of verification Your particular quality assurance requirements may supersede this recommendation.

All calibrations are performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-I-1994, MIL-STD 45662A. 10CFR2I and 10CFR50 when specified by customer documentation.

Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidity 30 to 55% RN Pressure 100 to 103 kPo

Accuracy of actual pressure reading is traceble to MIST Standards on Crystal nVision S/N: 479424 This lest instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85 A.N.S.I 840-I and/or API 60. 7.2.0 through the following report numbers:

Manufacturer Model Serial Number Report Number Due Date Reference Uncertainly

Enocj 15X•PioTP21 476697 C39055 7/3/20 I ?

- 2ox of is: •/ 0.02% SS 20%400% of Fs - c.,% ,earn,i

I l • SI , i 20640230 11237 7 11/21/2018 ___I

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 16 of 43

Test Results Report number FASTCAL-003922

As Received Test Results 21000 kPa

Reference Reading (kPa)

Gauge Reading (kPa)

Allowable Tolerance

Difference (kPa) I Difference

(% Of FS) Condition

0 210 0 0.00% Pass

4182 4200 210 18 0.09% Pass

8346 8400 210 54 0.26% Pass

12603 12600 210 -3 -0.01% Pass

16801 16800 210 -1 0.00% Pass

21093 21000 210 -93 -0.44% Pass

As Left Test Results 21000 kPa

Reference Reading

, (kPa) Gauge Reading

(kPa)

Allowable Tolerance

Difference (kPa) Difference (% of FS)

Condition

0 0 2101 0 0.007; Pass

4182 4200 210 18 0.09% Pass

8346 8400 210 54 0.26% Pass

12603 12600 910 -3 -0.01% Puss

16801 16800 210 -1 0.00% Pass

21093 21000 210 -93 -0.44% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 17 of 43

Model Uncertainty Technician

As Received Condition: in tolerance As lett Condition: In tolerance

A:)I^AE I A C)7

Company Location Date of P.O. P.O. Number .1lcor2oirr-ier,i1;

i Edfrioril1 9/2012018

Manufacturer Model Serial Number r

Calibration Date Expiration Dote tiorton Pecorder 20220 t Pa Single Pen .lif'3''' Y/20/2r.!18 12/20/2018

Date Format- f mmidd/wwl

This certificate shall not be reproduced except in full, without written approval.

Laboratory Representotive Quail y Representative

BERJA Meter & Controls Ltd. 831-77th Avenue Fdmonton, Alberto Canada T6P 1S9 • Ph: (780) 440-123.4 Fe: (780) 440-4775 email shop 4 beiiagroup.com Certificate of Calibration Report number FASTCAL-003923

All instrument calibrations are verified tor accuracy before they are shipped. The recommended calibration interval for this instrument is 12 months from the dote of verification. Your particular quality assurance requirements may supersede this recommendation.

All calibrations are performed in a controlled environment by quokfied personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL 1540-1-1994 MIL-STD 45662A. 10CFR2 I and 10CFR50 when specified by customer documentation.

Laboratory ambient conditions throughout this calibration were: Temperature 20 lo 24° C Humidity 30 to 55% RH Pressure 100 to 103 kRo

Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nVision S/N. 479424 This test instrumen is calibrated to compliance with Cr:mar:ion Standards Association CAN3-1299-3-85 A NSI 940- 1 and/or API 60 7 7 C through the following report numbers:

Manufacturer Model Serial Number Report Number j Due Date Reference Uncertainly Crystal

Engineering I SKPSVP21 470697 C 39,i;":5 '. 3/ JO i ? 1 , , 7

0 trt

Fluke -il ii 10040230 ,).0%-, . ti r

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 18 of 43

Test Results Report number FASTCAL-003923

As Received Test Results 21000 kPa

Reference Reactg‘ (kPa)

Gauge Reading

(kPa)

Allowable Tolerance

Difference (kPa) Difference (% of FS)

Condition

0 0 210 0 0.00% Pass

4225 4200 210 -25 -0.12% Pass

8375 8400 210 25 0.12% Pass

12678 12600 210 -78 -0.37% Pass

16757 16800j 210 43 0.20% Pass

20988 21000 210 12 0.06% Pass

As Left Test Results 21000 kPa

Reference Reading (kPa)

Gauge Reading

(kPa)

Allowable Tolerance

Difference (kPa) Difference (% of FS)

Condition

0 0 210 0 0.00% Pass

4225 4200 210 -25 -0.12% Pass

8375 8400 1 210 25 0.12% Pass

12678 12600 210 -78 -0.37% Pass

16757 16800 210 43 0.20% Pass

20988 21000 210 12 0.06% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 19 of 43

This certificate shall not be reproduced except in lull, without written approval.

