46
1 KERALA STATE ELECTRICITY BOARD Vydyuthi Bhavanam,Pattom ,Thiruvananthapuram KSEB/TRAC/Tariff Revision/2012-13 /571 Date 16.08.2012 CIRCULAR Sub: Revision of tariff for all categories of consumers including Bulk supply to other Licensees with effect from 01.07.2012 -orders issued by the Kerala State Electricity Regulatory Commission (KSERC)-directions for implementing the order- reg. Read: 1. KSERC order dated 25.07.2012 on petition No. 23 of 2012 2. BO (FM) No.1546 /2012(KSEB/TRAC/Tariff Rev/2012-13) dated 16-08-2012 3. G.O (Ms) No. 18/2012/PD dated 06-08-2012 4. Letter No. 19/SEA/2012/ KSERC/707 dated 09-08-2012 1. Kerala State Electricity Regulatory Commission (KSERC) has revised the tariff applicable to all categories of consumers w.e.f. 01-07-2012. Board vide the order cited under reference-2 has decided to implement the order of the KSERC to revise the retail tariff applicable to consumers in the State including that of Licensees with effect from 01.07.2012. State Government vide the order cited under reference-3 has ordered to exempt domestic consumers having monthly consumption up to 120 units and agriculture categories from the payment of enhanced electricity charges and ordered to provide Rs 25.00 crore in every month as subsidy in advance to meet the revenue shortfall on account of the above. Accordingly and also as decided by the KSERC vide letter dated 4 th cited , KSEB has decided to exempt domestic consumers having monthly consumption up to 120 units and agriculture categories from the payment of enhanced electricity charges. A copy of the Board order is attached to this circular. 2. Electricity duty shall be levied on energy charges payable as per the invoices at the rates specified in the Kerala Electricity Duty, Act, 1963. Meter rent, fuel surcharge ordered by the KSERC from time to time, and any other charges and levies as approved by the KSERC from time to time shall be levied in addition to the revised electricity charges. 3. All the charges levied on consumers including fixed charges, energy charges, electricity duty, meter rent, fuel surcharges and any other charges (please specify the same) shall be indicated in the invoices. For domestic consumers with bi-monthly consumption up to 240 units and agricultural consumers, the total electricity charges payable at the tariff rates approved by the KSERC, subsidy provided by the Government and the net amount payable shall invariably be indicated in the invoices.

KERALA STATE ELECTRICITY BOARD

Embed Size (px)

Citation preview

1

KERALA STATE ELECTRICITY BOARD Vydyuthi Bhavanam,Pattom ,Thiruvananthapuram

KSEB/TRAC/Tariff Revision/2012-13 /571 Date 16.08.2012

CIRCULAR

Sub: Revision of tariff for all categories of consumers including Bulk supply to

other Licensees with effect from 01.07.2012 -orders issued by the Kerala State Electricity Regulatory Commission (KSERC)-directions for implementing the order- reg.

Read: 1. KSERC order dated 25.07.2012 on petition No. 23 of 2012 2. BO (FM) No.1546 /2012(KSEB/TRAC/Tariff Rev/2012-13) dated 16-08-2012

3. G.O (Ms) No. 18/2012/PD dated 06-08-2012 4. Letter No. 19/SEA/2012/ KSERC/707 dated 09-08-2012

1. Kerala State Electricity Regulatory Commission (KSERC) has revised the tariff applicable to all categories of consumers w.e.f. 01-07-2012. Board vide the order cited under reference-2 has decided to implement the order of the KSERC to revise the retail tariff applicable to consumers in the State including that of Licensees with effect from 01.07.2012. State Government vide the order cited under reference-3 has ordered to exempt domestic consumers having monthly consumption up to 120 units and agriculture categories from the payment of enhanced electricity charges and ordered to provide Rs 25.00 crore in every month as subsidy in advance to meet the revenue shortfall on account of the above. Accordingly and also as decided by the KSERC vide letter dated 4th cited , KSEB has decided to exempt domestic consumers having monthly consumption up to 120 units and agriculture categories from the payment of enhanced electricity charges. A copy of the Board order is attached to this circular.

2. Electricity duty shall be levied on energy charges payable as per the

invoices at the rates specified in the Kerala Electricity Duty, Act, 1963. Meter rent, fuel surcharge ordered by the KSERC from time to time, and any other charges and levies as approved by the KSERC from time to time shall be levied in addition to the revised electricity charges.

3. All the charges levied on consumers including fixed charges, energy

charges, electricity duty, meter rent, fuel surcharges and any other charges (please specify the same) shall be indicated in the invoices. For domestic consumers with bi-monthly consumption up to 240 units and agricultural consumers, the total electricity charges payable at the tariff rates approved by the KSERC, subsidy provided by the Government and

the net amount payable shall invariably be indicated in the invoices.

2

4. The billing procedure to be followed for implementing the orders read above with effect from 01.07.2012 is appended as Annexure-II to this circular for information and strict compliance.

Secretary Encl: As above To All Chief Engineers The Financial Advisor All Deputy Chief Engineers Director (IT) &SPIO,

Special officer (Revenue) The Chief Internal Auditor, The CVO, KSEB TA to Chairman / Member (Trans & Gen (Opns.) / Member (Distn.)/ Member (Gen Projects) PA to Member (Finance), The Public Relations Officer

Sr.CA to Secretary Fair Copy Superintendent /Library

3

ANNEXURE-II General Instructions and Billing Procedures

(A) General Instructions

1. The revised rate is applicable to all consumers in the State including that of Licensees with effect from 01.07.2012.

2. Domestic consumers having bi-monthly consumption up to 240 units are

exempted from paying the enhanced electricity charges due to the revision. Further, single phase domestic consumers with bi-monthly consumption up to 240 units are exempted from paying the fixed charges.

3. Agriculture consumers are also exempted from paying revised tariff. 4. For subsidized consumers the details of subsidy allowed by the

Government shall be shown invariably in the invoices. 5. The meter rent, fuel surcharge, any other levies etc. shall be collected

at the rates approved by KSERC and as per the orders and directions issued by Board from time to time.

6. The consumers under tariff category LT-II, LT-III, LT-VIII & LT IX (Public

lighting) shall be billed at the revised tariff (Annexure 5) by adopting the usual procedure, w.e.f. 01.07.2012.

7. For raising invoices of monthly billed consumers, the revised rate shall

be applicable for the consumption from July-2012 onwards.

4

(B) Billing Procedure for Bi-monthly billed consumers ‘LT-1 (a) Domestic, LT-1 (b), LT-V, LT-VI(A), LT-VI (B), LT-VI(C), LT-VI(D), LT-VII (A), LT-VII(B) and LT-VII (C) categories for the interim period from 01.07.2012 to 29.08.2012

(I) Domestic consumers (LT I(a))

The pre -revised and revised tariff applicable to domestic category w.e.f.01.07.2012 is detailed below;

Fixed charge for single phase - Rs 40/- (bi- monthly) for three phase - Rs 120/- (bi-monthly) Energy Charge

Energy Charges

(paise per unit) Bi-monthly Consumption

slabs Pre-revised

Charges

Revised charges

( w.e.f.01.07.2012)

Up to 80 units 115 150

81-160 units 190 240

161-240 units 240 290

241-300 units 300 360

301-400 units 365 480

401-600 units 430 600

601-1000 units 530 750

Above 1000 units* 545 650 (all Units)

* for entire units

1. Bi-monthly billed domestic consumers having bi-monthly consumption up to 240 units (monthly consumption upto 120 units) may be prepared as follows. (i) Amount payable as per the revised tariff approved by KSERC

may be computed as follows.

Step-1 Let ‘X’ be the bi-monthly consumption as on billing date Step-2 Compute the energy charge at the pre-revised rate using ‘Annexure-3’. = ‘A’ Step-3 Compute the energy charge at the revised rate using ‘Annexure-3’ = ‘B’

5

Step-4 Using the multiplication factors ‘f1’ and ‘f2’ as on billing date using ‘Annexure-1’, compute the energy charge as on billing date as follows Energy charge as on billing date ‘E’= ‘A’ x ‘f1’ + ‘B’ x ‘f2’ Step-5

Fixed charge payable as on billing date (i) For single phase consumers with previous six months

average consumption less than 40 units (bi-monthly consumption up to 80 units)

Fixed charge ‘Fs’ = 0.00 (ii) For ‘single phase consumers’ with bi-monthly

consumption above ‘80’ units Fixed charge ‘Fs’ = 40 x ‘f2’

(iii) For three phase consumers with bi-monthly consumption above ‘80’ units’

Fixed charge ‘Ft’ = 120 x ‘f2’ Step-6

Total amount payable as per the revised tariff for (i) Single phase consumers with previous six months

average consumption less than 40 units (bi-monthly consumption up to 80 units)

ECsingle phase’ = Energy charge ‘E’

(ii) Single phase consumers (with previous six months average consumption above 80 units) ‘ECsingle phase’ = Energy charge ‘E’ + Fixed charge ‘Fs’

(iii) Three phase consumers

‘EC three phase’= Energy charge ‘E’ + Fixed charge ‘Ft’

Step-7 Subsidy provided by Government “S”

(i) For single phase consumers with bi-monthly consumption up to 80 units = ‘E’-‘A’

(ii) For single phase consumers with bi-monthly consumption 81 units to 240 units

= ‘ECsingle phase’-‘A’ (iii) For three phase consumers with bi-monthly

consumption up to 240 units = ‘E’-‘A’

6

Step-8 Prepare the invoice as detailed below

Sl No

Particulars Amount (Rs.)

1

Electricity charge payable at the revised rates approved by KSERC (as per step-6)

####

2 Subsidy provided by Government 'S' ####

3 Electricity charges payable by the consumers (1)-(2) ####

4 Electricity duty (as per schedule- of the KED Act-1963) ####

5 Fuel Surcharge ####

6 Meter rent ####

7 Other items ####

8 Net amount payable= (3)+(4)+(5)+(6)+(7) ####

2. For Bi-monthly billed domestic consumers having bi-monthly consumption above 240 units Amount payable as per the revised tariff approved by KSERC may be computed as follows.

Step-1 Let ‘X’ be the bi-monthly consumption as on billing date Step-2 Compute the energy charge at the pre-revised rate using ‘Annexure-3’. = ‘A’

Step-3 Compute the energy charge at the revised rate using ‘Annexure-3’ = ‘B’ Step-4 Using the multiplication factors ‘f1’ and ‘f2’ as on billing date using ‘Annexure-1, compute the energy charge as on billing date as follows Energy charge as on billing date ‘E’= ‘A’ x ‘f1’ + ‘B’ x ‘f2’ Step-5 Fixed charge payable as on billing date (iv) For ‘single phase consumers’ with bi-monthly

consumption above ‘240’ units Fixed charge ‘Fs’ = 40 x ‘f2’

(v) For three phase consumers with bi-monthly consumption above ‘240’ units’

Fixed charge ‘Ft’ = 120 x ‘f2’

7

Step-6

Total amount payable as per the revised tariff for (iv) Single phase consumers ‘ECsingle phase’ =

Energy charge ‘E’ + Fixed charge ‘Fs’ (v) Three phase consumers ‘EC three phase’=

Energy charge ‘E’ + Fixed charge ‘Ft’

Step-7 Prepare the invoice as detailed below

Sl No

Particulars Amount (Rs.)

1 Energy charge payable at the revised rates approved by KSERC

####

2 Fixed charges ####

3 Electricity duty (as per schedule- of the KED Act-1963) ####

4 Fuel Surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

(II) LT- I (b) Category The pre -revised and revised tariff applicable to LT I(b) category w.e.f

01.07.2012 is detailed below

Fixed charge for single phase - Rs 40/- (bi- monthly) for three phase - Rs 120/- (bi-monthly) Energy Charge

Energy Charges

(paise per unit) Bi-monthly Consumption

slabs

Pre-revised

Charges

Revised charges

( w.e.f.01.07.2012)

Up to 80 units 155 200

81-160 units 240 310

161-240 units 280 360

241-300 units 345 450

301-400 units 405 520

401-600 units 505 620

Above 600 units 630 750

8

Billing procedure- For Bi-monthly billed LT-1 (b) consumers Amount payable as per the revised tariff approved by KSERC may be computed as follows.

Step-1 Let ‘X’ be the bi-monthly consumption as on billing date Step-2 Compute the energy charge at the pre-revised rate using ‘Annexure-4’. = ‘A’

Step-3 Compute the energy charge at the revised rate using ‘Annexure-4’ = ‘B’ Step-4 Using the multiplication factors ‘f1’ and ‘f2’ as on billing date

using ‘Annexure-1’, compute the energy charge as on billing date as follows Energy charge as on billing date ‘E’= ‘A’ x ‘f1’ + ‘B’ x ‘f2’ Step-5 Fixed charge payable as on billing date (i) For ‘single phase consumers’ fixed charge ‘Fs’

= 40 x ‘f2’ (ii) For three phase consumers , fixed charge ‘Ft’

= 120 x ‘f2’ Step-6

Total amount payable as per the revised tariff for

(i) Single phase consumers ‘ECsingle phase’ = Energy charge ‘E’ + Fixed charge ‘Fs’

(ii) Three phase consumers ‘EC three phase’= Energy charge ‘E’ + Fixed charge ‘Ft’

Step-7 Prepare the invoice as detailed below

Sl No

Particulars Amount (Rs.)

