Disclaimer
This report is with reference to GIZ Contract for Developing Unified Single Window Clearance
Portal for Processing Solar Rooftop PV Applications (USRTPV), Contract No: 83310643, Project:
IGEN-GEC/EE-PVRT.
GIZ has engaged Idam Infrastructure Advisory Pvt. Ltd. (Idam Infra).
This report sets forth our views based on the completeness and accuracy of the facts stated to Idam
Infra and any assumptions that were included. If any of the facts and assumptions is not complete
or accurate, it is imperative that Idam Infra be informed accordingly, as the inaccuracy or
incompleteness thereof could have a material effect on our conclusions.
While performing the work, the genuineness of all signatures and the authenticity of all original
documents is assumed. The correctness or authenticity of the same have not independently been
verified.
While information obtained from the public domain or external sources has not been verified for
authenticity, accuracy or completeness, obtained has been information, as far as possible, from
sources generally considered to be reliable. Idam Infra assumes no responsibility for such
information.
Idam Infra has not performed an audit and do not express an opinion or any other form of
assurance. Further, comments in our report are not intended, nor should they be interpreted to be
legal advice or opinion.
Idam Infra’s views are not binding on any person, entity, authority or Court, and hence, no
assurance is given that a position contrary to the opinions expressed herein will not be asserted by
any person, entity, authority and/or sustained by an appellate authority or a court of law.
In accordance with its policy, Idam Infra advises that neither it nor any partner, director or
employee undertakes any responsibility arising in any way whatsoever, to any person other than
GIZ in respect of the matters dealt with in this report, including any errors or omissions therein,
arising through negligence or otherwise, howsoever caused.
In connection with our report or any part thereof, Idam Infra does not owe duty of care (whether
in contract or in tort or under statute or otherwise) to any person or party to whom the report is
circulated to and Idam Infra shall not be liable to any party who uses or relies on this report. Idam
Infra thus disclaims all responsibility or liability for any costs, damages, losses, liabilities, expenses
incurred by such third party arising out of or in connection with the report or any part thereof.
By reading our report the reader of the report shall be deemed to have accepted the terms mentioned
herein.
Consumer User Manual
for
Solar Rooftop Portal - Uttarakhand
Prepared by
Idam Infrastructure Advisory Pvt. Ltd.
November 2019
TABLE OF CONTENTS
List of Figures and Tables……………………………………………………………………………
List of Acronyms……………………………………………………………………………………….
About the Manual ................................................................................................................................ 1
1 Consumer Registration Process ............................................................................................... 1
1.1 Registration ................................................................................................................................. 1
Registration as Residential Consumer .................................................................................... 2
Registration as Non-Residential Consumers ......................................................................... 3
1.2 Applicant Dashboard ................................................................................................................ 5
1.3 Stages of Application Processing ............................................................................................. 7
1.4 Application Process ................................................................................................................... 8
LIST OF FIGURES
Figure 1: Solar Rooftop Portal – Uttarakhand – Login Page .......................................................... 1
Figure 2: Applicant Category Selection for Registration ................................................................ 2
Figure 3: Registration Form for Residential Consumer .................................................................. 3
Figure 4: Registration Form for Non-Residential Consumers ....................................................... 4
Figure 5: Registration Confirmation .................................................................................................. 5
Figure 6: Registered Applicant’s Homepage ................................................................................... 5
Figure 7: Registered Applicant’s Menu Bar ..................................................................................... 6
Figure 8: Selection of Application Form ........................................................................................... 6
Figure 9: Application Form 1(A) – Part 1 ........................................................................................ 11
Figure 10: Application Form 1(A) – Part 2 ...................................................................................... 12
Figure 11: Application Form 1(A) – Part 4 ...................................................................................... 13
Figure 12: Notification on Saving Form 1(A) ................................................................................. 13
Figure 13: Acknowledgement Receipt ............................................................................................ 14
Figure 14: Downloaded Acknowledgement – Form 1(A) ............................................................ 14
Figure 15: Track Solar Rooftop Application After Submission of Form 1(A)............................ 15
Figure 16: Application Status Update on Applicant’s Dashboard .............................................. 16
Figure 17: Notification for Shortfall ................................................................................................. 16
Figure 18: Track Application Page................................................................................................... 17
Figure 19: Track Solar Rooftop Application ................................................................................... 18
Figure 20: Form 1(A) With Reduced Technically Feasible Plant Capacity ................................ 19
Figure 21: Track Solar Rooftop Application ................................................................................... 19
Figure 22: Form 2(B) – Response of Applicant for Removal ....................................................... 20
Figure 23: Upload Power Purchase Agreement............................................................................. 21
Figure 24: Solar Rooftop Plant Installation ..................................................................................... 22
Figure 25: Submission of Form 4 for Meter Testing ...................................................................... 23
Figure 26: Form 4 – Request for Meter Testing .............................................................................. 25
Figure 27: Submit Work Completion Report ................................................................................. 26
Figure 28: Form 5 – Work Completion Report – Part 1 ................................................................ 29
Figure 29: Form 5 – Work Completion Report – Part 2 ................................................................ 30
Figure 30: Form 5 – Work Completion Report – Part 3 ................................................................ 31
Figure 31: Track Application – Select Time Slot ............................................................................ 32
Figure 32: Select Time Slot for Visit by SDO .................................................................................. 32
Figure 33: Track Application – Submit PCR .................................................................................. 33
Figure 34: PCR – Part 1 ...................................................................................................................... 35
Figure 35: PCR – Part 2 ...................................................................................................................... 36
Figure 36: Dashboard – Subsidy Process Completed ................................................................... 37
Figure 37: Application Form 1(B) – Part 1 ...................................................................................... 39
Figure 38: Application Form 1(B) – Part 2 ..................................................................................... 40
Figure 39: Application Form 1(B) – Part 4 ...................................................................................... 41
Figure 40: Notification on Saving Form 1(B) .................................................................................. 41
Figure 41: Acknowledgement Receipt ............................................................................................ 41
Figure 42: Downloaded Acknowledgement Receipt – Form 1(C) .............................................. 42
Figure 43: Track Solar Rooftop Application After Submission of Form 1(B) ............................ 43
Figure 44: Application Status Update on Applicant’s Dashboard .............................................. 43
Figure 45: Notification for Shortfall ................................................................................................. 44
Figure 46: Track Application Page................................................................................................... 44
Figure 47: Track Solar Rooftop Application ................................................................................... 46
Figure 48: Form 1(A) With Reduced Technically Feasible Plant Capacity ................................ 46
Figure 49: Track Solar Rooftop Application ................................................................................... 47
Figure 50: Form 2(B) – Response of Applicant for Removal of Deficiencies ............................. 48
Figure 51: Solar Rooftop Plant Installation ..................................................................................... 49
Figure 52: Intimation to UPCL for Installation of SPV ................................................................. 49
Figure 53: Submission of Form 4 ...................................................................................................... 50
Figure 54: Form 4 – Request for Meter Testing .............................................................................. 51
Figure 55: Submit Work Completion Report ................................................................................. 52
Figure 56: Form 5 – Work Completion Report – Part A ............................................................... 54
Figure 57: Form 5 – Work Completion Report – Part B ................................................................ 55
Figure 58: Form 5 – Work Completion Report – Part C................................................................ 56
Figure 59: Track Application – Select Time Slot ......................................................................... 57
Figure 60: Select Time Slot for Visit by SDO ................................................................................. 57
Figure 61: Track Application – Submit PCR .................................................................................. 58
Figure 62: PCR – Part 1 ...................................................................................................................... 60
Figure 63: PCR – Part 2 ...................................................................................................................... 61
LIST OF TABLES
Table 1: Process Stage List .................................................................................................................. 7
Table 2: Documents for Upload With Application Form 1(A) ...................................................... 9
Table 3: Document for Upload With Form 5 – Work Completion Report ................................. 27
Table 4: Documents for Submission With PCR ............................................................................. 34
Table 5: Documents for Upload With Application Form 1(B) ..................................................... 37
Table 6: Documents for Upload With Form 5 - Work Completion Report ................................ 53
Table 7: Documents for Submission With PCR ............................................................................. 59
LIST OF ACRONYMS
Acronyms Definition
DPO District Project Officer
EE Executive Engineer
EI Electrical Inspector
GRPV Grid Connected Solar Rooftop Photovoltaic
IFSC Indian Financial System Code
JNNSM Jawaharlal Nehru National Solar Mission
JPG/JPEG Joint Photographic Experts Group
MNRE Ministry of New and Renewable Energy
MW Megawatt
NOC No Objection Certificate
O&M Operations and Maintenance
PCR Project Completion Report
PDF Portable Document Format
PIC Project-Incharge
RWA Residential Welfare Associations
SLD Single Line Diagram
SPIN An Online Application for Solar Photovoltaic Installation
SPV Solar Photovoltaic
UPCL Uttarakhand Power Corporation Limited
UREDA Uttarakhand Renewable Energy Development Agency
Consumer User Manual for Solar Rooftop Portal – Uttarakhand
ABOUT THE MANUAL
The Ministry of New and Renewable Energy (MNRE) has proposed state-wise targets for grid-
connected solar rooftop projects under the Jawaharlal Nehru National Solar Mission
(JNNSM). Uttarakhand has a proposed target of installing 350 megawatt (MW) of grid-
connected solar rooftop projects. To ensure installation in a time-bound manner, transparent
interaction of the Distribution Company (DISCOM) and its Consumers is essential.