Laboratory Representative Quality Representative

BERJA Meter & Controls Ltd. 83I-7 7th Avenue Edmonton Alberta Canada T6P I S9 • Ph (780) 440-1234 Ex: (780) 440-4775 email: [email protected]

Certificate of Calibration Report number FASTCAI-C39749

Company Location Date of P.O. P.0• Number 1,-0,-;,)(S -.•,rrir-t),_-:r ,11,,1 Edrn1-0.3n ?, 20/2018 ii

Manufacturer L Model Serial Number Calibration Date Expiration Date , p21 5CC0 '-'31 B. 4Th 85259O 652590i ?;20/2018 9/2()K2':

Data Formot• (mm,c1d,yyyy)

Model Uncertainty Technician i 1'; LE

As Received Condition: In tolerance As Left Condition: In tolerance

All instrument calibrations are verified for accuracy before they ore shipped. The recommended calibration interval for this instrument Is 12 months from the dote of verification. Your particular quality assurance requirements may supersede this recommendation.

All calibrafions ore performed in a controlled environment by quolified personnel using instrumentation and methods which guarantee that specifications claimed ore ratable. Calibrations conform to ANSI/NCR 1540-1-1994. M1L-STD 45662A. 10CFR21 and 10CFR50 when specified by customer documentation.

Laboratory ambient conditions throughout this calibration were: Temperature 20 to 24° C Humidly 30 to 55% RH Pressure 10010 103 kPo

Accuracy of actual pressure reading is traceble to NIST Standards on Crystal nvision S/N: 479424 This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85. Ails! B40.1 and/or API 6C 7 2 c ihror.gh the following report numbers

Manufacturer Model Serial Number Report Number Due Date Reference Uncertainty Crystal

Engineenng 479424 U17418 7 /31 /2019 i• 304'. c• F -F. ,L.1.0..3.; .:I Fir JO', 1 .., • .

1.10.1%or Rdg)

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 20 of 43

Cr,

A

, C) -0

..0

A

A

0

0

C..)

,0

0

0

C...)

A

-0

-0

r...) 0

,C

0

r...)

Cr,

CD

CD

N

0

0

0

Cr,

0

0

0

0

0

Cr.

0

0 0

XI eD

70

0

(D

0: i

r 5 -

ko

(1) =

-c

o in

CD

....

.....

o

4500.0 4000.0

Co

C 0

0

b

CD

3000.0 2500.0 2000.0

(r,

0

0

b

——

0

0

0

b

Cp

0

0

b

Gauge Reading I (PSI)

cn

.r...

..

c.)

C.)

c...)

no

K.)

_ Allowable Tolerance

0 0 0 T

CD

CD 0

Difference (PSI)

CD

f,) 0

0

NJ 0

boob

0

N..) 0

0

IV

0

0.02%

0

b

0

O-9

0

b

0

0

0

b

0

0

0.00%

00

00

00

0 0

Difference (% of FS) I

Pass I

-0

0

ln

- 0

0

1-n

-a

0

ol

-0

0

ca,

Pass

--C

0

in

Passl

'V

0

tn

"0

0

in

-0

0

tn

0

0

7

Q.

ai

0

=

: -A

.0

...

0 -.0

1 4499

-0

-0

.0 (,) .

1 34991

K)

'0

.:',S)

K)

CM

8 N

8

0(1'

8

0

8 cr

, 8 0

Reference

Reading (PSI)

sooaq 4500.0 4000.0 3500.0

co

0

0

0

.0

2500.0 2000.0

_

C 0

0

1000.0

Cr.

0

00

DC

)

Gauge Reading (PSI)

Cr.

-t....

.1,

(..)

C.,

GI

ND

N

Allowable Tolerance

--.

--.

—.

--. 0 0 0 0 0 r)

0

ai

CD 0 = n

ro

a.,

.11

41)

••=

0

0.02%

pp

00

N..)

1...)

0.02%

0

to o

CD

0

coo

bbQ

bbbc

, o

CD

0

0

0

0

0

c._)

Difference (% of FS)

-0

0

,J7

-0

0

VI

-0

0

VI

-0

0

VI

-0

0

VI

-o

0

VI

Passi

-0

0

Pass]l

-0

00

VP

-o

VI

0

o

=

a

S

o

z

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 21 of 43

Barton Recorder

Technician Model Uncertainty

LF

As Received Condition: In tolerance As Left Condition: In tolerance

Serial Number I Calibration Date Expiration Date

-+ '21J '2018 1 12/20i2018 1

Manufacturer

2 1 000 KPo Single Per,

Dote Format- frnm!ddlvvvvl

Model

This certificate shall not he reproduced except in full, without wntten approval

Loboratory Representative Quality Representative

BERJA Meter & Controls Ltd. 631-77th Avenue Edmonton. Alberta. Canada T6P 159 • Ph: (780) 440-1234 Fx: (780) 440-4775 email: shopiberjagroup.com

Certificate of Calibration Report number FAS1CAL-003921

Company LOCOS= Date of P.O. P.O. Number - -

TesicclSor--.nier .ille, Edmonton 9/20/2018

All instrument calibrations are verified for accuracy before they ore shipped. The recommended ca5bration interval for this instrument is 12 months from the dole of verification Your particular quality assurance requirements may supersede this recommendation.