1 Energy charge payable at the revised rates approved by KSERC

####

2 Fixed charges ####

3 Electricity duty (as per schedule- of the KED Act-1963)] ####

4 Fuel Surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

9

(III) LT-V Agriculture categories

The pre -revised and revised tariff applicable w.e.f. 01.07.2012 is detailed below;

Particulars Pre-revised

Tariff Revised Tariff wef

01.07.2012 Fixed Charge (Rs/KW per month) 6 6

Energy Charge (Paise Per unit) 65 150

Billing procedure for Bi-monthly billed Consumers for the interim period from 01.07.2012 to 29.08.2012

Let ‘X’ be the bi-monthly consumption as on billing date, the electricity charges may be computed as follows. Step-1 Energy charge at the pre-revised rate ‘E1’ = ‘X’ x 0.65 Step-2 Energy charge at the revised rate ‘E2’ = ‘X’ x 1.50 Step-3 Compute the energy charge payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as per the Annexure-1. Energy charge payable as on billing date ‘E’ = ‘E1’ x ‘f1’ + ‘E2’ x ‘f2’ Step-4 Subsidy provided by the Government ‘S’ = ‘E’- ‘E1’ Step-5 Energy charges payable as on billing date = ‘E1’ Step-6: Compute Fixed charge payable Let ‘K’ be the connected load Fixed charge payable for two months ‘F’ = ‘K’ x 6 x 2 Step-7

Meter rent, fuel surcharge and other levies may be charged at the existing rate. Electricity duty may be charged as per the schedule in the Kerala Electricity Duty Act, 1963.

10

Step-8: Prepare the invoice as detailed below Sl No

Particulars Amount (Rs.)

1

Energy charge payable at the revised rates approved by KSERC (step-3)

####

2 Fixed charges ####

3 Subsidy provided by Government 'S' ####

4 Energy charges payable by the consumers (1)-(3) ####

5 Electricity duty (as per schedule- of the KED Act-1963) ####

6 Fuel Surcharge ####

7 Meter rent ####

8 Other items ####

9 Net amount payable= (2)+(4)+(5)+(6)+(7) ####

(IV) LT VI(A) Non- Domestic (applicable to premises of religious

worship, Govt/aided educational institutions, government hospitals, private hospitals registered under Charitable Societies Act etc;)

The pre -revised and revised tariff applicable w.e.f. 01.07.2012 is detailed below;

Pre-revised

Tariff Revised Tariff wef

01.07.2012

Fixed Charge (Rs/KW per month) 40 50

Energy Charge (Paise Per unit)

Upto 500 units 385 480

Above 500 units 520 550

Billing procedure for Bi-monthly billed Consumers for the interim period from 01.07.2012 to 29.08.2012

Step-1. Compute the fixed charge and energy charges at the pre-revised rate and revised rate as detailed below.

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

(a) Let 'C' be connected load of the consumer in 'kW'

(b) Fixed charges F(A) '= 'C' x 40 x2 'F(B)= 'C' x 50 x2

2 Calculation Energy charge 'EC'

(a) Let 'X' be the bi-monthly consumption as on billing date,

(b) Bi-monthly consumption is less than or equal to 1000 units, i.e., X<=1000 units, Energy charge 'E1' E1(A)'= 'X' x 3.85 E1(B)'= 'X' x 4.80

(c ) Bi-monthly consumption is more than 1000 units, i.e., X>1000 units, Energy charge 'E2'

E2(A)'= Rs 3850/- + ('X'-1000) x 5.20

E2(B)'=Rs 4800+ ('X'-1000) x 5.50

11

Step-2. Compute the fixed charge ‘F’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows

Fixed charge as on billing date ‘F’ = ‘F (A)’ x ‘f1’ + ‘F (B)’ x ‘f2’

Step-3

Compute the Energy charge ‘EC’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows:

(a) If the Bi-monthly consumption as on billing date is less than or

equal to 1000 units, i.e., X<=1000 units,

Energy charge 'EC' = ‘E1 (A)’ x ‘f1’ + ‘E1 (B)’ x ‘f2’

(b) If the Bi-monthly consumption is more than 1000 units, i.e., X>1000 units,

Energy charge 'EC' = ‘E2(A)’ x ‘f1’ + ‘E2(B)’ x ‘f2’

Step-4.

Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

12

(V) LT VI(B) Non- Domestic ((applicable to offices of State/Central

Government, Corporations, Boards ,KHRWS pay wards, Private Hospitals ,Guest Houses of Governments, offices of FRIENDS etc;)

The pre -revised and revised tariff applicable w.e.f. 01.07.2012 is detailed below;

Pre-revised

Tariff Revised Tariff wef

01.07.2012

Fixed Charge (Rs/KW per month) 55.00 70.00

Energy Charge (Paise Per unit)

Upto 500 units 450 550

Above 500 units 590 650

Billing procedure for Bi-monthly billed Consumers for the interim period from 01.07.2012 to 29.08.2012

Step-1. Compute the fixed charge and energy charges at the pre-revised rate and revised rate as detailed below.

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

(a) Let 'C' be connected load of the consumer in 'kW'

(b) Fixed charges F(A) '= 'C' x 55 x2 'F(B)= 'C' x 70 x2

2 Calculation Energy charge 'EC'

(a) Let 'X' be the bi-monthly consumption as on billing date,

(b) Bi-monthly consumption is less than or equal to 1000 units, i.e., X<=1000 units, Energy charge 'E1' E1(A)'= 'X' x 4.50 E1(B)'= 'X' x 5.50

(c ) Bi-monthly consumption is more than 1000 units, i.e., X>1000 units, Energy charge 'E2'

E2(A)'= Rs 4500/- + ('X'-1000) x 5.90

E2(B)'=Rs 5500+ ('X'-1000) x 6.50

Step-2. Compute the fixed charge ‘F’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows

Fixed charge as on billing date ‘F’ = ‘F (A)’ x ‘f1’ + ‘F (B)’ x ‘f2’

Step-3 Compute the Energy charge ‘EC’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows:

(c) If the Bi-monthly consumption as on billing date is less than or

equal to 1000 units, i.e., X<=1000 units,

13

Energy charge 'EC' = ‘E1 (A)’ x ‘f1’ + ‘E1 (B)’ x ‘f2’

(d) If the Bi-monthly consumption is more than 1000 units, i.e.,

X>1000 units, Energy charge 'EC' = ‘E2 (A)’ x ‘f1’ + ‘E2 (B)’ x ‘f2’

Step-4.

Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

(VI) LT VI(C) Non- Domestic ((applicable to offices under Income tax,

central excise, customs, Airport Authority of India, Motor vehicle dept., offices of all tax/revenue collection depts.. of State/Central Govt., Banks, ATM counters etc. )

The pre -revised and revised tariff applicable w.e.f. 01.07.2012 is detailed below;

Pre-revised Tariff

Revised Tariff wef 01.07.2012

Fixed Charge (Rs/KW per month) 170.00 180.00

Energy Charge (Paise Per unit)

Upto 500 units 675 700

Above 500 units 840 850

Billing procedure for Bi-monthly billed Consumers for the interim period from 01.07.2012 to 29.08.2012

Step-1. Compute the fixed charge and energy charges at the pre-revised rate and revised rate as detailed below.

14

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

(a) Let 'C' be connected load of the consumer in 'kW'

(b) Fixed charges F(A) '= 'C' x 170 x2 'F(B)= 'C' x 180 x2

2 Calculation Energy charge 'EC'

(a) Let 'X' be the bi-monthly consumption as on billing date,

(b) Bi-monthly consumption is less than or equal to 1000 units, i.e., X<=1000 units, Energy charge 'E1' E1(A)'= 'X' x 6.75 E1(B)'= 'X' x 7.00

(c ) Bi-monthly consumption is more than 1000 units, i.e., X>1000 units, Energy charge 'E2'

E2(A)'= Rs 6750/- + ('X'-1000) x 8.40

E2(B)'=Rs 7000+ ('X'-1000) x 8.50

Step-2. Compute the fixed charge ‘F’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows: Fixed charge as on billing date ‘F’ = ‘F(A)’ x ‘f1’ + ‘F(B)’ x ‘f2’

Step-3 Compute the Energy charge ‘EC’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows:

(a) If the Bi-monthly consumption as on billing date is less than or

equal to 1000 units, i.e., X<=1000 units, Energy charge 'EC' = ‘E1(A)’ x ‘f1’ + ‘E1(B)’ x ‘f2’

(b) If the Bi-monthly consumption is more than 1000 units, i.e.,

X>1000 units, Energy charge 'EC' = ‘E2(A)’ x ‘f1’ + ‘E2(B)’ x ‘f2’

Step-4.

Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the

electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

15

(VII) LT- VI (D). (applicable to orphanages, old age homes, polio homes, cancer/ palliative care centres, anganavadis, schools/hostels of mentally retarded, deaf, blind, PH etc.)

The pre -revised and revised tariff applicable w.e.f. 01.07.2012 is detailed below; Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Fixed charge Nil Nil

Energy Charge (paise per unit)

85 150

The energy charge on billing date may be computed as follows. Let the bi-monthly consumption as on billing date = ‘X’ units Step-1 Energy charges as on billing date at the pre-revised rate

‘E(A)’ = ‘X’ x 0.85

Step-2

Energy charges as on billing date at the revised rate ‘E(B)’ = ‘X’ x 1.50

Step-3

Energy charges payable as on billing date using the multiplication factors ‘f1’ & ‘f2’

‘E’ = ‘E(A)’ x ‘f1’ + ‘E(B)’ x ‘f2’

Step-4. Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above.

Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Energy charges ####

2 Electricity duty ####

3 Fuel surcharge ####

4 Meter rent ####

5 Other items (if any) ####

6 Net amount payable= (1)+(2)+(3)+(4)+(5) ####

16

(VIII) LT V II (A) Commercial (applicable to commercial premises, hotels,

private hostels, showrooms, cold storages, freezing plants, self financing educational institutions, petrol bunks, cellular Mobile towers, offices of telecom companies, insurance companies, call centres, etc.,)

The pre-revised tariff and the revised tariff w.e.f 01-07-2012 is detailed below.

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

Single Phase 50 60

Three phase 100 120

Energy Charge (paise per unit)*

Upto 100 units per month 545 545

Upto 200 units per month 605 605

Upto 300 units per month 675 675

Upto 500 units per month 730 730

above 500 units (all units) 805 850

•••• Corresponding Slab Charge applies to entire consumption The demand charges applicable to maximum demand based tariff shall be Rs.192/kVA per month.

The electricity charges payable as on billing date as per the revised tariff is detailed below. Step-1. Compute the fixed charge and energy charges as on billing date at the pre-revised tariff an revised tariff as detailed below.

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

Let 'C' be connected load of the consumer in 'kW'

Fixed charges

(a) for single phase consumers F(A) '= 'C' x 50 x2 'F(B)= 'C' x 60 x2

(b) for three phase consumers F(A) '= 'C' x 100 x2 'F(B)= 'C' x 120 x2

2 Calculation Energy charge 'EC'

Let 'X' be the bi-monthly consumption as on billing date, 'E'

(a) for bi-monthly consumption upto 200 units (all units) E(A)'= 'X' x 5.45 E(B)'= 'X' x 5.45

(b) for bi-monthly consumption upto 400 units (all units) E(A)'= 'X' x6.05 E(B)'= 'X' x 6.05

(c) for bi-monthly consumption upto 600 units (all units) E(A)'= 'X' x6.75 E(B)'= 'X' x 6.75

(d) for bi-monthly consumption upto 1000 units (all units) E(A)'= 'X' x7.30 E(B)'= 'X' x 7.30

(e) for bi-monthly consumption above 1000 units (all units) E(A)'= 'X' x8.05 E(B)'= 'X' x 8.50

17

Step-2 : Fixed charges payable as on billing date: Compute the fixed charges as on billing date using the multiplication factors ‘f1’ and ‘f2’ from Table-1. Fixed charges as on billing date ‘F’ = ‘F(A) ' x ‘f1’ + ‘F(B) ' x ‘f2’ Step-3: Energy charges payable as on billing date: Compute the energy charges as on billing date using the multiplication factors ‘f1’ and ‘f2’ from Table-1.

Energy charges as on billing date ‘E’ = ‘E(A) ' x ‘f1’ + ‘E(B) ' x ‘f2’ Step-4 Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

18

(IX) LT VII (B) Commercial : (applicable to shops/bunks hotels, restaurants, telephone booth, photocopy services etc., having connected load not exceeding 1000W)

The pre-revised tariff and the revised tariff w.e.f 01-07-2012 is detailed below.

Particulars Pre revised Tariff

Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

30 40

Energy Charge (paise per unit)

Upto 100 units 330 400

Above 100 units 520 600

The fixed charge and energy charge as on billing date may be computed as follows.(for the interim period from 01-07-2012 to 29-08-2012)

Step-1. Compute the fixed charge and energy charge at the pre-revised rate and revised rate as detailed below.

