RATE ANALYSIS OF CONSTRUCTION MATERIALS
Batch
2012
2 | P a g e
Muhammad Bilal Waseem (2012-CV-150)
Tariq Ali Soomro (2012-CV-131)
Shahbaz Khan (2012-CV-157)
Syed Muhammad Atif (2012-CV-169)
Abdullah Dal (2012-CV-158)
Azhar Ali Khurshadi (2012-CV-112)
Jan Muhammad Solangi (2012-CV-092)
3 | P a g e
ACKNOWLEDGEMENT
The group effort and ability of team work made it possible for us to
complete the task which was given to us and we all thanks Almighty
Allah for helping us through all this process.
PROFESSOR SYED FARAZ JAFRI is teacher as well as a inspiration for all
of the students. With his effort and encouragement we finally
completed our work and also it proved to be informative.
We are thankful to our sir for conveying us such a job which helped us
in accepting all technical terms, estimating the cost of a project and
computing the amount and rate of material used in project. It also
boost our confidence level and motivated us towards field work
analysis.
4 | P a g e
INDEX
S# DESCRIPTION PAGE
EXCAVATION AND FORMWORK 1-2
1 EXCAVATION AND FORMWORK 2
CEMENT,BLOCKS,SAND,CRUSH AND STEEL 3-7
2 CEMENT 4
3 BLOCKS 5
4 SAND AND CRUSH 6
5 STEEL 7
SANITARY FITTINGS 8-15
6 SANITARY FITTING 9
7 PIPE FITTINGS 10-11
8 COMMODE 12
9 WC 13
10 BASIN 14
11 TILES 15
ELECTRICAL FITTINGS 16-18
12 ACCESSORIES AND FITTING 17
13 WIRES AND CABLES 18
PAINTS 19-21
14 PAINTS 20-21
DOORS, WINDOWS AND WARDROBE 22-24
15 DOORS ,WINDOWS AND WARDROBE 23-24
STEEL WORKS 25-26
16 MAIN GATE 26
LABOUR 27-28
17 MASON, PAINTER, PLUMBER,ELECTRICIAN 28
EXCAVATION AND FORMWORK
6 | P a g e
EXCAVATION AND FORMWORK
S # DESCRIPTION UNIT COST DEALER
1 EXCAVATION Sq. Yd 60-70 AYAZ ALI AND BROTHERS QAYUMABAD CHOWRANGI KARACHI
0311-8972233 2 FORMWORK
OLD PLANKS Sq. Ft 22 NEW PLANKS Sq. Ft 30
3 EXCAVATION Sq. Yd 55-70 ISMAIL & SONS GIZRI DHA , KARACHI
0333-8929992 4 FORMWORK
OLD PLANKS Sq. Ft 23 NEW PLANKS Sq. Ft 35
5 EXCAVATION Sq. Yd 65-75 BASHIR BROTHERS ORANGI TOWN , KARACHI
0343-2087869 6 FORMWORK OLD PLANKS Sq. Ft 21
NEW PLANKS Sq. Ft 33
7 | P a g e
CEMENT, BLOCKS, SAND,CRUSH AND STEEL
8 | P a g e
CEMENT
S NO ITEM MAKER UNIT COST DEALER
1 OPC LUCKY BAG(50 KG) 525
FALCON BAG(50 KG) 535 POWER BAG(50 KG) 510
2 SULPHATE RESISTING
LUCKY BAG(50 KG) 545
FALCON BAG(50 KG) 560 POWER BAG(50 KG) 490
3 WHITE CEMENT KOHAT BAG(40 KG) 850
MAPLE BAG(40 KG) 790
4 OPC LUCKY BAG(50 KG) 530
FALCON BAG(50 KG) 545 POWER BAG(50 KG) 510
5 SULPHATE RESISTING
LUCKY BAG(50 KG) 550