AO calibrations ore performed in a controlled environment by qualified personnel using instrumentation and methods which guarantee that specifications claimed are reliable. Calibrations conform to ANSI/NCSL Z540-1-1994. MIL-SID 45662A, 10CFR21 and 10CFR50 when specified by customer documentotion.

Laboratory ambient conditions throughout this calibration were - Temperature 20 to 24°C Humidity 30 to 55% RH Pressure 100 to 103 kPa

Accuracy of actual pressure reacirvg is traceble I NIST Standards on Crystal nVision S/N: 479424 This test instrument is calibrated in compliance with Canadian Standards Association CAN3-1299-3-85 A.N.5.1. B40-1 and/Or API 60. 7 2.0 througn the following report numbers:

Manufacturer Model Serial Number . Report Number Due Date Reference Uncertainty

Crystal ISKPSIXP21 Engineering 46697 7/3/201

..57% ol FS' • . 0.0.f% is ;0% i Aft vi , • 0 I i reacitna

i

Fluke 51 I 20640230 1 2 ; ' ' 1/21/2018 / 05% . ) l'Ir

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 22 of 43

Test Results Report number FASTCAL-003921

As Received Test Results 21000 kPa

Reference Reading (kPa)

Gauge Reading (kPa)

Allowable Tolerance

Difference (kPa) Difference (% of FS)

Condition

0 0 2 1 0 0 0.00% Pass

4285 4200 210 1 -85 . -0.40% Pass

8436 8406 210 -36 -0.17% Pass

12781 12600 210 -181 -0.86% Pass

16974 16800 210 -174 -0.83% Pass

21134 21000 210 -134 -0.64% Pass

As Left Test Results 21000 kPa

Reference Reading (kPa)

Gauge Reading (kPa)

Allowable Tolerance

Difference (kPa) Difference (% of FS)

Condition

0 210 0 0.00% Pass

4285 4200 210 -85 -0.40% Pass

8436 8400 210 -36 -0.17% Pass

12781 12600 210 -181 -0.86% Pass

16974 16800 210 -174 -0.83% Pass

21134 21000 210 -134 -0.64% Pass

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 23 of 43

Line 3 ReplacemeMoject - Spread 9

Hydrostatic Testiligiculation Sheet

line 3 Replacement

Spread 9

Pipe Diameter (mm): 914.4

Pmax SMYS, Strength Test: 99%

Pmax SMYS, Leak Test: 90%

Strength Test

Test Point 0+000

Test Point Elev. (m) 0.00

Text Pressure - Aim (kPa) 13,000.00

Test Pressure - Mid (kPa) 12,847.50

Test Pressure - Min (kPa) 12,412.50

Test Pressure - Max (kPa) 13,282.50

Leak Test

Test Point 0+000

Test Point Elev. (m) 0.00

Text Pressure - Aim (kPa) 11,300.00

Test Pressure - Mid (kPa) 11,499.00

Test Pressure - Min (kPa) 10,923.00

Test Pressure - Max (kPa) 12,075.00

Calculated By:

Na me Alin /7-111.Ciit4i/

Sign

Date

Project: L3R - Spread 9

Date: 26-Oct-18

Linepipe Section WT(mm) Steel Grade Design MOP (kpa) From KP To KP Test Heads APE 9: 1440024A80

112.7 48319930 10+000 10+000 Owner: Enbridge Test Section: L3R-S9-Gretna Spool

Tags: E-13R-TH-025 & 028 From KP: 0+000

MAWP: 14,890.00 kPa To KP: 0+000

Strength Test

Mainline WT Point of Significance KP Elevation (m) MOP (kPa) 100% SMYS Pv,in (kPa) 1,,,,,„ (kPa) Pauv.i (kPa) PA.., %SMYS Ppc,.., %MOP Range Check Pwv Cal) (kPa) P,„,„ Cap (kPa)

12.7 Section Start 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50

12.7 Critical Low Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50

12.7 Physical Low Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50

12.7 High Point 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50

12.7 Section End 0+000 0.00 9,930 13,417 12,412.50 13,282.50 13,000.00 96.9% 130.9% In Range 587.50 282.50

Leak Test

Mainline WT Point of Significance KP Elevation (m) MOP (kPa) l00% mars Prnin (kPa) Pr... (kPa) Pm (kPa) P5,,„, %WATS P., %MOP Range Check P,„,,, Cap (kPa) P,„„ Cap (kPa)

