4
Curriculum Vitae Personal details : Name & Surname: FRANJO TOMLJENOVIC FROSIO Inspector Level III, Certificate No. 6379 Address: Branimira Markovica 11, 51000 RIJEKA, Croatia E-mail : [email protected] Visit my below web page and see all about me and my jobs: Web Page: http:/franjotomljenovic.wix.com/qualityservice Tel. (mobile): +385 91 723 3186 (Croatia) Tel. (private): +385 51 673 592 Skype: franjo.tomljenovic Nationality: Croatia Marital status: Married Date of birth : 26.01.1957 Education : 01.12.2011 12.12.2011 TWI Training & Examination Service, TWI Ltd. Course in Cambridge CB21 6AL, United Kingdom - Certificate of Registration for requirements CSWIP-WI-1-91 - Registered Visual Welding Inspector 01.07.2011 Passing the FROSIO-examination successfully, FROSIO Inspector Level III, Certificate No. 6379 20.06.2011 - 01.07.2011 HEMPEL Academy - Course in Umag, Croatia for FROSIO - Pre-Certification Course 31.03.2010 JPCL SSPC Webinar Education Series, Certificate of Participation Preparing a Coatings Inspection Plan 08.06.2009 International Paint (Korea) Ltd., in SHI (Samsung Heavy Industry), South Korea, Course of Application CHARTEK - Fireproofing Systems Applicator Certificate No.1341178. 13.02.2009 ABS Academy Korea, in Busan, South Korea, Course of Practical Implementation of IMO PSPC regulations 03.2004 - 04.2004 HODGE CLEMCO Training Center, Sheffield in United Kingdom, Certification for Blasting & Painting 02.1995 - 03.1995 QC Training Center ex. Ameron now paint manufactures PPG, in Geldermalsen, The Netherlands 09.1971 - 06.1976 Shipbuilding technician, Shipbuilding Technical School Center RIJEKA, CROATIA (Maritime/Offshore Subjects High school) (Average grade: SSS) I working in Corrosion protection more than 35 years and familiar with all international standards and recommendation (ISO, SSPC and Practical Implementation of IMO PSPC regulations) Positions: 01.2012 PRESENT PAINTING SUPERINTENDENT, for company SEAQUEST Marine Project Management Ltd. Managed of Project PMI, corrosion protection of 6 (sixth) vessels PRODUCT CARRIERS of 50.000 DWT, with PSPC regulation in Water Ballast Tanks in shipyard SPP Shipbuilding, Goseong-gun South Korea, 04.2010 10.2011 LEAD PAINT SUPERVISOR, for ship-owners OLTMANN / DOHLE, Hamburg, Germany Managed corrosion protection of 6 (sixth) vessels BULK CARRIERS of 57000 DWT, with PSPC regulation in Water Ballast Tanks in shipyard HANTONG SHIP HEAVY INDUSTRY Co. Ltd., JIANGSU, NANTONG, CHINA, 11.2008 - 03.2010 PAINT SUPERVISOR, For ship-owner, PRENUDA SpA - Genoa Italy Managed corrosive protection of (2) two vessels PRODUCT CARRIER, Project HN1737 & HN1900 in shipbuilding Samsung Heavy Industry (SHI) in South Korea, Geoje. Each vessel it's have 75.000 m2 of COT (Cargo Oil Tanks) and protecting with 2 x F/C (full coat) of Sigmaguad 720 Grey, Epoxy coat, each of 125 microns DFT (Dry Film Thickness). My contract and Project of two vessels is finish 9th March 2010

CV Franjo Tomljenovic

Embed Size (px)

Citation preview

Page 1: CV Franjo Tomljenovic

Curriculum Vitae Personal details:

Name & Surname: FRANJO TOMLJENOVIC FROSIO Inspector Level III, Certificate No. 6379 Address: Branimira Markovica 11, 51000 RIJEKA, Croatia

E-mail : [email protected]

Visit my below web page and see all about me and my jobs: Web Page: http:/franjotomljenovic.wix.com/qualityservice

Tel. (mobile): +385 91 723 3186 (Croatia) Tel. (private): +385 51 673 592 Skype: franjo.tomljenovic