FALCON BAG(50 KG) 540
POWER BAG(50 KG) 550 6 WHITE CEMENT KOHAT BAG(40 KG) 860
MAPLE BAG(40 KG) 800
7 OPC LUCKY BAG(50 KG) 525
FALCON BAG(50 KG) 540
POWER BAG(50 KG) 505 8 SULPHATE
RESISTING
LUCKY BAG(50 KG) 560
FALCON BAG(50 KG) 550
POWER BAG(50 KG) 545 9 WHITE CEMENT KOHAT BAG(40 KG) 850 MAPLE BAG(40 KG) 805
9 | P a g e
BLOCKS
S NO SIZE(inches) UNIT COST DEALER
1 3x8x12 1 PIECE 15
2 4x8x12 1 PIECE 16.5
3 5x8x12 1 PIECE 18.5 4 6x8x12 1 PIECE 20
5 3x8x12 1 PIECE 16
6 4x8x12 1 PIECE 17 7 5x8x12 1 PIECE 19
8 6x8x12 1 PIECE 21
9 3x8x12 1 PIECE 15.5
10 4x8x12 1 PIECE 16.5 11 5x8x12 1 PIECE 18
12 6x8x12 1 PIECE 23
10 | P a g e
SAND AND CRUSH
S NO ITEM UNIT COST DEALER
1 COARSE DUMPER(450 ftᶟ) 14500
2 FINE DUMPER(450 ftᶟ) 12500
3 COARSE DUMPER(450 ftᶟ) 14000
4 FINE DUMPER(450 ftᶟ) 13000
5 COARSE DUMPER(450 ftᶟ) 14000
6 FINE DUMPER(450 ftᶟ) 13500
11 | P a g e
STEEL
S NO DIA OF BAR TYPE UNIT COST DEALER
TWISTED SHIP PLATES
1 3/8 TONNES 85500 2 1/2 TONNES 86000 3 4/8 TONNES 84500 PLAIN SHIP PLATES
4 2/8 TONNES 82000
TWISTED SHIP PLATES
5 3/8 TONNES 86000
6 1/2 TONNES 83000 7 5/8 TONNES 82500
PLAIN SHIP PLATES 8 2/8 TONNES 81000
12 | P a g e
SANITARY FITTINGS AND TILES
13 | P a g e
SANITARY FITTINGS
S NO ITEM MAKER UNIT COST DEALER
1
SANITARY SET
Super asia
Per set 3000
Gold star Per set 15000 shalimar PER SET 30000 2 SANITARY FITTNG PER SET 5000
PER SET 6000
3
SANITARY SET
Super asia PER SET 5200
Golden star
PER SET 3500
shalimar
PER SET 7000
4 SANITARY FITTNG CLIMAX PER SET 6700 MASTER PER SET 9000
5
SANITARY SET
super asia PER SET 5500
Golden
star
PER SET 8000
shalimar PER SET 8500 6 SANITARY FITTNG CLIMAX PER SET 6800 MASTER PER SET 9200
14 | P a g e
S NO ITEM MAKER UNIT COST DEALER
1 PIPES(20 Ft)
3/4” DIA (cold) PAK ARAB PER PIECE 400 3/4” DIA(hot) PAK ARAB PER PIECE 1200 3”DIA PAK ARAB PER PIECE 1350
2 TEE 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60
3”DIA PAK ARAB PER PIECE 100 3 ELBOW 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60
3”DIA PAK ARAB PER PIECE 90 4 UNION 1” DIA PAK ARAB PER PIECE 90 2” DIA PAK ARAB PER PIECE 290
5 VALVE 1” PAK ARAB PER PIECE 130
1.5” PAK ARAB PER PIECE 200 2” PAK ARAB PER PIECE 360
6 PIPES(20 Ft)
1/2” DIA PPR PER PIECE 320
3/4” DIA PPR PER PIECE 455 1”DIA PPR PER PIECE 550
7 TEE 1” DIA PPR PER PIECE 40
2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 90
8 ELBOW 1” DIA PPR PER PIECE 40
2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 80
