Presentation on Industrial Processing Bamboo

11/11/11

Addis Ababa, Ethiopia

Khalid M. DURI

Page 2: EGK 2011: Agriculture 07 FORTUNE

2Overview

Page 3: EGK 2011: Agriculture 07 FORTUNE

3Agenda

• Objective

• Bamboo Market

• Bamboo in Ethiopia

• Current Status

• Supply Chain

• Industrial Processing of Bamboo

• International Market for Bamboo Products

• Stakeholders

Page 4: EGK 2011: Agriculture 07 FORTUNE

4

Key success factors:

• Tubes of Ethiopian highland bamboo are more straight, contain less starch and more fibre than the Chinese Moso varieties, making it very suitable for outdoor applications.

• Lower labour costs & raw material price (-20%) than China

• Incentives Ethiopian government: profit tax holiday and zero import tax

• Technical assistance secured

• Experienced international Staff 20 Germans and 5 Chinese

• High certified quality (EN350-2; E1, EN-350-Part 1, EN 335, CEN/TS 15083, EN 113, EN ISO/IEC 17025:2005, ISO 14000; ISO 9001)

• Cooperation and market access through Elephant Bambusprodukte GmbH.

Objective & strategy

Fortune Enterprise will become an African exporter of compressed panels and decking material produced from domestically grown bamboo, thereby providing the world market with a highly competitive alternative for hardwood composites and bamboo products from China.

Page 5: EGK 2011: Agriculture 07 FORTUNE

5

Specific company objectives:

1. Source bamboo splits through an outgrower scheme and own plantations in Ambo and Sidama

• outgrower scheme: 2,000 ha, 4,000 farmers organized in some 30 coops, 30 collections centres

• 1,500 ha plantation, 500 ha established per year from own nursery (cuttings)

• at full capacity, factory requires 2,2 mio culms annually

• first four years, raw material supply solely through outgrowers

• first harvest plantation in yr 4 (8%), full productivity yr 12

2. Establish industrial bamboo production in Ethiopia consisting of two regional pre-processing plants (Tikur Inchini , Ambo and Titicha, Sidame) and a main factory in Welmera producing compressed panels destined for the export market.

3. Produce 245,000 m2 of compressed bamboo panels during first year of production (2013) worth Eur 3.9 Mio, increasing to 500,000 m2 per year from year 3 onwards (2016) worth Eur 15 Mio.

4. To lay the ground for further investments in the Ethiopian bamboo sector. Investing in more private plantations and product diversification.

Objective & strategy

Page 6: EGK 2011: Agriculture 07 FORTUNE

6

• Bamboo Task Force

• In October 2009, Public Private Partnership worth € 400,000. Main activities:

- analysis into competiveness of Ethiopia bamboo

- numerous feasibility studies to determine technology and product

- market & technology investigation in Europe and China

- Initial inventory and assessment of standing bamboo culms in Ambo and Sidama

- prototypes development from Ethiopian Bamboo species for testing and certification at Fraunhofer Institute for Wood Research

- establishment of outgrowers scheme in Ambo, encompassing over 250 farmers organised in 5 Coops

What has been done ( 2009-2011)

Page 7: EGK 2011: Agriculture 07 FORTUNE

7

• Commercial contract with Elephant Bambusprodukte GmbH for the first 750,000m2

valued at EUR 18.75m annually for next five years.

• Profound technical assistance secured during the start up phase of the project.

• Land secured for plantation development ( 1,500 ha at two different regions), nursery site ( 1 ha each, at two locations), pre-processing plants ( 5 ha each, at two locations), and main factory ( 10 ha).

• Finalization of proforma based machinery and equipment list.

• Finalized production planning and flow chart.

• Award of highly competitive grant programme in June 2011 to Elephant and FE partnership, funded through the Dutch Private Sector Investment Programme (PSI). The total project budget is € 1.5 mio of which 50% is a result-based grant.

• Raised debt totalling Eur 7Mio, raised Eur 5M in Equity, total Project Budget Eur 12M

What has been done ( 2009-2011)

Page 8: EGK 2011: Agriculture 07 FORTUNE

8Bamboo Development 2011 - 2013

PPP with GIZ

AcquiringThird Party Funding

Strategic Alliance

Private Sector Investment

Long Term Loan

International Climate Initiative

EU Energy Facility

Page 9: EGK 2011: Agriculture 07 FORTUNE

9Bamboo Development 2009 - 2011

PPP with GIZ

Market Development

Page 10: EGK 2011: Agriculture 07 FORTUNE

10Bamboo Development 2009 - 2011

PPP with GIZ

Page 11: EGK 2011: Agriculture 07 FORTUNE

11Bamboo Resource in Ethiopia

• Ethiopia has 1 million ha of bamboo

• It accounts to 67% of African‘s bamboo resource

• 30% being high land bamboo and

• 70% is low land bamboo

Page 12: EGK 2011: Agriculture 07 FORTUNE

12

Status quo of Bamboo in Ethiopia

+ ETH accounts for 67% of Africa's Bamboo resource

+ 1 Mio. ha Bamboo coverage in total (estimation)

