BUILDING FROM THE GROUND UP THE RIGHT WAY Arch. Gene Arthur Go DINE Philippines 2015 September 10, 2015 | Chippens Garden, Davao City

Arch. Gene Go: Building from the Ground Up; the Right Way

Embed Size (px)

Citation preview

Page 1: Arch. Gene Go: Building from the Ground Up; the Right Way

BUILDING FROM THE GROUND UP

THE RIGHT WAY

Arch. Gene Arthur GoDINE Philippines 2015September 10, 2015 | Chippens Garden, Davao City

Page 2: Arch. Gene Go: Building from the Ground Up; the Right Way

GREEN TIPS

Page 3: Arch. Gene Go: Building from the Ground Up; the Right Way

PRE-DESIGN DESIGN & CONSTRUCTION OPERATIONS

OWNER- DEVELOPER

DECISION SUPPORT

ARCHITECTURE / ENGINEERING DESIGN and CONSTRUCTION TEAM

FACILITYMANAGER

OPERATIONS SUPPORT

DESIGN & COORDINATION SUPPORT

OWNER / DEVELOPER

COMMITMENTOPERATIONSCOMMITMENT

Page 4: Arch. Gene Go: Building from the Ground Up; the Right Way

PRE-DESIGNB

US

INE

SS

PLA

N PRELIMBUDGE

T…

Page 5: Arch. Gene Go: Building from the Ground Up; the Right Way

PRE-DESIGNS

ITE

SE

LEC

TIO

N

Page 6: Arch. Gene Go: Building from the Ground Up; the Right Way

TIME NEEDED TO DO A RESTAURANT PROJECT

90 – 120 – 150 DAYS

30 – 60 DAYSRENT FREE PERIOD GIVEN MALL /

LANDLORD

GREEN TIP

Page 7: Arch. Gene Go: Building from the Ground Up; the Right Way

OWNER

PROJECT MANAGER

ARCHITECTINTERIORDESIGNERKITCHEN PLANNER

GENERALCONTRACTOR

SUB-CONSSUPPLIERS

PR

E-D

ES

IGN

PRE-DESIGN

Page 8: Arch. Gene Go: Building from the Ground Up; the Right Way

DESIGN & CONSTRUCTIONS

CH

EM

ATIC

DE

SIG

N

Page 9: Arch. Gene Go: Building from the Ground Up; the Right Way

DE

SIG

N D

EV

ELO

PM

EN

TDESIGN &

CONSTRUCTION

UPDATE BUDGET… !

Page 10: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NTR

AC

T D

OC

UM

EN

TDESIGN &

CONSTRUCTION

Page 11: Arch. Gene Go: Building from the Ground Up; the Right Way

AVERAGE TIME NEEDED FOR MALL ENGINEERING AND CONSULTANTS TO REVIEW DRAWINGS

3 – 10 WORKING DAYS

7 – 30 WORKING DAYSAVERAGE TIME TO PROCESS BUILDING PERMITS

+

PERMITS AND REGULATORY COMPLIANCE

Page 12: Arch. Gene Go: Building from the Ground Up; the Right Way

GREEN TIP

MUST: KITCHEN PLAN

Page 13: Arch. Gene Go: Building from the Ground Up; the Right Way

GET UPDATED ESTIMATES TO PROTECT YOUR BUDGET

NO SURPRISES

KEEP CALMUNDERSTAND AND MOVE ON

GREEN TIP

PITSTOP: UPDATE

BUDGET ! ! !

Page 14: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTION

Page 15: Arch. Gene Go: Building from the Ground Up; the Right Way

IF TIME IS ON YOUR SIDE, ADD 2 WEEKS

CALL FOR TENDER

NEGOTIATERELATIVE/FAMILY/FRIEND IS IN

CONSTRUCTION

EVALUATE AND UNDERSTANDBEFORE YOU SIGN OFF

GREEN TIP

Page 16: Arch. Gene Go: Building from the Ground Up; the Right Way

MARGIN EXPECTED BY CONTRACTORS

20% - 40% 10% - 30% UNACCOUNTED CONSTRUCTION WASTE< P25K

>/M2TYPICAL FIT-OUT BUDGET EXCLUDING SHELL

GREEN TIP

Page 17: Arch. Gene Go: Building from the Ground Up; the Right Way

COST OF FF&E (FURNITURE, FIXTURES, AND EQUIPMENT

30% - 60%

GREEN TIP

Page 18: Arch. Gene Go: Building from the Ground Up; the Right Way

LUMP SUM CONSTRUCTION PROPOSAL

SCOPE OF WORK = PESOGENERAL REQUIREMENTS: P400,000.00CARPENTRY WORKS: P 300,000.00PARTITIONING WORKS: P 200,000.00PAINTING WORKS: P 350,000.00ELECTRICAL WORKS: P 300,000.00MECHANICAL WORKS: P250,000.00SANITARY WORKS: P180,000.00