To enable rapid deployment of solar rooftop systems in the State of Uttarakhand, a Unified
Single Window Clearance Portal for processing Solar Rooftop Photovoltaic (PV) Application
named ‘Solar Rooftop Portal – Uttarakhand’ is developed under the support of the GIZ for
Grid Connected Solar Rooftop Photovoltaic (GRPV). The Solar Rooftop Portal - Uttarakhand
shall enable Uttarakhand Power Corporation Limited’s (UPCL’s) Consumers to approach
UPCL to interconnect their solar rooftop system with the grid and eligible Consumers shall
avail subsidy.
This portal shall enable the following stakeholders to interact through the portal:
UPCL
Consumers who register as Applicants
The purpose of this Consumer Help Manual is to assist Consumers in using the Solar Rooftop
Portal – Uttarakhand through a step-by-step detailed guide. This manual will guide
Consumers regarding the use of Solar Rooftop Portal - Uttarakhand. The functions and the
processes to be followed are described in detail to aid the user in the use of Solar Rooftop
Portal - Uttarakhand. Once registered, the Consumers may seek the help of system installer
in navigating through the online process of the Solar Rooftop Portal - Uttarakhand.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 1
1 CONSUMER REGISTRATION PROCESS
This section defines the online registration process for the Consumers of Uttarakhand
DISCOM, i.e., UPCL.
1.1 REGISTRATION
Consumers shall mandatorily register themselves on the portal to apply online for grid
connectivity of the solar rooftop system by following the below-mentioned steps.
1. Access the website of ‘Solar Rooftop Portal – Uttarakhand’.
2. Click on the ‘Apply Online’ tab to access the Login page.
3. Click on the ‘New User Registration’ as shown in Figure 1.
Figure 1: Solar Rooftop Portal – Uttarakhand – Login Page
4. A category selection page shall appear mentioning ‘Applicant Category Types’. The
Consumer shall select an appropriate applicant category from the options -
‘Commercial’, ‘Domestic’, Industrial’, Institution’, Government’ and ‘Social Sector’ as
shown in Figure 2.
5. Click on the appropriate ‘Applicant Subcategory’ to enable the checkbox.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 2
Figure 2: Applicant Category Selection for Registration
6. Click on ‘Register Now’ to register in the portal.
The type of registration form required to be filled shall vary for different ‘Applicant
Subcategory’. Below mentioned are two different types of registration forms present for
Residential Consumers and Non-Residential Consumers:
1. Residential Consumers Subcategory: ‘Residential’
2. Non-Residential Consumers Subcategories: ‘Resident Welfare Associations’ (RWA),
‘Commercial’, ‘Institutional’, ‘Social Sector’, ‘Government Buildings’, ‘Government
Institutes’ and ‘Private Sector’.
Registration as Residential Consumer
Click on ‘Register Now’. The page as shown in Figure 3 shall appear.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 3
Figure 3: Registration Form for Residential Consumer
The Consumer shall fill in basic information details and click on ‘Save’ to register themselves
on the portal.
During registration, the Consumer shall provide an Email ID and Password of their choice as
this shall be an authentic Login ID and Password for the Consumer to access Solar Rooftop
Portal - Uttarakhand.
Note: All fields marked with asterisks (*) are mandatory. The Consumers may share their registered
Login ID and Password with the System Installers for performing further process steps.
Registration as Non-Residential Consumers
The RWA, Commercial, Institutional, Social Sector, Government Buildings, Government
Institutes and Private Sector Consumer, who are ‘Non-Residential Consumers’ shall enter
‘Basic Information’ and ‘Contact Person Information’ details as shown in Figure 4.
Click on ‘Save’ to register on the portal.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 4
Figure 4: Registration Form for Non-Residential Consumers
During registration, the Non-Residential Consumer shall enter an Email ID and Password of
their choice as this will be an authentic Login ID and Password to access the Solar Rooftop
Portal – Uttarakhand.
Note: All fields marked with asterisks (*) are mandatory. Consumers may share their registered Login
ID and Password with the System Installers for performing further process steps.
After successful registration, the Applicant shall view the acknowledgement message as
depicted in Figure 5 indicating that the registration has been successfully completed.
A confirmation email shall be sent on the registered email ID. Consumers who register on
Solar Rooftop Portal – Uttarakhand is the registered Applicants.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 5
Figure 5: Registration Confirmation
The registered Applicant can directly login to the portal by clicking on ‘Return to Login’ from
the registration confirmation message page (Figure 5). Alternately, ‘Apply Online’ link on the
website homepage shall provide access to the Login Page.
1.2 APPLICANT DASHBOARD
The Registered Applicant shall log in on the portal using their registered email ID and
Password. Once logged in, the Registered Applicant’s homepage shall appear as illustrated in
Figure 6.
Figure 6: Registered Applicant’s Homepage
Application Status
Apply Immediate Action Points For Stepwise Process Click on Step Number for Action
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 6
To apply, the Applicant shall click on the ‘Application’ menu and select ‘Apply for Solar
Rooftop’ from the sub-menu as shown in Figure 6 and 7 respectively.
Figure 7: Registered Applicant’s Menu Bar
Alternately, click on the ‘Step Number’ displayed at the top of the dashboard to take the next
action. The active step will appear ‘Blue’. The completed steps will appear ‘Green’ and
inactive steps will appear ‘Grey’.
The Dashboard enables tracking of the ‘Status of the Solar Rooftop Application’ through
sequential ‘Stages’. The active ‘Stages’ shall appear ‘Blue’ and completed ‘Stages’ shall appear
‘Green’. If the application is rejected at any Stage or a shortfall is provided, the Stage shall
appear ‘Red’. Refer Figure 6 and Figure 7 to understand changes in the Dashboard on the
progression of stages.
Subsidy is available to Residential and Resident Welfare Association (RWA) consumers only.
Therefore, there are two different forms, i.e., a) Form 1(A) - For Consumers Availing Subsidy
b) Form 1(B) - For Consumers Not Availing Subsidy.
Once the Applicant clicks on ‘Apply Solar Rooftop’ tab, a page will open as shown in
Figure 8. This page will provide two options to the Applicants, i.e., a) Form 1A: Apply With
Subsidy b) Form 1B: Apply Without Subsidy.
