41
eu:a eppstein uhen architects 1 Quality Control Review p r e s e n t a t i o n

QC Review Process

Embed Size (px)

Citation preview

Page 1: QC Review Process

eu:a eppstein uhen architects 1

Quality Control Review

p r e s e n t a t i o n

Page 2: QC Review Process

eu:a eppstein uhen architects 2

Identify potential…. Errors & Omissions (E & O) Request for Interpretations (RFI’s) Constructability & Liability Issues

Quality of Deliverables Compliance to EUA Standards Misdirected focus : Not enough vs. too much info

See how EUA project teams work PM’s : project scheduling Tech Staff : interactions w/design team Team : meeting deadlines + communication

Expectations : not perfect, all projects will have E&O’s

WHY … QC Review Projects?

Page 3: QC Review Process

eu:a eppstein uhen architects 3

HOW … QC Review Projects? Review through the eyes of others

: Contractor + Subcontractors Owner + Stakeholders (Users) Consultants Bldg Code Officials

Limitations of QC Review QC Reviewer is unaware of :

Client Expectations Project Budget & Design Schedule Specific Codes & Zoning

Page 4: QC Review Process

eu:a eppstein uhen architects 4

WHEN? . . . Design Stages SD : Schematic Design : conceptual design

Project Planning : Schedule : Milestone Deadlines (SD, DD, & CD) Project Team : EUA Team + Design Team

Project Scope : Area + Height + Site + Orientation EUA Standards : Sheet Numbering Liability Issues : Bldg Type + Site Issues

DD : Design Development : refinement of the design Systems & Components : Preliminary Project Description (PPD) Phasing Strategies : Multiple Bid Packages? Technical Issues : Adjacent to Train Tracks? Acoustical

Engineer? CD : Construction Documents : detail project

requirements Consultant Coordination + Detailing

Page 5: QC Review Process

eu:a eppstein uhen architects 5

HOW MUCH? … Time & CostQC Review : 30 minutes/Sheet Rules of Thumb $50/Sheet

SD-Schematic Design : 16 sheets : 8 hrs DD-Design Development : 24 sheets : 12 hrsCD-Construction Documents :40 sheets : 20

hrsTOTAL : 80 sheets = 40 hrs

40 hrs x $100/hr = $4000

Page 6: QC Review Process

eu:a eppstein uhen architects 6

QC Issues : Scheduling PM's don't always know milestone dates

How can support staff work toward unknown due dates?

Set a date for review sets to be final Don't send “what you have” Determine due date of all deliverables

(consultants) Plan schedule “backwards”

Determine deliverable due date = D Subtract Distribute Time (Dx) = D-Dx Subtract Revise Time (Dy) = D-Dy Subtract Review Time (Dz) = D-Dx-Dy-Dz

Page 7: QC Review Process

eu:a eppstein uhen architects 7

QC Issues : Scheduling

Page 8: QC Review Process

eu:a eppstein uhen architects 8

QC Review : Standard Tools Redline Color

Codes Required Suggested Coordination

General Comments Kudos…. Critique…

Page 9: QC Review Process

eu:a eppstein uhen architects 9

QC Issues : General Standards : Legends & Symbols L:\Design Applications\Revit\Imperial Library\Annotation\Legends and Diagrams

Legends and Diagrams.rvt Symbol Legend.rfa Abbreviation Legend.rfa

Page 10: QC Review Process

eu:a eppstein uhen architects 10

QC Issues : GeneralTags & Schedules

vs.“Dumb” text

Keynotesvs.

“Dumb” text

Page 11: QC Review Process

eu:a eppstein uhen architects 11

QC Issues : General Q : Since we aren’t sued because of

standards, why focus on their noncompliance?

A : The time EUA staff takes to create project or studio specific standards is time not spent on litigious issues (E&O’s, detailing, etc.)

