SIGNIFICANT IMPROVEMENTSON PREPAREDNESS TO OIL & HNS POLLUTION IN TURKEY
Mr. Burak AYKANAssistant Maritime Expert
Republic of TurkeyMinistry of Transport, Maritime Affairs
and Communications
2
R E S P O N S E T O O I L & H N S
CONTENTS
• FEASIBILITY STUDY• SUB‐NATIONAL CENTER• NATIONAL CENTER• STOCKPILES• OIL SPILL TRAJECTORY• OIL SPILL DETECTION
3
F E A S I B I L I T Y S T U D Y
4
ANTALYA
SUB‐NATIONAL RESPONSE CENTER
E M E R G E N C Y R E S P O N S E C E N T E R S
5
THE SUB‐NATIONAL CENTER IS CURRENTLY UNDER CONSTRUCTION.
E M E R G E N C Y R E S P O N S E C E N T E R S
6
TEKİRDAĞ
ANTALYA
NATIONAL CENTER OF EMERGENCY RESPONSE AND MARITIME SAFETY
E M E R G E N C Y R E S P O N S E C E N T E R S
7
E M E R G E N C Y R E S P O N S E C E N T E R S
8
E M E R G E N C Y R E S P O N S E C E N T E R S
9
THERE WAS A LORAN‐C RADIO STATION UNTIL 1990.
E M E R G E N C Y R E S P O N S E C E N T E R S
10
E M E R G E N C Y R E S P O N S E C E N T E R S
11
MAIN BUILDING
TRAINING BASIN
HANGAR
GUEST HOUSE
DWELLING HOUSES
LABORATORY
E M E R G E N C Y R E S P O N S E C E N T E R S
12
OFFICE BLOCK OPEN OFFICE FLOOR
CONFERENCE ENTRANCE
CAFETERIA
SEMINAR ROOM BLOCK
CIRCULATION BLOCK
E M E R G E N C Y R E S P O N S E C E N T E R S
13
CONFERENCE HALL
CRISIS MANAGEMENT
BLOCK
MAIN CIRCULATION
BLOCK
LABORATORY
E M E R G E N C Y R E S P O N S E C E N T E R S
14
E M E R G E N C Y R E S P O N S E C E N T E R S
BACK VIEW OF PREMISE
15
ARTIFICIAL SHORELINE
BUILDING OF PREPARATION FOR TRAINING
WAVE GENERATOR & CONTROL ROOM
DECONTAMINATION AREA
E M E R G E N C Y R E S P O N S E C E N T E R S
16
E M E R G E N C Y R E S P O N S E C E N T E R S
17
E M E R G E N C Y R E S P O N S E C E N T E R S
18
E M E R G E N C Y R E S P O N S E C E N T E R S
19
E M E R G E N C Y R E S P O N S E C E N T E R S
20
E M E R G E N C Y R E S P O N S E C E N T E R S
21
E M E R G E N C Y R E S P O N S E C E N T E R S
22
MAIN BUILDING : 12.850 M²LABORATORY : 662 M²HANGAR : 1.836 M²BUILDING OF PREPARATION : 260 M²ENERGY UNIT : 215 M²TRAINING BASIN : 5.229 M²GUEST HOUSE : 6.570 M²DWELLING HOUSE : 2.372 M²
CONSTRUCTION SITE : 29.994 M² PREMISES AREA : 110.000 M²
E M E R G E N C Y R E S P O N S E C E N T E R S
R E S P O N S E C O N T A I N E R S
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
23
24
İSTANBUL STRAIT
ÇANAKKALE
BLACK SEA
TURKEY
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
25
SAMSUN
TEKİRDAĞ
ANTALYA
BLACK SEA
TURKEY
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
MARMARA SEA
26
İZMİT
ALİAĞA
İSKENDERUN
BLACK SEA
TURKEY
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
MARMARA SEA
27
TRABZONK. EREĞLİ
MERSİN
BLACK SEA
TURKEY
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
MARMARA SEA
28
İNEBOLU
FETHIYE ANAMUR
TURGUT REİS
ÇEŞME
BLACK SEA
TURKEY
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
MARMARA SEA
29
HOPA
SAMANDAG
BLACK SEA
TURKEY
İĞNEADA
MARMARA SEA
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
30
TRABZONSAMSUN
İNEBOLU
K. EREĞLİ
İSTANBUL STRAIT
İZMİT
TEKİRDAĞ
ÇANAKKALE STRAIT
ALİAĞA
FETHIYEANTALYA
ANAMURİSKENDERUN
MERSİN
TURGUT REİS
ÇEŞME
İĞNEADA
BLACK SEA
MEDITERRANEAN SEA
AEGEAN SEA
E M E R G E N C Y R E S P O N S E S T O C K P I L E S
HOPA
SAMANDAĞ
EQIUPMENT AND MATERIALS WILL BE SUPPLIED IN 2013.
31
B U D G E T
TOTAL BUDGET (CONSTRUCTION & SUPPLY)65.0 M $ (APPROVED)
USED BUDGET3.3 M $ (FOR FEASIBILITY STUDY)
ALLOCATED BUDGET (TO THE END OF 2012)13.2 M $ (FOR CONSTRUCTION OF CENTERS)
32
O I L S P I L L T R A J E C T O R Y
THERE IS A PROTOCOL BETWEEN MARITIME AFFAIRS AND GENERAL DIRECTORATE OF LAND REGISTRY AND CADASTRE
33
GIS LAYERS
O I L S P I L L T R A J E C T O R Y
34
O I L S P I L D E T E C T I O N B Y X – B A N D R A D A R
SEA SURFACE ROUGHNESS PATTERNS IS OBSERVED WITH LAND BASED X BAND RADAR
35
BAY OF IZMIT VTMIS
OIL SPILL DETECTION
O I L S P I L D E T E C T I O N B Y X – B A N D R A D A R
36
SYSTEM CAPABILITIES• MINIMUM 4 NM • MORE THAN 200 LT• SOUND AND DISPLAY ALARMS• OIL POLLUTION POLYGON• DRIFTING DIRECTION • DRIFTING VELOCITY• WAVE DIRECTION• WAVE HEIGHT• WAVE PERIOD• CURRENT DIRECTION• CURRENT VELOCITY
O I L S P I L D E T E C T I O N B Y X – B A N D R A D A R
37