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

(a) Let 'C' be connected load of the consumer in 'kW'

(b) Fixed charges F(A) '= 'C' x 30 x2 'F(B)= 'C' x 40 x2

2 Calculation Energy charge 'EC'

(a) Let 'X' be the bi-monthly consumption as on billing date,

(b) Bi-monthly consumption is less than or equal to 200 units, i.e., X<=200 units, Energy charge 'E1' E1(A)'= 'X' x 3.30 E1(B)'= 'X' x 4.00

(c ) Bi-monthly consumption above 200 units and upto 400

units Energy charge 'E2' E2(A)'= 'X' x 5.20 E2(B)'='X' x 6.00

Note: If the bi-monthly consumption exceeds 400 units, LT-VII (A) tariff shall be applicable

Step-2

Fixed charges payable as on billing date: Compute the fixed charges as on billing date using the multiplication factors ‘f1’ and ‘f2’ from Table-1. Fixed charges as on billing date ‘F’ = ‘F(A) ' x ‘f1’ + ‘F(B) ' x ‘f2’ Step-3: Energy charges payable as on billing date: Compute the Energy charge ‘EC’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows:

19

(a) If the Bi-monthly consumption as on billing date is less than or

equal to 200units, i.e., X<=200 units, Energy charge 'EC' = ‘E1(A)’ x ‘f1’ + ‘E1(B)’ x ‘f2’

(b) If the Bi-monthly consumption is more than 200 units and up to

400 units, Energy charge 'EC' = ‘E2(A)’ x ‘f1’ + ‘E2(B)’ x ‘f2’

Step-4 Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

20

(X) LT VII (C) Commercial : (applicable to cinema theatres, circus etc., )

The pre-revised tariff and revised tariff w.e.f. 01-07-2012 is detailed below.

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

80 90

Energy Charge (paise per unit)

Upto 1000 units 440 500

Above 1000 units 590 650

The fixed charge and energy charge as on billing date may be computed as follows. (for the interim period from 01-07-2012 to 29-08-2012)

Step-1. Compute the fixed charge and energy charge at the pre-revised rate and revised rate as detailed below.

Computation of electricity charges (in Rupees)

Pre-revised rate Revised rate Sl No Particulars (A) (B)

1 Calculation of Fixed charge 'F"

(a) Let 'C' be connected load of the consumer in 'kW'

(b) Fixed charges F(A) '= 'C' x 80 x2 'F(B)= 'C' x 90 x2

2 Calculation Energy charge 'EC'

(a) Let 'X' be the bi-monthly consumption as on billing date,

(b) (a) Bi-monthly consumption is less than or equal to

2000 units, i.e., X<=2000 units, Energy charge 'E1' E1(A)'= 'X' x 4.40 E1(B)'= 'X' x 5.00

(c ) (b) Bi-monthly consumption is more than 2000 units,

i.e., X>2000 units, Energy charge 'E2' E2(A)'= Rs 8800/- + ('X'-2000) x 5.90

E2(B)'=Rs 10000+ ('X'-2000) x 6.50

Step-2. Compute the fixed charge ‘F’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows

Fixed charge as on billing date ‘F’ = ‘F (A)’ x ‘f1’ + ‘F (B)’ x ‘f2’

Step-3 Compute the Energy charge ‘EC’ payable as on billing date using the multiplication factors ‘f1’ and ‘f2’ as follows:

21

(a) If the Bi-monthly consumption as on billing date is less than or

equal to 2000 units, i.e., X<=2000 units,

Energy charge 'EC' = ‘E1 (A)’ x ‘f1’ + ‘E1(B)’ x ‘f2’

(b) If the Bi-monthly consumption is more than 2000 units, i.e., X>2000 units,

Energy charge 'EC' = ‘E2 (A)’ x ‘f1’ + ‘E2 (B)’ x ‘f2’ Step-4.

Electricity duty may be levied for the ‘energy charges payable’ as per the schedule in the Kerala Electricity Duty Act, 1963.

Step-5

Meter rent, fuel surcharge and other levies and charges approved by the KSERC from time to time may be charged over and above the electricity charges as detailed above. Step-6 The invoice may be prepared as follows.

Sl No Particulars Amount (Rs.)

1 Fixed charges ####

2 Energy charges ####

3 Electricity duty ####

4 Fuel surcharge ####

5 Meter rent ####

6 Other items (if any) ####

7 Net amount payable= (1)+(2)+(3)+(4)+(5)+(6) ####

Note: 1. The billing procedures and ready reckoners for the period from 30-

08-2012 shall be issued separately. 2. For raising invoices for monthly billed consumers, the revised rate shall

be applicable for the consumption from July-2012 onwards.

3. The tariff schedule as approved by the KSERC shall be issued separately.

4. For raising the monthly bills of LT-IV industrial consumers, the following points may be noted.

(1) For consumers having connected load of 10 HP (7.46 kW) or below, fixed charge shall be Rs 60/- per consumer per month.

22

(2) For consumers having connected load above 10 HP, fixed charge shall be Rs 60/- per kW per month.

(3) For consumers who opt maximum demand based tariff, monthly

demand charge shall be Rs.100/kVA.

(4) Segregation and separate metering of power and light load shall not be insisted w.e.f.01.07.2012.

5. Offices of the KWA, KSRTC, Kerala State Water Transport Corporation

(KSWTC) shall be billed under LT-VI (B) with effect from 01-07-2012.

23

Annexure-1

Multiplication Factors

Table-1 Table-2

Multiplication Factor (f1) Multiplication Factor (f2)

Billing date Factor 'f1' Billing date Factor 'f1' Billing date Factor 'f2' Billing date Factor 'f2'

