PROPOSAL FOR FOREST CLEARANCE UNDER FOREST (CONSERVATION) ACT, 1980 FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NAGPUR MUMBAI EXPRESS WAY (80.2 KMS FROM IGATPURI TO BHIWANDI) THANE & NASHIK DIVISION USER AGENCY GOVERNMENT OF MAHARASHTRA MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED (A Govt. of Maharashtra Undertaking)

diversion of 163.748 ha forest area for construction of package

Embed Size (px)

Citation preview

PROPOSAL FOR FOREST CLEARANCE

UNDER FOREST (CONSERVATION) ACT, 1980

FOR

DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF

PACKAGE V OF NAGPUR MUMBAI EXPRESS WAY (80.2 KMS FROM IGATPURI TO BHIWANDI)

THANE & NASHIK DIVISION

USER AGENCY

GOVERNMENT OF MAHARASHTRA

MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED (A Govt. of Maharashtra Undertaking)

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 2

NAME OF THE PROPOSAL: - Proposal for diversion of 163.748 ha forest land for construction of

Package V of Nagpur Mumbai Express Way of (80.2 kms from Igatpuri, Nashik District to Bhiwandi,

Thane District.)

Area: - 163.748 ha. Div: - Mumbai

Check list for preparing proposals of Maharashtra State for diverting forest land for non-forest use

under provisions of Forest (Conservation) Act, 1980 for irrigation road/Transmission line/ wind

mill/OFC/water supply scheme & other development project.

Sr.

No Details of Check list Compliance

Page

Number

1. Information of proposal from item of form 1(I) regarding short description

of the proposal / project which should invariably include.

Enclosed in

Section 1.

a) Cost of outlay

b) Justification for locating the project in forest area giving alternative

those were examined and reasons for the rejection.

c) Financial and social benefits.

d) Total population benefited.

e) Employment generated.

2.a The Geo digital map in 1:10,000 or any suitable scale with geo-reference

boundary in shape file prepared by using total stations or differential GPS

and also indicate forest land, non-forest land & adjoining land to the

proposed for diversion, in different colours must be duly signed by the

Deputy Conservator of Forests concerned and Project Authority, as per the

GOI letter No.F.no.11-9/98-FC, dt.8/7/2011. Compartment boundary on

the map should clearly be marked. Satellite imageries to be used to show

the density of forest cover to be enclosed.

Enclosed in

Section 2 as

2.a

b Index Map in 1:50000 scale with Project location: Latitude/ Longitude to be

enclosed.

Enclosed in

Section 2 as

2.b

1. Proposed area up to 1.00 ha • Only one co-ordinate to be given

2.Proposed area up to 1.00 to 5.00

ha

Two co-ordinate diagonally to be

given

3. Proposed area above 5.00 ha. Four co-ordinates at four corners

to be given.

c Map of compensatory Afforestation of forest / Non forest area in 1:50000

scale with location of Latitude & Longitude.

Enclosed in

Section 2 as

2.c

1. Proposed area up to 1.00 ha • Only one co-ordinate to be given

2.Proposed area up to 1.00 to 5.00

ha

Two co-ordinate diagonally to be

given

3. Proposed area above 5.00 ha. Four co-ordinates at four corners

to be given.

d A comprehensive land use plan of the area required should be attached if

land is required for more than one purpose the building plan and estimate

should invariably be attached if the area is required for construction

purpose.

Not

Applicable

e The following information must be complied in the construction of State

Highway /National Highway / Road/ Winding /Exploitation Purpose / Canal

/ Transmission line & all other linear Project as per GOI guideline vide

No.6-MPB-071/2011-BHO-736, Dt.30/04/2012.

Enclosed in

Section 2 as

2.e

i Map of the alternative alignments or route map examined by Dy.CF/

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 3

Sr.

No Details of Check list Compliance

Page

Number

Project Authority to be enclosed.

ii Show proposed diversion of forest / non forest area in the Original, colored

or legible topo-sheet and to be enclosed.

iii To give the Latitude & Longitude of the proposed area at starting, ending

turning point and breaking of the forest area Which should be identifiable.

iv To show the existing Water body / Water channel or road which should be

identifiable.

v To show the newly proposed bridge /culvert / underground pass / tunnel

etc. to be identify clearly.

vi To enclose the cross section Plan / Map indicating dimension of (Length /

Width / Height /depth etc) clearly.

vii To show the additional impacted area clearly which may be impacted

temporarily by the proposed construction.

viii To show the diversity of the ecology which is to be impacted by the

proposed construction.

f Map of Eco-Sensitive Zone, in 1:2,50,000 or 1” = 4-mile scale by showing

the distance of “Protected Area” from proposed forest areas under

diversion, in kilometer.

Enclosed in

Section 2 as

2. f

g Map of Wind Mill and Wind mast to be enclosed by showing the 10.00 Km

radius area from the wind mast site on 1:50,000 or 1:25000 scale topo

sheet.

Not

Applicable

Certificate by Dy. CF/ Chief Conservator of Forest and their authenticated

documents.

Enclosed in

Section 3

3 Documents verification Certificate by the Deputy Conservator of Forest Enclosed

4 Certificate of Dy. Conservator of Forest for absences of alternative about

the Project and minimum demand of forest area.

Enclosed

5 Certificate by the Deputy Conservator of Forests that no violation done of

the FCA-1980 and their guideline.

Enclosed

a If violated, circumstances leading to violation date of commencement of

work /quantity of work done and the amount spent Certificate to be

furnished by the concerned inspection of the site of violation.

Not

Applicable

b If work started in forest land when and how much amount spent on the

project and the works done in the forest land.

Not

Applicable

c

Detailed report of the disciplinary action or proposed to be taken against

the concerned staff for violation of the provisions of the Act.

Not

Applicable

d Details of clarification for violation, if administrative and technical sanction

accorded to the project by project authority / user agency after the

promulgation of the Forest (Conservation) Act, 1980.

Not

Applicable

6 Suitability certificate by the Deputy Conservator of Forests that forest and

non-forest land is suitable for raising trees species.

Enclosed

A The Compensatory Afforestation certificate must be geo-tagged photos of

the areas proposed for Compensatory Afforestation.

Enclosed

7 Certificate of Identified Forest and Acquired Forest for Compensatory

Afforestation Area by Dy. Conservator of Forests

Enclosed

8 Certificate of Identified Forest and Acquired Forest for Non-Forest area

under the project by Dy. Conservator of Forests.

Enclosed

9 Certificate by the Dy.CF Whether the proposed project likely to affect any

monument site of cultural, historical, religious, archaeological or

recreational importance including wild life sanctuaries and national parks

Enclosed

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 4

Sr.

No Details of Check list Compliance

Page

Number

to be enclosed

10 Wild life Certificate by the Dy.C.F. Enclosed

11 Net Present Value Certificate must be marked with eco-class /category of

Forest as per the GOI letter F.No.5-3/2007/-FC, Dt.05/02/2009 to be

enclosed.

Enclosed

12 No cutting and felling of trees Certificate of by the Dy. Conservator of

Forests to be enclosed

Enclosed

13 Certificate about distance of Project from Protected area by Deputy

Conservator of Forest.

Enclosed

14 Certificate of Dy. Conservator of Forests regarding alternative examined

for liner project (Certificate No-27)

Enclosed

15 Certificate by the Dy. CF Whether, the required Annexure and the

particulars to the proposal furnished in English? If any Govt. orders are in

Marathi, English as required by the Government of India to be enclosed.

Enclosed

16 Zudpi Jungle land offered certificate by the Dy. CF for the compensatory

afforestation is in a compact patch and is contingencies of the forest area

and is suitable for the management point of view.

Not

Applicable

17 Site inspection report form Deputy Conservator of Forests if forest area

involves is less than 10 ha and by Conservator of Forests if forest area

involved is more than 10 ha in regard to sensitivity and potential value of

the forest area in regard to forest types in catchments and submergence

area.

Not

Applicable

18 Cetificicate of the Dy.CF regarding the proposal of the Eco-Tourism

Scruitininzed vide GOM order No.WLP-1002/c.r.53/F-1/dated 20.2.2008

to be enclosed.

Not

Applicable

19 Compensatory Afforestation scheme prepared by Dy.CF. --

20 Medicinal plantation / road side/ canal side plantation scheme prepared by

PA /Dy.cf whether the proposed area is diverted for wind power/

transmission line and other linear proposals to be enclosed.

Not

Applicable

21 Cost benefits analysis. Whether the area is more than 20.00 ha. Enclosed

22 Item wise break up of forest and non-forest area required category wise

(Damseat, submergence, quarry, roads, colony, canals etc.) area statement

to be enclosed

Enclosed

23 List of the Identified forest form the Deputy Conservator of Forest Enclosed

24 List of tree, species wise/girth wise, with local and scientific name to be

given. If felling of trees is essential? The estimate of tree felling to be

enclosed. As per GOI letter no. 7-1/89/(For)/Part-VIII/2012-BHO/848,

dt.18/05/2012.

Enclosed

Certificate by Chief Conservator of Forest and their authenticated documents. Enclosed in

Section 4

25 Net Present Value Certificate must be counter signed by Chief Conservator

of Forest / with eco-class /category to be shown in the certificate of Forest

as as per the GOI letter F.No.5-3/2007/-FC, Dt.05/02/2009 to be enclosed

Enclosed

Certificate by Project Agency and their authenticated documents. Enclosed in

Section 5

26 Chronological of Events

27 Attempts made to find out Non forest land for the proposal/ reasons for its

rejection of the same and minimum demand of forest area.

--

28 Unqualified commitment from the project authority to bear cost of --

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 5

Sr.

No Details of Check list Compliance

Page

Number

exploitation of felling of trees and their allied works under project.

29 Certificate by Project Authority for the cost of Compensatory

Afforestation. (Certificate No.6)

Enclosed

30 Certificate by the project authority that no violation done of the FCA-1980

and their guideline.

Enclosed

31 Certificate by the Project Authority to furnish the Net Present Value as per

the ordered by Government of India.

Enclosed

32 Certificate of project authority (Providing i.e. water supply facilities to) Not

Applicable

33 Certificate of the Project Authority to get the Environmental clearance as

per the Environmental Act. 2006 (whenever necessary)

Enclosed

34 Certificate of Non Indemnity to forest Department (by Project Authority) Not

Applicable

35 Certificate or Noc from the private owner if the area under Private Forest

Act, (Acquisition) Act.1975 to be enclosed. (By villagers)

Not

Applicable

36 Certificate of the Projects Authority to take up catchments area treatment

plan as per the guideline of Government of India

Not

Applicable

37 Catchment area treatment plan. Not

Applicable

38 Command area development plan. Not

Applicable

39 Certificate by Project Authority Whether stipulation is made that 5 % of

area under command of the project is made available to the Forest

Department for planting trees and other vegetation for which necessary

irrigation should be provided free of cost by the project authority / user

agency. If the forest area involved is less than 2. 00 ha and there is no

felling to tree growth; it is to be dealt with as per simplified procedure.

Not

Applicable

40 Project note by the project authority. With salient features. Not

Applicable

a) Total catchment area

b) Total command area

c) Full reservoir level

d) High flood level

e) Minimum drawal level

f) Total catchment area of the dam (in Ha) and its breakup forest land,

cultivated land, Pasture, Human cultivation and others.

g) Details as per item (f) above for the area coming under submergence.

h) Total No. of families and population affected, scheduled caste and

scheduled tribe families to be displaced should be separately

indicated.

i) Proposal for the rehabilitation of affected persons (Rehabilitation Plan)

j) Comprehensive land use plan for the area required outside the

submergence i.e. building roads and other ancillary facilities outside

submergence i.e. building roads and other ancillary facilities.

41 It has been observed that water hardly stands the ear around even upto

FRL. Trees can definitely stand in water for one to three months and

therefore submergence should be calculated 2 M below FRL for this

following should be given for forest areas involved.

Not

Applicable

i) Area of submergence at H.F.L. (High flood level)

ii) Area of submergence at F.R.L. (Full Reservoir level)

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 6

Sr.

No Details of Check list Compliance

Page

Number

iii) Area of submergence at 2 Meter below F.R.L.

iv) Area of submergence at 4 Meter below F.R.L.

42 List of trees 2 Meter, 4 Meter below F.R.L. in submergence area species

wise.

Not

Applicable

43 Administrative/Technical approval from the competent authority to be

enclosed.

Enclosed

44 Certificate/ undertaking by the project authority regarding the wind power

project as per the GOI letter Dated 14/05/2004 to be enclosed.

Not

Applicable

Certificate by Other Department. Enclosed in

Section 6

45 In case of proposal related to stone quarries, the recommendation of the

Director, Geological and Mines is required.

Not

Applicable

46 If any Protected/Archaeological/Heritage site and other Important

Monument is located in the area. The Certificate by Archaeological

Department to be enclosed

Not

Applicable

47 Certificate about the distance of Project from Protected area by the Dy. CF

Wildlife Department. Whether the Project area within 10.00 Km. should be

clearly shown and marked.

Enclosed

48 No Objection Certificate of M.D., F.D.C.M. for involvement of their area. Enclosed

49 Relevant Notification/7/12 Extract/ restoration order/Rights of record etc.

of the proposed forest land to be enclosed.

Not

Applicable

Certificate by Collector: - Enclosed in

Section 6

50 Certificate from the Collector that no alternative suitable non-forest land is

available for the project. (In A Form itself)

Enclosed

51 Certificate of Collector under the FRA-2006 with resolution of Gram

Sabha/Gram Panchayat as per GOI letter dated 3/8/2009 to be enclosed.

Not

Applicable

52 Certificate of Compensatory Afforestation land made available by

Collector.

Not

Applicable

53 Certificate of non-availability of non-forest area for Compensatory

Afforestation by the Collector/Commissioner.

Not

Applicable

54 The agency has not given alternative land to the forest Department. If non

forest land for C.A. scheme is not available in the entire state, the

certificate from the Chief Secretary of the State to be enclosed. Vide GOI

letter dt. 13/2/12

Not

Applicable

55 As the project, area is within the 10.00 km from the boundary of PA area

therefore, the information regarding 16 points check list provided by

Principle Chief Conservator of Forest (W.L.) Nagpur which is enclosed

herewith to be furnished

Not

Applicable

56. All the certificate and documents must have name of the signatory,

designation, station, & date under the signature as per the GOM letter

vide, dtd.01 December 2010.

Enclosed

57. Resolution of the Gram Sabha may not be required in cases of projects like

transmission line, roads, canals, laying of pipeline/optical fibres where

linear diversion of forest land in several villages are involved, unless

recognized rights of PTG/ PAC are being affected as per Government of

India F.No.11-9/98-FC(pt.) dated 05/02/2013

Not

Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 7

Section 1:

Information of proposal from item of Form 1(I) regarding

short description of the proposal / project

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 8

1. Information of the Proposal

i. Name of Project – Proposal for diversion of 163.748 ha forest land for construction of

Package V of Nagpur Mumbai Express Way of (80.2 kms from Igatpuri, Nashik District to

Bhiwandi, Thane District.)

ii. User Agency - Maharashtra State Road Development Corporation Limited a Maharashtra

Government Undertaking.

iii. Forest area for which diversion is sought – 163.748 Ha.

iv. Aerial distance of project area from nearest Protected Areas – Tansa Wildlife Sanctuary:

2.00 km; Tungareshwar National Park: 5.86 km.

v. Detailed Note on Project: -

At present Nagpur is connected with Mumbai through various sections of State Highway

which passes through Wardha – Malegaon – Jalna – Aurangabad – Sinnar – Thane. This route

has poor geometry at many locations and also congested. Besides, this route connectivity

through National Highway also exists but it traverses through considerably longer route.

The proposed Package V will pass through Igatpuri, Nashik District to Bhiwandi, Thane

District and connect three major cities viz Nashik, Thane & Mumbai in less distance and time

as compared to the distance covered by the current Mumbai Nashik Highway corridors

passing through NH-3, SH-79, from Igatpuri, Nashik District to Bhiwandi, Thane District.

The project intends to develop 8 lane expressway with six lanes (3+3) carriage way of

Expressway, one lane for Railway corridor and one lane for utility shifting, bypass and other

structures in the state of Maharashtra. The proposed alignment passes through

approximately 49 villages and 4 Talukas namely, Igatpuri of Nashik District and Shahapur,

Kalyan & Bhiwandi Taluka of Thane District.

Apart from providing speed and connectivity, the project will also support the development

of Marathwada and Vidarbha regions. This is Greenfield alignment and will reduce travel

time, fuel consumption, vehicle operation and maintenance cost in comparison to the

existing alternatives. It is planned to develop new industrial/educational/

commercial/tourism nodes in vicinity of expressway at a regular interval of 40-50 km. The

project will, side by side, generate large scale temporary and permanent employment to the

skilled and un-skilled workers, thereby, offering employment opportunity of mainly to local

population.

vi. Main benefits from project – Implementation of entire project will ensure fast and safe road

traffic movement, reducing travel time to half by achieving speed of 150 km/hour for motor

vehicles. Project also aims at creation of commercial nodes for multiple development mainly

in industrial, commercial, agricultural, tourism sectors resulting in to employment

generation, capacity building as well as connectivity between industrial places like Butibori,

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 9

Amravati, Jalna, Chikalthana, Shendra, Waluj, Sinnar to Mumbai, and tourist and religious

places at Karanja, Lonar, Sindkhedraja, Verul, Shirdi.

