14
© Charge Bliss 2014 Charge Bliss Smart Panel™ Cloud Services Virtual Energy NOC Multi-Site Dashboard Summary - By Site Location 72-Hour Real-time View 1

Charge Bliss Cloud Services v2.0

Embed Size (px)

Citation preview

© Charge Bliss 2014

Charge Bliss Smart Panel™ Cloud ServicesVirtual Energy NOC

Multi-Site Dashboard Summary - By Site Location72-Hour Real-time View

1

© Charge Bliss 2014

Charge Bliss Cloud ServicesLocation Dashboard – Energy & Thermal Summary

72-Hour Real-time View

2

© Charge Bliss 2014

Charge Bliss Cloud ServicesLocation Dashboard – Energy Summary

By Electrical Distribution Panel72-Hour Real-time View

3

© Charge Bliss 2014

Charge Bliss Cloud ServicesLocation Dashboard – Thermal Summary

By Electrical Distribution Panel72-Hour Real-time View

4

© Charge Bliss 2014

Charge Bliss Cloud ServicesAdvance Analysis Energy Costing

By Multi-Site, Site Location, Dist Panel, Device

5

© Charge Bliss 2014

Charge Bliss Cloud ServicesDevice Dashboard – Warehouse Lighting Panel

Real-Time Minute Updates – Individual Circuit Monitoring Capable

6

© Charge Bliss 2014

Charge Bliss Cloud ServicesDevice Dashboard – HVAC

Real-Time Monitoring of Energy, Temperature, Demand Shift Status

7

© Charge Bliss 2014

Charge Bliss Cloud ServicesBefore & After Demand Control Enabled

Autonomous DR at Site and PanelResponds to OpenADR 2.0a Signaling

(OpenADR 2.0b Upgrade Capable)

Demand Control Disabled(15-Minute Peak Demand)

8

Demand Control Enabled(15-Minute Peak Demand)

Demand Limit of 60, 45, 50, 52, 15 Tested and Verified

Demand Peaks in Excess of 60 Occurs Most Weekdays

© Charge Bliss 2014

Charge Bliss Cloud ServicesBefore & After Demand Control Enabled

Demand Control Disabled(15-Minute Peak Demand)

9

Demand Control Enabled(15-Minute Peak Demand)

© Charge Bliss 2014

Charge Bliss Cloud ServicesAdvance Analysis View

15-Minute Demand and Load Shift Events

10

Demand Limit of 50Maintained

Lower PriorityHVAC Load Shift while

maintaining temperature

Higher PriorityHVAC Load Shift while

maintaining Temperature

Note: Temperature is Set-Back During Non-Office

Hours

© Charge Bliss 2014

Charge Bliss Cloud Services15-Minute Demand & Load Shift Events

Expanded View Showing Temperature Maintained

11

Demand Limit of 45kW Maintained

+/-1F Temperature Being Maintained During Load

Shift Events

Note: Temperature is Set-Back During Non-Office

Hours

© Charge Bliss 2014

Charge Bliss Cloud ServicesParametric Monitoring of Loads and HVACs

Notification of Out-Of-Bound Load Conditions Helps Prevent Wasted Energy

12

Malfunctioning HVAC Shows >50% Duty Cycle

7/3-7/10.

HVAC Serviced 7/11 Resulting in Correct

20% Duty Cycle

Malfunctioning HVAC Didn’t Maintain Set

Temperature of 76F 7/3-7/10.

HVAC Serviced 7/11 Resulting in CorrectTemperature Profile

© Charge Bliss 2014

Charge Bliss Cloud ServicesParametric Monitoring of Mains

Notification of Out-Of-Bounds Conditions* Automatic Brownout Load Reduction Feature is Planned for Future Upgrade

13

Mains Voltage

Mains Energy

© Charge Bliss 2014

Charge Bliss Smart Panel™ Generation (Solar, Wind, Other) is Fully IntegratedWith Net Metering and Dynamic Demand Limiting

14