1-Jul-12 0.983 31-Jul-12 0.483 1-Jul-12 0.017 31-Jul-12 0.517

2-Jul-12 0.967 1-Aug-12 0.467 2-Jul-12 0.033 1-Aug-12 0.533

3-Jul-12 0.950 2-Aug-12 0.450 3-Jul-12 0.050 2-Aug-12 0.550

4-Jul-12 0.933 3-Aug-12 0.433 4-Jul-12 0.067 3-Aug-12 0.567

5-Jul-12 0.917 4-Aug-12 0.417 5-Jul-12 0.083 4-Aug-12 0.583

6-Jul-12 0.900 5-Aug-12 0.400 6-Jul-12 0.100 5-Aug-12 0.600

7-Jul-12 0.883 6-Aug-12 0.383 7-Jul-12 0.117 6-Aug-12 0.617

8-Jul-12 0.867 7-Aug-12 0.367 8-Jul-12 0.133 7-Aug-12 0.633

9-Jul-12 0.850 8-Aug-12 0.350 9-Jul-12 0.150 8-Aug-12 0.650

10-Jul-12 0.833 9-Aug-12 0.333 10-Jul-12 0.167 9-Aug-12 0.667

11-Jul-12 0.817 10-Aug-12 0.317 11-Jul-12 0.183 10-Aug-12 0.683

12-Jul-12 0.800 11-Aug-12 0.300 12-Jul-12 0.200 11-Aug-12 0.700

13-Jul-12 0.783 12-Aug-12 0.283 13-Jul-12 0.217 12-Aug-12 0.717

14-Jul-12 0.767 13-Aug-12 0.267 14-Jul-12 0.233 13-Aug-12 0.733

15-Jul-12 0.750 14-Aug-12 0.250 15-Jul-12 0.250 14-Aug-12 0.750

16-Jul-12 0.733 15-Aug-12 0.233 16-Jul-12 0.267 15-Aug-12 0.767

17-Jul-12 0.717 16-Aug-12 0.217 17-Jul-12 0.283 16-Aug-12 0.783

18-Jul-12 0.700 17-Aug-12 0.200 18-Jul-12 0.300 17-Aug-12 0.800

19-Jul-12 0.683 18-Aug-12 0.183 19-Jul-12 0.317 18-Aug-12 0.817

20-Jul-12 0.667 19-Aug-12 0.167 20-Jul-12 0.333 19-Aug-12 0.833

21-Jul-12 0.650 20-Aug-12 0.150 21-Jul-12 0.350 20-Aug-12 0.850

22-Jul-12 0.633 21-Aug-12 0.133 22-Jul-12 0.367 21-Aug-12 0.867

23-Jul-12 0.617 22-Aug-12 0.117 23-Jul-12 0.383 22-Aug-12 0.883

24-Jul-12 0.600 23-Aug-12 0.100 24-Jul-12 0.400 23-Aug-12 0.900

25-Jul-12 0.583 24-Aug-12 0.083 25-Jul-12 0.417 24-Aug-12 0.917

26-Jul-12 0.567 25-Aug-12 0.067 26-Jul-12 0.433 25-Aug-12 0.933

27-Jul-12 0.550 26-Aug-12 0.050 27-Jul-12 0.450 26-Aug-12 0.950

28-Jul-12 0.533 27-Aug-12 0.033 28-Jul-12 0.467 27-Aug-12 0.967

29-Jul-12 0.517 28-Aug-12 0.017 29-Jul-12 0.483 28-Aug-12 0.983

30-Jul-12 0.500 29-Aug-12 0.000 30-Jul-12 0.500 29-Aug-12 1.000

24

Annexure-3

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

1 1.15 1.50 51 58.65 76.50 101 131.90 170.40

2 2.30 3.00 52 59.80 78.00 102 133.80 172.80

3 3.45 4.50 53 60.95 79.50 103 135.70 175.20

4 4.60 6.00 54 62.10 81.00 104 137.60 177.60

5 5.75 7.50 55 63.25 82.50 105 139.50 180.00

6 6.90 9.00 56 64.40 84.00 106 141.40 182.40

7 8.05 10.50 57 65.55 85.50 107 143.30 184.80

8 9.20 12.00 58 66.70 87.00 108 145.20 187.20

9 10.35 13.50 59 67.85 88.50 109 147.10 189.60

10 11.50 15.00 60 69.00 90.00 110 149.00 192.00

11 12.65 16.50 61 70.15 91.50 111 150.90 194.40

12 13.80 18.00 62 71.30 93.00 112 152.80 196.80

13 14.95 19.50 63 72.45 94.50 113 154.70 199.20

14 16.10 21.00 64 73.60 96.00 114 156.60 201.60

15 17.25 22.50 65 74.75 97.50 115 158.50 204.00

16 18.40 24.00 66 75.90 99.00 116 160.40 206.40

17 19.55 25.50 67 77.05 100.50 117 162.30 208.80

18 20.70 27.00 68 78.20 102.00 118 164.20 211.20

19 21.85 28.50 69 79.35 103.50 119 166.10 213.60

20 23.00 30.00 70 80.50 105.00 120 168.00 216.00

21 24.15 31.50 71 81.65 106.50 121 169.90 218.40

22 25.30 33.00 72 82.80 108.00 122 171.80 220.80

23 26.45 34.50 73 83.95 109.50 123 173.70 223.20

24 27.60 36.00 74 85.10 111.00 124 175.60 225.60

25 28.75 37.50 75 86.25 112.50 125 177.50 228.00

26 29.90 39.00 76 87.40 114.00 126 179.40 230.40

27 31.05 40.50 77 88.55 115.50 127 181.30 232.80

28 32.20 42.00 78 89.70 117.00 128 183.20 235.20

29 33.35 43.50 79 90.85 118.50 129 185.10 237.60

30 34.50 45.00 80 92.00 120.00 130 187.00 240.00

31 35.65 46.50 81 93.90 122.40 131 188.90 242.40

32 36.80 48.00 82 95.80 124.80 132 190.80 244.80

33 37.95 49.50 83 97.70 127.20 133 192.70 247.20

34 39.10 51.00 84 99.60 129.60 134 194.60 249.60

35 40.25 52.50 85 101.50 132.00 135 196.50 252.00

36 41.40 54.00 86 103.40 134.40 136 198.40 254.40

37 42.55 55.50 87 105.30 136.80 137 200.30 256.80

38 43.70 57.00 88 107.20 139.20 138 202.20 259.20

39 44.85 58.50 89 109.10 141.60 139 204.10 261.60

40 46.00 60.00 90 111.00 144.00 140 206.00 264.00

41 47.15 61.50 91 112.90 146.40 141 207.90 266.40

42 48.30 63.00 92 114.80 148.80 142 209.80 268.80

43 49.45 64.50 93 116.70 151.20 143 211.70 271.20

44 50.60 66.00 94 118.60 153.60 144 213.60 273.60

45 51.75 67.50 95 120.50 156.00 145 215.50 276.00

46 52.90 69.00 96 122.40 158.40 146 217.40 278.40

47 54.05 70.50 97 124.30 160.80 147 219.30 280.80

48 55.20 72.00 98 126.20 163.20 148 221.20 283.20

49 56.35 73.50 99 128.10 165.60 149 223.10 285.60

50 57.50 75.00 100 130.00 168.00 150 225.00 288.00

25

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

151 226.90 290.40 201 342.40 430.90 251 469.00 583.60

152 228.80 292.80 202 344.80 433.80 252 472.00 587.20

153 230.70 295.20 203 347.20 436.70 253 475.00 590.80

154 232.60 297.60 204 349.60 439.60 254 478.00 594.40

155 234.50 300.00 205 352.00 442.50 255 481.00 598.00

156 236.40 302.40 206 354.40 445.40 256 484.00 601.60

157 238.30 304.80 207 356.80 448.30 257 487.00 605.20

158 240.20 307.20 208 359.20 451.20 258 490.00 608.80

159 242.10 309.60 209 361.60 454.10 259 493.00 612.40

160 244.00 312.00 210 364.00 457.00 260 496.00 616.00

161 246.40 314.90 211 366.40 459.90 261 499.00 619.60

162 248.80 317.80 212 368.80 462.80 262 502.00 623.20

163 251.20 320.70 213 371.20 465.70 263 505.00 626.80

164 253.60 323.60 214 373.60 468.60 264 508.00 630.40

165 256.00 326.50 215 376.00 471.50 265 511.00 634.00

166 258.40 329.40 216 378.40 474.40 266 514.00 637.60

167 260.80 332.30 217 380.80 477.30 267 517.00 641.20

168 263.20 335.20 218 383.20 480.20 268 520.00 644.80

169 265.60 338.10 219 385.60 483.10 269 523.00 648.40

170 268.00 341.00 220 388.00 486.00 270 526.00 652.00

171 270.40 343.90 221 390.40 488.90 271 529.00 655.60

172 272.80 346.80 222 392.80 491.80 272 532.00 659.20

173 275.20 349.70 223 395.20 494.70 273 535.00 662.80

174 277.60 352.60 224 397.60 497.60 274 538.00 666.40

175 280.00 355.50 225 400.00 500.50 275 541.00 670.00

176 282.40 358.40 226 402.40 503.40 276 544.00 673.60

177 284.80 361.30 227 404.80 506.30 277 547.00 677.20

178 287.20 364.20 228 407.20 509.20 278 550.00 680.80

179 289.60 367.10 229 409.60 512.10 279 553.00 684.40

180 292.00 370.00 230 412.00 515.00 280 556.00 688.00

181 294.40 372.90 231 414.40 517.90 281 559.00 691.60

182 296.80 375.80 232 416.80 520.80 282 562.00 695.20

183 299.20 378.70 233 419.20 523.70 283 565.00 698.80

184 301.60 381.60 234 421.60 526.60 284 568.00 702.40

185 304.00 384.50 235 424.00 529.50 285 571.00 706.00

186 306.40 387.40 236 426.40 532.40 286 574.00 709.60

187 308.80 390.30 237 428.80 535.30 287 577.00 713.20

188 311.20 393.20 238 431.20 538.20 288 580.00 716.80

189 313.60 396.10 239 433.60 541.10 289 583.00 720.40

190 316.00 399.00 240 436.00 544.00 290 586.00 724.00

191 318.40 401.90 241 439.00 547.60 291 589.00 727.60

192 320.80 404.80 242 442.00 551.20 292 592.00 731.20

193 323.20 407.70 243 445.00 554.80 293 595.00 734.80

194 325.60 410.60 244 448.00 558.40 294 598.00 738.40

195 328.00 413.50 245 451.00 562.00 295 601.00 742.00

196 330.40 416.40 246 454.00 565.60 296 604.00 745.60

197 332.80 419.30 247 457.00 569.20 297 607.00 749.20

198 335.20 422.20 248 460.00 572.80 298 610.00 752.80

199 337.60 425.10 249 463.00 576.40 299 613.00 756.40

200 340.00 428.00 250 466.00 580.00 300 616.00 760.00

26

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

301 619.65 764.80 351 802.15 1004.80 401 985.30 1246.00

302 623.30 769.60 352 805.80 1009.60 402 989.60 1252.00

303 626.95 774.40 353 809.45 1014.40 403 993.90 1258.00

304 630.60 779.20 354 813.10 1019.20 404 998.20 1264.00

305 634.25 784.00 355 816.75 1024.00 405 1002.50 1270.00

306 637.90 788.80 356 820.40 1028.80 406 1006.80 1276.00

307 641.55 793.60 357 824.05 1033.60 407 1011.10 1282.00

308 645.20 798.40 358 827.70 1038.40 408 1015.40 1288.00

309 648.85 803.20 359 831.35 1043.20 409 1019.70 1294.00

310 652.50 808.00 360 835.00 1048.00 410 1024.00 1300.00

311 656.15 812.80 361 838.65 1052.80 411 1028.30 1306.00

312 659.80 817.60 362 842.30 1057.60 412 1032.60 1312.00

313 663.45 822.40 363 845.95 1062.40 413 1036.90 1318.00

314 667.10 827.20 364 849.60 1067.20 414 1041.20 1324.00

315 670.75 832.00 365 853.25 1072.00 415 1045.50 1330.00

316 674.40 836.80 366 856.90 1076.80 416 1049.80 1336.00

317 678.05 841.60 367 860.55 1081.60 417 1054.10 1342.00

318 681.70 846.40 368 864.20 1086.40 418 1058.40 1348.00

319 685.35 851.20 369 867.85 1091.20 419 1062.70 1354.00

320 689.00 856.00 370 871.50 1096.00 420 1067.00 1360.00

321 692.65 860.80 371 875.15 1100.80 421 1071.30 1366.00

322 696.30 865.60 372 878.80 1105.60 422 1075.60 1372.00

323 699.95 870.40 373 882.45 1110.40 423 1079.90 1378.00

324 703.60 875.20 374 886.10 1115.20 424 1084.20 1384.00

325 707.25 880.00 375 889.75 1120.00 425 1088.50 1390.00

326 710.90 884.80 376 893.40 1124.80 426 1092.80 1396.00

327 714.55 889.60 377 897.05 1129.60 427 1097.10 1402.00

328 718.20 894.40 378 900.70 1134.40 428 1101.40 1408.00

329 721.85 899.20 379 904.35 1139.20 429 1105.70 1414.00

330 725.50 904.00 380 908.00 1144.00 430 1110.00 1420.00

331 729.15 908.80 381 911.65 1148.80 431 1114.30 1426.00

332 732.80 913.60 382 915.30 1153.60 432 1118.60 1432.00

333 736.45 918.40 383 918.95 1158.40 433 1122.90 1438.00

334 740.10 923.20 384 922.60 1163.20 434 1127.20 1444.00

335 743.75 928.00 385 926.25 1168.00 435 1131.50 1450.00

336 747.40 932.80 386 929.90 1172.80 436 1135.80 1456.00

337 751.05 937.60 387 933.55 1177.60 437 1140.10 1462.00

338 754.70 942.40 388 937.20 1182.40 438 1144.40 1468.00

339 758.35 947.20 389 940.85 1187.20 439 1148.70 1474.00

340 762.00 952.00 390 944.50 1192.00 440 1153.00 1480.00

341 765.65 956.80 391 948.15 1196.80 441 1157.30 1486.00

342 769.30 961.60 392 951.80 1201.60 442 1161.60 1492.00

343 772.95 966.40 393 955.45 1206.40 443 1165.90 1498.00

344 776.60 971.20 394 959.10 1211.20 444 1170.20 1504.00

345 780.25 976.00 395 962.75 1216.00 445 1174.50 1510.00

346 783.90 980.80 396 966.40 1220.80 446 1178.80 1516.00

347 787.55 985.60 397 970.05 1225.60 447 1183.10 1522.00

348 791.20 990.40 398 973.70 1230.40 448 1187.40 1528.00

349 794.85 995.20 399 977.35 1235.20 449 1191.70 1534.00

350 798.50 1000.00 400 981.00 1240.00 450 1196.00 1540.00

27

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

451 1200.30 1546.00 501 1415.30 1846.00 551 1630.30 2146.00

452 1204.60 1552.00 502 1419.60 1852.00 552 1634.60 2152.00

453 1208.90 1558.00 503 1423.90 1858.00 553 1638.90 2158.00

