Karnataka Industrial Policy
2014 -19for
1. It is proposed to promote two industrial areas in the Stateat potential locations such as Hubli/Dharwad andHarohally in Kanakapura taluk for women.
2. Reservation of 5% of plots/sheds in the IndustrialAreas/Estates developed by KIADB/KSSIDC for womenentrepreneurs in all the future Industrial areas/estates.
3. Exclusive cluster for women in Textile, Gem & Jewellery.4. Trained entrepreneurs by CEDOK or recognized training
institutions will be provided with low interest start uploans (with interest subsidy) and flexible repaymentschedule.
5. Attractive incentives and concessions.
Encouragement to Women Entrepreneurs:
2
MSME’s Established during 2009-14 policy
Men
No. of Units: 75,785
Investment
Rs 7,94,474 lakhs.
Employment:5,54,414
Women
No. of Units: 31,023
Investment
Rs 1,10,247 lakhs.
Employment :1,31,719
3
Subsidy released to the units sanctioned in 2009-14 policy
Men
No.of Units 1,125
Amount released in Rs. 5,691.77 lakhs
Women
No of Units 558
Amount released in Rs 2,919.80 lakhs
4
Classification of taluks for Incentives & Concessions
Hyd-Kar region
Zone-1: 20 taluks
Zone-2: 11 taluks
Non Hyd-Kar region
Zone-1: 23 taluks
Zone-2: 51 taluks
Zone-3: 62 taluks
Zone-4: 9 taluks
5
MSMED Act 2006: Investment on Plant and machinery
Medium
Small
Micro
Rs.10 crore
Rs.5 crore
Rs.25 lakh
Rs.5 crore
Rs.2 crore
Rs.10 lakh
Manufacturing Service
6
Super mega
Ultra mega
Mega
Large
Above Rs.1000 crore
Above Rs.500 crore upto Rs.1000 crore
Above Rs.250 crore upto Rs.500 crore
Above Rs.10 crore to Rs. 250 Crore
Classification of Large Scale Industries
Definition of Mega, Ultra Mega & Super MegaInvestment on Fixed Assets
7
1. Investment Subsidy (Rs. In lakhs)
Category Other than Hyd-Kar Area Hyd-Kar Area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
Micro Other
women
% 30% 25% 20% 10% 35% 30%
Max Rs. 18.00 Rs.15.00 Rs. 12.00 Rs. 8.00 Rs.20.00 Rs.18.00
SC/ST
Women
% 35% 30% 25% 15% 40% 35%
Max Rs.20.00 Rs.18.00 Rs.15.00 Rs. 12.00 Rs.22.00 Rs.20.00
Small Other
women
% 25% 20% 15% 10% 30% 25%
Max Rs.45.00 Rs.35.00 Rs.25.00 Rs.10.00 Rs.50.00 Rs.45.00
SC/ST
Women
% 30% 25% 20% 15% 35% 30%
Max Rs.50.00 Rs.40.00 Rs.30.00 Rs.15.00 Rs.55.00 Rs.50.00
Mediu
m
Other
womenMax Rs.55.00 Rs.45.00 Rs.35.00 Rs.20.00 Rs.60.00 Rs.55.00
SC/ST
womenMax Rs.60.00 Rs.50.00 Rs.40.00 Rs.25.00 Rs.65.00 Rs.60.00
Medium :Unit those providing minimum of 25 direct employment8
2 & 3. Stamp Duty Exemption & Concessional Registration Charges
Other than Hyd-Kar Area Hyd-Kar Area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
Stamp duty exemption 100% 100% 100% 75% 100% 100%
Concessional
Registration Charges
Rs. 0.50/
Rs. 1000
Rs. 0.50/
Rs. 1000
Rs. 0.50/
Rs. 1000
Rs. 0.50/
Rs. 1000
Rs. 0.50/
Rs. 1000
Rs. 0.50/
Rs. 1000
4. Reimbursement of Land Conversion FeeOther than Hyd-Kar Area Hyd-Kar Area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
100% 100% 100% 75% 100% 100%
9
5. Exemption From Entry TaxOther than Hyd-Kar Area Hyd-Kar Area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
% 100% 100% 100% NIL 100% 100%
On PM 3 years 3 years 3 years NIL 3 years 3 years
On RM 6 years 6 years 6 years NIL 6 years 6 years
6. Subsidy for Setting up Effluent Treatment Plant (ETP) : Manufacturing MSMEs:
Non HK region HK regionZone-1,2 &3 -75%- Rs.100 lakhs Zone- 1 & 2- 75%- Rs.100 lakhs
Zone-4 – 75% - RS. 50 Lakhs
One time capital subsidy based on the cost of ETPs 10
7. Interest Subsidy (Micro units only)
Rate of
Int sub
Non HK area HK area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
6% 6 Years 5 years 4 years NIL 7 years 6 years
8. Exemption from Tax on Electricity Tariff: Manufacturing MSMEs:
% Non HK area HK area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
100% 7 years 6 years 5 years 4 years 8 years 7 years
11
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)5%- Interest subsidy on loans availed from KSFC & Scheduled commercial banks which are not
covered under CLCSS of GOI.
a. Interest Subsidy on Technology Upgradation Loan:
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
75% of cost ( max. Rs. 1.00 lakh)
b. ISO Series Certification:
9.Technology upgradation, Quality CertificationManufacturing MSMEs:
12
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
50% of fees payable to BIS (max. Rs. 20,000) and 50% of cost (max. Rs. 1,00,000) for purchase
of testing equipments as approved by BIS.
