“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
Drawing Number
Description Page size
Scale Purpose
A000 Drawing Register A3 N/A N/AA100 Site Plan A3 1:500 ConstructionA101 Roof Plan A3 1:100 ConstructionA102 Ground Floor A3 1:100 ConstructionA103 Level 1 A3 1:100 ConstructionA104 Level 2 A3 1:100 ConstructionA105 Level 3 - Roof Terrace A3 1:100 ConstructionA106 North Elevation A3 1:100 ConstructionA107 South Elevation A3 1:100 ConstructionA108 East Elevation A3 1:100 ConstructionA109 West Elevation A3 1:100 ConstructionA110 Section A-A A3 1:100 ConstructionA111 Section B-B A3 1:100 ConstructionA112 Detailed Plan of Guest
PodA3 1:50 Construction
A113 Guest Pod Elevations A3 1:50 ConstructionA114 Guest Pod Bathroom
ElevationsA3 1:50 Construction
A115 Guest Pod Axonometric Projection
A3 1:100 Design
A116 Detailed Wall Section A1 1:20 ConstructionA117 Door Schedule A3 N/A ConstructionA118 Window Schedule A3 N/A Construction
GENERAL NOTESDO NOT SCALE THE DRAWINGS
VERIFY FIELD CONDITIONS PRIOR TO COMMENCEMENT OF EACH PORTION OF THE WORK.
THE CONTRACT DOCUMENTS ARE COMPLEMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL; THE CONTRACTOR SHALL COORDINATE ALL PORTIONS OF THE WORK AS DESCRIBED IN THE CONTRACT DOCUMENTS. NOTIFY THE ARCHITECT FOR RESOLUTION OF ALL DISCREPANCIES PRIOR TO CONSTRUCTION.
DIMENSIONS ARE TO THE BUILDING GRID LINES OR THE FINISH SURFACES UNLESSOTHERWISE NOTED.
DOORS AND CASED OPENINGS INDICATED ADJACENT TO WALL INTERSECTIONS SHALL BE LOCATED WITH THE EDGE OF FINISH OPENING FOUR INCHES FROM THE ADJACENT WALL UNLESS OTHERWISE INDICATED.
ALL OTHER DOORS AND CASED OPENINGS SHALL BE CENTERED BETWEEN NEAREST ADJACENT WALL INTERSECTIONS, UNLESS OTHERWISE DIMENSIONED.
Drawing Register
A000
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A100Scale: 1: 500
Site
Site 1:500
SANTONI3 STOREYVICTORIAN, BRICKFLAT ROOFTERRACE DININGGLASS RAILING
HAWTHORN TOWN HALL3 STOREYVICTORIAN, BRICKPITCHED ROOF,SLATE TILED
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A101Scale: 1: 100
Roof Plan
Roof Plan 1:100
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
Ground Floor 1:100
Ground Floor
A102Scale: 1: 100
Finishes Legend
TIM-02 Internal Timber FlooringTI-03 Exterior Tile Flooring
A110
A111
A106
A107
A109
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
Level 1 1:100
Level 1
A103Scale: 1: 100
Finishes Legend
TIM-02 Internal Timber FlooringCAR-01 Carpet FlooringTI-02 Bathroom Tile Flooring
3
A106A110
A109
A111
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
Level 2 1:100
A104Scale: 1: 100
Level 2
Finishes Legend
TIM-02 Internal Timber FlooringCAR-01 Carpet FlooringTI-02 Bathroom Tile Flooring
A111
A109
A110A106
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
Level 3 - Roof Terrace 1:100
A105Scale: 1: 100
Level 3 - Roof Terrace
Finishes Legend
CON Concrete RoofTI-03 Exterior Tile Flooring
A111
A109
A106A110
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A106Scale: 1: 100
North Elevation
North Elevation 1:100
A110
Finishes Legend
CL-01 Exterior Cladding: TimberGLASS Glass Railing
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A107Scale: 1: 100
South Elevation
South Elevation 1:100
A110
Finishes Legend
CL-01 Exterior Cladding: Timber CL-02 Exterior Cladding : StoneGLASS Glass Railing
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A108Scale: 1: 100
East Elevation
East Elevation 1:100
A111
Finishes Legend
CL-01 Exterior Cladding: Timber CL-02 Exterior Cladding : StoneGLASS Glass Railing
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A109Scale: 1: 100
West Elevation
West Elevation 1:100
A111
Finishes Legend
CL-01 Exterior Cladding: TimberGLASS Glass Railing
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A110Scale: 1:100
Section A-A
FIX SHEET NUMBER ON CALLOUT TAG
Section A-A 1:100
A111
Finishes Legend
LA-01 Laminate: Exterior FinishST-01 CeasarstoneFB-01 Upholstery FabricGLASS Shower Screen Glass
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A111Scale: 1:100
Section B-B
Section B-B 1:100
A116
1
A110
Finishes Legend
LA-03 Laminate: Shower Door FinishFB-01 Upholstery FabricTI-01 Bathroom Wall Tile
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A112Scale: 1:50
Detailed Plan of Guest Pod
A113
A113
Level 1 - Guest Pod 1:50
Level 1 - Guest Pod Bathroom 1:50
Finishes Legend
CAR-01 Carpet FlooringTIM-02 Internal Timber FlooringTI-02 Bathroom Tile Flooring
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A113Scale: 1:50
Guest Pod Elevations
Level 1 - Guest Pod Elevation A 1:50
Level 1 - Guest Pod Elevation B 1:50
Finishes Legend
LA-01 Laminate: Exterior FinishST-01 CeasarstoneTI-01 Bathroom/ Kitchen Wall Tile
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A114Scale: 1:50
Guest Pod Bathroom Elevations
Guest Pod Bathroom Elevation A 1:50
Guest Pod Bathroom Elevation B 1:50
Guest Pod Bathroom Elevation C 1:50
Guest Pod Bathroom Elevation D 1:50
Finishes Legend
LA-01 Laminate: Exterior FinishGLASS Shower Screen GlassTI-01 Bathroom/ Kitchen Wall Tile
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A115Scale: N/A
Guest Pod Axonometric Projection
Axonometric Projection of Guest Pod 1:100
“Glenwood” Student Accomodation
350 Glenferrie Rd, Hawthorn VIC 3122
DIA30002 Interior Architecture Digital Documentation 2
Task 3: Construction and Cabinetry Documentation 2D & 3D via Revit/BIM
Tutor: Kevin Shen
Wed 2:30 BA 601
Larissa Ellen 2054914
A117Scale: N/A
Door Schedule