Figure 8: Selection of Application Form
The Applicant willing to avail subsidy shall select Form 1A and the Applicant not willing to
avail subsidy shall select Form 1B, accordingly the application form will open for eligible
consumers.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 7
1.3 STAGES OF APPLICATION PROCESSING
The following Officials have access to provide approvals on various process steps elaborated
in Table 1:
Sub-Division Officer (SDO), UPCL
Executive Engineer (EE) (Distribution), UPCL
AE (Meter), UPCL
SDO (Nodal), UPCL
EE (Nodal), UPCL
Finance, UPCL
The list of Stages on the Portal and approvers for each Stage is provided in Table 1. The roles
and description of each UPCL approver at specific Stages are provided in Chapter 2.
Table 1: Process Stage List
Stage
No. Stage Description Approver / Applicant Mandatory
1. Apply for Solar Rooftop Applicant Yes
2. Technical Feasibility Determination
by SDO SDO, UPCL Yes
3.
Technical Feasibility Outcome and
Issuance of In-Principal Sanction
Letter by EE (Distribution)
EE (Distribution), UPCL Yes
4. Technical Feasibility Outcome by EE
(Distribution) EE (Distribution), UPCL Yes
5. Rectify Application Form 1(A)/1(B)
by Applicant Applicant
If there is ‘Shortfall’ in
Application
6.
Submit Form 2(B) - Response
Regarding Technical Constraints by
Applicant
Applicant If there is ‘Shortfall’ in
Application
7. Submission of Power Purchase
Agreement by Applicant Applicant
Only for Subsidy
Availing Applicants
8. Solar Rooftop Plant Installation by
Applicant Applicant Yes
9.
Submit Request for Meter Testing
and Upload Meter Testing Payment
Slip by Applicant
Applicant Yes
10. Meter Testing Report Submitted by
AE (Meter) AE (Meter) Yes
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 8
Stage
No. Stage Description Approver / Applicant Mandatory
11.
Upload Work Completion Report,
Request for Meter Installation and
Joint Inspection
Applicant Yes
12. Allotment of Timeslot for Meter
Installation and Joint Inspection SDO, UPCL Yes
13. Confirm One Time Slot for UPCL
Visit by Applicant Applicant Yes
14.
System Check and Upload
Synchronization Letter After Grid
Synchronization and Joint Inspection
EE (Distribution), UPCL Yes
15. Grid Synchronization Intimation to
DPO (UREDA) for Joint Inspection DPO, UREDA Yes
16. Submission of PCR and Upload of
Documents by Applicant Applicant Yes
17. Review of PCR by SDO (Nodal) SDO (Nodal) Yes
18.
PCR Review and Upload to SPIN
Portal and Subsidy Release
Approval by EE (Nodal)
EE (Nodal) Yes
19. PCR Review and Upload to SPIN
Portal by EE (Nodal) EE (Nodal) Yes
20. Subsidy Disbursement by Finance
UPCL Accounts
Only for Subsidy
Availing Applicants
21. PCR Submission Completed Applicant Only for Subsidy
Availing Applicants
1.4 APPLICATION PROCESS
All applications are first received by the UREDA, the nodal agency.
Subsequently, the interconnection process is handled by UPCL and subsidy disbursement
process is handled by UREDA.
Application for Subsidy Availing Consumers – Form 1(A)
The Application Form 1(A) is developed under the heads of Site Details, Communication
Details, ID Proofs, Consumer Bank Details and Declaration.
The documents to be uploaded with Form 1(A) are provided in Table 2.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 9
Table 2: Documents for Upload With Application Form 1(A)
Sr.
No. Document Name
Maximum
File Size (KB) Format Mandatory
1.
Recent Passport Size Photo of the
Applicant/Office Bearer of
Group/Society
Dimensions: 170 X 130px (4.5 X 3.5 cm)
100 .jpg/.jpeg/.png Yes
2. Signature
Dimension: 150 X 80px (4 X 2 cm) 100 .jpg/.jpeg/.png Yes
3. Latest Electricity Bill 1,024 .pdf Yes
4.
Ownership of Proposed
Building/Premises:
(Third Party – Lease Agreement/ Rent
Agreement/Khasra Khatouni/ Sale
Deed/Others, Owner – Khasra
Khatouni/Sale Deed/Flat/House
Deed)
200 .pdf Yes
5. Relationship of Proof With the Owner
on Notarized Affidavit of INR 10 200 .pdf
If Applicant
Is Not an
Electric
Connection
Holder
6.
ID Proof (PAN Card/Aadhar
Card/Voter ID/Driving License/Voter
ID)
200 .pdf Yes
7. Cancelled Cheque 100 .jpg/.jpeg/.png Yes
8. Demand Draft for Application Fee 1,024 .pdf
Yes, in the
Case of
Offline
Payment
The steps to be followed while filling Form 1(A) are as follows:
1. The Registered Applicant shall enter their ‘Account No.’ as depicted in Figure 9 and
click on the ‘Show’ icon. The ‘Account No.’ entered should be as mentioned in the
electricity bill of the Consumer. Entering the Account No. shall fetch Consumer
specific information from UPCL’s database. This information shall include the
following:
i. Consumer Name
ii. Service Connection (S. C.) Number
iii. Sanctioned Load
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 10
iv. Category
v. Address of the Site of Installation (can be updated if incomplete/incorrect
address appears)
2. Enter details required under section ‘Site Details’ as depicted in Figure 9.
i. Site address (update if incomplete or incorrect address appears)
ii. Select the district of proposed solar rooftop plant’s location
iii. Based on the selected district, the ‘Sub-Division’ list shall be displayed in the
‘Sub-Division Name’ field. Select an appropriate ‘Sub-Division Name’ as
mentioned on the Consumer electricity bill.
iv. Shadow Free Area Available for Installation of Solar Panel (m2)
v. Proposed SPV Plant Capacity (kWp)
vi. Proposed Site Location
vii. Latitude and Longitude
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 11
Figure 9: Application Form 1(A) – Part 1
3. Enter ‘Communication Details’ as depicted in Figure 10. If the Applicant is not an
Electric Connection holder, provide details of the relationship with the electric
connection holder. The Applicant will also submit the following documents:
a. Type of ID proof:
i. PAN Card
Enter Account No. and Click on ‘Show’ to Fetch ‘Consumer Details’ and ‘Site Details’
Details Fetched From UPCL Database as per Account No. Consumer Will Update the
Incomplete/Incorrect Details
Click to View Instructions
Enter the Shadow Free Area, Proposed SPV
Plant Capacity, Proposed Site Location
Tick the Checkbox If the Applicant Is
Applying as Third Party
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 12
ii. Aadhar Card
iii. Voter ID
iv. Passport
v. Driving Licence
b. Aadhar Card Number – Mandatory
c. PAN Card Number - Mandatory
Figure 10: Application Form 1(A) – Part 2
4. The Registered Applicant shall then provide the following details —
i. Check the Declaration “I agree to work with UPCL Empanelled Vendor”
ii. Enter Place.
iii. Click on ‘Choose File’ to upload recent passport size photo, signature, latest
electricity bill, ownership proof and proof of relationship with the owner.
iv. Click on ‘Save’ to save the form and upload the documents. If the document is
uploaded, the icon appears green. If the document is not uploaded, the icon
appears red as shown in Figure 11.
Click on Checkbox If Communication Address Is Same as Site Address View Contact Details Entered
During Registration
Upload ID Proof Provide Details If the
Applicant and Consumer Are Different
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 13
Figure 11: Application Form 1(A) – Part 4
5. On saving Form 1(A), the notification as illustrated in Figure 12 shall appear.
Figure 12: Notification on Saving Form 1(A)
6. Click on ‘Verify/Proceed’ to submit and to initiate the payment process as shown in
Figure 12.
7. On successful submission of the application, an Acknowledgement will be generated.
Click on ‘Download’ to download and save Form 1(C) - ‘Net Metering Application
Acknowledgement’ in PDF as illustrated in Figure 13 and 14 respectively.
Upload Scanned Documents Click on ‘Save’ and Then Click on’ Verify/Proceed’
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 14
Figure 13: Acknowledgement Receipt
Figure 14: Downloaded Acknowledgement – Form 1(A)
8. After submission of Form 1(A), the Registered Applicant can view the details of Form
1(A) by clicking on ‘Apply for Solar Rooftop’ page.