c. BIS Certification:
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
50% of cost (max. Rs. 1.00 lakh)for adopting technology from recognized national laboratories
d. Technology Adoption:
9.Technology upgradation, Quality CertificationManufacturing MSMEs:
13
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
50% of the project cost (max: Rs.75.00 lakh).
e. Technology Business Incubation Center:
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
5% with a ceiling limit of Rs. 15.00 lakh
Additional investment promotion subsidy
f. Recycling of electronic waste and plastic waste:
9.Technology upgradation, Quality CertificationManufacturing MSMEs:
14
Non HK region (Zone 1,2 & 3 only) & HK region (Zone 1 & 2)
Rain water harvesting : 75% of cost of equipment (max. Rs. 1.50 lakh)
Waste water recycling : 75% of cost of equipment (max. Rs. 7.50 lakh)
Zero discharge process: 75% of cost of equipment (max. Rs. 7.50 lakh)
10.Water Harvesting / Conservation Measures: Manufacturing SMEs:
11.Energy Conservation : Manufacturing MSMEsAll Zones
Practicing Energy Conservation measures resulting in reduction of Energy Consumption of at least10% of earlier consumption: 15% of capital cost (max Rs. 7.50 lakh).Use of non-conventional energy sources: 15% of capital cost (max. Rs.7.50 lakh). Subsidy of Rs.0.75 per unit of Captive power generated and consumed through Solar & Wind Energy sourcesonly.
15
Non HK region (Zone 1,2 & 3 only) &
HK region (Zone 1 & 2)
75% of project report preparation cost- Max Rs.2.00 lakhs
Reimbursement of the cost of preparation of project reports up to prepared by
TECSOK and CEDOK required for which bank loans are sanctioned
12. Reimbursement of the cost of preparation of project reports
16
Subsidy Non HK area HK area
Zone 1 Zone 2 Zone 3 Zone 4 Zone 1 Zone 2
% 40% 40% 30% 25% 40% 40%
Max Rs.15.00 Rs.15.00 Rs.25.00 Rs.35.00 Rs.25.00 Rs.20.00
13. Land / Shed allotment by KIADB and KSSIDC at concessional rates for SC/ST women entrepreneurs
• This concession is in addition to theinvestment promotion subsidy provided
17
• This policy is with effect from : 1/10/2014
• Duration: for five years or as revised by the Government.
• Once the new Industrial Policy 2014-19 comes intooperation the Industrial Policy 2009-14 stands withdrawn
• Enterprises which have been sanctioned and have partlyavailed incentives and concessions under earlier policiesshall continue to enjoy those benefits as per respectivesanction orders.
Annexure-3A: TERMS & CONDITIONS FOR SANCTION OF INCENTIVES & CONCESSIONS-2
18
b) The applicability of the Industrial Policy 2009-14 or IndustrialPolicy 2014-19 for the Projects which are under implementation(pipeline projects) at the time of announcement of IndustrialPolicy 2014-19 is decided as follows.
(i) Projects cleared through District level, State Level and State HighLevel Clearance Committee during the 2009-14 Policy period andif they have availed any of the incentives and concessions for theproject as per 2009-14 policy are eligible to avail other incentivesand concessions under 2009-14 policy only.
Annexure-3A: TERMS & CONDITIONS FOR SANCTION OF INCENTIVES & CONCESSIONS-3
19
(ii) If any unit including self financed project has taken any one of the followingeffective steps and the date of any one of these steps is before the date of issue ofGovernment Order of the new industrial policy 2014-19, then the unit shall availincentives as per policy 2009-14 only.
1. Date of entering lease or sale agreement of the premises (either land or building).
2. Date on which possession certificate of the plot or shed is taken from KIADB/KSSIDC orany other agency
3. Date of approval of building plan by competent authority
4. Date of release of first installment of loan from Financial Institution /Bank.
5. Date of placement of first purchase order for plant and machinery.
(iii) If any enterprise has not taken any effective steps, not invested any amount andnot availed any incentives and concessions during the 2009-14 policy period, they shallavail incentives as per Industrial Policy 2014-19 only.
Annexure-3A: TERMS & CONDITIONS FOR SANCTION OF INCENTIVES & CONCESSIONS-4
20
c) The Projects which are under implementation (pipeline projects) at the time ofannouncement of Industrial Policy 2014-19 as explained above shall commencecommercial production before 31/08/2017 failing which their eligibility to availincentives as per Industrial Policy 2009-14 will lapse. They will not be eligible toclaim incentives either under Industrial Policy 2014-19.
d) Incentives and concessions under this policy shall primarily be available only forManufacturing Industries and specified categories of service industries as listed inAnnexure 1
e) The incentives and concessions under this policy will be available to all new andadditional investments made during the policy period for establishment of newenterprises and expansion/ diversification/ modernization (as defined in Annexure5).
h) Enterprises can avail incentives and concessions under only one policy of theIndustries Department.
Annexure-3A: TERMS & CONDITIONS FOR SANCTION OF INCENTIVES & CONCESSIONS-5
21
i) Minimum term loans on eligible fixed assets from FinancialInstitution/Banks required for Investment Promotion Subsidy – 50%
ii) Time frame for claiming Investment Promotion subsidy- within oneyear from the date of commencement of commercial production
j) There is no restriction on the quantum of loan to be availed from thefinancial institutions for availing tax based incentives. Own financedunits are also eligible for tax based incentives.
l) While calculating the value of eligible fixed assets created duringexpansion / diversification / modernization of an enterprise onlyadditional new investments shall be considered. The originalinvestment for which subsidy has already been sanctioned shall not beaccounted.
Annexure-3A: TERMS & CONDITIONS FOR SANCTION OF INCENTIVES & CONCESSIONS-6
22
Directorate of Industries & Commerce
23