Nationality: Croatia Marital status: Married Date of birth : 26.01.1957

Education:

01.12.2011 – 12.12.2011

TWI Training & Examination Service, TWI Ltd. Course in Cambridge CB21 6AL, United Kingdom - Certificate of Registration for requirements CSWIP-WI-1-91 - Registered Visual Welding Inspector

01.07.2011 Passing the FROSIO-examination successfully, FROSIO Inspector Level III, Certificate No. 6379

20.06.2011 - 01.07.2011 HEMPEL Academy - Course in Umag, Croatia for FROSIO - Pre-Certification Course

31.03.2010 JPCL – SSPC – Webinar Education Series, Certificate of Participation – Preparing a Coatings Inspection Plan

08.06.2009 International Paint (Korea) Ltd., in SHI (Samsung Heavy Industry), South Korea, Course of Application CHARTEK - Fireproofing Systems – Applicator Certificate No.1341178.

13.02.2009 ABS Academy Korea, in Busan, South Korea, Course of Practical Implementation of IMO PSPC regulations

03.2004 - 04.2004 HODGE CLEMCO Training Center, Sheffield in United Kingdom, Certification for Blasting & Painting

02.1995 - 03.1995 QC Training Center ex. Ameron now paint manufactures PPG, in Geldermalsen, The Netherlands

09.1971 - 06.1976 Shipbuilding technician, Shipbuilding Technical School Center – RIJEKA, CROATIA (Maritime/Offshore Subjects – High school) (Average grade: SSS)

I working in Corrosion protection more than 35 years and familiar with all international standards and recommendation (ISO, SSPC and Practical Implementation of IMO PSPC regulations)

Positions:

01.2012 – PRESENT PAINTING SUPERINTENDENT, for company SEAQUEST Marine Project Management Ltd. Managed of Project PMI, corrosion protection of 6 (sixth) vessels PRODUCT CARRIERS of 50.000 DWT, with PSPC regulation in Water Ballast Tanks in shipyard SPP Shipbuilding, Goseong-gun South Korea,

04.2010 – 10.2011 LEAD PAINT SUPERVISOR, for ship-owners OLTMANN / DOHLE, Hamburg, Germany Managed corrosion protection of 6 (sixth) vessels BULK CARRIERS of 57000 DWT, with PSPC regulation in Water Ballast Tanks in shipyard HANTONG SHIP HEAVY INDUSTRY Co. Ltd., JIANGSU, NANTONG, CHINA,

11.2008 - 03.2010 PAINT SUPERVISOR, For ship-owner, PRENUDA SpA - Genoa – Italy Managed corrosive protection of (2) two vessels PRODUCT CARRIER, Project HN1737 & HN1900 in shipbuilding Samsung Heavy Industry (SHI) in South Korea, Geoje. Each vessel it's have 75.000 m2 of COT (Cargo Oil Tanks) and protecting with 2 x F/C (full coat) of Sigmaguad 720 Grey, Epoxy coat, each of 125 microns DFT (Dry Film Thickness). My contract and Project of two vessels is finish 9th March 2010

Page 2: CV Franjo Tomljenovic

01.2005 - 10.2008

PAINT SUPERVISOR in corrosion protection company TERI-CROTEK Rijeka, Croatia Managed all jobs in site for shipyard 3. MAJ Rijeka, Croatia. Specially for CHEMICAL TANK COATING, Closed blasting/painting workshop and equipment in various tips of vessels.

01.2006 - 01.2007 PAINT ADVISER, For paint manufacture company PPG in the Netherlands ex. AMERON Year 2006 and 2007, company PPG (ex. Ameron) employed me for assist and advising in:

- Uzbekistan - painters and blasters of local company Neftgazkipavtomatika to corrosion protection for Aviation Fuel Tanks inside and outside and application lining system Amercoat 2209 the bottom of the tanks for Uzbekistan Airways in airport Tashkent & Samarkand. - Russia – Project: Domodedovo International Airport – Moscow, Corrosion protection of steel construction of new airport HALL in company ENERGOMASH – Belgorod, painting with PSX 700 siloxane-epoxy coating 165.000 m2.