9. The Registered Applicant shall track the progress of the submitted application under
‘Track Solar Rooftop Application’ page.
Actions and Tracking Through ‘Track Solar Rooftop Application’ for Form 1(A) Applicants
After successful submission of Form 1(A), the Registered Applicant shall view and perform
further steps via ‘Track Solar Rooftop Application’ page. The ‘Track Application’ page will
allow the Applicant to access the history and progress of the solar rooftop application at
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 15
various stages. It will also provide access to the Applicant to download/view the approvals
received, documents uploaded by the Applicant, UPCL and UREDA.
To go to ‘Track Solar Rooftop Application’ page for further actions, the following steps shall
be followed:
1. Go to the ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu. The page as illustrated in Figure 15 shall appear.
2. On the ‘Track Application’ page, the Applicant shall view – ‘Stage Description’,
‘Responsibility’, ‘Processed By’, ‘Target Date’, ‘Status’ and ‘Action/View’. Under
‘Status’, the Applicant shall view the response of UPCL. The Applicant shall perform
necessary action by clicking the icon under ‘Action/View’.
Figure 15: Track Solar Rooftop Application After Submission of Form 1(A)
Stage 1: Fill and Submit Application Form 1(A)
1. Figure 15 illustrates that the Application form has been ‘Submitted’ to the SDO, UPCL.
Click the icon under ‘Action/View’ to download the submitted Form 1(A) as PDF and
to view the uploaded Demand Draft.
2. Alternately, the Webform of Form 1(A) can be viewed in ‘Apply for Solar Rooftop’
sub-menu.
3. On submission of Form 1(A), the Applicant’s dashboard is updated as illustrated in
Figure 16.
Click on ‘Application’
and Then ‘Track Solar Rooftop Application’ Click to Download
Form 1(A) as PDF and to View
Uploaded Demand Draft
Click to Download Uploaded
Documents
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 16
Figure 16: Application Status Update on Applicant’s Dashboard
Stage 2: Technical Feasibility Determination by SDO
As illustrated in Figure 16, Technical Feasibility Determination by SDO, UPCL is pending with
UPCL. SDO will have two options – ‘Accept’ and ‘Shortfall’.
1. Accept: If approved, the application will be forwarded to Stage 3, i.e., to Technical
Feasibility Outcome and Issuance of In-Principal Sanction Letter by EE (Distribution).
2. Shortfall: In case of shortfall, the Applicant’s dashboard will show the status of review
by UREDA as shown in Figure 17.
Figure 17: Notification for Shortfall
To remove deficiencies, the Applicant shall perform the following steps:
i. Click on ‘Application’ menu, select ‘Track Solar Rooftop Application’ from the sub-
menu. A page “Track Application” shall appear as shown in Figure 18.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 17
Figure 18: Track Application Page
ii. Click the arrow under ‘Action/View’ against ‘Pending’ status. The Applicant
will be redirected to Form 1(A).
iii. The Applicant shall update Form 1(A) and re-submit the application and the
payment receipt.
iv. Once submitted, the application will be forwarded to SDO, UPCL for technical
feasibility.
Stage 3: Technical Feasibility Outcome and Issuance of In-Principal Sanction Letter by EE
(Distribution)
This Stage will be accessed by EE (Distribution), UPCL. EE (Distribution) will provide a
response and based on the response, Stages 2, 6 or 7 may be triggered. The EE (Distribution)’s
response can be viewed on the Dashboard by the Applicant.
The EE (Distribution) can respond in four ways:
1. Accept: Technically Feasible
The EE (Distribution) will provide a No Objection Certificate (NOC) and In-Principle Sanction
Letter to the Applicant through the portal. The Applicant can access the NOC and In-Principle
Sanction Letter on the ‘Track Application’ Page. This process will move to Stage 7.
2. Shortfall: Technical Constraints
The EE (Distribution) will provide Form 2(A) – Intimation of Technical Constraints, which can
be accessed through the ‘Track Application’ page. The Applicant shall act based on the inputs
received through Form 2(A). The process will move to Stage 6.
3. Reject: Technically Not Feasible
The EE (Distribution) will provide Form 2(C) – Intimation for Non-Feasibility and
Termination of Application, and the application will be terminated. Form 2(C) includes the
reasons and clarifications from UPCL for rejecting the application. The Applicant will receive
a notification on the Dashboard and shall view Form 2(C) on the ‘Track Application’ page.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 18
4. Rectify Form A: Redirect Technical Feasibility Report to SDO
The EE (Distribution) will send Technical Feasibility Report to the SDO. The process will
return to Stage 2.
Stage 4: Technical Feasibility Outcome by EE (Distribution)
This stage is not applicable to the Applicants availing subsidy.
Stage 5: Rectify Application Form 1(A)/1(B) by Applicant
This Stage will be accessed by the Applicant if ‘Shortfall’ or Technical Constraints are
provided by the EE (Distribution).
1. To view the reasons for ‘Shortfall’, check the Dashboard and Form 2(A). Click on
‘Application’ menu, select ‘Track Solar Rooftop Application’ from the sub-menu.
2. Check the ‘Status’ for ‘Technical Feasibility Outcome by EE’, and click on the eye
symbol to see the communication made by the UPCL, via Form 2(A), as shown in
Figure 19.
Figure 19: Track Solar Rooftop Application
Technical Constraints I
In the case of technical constraints, the Applicant shall re-submit Form 1(A), in
line with the reduced capacity mentioned by UPCL in Form 2(A). Click the green
icon under “Action/View” to make the necessary rectifications in Form 1(A) as
depicted in Figure 19.
The ‘Reduced SPV Plant Capacity’ specified by UPCL will be mentioned in Form
1(A) as illustrated in Figure 20.
Click to View Form 2(A) Click to Rectify the
Application
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 19
Click on ‘Submit’ at the end of the form to submit Form 1(A).
Figure 20: Form 1(A) With Reduced Technically Feasible Plant Capacity
Technical Constraints II
In case of Form 2(A), asks for Applicant’s response on waiting for system
enhancement, the Applicant shall resubmit Form 1(A) and provide further inputs
through Form 2(B) in Stage 6.
Stage 6: Submit Form 2(B) - Response Regarding Technical Constraints by Applicant
The Applicant upon resubmission of Form 1(A) through Stage 5, shall submit Form 2(B) -
‘Response of Applicant Regarding Technical Constraints as Intimated After the Technical
Feasibility’ through the following steps:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu. The page as illustrated in Figure 21 shall be displayed.
Figure 21: Track Solar Rooftop Application
Reduced Plant Capacity Mentioned by UPCL
Click to Submit Form 2(B)
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 20
2. Click the arrow icon under ‘Action’ to fill Form 2(B). The page as illustrated in Figure
22 shall appear.
3. The Applicant shall select one of the following three options:
a) Accept to connect with the reduced capacity of the system.
b) Accept to wait for system enhancement.
c) Withdraw application.
4. Click on ‘Convert to PDF’ to convert and save Form 2(B) as PDF file.
5. Click on ‘Choose File’ to browse and upload the saved Form 2(B) PDF file.
6. Click on ‘Verify/Submit’ to submit Form 2(B) PDF file to UPCL.
Figure 22: Form 2(B) – Response of Applicant for Removal
Select in Case the Applicant wishes to
Withdraw the Application
Click on Convert to PDF and Save Form 2(B) as a PDF File.
Verify the Contents of the Downloaded
Form 2(B)
Choose One Action to Continue With the
Application
Upload the Saved PDF Form 2(B)
Click on Submit to Send Form 2(B)
to UPCL
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 21
Stage 7: Submission of Power Purchase Agreement by Applicant
The Consumer and UPCL shall enter into a Power Purchase Agreement. The Consumer and
SDO shall sign the hard copy of Power Purchase Agreement. Subsequently, the Registered
Applicant shall upload the signed Power Purchase Agreement copy (Format 3) in PDF on the
Solar Rooftop Portal - Uttarakhand as per the following steps:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu to view ‘Track Application’ page.