454 1213.20 1564.00 504 1428.20 1864.00 554 1643.20 2164.00

455 1217.50 1570.00 505 1432.50 1870.00 555 1647.50 2170.00

456 1221.80 1576.00 506 1436.80 1876.00 556 1651.80 2176.00

457 1226.10 1582.00 507 1441.10 1882.00 557 1656.10 2182.00

458 1230.40 1588.00 508 1445.40 1888.00 558 1660.40 2188.00

459 1234.70 1594.00 509 1449.70 1894.00 559 1664.70 2194.00

460 1239.00 1600.00 510 1454.00 1900.00 560 1669.00 2200.00

461 1243.30 1606.00 511 1458.30 1906.00 561 1673.30 2206.00

462 1247.60 1612.00 512 1462.60 1912.00 562 1677.60 2212.00

463 1251.90 1618.00 513 1466.90 1918.00 563 1681.90 2218.00

464 1256.20 1624.00 514 1471.20 1924.00 564 1686.20 2224.00

465 1260.50 1630.00 515 1475.50 1930.00 565 1690.50 2230.00

466 1264.80 1636.00 516 1479.80 1936.00 566 1694.80 2236.00

467 1269.10 1642.00 517 1484.10 1942.00 567 1699.10 2242.00

468 1273.40 1648.00 518 1488.40 1948.00 568 1703.40 2248.00

469 1277.70 1654.00 519 1492.70 1954.00 569 1707.70 2254.00

470 1282.00 1660.00 520 1497.00 1960.00 570 1712.00 2260.00

471 1286.30 1666.00 521 1501.30 1966.00 571 1716.30 2266.00

472 1290.60 1672.00 522 1505.60 1972.00 572 1720.60 2272.00

473 1294.90 1678.00 523 1509.90 1978.00 573 1724.90 2278.00

474 1299.20 1684.00 524 1514.20 1984.00 574 1729.20 2284.00

475 1303.50 1690.00 525 1518.50 1990.00 575 1733.50 2290.00

476 1307.80 1696.00 526 1522.80 1996.00 576 1737.80 2296.00

477 1312.10 1702.00 527 1527.10 2002.00 577 1742.10 2302.00

478 1316.40 1708.00 528 1531.40 2008.00 578 1746.40 2308.00

479 1320.70 1714.00 529 1535.70 2014.00 579 1750.70 2314.00

480 1325.00 1720.00 530 1540.00 2020.00 580 1755.00 2320.00

481 1329.30 1726.00 531 1544.30 2026.00 581 1759.30 2326.00

482 1333.60 1732.00 532 1548.60 2032.00 582 1763.60 2332.00

483 1337.90 1738.00 533 1552.90 2038.00 583 1767.90 2338.00

484 1342.20 1744.00 534 1557.20 2044.00 584 1772.20 2344.00

485 1346.50 1750.00 535 1561.50 2050.00 585 1776.50 2350.00

486 1350.80 1756.00 536 1565.80 2056.00 586 1780.80 2356.00

487 1355.10 1762.00 537 1570.10 2062.00 587 1785.10 2362.00

488 1359.40 1768.00 538 1574.40 2068.00 588 1789.40 2368.00

489 1363.70 1774.00 539 1578.70 2074.00 589 1793.70 2374.00

490 1368.00 1780.00 540 1583.00 2080.00 590 1798.00 2380.00

491 1372.30 1786.00 541 1587.30 2086.00 591 1802.30 2386.00

492 1376.60 1792.00 542 1591.60 2092.00 592 1806.60 2392.00

493 1380.90 1798.00 543 1595.90 2098.00 593 1810.90 2398.00

494 1385.20 1804.00 544 1600.20 2104.00 594 1815.20 2404.00

495 1389.50 1810.00 545 1604.50 2110.00 595 1819.50 2410.00

496 1393.80 1816.00 546 1608.80 2116.00 596 1823.80 2416.00

497 1398.10 1822.00 547 1613.10 2122.00 597 1828.10 2422.00

498 1402.40 1828.00 548 1617.40 2128.00 598 1832.40 2428.00

499 1406.70 1834.00 549 1621.70 2134.00 599 1836.70 2434.00

500 1411.00 1840.00 550 1626.00 2140.00 600 1841.00 2440.00

28

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

601 1846.30 2447.50 651 2111.30 2822.50 701 2376.30 3197.50

602 1851.60 2455.00 652 2116.60 2830.00 702 2381.60 3205.00

603 1856.90 2462.50 653 2121.90 2837.50 703 2386.90 3212.50

604 1862.20 2470.00 654 2127.20 2845.00 704 2392.20 3220.00

605 1867.50 2477.50 655 2132.50 2852.50 705 2397.50 3227.50

606 1872.80 2485.00 656 2137.80 2860.00 706 2402.80 3235.00

607 1878.10 2492.50 657 2143.10 2867.50 707 2408.10 3242.50

608 1883.40 2500.00 658 2148.40 2875.00 708 2413.40 3250.00

609 1888.70 2507.50 659 2153.70 2882.50 709 2418.70 3257.50

610 1894.00 2515.00 660 2159.00 2890.00 710 2424.00 3265.00

611 1899.30 2522.50 661 2164.30 2897.50 711 2429.30 3272.50

612 1904.60 2530.00 662 2169.60 2905.00 712 2434.60 3280.00

613 1909.90 2537.50 663 2174.90 2912.50 713 2439.90 3287.50

614 1915.20 2545.00 664 2180.20 2920.00 714 2445.20 3295.00

615 1920.50 2552.50 665 2185.50 2927.50 715 2450.50 3302.50

616 1925.80 2560.00 666 2190.80 2935.00 716 2455.80 3310.00

617 1931.10 2567.50 667 2196.10 2942.50 717 2461.10 3317.50

618 1936.40 2575.00 668 2201.40 2950.00 718 2466.40 3325.00

619 1941.70 2582.50 669 2206.70 2957.50 719 2471.70 3332.50

620 1947.00 2590.00 670 2212.00 2965.00 720 2477.00 3340.00

621 1952.30 2597.50 671 2217.30 2972.50 721 2482.30 3347.50

622 1957.60 2605.00 672 2222.60 2980.00 722 2487.60 3355.00

623 1962.90 2612.50 673 2227.90 2987.50 723 2492.90 3362.50

624 1968.20 2620.00 674 2233.20 2995.00 724 2498.20 3370.00

625 1973.50 2627.50 675 2238.50 3002.50 725 2503.50 3377.50

626 1978.80 2635.00 676 2243.80 3010.00 726 2508.80 3385.00

627 1984.10 2642.50 677 2249.10 3017.50 727 2514.10 3392.50

628 1989.40 2650.00 678 2254.40 3025.00 728 2519.40 3400.00

629 1994.70 2657.50 679 2259.70 3032.50 729 2524.70 3407.50

630 2000.00 2665.00 680 2265.00 3040.00 730 2530.00 3415.00

631 2005.30 2672.50 681 2270.30 3047.50 731 2535.30 3422.50

632 2010.60 2680.00 682 2275.60 3055.00 732 2540.60 3430.00

633 2015.90 2687.50 683 2280.90 3062.50 733 2545.90 3437.50

634 2021.20 2695.00 684 2286.20 3070.00 734 2551.20 3445.00

635 2026.50 2702.50 685 2291.50 3077.50 735 2556.50 3452.50

636 2031.80 2710.00 686 2296.80 3085.00 736 2561.80 3460.00

637 2037.10 2717.50 687 2302.10 3092.50 737 2567.10 3467.50

638 2042.40 2725.00 688 2307.40 3100.00 738 2572.40 3475.00

639 2047.70 2732.50 689 2312.70 3107.50 739 2577.70 3482.50

640 2053.00 2740.00 690 2318.00 3115.00 740 2583.00 3490.00

641 2058.30 2747.50 691 2323.30 3122.50 741 2588.30 3497.50

642 2063.60 2755.00 692 2328.60 3130.00 742 2593.60 3505.00

643 2068.90 2762.50 693 2333.90 3137.50 743 2598.90 3512.50

644 2074.20 2770.00 694 2339.20 3145.00 744 2604.20 3520.00

645 2079.50 2777.50 695 2344.50 3152.50 745 2609.50 3527.50

646 2084.80 2785.00 696 2349.80 3160.00 746 2614.80 3535.00

647 2090.10 2792.50 697 2355.10 3167.50 747 2620.10 3542.50

648 2095.40 2800.00 698 2360.40 3175.00 748 2625.40 3550.00

649 2100.70 2807.50 699 2365.70 3182.50 749 2630.70 3557.50

650 2106.00 2815.00 700 2371.00 3190.00 750 2636.00 3565.00

29

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

601 1846.30 2447.50 651 2111.30 2822.50 701 2376.30 3197.50

602 1851.60 2455.00 652 2116.60 2830.00 702 2381.60 3205.00

603 1856.90 2462.50 653 2121.90 2837.50 703 2386.90 3212.50

604 1862.20 2470.00 654 2127.20 2845.00 704 2392.20 3220.00

605 1867.50 2477.50 655 2132.50 2852.50 705 2397.50 3227.50

606 1872.80 2485.00 656 2137.80 2860.00 706 2402.80 3235.00

607 1878.10 2492.50 657 2143.10 2867.50 707 2408.10 3242.50

608 1883.40 2500.00 658 2148.40 2875.00 708 2413.40 3250.00

609 1888.70 2507.50 659 2153.70 2882.50 709 2418.70 3257.50

610 1894.00 2515.00 660 2159.00 2890.00 710 2424.00 3265.00

611 1899.30 2522.50 661 2164.30 2897.50 711 2429.30 3272.50

612 1904.60 2530.00 662 2169.60 2905.00 712 2434.60 3280.00

613 1909.90 2537.50 663 2174.90 2912.50 713 2439.90 3287.50

614 1915.20 2545.00 664 2180.20 2920.00 714 2445.20 3295.00

615 1920.50 2552.50 665 2185.50 2927.50 715 2450.50 3302.50

616 1925.80 2560.00 666 2190.80 2935.00 716 2455.80 3310.00

617 1931.10 2567.50 667 2196.10 2942.50 717 2461.10 3317.50

618 1936.40 2575.00 668 2201.40 2950.00 718 2466.40 3325.00

619 1941.70 2582.50 669 2206.70 2957.50 719 2471.70 3332.50

620 1947.00 2590.00 670 2212.00 2965.00 720 2477.00 3340.00

621 1952.30 2597.50 671 2217.30 2972.50 721 2482.30 3347.50

622 1957.60 2605.00 672 2222.60 2980.00 722 2487.60 3355.00

623 1962.90 2612.50 673 2227.90 2987.50 723 2492.90 3362.50

624 1968.20 2620.00 674 2233.20 2995.00 724 2498.20 3370.00

625 1973.50 2627.50 675 2238.50 3002.50 725 2503.50 3377.50

626 1978.80 2635.00 676 2243.80 3010.00 726 2508.80 3385.00

627 1984.10 2642.50 677 2249.10 3017.50 727 2514.10 3392.50

628 1989.40 2650.00 678 2254.40 3025.00 728 2519.40 3400.00

629 1994.70 2657.50 679 2259.70 3032.50 729 2524.70 3407.50

630 2000.00 2665.00 680 2265.00 3040.00 730 2530.00 3415.00

631 2005.30 2672.50 681 2270.30 3047.50 731 2535.30 3422.50

632 2010.60 2680.00 682 2275.60 3055.00 732 2540.60 3430.00

633 2015.90 2687.50 683 2280.90 3062.50 733 2545.90 3437.50

634 2021.20 2695.00 684 2286.20 3070.00 734 2551.20 3445.00

635 2026.50 2702.50 685 2291.50 3077.50 735 2556.50 3452.50

636 2031.80 2710.00 686 2296.80 3085.00 736 2561.80 3460.00

637 2037.10 2717.50 687 2302.10 3092.50 737 2567.10 3467.50

638 2042.40 2725.00 688 2307.40 3100.00 738 2572.40 3475.00

639 2047.70 2732.50 689 2312.70 3107.50 739 2577.70 3482.50

640 2053.00 2740.00 690 2318.00 3115.00 740 2583.00 3490.00

641 2058.30 2747.50 691 2323.30 3122.50 741 2588.30 3497.50

642 2063.60 2755.00 692 2328.60 3130.00 742 2593.60 3505.00

643 2068.90 2762.50 693 2333.90 3137.50 743 2598.90 3512.50

644 2074.20 2770.00 694 2339.20 3145.00 744 2604.20 3520.00

645 2079.50 2777.50 695 2344.50 3152.50 745 2609.50 3527.50

646 2084.80 2785.00 696 2349.80 3160.00 746 2614.80 3535.00

647 2090.10 2792.50 697 2355.10 3167.50 747 2620.10 3542.50

648 2095.40 2800.00 698 2360.40 3175.00 748 2625.40 3550.00

649 2100.70 2807.50 699 2365.70 3182.50 749 2630.70 3557.50

650 2106.00 2815.00 700 2371.00 3190.00 750 2636.00 3565.00

30

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

751 2641.30 3572.50 801 2906.30 3947.50 851 3171 4322.50

752 2646.60 3580.00 802 2911.60 3955.00 852 3177 4330.00

753 2651.90 3587.50 803 2916.90 3962.50 853 3182 4337.50

754 2657.20 3595.00 804 2922.20 3970.00 854 3187 4345.00

755 2662.50 3602.50 805 2927.50 3977.50 855 3193 4352.50

756 2667.80 3610.00 806 2932.80 3985.00 856 3198 4360.00

757 2673.10 3617.50 807 2938.10 3992.50 857 3203 4367.50

758 2678.40 3625.00 808 2943.40 4000.00 858 3208 4375.00

759 2683.70 3632.50 809 2948.70 4007.50 859 3214 4382.50

760 2689.00 3640.00 810 2954.00 4015.00 860 3219 4390.00

761 2694.30 3647.50 811 2959.30 4022.50 861 3224 4397.50

762 2699.60 3655.00 812 2964.60 4030.00 862 3230 4405.00

763 2704.90 3662.50 813 2969.90 4037.50 863 3235 4412.50

764 2710.20 3670.00 814 2975.20 4045.00 864 3240 4420.00

765 2715.50 3677.50 815 2980.50 4052.50 865 3246 4427.50

766 2720.80 3685.00 816 2985.80 4060.00 866 3251 4435.00

767 2726.10 3692.50 817 2991.10 4067.50 867 3256 4442.50

768 2731.40 3700.00 818 2996.40 4075.00 868 3261 4450.00

769 2736.70 3707.50 819 3001.70 4082.50 869 3267 4457.50

770 2742.00 3715.00 820 3007.00 4090.00 870 3272 4465.00

771 2747.30 3722.50 821 3012.30 4097.50 871 3277 4472.50

772 2752.60 3730.00 822 3017.60 4105.00 872 3283 4480.00

773 2757.90 3737.50 823 3022.90 4112.50 873 3288 4487.50

774 2763.20 3745.00 824 3028.20 4120.00 874 3293 4495.00