Page 12: QC Review Process

eu:a eppstein uhen architects 12

QC Issues : General Graphics

Sheet layout Start on right Work to left

Note BlockVertical or Horizontal

All sheets : same date & deliverable description

Page 13: QC Review Process

eu:a eppstein uhen architects 13

QC Issues : Annotation Say it ONCE …

Use references notes (keynotes, general discipline notes and/or sheet notes) vs. “dumb text”

Don't repeat or redraw other disciplines' info

Don’t repeat specification info

Page 14: QC Review Process

eu:a eppstein uhen architects 14

QC Issues : Annotation Dimensioning

NCS : "The purpose of dimensioning is to locate each element of the construction. Each wall or part of a detail must be tied to a fixed point such as a column centerline or an existing or bearing wall.“

1.Dim to gridlines as much as possible2.Dim to identify design intent 3.Dim using Dot vs. tick

4.Don't close dimensions5.Don't dim the tagged & scheduled

components

Do’s

Don’tDo’s

Page 15: QC Review Process

eu:a eppstein uhen architects 15

QC Issues : Annotation Tags & Schedules

Room Name/Number Don’t include areas (w/o a disclaimer)

Door/Frames + Borrowed Lights Openings

Exterior Windows Storefronts + Curtainwalls

Equipment + Specialties Furniture Casework Wall Types

Page 16: QC Review Process

eu:a eppstein uhen architects 16

QC Issues : Annotation Callouts

Sections : Bldg vs. Wall

Enlarged plans + elev Miscellaneous

North Arrow Grids (A,B,C…1,2,3…) Diagrams :

Mounting hgts ADA Shelving quantities

Page 17: QC Review Process

eu:a eppstein uhen architects 17

QC Issues : Constructability Consider the sequencing of

construction Once the foundation, walls and slabs

(w/opngs) have been set, the locations & dims of the "arch" components are determinate on this "in-place" structure

Use gridlines as common project benchmark(s)

Design Intent : Implied vs. Implicit Don’t indicate Means & Methods (GC’s

role)

Page 18: QC Review Process

eu:a eppstein uhen architects 18

G000 : Index Updated legends

Abbreviations + symbol legend

Arch and Consultant sheet series correspond

Set Title : Don’t include

percentages (%) “100% CD’s” : no

such thing Progress stamp Signature stamp

Page 19: QC Review Process

eu:a eppstein uhen architects 19

G100 : Life Safety Plans Use standard LS legend & notes

Page 20: QC Review Process

eu:a eppstein uhen architects 20

A000 : General Architecture Info

A000 Bldg Systems Use of Uniformat keynoting for

systems B2010-A Wall System

vs. WS-# or EWS-# or W-#

General Notes : Don’t repeat spec language

A010 Wall Types General Sheet Notes + Wall Details

Page 21: QC Review Process

eu:a eppstein uhen architects 21

A100's : Floor Plans Duplication of

structural info Concrete walls

Too many tags vs. Typical Note …all walls are

A3S unless noted…

(Structural) (Architectural)

Page 22: QC Review Process

eu:a eppstein uhen architects 22

A100's : Roof Plans Minimum 4” diameter

RD’s per roof area : (2) Maximum RD spacing

: 60’ Maximum area served

per RD : 2400 sf Emergency drainage :

drains vs. scuppers

Page 23: QC Review Process

eu:a eppstein uhen architects 23

A110 : Ceiling Plans Coordination of

MEP Linked

backgrounds? Standard symbol

legend Lighting &

Devices Ceiling tags

Page 24: QC Review Process

eu:a eppstein uhen architects 24

A120 : Finish Plans Standard abbreviations Standard room finish tag

Show design intent

Page 25: QC Review Process

eu:a eppstein uhen architects 25

A200 : Exterior ElevationsMaterial Legends

+ Bldg Systems

Material key (fill) vs. Keynoting

Page 26: QC Review Process

eu:a eppstein uhen architects 26

A200 : Exterior Elevations Show :