Figure 23: Upload Power Purchase Agreement
2. Click the icon under ‘Action’ as illustrated in Figure 23 to upload the signed Power
Purchase Agreement as per Format 3.
3. ‘Submission of Power Purchase Agreement’ page shall open as depicted in Figure 24.
4. Click on ‘Browse’ to choose the signed .pdf/.jpg/.jpeg/.png file with the maximum
file size of 300 KB, then click on ‘Upload’. In case of any comments, the Applicant can
provide the comment in the Comments section.
5. Click on ‘Verify/Submit’ to submit the uploaded document.
6. Stage 8 and 9 shall start simultaneously.
Click to Submit Power Purchase Agreement
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 22
Figure 24: Submit Power Purchase Agreement
Stage 8: Solar Rooftop Plant Installation by Applicant
The Applicant shall have 180 days to install the plant after the grant of feasibility.
1. Visit the ‘Track Application’ page to indicate completion of the solar rooftop plant
installation.
Figure 24: Solar Rooftop Plant Installation
2. Click the green arrow under ‘Action/View’ as shown in Figure 24 to provide
comments regarding plant installation status in ‘Remarks’ as shown in Figure 25.
Click to Provide Comments on Completion of Plant Installation
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 23
Figure 25: Plant Installation Status
Stage 9: Submit Request for Meter Testing and Upload Meter Testing Payment Slip by Applicant
This Stage can be accessed parallel to Stage 8. In this stage, the Applicant shall request UPCL
for meter testing and pay the necessary fees via offline mode. On completing payment, the
Applicant shall submit Form 4 – Request for Meter Testing online and the payment Challan
details along with the copy of Challan received from UPCL. The steps are as under:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 25.
Figure 25: Submission of Form 4 for Meter Testing
3. Form 4 will open as shown in Figure 26. The Applicant shall fill the following:
a. Meter Procured From
b. Make of Meter
c. Model Number
Click to Submit Form 4
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 24
d. Meter Type
e. Accuracy Class
4. Click on ‘Convert to PDF’ to convert and save Form 4 as PDF file.
5. Enter ‘Challan No.’, ‘Challan Date’ and ‘Meter Testing Charges’.
6. Upload ‘Payment Slip’ and ‘Form 4’ as PDF files with a maximum size of 200 KB each.
7. Click on ‘Verify/Submit’ to submit meter testing request.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 25
Figure 26: Form 4 – Request for Meter Testing
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 26
Stage 10: Meter Testing Report Submitted by AE (Meter)
This Stage will be accessed for AE (Meter) for indicating details of meter testing. Time slot
allotment for meter installation, i.e., Stage 12 will not be activated until AE (Meter) provides
inputs through this stage.
Stage 11: Upload Work Completion Report, Request for Meter Installation and Joint Inspection
The Applicant will update the Work Completion Report after the plant has been installed. The
steps to submit Form 5 - Work Completion Report are as under:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 27.
Figure 27: Submit Work Completion Report
3. Form 5 will be displayed as shown in Figure 28 to 30. The Applicant shall enter details
in the below sections:
A. Details of the Solar PV Module
B. Details of the Inverter
C. Module Mounting Structure
D. Details of the Cables: DC
Click to Submit Work Completion Report
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 27
E. Details of the AC Wiring
F. Details of the DC Distribution Box
G. Details of the AC Distribution Box
H. Details of Earthing
I. Details of Meter Purchased
J. Details of the Caution Signage
K. Provision of Manual and Automatic Switches
L. GPS Coordinates of the RTSPV
M. Whether Operations and Maintenance Manual Provided to the Consumer
N. Capacity of Automatic Relay/Isolation Switch at Interconnection Point With
Grid
O. Installing the Agency Bank Details
P. Document Upload (here documents shall be uploaded as per Table 3).
Table 3: Document for Upload With Form 5 – Work Completion Report
Sr. No. Document Name Maximum
File Size (KB) Format Mandatory
1. Cancelled Cheque of the Vendor 300 (.jpg/.jpeg/.png/.pdf) Yes
2. Estimated Energy Generation
Report (PVsyst/PVSol etc.) 300 (.jpg/.jpeg/.png/.pdf) Yes
3. Test report of Net Meter Tested
at the Laboratory of DISCOM 300 (.jpg/.jpeg/.png/.pdf)
4.
Copy of the IEC/IS Test
Certificates of PV Modules,
Inverter, Cable etc.
300 (.jpg/.jpeg/.png/.pdf)
5. Data Sheets/Drawing for the
Array Mounting System 300 (.jpg/.jpeg/.png/.pdf)
6.
Actual Single line wiring
diagram (SLD) of the SPV
System
300 (.jpg/.jpeg/.png/.pdf) Yes
7.
Copy of Operations and
Maintenance Information
Manual Provided by the System
Installer
300 (.jpg/.jpeg/.png/.pdf)
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 28
4. To upload the documents, click on ‘Choose File’, click on ‘Upload’ icon as shown in
Figure 30. Verify whether the correct document is uploaded by clicking on the icon
under ‘Status’.
5. Click on ‘Save’, then click on ‘Verify/Submit’ to submit the Work Completion
Report.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 29
Figure 28: Form 5 – Work Completion Report – Part 1
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 30
Figure 29: Form 5 – Work Completion Report – Part 2
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 31
Figure 30: Form 5 – Work Completion Report – Part 3
Stage 12: Allotment of Timeslot for Meter Installation and Joint Inspection
The SDO shall grant three time slots to the Applicant for Meter Installation and Joint
Inspection visit.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 32
Stage 13: Confirm One Time Slot for UPCL Visit by Applicant
The Applicant will select one time slot from the three options provided for the visit by SDO.
The steps to select the time slot are as follows:
1. Click on ‘Application’ menu, select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 31.
Figure 31: Track Application – Select Time Slot
3. Click the desired time slot, enter remarks, if any as shown in Figure 32.
4. Click ‘Submit’ to submit the time slot to UREDA.
Figure 32: Select Time Slot for Visit by SDO
Select any One Option
Click to Submit
Click to Select Time Slot
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 33
Stage 14: System Check and Upload Synchronization Letter After Grid Synchronization and Joint Inspection
After selecting the time slot, the SDO, (Distribution) will install the meter, and conduct the
joint inspection. The SDO shall submit the Joint Inspection Report, System Check Report, and
Meter Sealing Certificate to the EE (Distribution). The EE (Distribution) shall generate the
commissioning certificate, i.e., Form 7 - Letter of Synchronisation to the Applicant. If the
system is not installed as per the requirement, EE will communicate ‘Shortfall’, i.e., Form 8 -
Intimation for Removal of Deficiency in the System Installed and the Applicant shall be
redirected to Stage 11 to resubmit Work Completion Report.
The Applicant can download ‘Letter of Synchronization’ from ‘Track Application’ page. At
this stage, the interconnection process is complete, and the Consumer can request UPCL to
release subsidy.
Stage 15: Grid Synchronization Intimation to DPO (UREDA) for Joint Inspection
Once the Applicant selects the time slot at Stage 13, a notification will be sent to the DPO
UREDA. The DPO, UREDA will accompany SDO, UPCL for joint inspection of the plant.
Stage 16: Submission of PCR and Upload of Documents by Applicant
The Applicant should fill the Project Completion Report (PCR) and upload the required
documents. Following are the steps to fill the PCR:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 33.
Figure 33: Track Application – Submit PCR
Click to Provide PCR Details
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 34
3. The Applicant will fill in the PCR and upload necessary documents. The PCR is
represented in Figure 34 and Figure 35 respectively.
a. Module: ‘Solar Technology’, ‘Capacity/ Power’, and ‘No. of Module’
b. Inverters: ‘Inverter Type’, ‘Inverter Make’, ‘Capacity Power’, and ‘No. of
Inverters’
c. Battery Bank: Battery Bank Type, Capacity of Battery Bank, Type of Battery
proposed
d. Metering Arrangement: Details of Metering, Types of Meters, Make of Meter
e. Other Information: ‘Monitoring Mechanism’, ‘No. of Personnel to be Trained
in O&M’, ‘Project Model’, ‘Task & Expected Schedule (in Months)’ and
Installation Date
f. Grid Connectivity Level
g. Costing of Project
h. Means of Finance
i. Document Attachment
The list of attachments required with PCR is shown in Table 4.