+ 30% highland, 70% lowland bamboo

+ Bamboo is one of the fastest growing plants on earth

with great potential for reducing pressure on forests

+ a quickly-renewing and sustainable source of biomass

+ vital role in environmental amelioration, bio-diversity

preservation, soil and water conservation

+ can serve as substitute for traditional woods which are

mostly imported from abroad due to their scarcity in

Ethiopia

Page 13: EGK 2011: Agriculture 07 FORTUNE

13

Status quo of Bamboo in Ethiopia

-- Image Problem

• Value of Bamboo has not been recognized yet• Unawareness about high quality of Bamboo

- Weakness of the Economic Environment• State-led and NGO initiatives of the past have promoted the

bamboo sector only on household level• Development of the private sector has been insignificant so far• No industrial use of Bamboo so far

- Lack of Credit and Financing• No microfinance for MSEs like farmers and cooperatives so far• Poor capital endowment and access to credits have prevented

industries from up-scaling their bamboo-related activities

Page 14: EGK 2011: Agriculture 07 FORTUNE

Bamboo resource map of Ethiopia

Page 15: EGK 2011: Agriculture 07 FORTUNE

15

WOOD INDUSTRY

Private sector, SMEs, Investment Agency, Export Promotion

Banks, MFIsMoTI, MoARD

Machinery/Glue manufacturersSub-sectors

INSTITUTES

Ethiopian/International Universities

Cluster of Excellence Student workshopsPractical curricula

Twinning arrangementsFocus areas: machinery,

design, glue

SUPPLY CHAIN

InstitutionalizationSix more locations

Support for CooperativesCommercial FS

Market Assessment Plan

STANDARDS/QUALITYTesting centers

Technical CommitteeAdapt EU+ISO Standards

Produce Quality Manuals Fraunhofer Institute

Ethiopian Standard Authority

MARKET

Import substitutionExport/National Market

Participation in trade fairs Marketing

Fair Trade Certificate

ENVIRONMENT/FORESTRY

Bamboo Baseline InventoryImpact Assessment

Develop carbon credit schemeForest Stewardship Council

Sustainable Participatory Forest Management

Establishment of a Wood Processing

Industry in Ethiopia

Establishment of a Wood Processing Industry in Ethiopia

Page 16: EGK 2011: Agriculture 07 FORTUNE

16Core Areas of Resource

Page 17: EGK 2011: Agriculture 07 FORTUNE

17Characteristics of Yushania alpina

• Yushania alpina is high land bamboo

• Height is 5-19.5 meters(average12 m.)

• The diameter ranges from 5-12.5cm

• The average weight is 8 kgs (oven dry wt)

Page 18: EGK 2011: Agriculture 07 FORTUNE

Supply chain Raw material resource.

1 – From existing farmers bamboo plots (2000 ha)

2- Establishing our own bamboo plantation (1500 ha)

Page 19: EGK 2011: Agriculture 07 FORTUNE

19Supply Chain Model

4,000 Farmers -> 2,000 ha -> 1,000 culms/ha -> 2 Mio culms/year

2 Mio culms/year

30 Regional Collection Centers

Page 20: EGK 2011: Agriculture 07 FORTUNE
Page 21: EGK 2011: Agriculture 07 FORTUNE

21Scope of the involvement

• 4000 farmers

• Average of 0.5 ha

• 30 cooperatives

2000 hectares of

bamboo plots

2 million culms per year at the beginning

Page 22: EGK 2011: Agriculture 07 FORTUNE

22Farmers bamboo plots

Page 23: EGK 2011: Agriculture 07 FORTUNE

23Bamboo Supply Chain

Bamboo Farmer Bamboo Farmer

Bamboo Farmer Bamboo Farmer

Bamboo Farmer Bamboo Farmer

Bamboo Farmer Bamboo Farmer

Bamboo Cooperative

Bamboo Farmer ABamboo Farmer A

Bamboo Farmer BBamboo Farmer B

Bamboo Farmer CBamboo Farmer C

Bamboo Cooperative

Bamboo CooperativeCollection center

Bamboo CooperativeCollection center

Bamboo Pre-Processing Plant in Tikur Inchini

- removal of nods- boiling- carbonizing,- drying- storage- ….