12.7 Section Start 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00

12.7 Critical Low Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00

12.7 Physical Low Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00

12.7 High Point 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00

12.7 Section End 0+000 0.00 9,930 13,417 10,923.00 12,075.00 11,300.00 84.2% 113.8% In Range 377.00 775.00

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 24 of 43

ENB-CFCS-PROC-002F413

ENBR1DGE PRESSURE TEST FORM I el AFE No. 1440024A80 Province/State Manitoba

'roject Name L3 Replacement Station Name Gretna

Contractor/Vendor/PLM Testco Western/SAEG Location/Milepost SE 8-1-1 W1M

Contract Ref. No.: e.g. (WO, PO, CWP) CWP #510-809 Date: YYYY/MM/DD N/A

Identify Metric or units: kPa El or psi CI L [E] or gal. 111 or °F LI m or ft ICI

PRESSURE TEST INFORMATION

Test Date: YYYY/MM/DD 2018/10/26 Test No. Spread 9-Gretna tie-in section test

Drawing No.(s) and rev:

N/A

Test Media

Test Media Type Water ' Air NI Water with Additives E

Approximate Test Media Volume 82 m3 Type of Additive N/A

Were permits for the use and disposal of water obtained? Yes Ii No Permits were required •

PIPE SPECIFICATIONS ,

Manufacturer Grade NPS/OD Wall

Thickness (USA

Length

only)

Seam Type

Evraz 483 36" 12.7 mm 121.6 m spiral seam

TEST EQUIPMENT DATA

Equipment Type Make Range Serial No. Precision Reference pressure tester Refinery Supply 500-21000 kPa BK-324

Continuous pressure recorder Barton Recorder 0-21000 kPa BK-366 / BK-520 / BK-330

Pressure Gauge Crystal 0-34400 kPa BK-477

Liquid in Glass Thermometer Thermo° -50°C to +50°C 351066

Ambient Air Temp Recorder N/A N/A N/A

Test Medium Temp Recorder Barton Recorder -50 C to +50 C BK-313 / BK-373

Ground Temp Recorder Barton Recorder -50 C to +50 C BK-313 / BK-373

ACY VERIFICATION

Test Equipment Pressure Verification Before Test Pressure Verification After Test

% of Test Pressure 25% 50% 100% 100% 50% Precision Reference pressure tester 3225 6505 13005 13000 6505

Oontinuous pressure recorder 3200 6500 13000 13000 6500

ilDressure Gauge 3228 6505 13007 13000 6505

Version 3 (Revised 2018-03-01) Internal Document Page 1 of 4

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 25 of 43

‘L4NBRIDGE PRESSURE TEST FORM ENB-CFCS-PROC-002F413

I 41. I

MAINLINE USE ONLY Pressure recorder and

Precision Reference Tester Elevation High Point Elevation Critical Low Point Elevation

Location N/A N/A N/A

Pressure N/A N/A N/A

First 2 upstream and downstream welds

Location of Test Limits

Upstream Weld ID Coordinates (lat and long.) Downstream Weld ID Coordinates (lat. and long.)

No. 1 N/A N/A N/A N/A

No. 2 N/A N/A N/A N/A

PRESSURE TESTING REQUIREMENTS Note 1: Manually record temperatures to ensure equilibrium has been reached before pressurization according to FCS-014 or PCS-005 Note 2: Charts must be signed using ENB-CFCS-PROC-002F414 Pressure Test Chart ID Label

PRESSURE TESTING DESIGN REQUIREMENTS AND DURATION

Maximum Operating Pressure i 9,930 kPa

Can the entire piping system be visually inspected for leaks? Yes i4 No •

Test Type Design Min Pressure Design Max Pressure Time On Time Off Duration Required

Strength 12,413 kPa 13,283 kPa N/A N/A 1 hour

Leak 10,923 kPa 12,075 kPa N/A N/A 1 hour

ACTUAL TEST PRESSURES ACHIEVED AND DURATIONS .

Time Ori TiMe--• ctua ota a urabon Test Type Actual Min Pressure— -:r..essure - Actua) ax

Strength 13,000 kPa 13,000 kPa 12:05 1:20 1 hour 15 min

Leak 11,300 kPa 11,310 kPa 1:35 2:05 30 min

Time (approx. 15 min

intervals)

PRESSURE TESTING DATA

Ground Temp.

Test No.

(Weather,

Spread 9-Gretna tie-in section

test

Remarks Volumes Added/Bled Off)

Reference Pressure

Ambient Air Temp.

Test Medium Temp.

