experiences of a supply chain partner Niall Rogers Enisca Group

Experiences of a Supply Chain partner | Niall Rogers | Enisca

Embed Size (px)

Citation preview

Page 1: Experiences of a Supply Chain partner | Niall Rogers | Enisca

experiences of a supply

chain partnerNiall Rogers

Enisca Group

Page 2: Experiences of a Supply Chain partner | Niall Rogers | Enisca

our businessWe are a multi disciplinary design, manufacturing and engineering business operating in the Water Sector

• We are MEICA-Process designer

• We are a manufacturer of products

• We are a contractor

• We are a support services provider

Page 3: Experiences of a Supply Chain partner | Niall Rogers | Enisca

our locations• Group Head Office - Cookstown

• JF Andrews - Enniskillen

• Profitec Solutions - Pomeroy

• South of England – Balcombe Depot, Enfield (EB), Snodland (Co-Located)

• Scotland - Livingston

Also Regional Hubs

Page 4: Experiences of a Supply Chain partner | Niall Rogers | Enisca

our capabilities• Concept/Outline/Detailed MEICA-Process Design • LV Switchboard & MCC Design and Manufacture• Systems Design and Integration• Product Design and Manufacture• On-site MEICA Installation• Testing & Commissioning• Plant Monitoring and Operation• Plant Maintenance (Planned & Reactive)• Turnkey Delivery

Page 5: Experiences of a Supply Chain partner | Niall Rogers | Enisca

our frameworksLong-term Framework Contracts have been a deliberate objective and Enisca are currently engaged on:

• Scottish Water Q&SIV Non Infra Tier 1 & Rural Framework

• South East Water AMP6 Minor & Intermediate Non-Infra Frameworks

• Environment Agency South East Hub & Pump and Panel Frameworks

• NIW Blower, Pump, Generator & Screens Framework

• NIW Non Infra LOT 2 – Quinn Contracts• NIW Non Infra LOT 1 – Graham Construction• Wessex Water EM&I Framework

Page 6: Experiences of a Supply Chain partner | Niall Rogers | Enisca

Northern Ireland Water• First project delivered to our home client from

our Cookstown office back in 2002

• Presently delivering a range of supply, reactive and capital maintenance programmes for NIW across 6 No long term Frameworks

• Providing 24/7/365 Reactive Crew support on our ‘C680 Pump Framework’ using a Fieldmotion work flow management system specifically adapted for this Contract

Page 7: Experiences of a Supply Chain partner | Niall Rogers | Enisca

Scottish Water

• Tier 1 Delivery Partner in Scotland since 2005 • Works delivered pan Scotland

through the Q&SIIIa & IIIb 5 year investment cycles• We have recently secured Tier 1

status for the next 6 years

Page 8: Experiences of a Supply Chain partner | Niall Rogers | Enisca

• Enisca has been a Tier 1 Delivery Partner in South East Water since AMP5

• Successfully secured Tier 1 status to deliver their Minor and Intermediate Programmes for AMP6 with opportunity to extend to AMP8

• Delivered by our Enisca Browne team working from collocated offices in Snodland and our office/depot at Balcombe

• In addition we are term Framework Supplier for MCCs

South East Water

Page 9: Experiences of a Supply Chain partner | Niall Rogers | Enisca

innovation – products

Innovative products developed to reduce capital and operational costs delivering savings for our Clients

The PumpPodTM – a past winner of Institute of Water Northern Ireland Area Innovation Challenge ‘An intelligent, integrated water pressure boosting system prefabricated offsite for delivery as a plug and play solution’

Biosettler – a £500K R&D investment in an innovative tertiary treatment pod that can be retrofitted into existing failing waste water treatment plants - a collaborative project between Enisca and the Queens University Belfast

Page 10: Experiences of a Supply Chain partner | Niall Rogers | Enisca

innovative workingInnovative approach to working also delivers benefits for our Clients

ICAT R&D – Profitec Solutions supporting NI Water’s PC15 Energy Efficiency & ICAT Programme developing Signature Designs for Service Reservoirs & WPS - These innovative control systems collaboratively developed with NIW improve compliance, increase network resilience whilst simultaneously reducing energy costs

In-situ MCC Replacement – innovative build method reducing the risk of loss of supply by reducing shutdowns and completely negating the need for temporary power generation on-site

Page 11: Experiences of a Supply Chain partner | Niall Rogers | Enisca

And looking to the future ………

• DfMA – expand our DfMA off-site modular build techniques across all existing and new products

• Move towards offering our services via digital construction platforms using modern design, visualisation and simulation tools… BIM

• Continue to collaborate with our Customers, Clients and our Supply Chain Partners to drive Innovation

Page 12: Experiences of a Supply Chain partner | Niall Rogers | Enisca

The Enisca Group looks forward to continued sustainable growth in the Water Sector