Table 4: Documents for Submission With PCR
Sr. No. Document Name Maximum File
Size (KB) Format Mandatory
1. Copy of Invoice Billed 200 .pdf -
2. Statement of Expenditure 1,024 .pdf -
3. Module Capacity/Power (Wp) - 1 1,024 .pdf -
4. Module Capacity/Power (Wp) - 2 1,024 .pdf -
5. Module Capacity/Power (Wp) - 3 1,024 .pdf -
6. Site Photographs (Pre-Installation) 2,048 .jpeg -
7. Site Photographs *(Post-Installation) 2,048 .jpeg Yes
8. Undertaking of Consumer 1,024 .pdf -
9. Additional Document (If any) 1,024 .pdf -
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 36
Figure 35: PCR – Part 2
4. To select documents for upload, click on ‘Choose File’.
5. Click on ‘Save’ to upload the documents and save the Form.
6. Click on ‘Verify/Submit’ to submit the PCR to UREDA.
Stage 17: Review of PCR by SDO (Nodal)
The SDO (Nodal) will review the PCR, documents and the subsidy application.
Stage 18: PCR Review and Upload to SPIN Portal and Subsidy Release Approval by EE (Nodal)
The EE (Nodal), UPCL will consider the application for subsidy release.
Stage 19: PCR Review and Upload to SPIN Portal by EE (Nodal)
The EE (Nodal) will approve the documents to be uploaded with the MNRE’s SPIN portal.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 37
Stage 20: Subsidy Disbursement by Finance, UPCL
The Finance Officials of UPCL will provide inputs regarding Subsidy Release to the
Consumer.
Stage 21: Subsidy Disbursement Process Completed
This Stage will indicate completion of the Subsidy Disbursement Process and the Applicant’s
Dashboard will appear as depicted in Figure 36.
Figure 36: Dashboard – Subsidy Process Completed
Application for Consumers Not Availing Subsidy – Form 1(B)
The Application Form is developed under the heads of Site Details, Communication Details,
ID Proofs, Consumer Bank Details and Declaration. Form 1(B) is developed under the heads
of Site Details, Communication Details, ID Proofs, Consumer Bank Details and Declaration.
The documents required for upload along with Form 1(A) are provided in Table 5.
Table 5: Documents for Upload With Application Form 1(B)
Sr.
No. Document Name
Maximum
File Size (KB) Format Mandatory
1
Recent Passport Size Photo of the
Applicant/Office Bearer of
Group/Society
Dimensions: 170 X 130px
(4.5 X 3.5 cm)
100 .jpg/.jpeg/.png Yes
2 Signature
Dimension: 150 X 80px (4 X 2 cm) 100 .jpg/.jpeg/.png Yes
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 38
Sr.
No. Document Name
Maximum
File Size (KB) Format Mandatory
3 Latest Electricity Bill 1,024 .pdf Yes
4
Ownership of Proposed
Building/Premises:
[Third Party – Lease Agreement/
Rent Agreement/Khasra Khatouni/
Sale Deed/Others, Owner – Khasra
Khatouni/Sale Deed/Flat/House
Deed]
200 .pdf Yes
5
Relationship of Proof With the
Owner on Notarized Affidavit of
INR 10
200 .pdf
If Applicant Is
Not an Electric
Connection
Holder
6
ID Proof (PAN Card/Aadhar
Card/Voter ID/Driving
License/Voter ID)
200 .pdf Yes
7 Cancelled Cheque 100 .jpg/.jpeg/.png Yes
8 Letter From SECI 200 .pdf
The steps to be followed while filling Form 1(B) are as follows:
1. The Registered Applicant shall enter their Account No. as depicted in Figure 37 and
click on ‘Show’ icon. The ‘Account No.’ should be as mentioned in the electricity bill
of the Consumer. Entering the Account No. shall fetch Consumer specific information
from UPCL’s database. This information shall include the following:
i. Consumer Name
ii. Account Number
iii. Sanctioned Load
iv. Category
v. Address of the Site of Installation (can be updated if incomplete/incorrect
address appears)
2. Enter details required under section ‘Site Details’ as depicted in Figure 37.
i. Provide Site Address
ii. Select District of the Proposed Solar Rooftop Plant’s Location
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 39
iii. Based on the selected district, the ‘Sub-Division’ list shall be displayed in the
‘Sub-Division Name’ field. Select an appropriate ‘Sub-Division Name’ as
mentioned on the consumer electricity bill.
iv. Enter ’Shadow Free Area Available for Installation of Solar Panel (m2)’
v. Enter ‘Proposed SPV Plant Capacity (kWp)’
vi. Enter ‘Proposed Site Location’
vii. Enter details of ‘Latitude’ and ‘Longitude’.
Figure 37: Application Form 1(B) – Part 1
3. Enter ‘Communication Details’ as depicted in Figure 37. If the Applicant is not an
Electric Connection holder, provide details of the relationship with the electric
Enter Account No. and Click on ‘Show’ to Fetch ‘Consumer Details’ and
‘Site Details’
Details Fetched From UPCL Database as per Account No. Consumer Will Update the
Incomplete/Incorrect Details
Click to View Instructions
Enter, Proposed SPV Plant Capacity
Tick the Checkbox If Applicant Is
Applying as Third Party
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 40
connection holder. The Registered Applicant should provide the following details as
shown in Figure 38 —
i. ID Proof: Scanned copy of Aadhaar Card/Voter ID Card/PAN Card/Driving
License/Passport.
ii. The Aadhar Card number is mandatory to be provided by all the Consumers.
Figure 38: Application Form 1(B) – Part 2
4. The Registered Applicant shall then provide the following details and save the Form
1(B) —
i. Enter the place and provide recent passport size photo, signature, latest
electricity bill, ownership proof and proof of relationship with the owner.
ii. To select the required documents, click on ‘Choose File’.
iii. Click on ‘Save’ to save the form and upload the documents. If the documents
are uploaded, the icon turns green. If the documents are not uploaded, the icon
appears red as shown in Figure 39.
Click on Checkbox If Communication Address Is Same as Site Address
Contact Details Entered During Registration
Upload ID Proof Provide Details If the
Applicant and Consumer Are Different
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 41
Figure 39: Application Form 1(B) – Part 4
5. On saving Form 1(B), a notification as illustrated in Figure 40 shall appear.
Figure 40: Notification on Saving Form 1(B)
6. On successful submission of application, an ‘Acknowledgement’ shall be generated.
Click on ‘Download’ to save Form 1(C) in PDF as illustrated in Figure 41 and 42
respectively.
Figure 41: Acknowledgement Receipt
Upload the Scanned Documents
Select Save and then Select Verify
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 42
Figure 42: Downloaded Acknowledgement Receipt – Form 1(C)
7. After submission of Form 1(B), the Registered Applicant can view the details of Form
1(B) by clicking on ‘Apply for Solar Rooftop’ page.
8. The Registered Applicant shall track the progress of the submitted application under
‘Track Solar Rooftop Application’ page.
Actions and Tracking Through ‘Track Solar Rooftop Application’ for Form 1(B) Applicants
After successful submission of Form 1(B), the Registered Applicant shall view and perform
further steps via ‘Track Solar Rooftop Application’ page. The ‘Track Application’ page will
allow the Applicant to access the history and view progress of the solar rooftop application at
various stages. It will also provide access for downloading the documents, approvals. etc.
uploaded by the Applicant and UPCL.