1hr Before Test BK-313

Above ground

10:40 2095 10°C 10.5°C N/A Check instrumentation

10:56 2095 10°C 10.5°C N/A Started squeezing to 25% of Test Pressure

11:00 3225 10°C 10.5°C N/A At 25% of TP; checking for leak

11:14 3225 10°C 10.5°C N/A Perform calibration check

11:16 3225 10°C 10.5°C N/A Started to squeeze to 50% of TP

11:27 6505 10°C 10.5°C N/A At 50% of TP; perform leak check

11:32 6505 10°C 10.5°C N/A Perform calibration check

11:40 6505 10°C 10.5°C N/A Started squeezing to 100% of TP

12:02 13005 10°C 10.5°C N/A At 100% of TP

12:04 13005 10°C 10.5°C N/A Perform calibration check

12:05 13000 10°C 10.5°C N/A Started strength test

Version 3 (Revised 2018-03-01) Internal Document Page 2 of 4

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 26 of 43

ENB-CFCS-PROC-002F413

ENBRIDGE PRESSURE TEST FORM itap

PRESSURE TESTING DATA Spread 9-Gretna tie-in section

Test No. test

Time (approx. 15 min

intervals)

Precision Reference Pressure

Ambient Air Temp.

Temperature

Test Medium Temp.

Ground Temp.

Remarks (Weather, Volumes Added/Bled Off)

12:15 13000 10°C 10.5°C N/A Raining since noon

12:25 13000 10°C 10.5°C N/A Still raining

12:35 13000 10°C 10.5°C N/A Still raining

12:45 13000 10°C 10.5°C N/A

12:55 13000 10°C 10.5°C N/A

1:05 13000 10°C 10.5°C N/A

1:15 13000 11°C 10.5°C N/A

1:20 13000 11°C 10.5°C N/A End of strength test

1:21 13000 11°C 10.5°C N/A Perform calibration check

1:25 13000 11°C 10.5°C N/A Begin de-pressurising to leak test pressure

1:34 11300 11°C 10.5°C N/A At leak pressure; perform leak check

1:35 11300 11°C 10.5°C N/A Started leak test

1:45 11300 11°C 10.5°C N/A

1:55 11305 12°C 10.5°C N/A

2:05 11310 12°C 10.5°C N/A End of leak test

2:08 11310 12°C 10.5°C N/A Started de-pressurising to 50% of TP

2:40 6505 12°C 10.5°C N/A At 50% of TP

2:45 6505 12°C 10.5°C N/A Calibration check

2:55 6510 12°C 10.5°C N/A Started de-pressurising pipe

Comments

DOCUMENT REVIEW,SIGNOFF

Contractor Rep Print DaneAke, \; ic4cs Sign jetil/c ,--- Date: YYYY/MM/DD 6/01V1 pfc910

Enbridge Rep Print Ruslan Hutsulyak Sign iotiv/c/lit/1// Date: YYYY/MM/DD 2018/10/26

Version 3 (Revised 2018-03-01) Internal Document Page 3 of 4

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 27 of 43

ENBR1DGE

HYDROSTATIC TESTING NOTIFICATION FORM - LP/MP (CANADA)

Complete the form and submit it to the regional or project Environment representative. Follow the instructions and submittal timelines as outlined in the Instructions section of this document. If any information on this form changes after submittal, a new form will be required.

0 New Form g Amendment to an Existing Form

Description of the Amendment: Notification for the hydrostatic test of Gretna Station Tie-in Section @ 1096+744/1096+872

Information Provided By: Date: Phone Number:

Danielle Vickers October 25, 2018 (587) 832-5455

A. PROJECT INFORMATION

Project Name: Line 3 Replacement On-site Contractor Name:

(responsible for the hydrotest)

Testco - SA Energy Group, 3rd Party Subcontractor

Project Location: (KP/KM Range, Terminal/Pump Station Name)

From 1000+363.8 in SW-19-4-8-mm to 1096+872.0

in SE-8-1-1-W1M.

Hydrotest Contractor Foreman Name:

Fraser Hyde

Enbridge Site Rep. Name: Dmitri Priadka — Enbridge Field Engineer Contractor Address: 110— 9th Avenue SW, Suite 300, Calgary, AB, T2P OT1

Enbridge Site Rep. Phone Number: Dmitri Priadka > (587) 334-0594 On-site Contractor Phone Number:

Testco: Fraser Hyde > (204) 781-6946 SAEG: Paul Prive > (780) 886-5257

Test Package or AFE #: (if applicable)

AFE #1440024A80 (LNS) Contract #510-809

Hydrotest Date Range: October 25, 2018 to October 31, 2018

Rev. 1 (September 2015) - Page 7

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 28 of 43

ENBRIDGE

B. INFRASTRUCTURE INFORMATION Infrastructure to be tested: • Mainline/Lateral/Connector • Facility Piping

apply, check other.

