19

Eme slide gioi thieu version tieng anh_2-01-2014

  • Upload
    xncd

  • View
    418

  • Download
    0

Embed Size (px)

DESCRIPTION

Gioi thieu XNCD

Citation preview

Page 1: Eme  slide gioi thieu version tieng anh_2-01-2014
Page 2: Eme  slide gioi thieu version tieng anh_2-01-2014

INTRODUCTION:

Office : No.45, Street No. 2, Truong Tho Ward, Thu Duc District,

Ho Chi Minh City, VietnamTel. : (84.8) 37.311.406 – (84.8) 22.180.920Fax : (84.8) 38.966.777Email : [email protected]

Established in October 1996 as an affiliate of PECC2, Electrical Mechanical Enterprise (EME) is specialized in mechanical manufacture and erection.

EME office

Page 3: Eme  slide gioi thieu version tieng anh_2-01-2014

FUNCTIONS

- Fabrication of Assorted Steel Tower, Telecommunication Antenna & Mast;

- Hot Dip galvanizing of Steel Tower, Electrical Appurtenances and Metal Products;

- Production of Specialized Electrical Appurtenances and Appliances;

- Construction Power network, Industrial, Telecommunication, Civil, Traffic, Water Resources, Underground and Infrastructure Projects;

- Mechanical Equipment Manufacture;- Soil test, design, material supply, installation of

foundation and installation of antenna towers.- Construction & Investment in Power Source Project:- Management of power, industrial & Civil work Project. - Electric Power production & Trading;- Construction Materials and Equipment Trading- Power, Industrial, Civil Equipment & Machinery

Trading;- Real Estate Business.

Steel Plate by 100 ton Cutting Machine

A corner of factory

Construction of aerial mast

Page 4: Eme  slide gioi thieu version tieng anh_2-01-2014

- Labor force: 70 skilled workers, 25 office staff- Total premises: about 15,000m2

In which:Office: 500m2

Factory: 2,000m2

Covered store: 200m2

Concrete leveled yard: 10,000m2

Workers’ house: 3,400m2

- Manufacturing of hot dip galvanized steel structures: 7,000 tons/year- Construction of BTS (antenna): 200 sites/year.

CAPABILITY

Auto-Production line CNC barsMechanical factory

EME Youth

Page 5: Eme  slide gioi thieu version tieng anh_2-01-2014

LIST OF EQUIPMENT

1. 560KVA Transformer station Vietnam 012. 75KVA Transformer station Vietnam 013. Crane (10 ton) Vietnam 014. Crane – Truck (5 ton) Japan 015. Forklift truck (7 ton) Korea 016. Truck (5 ton) Korea 017. Heavy truck (30 ton) Sweden 038. Auto-Production line CNC plates & bars Spain 029. Cutting knotting machine Japan 0710. Cutter Japan 0111. Driller Japan 0412. Driller magnetic Japan 0113. Steel Power – saw Russia 0214. Press machine (80 ton) Japan 0115. Grinder Japan 1016. Gauge thickness of galvanizing Germany 0217. Photocopier Japan 0218. Welding Machine Russia 2019. Computer Japan 3020. Printing machine Japan 06

Auto-Production line CNC bars

10 ton gantry crane with span 20m

Page 6: Eme  slide gioi thieu version tieng anh_2-01-2014

Auto-Production line CNC bars

Mechanical factory

Manufacturing Plates with CNC PUMA 110

Page 7: Eme  slide gioi thieu version tieng anh_2-01-2014

Inspection and Measurement of Zinc Coating

QUALITY CONTROL & ASSURANCE

- Quality management procedure;- Technological review with improvements in manufacturing methods;- Staff training and awareness of upgrading precision engineering;- Strict control and monitoring during fabrication;- Production classed ex-works only following complete trial assembly and

inspection by Quality Assurance & Testing Center 3 (QUATEST 3).

EME was officially granted ISO 9001:2000 Certificate by the Vietnam Certification Center (QUACERT) in August, 2003 and converted to ISO 9001:2008 in 2010. Product quality objectives are controlled by:

All the products of the EME are in accordance with the quality management system: ISO 9001 – 2008.

Inspection and Installation of aerial masts

Construction at Nhon Trach substation

Page 8: Eme  slide gioi thieu version tieng anh_2-01-2014

Trial assembly of Steel Structures

Packing

Painting

Page 9: Eme  slide gioi thieu version tieng anh_2-01-2014

PRODUCTS

Steel structure for 220kV substation

- Steel towers, antenna towers- Beam and Gantry- Anchor bolts- Brackets for equipment- Supporting steel structure- Prefabricated house

Construction:- Site soil test, design, material

supply, installation of foundation and installation of Antenna towers

- Design, material supply, installation of foundation and installation of prefabricated house

Construction of aerial mast

Steel structure for 220kV transmission line

Hot dipped galvanized steel structures:

Page 10: Eme  slide gioi thieu version tieng anh_2-01-2014

PROJECT EXPERIENCE

LIST OF STEEL STRUCTURES PROJECTS

Steel structures for Transmission line projects

No. Project Name Scope of work Customer

Weight

(Tons)

1 500kV Da Nang - Ha Tinh Transmission Line

Central Power Project Management Board (CPPMB)

515

2 500kV Ha Tinh - Thuong Tin Transmission Line

Northern Power Project Management Board (NPPMB)

530

3 220kV Ca Mau - Bac Lieu Transmission Line

Southern Power Project Management Board (SPPMB) 930

4 Transmission Line connecting to 220kV Nhon Trach substation

Gantry, Beam and support AREVA 620

5 110kV Phu Lam - Duc Hoa Transmission Line Steel towers Southern Power Project

Management Board (SPPMB) 679

6 110kV Tri An - Dinh Quan Transmission Line Steel towers Southern Power Project

Management Board (SPPMB) 285

Page 11: Eme  slide gioi thieu version tieng anh_2-01-2014

No. Project Name Scope of work Customer

Weight

(Tons)