- Belarrusia – Visit the BELARUSKALI Complex in Soligorsk, is producing on the base of Starobinskij ore mine of potassium chloride. It is located 130 km southerly from Minsk. - Gas pipeline 17 km long and 20" dia. blasting and painting with final coat Amercoat 450 - Steel construction of the New Mine SU-105 above ground, blasting and painting with Amercoat 236 - Portal CRANE (Kratcer) inside in hall for storage the SALT, blasting and painting with Amercoat 236 - Horizontal MIXERS inside and outside, give application system for protecting.

- Lithuania – Project: Oil Tank No. RZ-23 – 50.000 m3, in AB Mazeikiu Refinery - Juodeikiai, Blasting and painting outside and inside and make a laminate on bottom of the tank with laminate system Amercoat 2209

01.2002 - 12.2004 PAINT SUPERVISOR in corrosion protection company TERI-CROTEK Rijeka, Croatia Managed Project of the 6 vessels of CHEMICAL TANKERS in site shipyard BRODOTROGIR Trogir, Croatia

06.2001 - 12.2001 MANAGER FOR RUSSIAN REGION, for company TERI-CROTEK Rijeka, Croatia Subcontractor of company AMERCO-International Responsible for coordination of work and going a ride work corrosive protections crude oil tanks inside and outside and settings up LINING on the bottom of tank inside with Amercoat 2209 – AMERON in the Russia on work sites PRIMORSK- KIRIŠI- YAROSLAV with total 150 workers in all three work sites.

06.1996 - 06.2001 JOB SCHEDULER, for all company TERI-CROTEK Rijeka, Croatia Managed negotiation with shipyards for corrosion protection, calculated the prices, planning jobs and production according to all work sites in company ( 5 sites, with total 450 workers)

03.1992 - 05.1996 PAINT SUPERVISOR, for company MONTMONTAZA Libyan Branch, Zagreb, Croatia (SITES in LYBIA) Managed the projects : LPG – Floating storage and pipelines in Main Jetty in place of Mars el Brega in Libya, Tank for Crude Oil T-2 in place Raguba (desert site 500 km to coast) in Libya and other painting work according to contract for company Sirte Oil Company in place Marsa el Brega in Libya. Also working according to contracts for company Rasco Gas and Oil Processing Industry in place moldboard Ras Lanuf in Libya

01.1986 - 03.1992 MANAGER for technical preparation and maintenance of equipment, in corrosion protection company JADRANKOLOR, Rijeka, Croatia Managed maintenance of all equipment with which go out work corrosion protection on work sites to: Shipyards in new building: 3. MAJ Rijeka, ULJANIK Pula, TROGIR Trogir, BRODOSPLIT Split Repair shipyards: VIKTOR LENAC Rijeka, KRALJEVICA Kraljevica Sites in Energy & Oil Complex : Refinery INA Rijeka - Croatia, DINA Petrochemical Complex, JANAF Oil complex in island KRK

01.1985 - 01.1986 PAINT SUPERVISOR, in corrosion protection company JADRANKOLOR, Rijeka, Croatia

subcontractor company MONTMONTAZA Institute of Welding –Zagreb, Croatia (SITES in LYBIA) Managed the QC Corrosion Protection of the Project Industial blasting and painting facilities in ZELTEN in Libya (Fields: Nasser (Zelten), Hateiba, Lehib (Dor Marada), Jebel, Raguba, Wadi, Ralah, Meghil, Sorrah) for enterprise Sirte Oil Company out of Marsa el Brega in Libya. (125,000 m2, with 50 employees)

11.1982 - 01.1985 COMERCIAL MANAGER, for company JADRANKOLOR, Rijeka, Croatia Managed technical preparation, planning and analysis for corrosion protection and also calculation price for bids, entering agreement with clients - shipyards for job of corrosion protection.