1a. Cost of project: - Rs. 3105 crores.

1.b Justification for locating the project in forest area giving alternative those were examined and

reasons for the rejection:

The proposed alignment of Expressway has been chosen out of many alternatives studied by experts

so the project has become site specific, therefore, it is justified to locate the project on forest land

where ever it is barely essential. Wherever possible non forest land has been used for the alignment.

In view of above reason, Expressway passes through …. Kms of forest land in … pockets which cannot

be located on non-forest land. Hence the proposed diversion of 163.748 ha in the final alignment is

fully justified.

Sr.No. Parameters Option 1 Option 2 Option 3

1 Area of Land required in Ha 100 (964.86) 100 (916.8) 100 (888.0)

2 Agricultural land in % (Ha) 60.59 (584.61) 49.9 (457.48) 43.1 (382.73)

3 Barren land in % (Ha) 21.24 (204.892) 17.6 (161.36) 27.8 (246.86)

4 Forest land /open scrub in % (Ha) 16.97 (163.748) 32 (293.38) 27 (239.76)

5 Others (Built up & Water body) 1.2 (11.61) 0.5 (4.58) 2 (17.26)

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 10

1.c Financial and Social Benefits:

As per cost (Conservation) Rules 2003, Rules 6, Form ‘A’S. No. 1 (v) and guidelines (Under Forest

Conservation, Act 1980).

S.No. Parameters Description

1 Loss of value of timber fuel wood and

minor forest produce on an annual

basis, including loss of man hours per

annum of people who derived livelihood

and wages from the harvest of these

commodities.

There is no felling of trees involved as well as no

collection of Minor Forest produce in the area.

Therefore, loss of value of timber and fuel wood per

hectare is negligible. Hence, question of harvesting of

forest crop does not arise.

2 Loss of animal husbandry productivity,

including loss of fodder.

The project is located in the drought prone area and

soil is low fertile category. This condition offers great

resistance to any natural vegetation including grass.

Hence, the loss of animal husbandry productivity,

including loss of fodder is very less almost negligible.

3 Cost of human resettlement Since it is a green field alignment an exercise has

been made to avoid any adverse impact on human

settlements, therefore, impact is very low and trigger

no displacement of people. As such the loss on this

account is ‘NIL’

4 Loss of public facilities and

administrative infrastructure (Roads,

building, schools, dispensaries, electric

lines, railways etc.) on forest land, or

which would require forest land if these

facilities were diverted due to the

project.

The existing Public facilities and administrative

infrastructure like roads, buildings, schools,

dispensaries, electric lines, railways etc. are not going

to be affected due to the project and therefore the

loss on this account will be ‘NIL’. On the contrary the

road infrastructure will be substantially enriched due

to this project.

5 Environmental losses: (soil erosion,

effect on hydrological cycle, wildlife

habitual, microclimate upsetting of

ecological balance).

As a thumb rule the environmental value of one

hectare of fully stocked forest (density 1.0) would be

taken as Rs. 126 lacs to accrue over a period of 50

years. That means environmental value depends on

the density of the forest and the area of the forest.

The overall density of the proposed forest land under

application is 0.8.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 11

S.No. Parameters Description

Hence t h e e n v i r on m e n t a l l o s s for 1 6 3 .74 8 h a

ove r a period of 50 years works out as under:

Environmental Loss for 50 years:

126 x 0.8 x 163.748 = 16505.80 Lacs.

Environmental Loss for 1 year:

16505.80 = 330.116 lacs

50

Environmental Loss per year & per ha.:

330.116 = 2.02 lacs

163.748

Therefore, environmental loss per year per hect. will

be Rs.2.02 lacs.

And Environment Loss for 30 years lease period

will be Rs.2.02 x 30 years = 60.6 lacs.

This is much less as compared to the benefits due to

the project.

6 Suffering to oustees Since there are no oustees, because of the proposed

project, the social cost of rehabilitation of oustees is

NIL.

Therefore, the total loss of forest, as per the approved parameters, works out to as under:

Parameters No Discription Loss (in Lacs)

1 Environmental losses: (Soil erosion, effect on hydrological cycle,

Wildlife habitat, microclimate upsetting of ecological balance

60.6

Evaluation of Benefit from Forests

S.No. Parameters Description

1 Increase in productivity

attributable to the specific

project.

Implementation of entire project will ensure fast and safe

road traffic movement, reducing travel time to half by

achieving speed of 150km/hour for motor vehicles. Project

also aims at creation of commercial nodes for multiple

development mainly in industrial, commercial, agricultural,

tourism sectors resulting in to employment generation,

capacity building as well as connectivity between industrial

places like Butibori, Amravati, Jalna, Chikalthana, Shendra,

Waluj, Sinnar to Mumbai, and tourist and religious places at

Karanja, Lonar, Sindkhedraja, Verul, Shirdi.

2 Benefits to economy

Due to the proposed project 40% travel time will be saved,

Fuel and maintenance of vehicles will be reduced at about

35%. It will provide safe and faster transport link between

important cities like Aurangabad, Nagpur, and Mumbai and

serve better connectivity to Industrial growth center. Traffic

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 12

S.No. Parameters Description

and Tourism of area will be uplifted approximately 20%. The

above benefit in term of rupees id about 350.00 lacs

3 No. of population

benefited

Entire population of the project corridor and proposed

growth center area will be benefited due to construction of

this expressway.

The above benefit in term of rupees is about 250.00 lacs

4 Employment potential More local people will be benefited during construction as

well as operation of this expressway

Rs. 132.13 Crores per year through employment generations

as under:

Maintenance During During

Construction Maintenance

i) Skilled 1000 350

ii) Semiskilled 1400 650

iii) Unskilled 1600 1000

-------------------------------------------------------------------------

Total 4000 2000

-------------------------------------------------------------------------

This further per hector per year out as under:

a) During construction:

M.D. Rate/d Amount

i) Skilled 1000 1000 10,00,000

ii) Semiskilled 1400 600 8,40,000

iv) Unskilled 1600 400 6,40,000

Total 4000 24,80,000

b) During maintenance:

M.D. Rate/d Amount

i) Skilled 350 1000 3,50,000

ii) Semiskilled 650 600 3,90,000

iii) Unskilled 1000 400 4,00,000

Total 2000 11,40,000 Total cost of (a+b) works out to Rs. 36,20,000 per day. i.e.

132.13 Cr./ year.

5 Cost of acquisition of

facility on non-forest land

wherever feasible

As against 163.748 ha. of forest land proposed to be diverted

in the name of MSRDC for development of Nagpur-Mumbai

Expressway by the Collector (government land), an equivalent

non-forest land will be transferred to the Forest

Department.

6 Loss of

(a) agriculture and

a) Loss of agriculture – 583.081 Ha

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 13

S.No. Parameters Description

(b) Animal husbandry

production due to

diversion of forest land.

b) Loss of animal husbandry will be Nil.

7 Cost of rehabilitating the

d is p l a ced persons as

different from compensatory

amounts given for

displacement.

Since there is no displacement of persons due to the

proposed Project, the cost of rehabilitation is NIL.

8 Cost of supply of free

fuel- Wood to workers

residing in or near forest

area during the period of

construction.

No workers will be allowed to live in Forest area and also use

forest products for fuel and others

A Total benefits as per above parameters are

Parameters Amount (Rs. in

lacs)

No. s

2. Benefit to economy 350.00

3. Population benefit 250.00

4. Employment potential 13213

5. Cost of acquisition of facility on non-forest land wherever feasible -

6. Loss of (a) agriculture and (b) animal husbandry production due

to diversion of forest land. -

7. Cost of supply of free fuel-wood to workers residing in or ear

forest area during the period of construction.

-

---------------------

13813

B Total loss of forest as per parameters are

Therefore, the total loss of forest, as per the approved parameters, works out to as under:

Parameters No. Loss (in Rs)

5. Environmental losses: (Soil erosion, effect on hydrological

cycle, wildlife habitat, microclimate upsetting of ecological balance 60.6

Therefore, benefits/ cost ratio works out as under:

Benefit 13813

--------- = ----------- = 227.93~228

Cost 60.6

Cost Benefit Ratio: 1: 228

Note: This is as per guidelines of GoI.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 14

1.d Total Population Benefited

i) Employment Numbers during construction and operation:

Sl. No Description Construction Operation

1 Skilled 1000 350

2 Semiskilled 1400 650

3 Unskiled 1600 1000

Total 4000 2000

1.e Employment Generation

Construction Stage:

Sl. No Description Numbers

1 Skilled 1000

2 Semiskilled 1400

3 Unskiled 1600

Total 4000

Maintenance:

Sl. No Description Numbers

1 Skilled 350

2 Semiskilled 650

3 Unskiled 1000

Total 2000

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 15

Section 2:

Maps as per Checklist

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 16

2.a The Geo digital map in 1: 10,000 or any suitable scale with geo-reference boundary in

shape file prepared by using total stations or differential GPS and also indicate forest land, non-

forest land & adjoining land to the proposed for diversion, in different colors are duly signed by

the Deputy Conservator of Forests concerned and Project Authority, as per the GOI letter

No.F.no.11-9/98-FC, dt.8/7/2011. Compartment boundary on the map are clearly be marked.

Satellite imageries are used to show the density of forest cover.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 17

2.a. Geo-Digital Maps in 1:10000 Scale

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 18

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 19

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 20

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 21

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 22

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 23

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 24

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 25

2.b - Index Map in 1:50000 Scale with Project Location on Toposheet

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 26

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 27

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 28

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 29

2.c Map of Compensatory Afforestation of forest / Non forest area in 1:50000 scale with location of Latitude

& Longitude

We are in Process of browsing of site for afforestation. Will furnish the maps of the areas once came to the

conclusion.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 30

2.d A comprehensive land use plan of the area required should be attached if land is required for more than

one purpose the building plan and estimate should invariably be attached if the area is required for

construction purpose.

The entire forest land proposed for diversion is to be used for construction of Express Way hence not

applicable.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 31

2.e The following information must be complied in the construction of State Highway /National

Highway / Road/ Winding /Exploitation Purpose / Canal / Transmission line & all other linear Project as per

GOI guideline vide No.6-MPB-071/2011-BHO-736, Dt.30/04/2012.

i. Map of the alternative alignments or route map examined by Dy.CF/ Project Authority.

Enclosed under this Section – on MRSAC

ii. Show proposed diversion of forest / non forest area in the Original, colored or legible topo-sheet.

Enclosed under this Section – on TOPOSHEET

iii. To give the Latitude & Longitude of the proposed area at starting, ending turning point and breaking of

the forest area which is identifiable.

Enclosed under this Section – on LULC and Google Earth

iv. To show the existing Water body / Water channel or road which should be identifiable.

Enclosed under this Section – on Google Earth

v. To show the newly proposed bridge /culvert / underground pass / tunnel etc. to be identify clearly.

Enclosed under this Section – on MRSAC

vi. To enclose the cross section Plan / Map indicating dimension of (Length / Width / Height /depth etc)

clearly.

Enclosed under this Section – Cross Sections

vii. To show the additional impacted area clearly which may be impacted temporarily by the proposed

construction.

Enclosed under this Section.

viii. To show the diversity of the ecology which is to be impacted by the proposed construction.

Not Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 32

i. Map of the Alternative Alignments or Route Map on MRSAC

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 33

ALTERNATIVE SITE ANALYSIS

Sr.No. Parameters Option 1 Option 2 Option 3

1 Area of Land required in % Ha 100 (964.86) 100 (916.8) 100 (888.0)

2 Agricultural land in % (Ha) 60.59 (584.61) 49.9 (457.48) 43.1 (382.73)

3 Barren land in % (Ha) 21.24 (204.892) 17.6 (161.36) 27.8 (246.86)

4 Forest land /open scrub in % (Ha) 16.97 (163.748) 32 (293.38) 27 (239.76)

5 Others (Built up & Water body) 1.2 (11.61) 0.5 (4.58) 2 (17.26)

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 34

ii. Show proposed diversion of forest / non forest area in the Original, colored or legible topo-sheet.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 35

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 36

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 37

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 38

iii. To give the Latitude & Longitude of the proposed area at starting, ending turning point and breaking of the forest area which should be identifiable –

on LULC

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 39

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 40

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 41

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 42

iii. To give the Latitude & Longitude of the proposed area at starting, ending turning point and breaking of the forest area which should be identifiable –

on Google Earth

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 43

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 44

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 45

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 46

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 47

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 48

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 49

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 50

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 51

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 52

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 53

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 54

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 55

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 56

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 57

iv. Map of existing Water body / Water channel or road

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 58

v. Layout Showing Proposed Facilities Like Bridges / Culverts / Underground Pass

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 59

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 60

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 61

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 62

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 63

vi. Cross Section Plans of the Proposed Expressway

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 64

vii. Additional impacted area clearly which may be impacted temporarily by the proposed construction.

Please see the Section 2a.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 65

viii. Diversity of the Impacted Area during Construction

1. In part II the required data will be presented. Currently the team is collecting primary data from the field.

2. This will be supported with the report prepared by the district forest officials.

3. The report will be a part of Environmental Impact Assessment.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 66

2.f. Map of Eco-Sensitive Zone, in 1:2,50,000 or 1” = 4-mile scale by showing the distance of “Protected Area” from proposed forest areas under

diversion, in kilometre.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 67

2.g. Map of Wind Mill and Wind mast to be enclosed by showing the 10.00 Km radius area from the wind

mast site on 1: 50,000 or 1:25000 scale topo sheet.

Not applicable for highway project

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 68

Section 3

Certificate by Deputy Conservator of Forest / Chief Conservator of Forest

and their authenticated documents

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 69

Certificate No.: - 3

Certificate by the Deputy Conservator of Forest for

Documents verification

Certified that all the documents enclosed here with the proposal of Forest clearance for “Preparation of

Feasibility Study and Detailed Project Report of Access Controlled Nagpur Mumbai Expressway for

Package V i.e. Igatpuri, Nashik District to Bhiwandi, Thane District of 80.2 kms length” have been

scrutinized as per the revised check list and found to be correct.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 70

Certificate No.: - 3

Certificate by the Deputy Conservator of Forest for

Documents verification

Certified that all the documents enclosed here with the proposal of Forest clearance for “Preparation of

Feasibility Study and Detailed Project Report of Access Controlled Nagpur Mumbai Expressway for

Package V i.e. Igatpuri, Nashik District to Bhiwandi, Nashik District of 80.2 kms length” have been

scrutinized as per the revised check list and found to be correct.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 71

Certificate No.: - 4

Certificate of Deputy Conservator of Forest

For Absences of Alternative about the Project and Minimum Demand of Forest Area.

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with specific

alignment decided after detailed study and exploring various alternatives, therefore, the project is site

specific. The total land required for the Package V of the project is 962.508 Ha, out of which forest land

is only 163.748 Ha. In view of this no alternative non-forest land can be used for the purpose.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 72

Certificate No.: - 4

Certificate of Deputy Conservator of Forest

For Absences of Alternative about the Project and Minimum Demand of Forest Area.

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with specific

alignment decided after detailed study and exploring various alternatives, therefore, the project is site

specific. The total land required for the Package V of the project is 962.508 Ha, out of which forest land

is only 163.748 Ha. In view of this no alternative non-forest land can be used for the purpose.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 73

Certificate No.: - 5

Certificate by the Deputy Conservator of Forests that

No Violation Done of the FCA-1980 and their Guideline

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with

standardized technical specifications and as per specific alignment decided after detailed study

and exploring various alternatives. It is also certified that no construction is started, therefore, the

provision of FCA-1980 and guidelines under it has not been violated.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 74

Certificate No.: - 5

Certificate by the Deputy Conservator of Forests that

No Violation Done of the FCA-1980 and their Guideline

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with

standardized technical specifications and as per specific alignment decided after detailed study

and exploring various alternatives. It is also certified that no construction is started, therefore, the

provision of FCA-1980 and guidelines under it has not been violated.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 75

Certificate No.: - 6

Suitability certificate by the Deputy Conservator of Forests that

Forest and Non-Forest Land is Suitable for Raising Trees Species.

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Thane District of 80.2kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 76

Certificate No.: - 6

Suitability certificate by the Deputy Conservator of Forests that

Forest and Non-Forest Land is Suitable for Raising Trees Species.