Level lines Sections Callouts Gridlines

Const joints layout Masonry EIFS

Page 27: QC Review Process

eu:a eppstein uhen architects 27

A220 : Window Types Identify common/shared base &

head heights

Page 28: QC Review Process

eu:a eppstein uhen architects 28

A230 : Interior Elevations Mounting hgts : accessories

Page 29: QC Review Process

eu:a eppstein uhen architects 29

A300 : Building Sections Can (2) wall section(s) provide the

same info?(2) Wall Sections

Bldg Sections

Page 30: QC Review Process

eu:a eppstein uhen architects 30

A310 : Wall Sections Don’t dim scheduled items:

Windows Doors Ceiling Hgts Struct Members

Don’t repeat info: Roof slope

Page 31: QC Review Process

eu:a eppstein uhen architects 31

A320 : Stair Section & Plans Section

Landing to Landing (#) of equal risers

Don’t repeat plan dims

Plans : Identify important dims:

Clear between stringers Clear between handrails # of equal treads Landing size Handrail + Guardrails

Extensions

Page 32: QC Review Process

eu:a eppstein uhen architects 32

A320 : Elev Section & Plans Section

Pit Depth ? (4’-0”) Pit ladder - keynote

Total Travel Distance ? Add all flr-to-flr hgts

Minimum Overhead ? Hoist Beam ?

To underside of beam?

Plans : Don’t repeating shaft dims

Page 33: QC Review Process

eu:a eppstein uhen architects 33

A460 : Unit Plans Layouts duplicated on overall plans (A100)

A100’s : Demising and "common“ walls A460’s : Interior unit info (walls, doors, elevations,

etc) If (when) a change occurs in a single unit, team will

have to re-issue multiple drawings on multiple sheets.

Page 34: QC Review Process

eu:a eppstein uhen architects 34

A500's : Details Create typical details : Quantity vs. Quality Strategy for developing details

1. Identify the typical head, sill and jamb details of the exterior materials. Develop these at a larger scale (1" or 3/4").

2. Reference the model into these detail views and lock detail components to certain model content: Face of wall + gridlines, levels, etc.

3. Refer to Industry Standards: Brick industry : http://www.bia.org/html/frmset_thnt.htm Masonry advisory council :

http://www.maconline.org/index.html EIFS industry members association :

http://eima.com/pdfs/eima%20cguide%20final.pdf Roofing : http://www.carlisle-syntec.com/index.cfm?act=details

4. Think about constructability and sequencing issues.5. Use keynotes instead of “dumb text”6. Don't identify specific sizes of other disciplines info (e.g. stl

lintels ; should be identified on structural, not arch)

Page 35: QC Review Process

eu:a eppstein uhen architects 35

A600 : Door & Frame Schedule Don’t dim scheduled door

sizes Use standard door/frame

names Identify glazing types (GL-#)

A630 : Room Finish Schedule Standard material abbreviations

Page 36: QC Review Process

eu:a eppstein uhen architects 36

QC Support : Current Checklists

Studio-specific I:\Forms

Light table reviews Revit

Interference check Navisworks

Collision detection Newforma

Compare (PDF’s & DWF’s & DWG’s)

Page 37: QC Review Process

eu:a eppstein uhen architects 37

QC Support : Future… QC Page on EUA.net Graphic Examples

By sheet By building type

Professional Development Programs Focused training

Dimensioning Imperial Library +

WIP Your Ideas ? ? ?

Page 38: QC Review Process

eu:a eppstein uhen architects 38

ConclusionQuestions???

Comments???

Concerns???

Suggestions???

Page 39: QC Review Process

eu:a eppstein uhen architects 39

QC Issues : Constructability Sequencing…

Page 40: QC Review Process

eu:a eppstein uhen architects 40

QC Issues : General Content

Varies across projects/studios Revit Projects : over-modeling

Floor Plan : 1/8”

Enlarged Plan : 1/2”

Section : 1”

Elevation 1/16”

Page 41: QC Review Process

eu:a eppstein uhen architects 41

Glazing Types (GL-#) : G100-Index (by keynote) A200-Elevations (individual frames

keynoted) A240-Frame Elevations (glazing legend) A600-Schedules (door and frame schedule) Specifications

QC Issues : Annotation