To go to ‘Track Solar Rooftop Application’ page, the following steps shall be followed:
1. Go to the ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu. The page as illustrated in Figure 43 shall appear.
2. On the Track Application page, the Applicant can view – ‘Stage Description’,
‘Responsibility’, ‘Processed By’, ‘Target Date’, ‘Status’ and ‘Action/View’. Under
‘Status’ the Applicant can view the response of UREDA and UPCL. The Applicant
shall perform necessary action by clicking the icon provided under ‘Action/View’.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 43
Figure 43: Track Solar Rooftop Application After Submission of Form 1(B)
Stage 1: Fill and Submit Application Form 1(B)
1. Figure 43 illustrates that the Application form has been ‘Submitted’ to UPCL. To
download submitted Form 1(B) as PDF, click the icon under ‘Action/View’.
2. Alternately, the Webform of Form 1(B) can be viewed in ‘Apply for Solar Rooftop’ sub-
menu.
3. On submission of Form 1(B), the Applicant’s dashboard is updated as illustrated in
Figure 44.
Figure 44: Application Status Update on Applicant’s Dashboard
Stage 2: Technical Feasibility Determination by SDO
As illustrated in Figure 44, Form 1(B) is pending for Technical Feasibility with UPCL. UPCL
will have two options – ‘Accept’ and ‘Shortfall’.
Click on ‘Application’
and Then ‘Track Solar Rooftop
Application’ to Open the Page
Click to Download Form 1(B) as PDF
Click to Download Uploaded
Documents
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 44
1. Accept: If the SDO selects ‘Accept’, it will conduct the technical feasibility of the
application and the application will be forwarded to Stage 4, i.e., to UPCL for technical
feasibility.
2. Shortfall: In case SDO selects ’Shortfall’, the Applicant’s dashboard will show the
status of review by UREDA as depicted in Figure 45.
Figure 45: Notification for Shortfall
To remove deficiencies, the Applicant shall perform the following steps:
i. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu to view ‘Track Application’ page shown in Figure 46.
Figure 46: Track Application Page
ii. Click the green arrow in ‘Action/View’, against the ‘Pending’ status. The
Applicant will be redirected to Form 1(B).
iii. The Applicant shall update Form 1(B) and re-submit the application.
iv. Once submitted, the application will be forwarded to UPCL for review.
Stage 3: Technical Feasibility Outcome and Issuance of In-Principal Sanction Letter by
EE (Distribution)
This stage is not applicable to the Applicants not availing subsidy.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 45
Stage 4: Technical Feasibility Outcome by EE (Distribution)
This Stage will be accessed by EE (Distribution). EE (Distribution) will provide a response and
based on the response, Stages 2, 6 or 8 may be triggered. The EE (Distribution)’s response can
be viewed on the Dashboard by the Applicant.
The EE (Distribution), UPCL can respond in four ways:
1. Accept: Technically Feasible
The UPCL will provide a NOC to the Applicant through the portal. The Applicant shall
access the NOC on the ‘Track Application’ Page. The process will move to Stage 8.
2. Shortfall: Technical Constraints
The EE (Distribution) will provide Form 2(A) which can be accessed through the ‘Track
Application’ page. The Applicant shall act based on the inputs received through Form 2(A).
The process will move to Stage 6.
3. Reject: Technically Not Feasible
The EE (Distribution) will provide Form 2(C) and the application will be terminated. The
reasons and clarifications from UPCL for rejecting the application is mentioned in Form 2(C).
The Applicant will receive a notification on the dashboard and will be able to view Form
2(C) on the ‘Track Application’ page.
4. Rectify Form A: Redirect Technical Feasibility Report to SDO
The EE (Distribution) will send Technical Feasibility Report to the SDO. The process will
return to Stage 2.
Stage 5: Rectify Application Form 1(A)/1(B)
This Stage will be accessed by the Applicant if ‘Shortfall’ or Technical Constraints are
provided by the EE (Distribution).
1. To view the reasons for ‘Shortfall’, check the dashboard for notification and Form
2(A). Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from
the sub-menu.
2. Check the ‘Status’ for ‘Technical Feasibility Outcome by EE’, and click on the eye
icon to view the communication made by the UPCL, via Form 2(A) as shown in
Figure 47.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 46
Figure 47: Track Solar Rooftop Application
Technical Constraints I
In the case of technical constraints, the Applicant shall re-submit Form 1(B) in line
with the reduced capacity mentioned by UPCL in Form 2(A). Click the green icon
under “Action/View” to make necessary rectifications in Form 1(A) as depicted in
Figure 47.
The ‘Reduced SPV Plant Capacity’ will be mentioned in Form 1(B) as illustrated in
Figure 48.
Click on ‘Verify/Proceed’ and proceed to resubmit Form 1(B).
Figure 48: Form 1(A) With Reduced Technically Feasible Plant Capacity
Reduced Plant Capacity mentioned by UPCL
Click to View Form 2(A)
Click to Rectify the Application
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 47
Technical Constraints II
In case Form 2(A) asks for Applicant’s response on waiting for system
enhancement, the Applicant shall resubmit Application Form 1(A) and provide
further inputs through Form 2(B) in Stage 6.
Stage 6: Submit Form 2(B) - Response Regarding Technical Constraints by Applicant
The Applicant upon resubmission of Form 1(B), through Stage 5, shall submit Form 2(B)
through the following steps:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the
sub-menu. The page as illustrated in Figure 49 shall be displayed.
Figure 49: Track Solar Rooftop Application
2. Click the green arrow under ‘Action’ to fill Form 2(B) ‘Response Regarding Technical
Constraints as Intimated After the Technical Feasibility’. The page as illustrated in
Figure 50 shall appear.
3. Select one of the following three options:
a. Accept to connect with the reduced capacity of the system.
b. Accept to wait for system enhancement.
c. Withdraw application.
4. Click on ‘Convert to PDF’ to convert and save Form 2(B) as PDF file.
5. Select ‘Choose File’ to browse and upload the saved Form 2(B) PDF file.
6. Click on ‘Verify/Submit’ to submit Form 2(B) to UPCL.
Click to Submit Form 2(B)
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 48
Figure 50: Form 2(B) – Response of Applicant for Removal of Deficiencies
Stage 7: Submission of Power Purchase Agreement by Applicant
This Stage is not applicable to the Applicants not availing subsidy.
Stage 8: Solar Rooftop Plant Installation by Applicant
The Applicant shall have 180 days to install the plant after the grant of feasibility. Indicate
completion of plant installation through the following steps
1. Visit the ‘Track Application’ page and click the green arrow under ‘Action/View’ as
shown in Figure 51.
Select in Case the Applicant Wishes to Withdraw the
Application
Click on Convert to PDF and Save
Form 2(B) as PDF File. Verify the Contents of the Downloaded
Form 2(B)
Choose One Action to Continue With the Application
Upload the Saved Form 2(B) PDF File
Click on Submit to Send Form 2(B) to
UPCL
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 49
Figure 51: Solar Rooftop Plant Installation
2. A comment section as shown in Figure 52 will appear. Provide remarks regarding
plant installation status and click on ‘Save’.
Figure 52: Intimation to UPCL for Installation of SPV
Stage 9: Submit Request for Meter Testing and Upload Meter Testing Payment Slip by Applicant
This Stage can be accessed parallel to Stage 8. Here, the Applicant shall request UPCL for
meter testing and pay the necessary fee via offline mode. After payment, the Applicant shall
submit Form 4 and the payment Challan details online along with a copy of the Challan
received from UPCL. The steps are as under:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 53.
Click to Provide Comments on Completion of Plant Installation
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 50
Figure 53: Submission of Form 4
3. Form 4 will open as shown in Figure 54. The Applicant shall fill the following:
a. Meter Procured From
b. Make of Meter
c. Model Number
d. Meter Type
e. Accuracy class
4. Click on ‘Convert to PDF’ to convert and save Form 4 as PDF file.
5. Enter ‘Challan No.’, ‘Challan Date’ and ‘Meter Testing Charges’.
6. Upload ‘Payment Slip’ and ‘Form 4’ as PDF with a maximum size of 200 KB each.
7. Click on ‘Verify/Submit’ to submit meter testing request.
Click to Submit Form 4
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 51
Figure 54: Form 4 – Request for Meter Testing
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 52
Stage 10: Meter Testing Report Submitted by AE (Meter)
This Stage will be accessed by AE (Meter) to enter the details of meter testing. Time slot
allotment for meter installation, i.e., Stage 12 will not be activated until AE (Meter) provide
inputs through this stage.