TOTAL: P1,980,000.00VALUE ADDED TAX (12%): P237,600.00TOTAL COST: P2,455,200.00

Page 19: Arch. Gene Go: Building from the Ground Up; the Right Way

ITEMIZED CONSTRUCTION COSTSCOPE OF WORK = PESO

MATERIAL (QUANTITY X UNIT COST)

LABOR (QUANTITY x UNIT COST)

GREEN TIP

Page 20: Arch. Gene Go: Building from the Ground Up; the Right Way

GREEN TIP

Page 21: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTION

Page 22: Arch. Gene Go: Building from the Ground Up; the Right Way

BE PREPARED TO ADD TO YOUR BUDGET

“I WANT TO GO GREEN…”

GREEN TIP

Page 23: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTION

GREEN TIP

Page 24: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTIONGREEN TIP

Page 25: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTION

GREEN TIP

Page 26: Arch. Gene Go: Building from the Ground Up; the Right Way

CO

NS

TRU

CTI

ON

DESIGN & CONSTRUCTION

GREEN TIP

EXPECTATION REALITY

Page 27: Arch. Gene Go: Building from the Ground Up; the Right Way

VE

RIF

ICAT

ION

/ VA

LID

ATIO

NDESIGN &

CONSTRUCTION

Page 28: Arch. Gene Go: Building from the Ground Up; the Right Way

BU

ILD

ING

OP

ER

ATIO

NS

OPERATIONS

Page 29: Arch. Gene Go: Building from the Ground Up; the Right Way

BU

ILD

ING

OP

ER

ATIO

NS

OPERATIONS GREEN TIP

AUTO

16.0º C

23.0º C

Savings: up to P1000/month/unit*

Page 30: Arch. Gene Go: Building from the Ground Up; the Right Way

F&BOUTLET

WASTEVEGETABLE OIL (WVO)

BIODIESEL

http://alphabiofuels.sg/BU

ILD

ING

OP

ER

ATIO

NS

OPERATIONS

Page 31: Arch. Gene Go: Building from the Ground Up; the Right Way

CASE STUDY:

AZALEA Residences and Hotel Station 2, Boracay Island, Aklan

Page 32: Arch. Gene Go: Building from the Ground Up; the Right Way

case study:AZALEA Boracay

Lot Area : 5,482 sq.m.

Floor Area : 16,717.90 sq.m.

5 STOREYS with roof deck

285 ROOMS

Zone 7, Road C Manggayad,Brgy. Balabag, Station 2,

Boracay island,Malay, Aklan 5608

Page 33: Arch. Gene Go: Building from the Ground Up; the Right Way

PROJECTED BUDGET:

PhP 680 million

BUDGET:With Project Administration

Without Project Administration

PhP 520 million(Direct Cost)

PhP 40 million(Administration Fees)

PhP 25 million(Contingencies)

**Taxes at 12% of Admin Fees

Page 34: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 35: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 36: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 37: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 38: Arch. Gene Go: Building from the Ground Up; the Right Way

CASE STUDY:

UCC Clockwork

Page 39: Arch. Gene Go: Building from the Ground Up; the Right Way

case study:UCC Clockwork

Bluebay Walk EDSA cor. Macapagal Blvd.,

Pasay City

Freestanding:3-4 months construction

Page 40: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 41: Arch. Gene Go: Building from the Ground Up; the Right Way

case study:UCC Clockwork

Estancia MallMeralco Avenue, Pasig City

Mall Fit-out:60-75 days construction

Page 42: Arch. Gene Go: Building from the Ground Up; the Right Way
Page 43: Arch. Gene Go: Building from the Ground Up; the Right Way

THANK YOU!