M cKenney’s completed a complex radon remediation project at a condominium development. THE CHALLENGE The McKenney’s team was contracted to lower radon levels by installing Energy Recovery Ventilators (ERV) in a finished 200-unit condominium complex—half of which were occupied. Existing homeowners wanted reassurance that McKenney’s would respect their homes and uphold high quality standards. Varied floor plans and different construction methods within the same plan made ERV installation especially complicated. THE SOLUTION The team established a pre-task plan and met with 100 homeowners to address individ- ual schedules, expectations and concerns. To contend with inconsistent floor plans, the installer located space above closet ceilings to mount ERV units, and a subcon- tractor installed access doors. Holes were cut in sheetrock and soffits to install flexible duct- work and in the building exterior for venting. All holes were patched, sanded and painted. THE RESULTS Following successful ERV installation in more than 200 homes, independent testing showed radon levels had dropped well below Environ- mental Protection Agency requirements. Helping Homeowners Breathe Easy PROJECT NAME Multifamily Housing Radon Remediation PROJECT LOCATION Atlanta, Georgia PROJECT TEAM Owner: Property Developer Contractor: McKenney’s, Inc. SPECIALIZATIONS N/A MARKETS Mixed-use & Multifamily The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Helping Homeowners Breathe Easy - Multifamily & Mixed-Use Construction

Embed Size (px)

Citation preview

McKenney’s completed a complex radon remediation project at a condominium development.

THE CHALLENGEThe McKenney’s team was contracted to lower radon levels by installing Energy Recovery Ventilators (ERV) in a finished 200-unit condominium complex—half of which were occupied. Existing homeowners wanted reassurance that McKenney’s would

respect their homes and uphold high quality standards. Varied floor plans and different construction methods within the same plan made ERV installation especially complicated.

THE SOLUTIONThe team established a pre-task plan and met with 100 homeowners to address individ-ual schedules, expectations and concerns. To contend with inconsistent floor plans, the installer located space above closet

ceilings to mount ERV units, and a subcon-tractor installed access doors. Holes were cut in sheetrock and soffits to install flexible duct-work and in the building exterior for venting. All holes were patched, sanded and painted.

THE RESULTSFollowing successful ERV installation in more than 200 homes, independent testing showed radon levels had dropped well below Environ-mental Protection Agency requirements.

Helping Homeowners Breathe EasyPROJECT NAME

� Multifamily Housing Radon Remediation

PROJECT LOCATION

� Atlanta, Georgia

PROJECT TEAM

� Owner: Property Developer

� Contractor: McKenney’s, Inc.

SPECIALIZATIONS

N/A

MARKETS

� Mixed-use & Multifamily

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]