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Nashik District of 80.2kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 77

Certificate No.: - 7

Certificate of Identified Forest and Acquired Forest for Compensatory Afforestation Area by

Deputy Conservator of Forests

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Thane District of 80.2 kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 78

Certificate No.: - 7

Certificate of Identified Forest and Acquired Forest for Compensatory Afforestation Area by

Deputy Conservator of Forests

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Nashik District of 80.2 kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 79

Certificate No.: - 8

Certificate of Identified Forest and Acquired Forest for Non Forest area under the project by

Deputy Conservator of Forests.

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Thane District of 80.2 kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.20

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 80

Certificate No.: - 8

Certificate of Identified Forest and Acquired Forest for Non Forest area under the project by

Deputy Conservator of Forests.

This is to certify that undersigned has inspected the area ______________ ha from

_____________area Gut No. ____ / Sy. No. ______ of Village _______________,

Taluka___________, District _______________ to be transferred to the forest department as

Alternate Land for Compensatory afforestation in lieu of forest land required for the

construction of Nagpur Mumbai Expressway for Package V i.e. Igatpuri, Nashik District to

Bhiwandi, Nashik District of 80.2 kms length and it is contiguous, suitable for afforestation and

management purpose also and it is free from encroachment and encumbrances.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 81

Certificate No.: - 9

Certificate by the Deputy Conservator of Forest

Whether the proposed project likely to affect any monument site of cultural, historical,

religious, archaeological or recreational importance including wild life sanctuaries and

national parks to be enclosed

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Thane District) of 80.2 kms length is not likely to affect any Monument Site

of Cultural, Historical, Religious, Archeological or Recreational Importance.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 82

Certificate No.: - 9

Certificate by the Deputy Conservator of Forest

Whether the proposed project likely to affect any monument site of cultural, historical,

religious, archaeological or recreational importance including wild life sanctuaries and

national parks to be enclosed

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Nashik District) of 80.2 kms length is not likely to affect any Monument

Site of Cultural, Historical, Religious, Archeological or Recreational Importance.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 83

Certificate No.: - 9

Certificate by the Deputy Conservator of Forest

Whether the proposed project likely to affect any monument site of cultural, historical,

religious, archaeological or recreational importance including wild life sanctuaries and

national parks to be enclosed

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Nashik District) of 80.2 kms length is not likely to affect any Monument

Site of Cultural, Historical, Religious, Archeological or Recreational Importance.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 84

Certificate No.: - 10

Certificate by the Deputy Conservator of Forest

For not having Wild Life Sanctuary in the Project Area

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Thane District) of 80.2 kms length is not included in the area of any

National Park / Wild Life Sanctuary / Protected area or nature reserve.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 85

Certificate No.: - 10

Certificate by the Deputy Conservator of Forest

For not having Wild Life Sanctuary in the Project Area

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Nashik District) of 80.2 kms length is not included in the area of any

National Park / Wild Life Sanctuary / Protected area or nature reserve.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 86

Certificate No.: - 11

Net Present Value Certificate must be marked with eco-class /category of Forest as per the GOI letter

F.No.5-3/2007/-FC, Dt.05/02/2009

Certified that 163.748 hact of forest land used for Construction of Nagpur-Mumbai Expressway – (Package-V)

between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai Division) falls in Improvement

working circle and has the less density.

It is also certified that the amount of Net Present Value of forest land calculated and to be collected Rs.

______________________/- (Rupees_____________________ ___________________________ Only) is

exactly as per the rates and calculation provided in the GOI letter F.NO.5-3/2007/-FC, dt 05/02/2009.

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 87

Certificate No.: - 11

Net Present Value Certificate must be marked with eco-class /category of Forest as per the GOI letter

F.No.5-3/2007/-FC, Dt.05/02/2009

Certified that 163.748 hact of forest land used for Construction of Nagpur-Mumbai Expressway – (Package-V)

between Igatpuri, Nashik District to Bhiwandi, Nashik District (in Mumbai Division) falls in Improvement

working circle and has the less density.

It is also certified that the amount of Net Present Value of forest land calculated and to be collected Rs.

______________________/- (Rupees_____________________ ___________________________ Only) is

exactly as per the rates and calculation provided in the GOI letter F.NO.5-3/2007/-FC, dt 05/02/2009.

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 88

Certficate No: - 12

Certificate of by the Deputy Conservator of Forests for

No Cutting and Felling of Trees

This is to certify that in proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Thane District) of 80.2 kms length there is no cutting and felling of trees is

involved prior to permission.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 89

Certificate No: - 12

Certificate of by the Deputy Conservator of Forests for

No Cutting and Felling of Trees

This is to certify that in proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Nashik District) of 80.2 kms length there is no cutting and felling of trees is

involved prior to permission.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 90

Certficate No: - 13

Certificate by Deputy Conservator of Forest

About Distance of Project from Protected Area

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik District to Bhiwandi,

Thane District) of 80.2 kms length is located at distance of 2.0 km from Tansa Wildlife Sanctuary, 5.86 km from

Tungareshwar National Park.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Thane

Deputy Conservator of Forests Wild Life Department.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 91

Certificate No: - 13

Certificate by Deputy Conservator of Forest

About Distance of Project from Protected Area

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik District to Bhiwandi,

Nashik District) of 80.2 kms length is located at distance of 2.0 km from Tansa Wildlife Sanctuary, 5.86 km from

Tungareshwar National Park.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests Wild Life Department.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 92

Certficate No: - 14

Certificate of Dy. Conservator of Forests regarding

Alternative Examined for Liner Project (Certificate No-27)

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with specific alignment

decided after detailed study and exploring various alternatives, therefore, the project is site specific. The total

land required for the Package V of the project is 962.508 Ha, out of which forest land is only 163.748 Ha. In

view of this no alternative non-forest land can be used for the purpose.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Thane

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 93

Certificate No: - 14

Certificate of Dy. Conservator of Forests regarding

Alternative Examined for Liner Project (Certificate No-27)

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with specific alignment

decided after detailed study and exploring various alternatives, therefore, the project is site specific. The total

land required for the Package V of the project is 962.508 Ha, out of which forest land is only 163.748 Ha. In

view of this no alternative non-forest land can be used for the purpose.

(Authorized Signatory)

SEAL

Dated: 04.08.2016 Package V

Place: Nashik

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 94

Certificate No.: - 15

Certificate by the Deputy Conservator of Forest

Whether, the required Annexure and the particulars to the proposal furnished in English? If any Govt. orders

are in Marathi, English as required by the Government of India to be enclosed

Certified that all the documents enclosed therewith the proposal of diversion of Forest land for

Construction of Nagpur-Mumbai Expressway – (Package V) between Igatpuri, Nashik District to

Bhiwandi, Thane District (in Mumbai Division) have been scrutinized as the checklist and found to

be correct and all the particulars are finished in English.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 95

Certificate No.: - 15

Certificate by the Deputy Conservator of Forest

Whether, the required Annexure and the particulars to the proposal furnished in English? If any Govt. orders

are in Marathi, English as required by the Government of India to be enclosed

Certified that all the documents enclosed therewith the proposal of diversion of Forest land for

Construction of Nagpur-Mumbai Expressway – (Package V) between Igatpuri, Nashik District to

Bhiwandi, Nashik District (in Mumbai Division) have been scrutinized as the checklist and found to

be correct and all the particulars are finished in English.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 96

Certificate No.: - 16

Zudpi Jungle land offered certificate by the Dy. CF for the compensatory afforestation is in a compact patch

and is contingencies of the forest area and is suitable for the management point of view.

Not applicable

Certificate No.: - 17

Site inspection report form Deputy Conservator of Forests if forest area involves is less than 10 ha and by

Conservator of Forests if forest area involved is more than 10 ha in regard to sensitivity and potential value of

the forest area in regard to forest types in catchments and submergence area.

Not Applicable

Certificate No.: - 18

Cetificicate of the Dy.CF regarding the proposal of the Eco-Tourism Scruitininzed vide GOM order No.WLP-

1002/c.r.53/F-1/dated 20.2.2008 to be enclosed.

Not Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 97

Certificate No.: - 19

Compensatory Afforestation scheme: To be formulated and enclosed by the Dy.CF.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 98

Certificate No.: - 20

Medicinal plantation / road side/ canal side plantation scheme prepared by PA /Dy.cf whether the proposed

area is diverted for wind power/ transmission line and other linear proposals to be enclosed.

Not applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 99

Certificate No.: - 21

Cost benefits analysis. Whether the area is more than 20.00 ha.

Area is 163.748 ha (More than 20 hact)

As per cost (Conservation) Rules 2003, Rules 6, Form ‘A’S. No. 1 (v) and guidelines (Under Forest Act 1980).

S.No. Parameters Description

1 Loss of value of timber fuel wood and

minor forest produce on an annual

basis, including loss of man hours per

annum of people who derived livelihood

and wages from the harvest of these

commodities.

There is no felling of trees involved as well as no

collection of Minor Forest produce in the area.

Therefore, loss of value of timber and fuel wood per

hectare negligible. Hence, question of harvesting of

forest crop does not arise.

2 Loss of animal husbandry productivity,

including loss of fodder.

The project is located in the drought prone area and

soil is low fertile category. This condition offers great

resistance to any natural vegetation including grass.

Hence, the loss of animal husbandry productivity,

including loss of fodder is very less almost negligible.

3 Cost of human resettlement Since it is a green field alignment an exercise has

been made to avoid any adverse impact on human

settlements, therefore, impact is very low and trigger

no displacement of people. As such the loss on this

account is ‘NIL’

4 Loss of public facilities and

administrative infrastructure (Roads,

building, schools, dispensaries, electric

lines, railways etc.) on forest land, or

which would require forest land if these

facilities were diverted due to the

project.

The existing Public facilities and administrative

infrastructure like roads, buildings, schools,

dispensaries, electric lines, railways etc. are not going

to be affected due to the project and therefore the

loss on this account will be ‘NIL’. On the contrary the

road infrastructure will be substantially enriched due

to this project.

5 Environmental losses: (soil erosion,

effect on hydrological cycle, wildlife

habitual, microclimate upsetting of

ecological balance).

As a thumb rule the environmental value of one

hectare of fully stocked forest (density 1.0) would be

taken as Rs. 126 lacs to accrue over a period of 50

years. That means environmental value depends on

the density of the forest and the area of the forest.

The overall density of the proposed forest under

application is 0.8.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 100

S.No. Parameters Description

Hence t h e e nv i r onme nt a l l os s for 1 6 3 .7 48 h a

over a period of 50 years works out as under:

Environmental Loss for 50 years:

126 x 0.8 x 163.748 = Rs. 16505.80

Lacs.

Environmental Loss for 1 year:

16505.80 = Rs. 330.116

lacs

50

Environmental Loss per year & per ha.:

330.116 = Rs 2.02

163.748

Therefore, environmental loss per year per hect. will

be Rs.2.02 lacs.

And Environment Loss for 30 years lease period

will be Rs.2.02 x 30 years = Rs. 60.6 lacs.

This is much less as compared to the benefits due to 6 Suffering to oustees Since there are no oustees, because of the proposed

project, the social cost of rehabilitation of oustees is

NIL.

Therefore, the total loss of forest, as per the approved parameters, works out to as under:

Parameters No Description Loss (in Lacs)

1 Environmental losses: (Soil erosion, effect on hydrological cycle,

Wildlife habitat, microclimate upsetting of ecological balance

60.6

Evaluation of Benefit from Forests

S.No. Parameters Description

1 Increase in productivity

attributable to the specific

project.

Implementation of entire project will ensure fast and safe

road traffic movement, reducing travel time to half by

achieving speed of 150km/hour for motor vehicles. Project

also aims at creation of commercial nodes for multiple

development mainly in industrial, commercial, agricultural,

tourism sectors resulting in to employment generation,

capacity building as well as connectivity between industrial

places like Butibori, Amravati, Jalna, Chikalthana, Shendra,

Waluj, Sinnar to Mumbai, and tourist and religious places at

Karanja, Lonar, Sindkhedraja, Verul, Shirdi.

2 Benefits to economy

Due to the proposed project 40% travel time will be saved,

Fuel and maintenance of vehicles will be reduced at about

35%. It will provide safe and faster transport link between

important cities like Aurangabad, Nagpur, and Mumbai and

serve better connectivity to Industrial growth center. Traffic

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 101

S.No. Parameters Description

and Tourism of area will be uplifted approximately 20%. The

above benefit in term of rupees id about 350.00 lacs

3 No. of population

benefited

Entire population of the project corridor and proposed

growth center area will be benefited due to construction of

this expressway.

The above benefit in term of rupees is about 250.00 lacs

4 Employment potential More local people will be benefited during construction as

well as operation of this expressway

Rs. 6.98 Crores through employment generations as under:

Maintenance During During

Construction Maintenance

i) Skilled 1000 350

ii) Semiskilled 1400 650

iii) Unskilled 1600 1000

-------------------------------------------------------------------------

Total 4000 2000

-------------------------------------------------------------------------

This further per hector per year out as under:

a) During construction:

M.D. Rate/d Amount

i) Skilled 1000 1000 10,00,000

ii) Semiskilled 1400 600 8,40,000

iv) Unskilled 1600 400 6,40,000

Total 4000 24,80,000

b) During maintenance:

M.D. Rate/d Amount

i) Skilled 350 1000 3,50,000

ii) Semiskilled 650 600 3,90,000

iii) Unskilled 1000 400 4,00,000

Total 2000 11,40,000 Total cost of (a+b) works out to Rs. 36,20,000 per day. i.e.

132.13 Cr./ yr

5 Cost of acquisition of

facility on non-forest land

wherever feasible

As against 163.748 hector of forest land proposed to be

diverted non-forest land will be transferred in the name of

MSRDC for development of Nagpur-Mumbai Expressway by the

Collector (government land)

6 Loss of

(c) agriculture and

(d) Animal husbandry

production due to

a) Loss of agriculture – 583.018 ha

b) Loss of animal husbandry will be Nil.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 102

S.No. Parameters Description

diversion of forest land.

7 Cost of rehabilitating

The di spl a ce d persons as

different from compensatory

amounts given for

displacement.

Since there is no displacement of persons due to the

proposed Project, the cost of rehabilitation is NIL.

8 Cost of supply of free

fuel- Wood to workers

residing in or near forest

area during the period of

construction.

No workers will be allowed to live in Forest area and also use

forest products for fuel and others

A Total benefits as per above parameters are

Parameters Amount (in lacs)

No. s

2. Benefit to economy 350.00

3. Population benefit 250.00

4. Employment potential 13213

5. Cost of acquisition of facility on non-forest land wherever feasible -

6. Loss of (a) agriculture and (b) animal husbandry production due

to diversion of forest land. -

7. Cost of supply of free fuel-wood to workers residing in or ear

forest area during the period of construction.

