McKenney’s completed a turnkey build-out of HVAC systems for three linear accelerator vaults at a Georgia medical center.
Citation preview
Project NameGeorgia Medical Facility
Project LocationRome, Georgia
Project TeamOwner: Medical FacilityGeneral Contractor: Brasfield& Gorrie
Healthcare
Specializations
Markets
Architect: Peacock Architects
Engineer: Minick Engineering, Inc.
Sheet Metal Shop Prefab
Contractor: McKenney’s, Inc.
Science & Technology
McKenney’s completed a turnkey build-out of HVAC systems for three linear accelerator vaults at a Georgia medical center.
The ChallengeThis was an atypical HVAC project—supporting the installation of a mix of two new and one existing high tech linear accelerators with dedicated air cooled chillers in a medical facility. In addition to installing HVAC piping components for the new accelerators, McKenney’s had to reconnect an existing chiller to an existing accelerator being relocated from another facility without disrupting the medical clinic’s operations.
The content of this document is not intended as an endorsement.
The SolutionMcKenney’s conducted multiple coordination meetings with the entire construction team, resulting in all the trades working together toensure quick installation. To minimize downtime on the existing accelerator, both the chiller and accelerator were relocated—and all re-piping was completed—during a single weekend.
The ResultsMcKenney’s completed the job on time and on budget. The team also avoided any downtime during customary operating hours by relocating the existing accelerator and chiller on a Friday and working diligently have it back up and running the following Monday.