23
1 © Copyright 2015 EMC Corporation. All rights reserved. © Copyright 2015 EMC Corporation. All rights reserved. EMC ENTERPRISE CONTENT DIVISION - Performances Analysis, Monitoring and Securing

EMC AEROW offer Troubleshooting Performances

Embed Size (px)

Citation preview

1© Copyright 2015 EMC Corporation. All rights reserved.© Copyright 2015 EMC Corporation. All rights reserved.

EMC ENTERPRISE CONTENT DIVISION -

Performances Analysis, Monitoring and Securing

2© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Offering

EMC/ECD, an ECM solutions’ Editor, and Aerow Performance, a

company specialized in the measurement and analysis of

performance, partner today to offer you a set of packs dedicated

to ensure the proper functioning of your Documentum solutions.

This offer is based on 3 packs:

– « Trouble shooting » Pack : identify and fix the sooner the reasons for

malfunction of an application in production

– « Monitoring » Pack : Monitor and objectify the behavior of your

application, and anticipate problems

– « Performances » Pack : Validate the performance of your

application before putting it into production

3© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Offering : The packs

Troubleshooting Monitoring Performances

Customer Background:

Dysfunction of the environment, delays, service

interruptions

Pack Content:

Analysis of your EMC Documentum platform,

survey and metrics’ analysis,

recommendations, reports

Goal

Identify the potential causes of mal-packaging

& make recommendations for short-medium-

long term, to stabilize the application and set

up an action plan

Customer Background :

Need for surveillance of a Documentum in

Production application

Pack Content :

Implementation & loan of monitoring tools,

information survey, consolidation of results,

periodic reports

Goal :

Monitor the application on a relevant period

(response time, problems & load of the

platform) to objectify user’s feeling

Customer Background :

Application release into production, Migration

or change in architecture

Pack Content :

Definition of the test plan, Scripting of business

scenarios, tests simulation, Consolidation of

results, recommendations and report

Goal :

Measure the performance of an application, on

the basis of simulated business scenarios.

Validate the performance of the application

before going live

4© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack

5© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack : Background

Your Documentum application - D2 or xCP - presents

malfunctions or performance issues, resulting in a significant

degradation of service to users. One of the following

problems is frequently encountered:

• Interruption of service by stopping one of the components of

the architecture;

• Random degradation of performance in the day, or at certain

times of the day;

• Targeted and persistent slowness problems on some features.

6© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack : Goal

The goals of this pack are the following:

• Identify the potential causes of malfunctions by collecting the

metrics over the different layers of the application,

• Make recommendations in the short/medium/long term, to

help the customer to:

▪ As a first step: stabilize the application in production and improve the user’s

experience;

▪ In a second step: set up an action plan to address all of the identified

points.

7© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack : Methodology

Step 1 : Collecting technical and business information

• Low Layers• Statement and analysis of the system’s metric (CPU/ memory / network etc.)

• Statement of the network’s metrics around machines involved

• Statement of the configurations of the machines

• Application Layer• Statement of the configurations of the applications other than Documentum

(application servers, Web servers, Middleware...)

• Research and classification of errors, incidents and defects

• Business Layer• Statement and classification of the transaction activity statistics

• Statement of responses Time for critical transactions by unitary test

• Prerequisites: EMC/Aerow consultants will need to access the above mentioned data. For this, it is necessary only to technicians of the client with the necessary clearances (System Administrator, responsible for the application,) are available during the audit, to provide the data.

8© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack : Methodology

Step 2 : Analysis

• Metrics Analysis, implementation perspectives of technical and

business layers, verification of incidents and correlation

between layers.

• Correlating with the Documentum items.

Step 3 : Report and Recommendations

• Preparation of a detailed report and a summary report.

• Technical and architectural recommendations

Step 4 : Oral Report presentation

9© Copyright 2015 EMC Corporation. All rights reserved.

« Troubleshooting » Pack : Engagement and price

Fix fees package, materialized by an Audit report.

Done within a maximum of one week

Profiles involved

– Sr. Consultant, Performances Specialist

– Sr. Consultant, Documentum Product Expert

Price: 10 400 € HT

10© Copyright 2015 EMC Corporation. All rights reserved.

« Monitoring » Packs

11© Copyright 2015 EMC Corporation. All rights reserved.

« Monitoring » Packs : Background

Customer have a Documentum application - D2 or xCP -

running in production;

Customer wants to monitor the application’s behavior during

one day, and/or within a defined period

Customer wants to objectify some negative feelings from the

users

Customer wants to control the service’s quality rendered to

the users and provide actual indicators

12© Copyright 2015 EMC Corporation. All rights reserved.

