eu:a eppstein uhen architects 1
Quality Control Review
p r e s e n t a t i o n
eu:a eppstein uhen architects 2
Identify potential…. Errors & Omissions (E & O) Request for Interpretations (RFI’s) Constructability & Liability Issues
Quality of Deliverables Compliance to EUA Standards Misdirected focus : Not enough vs. too much info
See how EUA project teams work PM’s : project scheduling Tech Staff : interactions w/design team Team : meeting deadlines + communication
Expectations : not perfect, all projects will have E&O’s
WHY … QC Review Projects?
eu:a eppstein uhen architects 3
HOW … QC Review Projects? Review through the eyes of others
: Contractor + Subcontractors Owner + Stakeholders (Users) Consultants Bldg Code Officials
Limitations of QC Review QC Reviewer is unaware of :
Client Expectations Project Budget & Design Schedule Specific Codes & Zoning
eu:a eppstein uhen architects 4
WHEN? . . . Design Stages SD : Schematic Design : conceptual design
Project Planning : Schedule : Milestone Deadlines (SD, DD, & CD) Project Team : EUA Team + Design Team
Project Scope : Area + Height + Site + Orientation EUA Standards : Sheet Numbering Liability Issues : Bldg Type + Site Issues
DD : Design Development : refinement of the design Systems & Components : Preliminary Project Description (PPD) Phasing Strategies : Multiple Bid Packages? Technical Issues : Adjacent to Train Tracks? Acoustical
Engineer? CD : Construction Documents : detail project
requirements Consultant Coordination + Detailing
eu:a eppstein uhen architects 5
HOW MUCH? … Time & CostQC Review : 30 minutes/Sheet Rules of Thumb $50/Sheet
SD-Schematic Design : 16 sheets : 8 hrs DD-Design Development : 24 sheets : 12 hrsCD-Construction Documents :40 sheets : 20
hrsTOTAL : 80 sheets = 40 hrs
40 hrs x $100/hr = $4000
eu:a eppstein uhen architects 6
QC Issues : Scheduling PM's don't always know milestone dates
How can support staff work toward unknown due dates?
Set a date for review sets to be final Don't send “what you have” Determine due date of all deliverables
(consultants) Plan schedule “backwards”
Determine deliverable due date = D Subtract Distribute Time (Dx) = D-Dx Subtract Revise Time (Dy) = D-Dy Subtract Review Time (Dz) = D-Dx-Dy-Dz
eu:a eppstein uhen architects 7
QC Issues : Scheduling
eu:a eppstein uhen architects 8
QC Review : Standard Tools Redline Color
Codes Required Suggested Coordination
General Comments Kudos…. Critique…
eu:a eppstein uhen architects 9
QC Issues : General Standards : Legends & Symbols L:\Design Applications\Revit\Imperial Library\Annotation\Legends and Diagrams
Legends and Diagrams.rvt Symbol Legend.rfa Abbreviation Legend.rfa
eu:a eppstein uhen architects 10
QC Issues : GeneralTags & Schedules
vs.“Dumb” text
Keynotesvs.
“Dumb” text
eu:a eppstein uhen architects 11
QC Issues : General Q : Since we aren’t sued because of
standards, why focus on their noncompliance?
A : The time EUA staff takes to create project or studio specific standards is time not spent on litigious issues (E&O’s, detailing, etc.)
eu:a eppstein uhen architects 12
QC Issues : General Graphics
Sheet layout Start on right Work to left
Note BlockVertical or Horizontal
All sheets : same date & deliverable description
eu:a eppstein uhen architects 13
QC Issues : Annotation Say it ONCE …
Use references notes (keynotes, general discipline notes and/or sheet notes) vs. “dumb text”
Don't repeat or redraw other disciplines' info
Don’t repeat specification info
eu:a eppstein uhen architects 14
QC Issues : Annotation Dimensioning
NCS : "The purpose of dimensioning is to locate each element of the construction. Each wall or part of a detail must be tied to a fixed point such as a column centerline or an existing or bearing wall.“
1.Dim to gridlines as much as possible2.Dim to identify design intent 3.Dim using Dot vs. tick
4.Don't close dimensions5.Don't dim the tagged & scheduled
components
Do’s
Don’tDo’s
eu:a eppstein uhen architects 15
QC Issues : Annotation Tags & Schedules
Room Name/Number Don’t include areas (w/o a disclaimer)
Door/Frames + Borrowed Lights Openings
Exterior Windows Storefronts + Curtainwalls
Equipment + Specialties Furniture Casework Wall Types
eu:a eppstein uhen architects 16
QC Issues : Annotation Callouts
Sections : Bldg vs. Wall
Enlarged plans + elev Miscellaneous
North Arrow Grids (A,B,C…1,2,3…) Diagrams :
Mounting hgts ADA Shelving quantities
eu:a eppstein uhen architects 17
QC Issues : Constructability Consider the sequencing of
construction Once the foundation, walls and slabs
(w/opngs) have been set, the locations & dims of the "arch" components are determinate on this "in-place" structure
Use gridlines as common project benchmark(s)
Design Intent : Implied vs. Implicit Don’t indicate Means & Methods (GC’s
role)
eu:a eppstein uhen architects 18
G000 : Index Updated legends
Abbreviations + symbol legend
