Upload
-
View
273
Download
3
Tags:
Embed Size (px)
Citation preview
Name: Yam Yih HwanID: 0305861Year: Jan/2012Lecturer: Pn. Hasmanira
Introduction to ConstructionIndustry Portfolio
Mind-Mapping
Assignment 1a
Process
Done with all the basic
sketching, engineer drawn by
me.
Hand drawn, Taylor’s Logo!
Working on the coloring parts.
Mind-Mapping
The end product for mind-mapping! :)
0 It helps to generate more ideas through brainstorming session and provide a different point of view for each particular in order to bring up more ideas.
0 It helps to develop skills in summarizing the information of definition, construction process, team players, classification, stages in construction into a more specific words in order to gain understand through the mind-mapping.
Learning Outcomes
Collage
Assignment 1b
Collage
The end product for C.I. & Factory collage.
0 It learns about the general overview of construction industry from mankind perspective which can be derived from different point of views.
0 It helps to assess the students understanding on the general construction process from the sketch plan to completion of a building and introduce the scope of work handled by the players involved.
Learning Outcomes
Design a Vacant Lot
Assignment 2
Vacant Lot
Multipurpose Stage
AquariumAquarium
Seats
Aquarium
Multipurpose Stage
Aquarium
Sea
ts
3-D Landscape
3-D Site Design
Our design from the vacant lot we selected.
0 It enables to develop an understanding of client responsibilities and their needs in industry and how client creates idea and their intention for a project.
0 It learns to make full use of a vacant space, turn something out of nothing by designing it through the client needs.
0 It emphasis on the importance of site selection and observation base on the site chosen.
Learning Outcomes
Video Recording
Assignment 3a
Behind the scenesWhat we did during our video
recording, we worked as a group to complete the video and had a lot of
fun throughout this recording.
ICI Video Making
The video created by us based on an article. (http://www.youtube.com/watch?v=2HprtCyMmdM&feature=share )
Learning Outcomes0 It gives good experience to us by letting us know the
behavior of society nowadays.
0 It emphasis on the parties involved in the construction industry and their involvement through a project.
0 It helps to develop an awareness of their professional responsibilities and to appreciate the importance of their profession in the construction industry.
Interview with Q.S.
Assignment 3b
0What is the work involved? It is about the 5 distinct stages as you mentioned, Preliminary Stage, Detailed Design Stage, Tender Stage, Construction Stage, Post- Construction Stage, can you briefly explain all the stages?
0Can you tell us the process of getting plan approval, is there any problems encountered? Any amendments to the original submission as per request by authority?
0As a quantity surveyor, how frequent does you carry out site inspection to check the work process?
Interview Questions
0We know that you are required to send in a proposal about the constructions costs, constructions materials and labor activities on particular project in order to get a contract approval from the authority, can you elaborate in details of this proposal?
0After site inspection, do you report the work process to Project Manager or Project Director? What does the report is all about, can you specify it?
0Does a quantity surveyor important in a construction? What are the advantages for having a quantity surveyor and the disadvantages for not having a quantity surveyor?
Interview Questions
Learning Outcomes
0 It introduces the scope of work handled by quantity surveyor in construction with regards to their responsibility and duties in completing a construction project.
0 It explains the need of compliance to particular requirements in obtaining authority approval.
0 It gains the ability to document their observations and research as well as to communicate their findings.
Overall, Introduction to Construction Industry is a beneficial subject to students who is going to advance into Architecture and Quantity Surveyor. It helps students to work as a team to finish up a given project. Besides that, it brings understanding of a construction process, on the way we interview a profession and documentation of proposal.
Conclusion