08.1976 - 10.1982 MAIN FORMAN, for company JADRANKOLOR, Rijeka, Croatia In shipbuilding 3.MAJ working for subcontractor company JADRANKOLOR Rijeka, Croatia. Managed all corrosive protection job on site ( 6 foreman’s and 250 workers on the site)

Page 3: CV Franjo Tomljenovic

Projects:

01.2012. - PRESENT Project PMI, for corrosion protection of 6 (sixth) vessels PRODUCT CARRIERS of 50.000 DWT SEAQUEST Marine Project Management Ltd. in shipyard SPP Shipbuilding, Goseong, South Korea

04.2010. - 10.2011 Project PD of 6 vessels Bulk Carriers of 57000 DWT for Oltmann / Dhole, Germany Shipping Companies In shipyard HANTONG SHIP HEAVY INDUSTRY Co. Ltd., JIANGSU, NANTONG, CHINA

11.2008 - 03.2010 Project Product Carriers HN1737 & HN1900, company : Premuda SpA - Genoa - Italy. Inspection Corrosive protection of (2) two vessels PRODUCT CARRIER Each vessel it's have 75.000 m2 of COT (Cargo Tanks) and protecting with 2 x F/C (full coat) of Sigmaguad 720 Grey, Epoxy coat, each of 125 microns DFT (Dry Film Thickness) In shipbuilding Samsung Heavy Industry (SHI) in Geoje, South Korea

01.2005 - 10.2008 Projects in Shipyard 3. MAJ Rijeka, Croatia, for company TERI-CROTEK Rijeka, Croatia. Specially for TANK COATING, closed blasting/painting workshop and equipment in various tips of vessels and Projects 01.2002 - 12.2004 Project of the 6 vessels of CHEMICAL TANKERS in site shipyard BRODOTROGIR, TERI-CROTEK Rijeka, Croatia In mentioned period protecting vessels with paint for different owners, in places and on surfaces of Ballast Tanks about 220.000 m2, Chemical Tanks about 85.000 m2. 06.2001 - 12.2001 Project in sites PRIMORSK- KIRIŠI- YAROSLAV in Russia, TERI-CROTEK Rijeka, Croatia Subcontractor of company AMERCO-International. Managed coordination of work and going a ride work corrosive protections and settings up LINING on the bottom of tank inside with Amercoat 2209 – AMERON in the Russia on work sites PRIMORSK- KIRIŠI- YAROSLAV with total 150 workers in all three work sites. 35.000 m2 of LINING.

03.1992 - 05.1996 In place of Mars el Brega in LIBYA, MONTMONTAZA Libyan Branch, Zagreb, Croatia Managed the projects : LPG – Floating storage and pipelines in Main Jetty in place of Mars el Brega in Libya, Tank for Crude Oil T-2 in place Raguba (desert site 500 km to coast) in Libya and other work according to contract for company Sirte Oil Company in place Marsa el Brega in Libya. Also working according to contracts for company RASCO Gas and Oil Processing Industry in place moldboard Ras Lanuf in Libya (RASCO - 2nd Acetylene Plant in the world)

01.1985 - 01.1986 QC Corrosion Protection of the Project Industrial blasting and painting facilities in ZELTEN (Zaltan) in Libya, for enterprise Sirte Oil Company out of Marsa el Brega in Libya. (125,000 m2, with 50 employees) (ZELTEN - 3rd Gas Plant in the world)

Language: English Oral: Good Written: Good Russian Oral: Good Written: Good

References:

Mr. John Melhuish SITE MANAGER for Project PMI, in shipyard SPP Shipbuilding, Goseong, South Korea SEAQUEST Marine Project Management Ltd. Contact info: +82 1031764387 (Korea)

E-mail: [email protected] Cap. Vladimir Babic SITE MANAGER in shipyard Hantong Ship Heavy Industry Co. Ltd., Jiangsu, Nantong, China OLTMANN / DHOLE COMPANY, Hamburg, Germany. Contact info: +86 13773643928 (CHINA), Contact info: +385 98 403698 (CROATIA) E-mail: [email protected] Vannuccio Foglino SITE MANAGER in Samsung Heavy Industries(SHI) in Geoje, South Korea PREMUDA Spa, Genoa, Italy. Contact info: +39 335 7761395, E-mail: [email protected]

Page 4: CV Franjo Tomljenovic

Ideal job: Painting Inspection/Supervisor in Shipbuilding (new or repair vessels), Oil & Gas processing systems,

Location: Any location in the world

Description of location: YARD - FIELD

Type of job: Full time, Contract (Freelancer)

Travel & relocation: YES

My Byword: RUST NEVER SLEEPS