Tank • Other _indicate what will be tested. If none of the options

# New or Existing

Infrastructure

Pipe or Tank Description NPS (inside diameter in mm/

Tank Diameter (m)

Pipe Length (m)

Tank Height (m)

Hydro #2 New Pretest NPS 36, Grade 483, 12.7 mm WT line pipe section to be installed via open cut of the tie-in from mainline to Gretna station piping at approximately 1096+744 to 1096+872.

Inside diameter is 889.0 mm 128.0 m of pipe + 24.0 m of test heads =

—152.0 m Total Section Length

Note: If more than one water diversion source and/or water release location is proposed, please complete a row for each water diversion and water release location.

Rev. 1 (September 2015) - Page 7

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 29 of 43

ENBR1DGE C. WATER DIVERSION INFORMATION

#

Location of Source

(Diversion Site)

Water

Source

Type,

Name of

Water

Body

Type of

Additive

and Mix

Ratio (if

applicable)

Flow Rate

(m3/sec)

or Surface

Area (ha) of

Water Source

Location of the Start

and End Site(s) of

the Pipeline/Tank to

be Tested

Volume of

Water to be

Diverted

(m3)

Rate of

Diversion

(m3/sec)

or (m3/hr.)

Proposed

Date Rangel

to Divert

Water

(mm/dd/yy)

Diversion

Method

Transportation

Method

Legal Land Description

Start/

End

Legal Land Description

Hydro

#2

(Option 1)

Frieda Fill Station: LSD of Proposed Fill Water

Source is a well operated by the RM of Stanley

located in

SW-23-2-4-W1M.

Well N/A High flow rate

from pressure '

pump.

Start SE 8-1-1 W1M 100 m3 with allowance for

water to

pressure up the

section.

2 to 3 m3/minute

October 25, 2018 to October 31,

2018

Water

Pump -

+1- 4"

Truck water from

well operated by

RM of Stanley End SE 8-1-1 W1M

Hydro

#2

(Option 2)

Gnedentha/ Fill Station:

LSD of Proposed Fill Water Source is a well operated

by the RM of Rhineland located in NW-4-2-3-W1M.

Well N/A High flow rate

from pressure

pump.

Start SE 8-1-1 W1M 100 m3 with

allowance for

water to

pressure up the

section.

2 to 3

m3/minute

October 25, 2018

to October 31,

2018

Water

Pump -

+/- 4"

Truck water from

well operated by

RM of Rhineland End SE 8-1-1 W1M

Hydro #2

(Option 3)

Morden Lake Fill Station: LSD of Proposed Fill Water

Source is a well operated by the RM of Stanley located in

SW-6-3-5-W1M.

Well N/A High flow rate from pressure pump.

Start SE 8-1-1 W1M 100 m3 with allowance for

water to pressure up the section.

2 to 3 m3/minute

October 25, 2018 to October 31,

2018

Water Pump -

+1-4"

Truck water from well operated by

RM of Stanley End SE 8-1-1 W1M

Rev. 1 (September 2015) - Page 7

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 30 of 43

ENBRIDGE

It

Location of all Site(s) to

which Water will be

Released

Receiving Location

(e.g., Land, Water Body Type

and Name, Other Location

Description)

D. WATER RELEASE INFORMATION

Propose Date

Rangel to

Release Water

(mm/dd/yy)

Provide Description of the Treatment

and Mitigation Methods to be

Undertaken Prior to and During Release

Volume of Water

to be Released

(m3)

Rate of Release

(m3/hr)

Legal Land Description

Hydro

#2

LSD of Proposed Test Water

Release to Land is North of the

ROW in SE 8-1-1 W1M.

Released to vegetated/crop land in LSD

SE 8-1-1 W1M.

100 m3 Maximum 2

m3/minute

October 25, 2018

to October 31,

2018

Water will be released to a vegetated/crop land

that the right-of-way runs along on the North side.

Water will be run through a silt collecting bag and

erosion control measure that are deemed

necessary to protect the site will be in place.

1 — The date range of the withdrawal and release shall be within a maximum range of thirty [30] days.

Rev. 1 (September 2015) - Page 7

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 31 of 43

UTM NiE 5430685 m

605701 m CM:-99

Lat / Long 4a019991

-97.554262 Bev: 25 m

(SL, -1-1-W1 470 m North 342 m West

Bearing: 48° (TN) GPS: -±5 m Road 1N Road 4W

t..- 0: 43*

, ' v :I

Gretna Station pretest (Alternate) dewaic'r tr'nation

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 32 of 43

Legend

Feature 1

Gretna Test Section - Dewater KP 1096.6 ROW-CTL

ROW-CTL-Ver12 0

Temporary Workspace

The 49th Parallel Boundary, Prairie Section

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 33 of 43

3

4

16ft

ca

tII r.

