15
Project Overview Coastal Fars Gas Fields 3 CPTDC Land Rigs, 2 Year Technical Base @ Tehran Operational Base @ Lamerd 5 producers 30 producers + 1 workover 10 producers + 1 workover

Tabnak Drilling Management

Embed Size (px)

Citation preview

Project Overview

Coastal Fars Gas Fields

• 3 CPTDC Land Rigs, 2 Year

•Technical Base @ Tehran

• Operational Base @ Lamerd

5 producers

30 producers + 1 workover

10 producers+ 1 workover

Project Coordination

NIOC-PEDECGas Fields Development Plan

KEPSProject Management

ServicesRBT

CONSORTIUMCPTS

CPTDCMJF/BMC

Drilling and all relatedServices

3Rigs

GAS FIELD DEVELOPMENT PLANPROJECT MANAGEMENT SERVICES

PROVIDED BY KEPS/RBT:• GEOLOGY• DRILLING• LOGISTICS• INFORMATION TECHNOLOGY

Project Overview

Geology

Surface outcrop map and reservoir structural map supplied by PEDEC (NIOC)

Cross-sections produced by KEPS/RBT Geologist’s

Stratigraphic columns produced using cross-sections and offset data.

- 13 0 0 m .

- 14 0 0 m .

-1 5 0 0 m .

-1 6 0 0 m .

- 17 0 0m .

-1 8 00 m .

- 1 90 0m . - 2 0 0 0 m .

-1 7 0 0 m .

- 1 6 0 0 m .

- 1 5 0 0 m .

- 1 0 0 0 m .

- 1 5 0 0 m .

-2 0 0 0 m .

-1 50 0 m .

- 1 5 00 m .

- 2 0 00 m .

- 1 5 0 0 m .

- 2 00 0 m .

- 2 0 0 0 m .

- 1 2 9 0m .

TB K - W 1 4 0 N

G L E = 11 2 0

2 ,285, 000

2, 290, 000

615 ,0 00

2, 295, 00 0

2, 275, 000

6 20,0 00

2, 270, 000

630 ,00 0

2,2 65,0 00

2,300 ,000 2,305, 000

2, 310, 000

2 ,315, 000

2, 320 ,00 0

2 ,3 25,0 00

2, 330, 0002,33 5,00 0

62 5,0 00

610 ,00 060 5,00 0

600 ,00 0590 ,00 0

CH AH M U BA R A K

GAV BA ND I

T B K- 1

TBK-1

DATA

ALL DEPTHS MEASURED FROM RTE

DRAWING NOT TO SCALE

GROUND LEVEL AT 1114m ABOVE SEA LEVEL

30in CASING AT 184m36in HOLE TO 187m(TOP OF ASMARI FORMATION)

9.625in CASING AT 2450m12.25in HOLE TO 2455m(DASHTAK FORMATION,ABOVE BLUE ZONE)

20in CASING AT 890m26in HOLE TO 893m(BASE OF ILAM / TOP OF LAFFAN FORMATION)13.375in CASING AT 1035m17.5in HOLE TO 1040m(TOP OF DARIYAN FORMATION)

7in LINER AT 2700m8.5in HOLE TO 2705m(TOP OF KANGANFORMATION)

5in LINER AT 3185m6in HOLE TO 3185m(NAR MEMBER)

CEMENTING OF CASING STRINGSWILL BE VIA CONVENTIONAL ANDTOP-UP METHODS

TOP OF 7in LINERAT 2330m

TOP OF 5in LINERAT 2580m

TD AT 3185m

Drilling

Problematic shale

Salt water flow zone

Loss zone

Based on the stratigraphic column andoffset data a preliminary well design

is produced.

Peer review conducted to analyse and refine the design.

Well hazard assessment conducted with the aim of identifying all

potential hazards and establishing control/mitigating measures.

Well design finalised and Drilling Programs produced.

Performance monitoring KPI’s established.

PLA

NN

ING

PLA

NN

ING

OPE

RA

TIO

NS

OPE

RA

TIO

NS

Drilling

CO

MPL

ETED

WEL

LC

OM

PLET

ED W

ELL

SUB SURFACE SAFETY VALVE

7in TUBING

4.5in TUBINGCROSSOVER

7in PACKER

SLIDING SLEEVE

LANDING NIPPLE

RE-ENTRY GUIDE

GAS

TUBINGHANGER• Wells will be drilled in accordance with the

Drilling Programs. Modifications to well designs and procedures can only be made with the approval of the Drilling Manager.

• Drilling performance will be closely monitored at the rigsite and in Tehran.

• Regular discussions between the rig and Tehran will aim at optimising operations and maintaining a high safety standard.

• Data will be transmitted from the rigsite to Tehran on electronic format. Other packages will be used to monitor performance and assist in planning future wells.

• Upon completion of the drilling phase the well will be tested and completed as per the Completion Program.

CLO

SE-O

UT

CLO

SE-O

UT

Review meeting conducted to capture “learnings” from the well for application

to subsequent wells.

Planned KPI’s compared to actual KPI’s for assessment

of performance.

Well Completion Report produced detailing all aspects

of operations to assist in planning future wells

Drilling

WEL

L ST

YLES

WEL

L ST

YLES

VERTICAL DIRECTIONAL

Logistics

The Procurement Departments main tasks are as follows:

1. Check the quality and specification of material and equipment on behalf of PEDEC.2. Check the status and condition of access roads and operational sites.3. Co-ordinate the movement of personnel between the various sites.4. Inspect the disposal of waste material as per the HSE guidelines of the project.

Logistics

+/-1200km

LAMERD

LOCATION MAP

Logistics

Office

Bedrooms

Shelter for heavy trucks

Cement Barite&Bento Mud materials

Bits

Testing

Store Store Store Store Store Store

Tools Repair shop

Area for rig equipment

Dining room

Cement silo area

Racks for different sizes DP,DC,Casing & TBG

Power generator

X-Trees

LAMERD BASE

•Support the communication systems for the drilling operation•Manage technical databases and reporting systems for client and management•Build flexible systems and networks that can quickly grow or be re-configurated•Ensure complete system and data security at all times

Technical Computing Environment

RigSite to OfficeCommunications Plan

•Direct telephone communications between rigsites and ‘the world’

•Internet access for email

•Security managed by specialist IT company

•Drilling reporting application uses email

Wide Area Network (Tehran)

•Master database and web server is housed at ISP’s office

•Database is replicated in PEDEC and KEPS offices•Archived Data stored at PEDEC office

•Latest reports available to client and partners on the web

Office Computer Network

•High speed point to point networking

•Integration of telephone and computer networks

•Can quickly re-configure and segment for new projects

•Fully maintained and supported by local IT company

Web-Based Reporting System

•Provides client and partners with immediate access to latest project results

•Password-controlled access for security

•Locally sourced skills and resources