Upload
jemmajemmajemma
View
168
Download
0
Tags:
Embed Size (px)
Citation preview
The cast and crew:
9 am: All cast and crew met outside the kings theatre with all required props and equipment.
9:10 am: We then went inside to be greeted by our guide for the morning, safety briefing and cast and crew briefing. We went through our ideas and showed our storyboards and scripts to the theatre guide so we could establish a plan for the morning.
9:30: The theatre guide then took us on a tour so we could find rooms and corridors suitable for filming in and so we could finalize our plans for the morning.
10 am: tour and briefing completed. We head to the first part of the theatre for filming.
10 am – 12 pm (Filming taking place) Photos used as evidence of filming taking place can be seen in the next slides. We took these images to document us filming and our time at the kings theatre.
12 pm: Our allocated filming time is up. We head to the main stage to take still photos.
1 pm: We leave the theatre. Filming completed.