7 110kV Dai Ninh – Phan Ri Transmission Line

HydroPower Project Management Unit No.6 (TPPMU No.6) 518

8 110kV Dai Loc - Thanh My Transmission Line

Central Power Project Management Board (CPPMB) 407

9 110kV Cai Dau - Phu Tan - Binh Minh-Binh Phuoc Transmission Line Power Company No.2 448

10 110 kV Xuan Truong-Duc Linh Transmission Line

Northern Power Project Management Board (NPPMB) 229

11 Transmission Line connecting to 110 kV Yantan Sien substation

Tower structure No.11Co.,Ltd 279

Steel structure for 500kV Da Nang – Ha Tinh transmission line

Page 12: Eme  slide gioi thieu version tieng anh_2-01-2014

No. Project Name Scope of work Customer Weight (Tons)

1500kV Phu My - Nha Be - Phu Lam Substations

Steel support & anchor bolts

VATECH Transmission & Distribution

881

2 500 KV Doc Soi SubstationGantry, Beam

and supportPT Siemens 334

3 220kV My Phuoc Substation Steel supportSouthern Power Project Management Board (SPPMB)

1,008

4 220kV Vinh Yen and Lao Cai Substations Gantry, Beam Northern Power Project

Management Board (NPPMB) 583

5 220kV Ca Mau SubstationGantry, Beam

and supportPT Siemens

580

6 220kV Thu Duc SubstationGantry, Beam

and supportPower Transmission Company No.4 (PTC4)

555

7 220kV Cat Lai Substation Gantry and BeamSouthern Power Project Management Board (SPPMB)

320

8For Srok Phumieng Hydro Power Project

Song Da No.11 Co.,Ltd

280

Steel structure for Substation projects

Page 13: Eme  slide gioi thieu version tieng anh_2-01-2014

Steel structure for 220kV Thot Not Substation

At Nhon Trach Site

Steel structure for 500kV Nha Be Substation

Page 14: Eme  slide gioi thieu version tieng anh_2-01-2014

No. Project Name Scope of work Customer Weight (Tons)

1 Hanoi Telecom project (Phase 2) Antenna tower Huawei Hongkong Co.,Ltd 1,023

2 Hanoi Telecom project (Phase 2) Antenna tower Ericsson Vietnam Co.,Ltd 931

3 Hanoi Telecom project (Phase 1) Antenna tower Nortel Vietnam Co.,Ltd 510

4 Hanoi Telecom project (Phase 1) Antenna tower COMA 18 , Ltd 415

Steel structure for Antenna tower projects

Trial assembly of Steel Structure

Page 15: Eme  slide gioi thieu version tieng anh_2-01-2014

Construction of antenna tower

No. Customer Q’ty (Site) Scope of work Network

1 Vinaphone Binh Thuan 15 Survey, Soil test, design, material supply, installation of

foundation and installation of antenna towers Vinaphone

2 Nortel 105 Survey, Soil test, design, material supply, installation of foundation and installation of antenna towers

HT Mobile (CDMA)

3 Huawei 06 Survey, Soil test, design, material supply, installation of foundation and installation of antenna towers Vietnamobile

4 Ericsson 80 Survey, Soil test, design, material supply, installation of foundation and installation of antenna towers Vietnamobile

5 Gtel Mobile 50 Survey, Soil test, design, material supply, installation of foundation and installation of antenna towers Beeline

CONSTRUCTION OF BTS (TELECOMMUNICATION PROJECTS)

Page 16: Eme  slide gioi thieu version tieng anh_2-01-2014

Prefabricated house

BUILDING (PREFABRICATED HOUSE)

No. CustomerQuantity

(Site)Scope of work Network

1Mien Dong garage steel structure (prefabricated house)

2Fabricate, installation of

foundation and installationMien Dong Company

2 Ia Hrung Hydro Power Project 1Design, fabricate,

installation of foundation.Phan Vu Group

Page 17: Eme  slide gioi thieu version tieng anh_2-01-2014

CUSTOMERS

Local Customers

1. Song Da Corporation2. VNPT Corporation3. Northern Power Project Management Board (NPPMB)4 Central Power Project Management Board (CPPMB)5. Southern Power Project Management Board (SPPMB)6. Thermo Power Project Management Unit 3 (TPPMU3)7. Hydro Power Project Management Unit 6 (HPPMU6)8. Southern Power Corporation9. Power Construction Company No.1 (PCC1)10. Power Construction Company No.2 (PCC2)11. Power Construction Company No.3 (PCC3)12. Power Construction Company No.4 (PCC4)13. Power Transmission Company No.4 (PTC4)

Inspection of steel structure

Page 18: Eme  slide gioi thieu version tieng anh_2-01-2014

Foreign Customers

1. Ericsson Viet Nam2. Gtel Mobile (Beeline)3. Consortium Areva T&D-JRT4. PT Siemens Indonesia 5. Siemens Ltd. Vietnam6. ABB Switchgear AB7. Comin Asia Pte.Ltd.8. Comin Ltd.Vietnam9. Nortel Ltd. Vietnam10. Fanco Pacific Co.Ltd.11. Huawei Hong Kong12. Huawei Viet Nam13. Kinden Corporation Leaders of International Nuclear Energy

Development of Japan (JINED) visiting Mechanical Factory of EME

Page 19: Eme  slide gioi thieu version tieng anh_2-01-2014