15
AVOIDED POST CONSTRUCTION LANDFILL Multi-coloured dustbins/different garbage chut have been provided to building occupants to ensure segregation of waste at source. Dedicated, segregated and hygienic storage space in the project site to store different w before treatment /recycling. Contractual tie-ups with waste recyclers for saf recycling for recyclable wastes like metal, paper, plastic, glass etc. GRIHA criteria : 22 DEEPIKA VERMA (15001506003) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of

Griha avoided post construction landfill

Embed Size (px)

Citation preview

Page 1: Griha avoided post construction landfill

AVOIDED POST CONSTRUCTION LANDFILLMulti-coloured dustbins/different garbage chutes have been provided to building occupants to ensure segregation of waste at source.Dedicated, segregated and hygienic storage spaces in the project site to store different wastes before treatment /recycling.Contractual tie-ups with waste recyclers for safe recycling for recyclable wastes like metal, paper, plastic, glass etc.

GRIHA

criteria : 22

DEEPIKA VERMA (15001506003) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of Science & Technology, Murthal

Page 2: Griha avoided post construction landfill
Page 3: Griha avoided post construction landfill
Page 4: Griha avoided post construction landfill
Page 5: Griha avoided post construction landfill
Page 6: Griha avoided post construction landfill
Page 7: Griha avoided post construction landfill
Page 8: Griha avoided post construction landfill
Page 9: Griha avoided post construction landfill
Page 10: Griha avoided post construction landfill
Page 11: Griha avoided post construction landfill
Page 12: Griha avoided post construction landfill
Page 13: Griha avoided post construction landfill
Page 14: Griha avoided post construction landfill
Page 15: Griha avoided post construction landfill