Stage 11: Upload Work Completion Report, Request for Meter Installation and Joint Inspection
The Applicant will update the Work Completion Report after the plant has been installed. The
steps to submit Form 5 are as under:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 55.
Figure 55: Submit Work Completion Report
3. Form 5 will open as shown in Figure 56, 57 and 58 respectively. The Applicant shall
enter details in the below sections:
a. Details of the Solar PV Module
b. Details of the Inverter
c. Module Mounting Structure
d. Details of the Cables: DC
e. Details of the AC wiring
f. Details of the DC Distribution Box
g. Details of the AC Distribution Box
Click to Submit Work Completion Report
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 53
h. Details of Earthing
i. Details of Meter Purchased
j. Details of the Caution Signage
k. Provision of Manual and Automatic Switches
l. GPS coordinates of the RTSPV
m. Whether Operations and Maintenance Manual Provided to the Consumer
n. Capacity of Automatic Relay/Isolation Switch at Interconnection Point With
Grid
o. Installing Agency Bank Details
p. Document Upload Section (upload documents as per Table 6)
Table 6: Documents for Upload With Form 5 - Work Completion Report
Sr. No. Document Name Maximum File
Size (KB) Format Mandatory
1. Cancelled Cheque 300 (.jpg/.jpeg/.png/.pdf)
2. Estimated Energy Generation
Report (PVsyst/ PVSol etc.) 300 (.jpg/.jpeg/.png/.pdf) Yes
3.
Test report of Net Meter
Tested at the Laboratory of
DISCOM
300 (.jpg/.jpeg/.png/.pdf)
4.
Copy of the IEC/IS Test
Certificates of PV Modules,
Inverters, Cables etc.
300 (.jpg/.jpeg/.png/.pdf)
5. Data Sheets/Drawing for the
Array Mounting System 300 (.jpg/.jpeg/.png/.pdf)
6.
Actual Single line wiring
diagram (SLD) of the SPV
System
300 (.jpg/.jpeg/.png/.pdf) Yes
7.
Copy of Operations and
Maintenance Information
Manual Provided by the
System Installer
300 (.jpg/.jpeg/.png/.pdf)
4. To upload the documents, click on ‘Choose File’ and click on ‘Upload’ icon as shown
in Figure 58. Verify whether the correct document is uploaded by clicking on the icon
under ‘Status’.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 54
5. Click on ‘Save’, then click on ‘Verify/Submit’ to submit the Work Completion
Report.
Figure 56: Form 5 – Work Completion Report – Part A
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 55
Figure 57: Form 5 – Work Completion Report – Part B
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 56
Figure 58: Form 5 – Work Completion Report – Part C
Stage 12: Allotment of Timeslot for Meter Installation and Joint Inspection
The SDO, UPCL shall grant the Applicant three timeslots for the Joint Inspection Visit.
Stage 13: Confirm One Time Slot for UPCL Visit by Applicant
The Applicant will select a time slot from the three options provided for the visit by the SDO.
The steps to select the time slots are as follows:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 57
2. Click the green arrow under ‘Action/View’ as shown in Figure 59.
3. Select the desired time slot, enter remarks, if any, as shown in Figure 60.
4. Click on ‘Submit’ to submit the time slot to UREDA.
Figure 59: Track Application – Select Time Slot
Figure 60: Select Time Slot for Visit by SDO
Stage 14: System Check and Upload Synchronization Letter After Grid Synchronization and Joint Inspection
After selecting the time slot, the SDO, (Distribution) will install the meter and conduct the
joint inspection. The SDO shall submit the Joint Inspection Report, System Check Report and
Meter Sealing Certificate to the EE (Distribution). The EE (Distribution) shall generate the
commissioning certificate, i.e., Form 7 - Letter of Synchronisation to the Applicant. If the
system is not installed as per the requirement, the EE will communicate ‘Shortfall’, i.e., Form
Click to Select Time Slot
Select any One Option
Click to Submit
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 58
8 - Intimation for Removal of Deficiency in the System Installed and the Applicant shall be
redirected to Stage 11 to resubmit Work Completion Report.
The Applicant can download ‘Letter of Synchronization’ from ‘Track Application’ page. At
this stage, the interconnection process is complete, and the Consumer can request UPCL to
release subsidy.
Stage 15: Grid Synchronization Intimation to DPO (UREDA) for Joint Inspection
Once the Applicant selects the time slot at Stage 13, a notification will be sent to the DPO
UREDA. The DPO, UREDA will accompany SDO, UPCL for joint inspection of the plant.
Stage 16: Submission of PCR and Upload of Documents by Applicant
The Applicant should fill the Project Completion Report (PCR) and upload the required
documents. Following are the steps to fill the PCR:
1. Click on ‘Application’ menu and select ‘Track Solar Rooftop Application’ from the sub-
menu.
2. Click the green arrow under ‘Action/View’ as shown in Figure 61.
Figure 61: Track Application – Submit PCR
3. The Applicant will fill in the PCR and upload necessary documents. The PCR is
represented in Figure 62 and Figure 63 respectively.
a. Module: ‘Solar Technology’, ‘Capacity/ Power’ and ‘No. of Module’
b. Inverters: ‘Inverter Type’, ‘Inverter Make’, ‘Capacity Power’, and ‘No. of
Inverters’
Click to Provide PCR Details
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 59
c. Battery Bank: Battery Bank Type, Capacity of Battery Bank, Type of Battery
proposed
d. Metering Arrangement: Details of Metering, Types of Meters, Make of Meter
e. Other Information: ‘Monitoring Mechanism’, ‘No. of Personnel to be Trained
in O&M’, ‘Project Model’, ‘Task & Expected Schedule (in Months)’ and
Installation Date
f. Grid Connectivity Level
g. Costing of Project
h. Means of Finance
i. Document Attachment
The list of attachments required with PCR is shown in Table 7.
Table 7: Documents for Submission With PCR
Sr.
No. Document Name Maximum File Size (KB) Format Mandatory
1. Copy of Invoice Billed 200 .pdf
2. Statement of Expenditure 1,024 .pdf
3. Module Capacity/Power (Wp) - 1 1,024 .pdf
4. Module Capacity/Power (Wp) - 2 1,024 .pdf
5. Module Capacity/Power (Wp) - 3 1,024 .pdf
6. Site Photographs (Pre-Installation) 2,048 .jpeg
7. Site Photographs *(Post-Installation) 2,048 .jpeg Yes
8. Undertaking of Consumer 1,024 .pdf
9. Additional Document (If any) 1,024 .pdf
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 61
Figure 63: PCR – Part 2
4. To select documents for upload, click on ‘Choose File’.
5. Click on ‘Save’ to upload the documents and save the Form.
6. Click on ‘Verify/Submit’ to submit the PCR to UREDA.
Stage 17: Review of PCR by SDO (Nodal)
The SDO (Nodal) will review the PCR, documents and the subsidy application.
Stage 18: PCR Review and Upload to SPIN Portal and Subsidy Release Approval by EE (Nodal)
The EE (Nodal), UPCL will approve the PCR. The PCR will be integrated with MNRE.
Stage 19: PCR Review and Upload to SPIN Portal by EE (Nodal)
The EE (Nodal) will approve the documents to be uploaded on the MNRE’s SPIN portal.
Consumer User Manual for Solar Rooftop Portal – Uttarakhand Page 62
Thus, the Interconnection Process will be complete.
Stage 20: Subsidy Disbursement by Finance, UPCL
This stage is not applicable to the Applicants not availing subsidy.
Stage 21: Subsidy Disbursement Process Completed