Presentation Flow

• Introduction• Video of James P. Womack• Q&A• (45 Minute Takt Time)

EFC – Skyline Church 25/8/2011

Page 3: Introduction to Lean part 1

Introduction

• Christopher Koroly– Project Engineer at Goodrich Aerostructures– Goodrich• With Lean, Goodrich has been able to do:

– Twice as much, with half the space, a third of the resources, in a quarter of the time

EFC – Skyline Church 35/8/2011

Page 4: Introduction to Lean part 1

Womack Presentation

• http://www.lean.org/whatslean/

EFC – Skyline Church 45/8/2011

Page 5: Introduction to Lean part 1

Lean topics and tools to touch on

• Value Added vs. Non Value Add Activities• 7 Types of Waste• Process Mapping• 5S

EFC – Skyline Church 55/8/2011

Page 6: Introduction to Lean part 1

Value Added Activity

• What is Value Add?– Customer acknowledges the value and– Part/raw material/information is transformed or

shaped to meet customer requirements and– Done right the first time

EFC – Skyline Church 65/8/2011

Page 7: Introduction to Lean part 1

Non-value Added Activity

• What is Non-Value Added Activity? (waste)– Customer is not willing to pay for it or– Takes time/resources/space but does not add

value or– Not done right the first time

EFC – Skyline Church 75/8/2011

Page 8: Introduction to Lean part 1

7 Types of Waste

• Inventory• Overproduction• Transportation• Over-processing• Defects• Waiting• Motion

EFC – Skyline Church 85/8/2011

Page 9: Introduction to Lean part 1

Process Mapping

• Visually mapping the actual steps required to deliver a product or perform a service.– Document reality not how it’s supposed to be– Each step is shown and clearly identified

EFC – Skyline Church 95/8/2011

Page 10: Introduction to Lean part 1

Process Map Elements

• Tasks and activities• Decision points• Work in process• Sequence• Loops• Travel/distance• Yield/Scrap

EFC – Skyline Church 105/8/2011

Page 11: Introduction to Lean part 1

5S

• A workplace methodology in which the 5S stands for:– Sort– Straightening– Shine– Standardize– Sustain– (Safety)

EFC – Skyline Church 115/8/2011

Page 12: Introduction to Lean part 1

Intro to Lean – Part 1

• Q&A

EFC – Skyline Church 125/8/2011

Page 13: Introduction to Lean part 1

Intro to Lean – Part 1

• Further Reading– What is Lean? Article– Around Aerostructures Article on Training for City

of Chula Vista

– Lean Thinking by James P. Womack and Taniel T. Jones

EFC – Skyline Church 135/8/2011

Page 14: Introduction to Lean part 1

Intro to Lean – Part 1

• Additional Further Reading– The Toyota Way by Jeffrey K. Liker

EFC – Skyline Church 145/8/2011