775 2768.50 3752.50 825 3033.50 4127.50 875 3299 4502.50

776 2773.80 3760.00 826 3038.80 4135.00 876 3304 4510.00

777 2779.10 3767.50 827 3044.10 4142.50 877 3309 4517.50

778 2784.40 3775.00 828 3049.40 4150.00 878 3314 4525.00

779 2789.70 3782.50 829 3054.70 4157.50 879 3320 4532.50

780 2795.00 3790.00 830 3060.00 4165.00 880 3325 4540.00

781 2800.30 3797.50 831 3065.30 4172.50 881 3330 4547.50

782 2805.60 3805.00 832 3070.60 4180.00 882 3336 4555.00

783 2810.90 3812.50 833 3075.90 4187.50 883 3341 4562.50

784 2816.20 3820.00 834 3081.20 4195.00 884 3346 4570.00

785 2821.50 3827.50 835 3086.50 4202.50 885 3352 4577.50

786 2826.80 3835.00 836 3091.80 4210.00 886 3357 4585.00

787 2832.10 3842.50 837 3097.10 4217.50 887 3362 4592.50

788 2837.40 3850.00 838 3102.40 4225.00 888 3367 4600.00

789 2842.70 3857.50 839 3107.70 4232.50 889 3373 4607.50

790 2848.00 3865.00 840 3113.00 4240.00 890 3378 4615.00

791 2853.30 3872.50 841 3118.30 4247.50 891 3383 4622.50

792 2858.60 3880.00 842 3123.60 4255.00 892 3389 4630.00

793 2863.90 3887.50 843 3128.90 4262.50 893 3394 4637.50

794 2869.20 3895.00 844 3134.20 4270.00 894 3399 4645.00

795 2874.50 3902.50 845 3139.50 4277.50 895 3405 4652.50

796 2879.80 3910.00 846 3144.80 4285.00 896 3410 4660.00

797 2885.10 3917.50 847 3150.10 4292.50 897 3415 4667.50

798 2890.40 3925.00 848 3155.40 4300.00 898 3420 4675.00

799 2895.70 3932.50 849 3160.70 4307.50 899 3426 4682.50

800 2901.00 3940.00 850 3166.00 4315.00 900 3431 4690.00

31

LT- 1(a) Domestic. Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

901 3436.30 4697.50 951 3701.30 5072.50 1001 3966.45 6506.50

902 3441.60 4705.00 952 3706.60 5080.00 1002 3971.90 6513.00

903 3446.90 4712.50 953 3711.90 5087.50 1003 3977.35 6519.50

904 3452.20 4720.00 954 3717.20 5095.00 1004 3982.80 6526.00

905 3457.50 4727.50 955 3722.50 5102.50 1005 3988.25 6532.50

906 3462.80 4735.00 956 3727.80 5110.00 1006 3993.70 6539.00

907 3468.10 4742.50 957 3733.10 5117.50 1007 3999.15 6545.50

908 3473.40 4750.00 958 3738.40 5125.00 1008 4004.60 6552.00

909 3478.70 4757.50 959 3743.70 5132.50 1009 4010.05 6558.50

910 3484.00 4765.00 960 3749.00 5140.00 1010 4015.50 6565.00

911 3489.30 4772.50 961 3754.30 5147.50 1011 4020.95 6571.50

912 3494.60 4780.00 962 3759.60 5155.00 1012 4026.40 6578.00

913 3499.90 4787.50 963 3764.90 5162.50 1013 4031.85 6584.50

914 3505.20 4795.00 964 3770.20 5170.00 1014 4037.30 6591.00

915 3510.50 4802.50 965 3775.50 5177.50 1015 4042.75 6597.50

916 3515.80 4810.00 966 3780.80 5185.00 1016 4048.20 6604.00

917 3521.10 4817.50 967 3786.10 5192.50 1017 4053.65 6610.50

918 3526.40 4825.00 968 3791.40 5200.00 1018 4059.10 6617.00

919 3531.70 4832.50 969 3796.70 5207.50 1019 4064.55 6623.50

920 3537.00 4840.00 970 3802.00 5215.00 1020 4070.00 6630.00

921 3542.30 4847.50 971 3807.30 5222.50 1021 4075.45 6636.50

922 3547.60 4855.00 972 3812.60 5230.00 1022 4080.90 6643.00

923 3552.90 4862.50 973 3817.90 5237.50 1023 4086.35 6649.50

924 3558.20 4870.00 974 3823.20 5245.00 1024 4091.80 6656.00

925 3563.50 4877.50 975 3828.50 5252.50 1025 4097.25 6662.50

926 3568.80 4885.00 976 3833.80 5260.00 1026 4102.70 6669.00

927 3574.10 4892.50 977 3839.10 5267.50 1027 4108.15 6675.50

928 3579.40 4900.00 978 3844.40 5275.00 1028 4113.60 6682.00

929 3584.70 4907.50 979 3849.70 5282.50 1029 4119.05 6688.50

930 3590.00 4915.00 980 3855.00 5290.00 1030 4124.50 6695.00

931 3595.30 4922.50 981 3860.30 5297.50 1031 4129.95 6701.50

932 3600.60 4930.00 982 3865.60 5305.00 1032 4135.40 6708.00

933 3605.90 4937.50 983 3870.90 5312.50 1033 4140.85 6714.50

934 3611.20 4945.00 984 3876.20 5320.00 1034 4146.30 6721.00

935 3616.50 4952.50 985 3881.50 5327.50 1035 4151.75 6727.50

936 3621.80 4960.00 986 3886.80 5335.00 1036 4157.20 6734.00

937 3627.10 4967.50 987 3892.10 5342.50 1037 4162.65 6740.50

938 3632.40 4975.00 988 3897.40 5350.00 1038 4168.10 6747.00

939 3637.70 4982.50 989 3902.70 5357.50 1039 4173.55 6753.50

940 3643.00 4990.00 990 3908.00 5365.00 1040 4179.00 6760.00

941 3648.30 4997.50 991 3913.30 5372.50 1041 4184.45 6766.50

942 3653.60 5005.00 992 3918.60 5380.00 1042 4189.90 6773.00

943 3658.90 5012.50 993 3923.90 5387.50 1043 4195.35 6779.50

944 3664.20 5020.00 994 3929.20 5395.00 1044 4200.80 6786.00

945 3669.50 5027.50 995 3934.50 5402.50 1045 4206.25 6792.50

946 3674.80 5035.00 996 3939.80 5410.00 1046 4211.70 6799.00

947 3680.10 5042.50 997 3945.10 5417.50 1047 4217.15 6805.50

948 3685.40 5050.00 998 3950.40 5425.00 1048 4222.60 6812.00

949 3690.70 5057.50 999 3955.70 5432.50 1049 4228.05 6818.50

950 3696.00 5065.00 1000 3961.00 5440.00 1050 4233.50 6825.00

32

Annexure-4 LT-1(b) – Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

1 1.55 2.00 51 79.05 102.00 101 174.40 225.10

2 3.10 4.00 52 80.60 104.00 102 176.80 228.20

3 4.65 6.00 53 82.15 106.00 103 179.20 231.30

4 6.20 8.00 54 83.70 108.00 104 181.60 234.40

5 7.75 10.00 55 85.25 110.00 105 184.00 237.50

6 9.30 12.00 56 86.80 112.00 106 186.40 240.60

7 10.85 14.00 57 88.35 114.00 107 188.80 243.70

8 12.40 16.00 58 89.90 116.00 108 191.20 246.80

9 13.95 18.00 59 91.45 118.00 109 193.60 249.90

10 15.50 20.00 60 93.00 120.00 110 196.00 253.00

11 17.05 22.00 61 94.55 122.00 111 198.40 256.10

12 18.60 24.00 62 96.10 124.00 112 200.80 259.20

13 20.15 26.00 63 97.65 126.00 113 203.20 262.30

14 21.70 28.00 64 99.20 128.00 114 205.60 265.40

15 23.25 30.00 65 100.75 130.00 115 208.00 268.50

16 24.80 32.00 66 102.30 132.00 116 210.40 271.60

17 26.35 34.00 67 103.85 134.00 117 212.80 274.70

18 27.90 36.00 68 105.40 136.00 118 215.20 277.80

19 29.45 38.00 69 106.95 138.00 119 217.60 280.90

20 31.00 40.00 70 108.50 140.00 120 220.00 284.00

21 32.55 42.00 71 110.05 142.00 121 222.40 287.10

22 34.10 44.00 72 111.60 144.00 122 224.80 290.20

23 35.65 46.00 73 113.15 146.00 123 227.20 293.30

24 37.20 48.00 74 114.70 148.00 124 229.60 296.40

25 38.75 50.00 75 116.25 150.00 125 232.00 299.50

26 40.30 52.00 76 117.80 152.00 126 234.40 302.60

27 41.85 54.00 77 119.35 154.00 127 236.80 305.70

28 43.40 56.00 78 120.90 156.00 128 239.20 308.80

29 44.95 58.00 79 122.45 158.00 129 241.60 311.90

30 46.50 60.00 80 124.00 160.00 130 244.00 315.00

31 48.05 62.00 81 126.40 163.10 131 246.40 318.10

32 49.60 64.00 82 128.80 166.20 132 248.80 321.20

33 51.15 66.00 83 131.20 169.30 133 251.20 324.30

34 52.70 68.00 84 133.60 172.40 134 253.60 327.40

35 54.25 70.00 85 136.00 175.50 135 256.00 330.50

36 55.80 72.00 86 138.40 178.60 136 258.40 333.60

37 57.35 74.00 87 140.80 181.70 137 260.80 336.70

38 58.90 76.00 88 143.20 184.80 138 263.20 339.80

39 60.45 78.00 89 145.60 187.90 139 265.60 342.90

40 62.00 80.00 90 148.00 191.00 140 268.00 346.00

41 63.55 82.00 91 150.40 194.10 141 270.40 349.10

42 65.10 84.00 92 152.80 197.20 142 272.80 352.20

43 66.65 86.00 93 155.20 200.30 143 275.20 355.30

44 68.20 88.00 94 157.60 203.40 144 277.60 358.40

45 69.75 90.00 95 160.00 206.50 145 280.00 361.50

46 71.30 92.00 96 162.40 209.60 146 282.40 364.60

47 72.85 94.00 97 164.80 212.70 147 284.80 367.70

48 74.40 96.00 98 167.20 215.80 148 287.20 370.80

49 75.95 98.00 99 169.60 218.90 149 289.60 373.90

50 77.50 100.00 100 172.00 222.00 150 292.00 377.00

33

LT-1(b) – Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

151 294.40 380.10 201 430.80 555.60 251 577.95 745.50

152 296.80 383.20 202 433.60 559.20 252 581.40 750.00

153 299.20 386.30 203 436.40 562.80 253 584.85 754.50

154 301.60 389.40 204 439.20 566.40 254 588.30 759.00

155 304.00 392.50 205 442.00 570.00 255 591.75 763.50

156 306.40 395.60 206 444.80 573.60 256 595.20 768.00

157 308.80 398.70 207 447.60 577.20 257 598.65 772.50

158 311.20 401.80 208 450.40 580.80 258 602.10 777.00

159 313.60 404.90 209 453.20 584.40 259 605.55 781.50

160 316.00 408.00 210 456.00 588.00 260 609.00 786.00

161 318.80 411.60 211 458.80 591.60 261 612.45 790.50

162 321.60 415.20 212 461.60 595.20 262 615.90 795.00

163 324.40 418.80 213 464.40 598.80 263 619.35 799.50

164 327.20 422.40 214 467.20 602.40 264 622.80 804.00

165 330.00 426.00 215 470.00 606.00 265 626.25 808.50

166 332.80 429.60 216 472.80 609.60 266 629.70 813.00

167 335.60 433.20 217 475.60 613.20 267 633.15 817.50

168 338.40 436.80 218 478.40 616.80 268 636.60 822.00

169 341.20 440.40 219 481.20 620.40 269 640.05 826.50

170 344.00 444.00 220 484.00 624.00 270 643.50 831.00

171 346.80 447.60 221 486.80 627.60 271 646.95 835.50

172 349.60 451.20 222 489.60 631.20 272 650.40 840.00

173 352.40 454.80 223 492.40 634.80 273 653.85 844.50

174 355.20 458.40 224 495.20 638.40 274 657.30 849.00

175 358.00 462.00 225 498.00 642.00 275 660.75 853.50

176 360.80 465.60 226 500.80 645.60 276 664.20 858.00

177 363.60 469.20 227 503.60 649.20 277 667.65 862.50

178 366.40 472.80 228 506.40 652.80 278 671.10 867.00

179 369.20 476.40 229 509.20 656.40 279 674.55 871.50

180 372.00 480.00 230 512.00 660.00 280 678.00 876.00

181 374.80 483.60 231 514.80 663.60 281 681.45 880.50

182 377.60 487.20 232 517.60 667.20 282 684.90 885.00

183 380.40 490.80 233 520.40 670.80 283 688.35 889.50

184 383.20 494.40 234 523.20 674.40 284 691.80 894.00

185 386.00 498.00 235 526.00 678.00 285 695.25 898.50

186 388.80 501.60 236 528.80 681.60 286 698.70 903.00

187 391.60 505.20 237 531.60 685.20 287 702.15 907.50

188 394.40 508.80 238 534.40 688.80 288 705.60 912.00

189 397.20 512.40 239 537.20 692.40 289 709.05 916.50

190 400.00 516.00 240 540.00 696.00 290 712.50 921.00

191 402.80 519.60 241 543.45 700.50 291 715.95 925.50

192 405.60 523.20 242 546.90 705.00 292 719.40 930.00

193 408.40 526.80 243 550.35 709.50 293 722.85 934.50

194 411.20 530.40 244 553.80 714.00 294 726.30 939.00

195 414.00 534.00 245 557.25 718.50 295 729.75 943.50

196 416.80 537.60 246 560.70 723.00 296 733.20 948.00

197 419.60 541.20 247 564.15 727.50 297 736.65 952.50

198 422.40 544.80 248 567.60 732.00 298 740.10 957.00

199 425.20 548.40 249 571.05 736.50 299 743.55 961.50

200 428.00 552.00 250 574.50 741.00 300 747.00 966.00

34

LT-1(b) – Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

301 751.05 971.20 351 953.55 1231.20 401 1157.05 1492.20

302 755.10 976.40 352 957.60 1236.40 402 1162.10 1498.40

303 759.15 981.60 353 961.65 1241.60 403 1167.15 1504.60

304 763.20 986.80 354 965.70 1246.80 404 1172.20 1510.80

305 767.25 992.00 355 969.75 1252.00 405 1177.25 1517.00