Bamboo Pre-Processing Plant in Tikur Inchini

- removal of nods- boiling- carbonizing,- drying- storage- ….

Bamboo Pre-Processing Plant in Tetecaha - nod removal - boiling- carbonizing,- drying--storage

Bamboo Pre-Processing Plant in Tetecaha - nod removal - boiling- carbonizing,- drying--storage

Main factory at Wolmera

Sidama 70%

Ambo 30%

Page 24: EGK 2011: Agriculture 07 FORTUNE

24

Production Calculation and Processing

Page 25: EGK 2011: Agriculture 07 FORTUNE

25

General Production Flow Chart of WSBCooperatives Collection centers Pre-processing Main Industry Customer

Aethiopic Alpine Bamboo

 

Page 26: EGK 2011: Agriculture 07 FORTUNE

26

Collection Centers

Page 27: EGK 2011: Agriculture 07 FORTUNE

27

Pre-processing Plant – Sidama and Ambo

Page 28: EGK 2011: Agriculture 07 FORTUNE

28

Industrial Plant until Hot Press

Page 29: EGK 2011: Agriculture 07 FORTUNE

29Industrial Plant After Hot Press

Page 30: EGK 2011: Agriculture 07 FORTUNE

30

Overall Material BalanceTon/Year Ton/day Containers/day

Fresh bamboo 40920 205 10

Dry matter 19032 95

Moisture/Water 21887 109

After dry matter loss 20%Total dry 15226 76 4

starch 1066 5

Other than starch 14160 71

After Starch removalFrom 7% to 2%

Total dry 14449 72 4

Starch 289 1.4

Other starch 14160 71

Glue consumption 2102 6 0.3

Page 31: EGK 2011: Agriculture 07 FORTUNE

31 90,144 panel/year 14,016 m³/year 16,118 tons/year 247 panel/day 38 m³/day 44 tons/day

1,442,304 boards/year

9,854 m³/year

3,952 boards/day

27 m³/day

492,691m²/year 11,332 tons/year

1,350 m²/day 31 tons/day

Panel production (2600x1300x46mm)

Final Board production (2440x140x20mm)

Oil 0.039284 l/board 56,659 l/year 155 l/day

Page 32: EGK 2011: Agriculture 07 FORTUNE

32

594 Containers/year

≈2 Containers/day

Page 33: EGK 2011: Agriculture 07 FORTUNE

33

Production flow and

Machinery Layout

Page 34: EGK 2011: Agriculture 07 FORTUNE

34China study tour

• Fortune Enterprise has done a study tour to China two times to understand the WSB production scheme.

• Some of the WSB production factories visited in china were: 1. Werner flooring

2. Anhui Fengtian Bamboo Manufacturing

3. Wuxi Senda Bamboo & Wood Products CO.LTD.

4. Xingli ( Everjade) Bamboo Products Co

5. Three WSB factories in Anji province

6. DASSO flooring …etc

Page 35: EGK 2011: Agriculture 07 FORTUNE

35China study tour

• Fortune Enterprise after visiting some WSB factories in China , has selected the below stated machines for its production of WSB outdoor decking.

Page 36: EGK 2011: Agriculture 07 FORTUNE

36Source of Bamboo

• 30 Bamboo Co-operatives

• 2 million bamboo culms

Page 37: EGK 2011: Agriculture 07 FORTUNE

37 Collection Center

Manual Cutting

Manual splitting

Page 38: EGK 2011: Agriculture 07 FORTUNE

38

Pre-Processing plant ( bamboo culm processing machine)

Cutting machine

Splitting machine

Node remover

Slicing machine

Crushing machine

Blade glinder

Page 39: EGK 2011: Agriculture 07 FORTUNE

39

Pre-processing plant (starch removing process)

Bleaching tab Carbonizer

Drying tunnel

Page 40: EGK 2011: Agriculture 07 FORTUNE

40Pre-Processing (Transportation)

Trolley

Motor bike

Tractor

forklift

Pallet carrier Trailer

truck

Page 41: EGK 2011: Agriculture 07 FORTUNE

41Pre-Processing (supplementaries)

Gen set Steam Boiler

transformers Sewer purification Air compressor

Page 42: EGK 2011: Agriculture 07 FORTUNE

42Main Industrial Plant

Crushing machine

Drying tunnel before glue

Page 43: EGK 2011: Agriculture 07 FORTUNE

43Main Industrial plant (Glue )

Glue MixerGlue reactor

Glue Immersing pool and

electric hoist

Glue drying tunnel.