-

---------------------

13813

B Total loss of forest as per parameters are

Therefore, the total loss of forest, as per the approved parameters, works out to as under:

Parameters No. Loss (in Rs)

5. Environmental losses: (Soil erosion, effect on hydrological

cycle, wildlife habitat, microclimate upsetting of ecological balance 60.6

Therefore, benefits/ cost ratio works out as under:

Benefit 13813

--------- = ----------- = 227.93~228

Cost 60.6

Cost Benefit Ratio: 1: 228

Note: This is as per guidelines of GoI.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 103

1.d Total Population Benefited

i) Employment Numbers during construction and Operation:

Sl. No Description Construction operation

1 Skilled 1000 350

2 Semiskilled 1400 650

3 Unskiled 1600 1000

Total 4000 2000

1.e Employment Generation

Construction Stage:

Sl. No Description Numbers

1 Skilled 1000

2 Semiskilled 1400

3 Unskiled 1600

Total 4000

Maintenance:

Sl. No Description Numbers

1 Skilled 350

2 Semiskilled 650

3 Unskiled 1000

Total 2000

In addition to this huge number of travelers will be benefited by saving time and cost of travel. Beisdes, the

valuable resource of fuel will be saved substantially.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 104

Certificate No.: - 22

Item wise break up of forest and non-forest area required category wise (Damseat, submergence, quarry,

roads, colony, canals etc.) area statement is enclosed-

Summary:

ALTERNATIVE SITE ANALYSIS

Sr.No. Parameters Option 1 Option 2 Option 3

1 Area of Land required in % ( Ha) 100 (964.86) 100 (916.8) 100 (888.0)

2 Agricultural land in % (Ha) 60.59 (584.61) 49.9 (457.48) 43.1 (382.73)

3 Barren land in % (Ha) 21.24 (204.892) 17.6 (161.36) 27.8 (246.86)

4 Forest land /open scrub in % (Ha) 16.97 (163.748) 32 (293.38) 27 (239.76)

5 Others (Built up & Water body) 1.2 (11.61) 0.5 (4.58) 2 (17.26)

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 105

Certificate No.: - 22

Item wise break up of forest and non-forest area required category wise (Damseat, submergence, quarry,

roads, colony, canals etc.) area statement is enclosed-

Summary:

ALTERNATIVE SITE ANALYSIS

Sr.No. Parameters Option 1 Option 2 Option 3

1 Area of Land required in % ( Ha) 100 (964.86) 100 (916.8) 100 (888.0)

2 Agricultural land in % (Ha) 60.59 (584.61) 49.9 (457.48) 43.1 (382.73)

3 Barren land in % (Ha) 21.24 (204.892) 17.6 (161.36) 27.8 (246.86)

4 Forest land /open scrub in % (Ha) 16.97 (163.748) 32 (293.38) 27 (239.76)

5 Others (Built up & Water body) 1.2 (11.61) 0.5 (4.58) 2 (17.26)

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 106

Statement showing Details of forest area and non-forest area Proposed for diversion legal status of forest

applied for diversion –

Forest Area Statement:

Sr.No District Taluka Village Gat No. Total Gat Area(Ha) Area (Forest) Under

Acquisition (Ha)

1 Thane Bhiwandi Borivali Tarf

Sonale

56/19 42.9538 5.0694

2 Thane Bhiwandi Usroli 46/60/73 69.857 5.0309

3 Thane Bhiwandi Vadape 138 104.4379 10.3654

Thane Bhiwandi 68 1.7443 0.1431

Thane Bhiwandi 67 0.2744 0.0383

Thane Bhiwandi 132 0.7795 0.2359

Thane Bhiwandi 140 42.4181 1.4448

Thane Bhiwandi 121 10.5365 0.0002

4 Thane Kalyan Danbav 82 0.6157 0.0239

5 Thane Kalyan Nadgaon 69 61.8075 0.0218

Thane Kalyan 69 0.0253

Thane Kalyan 76 1.5071 0.0348

Thane Kalyan 78 1.9019 0.2802

Thane Kalyan 77 0.198 0.1104

6 Thane Kalyan Ushid 31 10.21 0.9240

7 Thane Kalyan Phalegaon 33 10.3135 0.9493

Thane Kalyan 30 0.6081 0.3972

Thane Kalyan 31 0.179 0.0008

Thane Kalyan 26 2.3764 0.0382

Thane Kalyan 24 5.353 0.0398

Thane Kalyan 28 10.3909 0.0866

Thane Kalyan 28 0.4209

Thane Kalyan 27 1.0813 0.6861

Thane Kalyan 153 11.4994 1.9285

Thane Kalyan 206 10.0424 3.4864

Thane Kalyan 28 10.3909 0.0001

Thane Kalyan 203 3.1283 0.0996

Thane Kalyan 207 5.8297 0.8574

Thane Kalyan 208 4.5573 1.0057

Thane Kalyan 204 0.3001 0.1564

Thane Kalyan 205 0.5735 0.5735

Thane Kalyan 199 2.4695 0.5614

S. No. District Forest Area (Ha) Non- Forest Area

(Ha)

Total Area (Ha)

1. Thane 143.269 736.575 879.844

2. Nashik 20.479 64.537 85.016

Total 163.748 801.112 964.86

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 107

Thane Kalyan 198 1.9643 0.0462

8 Thane Shahapur Chande 91 52.0532 1.7371

9 Thane Shahapur Dalkhan 161 36.66 1.3394

10 Thane Shahapur Hiv 188 93.2936 0.9104

Thane Shahapur 138 1.77 0.0584

Thane Shahapur 139 2.2346 0.1508

Thane Shahapur 140 0.2799 0.0030

Thane Shahapur 188 93.2936 0.0258

Thane Shahapur 188 1.3921

Thane Shahapur 186 0.8771 0.0000

11 Thane Shahapur Kasara Kh. 180 106.9745 19.8711

Thane Shahapur 5 0.3050

Thane Shahapur 159 0.7072 0.7064

12 Thane Shahapur Khardi 84 10.1894 0.0112

Thane Shahapur 274 2.8559 0.2523

13 Thane Shahapur Mokhavane 55 107.7578 0.1485

Thane Shahapur 40 0.7805 0.1411

Thane Shahapur 55 107.7578 8.6676

Thane Shahapur 14 15.8508 0.5582

Thane Shahapur 13 4.5591 0.0781

Thane Shahapur 19 0.3545 0.2219

Thane Shahapur 21 1.4845 0.1099

Thane Shahapur 20 0.479 0.0945

Thane Shahapur 124 218.2976 24.4403

14 Thane Shahapur Shere 95 32.9595 0.4307

15 Thane Shahapur Shirol 619/1 237.2432 0.0378

Thane Shahapur 619/1 1.1436

Thane Shahapur 619/1 2.4508

Thane Shahapur 126 1.2615 0.6771

Thane Shahapur 619/39 1.6189 0.0068

Thane Shahapur 619/1 237.2432 1.8217

Thane Shahapur 618/6 71.0593 0.3224

Thane Shahapur 310 3.2419 0.0003

Thane Shahapur 619/17 1.2199 0.4788

Thane Shahapur 67 6.6354 0.0037

Thane Shahapur 618/4 2.6845 0.3527

Thane Shahapur 667 374.1618 5.7331

Thane Shahapur 308 0.5646 0.0880

Thane Shahapur 618/6 71.0593 0.1550

16 Thane Shahapur Vashala Kh 11 5.9528 0.1555

Thane Shahapur 109 20.6393 0.3792

Thane Shahapur 114 13.5188 3.1460

Thane Shahapur 110 0.2979 0.0322

Thane Shahapur 105 10.0973 2.3067

Thane Shahapur 111 0.2055 0.0001

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 108

Thane Shahapur 104 0.2198 0.1025

Thane Shahapur 16 0.4522 0.0848

Thane Shahapur 112 4.9841 1.1614

Thane Shahapur 103 12.0353 0.5256

17 Thane Shahapur Vihigaon 65 377.2221 3.3052

Thane Shahapur 409 1.9814 0.0175

Thane Shahapur 468 1.3468 0.0774

Thane Shahapur 301 64.13 0.0158

18 Thane Shahapur Ambarje 446 6.6 1.5400

19 Thane Shahapur Andad 73/1/1 48.946 3.2000

Thane Shahapur 73/A/1/1

& 72/D

10.02

1.8539

20 Thane Shahapur Birwadi 88 66.85 2.4300

21 Thane Shahapur Golbhan 56 7.17 1.8511

22 Thane Shahapur Gosai 2 2.28 0.4530

Thane Shahapur 6 3.56 0.4510

23 Thane Shahapur Kasgaon 27 46.31 1.2200

24 Thane Shahapur Ras 70/1/1 211.01 2.6000

25 Thane Shahapur Shere 489 109.67 2.3400

26 Thane Shahapur Usroli 61/1,

61/2,

61/3/A,

61/3/k,

61/3/B,

61/5

4.900 1.4232

Thane Shahapur 59/3/A,

59/3/k,

59/3/B,

59/4,

59/6,

59/7,

59/9

5.6200 2.5894

27 Nashik Igatpuri Chinchale

Khair

23 0.8384 0.8320

Nashik Igatpuri 24 20.6136 17.8500

28 Nashik Igatpuri Awal Khed 218 0.4127 0.4253

29 Nashik Igatpuri Talegaon 272 2.1127 0.3240

Nashik Igatpuri 271 0.06145 0.0560

Nashik Igatpuri 273 1.8135 0.1190

Nashik Igatpuri 279 1.1743 0.2163

Nashik Igatpuri 278 1.2339 0.0075

Nashik Igatpuri 269 2.2689 0.3592

Nashik Igatpuri 280 1.1743 0.2893

Total Forest Area =

163.748

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 109

Purpose wise break up of forest area required: -

Sr. No. Purpose for which forest land is required Area (ha)

1 Construction of Express Way 163.748

2 Any other purpose Nil

Total area 163.748

Entire forest land (163.748 ha) will be used for road construction.

Statement showing Details of Non- forest area involved in the Proposal: -

Sr. No District Taluka Village Gat No. Area Under

Acquisition (Ha)