306 771.30 997.20 356 973.80 1257.20 406 1182.30 1523.20

307 775.35 1002.40 357 977.85 1262.40 407 1187.35 1529.40

308 779.40 1007.60 358 981.90 1267.60 408 1192.40 1535.60

309 783.45 1012.80 359 985.95 1272.80 409 1197.45 1541.80

310 787.50 1018.00 360 990.00 1278.00 410 1202.50 1548.00

311 791.55 1023.20 361 994.05 1283.20 411 1207.55 1554.20

312 795.60 1028.40 362 998.10 1288.40 412 1212.60 1560.40

313 799.65 1033.60 363 1002.15 1293.60 413 1217.65 1566.60

314 803.70 1038.80 364 1006.20 1298.80 414 1222.70 1572.80

315 807.75 1044.00 365 1010.25 1304.00 415 1227.75 1579.00

316 811.80 1049.20 366 1014.30 1309.20 416 1232.80 1585.20

317 815.85 1054.40 367 1018.35 1314.40 417 1237.85 1591.40

318 819.90 1059.60 368 1022.40 1319.60 418 1242.90 1597.60

319 823.95 1064.80 369 1026.45 1324.80 419 1247.95 1603.80

320 828.00 1070.00 370 1030.50 1330.00 420 1253.00 1610.00

321 832.05 1075.20 371 1034.55 1335.20 421 1258.05 1616.20

322 836.10 1080.40 372 1038.60 1340.40 422 1263.10 1622.40

323 840.15 1085.60 373 1042.65 1345.60 423 1268.15 1628.60

324 844.20 1090.80 374 1046.70 1350.80 424 1273.20 1634.80

325 848.25 1096.00 375 1050.75 1356.00 425 1278.25 1641.00

326 852.30 1101.20 376 1054.80 1361.20 426 1283.30 1647.20

327 856.35 1106.40 377 1058.85 1366.40 427 1288.35 1653.40

328 860.40 1111.60 378 1062.90 1371.60 428 1293.40 1659.60

329 864.45 1116.80 379 1066.95 1376.80 429 1298.45 1665.80

330 868.50 1122.00 380 1071.00 1382.00 430 1303.50 1672.00

331 872.55 1127.20 381 1075.05 1387.20 431 1308.55 1678.20

332 876.60 1132.40 382 1079.10 1392.40 432 1313.60 1684.40

333 880.65 1137.60 383 1083.15 1397.60 433 1318.65 1690.60

334 884.70 1142.80 384 1087.20 1402.80 434 1323.70 1696.80

335 888.75 1148.00 385 1091.25 1408.00 435 1328.75 1703.00

336 892.80 1153.20 386 1095.30 1413.20 436 1333.80 1709.20

337 896.85 1158.40 387 1099.35 1418.40 437 1338.85 1715.40

338 900.90 1163.60 388 1103.40 1423.60 438 1343.90 1721.60

339 904.95 1168.80 389 1107.45 1428.80 439 1348.95 1727.80

340 909.00 1174.00 390 1111.50 1434.00 440 1354.00 1734.00

341 913.05 1179.20 391 1115.55 1439.20 441 1359.05 1740.20

342 917.10 1184.40 392 1119.60 1444.40 442 1364.10 1746.40

343 921.15 1189.60 393 1123.65 1449.60 443 1369.15 1752.60

344 925.20 1194.80 394 1127.70 1454.80 444 1374.20 1758.80

345 929.25 1200.00 395 1131.75 1460.00 445 1379.25 1765.00

346 933.30 1205.20 396 1135.80 1465.20 446 1384.30 1771.20

347 937.35 1210.40 397 1139.85 1470.40 447 1389.35 1777.40

348 941.40 1215.60 398 1143.90 1475.60 448 1394.40 1783.60

349 945.45 1220.80 399 1147.95 1480.80 449 1399.45 1789.80

350 949.50 1226.00 400 1152.00 1486.00 450 1404.50 1796.00

35

LT-1(b) – Energy charges at revised rate and pre-revised rates

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

451 1409.55 1802.20 501 1662.05 2112.20 551 1914.55 2422.20

452 1414.60 1808.40 502 1667.10 2118.40 552 1919.60 2428.40

453 1419.65 1814.60 503 1672.15 2124.60 553 1924.65 2434.60

454 1424.70 1820.80 504 1677.20 2130.80 554 1929.70 2440.80

455 1429.75 1827.00 505 1682.25 2137.00 555 1934.75 2447.00

456 1434.80 1833.20 506 1687.30 2143.20 556 1939.80 2453.20

457 1439.85 1839.40 507 1692.35 2149.40 557 1944.85 2459.40

458 1444.90 1845.60 508 1697.40 2155.60 558 1949.90 2465.60

459 1449.95 1851.80 509 1702.45 2161.80 559 1954.95 2471.80

460 1455.00 1858.00 510 1707.50 2168.00 560 1960.00 2478.00

461 1460.05 1864.20 511 1712.55 2174.20 561 1965.05 2484.20

462 1465.10 1870.40 512 1717.60 2180.40 562 1970.10 2490.40

463 1470.15 1876.60 513 1722.65 2186.60 563 1975.15 2496.60

464 1475.20 1882.80 514 1727.70 2192.80 564 1980.20 2502.80

465 1480.25 1889.00 515 1732.75 2199.00 565 1985.25 2509.00

466 1485.30 1895.20 516 1737.80 2205.20 566 1990.30 2515.20

467 1490.35 1901.40 517 1742.85 2211.40 567 1995.35 2521.40

468 1495.40 1907.60 518 1747.90 2217.60 568 2000.40 2527.60

469 1500.45 1913.80 519 1752.95 2223.80 569 2005.45 2533.80

470 1505.50 1920.00 520 1758.00 2230.00 570 2010.50 2540.00

471 1510.55 1926.20 521 1763.05 2236.20 571 2015.55 2546.20

472 1515.60 1932.40 522 1768.10 2242.40 572 2020.60 2552.40

473 1520.65 1938.60 523 1773.15 2248.60 573 2025.65 2558.60

474 1525.70 1944.80 524 1778.20 2254.80 574 2030.70 2564.80

475 1530.75 1951.00 525 1783.25 2261.00 575 2035.75 2571.00

476 1535.80 1957.20 526 1788.30 2267.20 576 2040.80 2577.20

477 1540.85 1963.40 527 1793.35 2273.40 577 2045.85 2583.40

478 1545.90 1969.60 528 1798.40 2279.60 578 2050.90 2589.60

479 1550.95 1975.80 529 1803.45 2285.80 579 2055.95 2595.80

480 1556.00 1982.00 530 1808.50 2292.00 580 2061.00 2602.00

481 1561.05 1988.20 531 1813.55 2298.20 581 2066.05 2608.20

482 1566.10 1994.40 532 1818.60 2304.40 582 2071.10 2614.40

483 1571.15 2000.60 533 1823.65 2310.60 583 2076.15 2620.60

484 1576.20 2006.80 534 1828.70 2316.80 584 2081.20 2626.80

485 1581.25 2013.00 535 1833.75 2323.00 585 2086.25 2633.00

486 1586.30 2019.20 536 1838.80 2329.20 586 2091.30 2639.20

487 1591.35 2025.40 537 1843.85 2335.40 587 2096.35 2645.40

488 1596.40 2031.60 538 1848.90 2341.60 588 2101.40 2651.60

489 1601.45 2037.80 539 1853.95 2347.80 589 2106.45 2657.80

490 1606.50 2044.00 540 1859.00 2354.00 590 2111.50 2664.00

491 1611.55 2050.20 541 1864.05 2360.20 591 2116.55 2670.20

492 1616.60 2056.40 542 1869.10 2366.40 592 2121.60 2676.40

493 1621.65 2062.60 543 1874.15 2372.60 593 2126.65 2682.60

494 1626.70 2068.80 544 1879.20 2378.80 594 2131.70 2688.80

495 1631.75 2075.00 545 1884.25 2385.00 595 2136.75 2695.00

496 1636.80 2081.20 546 1889.30 2391.20 596 2141.80 2701.20

497 1641.85 2087.40 547 1894.35 2397.40 597 2146.85 2707.40

498 1646.90 2093.60 548 1899.40 2403.60 598 2151.90 2713.60

499 1651.95 2099.80 549 1904.45 2409.80 599 2156.95 2719.80

500 1657.00 2106.00 550 1909.50 2416.00 600 2162.00 2726.00

36

LT-1(b) – Energy charges at revised rate and pre-revised rates Energy charges at pre-revised rate

Energy charges at revised rate

Energy charges at pre-revised rate

Energy charges at revised rate

(Rs) (Rs) (Rs) (Rs)

Bi-monthly consumption

(A) (B)

Bi-monthly consumption

(A) (B)

601 2168.30 2733.50 651 2483.30 3108.50

602 2174.60 2741.00 652 2489.60 3116.00

603 2180.90 2748.50 653 2495.90 3123.50

604 2187.20 2756.00 654 2502.20 3131.00

605 2193.50 2763.50 655 2508.50 3138.50

606 2199.80 2771.00 656 2514.80 3146.00

607 2206.10 2778.50 657 2521.10 3153.50

608 2212.40 2786.00 658 2527.40 3161.00

609 2218.70 2793.50 659 2533.70 3168.50

610 2225.00 2801.00 660 2540.00 3176.00

611 2231.30 2808.50 661 2546.30 3183.50

612 2237.60 2816.00 662 2552.60 3191.00

613 2243.90 2823.50 663 2558.90 3198.50

614 2250.20 2831.00 664 2565.20 3206.00

615 2256.50 2838.50 665 2571.50 3213.50

616 2262.80 2846.00 666 2577.80 3221.00

617 2269.10 2853.50 667 2584.10 3228.50

618 2275.40 2861.00 668 2590.40 3236.00

619 2281.70 2868.50 669 2596.70 3243.50

620 2288.00 2876.00 670 2603.00 3251.00

621 2294.30 2883.50 671 2609.30 3258.50

622 2300.60 2891.00 672 2615.60 3266.00

623 2306.90 2898.50 673 2621.90 3273.50

624 2313.20 2906.00 674 2628.20 3281.00

625 2319.50 2913.50 675 2634.50 3288.50

626 2325.80 2921.00 676 2640.80 3296.00

627 2332.10 2928.50 677 2647.10 3303.50

628 2338.40 2936.00 678 2653.40 3311.00

629 2344.70 2943.50 679 2659.70 3318.50

630 2351.00 2951.00 680 2666.00 3326.00

631 2357.30 2958.50 681 2672.30 3333.50

632 2363.60 2966.00 682 2678.60 3341.00

633 2369.90 2973.50 683 2684.90 3348.50

634 2376.20 2981.00 684 2691.20 3356.00

635 2382.50 2988.50 685 2697.50 3363.50

636 2388.80 2996.00 686 2703.80 3371.00

637 2395.10 3003.50 687 2710.10 3378.50

638 2401.40 3011.00 688 2716.40 3386.00

639 2407.70 3018.50 689 2722.70 3393.50

640 2414.00 3026.00 690 2729.00 3401.00

641 2420.30 3033.50 691 2735.30 3408.50

642 2426.60 3041.00 692 2741.60 3416.00

643 2432.90 3048.50 693 2747.90 3423.50

644 2439.20 3056.00 694 2754.20 3431.00

645 2445.50 3063.50 695 2760.50 3438.50

646 2451.80 3071.00 696 2766.80 3446.00

647 2458.10 3078.50 697 2773.10 3453.50

648 2464.40 3086.00 698 2779.40 3461.00

649 2470.70 3093.50 699 2785.70 3468.50

650 2477.00 3101.00 700 2792.00 3476.00

37

Annexure-5

Abstract of the tariff revised by the KSERC with effect from 01.07.2012

LOW TENSION SUPPLY

1. LT I(A) (applicable to supply of energy for Domestic use)

Pre-revised Tariff Revised Tariff wef

01.07.2012

Fixed Charges Fixed Charges

Nil 1 ph: Rs 20/ month

3 ph: Rs 60/ month Monthly Consumption

slabs Energy Charges (paise per unit)

Energy Charges (paise per unit)

0-40 units 115 150

41-80 units 190 240

81-120 units 240 290

121-150 units 300 360

151-200 units 365 480

201-300 units 430 600

301-500 units 530 750

Above 500 units 545 650(all units) *Note: Fixed charges shall not be applicable for Single phase consumers having average consumption 40 units or below for the previous six months.

2. LT I(B) (applicable to libraries, reading rooms, political parties approved by EC of

India)

Pre-revised Tariff Revised Tariff wef

01.07.2012

Fixed Charges Fixed Charges

Nil 1 ph: Rs 20/ month

3 ph: Rs 60/ month Monthly Consumption

slabs Energy Charges (paise per unit)

Energy Charges (paise per unit)

0-40 units 155 200

41-80 units 240 310

81-120 units 280 360

121-150 units 345 450

151-200 units 405 520

201-300 units 505 620 Above 300 units 630 750

38

3. LT II colonies (applicable to colonies of Universities ,State/Central Departments, Railways etc)

Particulars Pre-revised Tariff

Revised Tariff wef 01.07.2012

Fixed Charge (Rs/Connection) 1990 2200 Energy Charge (Paise Per unit) 565 650

4. LT III Temporary Supply (applicable for illumination, exhibitions,

festivals, fairs ,meeting)

Particulars Pre-revised Tariff

Revised Tariff wef 01.07.2012

Energy Charge Rs 12 per unit Rs 13.50 per unit

OR Daily Minimum Rs/KW or part thereof connected load Rs 120/KW Rs 130/KW

5. LT IV Industrial (general purpose industrial loads, oil mills, saw mills,

stone crushing, software services and data processing, diary farms, tissue culture units, public water works, sewage pumping, power laundries, printing press, garment units etc)

Particulars Pre-revised Tariff

Revised Tariff wef 01.07.2012

Fixed Charge (Rs/KW per month) 45 60* Energy Charge (Paise Per unit) 325 425

*For consumers having connected load of 10 HP or below fixed charge shall be Rs 60 per consumer per month. The demand charges applicable to maximum demand based tariff will be Rs.100/kVA per month.