Page 44: EGK 2011: Agriculture 07 FORTUNE

44Main Industrial plant (hot press)

Page 45: EGK 2011: Agriculture 07 FORTUNE

45

Main Industrial plant ( after the press machineries)

Length cutting

Width cutting and plank dividing machine

Four side planning and

slicing machine

Curing chamber

Page 46: EGK 2011: Agriculture 07 FORTUNE

46

Main Industrial plant ( after the press machineries)

Top bottom sanding

Width Endgrooving (tongue and

groove)

Riffiling, profiling, Length

grooving

Universal Tool Grinder

Page 47: EGK 2011: Agriculture 07 FORTUNE

47Main Industrial plant ( oiling)

Oiling machine Drying tunnel

Page 48: EGK 2011: Agriculture 07 FORTUNE

48Main industrial plant ( packaging)

Pack

agin

g m

achi

ne

pallets Wrapping machine Strapping roll

cartons

Page 49: EGK 2011: Agriculture 07 FORTUNE

49Main Industrial Plant ( Transportation)

Truck

forklift

Pallet carrier

Page 50: EGK 2011: Agriculture 07 FORTUNE

50Main Industrial plant (supplementaries)

Gen set Boiler

Transformers Air compressor

Page 51: EGK 2011: Agriculture 07 FORTUNE

51Main Industrial plant (supplementary)

Waste gas treatment

Dust extraction

Weighing scale

Weighing bridge

Page 52: EGK 2011: Agriculture 07 FORTUNE

52Machinery supplier visited

• Fortune Enterprise has visited many bamboo making machinery companies

• Some of the companies visited are:1. Qingdao Guosen

2. Anji Yukang Machinery

3. Hangzhou Garden Corporation

4. Shanghai Wood Based Panel Machinery - Dieffenbacher Group

5. Fujian Jinmen

6. Changshan hot Press manufacturer .. etc

Page 53: EGK 2011: Agriculture 07 FORTUNE

53Machinery supplier selected

• Form the companies visited Guosen, Anji Yukang and Garden corporation has provided quotation for the full line machineries.

• From the information gathered Guosen presses are currently big in the market.

• They have provided us reasonably better specification of the machineries compared to the other two manufacturers.

• even if Also Guosen is a bit expensive in price, compared to the other two they have helped us with our production flow, machinery requirement and factory design.

• Finally after considering the above selection criteria's, We have decided to buy the full line machineries from Qingdao Guosen.

Page 54: EGK 2011: Agriculture 07 FORTUNE

54

Design and Construction

Page 55: EGK 2011: Agriculture 07 FORTUNE

55Design & Construction

1. Design & Construction of the Plant Collection Centers Pre-processing Plant Main industrial factory

Page 56: EGK 2011: Agriculture 07 FORTUNE

56Collection Center Plan

Total Area of the collection Center =1762 m2

Total Built Up Area=338 m2

Page 57: EGK 2011: Agriculture 07 FORTUNE

57Collection Centers…

Page 58: EGK 2011: Agriculture 07 FORTUNE

58

• The two Pre-Processing plants are located

1. Sidama Zone, Tetecha Wereda,355 km from Addis Ababa.

Total Area allocated=50,000 m2

2. West Shewa Zone,Tikur inchini,147 Km from Addis Ababa.

Total Area allocated=50,000 m2

Pre-Processing Plant

Page 59: EGK 2011: Agriculture 07 FORTUNE

59Pre-processing Plant site at Tetecha

Page 60: EGK 2011: Agriculture 07 FORTUNE

60

Page 61: EGK 2011: Agriculture 07 FORTUNE

61Locations of the proposed plants

Tetecha

Page 62: EGK 2011: Agriculture 07 FORTUNE

62

• The construction of the pre-processing plants

Can be categorized in to two:

1. Sub-structure-Mainly includes, Excavations, earth works and flooring either with concrete or cobble stone.

2. Super structure-Mainly includes Construction of bamboo columns, beams and trusses.

Construction of the preprocessing plants

Page 63: EGK 2011: Agriculture 07 FORTUNE

63Proposed bamboo structures

Page 64: EGK 2011: Agriculture 07 FORTUNE

64

• The Main industrial plants is located

1. West Shewa Zone, Wolmera Wereda,20 Km from Addis Ababa.

Total Area allocated=100,000 m2

Main Industrial Factory

Page 65: EGK 2011: Agriculture 07 FORTUNE

65Main industrial Factory Google Map

Page 66: EGK 2011: Agriculture 07 FORTUNE

66

Page 67: EGK 2011: Agriculture 07 FORTUNE

67Plan of the main Industry at Wolmera

Page 68: EGK 2011: Agriculture 07 FORTUNE

68Bamboo Development 2011 - 2013

Private Sector Investment

Page 69: EGK 2011: Agriculture 07 FORTUNE

69 • Thank you for your attention