Upload
neil-bolton
View
41
Download
1
Embed Size (px)
Citation preview
Outer Wall Sleeve
PV and PVD Pictorial Fitting Instructions
PV and PVD kit arrives in a box with all
the items required for fitting
Middle Wall Sleeve
PV Vent
Fixing Kit
Safety Label
Fitting Instructions
Mark Hole Size using the Middle
wall sleeve.
Insert Outer Wall Sleeve in tohole from outside the risk
Cut Hole in wall to localbuilding regulations
1 – Fitting the wall sleeve from outside the risk
1
2
Mark drill hole through the Outer WallSleeve
Remove the Outer Wall Sleeve and finishdrilling the fixing holes using a 6mm Masonry
Drill
Push Raw Plugs into holes
Refit Outer Wall Sleeve and using thescrews and white screw caps in the fixing
kit secure the vent to the wall
DO NOT OVER TIGHTEN THE SCREWS
3
Tighten screws and close screw caps
The outer wall sleeve is nowcorrectly fitted and you can move
inside the risk.
2 - Installation from inside the protected risk
The same process is repeated with the internal pressure vent.
From inside the room slide the pressure vent into
the opening in the wall with the label at the top.
4
Mark the screw holes
Drill the wall. Remove the vent andcomplete the drilling process
Fit the raw plugs into the wall
Refit the vent into the wall with the label ontop of the vent as shown.
Using the screws and white screw capsfix the vent to the wall.
DO NOT OVER TIGHTEN THE SCREWS.
5
If you have any installation questions please call us on 0044 1732652025
Close the white screw caps and the vent isfitted.
Test that the vent blade opens and closedfreely. Simply push the blade open with
your hand and let it fall closed.
Finally stick the safety labels to bothsides of the vent and the vent is fitted
correctly.