1

Nashik Igatpuri Talegaon

200 0.3684

2 167 0.2067

3 199 1.7344

4 227 0.1012

5 229 0.5692

6 226 1.3109

7 203 0.0194

8 219 0.0164

9 222 0.1737

10 223 0.2893

11 224 0.2856

12 225 0.3389

13 214 0.3663

14 249 1.3895

15 253 0.6897

16 250 0.5987

17 251 1.9864

18 262 3.8694

19 259 0.6042

20 267 0.1084

21 268 3.526

22 276 1.1986

23 274 3.3275

24 288 0.8451

25 289 1.5582

26 292 2.9518

27 293 1.22

28 294 0.6418

29 302 1.4937

30 295 0.483

31 300 1.8609

32 299 1.3508

33 301 2.4028

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 110

34

Chinchale Khair

20 3.1799

35 85 2.253

36 84 0.3985

37 86 2.0673

38 83 0.3831

39 88 1.7514

40 87 0.262

41 100 1.0738

42 89 2.6462

43 112 6.0691

44 129 3.1402

45 130 2.2282

46 132 0.3176

47 131 0.8802

Total 64.5374

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

1

Thane Shahapur

Ambarje 679 0.4677

2 Ambarje 694 0.6305

3 Ambarje 695 0.3257

4 Ambarje 693 0.237

5 Ambarje 687 0.0033

6 Ambarje 692 0.4215

7 Ambarje 696 0.2294

8 Ambarje 691 0.0192

9 Ambarje 690 0.0112

10 Ambarje 688 0.0128

11 Ambarje 698 0.4532

12 Ambarje 672 0.4878

13 Ambarje 673 0.069

14 Ambarje O2 0.0445

15 Ambarje O3 0.1288

16 Ambarje 671 0.0206

17 Ambarje 702 0.0271

18 Ambarje 675 0.0067

19 Ambarje 670 0.0141

20 Ambarje 54 0.0813

21 Ambarje 666 0.5032

22 Ambarje 703 0.0415

23 Ambarje 669 0.0346

24 Ambarje O4 0.1026

25 Ambarje 676 0.0305

26 Ambarje 664 0.0963

27 Ambarje 663 0.0549

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 111

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

28 Ambarje 662 0.1145

29 Ambarje 667 0.0582

30 Ambarje 656 0.0246

31 Ambarje 657 0.1054

32 Ambarje 661 0.2753

33 Ambarje 658 0.2787

34 Ambarje 654 0.0661

35 Ambarje 660 0.2103

36 Ambarje 659 0.0798

37 Ambarje 623 0.0365

38 Ambarje 613 0.4797

39 Ambarje 621 0.2002

40 Ambarje 620 0.3706

41 Ambarje 622 0.001

42 Ambarje 614 0.6119

43 Ambarje 613 0.5014

44 Ambarje 619 0.0261

45 Ambarje 566 0.1283

46 Ambarje 612 0.0485

47 Ambarje 564 0.0062

48 Ambarje 565 0.014

49 Ambarje 615 0.1375

50 Ambarje 567 0.1144

51 Ambarje O8 0.0274

52 Ambarje 610 0.1409

53 Ambarje 611 0.051

54 Ambarje 568 0.0237

55 Ambarje 569 0.3311

56 Ambarje O9 0.0975

57 Ambarje 570 0.0174

58 Ambarje 571 0.1602

59 Ambarje 555 0.1937

60 Ambarje 608 0.1482

61 Ambarje 607 0.1743

62 Ambarje 572 0.096

63 Ambarje 606 0.2213

64 Ambarje 573 0.1966

65 Ambarje 603 0.1194

66 Ambarje 574 0.2472

67 Ambarje 584 0.0291

68 Ambarje 575 0.0877

69 Ambarje O14 0.0528

70 Ambarje 579 0.0037

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 112

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

71 Ambarje 553 0.7055

72 Ambarje 576 0.0049

73 Ambarje 554 0.8092

74 Ambarje 577 0.0052

75 Ambarje 550 0.0035

76 Ambarje 551 0.1642

77 Ambarje 552 0.0353

78 Ambarje 541 0.464

79 Ambarje 544 0.0023

80 Ambarje 539 0.4778

81 Ambarje 543 0.0029

82 Ambarje 542 0.0369

83 Ambarje 532 0.2381

84 Ambarje 540 0.505

85 Ambarje 530 0.3588

86 Ambarje 528 0.0082

87 Ambarje 531 0.0556

88 Ambarje 529 0.204

89 Ambarje O29 0.3746

90 Ambarje O30 0.1219

91 Ambarje 493 0.0006

92 Ambarje 483 0.2656

93 Ambarje 481 1.4185

94 Ambarje 490 0.1595

95 Ambarje 477 0.9829

96 Ambarje 480 0.3981

97 Ambarje 413 0.0046

98 Ambarje 420 0.0001

99 Ambarje 475 0.2826

100 Ambarje 474 0.0516

101 Ambarje 473 0.068

102 Ambarje 453 1.5399

103 Ambarje 476 0.0184

104 Ambarje 472 0.0294

105 Ambarje 452 0.7495

106 Ambarje 470 0.1666

107 Ambarje 471 0

108 Ambarje 455 0.1132

109 Ambarje 456 0.0859

110 Ambarje 454 0.0582

111 Ambarje 451 0.2249

112 Ambarje 449 0.0001

113 Ambarje 450 0.048

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 113

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

114 Andad 29 0.1522

115 Andad 30 0.6851

116 Andad 31 1.046

117 Andad 33 0.4862

118 Andad 34 0.0006

119 Andad 74 0.8023

120 Andad 43 1.7804

121 Andad 42 0.169

122 Andad 45 1.617

123 Andad 44 0.5761

124 Andad 48 0.3811

125 Andad 56 0.3208

126 Andad 49 0.9358

127 Andad 72 2.7911

128 Andad 55 0.3048

129 Arjunali S1 0.6759

130 Arjunali 148 1.1054

131 Birwadi 310 0.0747

132 Birwadi 309 0.1724

133 Birwadi 292 2.8083

134 Birwadi 294 0.512

135 Birwadi 293 0.8693

136 Birwadi W1 0.059

137 Birwadi 276 2.166

138 Birwadi 297 1.5304

139 Birwadi 296 0.1599

140 Birwadi 275 0.1742

141 Birwadi O18 3.207

142 Birwadi 414 0.1092

143 Birwadi 416 0.249

144 Birwadi O23 0.2486

145 Birwadi 242 0.3573

146 Birwadi 241 1.4425

147 Birwadi 208 2.5977

148 Birwadi 240 1.0035

149 Birwadi 207 0.5751

150 Birwadi 206 0.1141

151 Birwadi 239 0.0436

152 Birwadi 205 1.9626

153 Birwadi 209 0.5478

154 Birwadi 204 1.6179

155 Birwadi 203 0.6773

156 Birwadi 181 1.2426

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 114

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

157 Birwadi 191 0.415

158 Birwadi 192 0.7656

159 Birwadi 180 0.0735

160 Birwadi 179 1.3413

161 Birwadi 178 0.1182

162 Birwadi 168 0.649

163 Birwadi 170 0.1296

164 Birwadi 169 0.6626

165 Birwadi 166 1.9631

166 Birwadi O36 0.9337

167 Birwadi 145 4.3817

168 Birwadi 144 0.0075

169 Birwadi 142 0.1117

170 Birwadi 141 0.0267

171 Birwadi 143 0.2827

172 Birwadi O42 0.2165

173 Birwadi 127 2.3909

174 Birwadi 88 2.0475

175 Birwadi 122 0.8233

176 Birwadi 119 0.7161

177 Birwadi 66 0.1384

178 Birwadi 117 0.3152

179 Birwadi 123 0.2195

180 Birwadi 116 0.5437

181 Birwadi 121 0.5114

182 Birwadi 79 1.8972

183 Birwadi 115 0.0286

184 Birwadi 77 0.3723

185 Birwadi 80 1.0227

186 Birwadi 81 0.9004

187 Birwadi 73 0.4642

188 Birwadi O46 0.7612

189 Birwadi 85 0.571

190 Chande 40 1.3858

191 Chande 66 0.1148

192 Chande 65 0.0056

193 Chande 118 0.0654

194 Chande 114 0.1326

195 Chande 106 1.1468

196 Chande 67 0.1341

197 Chande 68 0.8972

198 Chande 112 1.2446

199 Chande 105 0.3416

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 115

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

200 Chande 104 0.3047

201 Chande 70 0.0194

202 Chande 113 0.5988

203 Chande 107 0.2463

204 Chande 102 0.0377

205 Chande 108 0.2487

206 Chande S1 0.0931

207 Chande 110 0.1133

208 Chande 109 0.0215

209 Dalkhan 222/A 1.3884

210 Dalkhan 221 0.4276

211 Dalkhan 220/D 0.3731

212 Dalkhan 220/B 0.4062

213 Dalkhan 220/C 0.3065

214 Dalkhan 220/A 0.0045

215 Dalkhan 99 0.4349

216 Dalkhan 95 0.1201

217 Dalkhan 97 0.2196

218 Dalkhan 92 0.0013

219 Dalkhan 96 0.108

220 Dalkhan 98 0.0214

221 Dalkhan 90 1.1908

222 Dalkhan 91 0.2458

223 Dalkhan 83 0.9606

224 Dalkhan O2 0.1252

225 Dalkhan 89 0.0163

226 Dalkhan 88 0.0187

227 Dalkhan 87 0.0224

228 Dalkhan 86 0.0206

229 Dalkhan 84 0.2747

230 Dalkhan 81 0.5173

231 Dalkhan 79 0.0134

232 Dalkhan 80 0.2607

233 Dalkhan 43 3.6585

234 Dalkhan 82 0.254

235 Dalkhan 115/C 0.3163

236 Dalkhan 28 0.3155

237 Dalkhan 9 0.528

238 Dalkhan 289 0.9096

239 Dalkhan 8/B 0.2309

240 Dalkhan 10/A 0.7837

241 Dalkhan 17 0.1929

242 Dalkhan 10/B 0.0566

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 116

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

243 Dalkhan 15 0.3571

244 Dalkhan 1 0.1003

245 Dalkhan 16 0.0256

246 Dalkhan G1 0.9216

247 Dalkhan 137 0.1737

248 Dalkhan 284 0.3815

249 Dalkhan 166 3.5188

250 Dalkhan 146 1.2349

251 Dalkhan 147 0.1607

252 Dalkhan 144/2 0.5878

253 Dalkhan 143 0.6322

254 Dalkhan 144/1 0.1573

255 Dalkhan 142 0.1148

256 Dalkhan 145 0.0154

257 Dalkhan 174 2.6143

258 Dalkhan 152 0.0119

259 Dalkhan 167 0.3736

260 Dalkhan 165 0.2512

261 Dalkhan 172 0.0183

262 Dalkhan 171/A 0.7281

263 Ghosai 54 0.0017

264 Ghosai 3 0.0023

265 Ghosai 5 0.0001

266 Ghosai 23 0.6432

267 Ghosai 7 0.0001

268 Golbhan O1 0.2877

269 Golbhan 67 0.4358

270 Golbhan 67 1.8114

271 Golbhan 68 0.0026

272 Golbhan 73 0.0214

273 Golbhan 74 0.244

274 Golbhan 65 2.5264

275 Golbhan 75 0.4352

276 Golbhan 66 0.009

277 Golbhan 76 0.331

278 Golbhan 79 0.1016

279 Golbhan 80 1.0853

280 Golbhan 81 0

281 Golbhan 83 0.0025

282 Golbhan O3 0.0975

283 Golbhan 82 0.3691

284 Golbhan 94 0.9251

285 Golbhan 93 1.253

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 117

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

286 Golbhan 95 0.4179

287 Golbhan 91 0.1353

288 Golbhan 117 0.1307

289 Golbhan 119 1.2647

290 Golbhan 120 0.0682

291 Golbhan 124 0.0855

292 Golbhan 121 0.0397

293 Golbhan O7 0.0767

294 Golbhan 188 0.3598

295 Golbhan 186 0.208

296 Golbhan 122 0.1017

297 Golbhan O9 0.2844

298 Golbhan 123 0.0503

299 Golbhan 194 0.8724

300 Golbhan 187 0.007

301 Golbhan 185 0.1307

302 Golbhan 184 0.0487

303 Golbhan 182 0.1023

304 Golbhan 181 0.2357

305 Golbhan 180 0.2826

306 Golbhan 168 0.1055

307 Golbhan 169 0.1049

308 Golbhan 167 0.0577

309 Golbhan 170 0.0191

310 Golbhan 171 0.5432

311 Golbhan 159 0.59

312 Golbhan 166 0.1268

313 Golbhan 165 0.1106

314 Golbhan 164 0.0029

315 Golbhan 172 0.0606

316 Golbhan 176 0.1855

317 Golbhan 152 1.1081

318 Golbhan 173 0.0625

319 Golbhan 175 0.0481

320 Golbhan 174 0.0698

321 Golbhan O22 0.8259

322 Golbhan 151 0.0592

323 Golbhan 149 0.0068

324 Golbhan 150 0.1894

325 Golbhan 143 2.1659

326 Golbhan 144 0.1825

327 Golbhan 146 0.0481

328 Golbhan 141 0.3137

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 118

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

329 Golbhan 145 0.0124

330 Golbhan O13 0.2126

331 Hiv S1 0.4063

332 Hiv 251 3.1368

333 Hiv O1 0.6851

334 Hiv 255 0.0798

335 Hiv 246 2.9848

336 Hiv 250 0.2434

337 Hiv 262 0.0389

338 Hiv 261 0.1742

339 Hiv 244 2.5499

340 Hiv 243 0.9851

341 Hiv O2 0.247

342 Hiv 3-Apr 0.0241

343 Hiv 242 0.3519

344 Hiv O3 0.8352

345 Hiv 187 0.3636

346 Hiv 183/1 0.0034

347 Hiv 184 0.5319

348 Hiv 185 0.0189

349 Hiv 144 1.0281

350 Hiv 145 0.2065

351 Hiv 143 0.5907

352 Hiv 142 0.361

353 Hiv 148 0.2658

354 Hiv 141 0.6214

355 Hiv 137 0.1707

356 Kasagaon S1 0.7846

357 Kasagaon 27 0.5424

358 Kasagaon 16 0.4199

359 Kasagaon 17 0.3031

360 Kasagaon 21 0.6612

361 Kasagaon 18 1.0667

362 Kasagaon 14 0.3869

363 Kasagaon 23 0.0142

364 Kasagaon 20 0.1215

365 Kasagaon 19 0.0783

366 Kasagaon 15 0.2734

367 Kasagaon 22 0.0387

368 Kasagaon 37 0.5565

369 Kasagaon 36 1.5829

370 Kasagaon 9 0

371 Kasagaon 38 0.0934

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 119

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

372 Kasagaon 39 0.6769

373 Kasagaon 45 0.0079

374 Kasagaon 43 0.2604

375 Kasagaon 40 1.1922

376 Kasagaon 222 0

377 Kasagaon 41 0.1545

378 Kasagaon 113 1.9167

379 Kasagaon 221 0.015

380 Kasagaon 219 0.0541

381 Kasagaon 114 1.7832

382 Kasagaon 149 8.7991

383 Kasagaon 149 0.018

384 Kasagaon 218 0.327

385 Kasagaon 143 1.2351

386 Kasagaon 142 0.0435

387 Kasagaon 139 0.0909

388 Kasagaon 138 0

389 Kasagaon S3 0.2644

390 Kasagaon 154 0.75

391 Kasagaon 233 0.0023

392 Kasagaon 148 0.0453

393 Kasara Kh. R1 0.2286

394 Kasara Kh. 5/6/7/8/10/11/12/13/ 4.7737

395 Khardi 34 2.0437

396 Khardi O41 0.7303

397 Khardi 185 1.1466

398 Khardi O8 0.2154

399 Khardi O7 0.4181

400 Khardi 37 0.0121

401 Khardi 184 3.249

402 Khutadi 49/A 0.6993

403 Khutadi 36 6.529

404 Khutadi 49/B 0.9381

405 Khutadi 48 1.5722

406 Khutadi 47 0.2926

407 Khutadi 46 0.9443

408 Khutadi 45 0.3968

409 Khutadi 44 0.8256

410 Khutadi 42 0.2116

411 Khutadi 41 0.4693

412 Khutadi 7/A 0.1897

413 Khutadi 6 3.1926

414 Khutadi 5 0.3503

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 120

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

415 Khutadi 204 0.2468

416 Khutadi 7/B 0.0004

417 Khutadi O3 0.0146

418 Khutadi 9 0.1818

419 Khutadi G1 0.3131

420 Khutadi 18 0.1622

421 Khutadi O4 0.066

422 Khutadi 13 0.1942

423 Khutadi 14 0.1318

424 Khutadi 15 0.1174

425 Khutadi 17 0.1484

426 Khutadi 16 0.1621

427 Khutadi 201 0.0666

428 Khutadi 206 0.2355

429 Khutadi 158 0.5586

430 Khutadi O5 0.0448

431 Khutadi O6 0.1556

432 Khutadi 156 0.0331

433 Khutadi 160 1.3962

434 Khutadi 157 0.4937

435 Khutadi 162/B 0.0252

436 Khutadi 149 0.0035

437 Khutadi 159 0.0502

438 Khutadi 131 1.4813

439 Khutadi 132 0.1341

440 Khutadi 133 0.5068

441 Khutadi 140 0.2546

442 Khutadi 138 0.8141

443 Khutadi 135 0.1305

444 Khutadi 136 0.3825

445 Khutadi O14 0.0625

446 Khutadi 137 0.0867

447 Khutadi 142 0.0241

448 Khutadi 139 0.0925

449 Khutadi 205 0.0036

450 Khutadi 126 0.0958

451 Khutadi 124 0.0002

452 Khutadi 116 0.1226

453 Khutadi 118 0.3526

454 Khutadi 125 0.034

455 Khutadi 121 0.503

456 Khutadi 123 0.0431

457 Khutadi 120 0.1588

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 121

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

458 Khutadi 203 0.0994

459 Khutadi 122 0.3097

460 Khutadi 119 0.2469

461 Khutghar 49 0.5298

462 Khutghar 88 0.2306

463 Khutghar 96 0.8655

464 Khutghar 95 0.1316

465 Khutghar 97 0.3465

466 Khutghar 89 0.001

467 Khutghar 94 0.6189

468 Khutghar 100 0.3267

469 Khutghar 92 0.0957

470 Khutghar 91 1.1204

471 Khutghar 90 0.0191

472 Khutghar 93 0.071

473 Khutghar 133 0.6993

474 Khutghar 134 0.0046

475 Khutghar W1 0.5781

476 Khutghar 137 4.4238

477 Khutghar 132 0.7152

478 Khutghar 131 1.0999

479 Khutghar 130 0.0088

480 Khutghar 138 0.0028

481 Khutghar 142 0.4732

482 Khutghar 141 1.1218

483 Khutghar 139 0.5714

484 Khutghar 140 0.0762

485 Khutghar 149 1.241

486 Khutghar 174 1.4273

487 Khutghar 149 5.8174

488 Khutghar 157 0.1722

489 Khutghar 156 0.0608

490 Khutghar 154 0.0145

491 Lahe 109 0.062

492 Lahe 111 0.3546

493 Lahe 112 0.4807

494 Lahe 113 1.286

495 Lahe 106 0.6266

496 Lahe 104 0.0752

497 Lahe 114 0.341

498 Lahe 105 0.5452

499 Lahe 92 0.7991

500 Lahe 96 0.5213

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 122

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

501 Lahe 95 0.4894

502 Lahe 93 0.1172

503 Lahe 83 0.4318

504 Lahe 116 0.1653

505 Lahe 86 1.4073

506 Lahe 87 0.0743

507 Lahe 118 1.0465

508 Lahe 119 0.483

509 Lahe 122 0.5939

510 Lahe 64 0.3663

511 Lahe 125 0.9984

512 Lahe 62 0.8712

513 Lahe 29/D 0.9265

514 Lahe 29/B 0.0277

515 Lahe 22 0.4123

516 Lahe 25 0.939

517 Lahe 13 1.1133

518 Lahe 12 0.0234

519 Lahe 8 0.3919

520 Lahe 14 0.1889

521 Lahe 1 0.853

522 Lahe 7 0.3719

523 Lahe 5 1.6889

524 Lahe 2 0.1429

525 Lahe 185 0.0303

526 Lahe 3 0.1429

527 Lahe 4 0.2736

528 Lahe 184 0.0253

529 Lahe 172 1.9122

530 Lahe 170 1.5812

531 Lahe 173 0.1974

532 Lahe 175 0.8013

533 Lahe 169 0.0046

534 Lahe 160 0.7758

535 Lahe 157 0.069

536 Lahe 158 0.0232

537 Lahe 159 0.3823

538 Lahe 152 1.5912

539 Lahe 156 0.32

540 Lahe 153 0.9316

541 Lahe 150/B 0.3138

542 Lahe 150/A 0.0812

543 Lahe 148 1.4467

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 123

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

544 Lahe 149 0.0755

545 Madh 17 2.3302

546 Madh 96 0.0395

547 Madh 88 0.0576

548 Madh 86 0.6743

549 Madh 91 0.0035

550 Madh 85 0.0796

551 Madh 93 0.2688

552 Madh 77 0.3799

553 Madh 83 0.9301

554 Madh 84 0.1581

555 Madh 78 0.1557

556 Madh 79 0.4568

557 Madh 76 0.0741

558 Madh 82 0.0572

559 Madh 72 0.0687

560 Madh 81 0.0156

561 Mokhavane 83 15.493

562 Mokhavane O12 0.1667

563 Mokhavane 122 2.7983

564 Mokhavane O14 0.1869

565 Mokhavane O15 1.1407

566 Mokhavane 119 0.0029

567 Mokhavane 123 0.1842

568 Mokhavane 120 0.1285

569 Mokhavane 121 0.683