9 UNION 1” DIA PPR PER PIECE 90
2” DIA PPR PER PIECE 290 10 VALVE
1” PPR PER PIECE 120
1.5” PPR PER PIECE 200 2” PPR PER PIECE 350
15 | P a g e
COMMODE
S NO SHADE MAKER SIZE COST DEALER
1 LIGHT LUCKY CERAMICS LARGE 3600
2 LIGHT DAIMOND LARGE 4500
3 LIGHT KARAM LARGE 5500
4 LIGHT LUCKY CERMAICS LARGE 4000
5 LIGHT DAIMOND LARGE 8500
6 LIGHT KARAM LARGE 7500
7 LIGHT LUCKY CERMAICS LARGE 4200
8 LIGHT DAIMOND LARGE 8600
9 LIGHT KARAM LARGE 7300
16 | P a g e
WC
S NO SHADE MAKER SIZE COST DEALER
1 LIGHT LUCKY CERAMIC LARGE 1000 DARK LARGE 1400
2 LIGHT MASTER LARGE 3000 DARK LARGE 3500
3 LIGHT AL KARAM LARGE 2000 DARK LARGE 2200
4 LIGHT LUCKY CERAMIC LARGE 1050 DARK LARGE 1350
5 LIGHT MASTER LARGE 2600 DARK LARGE 2900
6 LIGHT AL KARAM LARGE 1850 DARK LARGE 2150
7 LIGHT LUCKY CERAMIC LARGE 1150 DARK LARGE 1350
8 LIGHT MASTER LARGE 2700
DARK LARGE 3100 9 LIGHT AL KARAM LARGE 1950 DARK LARGE 2200
17 | P a g e
TILES
MARBLE
S NO ITEM MAKER UNIT COST DEALER
FLOOR 1 16x16 KAMRAN m² 550
2 16x16 SONEX m² 750
3 16x16 ALKARAM m² 900 WALL
4 8x12 KAMRAN m² 550 5 8x12 SONEX m² 600
6 8x12 ALKARAM m² 720
FLOOR 7 16x16 KAMRAN m² 620
8 16x16 SONEX m² 780 9 16x16 ALKARAM m² 610 WALL
10 8x12 KAMRAN m² 560 11 8x12 SONIX m² 620 12 8x12 ALKARAM m² 610
FLOOR 7 16x16 KAMRAN m² 550
8 16x16 SONEX m² 820 9 16x16 ALKARAM m² 550
WALL 10 8x12 KAMRAN m² 580 11 8x12 SONIX m² 630 12 8x12 ALKARAM m² 620
S NO ITEM MAKER UNIT COST DEALER
FLOOR 1 MARBLE SUNY GREEN Sq.ft 160
2 MARBLE CHECKU Sq.ft 130
3 MARBLE CANA BROWN Sq.ft 250 4 MARBLE GRANITE Sq.ft 1200
18 | P a g e
ELECTRICAL FITTINGS
19 | P a g e
S NO ITEM MAKER UNIT COST DEALER
1 MAIN SWITCH MILLAT PER PIECE 260
2 DOUBLE BREAKER MILLAT PER PIECE 200
3 DB(12X15) MILLAT PER PIECE 950 4 BREAKER MILLAT PER PIECE 280
5 SWITCH SHEET MILLAT PER PIECE 90 6 MULTIPOWER
SWITCH
MILLAT PER PIECE 90
7 POWER BOARD MILLAT PER PIECE 180
8 SWITCH SHEET MILLAT PER PIECE 30 9 DIMMER MILLAT PER PIECE 80
10 SWITCH MILLAT PER PIECE 15 11 SOCKET MILLAT PER PIECE 20 12 CHANNEL FITTING MILLAT PER Ft 5.5
13 MAIN SWITCH MILLAT PER PIECE 280
14 DOUBLE BREAKER MILLAT PER PIECE 240 15 DB(12X15) MILLAT PER PIECE 980
16 BREAKER MILLAT PER PIECE 250 17 SWITCH SHEET MILLAT PER PIECE 120
18 MULTIPOWER SWITCH MILLAT PER PIECE 100 19 POWER BOARD MILLAT PER PIECE 190 20 SWITCH SHEET MILLAT PER PIECE 40 21 DIMMER MILLAT PER PIECE 80 22 SWITCH MILLAT PER PIECE 15 23 SOCKET MILLAT PER PIECE 20
24 CHANNEL FITTING MILLAT PER Ft 6
