Steps in installation of gutters
http://thelegendgs.com.au/gutter-replacement-sydney/
Gutter system
• A correctly installed gutter system will increase the efficiency of water transfer from roof to drainage system.
• This helps to maintain house structure by eliminating problems often caused by leaking or badly positioned gutters.
• Rainwater is usually directed underground, but it can be recycled. This can be done by collecting it in a rain barrel positioned below a gutter downspout, or with a system of water recycling for use in the household plumbing system.
#Step1
• Installation is simple, methodical process, but the technique will vary slightly depending on the gutter type.
• Plan thoroughly the layout and component needed.
• In most cases it will simply be a case of replacing like with like, so it may be worth making a sketch of how the components of the old system are arranged.
• Familiarize yourself with how to assemble the joints used with your system.
#Step2
• Calculate and purchase the total length of the gutter needed ,as well the correct number of necessary downspouts and attachment brackets.
• Rain water gutter should be attached to the fascia and run the entire length of the roof, ending with a downspout .
• If a gutter run will measure longer than 40 feet ,the gutter should be positioned to pitch down from the middle, aimed toward a downspout at each end.
#Step3
• Measure the snap layout line using a chalk line.
• Locate the starting point, or highest point, of the gutter run.
• Mark the point on the fascia, 1.25 inches (3.2 cm) below the roof flashing.
• Locate the ending point, or the downspout location, of the gutter run.
#Step4
• Cut the gutter to size .
• Use a hacksaw, or heavy duty tin snips to cut the gutter at the appropriate
measurement.
#Step5
• Brackets will either snap onto the gutters or will be mounted into the face board first, depending on the type of gutters you purchase.
• Review the manufacturer's recommendations for your type of gutter.
#Step6
• Mark the location for the downspout opening on the gutter.
• Use a jigsaw to cut a square opening at the appropriate place in the gutter.
#Step7
• Attach the downspout connector and end cap to the gutter using silicone sealant and short metal screws.
• An end cap should be used on any open-ended run of gutter.
#Step8
• Mount the gutters, the bracket should be mounted to the face board every 18-24 inches.
• Use the stainless steel lag screw long enough to penetrate the face board at least 2 inches (5.1 cm).
#Step9
• Attach the downspout to the gutters via the downspout connector.
• Make sure the tapered end of the downspout is facing down and aimed in the appropriate direction.
#Step10
• Seal the gutter connection seams with a heavy bead of sealant and allow it to dry overnight.
• There are many gutter replacement company in Sydney will help you to choose the best gutter for the home with better installation .
• To know more details about gutter service, gutter Replacement visit http://thelegendgs.com.au/gutter-replacement-sydney/