11, m

nite

ralu

m

istr

umai

111

R

ultu

ninn

unun

stos

sost 41

mil

s go

lie w

ool

oiow

000 0

0••

•••/

Iffifili.

Na

mil 0/ .1.1,11

1

ii0

wirM

iM

witW

oo

1•01 •

••■ 0 1

mo

mmo ow

17

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 34 of 43

4°• 0

. . . . le

.47

C zg' 0 •

w.... (,, 4. '0 $' ‘ZP V

cS.,,e 4' ? , .6' K •

41. ii. c• c., • • \- __0* .. _ k ke, • .

k' k • g' 0 0 4' '''' e' ,1/4. q-' 0 4,

.Z. 0 n;:. "s. Q. '(' q c• q C.. 4 q

0k 0 O'b '‘.9 e c'' ,c•F" :Cc ei,..?

0 ,,, 'Z' (4i a, <<; 4' •$, 44 , o-

C)

V-.'S

*5' 0 ,i..• (.• •• ,k <2 <`'

49 (z, 0 et, Q-

0 ,Qo 4., • c A

(I <. • 0.0 0 '7)

0

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 35 of 43

9 09:00

boo

0 0 0

VA Watient

\ AVM

SUS MMUS

es

ji:Altnnin7llol::::

supireginrilln11111111M1

00:2,2

01 6

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 36 of 43

:ppiww/AAAA ale°

quiJd

Va.A • 7Z/Vg/(32 :Pp/ww/AAAA ale

a :u2IS :11.1Pd

3AIIVIN3S3Hd311 3901/JEIN3 3AL1VIN3S3lid3H HOIDVHINOD

sniawamnbai u2!sap e9a1m3 SuRsal

ainssaid fie swain lim

p Japio3ai ainssaJd patpene atu

:Jolop uad w

awai3 anueiadwai

'eSuqi lu

awai3 amleJadwai

:Joio3 uad luawan ainssaid

:auejluawal3 a.mssaid

:•oN lsaiJope.quo3

:.oN qorpope.quoj

Ogig

kitt .ppiww/AAAA alea

firth

-vu/71 :uo!lepoi

TVA& _ ri4

41•7741 -7v,17 :p

alcud

Cfrii?Mhi :*o

N 3JV

uoRe3gRuaPI Ve43 1sai ainssaJd

3901118N3

uogannsuop Ampej

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 37 of 43

• aft.. • r

4.6".%".0‘

..*

....

"%ft.

.9

w.• ctk

wok_ 0

.•,10

0.. .0. ,

a mil 111..........000

%1

2

PR

SITE

D

IN

U.S

.A.

- -0•1

11

-0 --..:1:. - -.... __. N

‘C3 43\4

fa, 101 r4;:a.11

4

aim

I%

(3' -• : 0%

....Oxi -o 0 ; 5-::: --. ......

.. ,..loir• 004.0:4,-0- -r-m

isr.- -=

0

4, 4 ° • 1 ; P

' ` •,..0. 0

_7

10

0 O

rd

1,!..... 24.. ,S

IO. ....,- 11.--0" •7

:**1 rfr ' •

1.',,0_,- .--i_j'- ___

,• „..'salo

t

0 ,,, • r At o l ,

#4

'• • ..,

•• di, - -.7

- ,, ,,- ---. .. ,0 ,,...................

z.ns

70

10

3ra

r.0

0:

0.0

Or%

A

fto. O

W:

•••••••

‘osravir-triety,

11

, S

all%

Ilatatt lettli

'WO

W. 0

1•1

1......m

o

20

100.

0•0

000.

M

• • •

Va

tessta

nitin

al

41

12

11

11,1"6"161111 llhl

8\ 6.4

< t>

°

0

C<F

't•r> )

0

ii

"14"111111111111"1" cO

10

111111111111 • • •

is, • Sr4

llftIiUiin

i

sulA

taula

get r

, '1

"•1

13

‘ 0\

1111111111 mffiniumillihmummumbilimmillt1111110111111111

mmine NI 'Immo ii1011111111111111111111 NIMINImumumemoluffintiiiito

r1111,411111111/1

umumniimilowillIII11111111111111014 10410111,1111"1411

1

I

/

/

1

I k ,

**** "si 44*

I/1 ift*I

*It

4

‘‹\`'

...II& ,Ir

. .. 10‘ •,;.:

.4,440 .:2

"..%o

„....1

.'

''‘' ..1„.1.....„.. .....,.,:__.....,.-.. ...

.,......... j, m

...-

1 \

b41

q 4‘

11

4 14

4 t4

• • • 4 • 4

46

414

%

.%

.

%>

_*.,.. .

......