25 MAIN SWITCH MILLAT PER PIECE 285
26 DOUBLE BREAKER MILLAT PER PIECE 240 27 DB(12X15) MILLAT PER PIECE 980
28 BREAKER MILLAT PER PIECE 270 29 SWITCH SHEET MILLAT PER PIECE 120 30 MULTIPOWER
SWITCH MILLAT PER PIECE 100
31 POWER BOARD MILLAT PER PIECE 200 32 SWITCH SHEET MILLAT PER PIECE 45 33 DIMMER MILLAT PER PIECE 80 34 SWITCH MILLAT PER PIECE 15 35 SOCKET MILLAT PER PIECE 15 36 CHANNEL FITTING MILLAT PER Ft 6
20 | P a g e
S NO ITEM MAKER UNIT COST DEALER
1 3-29 PAKISTAN CABLES PER COIL 1700
ASHFAQ CABLES PER COIL 880 FAYAZ CABLES PER COIL 1060
2 7-29 PAKISTAN CABLES PER COIL 3630 ASHFAQ CABLES PER COIL 1880
FAYAZ CABLES PER COIL 2400 3 7-36 PAKISTAN CABLES PER COIL 4570
ASHFAQ CABLES PER COIL 2750 FAYAZ CABLES PER COIL 3680
4 7-44 PAKISTAN CABLES PER COIL 6990 ASHFAQ CABLES PER COIL 4300 FAYAZ CABLES PER COIL 5425 PER COIL
5 3-29 PAKISTAN CABLES PER COIL 1850
ASHFAQ CABLES PER COIL 940
FAYAZ CABLES PER COIL 1200 6 7-29 PAKISTAN CABLES PER COIL 3700 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2500
7 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2800 FAYAZ CABLES PER COIL 3750
8 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4400
FAYAZ CABLES PER COIL 5500
9 3-29 PAKISTAN CABLES PER COIL 1750
ASHFAQ CABLES PER COIL 890
FAYAZ CABLES PER COIL 1120 10 7-29 PAKISTAN CABLES PER COIL 3680
ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2450
11 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2770 FAYAZ CABLES PER COIL 3700
12 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4500
FAYAZ CABLES PER COIL 5500
21 | P a g e
PAINTS
22 | P a g e
PAINTS
S NO ITEM MAKER UNIT COST DEALER
1 OIL PAINT BERGER 1 GALLON 1300
BELTA 1 GALLON 1050 ICI 1 GALLON 1700
2 MATT FINISH BERGER 1 GALLON 1950 BELTA 1 GALLON 2000 ICI 1 GALLON 1950
3 WEATHER SHIELD BERGER 1 GALLON 1930 BELTA 1 GALLON 1750 ICI 1 GALLON 1950
4 DISTEMPER BERGER 1 GALLON 720 BELTA 1 GALLON 1100 ICI 1 GALLON 1980
5 PUTTY BERGER BAG(20 KG) 1900
BELTA BAG(20 KG) 1900 ICI BAG(20 KG) 1500
6 OIL PAINT BERGER 1 GALLON 1800
BELTA 1 GALLON 1900 ICI 1 GALLON 1700
7 MATT FINISH BERGER 1 GALLON 1900 BELTA 1 GALLON 1950 ICI 1 GALLON 1800
8 WEATHERSHIELD BERGER 1 GALLON 2200 BELTA 1 GALLON 2100 ICI 1 GALLON 1800
9 DISTEMPER BERGER 1 GALLON 1000
BELTA 1 GALLON 1050 ICI 1 GALLON 800
10 PUTTY BERGER BAG(20 KG) 2400 BELTA BAG(20 KG) 2600
ICI BAG(20 KG) 1400
23 | P a g e
S NO ITEM MAKER UNIT COST DEALER
11 OIL PAINT NELSON 1 GALLON 1750