6. LT V Agriculture (applicable to poultry farms, agriculture including

dewatering and lift irrigation, livestock farms etc )

Particulars Pre-revised Tariff

Revised Tariff wef 01.07.2012

Fixed Charge (Rs/KW per month) 6 6

Energy Charge (Paise Per unit) 65 150

39

7. LT VI(A) Non- Domestic (applicable to premises of religious worship, govt/aided educational institutions, government hospitals, private hospitals registered under Charitable Societies Act etc;)

Pre-revised

Tariff Revised Tariff wef 01.07.2012

Fixed Charge (Rs/KW per month) 40 50

Energy Charge (Paise Per unit)

Upto 500 units 385 480

Above 500 units 520 550

8. LT VI(B) Non-Domestic (applicable to offices of State/Central

Government,Corporations,Boards ,KHRWS paywards,Private Hospitals ,Guest Houses of Governments,offices of FRIENDS etc;)

Particulars Pre-revised

Tariff Revised Tariff wef 01.07.2012

Fixed Charge (Rs/KW per month) 55 70

Energy Charge (Paise Per unit)

Upto 500 units 450 550

Above 500 units 590 650

9. LT VI (C) Non-Domestic : (applicable to offices under Income tax, central excise, customs, Airport Authority of India, Motor vehicle dept., offices of all tax/revenue collection depts.of State/Central Govt., Banks, ATM counters etc., )

Particulars

Pre-revised Tariff

Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

170 180

Energy Charge (paise per unit)

Upto 500 units 675 700

Above 500 units 840 850

10. LT VI (D) Non-Domestic : (applicable to orphanages, old age homes, polio homes, cancer/ palliative care centres, anganavadis, schools/hostels of mentally retarded, deaf,blind,PH etc.,)

Particulars Pre revised Tariff

Revised Tariff wef 01.07.2012

Fixed charge Nil Nil

Energy Charge (paise per unit)

85 150

40

11. LT V II (A) Commercial (applicable to commercial premises, hotels,

private hostels, showrooms, cold storages, freezing plants, self financing educational institutions, petrol bunks, cellular Mobile towers, offices of telecom companies, insurance companies, call centres, etc.,)

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

Single Phase 50 60

Three phase 100 120

Energy Charge (paise per unit)*

Upto 100 units per month 545 545

Upto 200 units per month 605 605

Upto 300 units per month 675 675

Upto 500 units per month 730 730

above 500 units (all units) 805 850

•••• Corresponding Slab Charge applies to entire consumption •••• The demand charges applicable to maximum demand based tariff shall be

Rs.192/kVA per month.

12. LT VII (B) Commercial : (applicable to shops/bunks hotels, restaurants, telephone booth, photocopy services etc., having connected load not exceeding 1000W)

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

30 40

Energy Charge (paise per unit)

Upto 100 units 330 400

Above 100 units 520 600

13. LT VII (C) Commercial : (applicable to cinema theatres, circus etc., )

Particulars

Pre revised Tariff

Revised Tariff wef 01.07.2012

Fixed charge (Rs/ kW per month)

80 90

Energy Charge (paise per unit)

Upto 1000 units 440 500

Above 1000 units 590 650

41

14. LT VIII Temporary Extension (applicable to temporary extension from

consumer premises)

Particulars Pre revised Tariff Revised Tariff wef 01.07.2012

Rs. 50/kW/day Rs.65/kW/day

15. LT IX Public Lighting- Electricity charges for metered supply

Particulars Pre revised Tariff

Revised Tariff wef 01.07.2012

Fixed charge (Rs/ meter/month)

12 30

Energy Charge (paise per unit)

90 275

16. LT IX Public Lighting- Composite tariff approved by KSERC

Approved Tariff

Rs/Lamp/month Type of Lamp Watts Effective Energy rate (paise per unit) 4 hours 6 hours 12 hours

Ordinary 40 300 14 22 43

Ordinary 60 300 22 32 65

Ordinary 100 300 36 54 108

Fluoroscent tube 40 300 14 22 43 Fluoroscent tube 80 300 29 43 86

Flood Light 1000 300 360 540 1080

Mercury Vapour Lamp 80 300 29 43 86

Mercury Vapour Lamp 125 300 45 68 135 Mercury Vapour Lamp 160 300 58 86 173

Mercury Vapour Lamp 250 300 90 135 270

Mercury Vapour Lamp 400 300 144 216 432

Sodium Vapour Lamp 70 300 25 38 76 Sodium Vapour Lamp 80 300 29 43 86

Sodium Vapour Lamp 100 300 36 54 108

Sodium Vapour Lamp 125 300 45 68 135

Sodium Vapour Lamp 150 300 54 81 162 Sodium Vapour Lamp 250 300 90 135 270

CFL 11 150 2 3 6

CFL 22 150 4 6 12

CFL 44 150 8 12 24 CFL 18 150 3 5 10

CFL 36 150 6 10 19 CFL 72 150 13 19 39 CFL 15 150 3 4 8 CFL 30 150 5 8 16 CFL 36 150 6 10 19 CFL 72 150 13 19 39 CFL 144 150 26 39 78

LED 18 150 3 5 10

Mercury vapour lamp

1200 300 1296

Sodium vapour lamp 250 300 270

42

HIGH TENSION/EXTRA HIGH TENSION SUPPLY

1. HT –I Industrial (applicable to printing press, plantations, granite

crushing units, dairy farms, software development units, non-agricultural pumping, drinking water pumping of KWA etc.,)

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month) 270 300

Energy Charge (paise per unit)

Normal tariff 300 410

Power intensive category (applicable to power intensive industries allotted power on or after 17-12-1996)

350 410

*Distinction of power intensive removed

2. HT II Non industrial /Non Commercial (applicable to public offices of Central/State Govt, Educational institutions of Universities, Govt Depts, Govt. Hospitals etc.,)

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month)

300 350

Energy Charge (paise per unit)

300 410

* The existing sub category of HT II(b) meant for Offices of Political parties approved by Election Commission of India shall be abolished and merged with this category

3. HT III Agriculture: (applicable to all cultivations, dewatering, lift irrigation, poultry farms, livestock farms, piggery farms, etc., )

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month)

165 165

Energy Charge (paise per unit) 130 180

4. HT IV Commercial (Applicable to Hotels, Private hospitals, airports, business houses, self financing educational institutions etc.,)

Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month)

350 400

Energy Charge (paise per unit)

upto 30,000 units (all units) 550

above 30,000 units (all units)

370

650

43

5. EHT 66kV / 110kV (applicable to Extra High Tension consumers)

Particulars Pre revised Tariff Revised Tariff wef 01.07.2012

66kV 110kV 66kV 110kV

Demand charge (Rs/ kVA per month)

260 245 300 290

Energy Charge (paise per unit)

Normal tariff 290 290 400 400

Power intensive category 340 340 400 400

*Distinction of power intensive removed

6. EHT 220kV (applicable to Extra High Tension consumers connected at

220kV, new category) Particulars Revised Tariff wef 01.07.2012

Demand charge (Rs/kVA per month)

275

Energy Charge (paise per unit) 400

7. Railway Traction Particulars Pre revised

Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month)

245 250

Energy Charge (paise per unit)

290 400

8. Bulk Supply Tariff

Pre revised Tariff Revised Tariff wef 01.07.2012

Demand charge (Rs/ kVA per month)

Energy Charge (paise per unit)

Demand charge (Rs/ kVA per month)

Energy Charge (paise per unit)

KPUPL 245 316 300 415

CSEZ 245 316 300 430

RPL 245 316 300 370

Technopark 245 316 300 400

CPT 245 316 350 530

Thrissur Corporation 260 316 350 520

KDHPCL 270 328 300 370

MES,PED& Karnataka 270 328 350 410

44

KERALA STATE ELECTRICTY BOARD

ABSTRACT

KSERC order dated 25-07-2012 on revision of tariff for all consumers including Bulk licensees- Implementation of the revised tariff for all categories w.e.f.01-07-2012- Sanction accorded- Orders issued.

CORPORATE OFFICE (Tariff & Regulatory Affairs Cell)

B.O. (FM)) No. 1546/2012 (KSEB/TRAC/Tariff Rev-2012-13) dated ,Tvpm 16.08.2012

Read: 1. KSERC order dated 25.07.2012 on petition OP No. 23 of 2012 2. BO (MF) No. 1510/2012 (KSEB/ TRAC/ Tariff Rev 2012-13) dtd 06-08-2012

3. Government Order G.O (Ms) No. 18/2012/PD dated 06-08-2012

4. Letter No. 19/ SEA/2012/ KSERC/707 dated 09-08-2012 of KSERC 5. Note No. KSEB/TRAC/ Tariff Rev2012-13 dated 14.08.2012 of the Chief

Engineer (Commercial &Tariff).

ORDER

KSEB had filed the tariff revision proposals before the Kerala State Electricity

Regulatory Commission (KSERC) on 30-03-2012 for revising the tariff applicable to all categories of consumers including Bulk licensees. KSERC vide the order dated 25-07-2012 has approved the tariff proposals of KSEB with certain modifications and ordered to implement the same w.e.f. 01-07-2012.

2. KSEB vide the order dated 06-08-2012, read as second paper above has ordered to implement the revised tariff applicable to all HT&EHT consumers including bulk licensees w.e.f. 01-07-2012 as directed by KSERC.

3. State Government vide the order read as third paper above has ordered

to exempt ‘Domestic Consumers with monthly consumption up to 120 units and Agricultural consumers from the enhanced electricity charges due to the tariff ordered by KSERC by providing cash subsidy as provided under section 65 of the Electricity Act-2003. Government has also ordered that an amount of Rs 25.00 crore will be provided to KSEB in every month, in advance to compensate the revenue short fall on account of the exemption. KSERC vide the letter read as fourth paper above has permitted the Board to implement subsidy as per the G.O read above strictly as per section-65 of the Act.

4. The Chief Engineer (Commercial &Tariff) vide the note read as fifth paper

above has placed the tariff order of the KSERC, Government order on subsidy and decision of the KSERC on the implementation of subsidy before the Board for further orders. Chief Engineer has also placed the detailed procedure to be followed for the smooth and speedy implementation of the tariff order issued by KSERC. The Chief Engineer has pointed out that as per the Kerala Electricity Duty Act, 1963; KSEB has to collect the electricity duty along with the revised electricity charges at the rates specified in the Schedule attached to the said Act of 1963. As per the schedule, the duty shall be collected @10% of the price of energy indicated in the invoice from all LT consumers except public lighting. The Chief Engineer has also requested to ratify the Board order dated 06-08-2012 on implementing the revised tariff for all HT &EHT consumers including Bulk consumers of the State.

45

5. Having considered the note of the Chief Engineer (Commercial & Tariff), Board hereby orders to: (1) implement the revised tariff applicable to the LT consumers w.e.f.

01-07-2012 as ordered by the KSERC vide order dated 25th July-2012 on petition No. OP No. 23 of 2012.

(2) exempt domestic consumers with monthly consumption up to 120 units and

agriculture consumers from payment of the enhanced energy charges and single phase domestic consumers with monthly consumption up to 120 units from paying of fixed charges.

(3) ratify the Board Order dated 06.08.2012 on the implementation of the revised tariff applicable to HT &EHT consumers, including bulk licensees.

For the smooth and speedy implementation of the revised tariff w.e.f

01-07-2012, Board hereby issues following directions:

(a) the Director (IT) and all the Distribution field units shall raise the invoice for

the electricity charges at the revised rates for the energy consumption from 01-07-2012. While preparing the invoices, Director (IT) and Distribution field units shall ensure the following.

(i) All the domestic consumers with monthly consumption up to 120 units is exempted from payment of the enhanced energy charges.

(ii) All the single phase domestic consumers with monthly consumption up to 120 units is exempted from payment of fixed charges.

(iii) The agricultural consumers are exempted from the payment of the enhanced energy charges.

(iv) The invoices issued to the above categories of consumers shall explicitly contain the following particulars.

(a) The total electricity charges payable by the consumer as per the tariff approved by KSERC.

(b) Subsidy provided by the Government. (c) Net amount payable by the consumers.

(v) The billing procedures and circular issued from Tariff &

Regulatory Affairs Cell (TRAC) of KSEB may be followed. (b) The Director (IT) shall be entrusted to make necessary modifications in the

‘ORUMA’ billing software to implement the revised tariff with immediate effect. He shall also ensure that, necessary modification in the ORUMA billing software shall be completed in a time bound manner in all section offices and the progress shall be reported to the Board within one week from the date of this order.

46

(c) The Tariff & Regulatory Affairs Cell (TRAC) shall issue necessary billing procedures and other instructions to the field offices for the smooth implementation of the revised tariff order.

(d) All the section offices shall keep the account of the subsidy provided to exempt

domestic consumers with monthly consumption up to 120 units and agricultural consumers from enhancement in electricity charges. All Deputy Chief Engineers, Distribution circles shall compile and communicate the same to the Tariff & Regulatory Affairs Cell (TRAC), on monthly basis on or before 20th of the succeeding month, with a copy to the Financial advisor. Since the details of the subsidy is a mandatory information to be submitted by the Board to the KSERC, any failure from the part of the officers in providing the details to TRAC will be viewed seriously by the Board.

(e) The Financial Advisor shall issue necessary instructions to the field offices /

ARUs to account the subsidy receivable from the Government for exempting domestic consumers with monthly consumption up to 120 units and agricultural consumers from enhanced electricity charges. Financial Advisor shall initiate necessary action to obtain the subsidy from Government on monthly basis in advance, as ordered by the Government. If the subsidy is not received as ordered, the matter shall be immediately brought into the attention of the Board.

(f) Electricity duty on energy charges shall be collected from consumers as per the

schedule of the Kerala Electricity Duty Act, 1963.

By Order of the Board Sd/-

S. Roopakala Jagath Secretary

To Chief Engineer (Commercial & Tariff) Chief Engineer (Distn. South/Central/North) Financial Advisor Director (IT) &SPIO Copy to: - The Chief Internal Auditor, All Chief Engineers Deputy Chief Engineers Legal Adviser & Disciplinary Enquiry Officer TA to Chairman / Member (Distn./Trans. Gen Opns./Gen. Projects) PA to Member (Finance), Sr.CA to Secretary CA to CVO Fair Copy Superintendent, Library