570 Mokhavane 110 1.0945

571 Mokhavane O22 0.0035

572 Mokhavane 107 1.7193

573 Mokhavane O26 0.0001

574 Mokhavane 163 3.5302

575 Mokhavane 162 0.2184

576 Mokhavane 80 0.9951

577 Mokhavane 77 0.0181

578 Mokhavane O46 0.0012

579 Mokhavane 76 0.091

580 Mokhavane 75 0.0498

581 Mokhavane 69 0.7971

582 Mokhavane 70 0.3083

583 Mokhavane 64 2.5784

584 Mokhavane 67 0.7374

585 Mokhavane 184 0.0107

586 Mokhavane 68 0.0076

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 124

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

587 Mokhavane O50 0.0071

588 Mokhavane 63 0.1852

589 Mokhavane 65 0.1069

590 Mokhavane Y2 0.2325

591 Mokhavane 203 3.2475

592 Mokhavane 188 0.2845

593 Mokhavane G1 0.036

594 Mokhavane 127 1.1168

595 Mokhavane 15 1.3461

596 Mokhavane 190 0.4558

597 Mokhavane 16 0.0086

598 Mokhavane 17 0.0077

599 Mokhavane 41 0.149

600 Mokhavane 37 0.1725

601 Ras 25 0.5802

602 Ras 70 9.4647

603 Ras 26 0.3189

604 Ras 27 1.1627

605 Ras S1 0.28

606 Ras 28 1.3959

607 Ras 29 2.3806

608 Ras 46 3.4837

609 Ras 40 0.5138

610 Ratandhale 67 0.6249

611 Ratandhale 66 0.6452

612 Ratandhale 1 2.9102

613 Ratandhale 7 0.037

614 Ratandhale S1 0.0891

615 Ratandhale 6 0.5771

616 Ratandhale 9-Jan 0.1315

617 Ratandhale 8 0.0851

618 Ratandhale 10 2.1107

619 Ratandhale G1 0.2896

620 Ratandhale 53 1.8811

621 Ratandhale 51 0.3166

622 Ratandhale 52 0.1869

623 Ratandhale 49 2.7257

624 Ratandhale 48 0.0271

625 Ratandhale O3 0.0013

626 Ratandhale O4 0.1825

627 Ratandhale 47 0.2761

628 Ratandhale 69 0.2627

629 Ratandhale 44 0.4826

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 125

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

630 Ratandhale 43 0.0879

631 Sapagaon PART MISSING 10.1113

632 Saralambe 385 1.1507

633 Saralambe 387 1.3699

634 Saralambe 388 0.0109

635 Saralambe 389 0.1435

636 Saralambe 391 0.3855

637 Saralambe 390 0.0014

638 Saralambe 392 0.2865

639 Saralambe 394 1.2349

640 Saralambe 395 0.4032

641 Saralambe 396 2.1815

642 Saralambe 398 0.4465

643 Saralambe 399 0.1854

644 Saralambe 401 0.0009

645 Saralambe 41 0.0002

646 Saralambe 40 0.1665

647 Saralambe 38 0.2124

648 Saralambe 39 0.0384

649 Saralambe 45 0.0763

650 Saralambe 27 0.1219

651 Saralambe 46 0.1274

652 Saralambe 37 0.2392

653 Saralambe 28 0.0004

654 Saralambe 36 0.256

655 Saralambe 47 0.115

656 Saralambe 48 0.1521

657 Saralambe 49 0.2894

658 Saralambe 34 0.0199

659 Saralambe 35 0.0061

660 Saralambe 51 0.0014

661 Saralambe 33 0.0948

662 Saralambe 50 0.268

663 Saralambe 71 0.1129

664 Saralambe 72 0.0313

665 Saralambe 70 1.3073

666 Saralambe 83 1.1965

667 Saralambe 84 0.3599

668 Saralambe 85 2.0721

669 Saralambe 95 0.1131

670 Saralambe 94 0.0927

671 Saralambe 86 0.2092

672 Saralambe O6 0.152

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 126

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

673 Saralambe 88 0.0605

674 Saralambe 87 0.0949

675 Saralambe 90 0.5846

676 Saralambe 91 0.0274

677 Saralambe 89 0.0015

678 Shei 67 2.2484

679 Shei 337 0.616

680 Shei 61 0.0629

681 Shei 66 0.005

682 Shei 66/B 0.1007

683 Shei 69 0.7607

684 Shei 66/A 0.6939

685 Shei 70 0.2395

686 Shei 60 0.9115

687 Shei 71 0.1692

688 Shei 72 0.1238

689 Shei 59 0.3538

690 Shei 58 0.4847

691 Shei 46 1.4564

692 Shei 57 0.0198

693 Shei 45 0.5254

694 Shei 44 0.0192

695 Shei 47 0.1157

696 Shei 42 0.4091

697 Shei 43 0.039

698 Shei 40 0.0282

699 Shei 41 0.5445

700 Shei 30 0.3918

701 Shei 39 0.2473

702 Shei 31 0.8607

703 Shei 32 0.0512

704 Shei 28 0.1351

705 Shei 33 0.235

706 Shei 34 0.0249

707 Shei 36 0.9279

708 Shei 340 0.7294

709 Shei 37 0.1741

710 Shei 38 0.371

711 Shei 338 0.7937

712 Shei 339 0.0849

713 Shei 342 0.0161

714 Shei 341 0.1627

715 Shei 336 0.7054

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 127

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

716 Shei 335 0.1592

717 Shei 334 0.1509

718 Shei 333 0.3254

719 Shei 332 0.2005

720 Shei 331 0.2098

721 Shei 322 0.0511

722 Shei 320 1.5704

723 Shei 319 0.4745

724 Shei 318 0.7329

725 Shei 317 0.1201

726 Shei 313 0.4212

727 Shei 307 0.2686

728 Shei 311 0.0888

729 Shei 312 0.1715

730 Shei 309 1.1306

731 Shei 308 0.0428

732 Shei O6 0.2833

733 Shei 310 0.0935

734 Shei 301 2.15

735 Shei 286 0.0012

736 Shei 285 0.0059

737 Shelwali (Khadabachi) 237 3.4699

738 Shelwali (Khadabachi) O6 1.6214

739 Shelwali (Khadabachi) 233 5.2227

740 Shelwali (Khadabachi) 308 0.0248

741 Shelwali (Khadabachi) 281 1.5657

742 Shelwali (Khadabachi) O6 0.0526

743 Shelwali (Khadabachi) 251 1.1108

744 Shelwali (Khadabachi) 249 0.0812

745 Shelwali (Khadabachi) 280 0.0749

746 Shelwali (Khadabachi) 250 0.2126

747 Shelwali (Khadabachi) 277 0.0152

748 Shelwali (Khadabachi) 278 0.0111

749 Shelwali (Khadabachi) 266 0.9182

750 Shelwali (Khadabachi) 257 0.0003

751 Shere O6 0.2309

752 Shere 489 3.1354

753 Shere 473 0.7406

754 Shere 477 1.4776

755 Shere 462 0.9504

756 Shere 470 0.5649

757 Shere 474 0.1278

758 Shere 475 0.0008

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 128

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

759 Shere 469 0.3388

760 Shere 467 0.0275

761 Shere 463 1.8907

762 Shere 563 0.3178

763 Shere 564 0.672

764 Shere 565 0.5516

765 Shere 566 0.0074

766 Shere 398 0.6356

767 Shere 569 0.1716

768 Shere 568 0.4589

769 Shere 567 0.2371

770 Shere 571 0.0512

771 Shere 570 0.0404

772 Shere 399 0.3957

773 Shere 572 0.1086

774 Shere 573 0.2675

775 Shere 397 0.4297

776 Shere 244 0.1851

777 Shere 396 1.3126

778 Shere 395 0.1573

779 Shere 394 0.2569

780 Shere 387 0.8553

781 Shere 384 0.0388

782 Shere 393 0.3325

783 Shere 392 0.3489

784 Shere 391 0.0105

785 Shere 388 0.168

786 Shere 390 0.016

787 Shere 385 0.1623

788 Shere 389 0.1247

789 Shere 386 0.1381

790 Shere 635 0.3364

791 Shere 636 0.2903

792 Shere 638 0.22

793 Shere 634 0.0515

794 Shere 637 0.3017

795 Shere 644 0.2548

796 Shere O6 0.0816

797 Shere 643 0.5004

798 Shere 640 0.1431

799 Shere 642 0.7139

800 Shere 645 0.3477

801 Shere 641 0.4574

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 129

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

802 Shere 658 0.0101

803 Shere 651 0.2951

804 Shere 652 0.0242

805 Shere 650 0.0468

806 Shere 649 0.0991

807 Shirol O6 0.3622

808 Shirol 650 0.1212

809 Shirol 618/5 0.9303

810 Shirol 619/16 0.054

811 Shirol 379 0.7371

812 Shirol 619/18 0.8002

813 Shirol 619/2 0.9152

814 Shirol 377 0.255

815 Shirol 619/33 0.0064

816 Shirol 366 0.9551

817 Shirol 365 0.2714

818 Shirol 367 0.6767

819 Shirol 619/38 1.0838

820 Shirol 357 0.1249

821 Shirol 120 1.333

822 Shirol 354 0.0213

823 Vihigaon O6 1.1461

824 Vihigaon O6 2.3791

825 Vihigaon 228 2.2003

826 Vihigaon 227 0.2394

827 Vihigaon O6 0.2113

828 Vihigaon 229 0.5993

829 Vihigaon 437 0.9509

830 Vihigaon 238 0.9283

831 Vihigaon 235 0.0581

832 Vihigaon 260 1.0104

833 Vihigaon 237 0.5187

834 Vihigaon 233 0.0273

835 Vihigaon 239 0.6203

836 Vihigaon 240 1.7302

837 Vihigaon O6 0.5249

838 Vihigaon 258 0.5851

839 Vihigaon 271 1.4352

840 Vihigaon 263 0.0008

841 Vihigaon 267 1.6453

842 Vihigaon O6 0.5378

843 Vihigaon 269 0.0945

844 Vihigaon 272 0.4916

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 130

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

845 Vihigaon 270 0.0036

846 Vihigaon 339 3.0517

847 Vihigaon 389 0.7434

848 Vihigaon 390 0.2629

849 Vihigaon 394 2.7236

850 Vihigaon 394 1.1078

851 Vihigaon 395 0.0184

852 Vihigaon 393 0.0151

853 Vihigaon 428 0.0257

854 Vihigaon 426 0.0084

855 Vihigaon 397 1.3107

856 Vihigaon 427 0.0425

857 Vihigaon O6 0.087

858 Vihigaon 424 0.1235

859 Vihigaon 423 0.6857

860 Vihigaon 398 0.1

861 Vihigaon 418 0.458

862 Vihigaon 419 0.6623

863 Vihigaon 417 0.4441

864 Vihigaon 422 0.1386

865 Vihigaon 420 0.3531

866 Vihigaon 416 0.0378

867 Vihigaon 415 0.1805

868 Vihigaon 414 0.0016

869 Vihigaon 410 2.1015

870 Vihigaon 408 0.5486

871 Vihigaon 411 0.0002

Total 486.7877

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

1

Thane Bhiwandi

Vadape R1 0.1757

2 Vadape 85 0.3698

3 Vadape 133 0.0444

4 Vadape 131 0.2031

5 Vadape PL1 0.1734

6 Vadape 86 0.4905

7 Vadape 88 0.4011

8 Vadape 71 1.3433

9 Vadape 87 0.0285

10 Vadape 70 0.1191

11 Vashere 27/A 2.3361

12 Vashere 29 2.0456

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 131

13 Vashere S1 0.7276

14 Vashere 30 0.1956

15 Vashere 28 0.2177

16 Usroli 46/60/73 5.5525

17 Usroli 59 2.5894

18 Usroli 57 0.1776

19 Usroli 58 0.8425

20 Usroli 52 0.8302

21 Usroli 56 0.9866

22 Usroli 55 0.9223

23 Usroli 10 0.4457

24 Usroli 53 1.9191

25 Usroli 11 1.3526

26 Usroli 44/4/A/45/47/48 2.3185

27 Usroli 51 1.2188

28 Usroli 12 0.0002

29 Usroli 61 1.4232

30 Usroli 13 1.3516

31 Usroli 70 0.2071

32 Usroli L1 0.0304

33 Usroli 16 2.3709

34 Usroli 18 2.9057

35 Usroli 20 1.5041

36 Usroli 21 0.9075

37 Usroli 17 0.1889

38 Usroli 14 0.7362

39 Usroli O2 0.1335

40 Usroli 27 0.1569

41 Usroli 25 0.1402

42 Usroli 26 0.1169

43 Chiradpada S1 0.9438

44 Chiradpada 85 0.9691

45 Chiradpada 12 0.6773

46 Chiradpada 62 1.1278

47 Chiradpada 54 4.0316

48 Chiradpada 9 0.2098

49 Chiradpada 37 1.605

50 Chiradpada 8 0.0449

51 Chiradpada 59 0.3936

52 Chiradpada 15 1.1144

53 Chiradpada 13 2.1353

54 Chiradpada 61 0.2615

55 Chiradpada O3 0.6152

56 Chiradpada 57 0.2801

57 Chiradpada 48 0.2829

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 132

58 Chiradpada 14 0.064

59 Chiradpada 58 0.2606

60 Chiradpada 36 0.0797

61 Chiradpada O4 0.0985

62 Chiradpada 56 0.1351

63 Chiradpada O5 0.1835

64 Chiradpada 32 0.0431

65 Chiradpada 35 0.0214

66 Chiradpada 47 0.029

67 Chiradpada 53 0.205

68 Chiradpada 45 0

69 Chiradpada 52 0.1349

70 Chiradpada 51 0.0879

71 Pise 112 0.805

72 Pise 107 0.1182

73 Pise 117 0.2105

74 Pise 97 3.8945

75 Pise 119 1.7809

76 Pise 90 0.4887

77 Pise 113 0.3093

78 Pise 115 0.4655

79 Pise 114 0.2994

80 Pise 106 1.0533

81 Pise 91 1.0042

82 Pise 118 0.2062

83 Pise 105 1.0217

84 Pise O1 0.1446

85 Pise 116 0.1982

86 Pise 98 0.2648

87 Pise O2 0.1072

88 Pise 104 0.1186

89 Pise O3 0.0762

90 Pise 99 0.0082

91 Amane S1 0.3518

92 Amane 42 0.4268

93 Amane 56 1.0839

94 Amane 53 1.1062

95 Amane 54 1.1593

96 Amane 81 0.2911

97 Amane 43 0.1497

98 Amane 77 2.941

99 Amane 46 1.8442

100 Amane 29 0.9971

101 Amane 257 1.1501

102 Amane 30 0.0844

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 133

103 Amane 50 0.0085

104 Amane 82 0.2303

105 Amane 44 0.0002

106 Amane 83 2.7904

107 Amane 49 0.3978

108 Amane 75 1.1845

109 Amane 89 0.3038

110 Amane 45 0.0426

111 Amane 55 0.4632

112 Amane 28 0.5639

113 Amane 74 0.0416

114 Amane 78 0.2194

115 Amane 90 0.1506

116 Amane 47 0.0186

117 Amane 48 0.0266

118 Amane 268 0.0013

Total 86.8394

Sr.No. District Taluka Village Gut No. Area Under

Acquisition (Ha)

1

Thane Kalyan

Chinchavali 13 2.9913

2 Chinchavali 11 2.064

3 Chinchavali 10 0.0444

4 Chinchavali 20 0.8859

5 Chinchavali 12 0.0487

6 Chinchavali 21 0.3107

7 Chinchavali 19 1.632

8 Chinchavali 24 2.7662

9 Chinchavali 23 0.8523

10 Chinchavali O1 0.0835

11 Chinchavali 18 0.0463

12 Chinchavali 33 0.5038

13 Chinchavali 26 0.1444

14 Chinchavali 34 0.0947

15 Chinchavali O2 0.0357

16 Chinchavali 31 0.0598

17 Danbav 82 0.0876

18 Guravali 20 0.539

19 Guravali 27 0.8688

20 Guravali 24 1.5305

21 Guravali 25 0.7455

22 Guravali 30 1.7348

23 Guravali 26 0.0704

24 Guravali 165 0.1091

25 Guravali 28 0.7027

26 Guravali 19 0.9412

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 134

27 Guravali 16 0.1801

28 Guravali 18 0.9048

29 Guravali 29 0.2367

30 Nadgaon 130 2.3062

31 Nadgaon 132 1.4107

32 Nadgaon 92 3.07

33 Nadgaon 96 2.3164

34 Nadgaon 93 2.6781

35 Nadgaon 108 0.0318

36 Nadgaon 109 0.7912

37 Nadgaon 107 1.2677

38 Nadgaon 98 0.1457

39 Nadgaon 129 0.5665

40 Nadgaon 100 2.0638

41 Nadgaon 104 4.4567

42 Nadgaon 91 0.878

43 Nadgaon 99 0.3783

44 Nadgaon 89 0.1704

45 Nadgaon 74 0.0089

46 Nadgaon 75 0.5826

47 Nadgaon 105 0.2847

48 Nadgaon 79 0.1126

49 Nimbavli S2 1.1022

50 Nimbavli 84 0.1704

51 Nimbavli 97 0.5535

52 Nimbavli 34 1.261

53 Nimbavli 82 0.3038

54 Nimbavli 94 0.1599

55 Nimbavli 29 1.408

56 Nimbavli 57 3.4104

57 Nimbavli 40 0.1502

58 Nimbavli 89 1.5613

59 Nimbavli 85 0.8704

60 Nimbavli 81 0.1527

61 Nimbavli 81/B 0.2158

62 Nimbavli 86 0.2749

63 Nimbavli 80 0.5942

64 Nimbavli 31 0.6765

65 Nimbavli 32 0.601

66 Phalegaon 51 3.1493

67 Phalegaon 49 1.3705

68 Phalegaon 37 1.3451

69 Phalegaon 44 1.3149

70 Phalegaon O1 0.5088

71 Phalegaon 202 0.4167

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 135

72 Phalegaon 43 0.1348

73 Phalegaon 34 0.1234

74 Phalegaon 212 0.0005

75 Phalegaon 42 0.2125

76 Phalegaon 200 0.0275

77 Pitambare Nagar 147'p 0.5293

78 Raye Y1 0.1372

79 Raye 28 1.8955

80 Raye 20 0.0085

81 Ushid 75 1.3358

82 Ushid 71 1.3436

83 Ushid 49 1.3652

84 Ushid 47 0.3323

85 Ushid 72 0.6188

86 Ushid 68 2.0064

87 Ushid 50 1.0834

88 Ushid 69 0.1436

89 Ushid 73 3.4301

90 Ushid 70 0.3427

91 Ushid 34 0.6731

92 Ushid 63 0.5981

93 Ushid 67 0.4752

94 Ushid 107 1.6747

95 Ushid 74 0.0663

96 Ushid 53 0.5022

97 Ushid 51 0.9024

98 Ushid 29 0.4811

99 Ushid 33 1.0427

100 Ushid 52 0.0487

101 Ushid 32 0.0403

102 Ushid 30 0.0709

103 Utane 125 2.5218

104 Utane 123 0.7109

Total 91.1861

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 136

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 137

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 138

Certificate No.: - 23

List of the Identified forest from the Deputy Conservator of Forest

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under

Acquisition (Ha)

1 Thane Bhiwandi Borivali Tarf

Sonale

56/19 42.9538 5.0694

2 Thane Bhiwandi Usroli 46/60/73 69.857 5.0309

3 Thane Bhiwandi Vadape 138 104.4379 10.3654

Thane Bhiwandi 68 1.7443 0.1431

Thane Bhiwandi 67 0.2744 0.0383

Thane Bhiwandi 132 0.7795 0.2359

Thane Bhiwandi 140 42.4181 1.4448

Thane Bhiwandi 121 10.5365 0.0002

4 Thane Kalyan Danbav 82 0.6157 0.0239

5 Thane Kalyan Nadgaon 69 61.8075 0.0218

Thane Kalyan 69 0.0253

Thane Kalyan 76 1.5071 0.0348

Thane Kalyan 78 1.9019 0.2802

Thane Kalyan 77 0.198 0.1104

6 Thane Kalyan Ushid 31 10.21 0.9240

7 Thane Kalyan Phalegaon 33 10.3135 0.9493

Thane Kalyan 30 0.6081 0.3972

Thane Kalyan 31 0.179 0.0008

Thane Kalyan 26 2.3764 0.0382

Thane Kalyan 24 5.353 0.0398

Thane Kalyan 28 10.3909 0.0866

Thane Kalyan 28 0.4209

Thane Kalyan 27 1.0813 0.6861

Thane Kalyan 153 11.4994 1.9285

Thane Kalyan 206 10.0424 3.4864

Thane Kalyan 28 10.3909 0.0001

Thane Kalyan 203 3.1283 0.0996

Thane Kalyan 207 5.8297 0.8574

Thane Kalyan 208 4.5573 1.0057

Thane Kalyan 204 0.3001 0.1564

Thane Kalyan 205 0.5735 0.5735

Thane Kalyan 199 2.4695 0.5614

Thane Kalyan 198 1.9643 0.0462

8 Thane Shahapur Chande 91 52.0532 1.7371

9 Thane Shahapur Dalkhan 161 36.66 1.3394

10 Thane Shahapur Hiv 188 93.2936 0.9104

Thane Shahapur 138 1.77 0.0584

Thane Shahapur 139 2.2346 0.1508

Thane Shahapur 140 0.2799 0.0030

Thane Shahapur 188 93.2936 0.0258

Thane Shahapur 188 1.3921

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 139

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under

Acquisition (Ha)