GOBI 1 GALLON 1950 ICI 1 GALLON 1750
12 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1980
ICI 1 GALLON 1850 13 WEATHER SHIELD NELSON 1 GALLON 2200
GOBI 1 GALLON 1980
ICI 1 GALLON 1850 14 DISTEMPER NELSON 1 GALLON 1100
GOBI 1 GALLON 1070 ICI 1 GALLON 830
15 PUTTY NELSON BAG(20 KG) 2600 GOBI BAG(20 KG) 2720
ICI BAG(20 KG) 1500
24 | P a g e
DOORS, WINDOWS AND WARDROBE
25 | P a g e
DOORS AND WINDOWS
S NO ITEM SIZE UNIT COST DEALER
1 DOORS
SKIN DOOR 3’x7’ Sq.Ft 2520 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3150 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 7350
2 WINDOWS SIMPLE RUNNING Ft 110 FANCY RUNNING Ft 130
3 PANEL CAL RUNNING Ft 185
GOLDEN TEAK RUNNING Ft 250 4 CABINET
LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 750
5 WARDROBE CHIPBOARD Sq.Ft 550 LASANI Sq.Ft 700
6 DOORS
SKIN DOOR 3’x7’ Sq.Ft 2300 SKIN DOOR(CAL) 3’x7’ Sq.Ft 1995
SKIN DOOR(GLASS) 3’x7’ Sq.Ft 18900 7 WINDOWS
SIMPLE RUNNING Ft 95 FANCY RUNNING Ft 110
8 PANEL CAL RUNNING Ft 175
GOLDEN TEAK RUNNING Ft 250 9 CABINET
LASANI Sq.Ft 360
LASANI(GLASS) Sq.Ft 750 10 WARDROBE
CHIPBOARD Sq.Ft 520 LASANI Sq.Ft 675
26 | P a g e
S NO ITEM SIZE UNIT COST DEALER
11 DOORS
SKIN DOOR 3’x7’ Sq.Ft 2200 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3900
SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8400 12 WINDOWS
SIMPLE RUNNING Ft 92 FANCY RUNNING Ft 92>
13 PANEL CAL RUNNING Ft 180 GOLDEN TEAK RUNNING Ft 240
14 CABINET LASANI Sq.Ft 380
LASANI(GLASS) Sq.Ft 730 15 WARDROBE CHIPBOARD Sq.Ft 540 LASANI Sq.Ft 680
27 | P a g e
LABOUR
28 | P a g e
LABOUR
S NO ITEM UNIT COST CONTACT
1 MASON SHAFIQ AHMAD, SOHRAB GOTH,
0332-2584475 SKILLED PER DAY 1200 UNSKILLED PER DAY 600
2 MASON WALI KHAN, WATERPUMP 0300-2545232
SKILLED PER DAY 1100
UNSKILLED PER DAY 600
3 MASON MOLA BUKSH, SAFURA GOTH
0343-2985521 SKILLED PER DAY 1300
UNSKILLED PER DAY 700
4 ELECTRICIAN
Sq Ft 14 MAQSUD, HYDERI 0345-2316903
Sq Ft 11 SHAKEEL, LIAQATABAD 0306-2010420
Sq Ft 13 REHAN, NAZIMABAD 0300-9214169
5 PLUMBER
FOR 120 Sq Yds LUMP SUM 17000 QASIM, GOLIMAAR 0345-2760866
FOR 120 Sq Yds LUMP SUM 20000 ALI RAZA, WATERPUMP 0300-2554100
FOR 120 Sq Yds LUMP SUM 19000 NOOR MUHAMMAD, SAFURA
0342-2705358
6 PAINTER
FOR 120 Sq Yds LUMP SUM 22000 YAMIN KHAN, SAFURA 0346-2773248
FOR 120 Sq Yds LUMP SUM 25000 SULEMAN , LIAQATABAD 0313-2757653
FOR 120 Sq Yds LUMP SUM 18500 ABDULLAH, WATERPUMP 0312- 2130742
1 CARPENTER WAQAS AHMED 0302-2894639 SKILLED PER Sq.ft 250