Arch and Consultant sheet series correspond
Set Title : Don’t include
percentages (%) “100% CD’s” : no
such thing Progress stamp Signature stamp
eu:a eppstein uhen architects 19
G100 : Life Safety Plans Use standard LS legend & notes
eu:a eppstein uhen architects 20
A000 : General Architecture Info
A000 Bldg Systems Use of Uniformat keynoting for
systems B2010-A Wall System
vs. WS-# or EWS-# or W-#
General Notes : Don’t repeat spec language
A010 Wall Types General Sheet Notes + Wall Details
eu:a eppstein uhen architects 21
A100's : Floor Plans Duplication of
structural info Concrete walls
Too many tags vs. Typical Note …all walls are
A3S unless noted…
(Structural) (Architectural)
eu:a eppstein uhen architects 22
A100's : Roof Plans Minimum 4” diameter
RD’s per roof area : (2) Maximum RD spacing
: 60’ Maximum area served
per RD : 2400 sf Emergency drainage :
drains vs. scuppers
eu:a eppstein uhen architects 23
A110 : Ceiling Plans Coordination of
MEP Linked
backgrounds? Standard symbol
legend Lighting &
Devices Ceiling tags
eu:a eppstein uhen architects 24
A120 : Finish Plans Standard abbreviations Standard room finish tag
Show design intent
eu:a eppstein uhen architects 25
A200 : Exterior ElevationsMaterial Legends
+ Bldg Systems
Material key (fill) vs. Keynoting
eu:a eppstein uhen architects 26
A200 : Exterior Elevations Show :
Level lines Sections Callouts Gridlines
Const joints layout Masonry EIFS
eu:a eppstein uhen architects 27
A220 : Window Types Identify common/shared base &
head heights
eu:a eppstein uhen architects 28
A230 : Interior Elevations Mounting hgts : accessories
eu:a eppstein uhen architects 29
A300 : Building Sections Can (2) wall section(s) provide the
same info?(2) Wall Sections
Bldg Sections
eu:a eppstein uhen architects 30
A310 : Wall Sections Don’t dim scheduled items:
Windows Doors Ceiling Hgts Struct Members
Don’t repeat info: Roof slope
eu:a eppstein uhen architects 31
A320 : Stair Section & Plans Section
Landing to Landing (#) of equal risers
Don’t repeat plan dims
Plans : Identify important dims:
Clear between stringers Clear between handrails # of equal treads Landing size Handrail + Guardrails
Extensions
eu:a eppstein uhen architects 32
A320 : Elev Section & Plans Section
Pit Depth ? (4’-0”) Pit ladder - keynote
Total Travel Distance ? Add all flr-to-flr hgts
Minimum Overhead ? Hoist Beam ?
To underside of beam?
Plans : Don’t repeating shaft dims
eu:a eppstein uhen architects 33
A460 : Unit Plans Layouts duplicated on overall plans (A100)
A100’s : Demising and "common“ walls A460’s : Interior unit info (walls, doors, elevations,
etc) If (when) a change occurs in a single unit, team will
have to re-issue multiple drawings on multiple sheets.
eu:a eppstein uhen architects 34
A500's : Details Create typical details : Quantity vs. Quality Strategy for developing details
1. Identify the typical head, sill and jamb details of the exterior materials. Develop these at a larger scale (1" or 3/4").
2. Reference the model into these detail views and lock detail components to certain model content: Face of wall + gridlines, levels, etc.
3. Refer to Industry Standards: Brick industry : http://www.bia.org/html/frmset_thnt.htm Masonry advisory council :
http://www.maconline.org/index.html EIFS industry members association :
http://eima.com/pdfs/eima%20cguide%20final.pdf Roofing : http://www.carlisle-syntec.com/index.cfm?act=details
4. Think about constructability and sequencing issues.5. Use keynotes instead of “dumb text”6. Don't identify specific sizes of other disciplines info (e.g. stl
lintels ; should be identified on structural, not arch)
eu:a eppstein uhen architects 35
A600 : Door & Frame Schedule Don’t dim scheduled door
sizes Use standard door/frame
names Identify glazing types (GL-#)
A630 : Room Finish Schedule Standard material abbreviations
eu:a eppstein uhen architects 36
QC Support : Current Checklists
Studio-specific I:\Forms
Light table reviews Revit
Interference check Navisworks
Collision detection Newforma
Compare (PDF’s & DWF’s & DWG’s)
eu:a eppstein uhen architects 37
QC Support : Future… QC Page on EUA.net Graphic Examples
By sheet By building type
Professional Development Programs Focused training
Dimensioning Imperial Library +
WIP Your Ideas ? ? ?
eu:a eppstein uhen architects 38
ConclusionQuestions???
Comments???
Concerns???
Suggestions???
eu:a eppstein uhen architects 39
QC Issues : Constructability Sequencing…
eu:a eppstein uhen architects 40
QC Issues : General Content
Varies across projects/studios Revit Projects : over-modeling
Floor Plan : 1/8”
Enlarged Plan : 1/2”
Section : 1”
Elevation 1/16”
eu:a eppstein uhen architects 41
Glazing Types (GL-#) : G100-Index (by keynote) A200-Elevations (individual frames
keynoted) A240-Frame Elevations (glazing legend) A600-Schedules (door and frame schedule) Specifications
QC Issues : Annotation