::::

op

,.,. ..„,,,.,,,...„........7.

...„...: , ...,. ..,

„*...„,....4

...ft.......„........., za-,... _

-,..,...... ...,...,„,.. 4„__,..._,.......

t..............._..,„

. ...:. . ,

. ....._.%.,....„......-.7,_ "ki.

,&•;,... ,---....,

40,

...,,;,,,. .,-,,......... .....

4,44. ....... ___ ..._ ......

-e- „_,... .,„.. 4....7

.

,11.........

Ja

....

....II...2

11 .2

,. .1

01

.,..

01

\

„,,..

7..... .. ...._

, ....._ ,41

,,„„._

,r.:

•-7

. 4,

...

, ...ii. se

,

fif.....

.. .1....ftr

ft. ft. ft. ift,

...0 oft ftft

ot, •0

4.•

.00 0.• eft.

10

%I.

soft

••,....

/

Ave..

....

,

..........:::: 4%.

417 ...._ ........,

tra.....0.1.-0.1.0., ,,,...-

............. ........%

.se...0

0,

...."

..

...

..al.

loP

.0 ..... ..... .00. 4,,

......., .....--0.: 6 ,,,...,

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 38 of 43

Facility Construction ENBRIDGE Pressure Test Chart Identification Label

AFE No.: 1110211EO Project: LAG, 3 S/0,/ Location: //reirl*.- .('*//i4.

Test Date yyyy/mm/dd: 0000/744 Contractor/Job No.: (,1A7? # .70 -go, Contractor Test No.: 6r-04u, 7;?--//7 IL/4K 7-et Pressure Element Range: Pressure Element Pen Color.

Temperature Element Range: — Si& J/ Tern Element Pen Color: !'9'J' 1 ) AL- 614)

rn , -11.‘ The attached pressure recorder chart meets all pressure testing criteria design requirements. CONTRACTOR REPRESENTATIVE

L...

) Print: ‘61e. \Jiciai- Sign: VA... Date yyyy/mm/dd: .00 IS/ )0 /aLo ENBRIDGE REPRESENTATIVE

Print: -4..../Iri P 1...- Sign:

Date yyyy/mm/dd:

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 39 of 43

7 19:0

0

8

9

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 40 of 43

:uSIS qu!-Id

TZ/Odt /40 :PP/ww/AAAA alea — /-7

3AI1V1N3S31:1d3k1390121EIN3

0) et 01 s106, :pp/ww/AAAAl

ea

.14474.11 ws!s

vp-jic\

3upd

3AIIVIN3S321d321/1013VIIINO3

-suiawaJpbaJ Asap e!Jalp SuRsal

ainssaid lie slaaw uetp Jape:13w ainssaJd patpeue atu

Jolop uad luawal3 ainleJadwai

luawai3 amleJadwai

:Jolop uad luawai3 amssaJd

C2tZ-0 :aue8 luaLual3 ainssam

k

5- (//-24 —vp.T :o sJope.nuoj

‘Of- ,96

ipy; :.0N clo1pope.nuo3

othoz :pp/ww/AAAA alea

vor • 5 --..1,14)e/ :

uopepoi

rijC/5' —

4v;"rxir

s- --at/7 :p

rom

Olt/I/700W :•oN 3JV

laqei uogeDguuapi 2JL1D saj ainssald

uo!pnusuo3 Ampej

30a1218N3 •

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 41 of 43

9 10

11

mil imeN111111 ""1"1 sou Motallialligunualid

Ittellallia6188318114 Waststswor " ‘s1 '

01 6

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 42 of 43

Print:

Sign:

Pressure Element Pen Color:

Temperature Element Range: - SOZ, DZ..

Temperature Element Pen Color: ted We.) PO_ iltv.A9

The attached pressure recorder chart meets all pressure

testing criteria design requirements.

CONTRACTOR REPRESENTATIVE

Ocantellf, \l‘c.Y4,6

/14/ 19-

• Date yyyy/mm/dd: Si 10/Q lo

ENBRIDGE REPRESENTATIVE

Print: 17 *Ai ici

Sign:

Date yyyy/mm/dd:

Facility Construction ENBRIDGE

Pressure Test Chart Identification Label

AFE No.: 1 11 L(COPIA0 - ( (e#.1 9

ZoigiV 26 tvP- Sin - goj

Tic Spo/ _(14fisi,

Project: LA,. Location:

Test Date yyyy/mm/dd:

Contractor/Job No.:

Contractor Test No.: 6rd IAA,

Pressure Element Range:

Enbridge Pipelines Inc. Line 3 Replacement Program Leave to Open Application – Cromer to Gretna (Part 4 of 4)

Attachment 4.4.3a - Pressure Test Spread 9-Gretna Tie In Section Filed April 3, 2019

Page 43 of 43