Thane Shahapur 186 0.8771 0.0000

11 Thane Shahapur Kasara Kh. 180 106.9745 19.8711

Thane Shahapur 5 0.3050

Thane Shahapur 159 0.7072 0.7064

12 Thane Shahapur Khardi 84 10.1894 0.0112

Thane Shahapur 274 2.8559 0.2523

13 Thane Shahapur Mokhavane 55 107.7578 0.1485

Thane Shahapur 40 0.7805 0.1411

Thane Shahapur 55 107.7578 8.6676

Thane Shahapur 14 15.8508 0.5582

Thane Shahapur 13 4.5591 0.0781

Thane Shahapur 19 0.3545 0.2219

Thane Shahapur 21 1.4845 0.1099

Thane Shahapur 20 0.479 0.0945

Thane Shahapur 124 218.2976 24.4403

14 Thane Shahapur Shere 95 32.9595 0.4307

15 Thane Shahapur Shirol 619/1 237.2432 0.0378

Thane Shahapur 619/1 1.1436

Thane Shahapur 619/1 2.4508

Thane Shahapur 126 1.2615 0.6771

Thane Shahapur 619/39 1.6189 0.0068

Thane Shahapur 619/1 237.2432 1.8217

Thane Shahapur 618/6 71.0593 0.3224

Thane Shahapur 310 3.2419 0.0003

Thane Shahapur 619/17 1.2199 0.4788

Thane Shahapur 67 6.6354 0.0037

Thane Shahapur 618/4 2.6845 0.3527

Thane Shahapur 667 374.1618 5.7331

Thane Shahapur 308 0.5646 0.0880

Thane Shahapur 618/6 71.0593 0.1550

16 Thane Shahapur Vashala Kh 11 5.9528 0.1555

Thane Shahapur 109 20.6393 0.3792

Thane Shahapur 114 13.5188 3.1460

Thane Shahapur 110 0.2979 0.0322

Thane Shahapur 105 10.0973 2.3067

Thane Shahapur 111 0.2055 0.0001

Thane Shahapur 104 0.2198 0.1025

Thane Shahapur 16 0.4522 0.0848

Thane Shahapur 112 4.9841 1.1614

Thane Shahapur 103 12.0353 0.5256

17 Thane Shahapur Vihigaon 65 377.2221 3.3052

Thane Shahapur 409 1.9814 0.0175

Thane Shahapur 468 1.3468 0.0774

Thane Shahapur 301 64.13 0.0158

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 140

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under

Acquisition (Ha)

18 Thane Shahapur Ambarje 446 6.6 1.5400

19 Thane Shahapur Andad 73/1/1 48.946 3.2000

Thane Shahapur 73/A/1/1 & 72/D 10.02

1.8539

20 Thane Shahapur Birwadi 88 66.85 2.4300

21 Thane Shahapur Golbhan 56 7.17 1.8511

22 Thane Shahapur Gosai 2 2.28 0.4530

Thane Shahapur 6 3.56 0.4510

23 Thane Shahapur Kasgaon 27 46.31 1.2200

24 Thane Shahapur Ras 70/1/1 211.01 2.6000

25 Thane Shahapur Shere 489 109.67 2.3400

26 Thane Shahapur Usroli 61/1, 61/2, 61/3/A,

61/3/k, 61/3/B, 61/5

4.900 1.4232

Thane Shahapur 59/3/A, 59/3/k,

59/3/B, 59/4, 59/6,

59/7, 59/9

5.6200 2.5894

27 Nashik Igatpuri Chinchale

Khair

23 0.8384 0.8320

Nashik Igatpuri 24 20.6136 17.8500

28 Nashik Igatpuri Awal Khed 218 0.4127 0.4253

29 Nashik Igatpuri Talegaon 272 2.1127 0.3240

Nashik Igatpuri 271 0.06145 0.0560

Nashik Igatpuri 273 1.8135 0.1190

Nashik Igatpuri 279 1.1743 0.2163

Nashik Igatpuri 278 1.2339 0.0075

Nashik Igatpuri 269 2.2689 0.3592

Nashik Igatpuri 280 1.1743 0.2893

Total Forest Area =

163.748

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

(Authorized signatory)

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 141

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 142

Certificate No.: - 24

List of tree, species wise/girth wise, with local and scientific name to be given. If felling of trees is essential?

The estimate of tree felling to be enclosed. As per GOI letter no. 7-1/89/(For)/Part-VIII/2012-BHO/848,

dt.18/05/2012.

To be furnished by the D.C.F. as a part of Part II of application.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 143

Certificate No.: - 24

List of tree, species wise/girth wise, with local and scientific name to be given. If felling of trees is essential?

The estimate of tree felling to be enclosed. As per GOI letter no. 7-1/89/(For)/Part-VIII/2012-BHO/848,

dt.18/05/2012.

To be furnished by the D.C.F. as a part of Part II of application.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 144

Section 4

Certificate by Chief Conservator of Forest and their authenticated

documents.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 145

Certificate No.: - 25

Net Present Value Certificate must be counter signed by Chief Conservator of Forest / with eco-class

/category to be shown in the certificate of Forest as as per the GOI letter F.No.5-3/2007/-FC, Dt.05/02/2009

to be enclosed

Certificate that 163.748 Ha of forest land used in Construction of Nagpur-Mumbai Expressway – (Package V)

between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai Division). The proposed forest Range

falls in Mumbai working circle and as the density of ................. It is also certified that the amount of Net

Present Value of forest land calculated and collected for Rs. (In words and figures) ...................... is exactly as

per the rates and calculation provided in the Government Resolution No.FLD- 1002/CR- 199/F-10 dated 19-12-

2003 of Government of Maharashtra. (Enclosed attested copy of challan)

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Chief Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 146

Certificate No.: - 25

Net Present Value Certificate must be counter signed by Chief Conservator of Forest / with eco-class

/category to be shown in the certificate of Forest as as per the GOI letter F.No.5-3/2007/-FC, Dt.05/02/2009

to be enclosed

Certificate that 163.748 Ha of forest land used in Construction of Nagpur-Mumbai Expressway – (Package V)

between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai Division). The proposed forest Range

falls in Mumbai working circle and as the density of ................. It is also certified that the amount of Net

Present Value of forest land calculated and collected for Rs. (In words and figures) ...................... is exactly as

per the rates and calculation provided in the Government Resolution No.FLD- 1002/CR- 199/F-10 dated 19-12-

2003 of Government of Maharashtra. (Enclosed attested copy of challan)

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

Chief Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 147

Section 5

Certificate by Project Agency

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 148

Certificate No.: - 26

Information on the movement of the proposal from one office to other with dates

Not Applicable.

Certificate No.: - 27

Attempts made to find out Non forest land for the proposal/ reasons for its rejection of the same and

minimum demand of forest area.

This Express Way is to be constructed as per specific alignment which has been decided after exploring various

alternatives. Attempt has been made to use minimum forest land for this project. In can be seen that major

part of this Express Way is located on non forest land.

Certificate No.: - 28

Unqualified commitment from the project authority to bear cost of exploitation of felling of trees and their

allied works under project.

Not Applicable as, in absence of any tree growth, no felling of trees will be required

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 149

Certificate No.: - 29

Certificate by Project Authority /User Agency for

Cost of compensatory afforestation, duly countersigned by D.C.F.

Certified that, the project authority is agreed to defray the cost as determined by the Forest

Department for Compensatory Afforestation in lieu of the forest area of 163.748 ha diverted

for proposed construction of Package V of Nagpur Mumbai Expressway project, as per

prevailing wage rate at the time of plantation.

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

Deputy Conservator of Forests.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 150

Certificate No.: - 29

Certificate by Project Authority /User Agency for

Cost of compensatory afforestation, duly countersigned by D.C.F.

Certified that, the project authority is agreed to defray the cost as determined by the Forest

Department for Compensatory Afforestation in lieu of the forest area of 163.748 ha diverted

for proposed construction of Package V of Nagpur Mumbai Expressway project, as per

prevailing wage rate at the time of plantation.

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

Deputy Conservator of Forests.

Nashik Division.

Place Nashik Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 151

Certificate No.: - 30

Certificate by Project Authority /User Agency for

No Violation of FCA-1980/Guidelines under it

This is to certify that provisions of F.C.A., 1980 have not been violated by the User Agency i.e.

Maharashtra State Road Development Corporation as construction (or any other related

activity) of Nagpur-Mumbai Expressway has not been started. We further undertake that no

work will be started on forest land without obtaining diversion of forest land as is being applied

for through this proposal.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 152

Certificate No.: - 31

Certificate by the Project Authority to furnish the Net Present Value as per the ordered by Government of

India.

It is to certify that I/We have applied for diversion of 163.748 ha forest area for the purpose of construction of

Package V of Nagpur-Mumbai Express Way between Igatpuri, Nashik District to Bhiwandi, Thane District (in

Mumbai Division). I/We, hereby, undertake to pay net present value (NPV) of the above forest land. I/We

hereby also undertake to pay the additional amount of NPV, if so determined as per decision of the Honorable

Supreme Court

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 153

Certificate No.: - 32

Certificate of project authority (Providing i.e. water supply facilities to)

Certified that the project Authority agrees to provide water supply from the storage of the project as per

the requirement of the forest Department for compensatory afforestation in lieu of this proposal @

prevailing rate at the time of water supply as fixed by Government.

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 154

Certificate No.: - 33

Certificate by Project Authority /User Agency

To get the Environmental clearance as per the Environmental Act. 2006 (whenever

necessary)

The project will require Environmental Clearance as per EPA 1986. I/We hereby undertake to

obtain Environmental Clearance before commencement of works of this project. As of now the

project has been presented before EAC, New Delhi for issuance of ToR by the MoEFCC, GoI,

New Delhi on June 28, 2016.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 155

Certificate No.: - 34

Certificate of Non Indemnity to forest Department (by Project Authority)

Not Applicable

Certificate No.: - 35

Certificate or NOC from the private owner if the area under private forest act, (Acquisition) Act.1975 to be

enclosed. (By villagers)

Not Applicable

Certificate No.: - 36

Certificate of the Projects Authority to take up catchments area treatment plan as per the guideline of

Government of India

Not Applicable

Certificate No.: - 37

Catchment area treatment plan.

Not applicable-this is a linear project

Certificate No.: - 38

Certificate No Command area development plan.: - 38

Not applicable-this is a linear project

Certificate No.: - 39

Certificate by Project Authority Whether stipulation is made that 5 % of area under command of the project

is made available to the Forest Department for planting trees and other vegetation for which necessary

irrigation should be provided free of cost by the project authority / user agency. If the forest area involved is

less than 2. 00 ha and there is no felling to tree growth; it is to be dealt with as per simplified procedure.

Not applicable-this is a linear project

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 156

Certificate No.: - 40

Project note by the project authority. With salient features

(Also provided in the starting of the proposal for better understanding)

At Present Nagpur is connected with Mumbai through various sections of State Highway which

passes through Wardha – Malegaon – Jalna – Aurangabad – Sinnar – Thane. This route has poor

geometry at many locations and also congested. Besides, this route connectivity through National

Highway also exists but it traverses through considerably longer route. The proposed construction of

Nagpur-Mumbai Expressway will be done through state of art technology with controlled access. It is

aimed to attain a speed of 150 km / hour by vehicles plying on this Express Way. Apart from providing

speed and connectivity, the project will also support the development of Marathwada and Vidarbha

regions. This is Greenfield alignment and will reduce travel time, fuel consumption, vehicle operation

and maintenance cost in comparison to the existing alternatives. It is planned to develop new

industrial/educational/ commercial/tourism nodes in vicinity of expressway at a regular interval of 40-

50 km. The project will, side by side, generate large scale temporary and permanent employment to

the skilled and un-skilled workers, thereby, offering employment opportunity of mainly to local

population

Salient details of Project

1. Name of Project – Construction of Nagpur-Mumbai Express Way – (Package V) between Igatpuri,

Nashik District to Bhiwandi, Thane District (in Mumbai Division.)

2. User Agency - Maharashtra State Road Development Corporation Limited a Maharashtra Government

Undertaking.

3. Forest area for which diversion is sought – 163.748 ha.

4. Cost of project – Rs. 3105 crore.

5. Aerial distance of project area from nearest Protected Areas – Tansa Wildlife Sanctuary: 2.0 km;

Tungareshwar National Park: 5.86 km;

6. About application – It is submitted in the Part I of Form A prescribe under Forest (Conservation) Act,

1980.

7. Main benefits from project – Implementation of entire project will ensure fast and safe road traffic

movement, reducing travel time to half by achieving speed of 150km/hour for motor vehicles. Project

also aims at creation of commercial nodes for multiple development mainly in industrial, commercial,

agricultural, tourism sectors resulting in to employment generation, capacity building as well as

connectivity between industrial places like Butibori, Amravati, Jalna, Chikalthana, Shendra, Waluj,

Sinnar to Mumbai, and tourist and religious places at Karanja, Lonar, Sindkhedraja, Verul, Shirdi.

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 157

Certificate No.: - 40-a,b,c,d,fe,f,g,h,I,j

a) Total catchment area -NA

b) Total command area-NA

c) Full reservoir level-NA

d) High flood level-NA

e) Minimum drawal level-NA

f) Total catchment area of the dam (in Ha) and its breakup forest land, cultivated land, Pasture, Human

cultivation and others. -NA

g) Details as per item (f) above for the area coming under submergence. -NA

h) Total No. of families and population affected, scheduled caste and scheduled tribe families to be

displaced should be separately indicated. -NA

i) Proposal for the rehabilitation of affected persons (Rehabilitation Plan)-NA

j) Comprehensive land use plan for the area required outside the submergence i.e. building roads and

other ancillary facilities outside submergence i.e. building roads and other ancillary facilities. NA

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 158

Certificate No.: - 41-I, ii, iii, iv

It has been observed that water hardly stands the ear around even upto FRL. Trees can definitely stand in

water for one to three months and therefore submergence should be calculated 2 M below FRL for this

following should be given for forest areas involved.

Not Applicable

Certificate No.: - 42

List of trees 2 Meter, 4 Meter below F.R.L. in submergence area species wise

Not Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 159

Certificate No.: - 43

Administrative/Technical approval from the competent authority (Nashik Division) to be enclosed

Not Yet Recieved

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 160

Certificate No.: - 43

Administrative/Technical approval from the competent authority (Thane Division) to be enclosed

Not Yet Recieved

(Authorized signatory)

SEAL

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 161

Certificate No.: - 44

Certificate/ undertaking by the project authority regarding the wind power project as per the GOI letter

Dated 14/05/2004 to be enclosed.

Not Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 162

Section 6

Certificate by Other Department

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 163

Certificate No.: - 45

In case of proposal related to stone quarries, the recommendation of the Director, Geological and Mines is

required

Not Applicable

Certificate No.: - 46

If any Protected/Archeological/Heritage site and other Important Monument is located in the area. The

Certificate by Archeological Department to be enclosed

Not Applicable

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 164

Certificate No.: - 47

Certificate about the distance of Project from Protected area by the Dy.CF Wildlife

Department. Whether the Project area within 10.00 Km. should be clearly shown and

marked.

This is to certify that proposed Package V of Nagpur Mumbai Expressway (Igatpuri, Nashik

District to Bhiwandi, Thane District) of 80.2 kms length is at distance of 2.0 km from Tansa

Wildlife Sanctuary and 5.86 km from Tungareshwar National Park.

(Authorized Signatory)

SEAL

Dated: 04.08.2016

Package V

Place: Thane

Deputy Conservator of Forests Wild Life Department.

Thane Division.

Place Thane Date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 165

Certificate No.: - 48

No Objection Certificate of M.D., F.D.C.M. for involvement of their area.

Certified that area mentioned in the following statement is not under charge of F.D.C.M. Ltd.

and as such we have no objectetion if forest land is diverted for purpose applied for under this

proposal.