« Monitoring » Pack : Goals

The goals of this pack are :

• Monitor the application on a significant period :

• Response time for functionality and/or URL considered as sensitive,

• Incidents of type “interruption of certain sensitive services”,

• Platform workload.

• Objectify user’s feeling

• Give a factual view of your application’s behavior over a

significant period, and within the actual conditions of use.

13© Copyright 2015 EMC Corporation. All rights reserved.

« Monitoring » Pack : Content

• Offering’s content is the following

• Define 10 points of measurement with the customer

• Setup and install the Monitoring environment[1]

• Collect & Analyze data

• Provide a monthly report tracking the record of all the platform

activity,

• Two options pack:

• Trial offer limited to one month

• One Year Pack

[1], our offering includes the subscription for the monitoring tool NeoSense © by Neotys ® within the whole period of engagement

14© Copyright 2015 EMC Corporation. All rights reserved.

« Monitoring » Pack : Engagement and price

Fix fee package, materialized by following deliverables:

– Implementation, configuration & maintenance of the

monitoring platform

– Collection of information, interpretation and monthly reports

Profiles

– Sr. Consultant, Performances Specialist

– Sr. Consultant, Product Expert

Price

– Trial: 4 850 € (VAT Excluded)

– Pack 1 year: TBD

15© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Pack

16© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Pack : Background

You plan to soon put a Documentum application - D2 or xCP – into production and you want to validate its performance first.

You plan to upgrade a Documentum application - D2 or xCP -to a later version, and you want to ensure the continuation of the performance of this application, prior to deployment.

You plan an evolution of the architecture that supports your Documentum application - D2 or xCP - changing, for instance, the system database, and you want to ensure the continuation of the performance of this application prior to this change, in order to validate it.

17© Copyright 2015 EMC Corporation. All rights reserved.

« Performances »Pack : Goals

The goals for this offer are :

– Measure the performance of an application, on the basis of simulated business scenarios ,

– Implement means for testing and measurement

– Measure the performance of the application before production, after version change or change in a component of the architecture

– Validate the workload your application can withstand

– Identify possible points of restraints and the axes of improvement to consider

– Precisely analyze the behavior of the database and identify the potential causes (optional)

[1] By default, our "Performance" includes rent upon the commitment period, the tool Neotys® NeoLoad ©for load and performance simulation

18© Copyright 2015 EMC Corporation. All rights reserved.

« Performances »Pack : Scenarios

Types of scenarios included in the offer– Research: 1 scenario chaining 8 screens max.,

– Consultation: 1 scenario stringing together 10 screens max.,

– Contribution: 1 script stringing together 10 screens max.,

– Workflow: 1 script stringing together 20 screens max..

Different Packs and Options, depending on your needs :– Depending on the context

▪ Going live with an application

▪ Comparison before and after migration

▪ Comparison before and after a change in architecture (Same Documentum release)

– Depending on the number of users to simulate▪ Pack «50 concurrent users.

▪ Pack «250 concurrent users »

▪ Pack «500 concurrent users »

▪ Pack «1,000 concurrent users »

– Depending on the level of analysis desired▪ Option detailed analysis of the behavior of the database (Oracle only)

19© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Pack : Organization

This offer is structured around 5 main steps– Definition of the test plan, based on your functional scenarios

– Implementation and configuration of the test platform

– Creation of scripts and test scenarios

– Execution of shots and “hot” analysis

– Overall analysis and drafting of the final report

The report issued at the end of this study will contain particularly:– A reminder of the goals of the scalability test.

– Test conditions.

– The detailed 'Road map' used for the test execution.

– Measurements done

– Analysis of the scalability testing

– The conclusion on the State of the system

– The recommendations for optimization

[1] Shots run duplicate environments source (reference) and target in 'Documentum Migration' and «Change of Technical Architecture» contexts

20© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Pack : Engagement

Fix fee Package, materialized by following deliverables:

– Performance measurement scripts

– Tests execution

– "Flash Reports" after each group of test

– Overall analysis report and recommendations

Profiles

– Sr. Consultant, Performances Specialist

– Sr. Consultant, Product Expert

– Sr. DBA (In case of option being selected)

21© Copyright 2015 EMC Corporation. All rights reserved.

« Performances » Pack : Price

Work Package Background

Initial Study Go LiveDocumentum

Migration

Architecture

Change

« Performances » Pack 50 VU 19 900 € HT 26 900€ HT 22 900 € HT

« Performances » Pack 250 VU 26 900 € HT 33 900 € HT 28 900 € HT

« Performances » Pack 500 VU 29 900 € HT 36 900 € HT 31 900 € HT

« Performances » Pack 1 000 VU 39 900 € HT 46 900 € HT 42 900 € HT

Options

Option #1 : In-depth analysis of the database (if

option selected)7 500€ HT

22© Copyright 2015 EMC Corporation. All rights reserved.