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under Acquisition

(Ha)

Status

1 Thane Bhiwandi Borivali Tarf

Sonale

56/19 42.9538 5.0694 Reserved Forest

2 Thane Bhiwandi Usroli 46/60/73 69.857 5.0309 Reserved Forest

3 Thane Bhiwandi Vadape 138 104.4379 10.3654 Reserved Forest

Thane Bhiwandi 68 1.7443 0.1431 To be verified from

Forest Dept

Thane Bhiwandi 67 0.2744 0.0383 To be verified from

Forest Dept

Thane Bhiwandi 132 0.7795 0.2359 Udland Protect Forest

(Maharashtra

Shashan Vane)

Thane Bhiwandi 140 42.4181 1.4448 Reserve Forest

Thane Bhiwandi 121 10.5365 0.0002 To be verified from

Forest Dept

4 Thane Kalyan Danbav 82 0.6157 0.0239 To be verified from

Forest Dept

5 Thane Kalyan Nadgaon 69 61.8075 0.0218 To be verified from

Forest Dept

Thane Kalyan 69 0.0253 To be verified from

Forest Dept

Thane Kalyan 76 1.5071 0.0348 To be verified from

Forest Dept

Thane Kalyan 78 1.9019 0.2802 To be verified from

Forest Dept

Thane Kalyan 77 0.198 0.1104 To be verified from

Forest Dept

6 Thane Kalyan Ushid 31 10.21 0.9240 Forest Khatyakade

7 Thane Kalyan Phalegaon 33 10.3135 0.9493 To be verified from

Forest Dept

Thane Kalyan 30 0.6081 0.3972 To be verified from

Forest Dept

Thane Kalyan 31 0.179 0.0008 To be verified from

Forest Dept

Thane Kalyan 26 2.3764 0.0382 To be verified from

Forest Dept

Thane Kalyan 24 5.353 0.0398 To be verified from

Forest Dept

Thane Kalyan 28 10.3909 0.0866 To be verified from

Forest Dept

Thane Kalyan 28 0.4209 To be verified from

Forest Dept

Thane Kalyan 27 1.0813 0.6861 To be verified from

Forest Dept

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 166

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under Acquisition

(Ha)

Status

Thane Kalyan 153 11.4994 1.9285 To be verified from

Forest Dept

Thane Kalyan 206 10.0424 3.4864 Private Forest

Thane Kalyan 28 10.3909 0.0001 To be verified from

Forest Dept

Thane Kalyan 203 3.1283 0.0996 To be verified from

Forest Dept

Thane Kalyan 207 5.8297 0.8574 Forest Khatyakade

Thane Kalyan 208 4.5573 1.0057 To be verified from

Forest Dept

Thane Kalyan 204 0.3001 0.1564 To be verified from

Forest Dept

Thane Kalyan 205 0.5735 0.5735 To be verified from

Forest Dept

Thane Kalyan 199 2.4695 0.5614 To be verified from

Forest Dept

Thane Kalyan 198 1.9643 0.0462 To be verified from

Forest Dept

8 Thane Shahapur Chande 91 52.0532 1.7371 Rakhiv Van (Tansa

Abhyaran).

9 Thane Shahapur Dalkhan 161 36.66 1.3394 Tansa Abhyaran

10 Thane Shahapur Hiv 188 93.2936 0.9104 Reserve Forest

Thane Shahapur 138 1.77 0.0584 Private Forest

Thane Shahapur 139 2.2346 0.1508 U. Pro. Forest

Thane Shahapur 140 0.2799 0.0030 Private Forest

Thane Shahapur 188 93.2936 0.0258 Reserve Forest

Thane Shahapur 188 1.3921 Reserve Forest

Thane Shahapur 186 0.8771 0.0000 Private Forest

11 Thane Shahapur Kasara Kh. 180 106.9745 19.8711 To be verified from

Forest Dept

Thane Shahapur 5 0.3050 Udland Pro. Forest

Thane Shahapur 159 0.7072 0.7064 To be verified from

Forest Dept

12 Thane Shahapur Khardi 84 10.1894 0.0112 Maharashtra Shashan

Van Vibhag Acquired

Forest

Thane Shahapur 274 2.8559 0.2523 Reserve Forest

(Maharashtra

Shashan)

13 Thane Shahapur Mokhavane 55 107.7578 0.1485 Reserve Forest

Thane Shahapur 40 0.7805 0.1411 Private Forest

Thane Shahapur 55 107.7578 8.6676 Reserve Forest

Thane Shahapur 14 15.8508 0.5582 Private Forest

Thane Shahapur 13 4.5591 0.0781 Private Forest

Thane Shahapur 19 0.3545 0.2219 U. Pro. Forest

Thane Shahapur 21 1.4845 0.1099 Private Forest

Thane Shahapur 20 0.479 0.0945 U. Pro. Forest

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 167

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under Acquisition

(Ha)

Status

Thane Shahapur 124 218.2976 24.4403 Reserve Forest

14 Thane Shahapur Shere 95 32.9595 0.4307 To be verified from

Forest Dept

15 Thane Shahapur Shirol 619/1 237.2432 0.0378 Private Forest

Thane Shahapur 619/1 1.1436 Private Forest

Thane Shahapur 619/1 2.4508 Private Forest

Thane Shahapur 126 1.2615 0.6771 Private Forest

Thane Shahapur 619/39 1.6189 0.0068 Private Forest

Thane Shahapur 619/1 237.2432 1.8217 Private Forest

Thane Shahapur 618/6 71.0593 0.3224 Private Forest

Thane Shahapur 310 3.2419 0.0003 Private Forest

Thane Shahapur 619/17 1.2199 0.4788 Private Forest

Thane Shahapur 67 6.6354 0.0037 Private Forest

Thane Shahapur 618/4 2.6845 0.3527 Private Forest

Thane Shahapur 667 374.1618 5.7331 Private Forest

Thane Shahapur 308 0.5646 0.0880 Private Forest

Thane Shahapur 618/6 71.0593 0.1550 Private Forest

16 Thane Shahapur Vashala Kh 11 5.9528 0.1555 To be verified from

Forest Dept

Thane Shahapur 109 20.6393 0.3792 To be verified from

Forest Dept

Thane Shahapur 114 13.5188 3.1460 To be verified from

Forest Dept

Thane Shahapur 110 0.2979 0.0322 To be verified from

Forest Dept

Thane Shahapur 105 10.0973 2.3067 To be verified from

Forest Dept

Thane Shahapur 111 0.2055 0.0001 To be verified from

Forest Dept

Thane Shahapur 104 0.2198 0.1025 To be verified from

Forest Dept

Thane Shahapur 16 0.4522 0.0848 To be verified from

Forest Dept

Thane Shahapur 112 4.9841 1.1614 To be verified from

Forest Dept

Thane Shahapur 103 12.0353 0.5256 To be verified from

Forest Dept

17 Thane Shahapur Vihigaon 65 377.2221 3.3052 U. Pro. Forest

Thane Shahapur 409 1.9814 0.0175 U. Pro. Forest

Thane Shahapur 468 1.3468 0.0774 U. Pro. Forest

Thane Shahapur 301 64.13 0.0158 U. Pro. Forest

18 Thane Shahapur Ambarje 446 6.6 1.5400 U. Pro. Forest

19 Thane Shahapur Andad 73/1/1 48.946 3.2000 U. Pro. Forest

Thane Shahapur 73/A/1/1 &

72/D

10.02

1.8539

U. Pro. Forest

20 Thane Shahapur Birwadi 88 66.85 2.4300 Maharastra Shashan

Van Vibhag

Sanrakshit van

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 168

Sr.

No.

District Taluka Village Gat No. Total Gat

Area(Ha)

Area (Forest)

Under Acquisition

(Ha)

Status

21 Thane Shahapur Golbhan 56 7.17 1.8511 Rakhiv Van

(Maharashtra

Shashan Van Vibhag)

22 Thane Shahapur Gosai 2 2.28 0.4530

Maharastra Shashan

Van Vibhag

Sanrakshit van

Thane Shahapur 6 3.56 0.4510 Rakhiv Van

(Maharashtra

Shashan Van Vibhag)

23 Thane Shahapur Kasgaon 27 46.31 1.2200 Udland Pro. Forest

24 Thane Shahapur Ras 70/1/1 211.01 2.6000 U. Pro. Forest

25 Thane Shahapur Shere 489 109.67 2.3400 U. Pro. Forest

26 Thane Shahapur Usroli 61/1, 61/2,

61/3/A,

61/3/k,

61/3/B, 61/5

4.900 1.4232 Forest Khatyakade

Thane Shahapur 59/3/A,

59/3/k,

59/3/B,

59/4, 59/6,

59/7, 59/9

5.6200 2.5894 Maharastra Shashan

Van Khate except

59/4 which is in

Private Forest.

27 Nashik Igatpuri Chinchale

Khair

23 0.8384 0.8320 Private Forest

Nashik Igatpuri 24 20.6136 17.8500 Rakhiv Van

(Maharashtra

Shashan Van Vibhag)

28 Nashik Igatpuri Awal Khed 218 0.4127 0.4253 Rakhiv Van

(Maharashtra

Shashan Van Vibhag)

29 Nashik Igatpuri Talegaon 272 2.1127 0.3240 To be verified from

Forest Dept

Nashik Igatpuri 271 0.06145 0.0560 To be verified from

Forest Dept

Nashik Igatpuri 273 1.8135 0.1190 Private Forest

Nashik Igatpuri 279 1.1743 0.2163 Private Forest

Nashik Igatpuri 278 1.2339 0.0075 Private Forest

Nashik Igatpuri 269 2.2689 0.3592 Private Forest

Nashik Igatpuri 280 1.1743 0.2893 Private Forest

Total Forest Area =

163.748

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 169

M. D, F.D.C.M.

Thane Division.

Place Thane date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 170

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

M. D, F.D.C.M.

Nashik Division.

Place Nashik date 04.08.2016

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 171

Certificate No.: - 49

Relevant Notification/7/12 Extract/ restoration order/Rights of record etc. of the proposed forest land to be

enclosed.

To be complied by the Collector, Thane.

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 172

Certificate No.: - 49

Relevant Notification/7/12 Extract/ restoration order/Rights of record etc. of the proposed forest land to be

enclosed.

To be complied by the Collector, Nashik.

(Authorized signatory)

SEAL

Dated: 04.08.2016

Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 173

Certificate No.: - 50

Certificate from the Collector that no alternative suitable non-forest land is available for the

project. (In A Form itself)

This is to certify that Nagpur-Mumbai Expressway-Package-V is to be constructed in accordance

with specific alignment decided after detailed study and exploring various alternatives, therefore,

the project is site specific. Wherever possible non forest land has been used but, in view of above

reason, the patch of Express Way passing through forest cannot be located on non-forest land and,

as such, the proposed diversion of 163.748 ha is required.

It is also Certified that all other alternate for the purpose have been explored and the demand for

the required forest land of Reserved forest for Construction of Nagpur-Mumbai Expressway-

(Package-V) between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai Division) is

the barest minimum demand.

Package V

Countersigned,

Collector

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 174

Certificate No.: - 50

Certificate from the Collector that no alternative suitable non-forest land is available for the

project. (In A Form itself)

This is to certify that Nagpur-Mumbai Expressway-Package-V is to be constructed in accordance

with specific alignment decided after detailed study and exploring various alternatives, therefore,

the project is site specific. Wherever possible non forest land has been used but, in view of above

reason, the patch of Express Way passing through forest cannot be located on non-forest land and,

as such, the proposed diversion of 163.748 ha is required.

It is also Certified that all other alternate for the purpose have been explored and the demand for

the required forest land of Reserved forest for Construction of Nagpur-Mumbai Expressway-

(Package-V) between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai Division) is

the barest minimum demand.

Package V

Countersigned,

Collector

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 175

Certificate No.: - 51

Certificate of Collector under the FRA-2006 with resolution of Gram Sabha/Gram Panchayat as per GOI

letter dated 3/8/2009 to be enclosed.

To be complied by the Collector.

Package V

Countersigned,

Collector

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 176

Certificate No.: - 51

Certificate of Collector under the FRA-2006 with resolution of Gram Sabha/Gram Panchayat as per GOI

letter dated 3/8/2009 to be enclosed.

To be complied by the Collector.

Package V

Countersigned,

Collector

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 177

Certificate No.: - 52

Certificate of Compensatory Afforestation land made available by Collector

Certified that Revenue land at village ........... Tal ..............Dist ............. Gut No/Sur. No .............is available for

handing over 163.748 ha to the forest Department in lieu of forest land required for Construction of Nagpur-

Mumbai Expressway – (Package V) between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai

Division). This land is not proposed for compensatory afforestation previously for any other project.

(It is further certified on behalf of User Agency i.e. Maharashtra State Road Development Corporation that we

will arrange to provide equivelaent suitable non forest land for compensatory afforestation in lie of forest area

proposed to be diverted under this proposal.)

Package V

Countersigned,

Collector

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 178

Certificate No.: - 52

Certificate of Compensatory Afforestation land made available by Collector

Certified that Revenue land at village ........... Tal ..............Dist ............. Gut No/Sur. No .............is available for

handing over 163.748 ha to the forest Department in lieu of forest land required for Construction of Nagpur-

Mumbai Expressway – (Package V) between Igatpuri, Nashik District to Bhiwandi, Thane District (in Mumbai

Division). This land is not proposed for compensatory afforestation previously for any other project.

(It is further certified on behalf of User Agency i.e. Maharashtra State Road Development Corporation that we

will arrange to provide equivelaent suitable non forest land for compensatory afforestation in lie of forest area

proposed to be diverted under this proposal.)

Package V

Countersigned,

Collector

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 179

Certificate No.: - 53

Certificate from Collector / Divisional Commissioner for

Non-availability of Non-forest land for project.

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with

specific alignment decided after detailed study and exploring various alternatives, therefore, the

project is site specific. In view of this no alternative non-forest land is available and can be used

for the purpose.

Package V

Countersigned,

Collector

Thane Division

Divisional Commissioner

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 180

Certificate No.: - 53

Certificate from Collector / Divisional Commissioner for

Non-availability of Non-forest land for project.

This is to certify that Nagpur-Mumbai Expressway is to be constructed in accordance with

specific alignment decided after detailed study and exploring various alternatives, therefore, the

project is site specific. In view of this no alternative non-forest land is available and can be used

for the purpose.

Package V

Countersigned,

Collector

Nashik Division

Divisional Commissioner

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 181

Certificate No.: - 54

The agency has not given alternative land to the forest Department. If non forest land for C.A. scheme

is not available in the entire state, the certificate from the Chief Secretary of the State to be enclosed.

vide GOI letter dt 13/2/12

Not Applicable

Certificate No.: - 55

As the project, area is within the 10.00 km from the boundary of PA area therefore, the information

regarding 16 points check list provided by Principle Chief Conservator of Forest (W.L.) Nagpur which is

enclosed herewith to be furnished.

Not Applicable.

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 182

Certificate No.: - 56

All the certificate and documents must have name of the signatory, designation, station, & date

under the signature as per the GOM letter vide, dtd.01 December 2010.

All the certificated and docuemnts are signed and mentioned the dates and place as per GOM

letter vide, dtd.01 December 2010.

Package V

Countersigned,

Collector

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 183

Certificate No.: - 56

All the certificate and documents must have name of the signatory, designation, station, & date

under the signature as per the GOM letter vide, dtd.01 December 2010.

All the certificated and docuemnts are signed and mentioned the dates and place as per GOM

letter vide, dtd.01 December 2010.

Package V

Countersigned,

Collector

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 184

Certificate No.: - 57

Resolution of the Gram Sabha may not be required in cases of projects like transmission line,

roads, canals, laying of pipeline/optical fibers where linear diversion of forest land in several

villages are involved, unless recognized rights of PTG/ PAC are being affected as per Government

of India F.No.11-9/98-FC(pt.) dated 05/02/2013.

As per above GoI order the resolution of the Gram Sabhas are not required for this project.

Package V

Countersigned,

Collector

Thane Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 185

Certificate No.: - 57

Resolution of the Gram Sabha may not be required in cases of projects like transmission line,

roads, canals, laying of pipeline/optical fibers where linear diversion of forest land in several

villages are involved, unless recognized rights of PTG/ PAC are being affected as per Government

of India F.No.11-9/98-FC(pt.) dated 05/02/2013.

As per above GoI order the resolution of the Gram Sabhas are not required for this project.

Package V

Countersigned,

Collector

Nashik Division

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 186

Certificate No.: - 58

Undertaking Regarding Certificate under FRA, 2006

That I/we, hereby undertake that we will provide FRA,2006 certificate for the FCA case of diversion of 163.748

Ha of forest land for “Nagpur-Mumbai Super Communication Expressway Project, Package-V, under Forest

Division Thane. As and when receive the certificate from District Collector, Thane, same will be submitted to

the forest department.

(Authorized Signatory)

Dated: 04.08.2016 Package V

PROPOSAL FOR DIVERSION OF 163.748 HA FOREST AREA FOR CONSTRUCTION OF PACKAGE V OF NMEW 4-8-2016

MSRDC 187

Certificate No.: - 58

Undertaking Regarding Certificate under FRA, 2006

That I/we, hereby undertake that we will provide FRA,2006 certificate for the FCA case of diversion of 163.748

Ha of forest land for “Nagpur-Mumbai Super Communication Expressway Project, Package-V, under Forest

Nashik. As and when receive the certificate from District Collector, Nashik, same will be submitted to the

forest department.

(Authorized Signatory)

Dated: 04.08.2016 Package V